ML16127A398

From kanterella
Jump to navigation Jump to search
ISFSI - Notification of 10 CFR 50.59, 10 CFR 72.48, and Commitment Change, Annual Reports and Notifications
ML16127A398
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/06/2016
From: Weber T
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
102-07238 TNW/TMJ
Download: ML16127A398 (7)


Text

10 CFR 50.59 / 10 CFR 72.48 Palo Verde Nuclear Generating Station 102-07238 TNW/TMJ P.O. Box 52034 May 6, 2016 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-5764 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, & 3 and Independent Spent Fuel Storage Installation (ISFSI)

Docket Nos. STN 50-528/529/530 and 72-44 10 CFR 50.59, 10 CFR 72.48, and Commitment Change Annual Reports and Notifications Enclosed please find the Arizona Public Service Company (APS) 10 CFR 50.59 and 10 CFR 72.48 report for January 1, 2015, through December 31, 2015. The Commitment Change Report is for the period of January 1, 2015, through December 31, 2015.

In accordance with 10 CFR 50.59(d)(2), APS is providing a brief description and summary of the evaluations required by 10 CFR 50.59(d)(1) for each change completed during the period. This report contains the evaluations written during 2015, regardless of the implementation status of the evaluated action, and is included as Enclosure 1 to this letter.

In accordance with 10 CFR 72.48(d)(2), APS is reporting that there were no changes completed during the period that were required to be reported pursuant to 10 CFR 72.48.

In accordance with the APS commitment management program, APS is reporting two NRC commitment changes made during the referenced time period as described in to this letter. Other commitment changes made during 2015 that were reported in separate correspondence are not included in Enclosure 2.

No new commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Michael D. DiLorenzo, Regulatory Affairs, Section Leader, at (623) 393-3495.

Sincerely, Weber, Thomas Digitally signed by Weber, Thomas N(Z00499)

DN: cn=Weber, Thomas N(Z00499)

N(Z00499)

Reason: I am approving this document Date: 2016.05.06 09:38:33 -07'00' Thomas N. Weber Department Leader, Regulatory Affairs TNW/TMJ/akf

Enclosures:

1. 10 CFR 50.59 and 10 CFR 72.48 Report January 2015 - December 2015
2. Commitment Change Report January 2015 - December 2015 A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

ENCLOSURE 1 PALO VERDE NUCLEAR GENERATING STATION 10 CFR 50.59 and 10 CFR 72.48 Report January 2015 - December 2015

10 CFR 50.59 and 10 CFR 72.48 REPORT (JANUARY 2015 through DECEMBER 2015)

Log Doc Doc Number Description Summary Type E-14-0003 DMWO 3286783 THE LEGACY MAIN GENERATOR EXCITATION AND THIS CHANGE DOES NOT Rev.001 VOLTAGE REGULATOR SYSTEM (GENERREX) REQUIRE PRIOR NRC REPLACED WITH A NEW GENERAL ELECTRIC (GE) APPROVAL IN ACCORDANCE DIGITAL EXCITATION CONTROL SYSTEM WITH 10 CFR 50.59(C)(1).

(EX2100E).

E-15-0002 DMWO 4096894 THE DIGITAL ASSET PROTECTION SYSTEM (DAPS) THIS CHANGE DOES NOT Rev. 000 IS A CENTRALIZED MONITORING AND CYBER- REQUIRE PRIOR NRC SECURITY RESPONSE ARCHITECTURE FOR APPROVAL IN ACCORDANCE PROCESS SYSTEMS AT THE PALO VERDE NUCLEAR WITH 10 CFR 50.59(C)(1).

GENERATING STATION (PVNGS) FACILITIES.

E-07-0006 DMWO 2859190 THE MODIFICATION WILL REMOVE THE EXISTING THIS CHANGE DOES NOT Rev. 005 90VR PANEL THAT INCLUDES THE AUTOMATIC REQUIRE PRIOR NRC AND MANUAL VOLTAGE REGULATORS, THE MOTOR APPROVAL IN ACCORDANCE OPERATED POTENTIOMETERS (MOP) MOUNTED WITH 10 CFR 50.59(C)(1).

