Annual Environmental Operating Report
ML21104A429
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/14/2021
From: Dilorenzo M
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-08253-MDD/MSC
Download: ML21104A429 (5)


Text

PaloVerde Nuclear GeneratingStation P.O.Box52034 Phoenix,Az 85072 MallStation7636 Tel:(623)393-3495 102-08253-MDD/MSC April 14,2021 ATTN: Document Control Desk U.S.Nuclear Regulatory Commission Washington, DC 20555-0001

DearSirs:

Subject:

PaloVerdeNuclear Generating Station (PVNGS)

Units 1,2,and3 Docket Nos.STN 50-528/529/530 2020Annual Environmental Operating Report Enclosed please find the2020Annual Environmental Operating Report for PVNGSUnits 1,2,and3.Arizona Public Service Company issubmitting this reportpursuant toSection 5.4.1 ofAppendix B tothePVNGSUnits 1, 2,and3 Renewed Operating License Nos.NPF-41, NPF-51, andNPF-74, respectively.

No newcommitments arebeing madetotheNRCbythis letter.

Should youneedfurther information regarding this submittal, please contact Matthew S.Cox,Licensing Section Leader, at(623)393-5753.

Sincerely, DDilorenzo, Michael"9'3;;gned Date:

2021.04.14 byDilorenzo, DN:cn=Dilorenzo, Michael 14:17:25 Michael D(z99838)

-07'00' Michael D.DiLorenzo Department Leader, Regulatory Affairs MDD/MSC/mg

Enclosure:

Palo VerdeNuclear Generating Station Units 1,2,and3 2020Annual Environmental Operating Report cc: S.A.Morris NRCRegion IVRegional Administrator S.P.Lingam NRCNRRProject Manager forPVNGS C.A.Peabody NRCSenior Resident Inspector for PVNGS A memberoftheSTARSAlliance LLC Callaway

  • Diablo Canyon* Palo Verde* WolfCreek

Enclosure Generating Station PaloVerdeNuclear Units 1,2,and3 Operating Report 2020AnnualEnvironmental

Enclosure 2020Annual Environmental Operating Report I. INTRODUCTION Palo Verde Nuclear Generating Station (PVNGS) islocated inMaricopa County, Arizona, approximately 50 miles westofthePhoenix metropolitan area The PVNGS site comprises approximately 4,250acres. Site elevations range from 890 feet above meansealevel atthesouthern boundary to1,030 feet abovemean sealevel atthenorthern boundary. Thestation consists of three pressurized water reactor electrical generating units. Units 1,2,and3 havea rated thermal power of3,990 MW.

Arizona Public Service (APS) Company wasissued lowpoweroperating licenses NPF-34, NPF-46 and NPF-65 for Units 1,2,and3 bytheUnited States Nuclear Regulatory Commission (NRC) on December 31,1984, December 9,1985, andMarch 25, 1987,respectively. APSwasissued full poweroperating licensesNPF-41, NPF-51 andNPF-74forUnits 1,2,and3 on June1,1985, April 24,1986, and November 25,1987,respectively. These licenses wererenewed onApril 21, 2011 Appendix B tothese operating licensesis entitled theEnvironmental Protection Plan (Non-Radiological) Theenvironmental protection plans (EPP) for eachofthecurrent operating licenses are identical Thepurpose oftheEPPistoprovide for theprotection ofenvironmental values during theconstruction andoperation ofthe nuclear facility. The principal objectives oftheEPPareasfollows:

(1) Verify that thestation isoperated inanenvironmentally acceptable manner, asestablished bythefinal environmental statement (FES) andother NRCenvironmental impact assessments.

(2) Coordinate NRCrequirements andmaintain consistency withother federal, state andlocal requirements forenvironmental protection.

(3) KeeptheNRCinformed oftheenvironmental effects offacility construction andoperation andactions taken tocontrol those effects.

This Annual Environmental Operating Report isrequired bySection 5.4.1 of theEPPwhich isAppendix B oftherespective renewed operating licenses.

This report describes theactivities related tothePVNGSEPPduring the2020 calendar year. Forpurposes ofthis report, references totheEPPare considered tobetheEPPofNPF-41, NPF-51, andNPF-74.

1

Enclosure 2020Annual Environmental Operating Report II. ENVIRONMENTAL MONITORINGSUMMARIESANDANALYSIS A. Cultural Resources Section 4.2.1 oftheEPPrequires thatanarchaeological survey beperformed whenfinal alignment ofthePVNGS-to-Saguaro transmission lineis completed. As ofthedate ofthis report, plans forthis transmission line have beenindefinitely suspended Therefore, there hasbeennoactivity with regard tothis requirement oftheEPP.

B. Terrestrial Ecology Monitoring Section 4.2.2 oftheEPPstates that APSwill implement a salt deposition and impact monitoring program as communicated ina letter totheNRCdated December 30,1991(Reference 1), thesalt deposition monitoring program wasdiscontinued attheendof1991.

III. PLANT DESIGNAND OPERATION CHANGES Section 3.1oftheEPPallows changes instation design, operation, orthe performance oftests orexperiments affecting the environment provided that suchchanges, tests, orexperiments donotinvolve an unreviewed environmental question anddonotinvolve a change to theEPP.Changes, tests, orexperiments inwhich allmeasurable non-radiological effects are confined totheonsite areas previously disturbed during site preparation and plant construction orinwhich theenvironment isnotaffected areexempt fromtheevaluation andreporting requirements ofSection 3.1 Section 3.2oftheEPPalso exempts changes, tests, orexperiments which arerequired tocomply with other federal, state, orlocal environmental regulations.

No design andoperational changes wereinitiated in2020that required an evaluation todetermine iftheyinvolved either anunreviewed environmental question orconstituted a change intheEPP.

IV. EPP NON-COMPLIANCES There werenoinstances ofnon-compliance with theEPPidentified during 2020.

2

Enclosure 2020Annual Environmental Operating Report V. NON-ROUTINE REPORTS There were nonon-routinereports requiredbySection oftheEPP 5.4.2 during 2020.

VI. REFERENCES 1.,Letter from W.F. Conway (APS) toU.S.NRC,PaloVerdeNuclear Generating Station (PVNGS) Units 1,2,and3,Salt and Deposition ImpactMonitoring Plan, dated December 30,1991[NRC Agencywide Documents Access and Management System(ADAMS)Accession Number9201070077) 3