ML21104A429: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:PaloVerde Nuclear GeneratingStation P.O.Box52034 Phoenix,Az 85072 MallStation7636 Tel:(623)393-3495 102-08253-MDD/MSC April 14,2021 ATTN: Document      Control  Desk U.S.Nuclear  Regulatory    Commission Washington,  DC 20555-0001
{{#Wiki_filter:}}
 
==DearSirs:==
 
==Subject:==
PaloVerdeNuclear Generating                Station    (PVNGS)
Units  1,2,and3 Docket    Nos.STN 50-528/529/530 2020Annual        Environmental        Operating    Report Enclosed  please find    the2020Annual        Environmental      Operating    Report  for PVNGSUnits    1,2,and3.Arizona          Public  Service    Company      issubmitting this reportpursuant    toSection    5.4.1  ofAppendix B tothePVNGSUnits                1, 2,and3 Renewed      Operating    License  Nos.NPF-41, NPF-51, andNPF-74, respectively.
No newcommitments        arebeing    madetotheNRCbythis            letter.
Should  youneedfurther      information    regarding      this submittal,    please contact Matthew    S.Cox,Licensing      Section    Leader,  at(623)393-5753.
Sincerely, DDilorenzo,      Michael"9'3;;gned Date:
2021.04.14 byDilorenzo, DN:cn=Dilorenzo, Michael 14:17:25 Michael D(z99838)
                                                            -07'00' Michael D.DiLorenzo Department  Leader,  Regulatory    Affairs MDD/MSC/mg
 
==Enclosure:==
Palo VerdeNuclear      Generating    Station  Units  1,2,and3 2020Annual      Environmental      Operating    Report cc: S.A.Morris              NRCRegion      IVRegional      Administrator S.P.Lingam              NRCNRRProject        Manager    forPVNGS C.A.Peabody NRCSenior                  Resident    Inspector  for    PVNGS A memberoftheSTARSAlliance      LLC Callaway
* Diablo Canyon* Palo  Verde* WolfCreek
 
Enclosure Generating Station PaloVerdeNuclear Units 1,2,and3 Operating Report 2020AnnualEnvironmental
 
Enclosure 2020Annual    Environmental  Operating Report I.      INTRODUCTION Palo Verde      Nuclear  Generating    Station  (PVNGS)    islocated    inMaricopa County,    Arizona,    approximately 50 miles      westofthePhoenix        metropolitan area The PVNGS site          comprises    approximately    4,250acres.        Site elevations range  from 890 feet      above meansealevel        atthesouthern      boundary      to1,030 feet  abovemean sealevel        atthenorthern      boundary.      Thestation    consists  of three  pressurized    water reactor    electrical generating    units. Units  1,2,and3 havea rated      thermal  power of3,990      MW.
Arizona    Public  Service (APS) Company wasissued            lowpoweroperating licenses  NPF-34,    NPF-46 and NPF-65 for      Units  1,2,and3 bytheUnited States    Nuclear    Regulatory Commission        (NRC)  on December        31,1984, December      9,1985,    andMarch 25, 1987,respectively. APSwasissued                    full poweroperating        licensesNPF-41,    NPF-51  andNPF-74forUnits            1,2,and3 on June1,1985,        April 24,1986,  and November        25,1987,respectively.          These licenses  wererenewed      onApril    21, 2011 Appendix    B tothese    operating  licensesis entitled theEnvironmental Protection    Plan  (Non-Radiological)      Theenvironmental        protection    plans  (EPP) for eachofthecurrent        operating    licenses  are identical Thepurpose        oftheEPPistoprovide        for theprotection      ofenvironmental values    during    theconstruction    andoperation    ofthe nuclear facility. The principal  objectives    oftheEPPareasfollows:
(1) Verify        that thestation  isoperated      inanenvironmentally        acceptable manner,    asestablished  bythefinal      environmental    statement      (FES) andother      NRCenvironmental      impact  assessments.
(2) Coordinate          NRCrequirements      andmaintain      consistency    withother federal,    state  andlocal  requirements      forenvironmental      protection.
(3) KeeptheNRCinformed              oftheenvironmental          effects  offacility construction    andoperation    andactions    taken    tocontrol  those    effects.
This  Annual    Environmental  Operating      Report  isrequired    bySection      5.4.1  of theEPPwhich        isAppendix  B oftherespective      renewed    operating    licenses.
This  report  describes  theactivities  related  tothePVNGSEPPduring              the2020 calendar    year. Forpurposes  ofthis  report,  references    totheEPPare considered      tobetheEPPofNPF-41,          NPF-51,  andNPF-74.
1
 
Enclosure 2020Annual  Environmental    Operating  Report II. ENVIRONMENTAL              MONITORINGSUMMARIESANDANALYSIS A.      Cultural    Resources Section  4.2.1    oftheEPPrequires          thatanarchaeological        survey    beperformed whenfinal      alignment      ofthePVNGS-to-Saguaro transmission                lineis completed. As ofthedate            ofthis    report, plans  forthis    transmission      line have beenindefinitely suspended              Therefore,  there  hasbeennoactivity            with regard  tothis    requirement    oftheEPP.
B.      Terrestrial      Ecology  Monitoring Section  4.2.2    oftheEPPstates that        APSwill  implement      a salt  deposition  and impact  monitoring        program as communicated        ina letter    totheNRCdated December      30,1991(Reference 1), thesalt              deposition    monitoring    program wasdiscontinued          attheendof1991.
III. PLANT DESIGNAND OPERATION                          CHANGES Section  3.1oftheEPPallows            changes  instation design, operation,          orthe performance        oftests    orexperiments      affecting the environment          provided  that suchchanges,        tests,  orexperiments      donotinvolve an unreviewed environmental        question    anddonotinvolve      a change to theEPP.Changes, tests, orexperiments          inwhich    allmeasurable  non-radiological      effects  are confined    totheonsite        areas previously  disturbed  during site preparation        and plant construction        orinwhich    theenvironment      isnotaffected areexempt fromtheevaluation            andreporting      requirements  ofSection      3.1 Section  3.2oftheEPPalso            exempts    changes,  tests,  orexperiments        which arerequired        tocomply      with other  federal, state, orlocal      environmental regulations.
No design    andoperational        changes    wereinitiated  in2020that        required  an evaluation    todetermine        iftheyinvolved    either  anunreviewed          environmental question    orconstituted        a change    intheEPP.
IV. EPP NON-COMPLIANCES There  werenoinstances            ofnon-compliance      with theEPPidentified during  2020.
2
 
Enclosure 2020Annual Environmental Operating Report V. NON-ROUTINE        REPORTS There  were  nonon-routinereports    requiredbySection    oftheEPP 5.4.2 during  2020.
VI. REFERENCES 1.,Letter  from W.F. Conway (APS)  toU.S.NRC,PaloVerdeNuclear Generating Station (PVNGS) Units    1,2,and3,Salt        and Deposition ImpactMonitoring    Plan, dated December 30,1991[NRC Agencywide Documents    Access  and Management    System(ADAMS)Accession Number9201070077) 3}}

Revision as of 20:51, 17 January 2022

Annual Environmental Operating Report
ML21104A429
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/14/2021
From: Dilorenzo M
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-08253-MDD/MSC
Download: ML21104A429 (5)


Text