ADJACENT TO THE 90VR AND INSTALL A NEW 90VR PANEL THAT CONTAINS TWO AVRS AND TWO DIGITAL REFERENCE UNITS (DRU) AS REPLACEMENT FOR THE MOPS E-15-0001 DEC 00494.R001 THE PROPOSED ACTIVITY IS TO ISSUE DEC- THIS CHANGE DOES NOT Rev. 000 00494, REVISION 1, WHICH ACCEPTS AS-IS THE REQUIRE PRIOR NRC ORIGINAL ALLOY 600 NOZZLE REMNANT (WITH A APPROVAL IN ACCORDANCE FLAWED ALLOY 82 J-GROOVE WELD AND BOAT WITH 10 CFR 50.59(C)(1).

SAMPLE REMOVED) INSIDE THE REACTOR VESSEL AT BOTTOM MOUNTED INSTRUMENTATION (BMI) PENETRATION #3 FOR THE REMAINDER OF THE UNIT 3 LICENSED OPERATING LIFE.

E-13-0001 DMWO 3270069 THE LEGACY HONEYWELL PLANT COMPUTER (PC) THIS CHANGE DOES NOT Rev. 002 SYSTEM AND ASSOCIATED SOFTWARE ARE BEING REQUIRE PRIOR NRC REPLACED WITH A NEW ROLLS ROYCE SYSTEM. APPROVAL IN ACCORDANCE THE PROPOSED CHANGE IS APPLICABLE TO UNITS WITH 10 CFR 50.59(C)(1).

1, 2, AND 3.

Enclosure Page 1 of 2

10 CFR 50.59 and 10 CFR 72.48 REPORT (JANUARY 2015 through DECEMBER 2015)

Log Doc Doc Number Description Summary Type E-15-0004 CALC 13-JC-SF-0202 PROCEDURES AND A CALCULATION ARE BEING THIS CHANGE DOES NOT Rev. 000 PROC 90OP-9SF01 REVISED TO SUPPORT ALLOWING A GIVEN CEA REQUIRE PRIOR NRC TO BE HELD ON THE LOWER GRIPPER (LG) APPROVAL IN ACCORDANCE INSTEAD OF THE UPPER GRIPPER (UG). WITH 10 CFR 50.59(C)(1).

E-15-0004 CALC 13-JC-SF-0202 CALCULATION 13-JC-SF-0202, PROCEDURE 40OP- THIS CHANGE DOES NOT Rev. 001 PROC 40OP-9SF01 9SF01, CLARIFICATION WAS ADDED THAT REQUIRE PRIOR NRC PROCEDURES IMPLEMENTING SOME ASPECTS OF APPROVAL IN ACCORDANCE TS LCO 3.1.7 FOR CEAS THAT ARE HELD BY THE WITH 10 CFR 50.59(C)(1).

LOWER GRIPPER ALSO HAVE A SLIGHTLY DIFFERENT POSITION REQUIREMENT.

E-14-0003 DMWO 3286783 THE LEGACY MAIN GENERATOR EXCITATION AND THIS CHANGE DOES NOT Rev. 002 VOLTAGE REGULATOR SYSTEM (GENERREX) IS REQUIRE PRIOR NRC TO BE REPLACED WITH A NEW GENERAL APPROVAL IN ACCORDANCE ELECTRIC (GE) DIGITAL EXCITATION CONTROL WITH 10 CFR 50.59(C)(1).

SYSTEM (EX2100E).

E-15-0003 PROC 73TI-9CH08 THE PROPOSED ACTIVITY IS TO IMPLEMENT TEST THIS CHANGE DOES NOT Rev. 000 INSTRUCTION (TI) PROCEDURE 73TI-9CH08, REQUIRE PRIOR NRC CHARGING PUMP SUCTION PRESSURE DATA APPROVAL IN ACCORDANCE COLLECTION. WITH 10 CFR 50.59(C)(1).

