|
|
Line 2: |
Line 2: |
| | number = ML20118C096 | | | number = ML20118C096 |
| | issue date = 10/02/1992 | | | issue date = 10/02/1992 |
| | title = Responds to NRC 920904 Ltr Re Violation Noted in Safety Insp Repts 50-206/92-15 & 50-301/92-15 on 920629-0823.Corrective Actions:Procedure Pbnp 4.13, Equipment Isolation.... & Form SEC-79, Escort...Authorization... Being Revised | | | title = Responds to NRC Re Violation Noted in Safety Insp Repts 50-206/92-15 & 50-301/92-15 on 920629-0823.Corrective Actions:Procedure Pbnp 4.13, Equipment Isolation.... & Form SEC-79, Escort...Authorization... Being Revised |
| | author name = Link B | | | author name = Link B |
| | author affiliation = WISCONSIN ELECTRIC POWER CO. | | | author affiliation = WISCONSIN ELECTRIC POWER CO. |
Line 12: |
Line 12: |
| | case reference number = CON-NRC-92-113 | | | case reference number = CON-NRC-92-113 |
| | document report number = VPNPD-92-319, NUDOCS 9210090247 | | | document report number = VPNPD-92-319, NUDOCS 9210090247 |
| | | title reference date = 09-04-1992 |
| | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE | | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE |
| | page count = 6 | | | page count = 6 |
Line 51: |
Line 52: |
| investigation team for the June 10, 1992, event and an ad-hoc interdiccip)inary group formed to review the July 24, 1992, event identified in the 110tice, corrective actions have been taken or are planned to be taken to respond to the identified deficiencies. | | investigation team for the June 10, 1992, event and an ad-hoc interdiccip)inary group formed to review the July 24, 1992, event identified in the 110tice, corrective actions have been taken or are planned to be taken to respond to the identified deficiencies. |
| Thece corrective actions are intended to implement enhanced management controls and practices to ensure conformance to PB!1P 4.13. , | | Thece corrective actions are intended to implement enhanced management controls and practices to ensure conformance to PB!1P 4.13. , |
| We believe that the attached reply is responsive to the concerno and fulfills the regnirements identified in your September 4, 1992, letter. If you have any questions or require additional infor-mation regarding this renponse, please contact us. | | We believe that the attached reply is responsive to the concerno and fulfills the regnirements identified in your {{letter dated|date=September 4, 1992|text=September 4, 1992, letter}}. If you have any questions or require additional infor-mation regarding this renponse, please contact us. |
| Sincerely, e" -r fe'. .. ~) )) | | Sincerely, e" -r fe'. .. ~) )) |
| ~ | | ~ |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARNPL-99-0564, Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability1999-10-19019 October 1999 Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability ML20217A5911999-09-30030 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities.Plant Issues Matrix Encl 05000266/LER-1999-007, Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics1999-09-30030 September 1999 Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics ML20212J7431999-09-30030 September 1999 Forwards Insp Repts 50-266/99-15 & 50-301/99-15 on 990830- 0903.No Violations Noted.Inspectors Concluded That Util Licensed Operator Requalification Training Program Satisfactorily Implemented NPL-99-0555, Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel1999-09-29029 September 1999 Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel ML20212K7651999-09-29029 September 1999 Forwards Insp Repts 50-266/99-13 & 50-301/99-13 on 990714-0830.No Violations Noted.Operators Responded Well to Problems with Unit 1 Instrument Air Leak & Unit 2 Turbine Governor Valve Position Fluctuation ML20212D5771999-09-15015 September 1999 Discusses Review of Response to GL 88-20,suppl 4,requesting All Licensees to Perform Ipeee.Ser,Ter & Supplemental TER Encl ML20211Q6451999-09-0808 September 1999 Forwards Operator Licensing Exam Repts 50-266/99-301OL & 50-301/99-301OL for Exams Conducted on 990726-0802 at Point Beach Npp.All Nine Applicants Passed All Sections of Exam ML20211Q4171999-09-0606 September 1999 Responds to VA Kaminskas by Informing That NRC Tentatively Scheduled Initial Licensing Exam for Operator License Applicants During Weeks of 001016 & 23.Validation of Exam Will Occur at Station During Wk of 000925 05000266/LER-1999-004, Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump1999-09-0202 September 1999 Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump ML20211K5261999-08-31031 August 1999 Forwards Insp Repts 50-266/99-14 & 50-301/99-14 on 990726- 30.Areas Examined within Secutity Program Identified in Rept.No Violations Noted ML20211F6941999-08-27027 August 1999 Provides Individual Exam Results for Applicants That Took Initial License Exam in July & August of 1999.Completed ES-501-2,copy of Each Individual License,Ol Exam Rept, ES-303-1,ES-303-2 & ES-401-8 Encl.Without Encl NPL-99-0473, Informs of Change Being Made to Plan Third 10-year Interval ISI Long Term Plan.Change Extends Interval from Current End Date of 001130 to 020831,due to Operating Cycle Being Increased from 12 to 18 Months1999-08-27027 August 1999 Informs of Change Being Made to Plan Third 10-year Interval ISI Long Term Plan.Change Extends Interval from Current End Date of 001130 to 020831,due to Operating Cycle Being Increased from 12 to 18 Months ML20211E8791999-08-24024 August 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, for Point Beach Nuclear Power Plant,Units 1 & 2.Licensees Provided Requested Info & Responses Required by GL 96-01 ML20211F1501999-08-24024 August 1999 Submits Summary of Meeting Held on 990729,in Region III Office with Util Re Proposed Revs to Plant Emergency Action Level Criteria Used in Classifying Emergencies & Results of Recent Improvement Initiatives in Emergency Preparedness 05000266/LER-1999-006, Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics1999-08-19019 August 1999 Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics NPL-99-0477, Forwards Revised Procedures to Point Beach Nuclear Plant Epips.Revised Procedures Dtd 990723,should Be Filed in NRC Copies of Manual IAW Attached Instructions1999-08-18018 August 1999 Forwards Revised Procedures to Point Beach Nuclear Plant Epips.Revised Procedures Dtd 990723,should Be Filed in NRC Copies of Manual IAW Attached Instructions NPL-99-0426, Requests Relief from Section II of ASME B&PV Code, Nuclear Vessels, 1965 Edition,No Addenda.Detailed Info Attached1999-08-16016 August 1999 Requests Relief from Section II of ASME B&PV Code, Nuclear Vessels, 1965 Edition,No Addenda.Detailed Info Attached ML20210L9141999-08-0404 August 1999 Informs That Versions of Info Re WCAP-14787,submitted in 990622 Application for Amend,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20210K5221999-08-0404 August 1999 Discusses Point Beach Nuclear Plant,Units 1 & 2 Response to Request for Info in GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity NPL-99-0436, Forwards fitness-for-duty Performance Data for six-month Period Ending 9906301999-08-0202 August 1999 Forwards fitness-for-duty Performance Data for six-month Period Ending 990630 ML20210G6011999-07-30030 July 1999 Discusses 990415 Complaint OSHA Received from Employee of Wisconsin Electric Power Co Alleging That Employee Received Lower Performance Appraisal for 1998 Because Employee Raised Safety Concerns While Performing Duties at Point Beach NPL-99-0406, Provides Response to NRC GL 99-02, Lab Testing of Nuclear- Grade Activated Charcoal1999-07-29029 July 1999 Provides Response to NRC GL 99-02, Lab Testing of Nuclear- Grade Activated Charcoal ML20210H0211999-07-28028 July 1999 Forwards Insp Repts 50-266/99-09 & 50-301/99-09 on 990528-0713.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20210G2441999-07-26026 July 1999 Discusses 990714 Meeting with PRA Staff to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA Staff NPL-99-0408, Forwards Pbnps,Units 1 & 2 Plant Simulation Four-Yr Rept, IAW 10CFR55.45(b)(5)(ii).Rept Describes Certification Program Tests Conducted from 1996-1999,identifies Test Discrepancies Still Outstanding & Schedules for 2000-20031999-07-15015 July 1999 Forwards Pbnps,Units 1 & 2 Plant Simulation Four-Yr Rept, IAW 10CFR55.45(b)(5)(ii).Rept Describes Certification Program Tests Conducted from 1996-1999,identifies Test Discrepancies Still Outstanding & Schedules for 2000-2003 ML20209H5471999-07-14014 July 1999 Forwards Insp Repts 50-266/99-12 & 50-301/99-12 on 990614-18.One Violation Noted,But Being Treated as non-cited violation.Long-term MOV Program Not Sufficiently Established to close-out NRC Review of Program,Per GL 89-10 NPL-99-0395, Forwards Partial Response to NRC 990512 RAI Re TS Change 204 Re Control Room Habitability.Meeting Is Planned with NRC to Discuss Issues Related to Control Room & Primary Auxiliary Bldg Ventilation Sys Modifications1999-07-12012 July 1999 Forwards Partial Response to NRC 990512 RAI Re TS Change 204 Re Control Room Habitability.Meeting Is Planned with NRC to Discuss Issues Related to Control Room & Primary Auxiliary Bldg Ventilation Sys Modifications NPL-99-0390, Projects Listed Major near-term License Amend Requests That Could Be Expected to Impact Staff Resources Into Fiscal Years 2000 & 2001,in Response to Administrative Ltr 99-021999-07-0808 July 1999 Projects Listed Major near-term License Amend Requests That Could Be Expected to Impact Staff Resources Into Fiscal Years 2000 & 2001,in Response to Administrative Ltr 99-02 NPL-99-0388, Forwards MORs for June 1999 & Revised MORs for May 1999 for Pbnps,Units 1 & 21999-07-0707 July 1999 Forwards MORs for June 1999 & Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0381, Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl1999-06-30030 June 1999 Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML20196J4161999-06-30030 June 1999 Discusses Relief Requests Submitted by Wisconsin Electric on 980930 for Pump & Valve Inservice Testing Program,Rev 5. Safety Evaluation Authorizing Relief Requests VRR-01,VRR-02, PRR-01 & ROJ-16 Encl NPL-99-0379, Documents Telcon with Hg Ashar of NRC Re Licensee Intentions & Basis for Reselection of Control Tendons in Pbnps Containment Structures.Plants Are Currently Completing 28th Year Tendon Surveillance During Summer of 19991999-06-29029 June 1999 Documents Telcon with Hg Ashar of NRC Re Licensee Intentions & Basis for Reselection of Control Tendons in Pbnps Containment Structures.Plants Are Currently Completing 28th Year Tendon Surveillance During Summer of 1999 NPL-99-0376, Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided1999-06-28028 June 1999 Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided NPL-99-0353, Forwards June 1999 Rev to FSAR for Point Beach Nuclear Plant,Units 1 & 2, IAW Requirements of 10CFR50.71(e).Each Package Contains Revised FSAR Pages That Are to Be Inserted IAW Instructions1999-06-23023 June 1999 Forwards June 1999 Rev to FSAR for Point Beach Nuclear Plant,Units 1 & 2, IAW Requirements of 10CFR50.71(e).Each Package Contains Revised FSAR Pages That Are to Be Inserted IAW Instructions ML20196D4931999-06-18018 June 1999 Forwards Insp Repts 50-266/99-08 & 50-301/99-08 on 990411- 0527.No Violations Noted.Operator Crew Response to Equipment Induced Challenges Generally Good.Handling of Steam Plume in Unit 1 Turbine Bldg Particularly Good ML20195J9471999-06-16016 June 1999 Discusses Ltr from NRC ,re Arrangements Made to Finalized Initial Licensed Operator Exam to Be Administered at Point Beach Nuclear Plant During Week of 990726 ML20196A2931999-06-16016 June 1999 Ack Receipt of Transmitting Changes to Listed Sections of Point Beach Nuclear Plant Security Plan & ISFSI Security Plan,Submitted IAW 10CFR50.54(p).No NRC Approval Is Required Since Changes Do Not Decrease Effectiveness ML20195J9251999-06-14014 June 1999 Discusses 990610 Telcon Between Wp Walker & D Mcneil Re Arrangements for NRC to Inspect Licensed Operator Requalification Program at Point Beach Nuclear Power Plant for Week of 990816 05000266/LER-1999-005, Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics1999-06-11011 June 1999 Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics NPL-99-0336, Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-62301999-06-10010 June 1999 Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-6230 NPL-99-0330, Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld1999-06-0404 June 1999 Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld 05000301/LER-1999-003, Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech Specs1999-05-28028 May 1999 Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech Specs NPL-99-0319, Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 21999-05-28028 May 1999 Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 2 ML20206T3691999-05-17017 May 1999 Ltr Contract,Task Order 242 Entitled, Review Point Beach 1 & 2 Conversion of Current TS for Electrical Power Systems to Improved TS Based on Standard TS, Under Contract NRC-03-95-026 ML20206N5561999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Cm Craig Will Be Section Chief for Point Beach Npp.Organization Chart Encl ML20206P2551999-05-12012 May 1999 Forwards Handout Provided to NRC by Wisconsin Electric at 990504 Meeting Which Discussed Several Recent Operational Issues & Results of Recent Improvement Initiatives in Engineering ML20206N5331999-05-12012 May 1999 Forwards RAI Re & Suppl by Oral Presentation During 980604 Meeting,Requesting Amend for Plant,Units 1 & 2 to Revise TSs 15.3.12 & 15.4.11 ML20196F3211999-05-11011 May 1999 Requests Proprietary WCAP-14787, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt-NSSS Power), Be Withheld from Public Disclosure ML20206K0391999-05-0707 May 1999 Forwards Insp Repts 50-266/99-06 & 50-301/99-06 on 990223- 0410.Ten Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARNPL-99-0564, Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability1999-10-19019 October 1999 Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability 05000266/LER-1999-007, Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics1999-09-30030 September 1999 Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics NPL-99-0555, Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel1999-09-29029 September 1999 Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel 05000266/LER-1999-004, Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump1999-09-0202 September 1999 Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump NPL-99-0473, Informs of Change Being Made to Plan Third 10-year Interval ISI Long Term Plan.Change Extends Interval from Current End Date of 001130 to 020831,due to Operating Cycle Being Increased from 12 to 18 Months1999-08-27027 August 1999 Informs of Change Being Made to Plan Third 10-year Interval ISI Long Term Plan.Change Extends Interval from Current End Date of 001130 to 020831,due to Operating Cycle Being Increased from 12 to 18 Months 05000266/LER-1999-006, Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics1999-08-19019 August 1999 Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics NPL-99-0477, Forwards Revised Procedures to Point Beach Nuclear Plant Epips.Revised Procedures Dtd 990723,should Be Filed in NRC Copies of Manual IAW Attached Instructions1999-08-18018 August 1999 Forwards Revised Procedures to Point Beach Nuclear Plant Epips.Revised Procedures Dtd 990723,should Be Filed in NRC Copies of Manual IAW Attached Instructions NPL-99-0426, Requests Relief from Section II of ASME B&PV Code, Nuclear Vessels, 1965 Edition,No Addenda.Detailed Info Attached1999-08-16016 August 1999 Requests Relief from Section II of ASME B&PV Code, Nuclear Vessels, 1965 Edition,No Addenda.Detailed Info Attached NPL-99-0436, Forwards fitness-for-duty Performance Data for six-month Period Ending 9906301999-08-0202 August 1999 Forwards fitness-for-duty Performance Data for six-month Period Ending 990630 NPL-99-0406, Provides Response to NRC GL 99-02, Lab Testing of Nuclear- Grade Activated Charcoal1999-07-29029 July 1999 Provides Response to NRC GL 99-02, Lab Testing of Nuclear- Grade Activated Charcoal NPL-99-0408, Forwards Pbnps,Units 1 & 2 Plant Simulation Four-Yr Rept, IAW 10CFR55.45(b)(5)(ii).Rept Describes Certification Program Tests Conducted from 1996-1999,identifies Test Discrepancies Still Outstanding & Schedules for 2000-20031999-07-15015 July 1999 Forwards Pbnps,Units 1 & 2 Plant Simulation Four-Yr Rept, IAW 10CFR55.45(b)(5)(ii).Rept Describes Certification Program Tests Conducted from 1996-1999,identifies Test Discrepancies Still Outstanding & Schedules for 2000-2003 NPL-99-0395, Forwards Partial Response to NRC 990512 RAI Re TS Change 204 Re Control Room Habitability.Meeting Is Planned with NRC to Discuss Issues Related to Control Room & Primary Auxiliary Bldg Ventilation Sys Modifications1999-07-12012 July 1999 Forwards Partial Response to NRC 990512 RAI Re TS Change 204 Re Control Room Habitability.Meeting Is Planned with NRC to Discuss Issues Related to Control Room & Primary Auxiliary Bldg Ventilation Sys Modifications NPL-99-0390, Projects Listed Major near-term License Amend Requests That Could Be Expected to Impact Staff Resources Into Fiscal Years 2000 & 2001,in Response to Administrative Ltr 99-021999-07-0808 July 1999 Projects Listed Major near-term License Amend Requests That Could Be Expected to Impact Staff Resources Into Fiscal Years 2000 & 2001,in Response to Administrative Ltr 99-02 NPL-99-0388, Forwards MORs for June 1999 & Revised MORs for May 1999 for Pbnps,Units 1 & 21999-07-0707 July 1999 Forwards MORs for June 1999 & Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0381, Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl1999-06-30030 June 1999 Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl NPL-99-0379, Documents Telcon with Hg Ashar of NRC Re Licensee Intentions & Basis for Reselection of Control Tendons in Pbnps Containment Structures.Plants Are Currently Completing 28th Year Tendon Surveillance During Summer of 19991999-06-29029 June 1999 Documents Telcon with Hg Ashar of NRC Re Licensee Intentions & Basis for Reselection of Control Tendons in Pbnps Containment Structures.Plants Are Currently Completing 28th Year Tendon Surveillance During Summer of 1999 NPL-99-0376, Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided1999-06-28028 June 1999 Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided NPL-99-0353, Forwards June 1999 Rev to FSAR for Point Beach Nuclear Plant,Units 1 & 2, IAW Requirements of 10CFR50.71(e).Each Package Contains Revised FSAR Pages That Are to Be Inserted IAW Instructions1999-06-23023 June 1999 Forwards June 1999 Rev to FSAR for Point Beach Nuclear Plant,Units 1 & 2, IAW Requirements of 10CFR50.71(e).Each Package Contains Revised FSAR Pages That Are to Be Inserted IAW Instructions 05000266/LER-1999-005, Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics1999-06-11011 June 1999 Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics NPL-99-0336, Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-62301999-06-10010 June 1999 Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-6230 NPL-99-0330, Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld1999-06-0404 June 1999 Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld NPL-99-0319, Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 21999-05-28028 May 1999 Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 2 05000301/LER-1999-003, Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech Specs1999-05-28028 May 1999 Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech Specs ML20196F3211999-05-11011 May 1999 Requests Proprietary WCAP-14787, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt-NSSS Power), Be Withheld from Public Disclosure NPL-99-0242, Submits Commitment Schedule Update,Per GL 95-07 Re Pressure Locking & Thermal Binding of safety-related power-operated Gate Valves.Unit 1 Block Valve Replacement Will Be Performed During Upcoming 1999 U1R25 Outage1999-04-27027 April 1999 Submits Commitment Schedule Update,Per GL 95-07 Re Pressure Locking & Thermal Binding of safety-related power-operated Gate Valves.Unit 1 Block Valve Replacement Will Be Performed During Upcoming 1999 U1R25 Outage NPL-99-0246, Forwards 1998 Annual Monitoring Rept, for Pbnps Units 1 & 2.Revised ODCM & Environ Manual Are Encl1999-04-27027 April 1999 Forwards 1998 Annual Monitoring Rept, for Pbnps Units 1 & 2.Revised ODCM & Environ Manual Are Encl ML20206C2361999-04-22022 April 1999 Forwards 1998 Annual Rept to Stockholders of Wepc Which Includes Certified Financial Statements,Per 10CFR50.71 NPL-99-0230, Submits Clarification of Which Portions of OMa-1988 Parts 6 & 10 Are Being Utilized at Pbnp for IST Program Implementation & Cold SD & RO Justifications,Per 990218 Telcon with NRC1999-04-19019 April 1999 Submits Clarification of Which Portions of OMa-1988 Parts 6 & 10 Are Being Utilized at Pbnp for IST Program Implementation & Cold SD & RO Justifications,Per 990218 Telcon with NRC 05000301/LER-1999-002, Forwards LER 99-002-00 Re Discovery That Cable Necessary to Provide Plant Parameter Required to Be Monitored for App R Safe SD Location Was Not Routed Independent of Appropriate Fire Zone.Commitments in Rept Indicated in Italic1999-04-16016 April 1999 Forwards LER 99-002-00 Re Discovery That Cable Necessary to Provide Plant Parameter Required to Be Monitored for App R Safe SD Location Was Not Routed Independent of Appropriate Fire Zone.Commitments in Rept Indicated in Italics NPL-99-0219, Provides Final Notification of Change to Commitments Documented in LER 266/97-022-00 Re Electrical Short Circuits During CR Fire1999-04-15015 April 1999 Provides Final Notification of Change to Commitments Documented in LER 266/97-022-00 Re Electrical Short Circuits During CR Fire 05000266/LER-1999-001, Forwards LER 99-001-01,describing Discovery That Common Min Recirculation Flow Line Return to RWST for Safety Injection & Containment Spray Pumps Was Partially Frozen & Would Not Pass Flow.New Commitments Indicated in Italics i1999-04-0808 April 1999 Forwards LER 99-001-01,describing Discovery That Common Min Recirculation Flow Line Return to RWST for Safety Injection & Containment Spray Pumps Was Partially Frozen & Would Not Pass Flow.New Commitments Indicated in Italics in Rept NPL-99-0174, Confirms Completion of Requested Actions in Accordance with Required Response of GL 96-01 for Unit 2.Confirmation of Completion for Unit 1 Was Provided in Ltr Npl 98-0591,dtd 9807141999-03-30030 March 1999 Confirms Completion of Requested Actions in Accordance with Required Response of GL 96-01 for Unit 2.Confirmation of Completion for Unit 1 Was Provided in Ltr Npl 98-0591,dtd 980714 ML20206B8231999-03-30030 March 1999 Forwards Final Exercise Rept for Biennial Radiological Emergency Preparedness Exercise Conducted on 981103 for Point Beach Power Plant.One Deficiency Identified for Manitowoc County.County Corrected Deficiency Immediately NPL-99-0177, Forwards Decommissioning Funding Status Info for Pbnp,Units 1 & 2,per 10CFR50.751999-03-30030 March 1999 Forwards Decommissioning Funding Status Info for Pbnp,Units 1 & 2,per 10CFR50.75 05000301/LER-1999-001, Forwards LER 99-001-00,re Loss of Safeguards Electrical Bus During Refueling Surveillance Testing Which Resulted in Temporary Unavailability of One Train of Decay Heat Removal. Commitments Made by Util Are Identified in Italics1999-03-10010 March 1999 Forwards LER 99-001-00,re Loss of Safeguards Electrical Bus During Refueling Surveillance Testing Which Resulted in Temporary Unavailability of One Train of Decay Heat Removal. Commitments Made by Util Are Identified in Italics NPL-99-0122, Forwards Relief Requests RR-1-19 & RR-2-25,requesting Relief from Section XI of ASME B&PV Code, Rules for Inservice Exam of NPP Components, 1986 Edition,No Addenda.Requirements for Relief Apply to Third ten-yr ISI Interval for Units 1 &1999-03-0303 March 1999 Forwards Relief Requests RR-1-19 & RR-2-25,requesting Relief from Section XI of ASME B&PV Code, Rules for Inservice Exam of NPP Components, 1986 Edition,No Addenda.Requirements for Relief Apply to Third ten-yr ISI Interval for Units 1 & 2 NPL-99-0111, Informs NRC That IAW Provisions of ASME Boiler & Pressure Code,Section Xi,Paragraphs IWA-2430(d) & IWA-2430(e),WEPC Has Extended Third 10 Yr Interval for Pressure Testing Program at Pbnp,Unit 1 by 21 Months1999-03-0303 March 1999 Informs NRC That IAW Provisions of ASME Boiler & Pressure Code,Section Xi,Paragraphs IWA-2430(d) & IWA-2430(e),WEPC Has Extended Third 10 Yr Interval for Pressure Testing Program at Pbnp,Unit 1 by 21 Months NPL-99-0116, Forwards Proprietary & non-proprietary Revised Point Beach Nuclear Plant Emergency Plan IAW 10CFR50.54(q).Proprietary Plan Withheld1999-03-0101 March 1999 Forwards Proprietary & non-proprietary Revised Point Beach Nuclear Plant Emergency Plan IAW 10CFR50.54(q).Proprietary Plan Withheld NPL-99-0115, Forwards Proprietary & non-proprietary Revised EPIPs to Point Beach Nuclear Plant,Units 1 & 21999-03-0101 March 1999 Forwards Proprietary & non-proprietary Revised EPIPs to Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0114, Provides Results of Wepcs Insp,Replacement & Mechanical Testing of Reactor Internals Baffle Former Bolts During Recent Point Beach Refueling Outage1999-02-25025 February 1999 Provides Results of Wepcs Insp,Replacement & Mechanical Testing of Reactor Internals Baffle Former Bolts During Recent Point Beach Refueling Outage NPL-99-0086, Documents Commitment Change Which Is to Discontinue Actions Contained in Util Ltr Dtd 970613,after NRC Approval of LAR & Lower Containment Leak Rate Limit Is Implemented. Change Is Acceptable IAW Applicable Plant Procedure1999-02-24024 February 1999 Documents Commitment Change Which Is to Discontinue Actions Contained in Util Ltr Dtd 970613,after NRC Approval of LAR & Lower Containment Leak Rate Limit Is Implemented. Change Is Acceptable IAW Applicable Plant Procedure NPL-99-0101, Forwards Proprietary & non-proprietary Version of Rev 20 to EPIP 3.2, Emergency Response Organization Notification & Revised Index.Proprietary Info Withheld1999-02-19019 February 1999 Forwards Proprietary & non-proprietary Version of Rev 20 to EPIP 3.2, Emergency Response Organization Notification & Revised Index.Proprietary Info Withheld ML20203F7301999-02-10010 February 1999 Forwards Revs to Security Plan Sections 1.2,1.3,1.4,2.1,2.5, 2,6,2.8,6.1,6.4,6.5,B-3.0,B-4.0,B-5.0 & Figure R Dtd 990210. Evaluation & Description of Plan Revs Also Encl to Assist in NRC Review.Encls Withheld NPL-99-0067, Submits 30 Day Rept of Changes & Errors Discovered in ECCS Evaluation Models for Pbnp,Unit 21999-02-0202 February 1999 Submits 30 Day Rept of Changes & Errors Discovered in ECCS Evaluation Models for Pbnp,Unit 2 NPL-99-0064, Forwards Revised TS Bases Page 15.4.4,correcting References to Pbnp FSAR Re Reactor Containment Design.Changes Are Administrative Only & Do Not Alter Facility or Operation,As Described in FSAR or Any TS Requirement1999-02-0202 February 1999 Forwards Revised TS Bases Page 15.4.4,correcting References to Pbnp FSAR Re Reactor Containment Design.Changes Are Administrative Only & Do Not Alter Facility or Operation,As Described in FSAR or Any TS Requirement NPL-98-1032, Forwards Revs to Pbnp Security Plan Sections 1.1,1.2,2.1, 2.6,2.8,6.1 & 6.4 & Revs to Pbnp ISFSI Security Plan Sections 1.0 & 7.0,per 10CFR50.54(p).Encl Withheld1999-01-27027 January 1999 Forwards Revs to Pbnp Security Plan Sections 1.1,1.2,2.1, 2.6,2.8,6.1 & 6.4 & Revs to Pbnp ISFSI Security Plan Sections 1.0 & 7.0,per 10CFR50.54(p).Encl Withheld 05000266/LER-1998-029, Forwards LER 98-029-00,describing Discovery of Isolation of Autostart Feature for Svc Water Pumps from Unit 2,safeguards Buses During Modifications1999-01-26026 January 1999 Forwards LER 98-029-00,describing Discovery of Isolation of Autostart Feature for Svc Water Pumps from Unit 2,safeguards Buses During Modifications NPL-99-0031, Informs That Wepc Reviewed Contents of NEI to NRC & Have Verified Info Provided in Ltr Pertaining to WOG Member Plants Is Applicable to Pbnp.Attachment Responds to NRC Questions by Ref to Info in 981211 NEI Ltr1999-01-15015 January 1999 Informs That Wepc Reviewed Contents of NEI to NRC & Have Verified Info Provided in Ltr Pertaining to WOG Member Plants Is Applicable to Pbnp.Attachment Responds to NRC Questions by Ref to Info in 981211 NEI Ltr NPL-99-0004, Provides Status Update on Program Activities & Schedule for Final Resolution of Items Re Verification of Seismic Piping Class Interfaces for Point Beach Nuclear Plant,Units 1 & 21999-01-11011 January 1999 Provides Status Update on Program Activities & Schedule for Final Resolution of Items Re Verification of Seismic Piping Class Interfaces for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0012, Forwards Proprietary & Nonproprietary Revs to Epips. Proprietary Version of EPIPs Withheld1999-01-0808 January 1999 Forwards Proprietary & Nonproprietary Revs to Epips. Proprietary Version of EPIPs Withheld 1999-09-30
[Table view] |
Text
_ _ _ _ _ _ - _ _ _ _ - _ _ - _ _ _
6
^
Wisconsin Electnc
\
. PONER COk1PAM m W uoyn no b ice most+ wimm um 221 nas VPNPD-92-319 ~
NRC-92-113 October 2, 1992 Document Control Desk U.S. HUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Gentlernen :
QOCKETS 50-266 AND 50-301 BESPONSE TO,1LQTICE OF VIOLATION POINT DEACH NUCLEAR PLANT.-UNITS 1 AND 2 In a letter from Mr. Robert L. Greger dated September 4, 1992, the Nuclear Regulatory Commission forwarded to Wisconsin Electric Power _ Company, licensee for_the Point Beach Nuclear Plant, the results of the routine safety inspection conducted by Messrs.
K. R. Jury and J. Gadza.la from June 29 through August 23, 1992. i This inspection report included a Notice of Violation (Notice).
The Notice describes a violation of Point Beach Nuclear Plant Technical Specification 15.6.8, " Plant Operating Procedures,"
Section--15.6.8.1.- -
We have reviewed this Notice and, pursuant-to the provisions of 10 CFR 2.201, have prepared a written response'of explanation !
concerning the identified violation. Our written response is ,
included as an attachment to this letter. !
The violation identified in the Notice pertains to procedural requirements for returning equipment, that-has been-isolated, back to service._ Technical Specification 15.6.8.1 requires that the plant be operated and maintained-in accordance with approved L
procedures. Our procedure, PBNP 4.13, _" Equipment Isolation _ ;
Procedure," Step 6.2.3, requires that equipment not be returned to
=uervice - until the danger (equipment isolation)1 tag location sheet.
authorizes the return of the equipment to the operations group.- In addition, Step 6.4 of'the procedure requires that-the positioning
'of equipment identified on the danger tag location sheet be- ,
performed by a qualifled individual.- The. identified violation occurred on. July 24, 1992',_When a battery cable for the-auxiliary-diesel (G501) _ was reconnected to the battery prior to the-danger h[)()l)- .Q
. . , ,',n _
f 9210090247 921002 -
/d I '
l- -PDR ADDCK 05000266 '/
O. PDR -Y \
/' \
A sakwmuminum anmuw
, . __ _ . .._,,._.-. _ . . . . - _ _ . . . _ - ~ . _ ,_ - . _ _ , . , _ . , , . ---
I Document Control Desk October 5, 1992 Page 2 t39 location rheet authorizing this equipment to be returned to service. The reconnection was completed by a contractor employee who was not qualified to perform this task.
This violation characterizes a contractor employee's failure to conform to the PB!IP equipment isolati n procedure. An event invectigation team had previously been chartered to review the circumstances of an event which occurred on June 10, 1992, which r,imilarly is believed to have involved a contractor's violation of PbitP 4.13. Based on the evaluation performed by the event _
investigation team for the June 10, 1992, event and an ad-hoc interdiccip)inary group formed to review the July 24, 1992, event identified in the 110tice, corrective actions have been taken or are planned to be taken to respond to the identified deficiencies.
Thece corrective actions are intended to implement enhanced management controls and practices to ensure conformance to PB!1P 4.13. ,
We believe that the attached reply is responsive to the concerno and fulfills the regnirements identified in your September 4, 1992, letter. If you have any questions or require additional infor-mation regarding this renponse, please contact us.
Sincerely, e" -r fe'. .. ~) ))
~
/
Bo',b Link Vice President fluclear Power 14FB/jy Enclosure cc: Regional Administrator, 11RC Region 1'1 IIRC Resident Inspector
REPLY TO NOTICE OF VIOLATION WISCOllSIN ELECTRIC POWER CO!4PANY POI!1T BEACH NUCLEAR PIJd1T, UNITS 1 A!1D 2 DOCKETS 50-266 AND 50-301 LICENSE NOS. DPR-24 AND DPR-27 During the routine cafety incpection conducted at our Point Beach Nuclear Plant from June 29 through August 23, 1992, one violation of 11RC requirements was identified. The identified violation was classified as a Severity Level IV. Inspection Report llumbers 50-266/92015(DRP) and 50-301/92015(DRP) and the flotice of Violation (flotice) transmitted to Wisconsin Electric on September ., 1992, provide details regarding the violation. We -
agree that the event and circumstances described in the Fotice are accurately characterized.
In accordance with the instructions provided in the flotice, our reply to the alleged violation includes: (1) the reason for the violation; (2) corrective action taken; (3) corrective action taken to avoid further violations; and (4) the date when full compliance will be achieved.
VLOLATION
" Technical Specification 15.6.8.1 requires that the plant be operated and maintained in accordance with approved procedures.
Procedure PBNP 4.13, Equipment Isolation Procedure, Stop 6.2.3, -
requires that equipment not be returned to service until the danger tag location sheet authorizes the return of the equipment to the operations group. Step 6.4, reouires that positioning a component per the danger tag location cheet shall be performed by a qualified red tagger."
" Contrary to the above, on July 24, a battery cabic on the G-501 auxiliary diesel was reconnected to the battery prior to the danger tag location sheet authorizing the return to service of the equipment to the operations group. Also the person who reconnected the cable was not a qualified red tagger."
IEfiEO. BEE __T_O VI01ATlall
- 1. REASON FOR THE VIOLATIOil The event cited in the Notice of Violation occurred on July 24, 1992, during the ongoing overhaul of the gas turbine generator (GOS) installed at PBNP. Work on the gas turbine auxiliary power diesel (G501) was being supported by a contractor employee. The contractor ;mployee had not been authorized general plant access and, therefore, was required to be escorted. During performance of his assigned work, the contractor employee repla ed a power cable on the diesel starting battery. The cable had been danger tagged, in the
Reply to Not'.co of violation October 5, 1992 Page 2 disconnected condition, in accordance with PBNP 4.13,
" Equipment Isolation Procedure." PBNP 4.13, Step 6.4, requires that positioning a component per the danger tag location sheet be done by a person qualified as a danger tagger.
The contractor employee involved, noted the installed danger tag but did not understand that the tag precluded him from reattaching the cable on the battery. The contractor's understanding of the equipment isolation requirements was that he was prohibited from operating the auxiliary power diesel following the completion of the work, but did not prevent him from attaching the battery cable. A contributing factor to the failure of the contractor employee to completely understand the isolation requirements of this system was that a sufficiently thorough pre-job briefing had not been conducted prior to beginning the work activities.
t An additional contributing factor was identified as different
' training requirements dependent on the type of plant access required by a contractor. The contractne employee involved in this event was classified as a shcrc term visitor and was o authorized escort required access. The contractor employee '
was being encorted by a PBNP Security Officer. Short-term visitors, suct, as this contractor employee, are not normally granted unescorted access to PBNP and, therefore, do not receive general employee training (GET). GET would ha\e provided the contractor employee training on the equipment isolation system and procedural requirements which may have prevented the event. -
y 2. C_ORBECILYE _ ACTION TAKEN
.. In response to this violation, corrective actions were takt9 immediately following identification of the inappropriately installed battoiy cable. 11so, additional corroctive actions have been 'ompleted to date in response to this event to prevent recurrence of similm 22,nts.
A. IJnmediate Certective Action
- Work on the auxiliary power diesel had been completed when the condition was discovered by operations personnel tasked to remove the danger tags associated with the auxiliary powcr diesel. The tagout of the diesel was suosequently cleared by qualified operations personnel and the equipment configuration verified as correct.
. 4 &
Reply to Notice of Violation l October 5, 1992 Page 3
- The contractor employee was counselled regarding equipment laolation requirements, the personal safety i implications of taking actions prohibited by the equipment isolation requirements, and the incorrectness of his actions based on this event
- The PDNP contractor liaison and manager-responsible for-the oversight of the gas turbine overhaul were counselled of their responsibility and obligation.to-brief contractor personnel regarding equipment isolation procedure requirements.
B. Additional Corrective Actions Taken To Date r
- An ad-hoc interdisciplinary group met on multiple occasions to discuss the event, determine the causes, and formulate corrective actions. The ad-hoc interdisciplinary group also met with the event investigation team which had been formed to review the equipment isolation procedural violation that occurred on June 10, 1992.
- Past occurrences of similar equipment isolation procedural violation events were reviewed to determine ,
if there is a commonality between the causes of these.
events. Causes identified included the' inadequacy of the pre-job briefings for escorted personnel-and the need to identify specifio guidelines for use in performing pre-job briefings. In addition, it was I identified that additional emphasis on the duties and l responsibilities of Wisconsit. Electric liaison j personnel dealing with contractors was needed.
i j -
On September 30, 1992, the Plant Manager issued a memorandum to all Nuclear Power L,partment management personnel summarizing the violations'of theJequipmen. -
isolation procedure. The memorandum reinforces the l importance and requirements of conducting adequate pre- i job briefings and the requirements contained in PBNP 4.13, " Equipment Isolation ?rocedure." Specifically, the memorandum summarizes t.a' responsibilities of-supervisors and contractor liaisons as defined in PSNP 4.13, Step 5.5.
Ir ys-c-> v y pum f vy' ,e1---tg ----e
e Reply to Hotice of Violation October 5, 1992 Page 4
- 3. C&OIWECTIVE /LQTJO!1 TO BE TAKEN TO PREVENT RECURRE1C_E Based on the reviews of equipment isolation procedure violation evento performed by the ad-hoc interdisciplinary group and the event investigation team, the following actions will be taken to preclude recurrence of similar events:
A. PB11P 4.13, " Equipment 1 solation Procedure," is being revised to clearly define the responsibilities of operations, maintenance, and engineering personnel involved with the equipment isolation procedure. This revision will include the requirement for the Wisconsin Electric contractor liaison, who is responsib]e for oversight of contractor work activities, to sign the equipment isolation tag record sheet. We plan to have these revisions to PB11P 4.13 completed by 11ovember 20, 1992.
B. 11uclear Power Department personnel with authorization to approve visitor access to the PBtJP site will be required to identify the necessary pre-job briefing requirements prior to authorizing contractor or visitor access to P B11P . This will be accomplished by enhancements tc, PE;d form PDF-7015, " Pre-Work Conference Checklist," and SEC-79, " Escort, Vehicle and Access Level Authorization and Control." The revisions to PBF-7015 and SEC-79 are scheduled to be completed by November 20, 1992.
- 4. DATE OF_ FULL CoMPLI Atty -
All corrective actions, identified above, which we believe will result in full compliance with Technical Specification 15.6.8.1 as it relates to proper implementation of equipment isolation requirements have been completed or will b3 completed by November 20, 1992.
__. _ _ _ _ _ _ _ _ _ _ _ _ _ _ .