E-15-0005 TMWO 4712119 IMPLEMENT TEMPORARY MODIFICATION WORK THIS CHANGE DOES NOT Rev. 000 ORDER (TMWO) 4712119 PERTAINING TO THE REQUIRE PRIOR NRC MOVEMENT OF NEW FUEL ASSEMBLY P2Y107 AT APPROVAL IN ACCORDANCE CORE LOCATION C03 FROM THE REACTOR WITH 10 CFR 50.59(C)(1).

VESSEL TO THE FUEL TRANSFER MACHINE. THIS IS A ONE-TIME EVOLUTION TO BE PERFORMED DURING THE U2R19 REFUELING OUTAGE.

NOTE: There were no 10 CFR 72.48 Evaluations in 2015.

ACRONYMN/ABBREVIATION LIST CALC Calculation DMWO Design Modification Work Order LDCR Licensing Document Change Request PROC Procedure STDY Study TMWO Temporary Modification Work Order Enclosure Page 2 of 2

ENCLOSURE 2 PALO VERDE NUCLEAR GENERATING STATION Commitment Change Report January 2015 - December 2015

Enclosure 2 Page 1 of 2 COMMITMENT CHANGE 15-C003 The commitment change related to NRC Order EA-05-007 was finalized December 21, 2015.

Commitment Number: RCTSAI 2820524 Source Document(s): APS Letter 102-05317 response to NRC Order EA-05-007 Existing Commitment

Description:

NRC Order EA-05-007 (dated July 19, 2005) modifies PV's license for the transportation of radioactive material quantities of concern (RAMQC) and requires implementation of the order 90 days prior to PV's first RAMQC shipment. To ensure compliance with the order, a note will be added referencing NCR Order EA-05-007 in station procedure 76RP-0RW07 "Shipping Radioactive Material" as well as the list of isotopes/limits identified in the order.

Revised Commitment

Description:

This RCTSAI can be changed from an Active Y commitment to Active N closed as the NRC issued a rescission of the order.

Justification of Change:

The NRC rescission of order EA-05-007, Order Imposing Additional Security Measures dated 6/3/2015 had been evaluated by Security and Program Standards under evaluation 15-05745-002. This evaluation concluded the commitment to the rescinded Order was no longer necessary due to the regulatory requirements of 10 CFR Part 37. Procedures have been adjusted accordingly.

Enclosure 2 Page 2 of 2 COMMITMENT CHANGE 15-C005 The commitment change related to SIT level monitoring was finalized December 21, 2015.

Commitment Number: RCTSAI 3235215 Source Document(s): Generic Letter 2008-01 response letter 102-05910-JHH/DLK, 10/14/2008 Existing Commitment

Description:

Procedure 40DP-9OP06 will be revised to provide guidance on the amount of SIT level change that should be considered abnormal and require entry into the CAP to assess the cause of the leak and the potential for void formation when the threshold is exceeded. This corrective action is scheduled to be completed by January 15, 2009.

Revised Commitment

Description:

Procedures will provide guidance on the amount of SIT level change that should be considered abnormal and require entry into the CAP to assess the cause of the leak and the potential for void formation when the threshold is exceeded.

Justification of Change:

Originally the RCTSAI was to credit the Operations Repetitive Task Program, 40DP-9OP06, with the monitoring of the SIT levels by the STAs on shift.

Operations, Engineering, Operations Standards, and Regulatory Affairs discussed the feasibility of transferring the guidance to the trending performed by the system engineers. This change would remove redundancy of tracking, trending and documenting while improving Operational Focus in the control room.

10 CFR 50.59 / 10 CFR 72.48 Palo Verde Nuclear Generating Station 102-07238 TNW/TMJ P.O. Box 52034 May 6, 2016 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-5764 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, & 3 and Independent Spent Fuel Storage Installation (ISFSI)

Docket Nos. STN 50-528/529/530 and 72-44 10 CFR 50.59, 10 CFR 72.48, and Commitment Change Annual Reports and Notifications Enclosed please find the Arizona Public Service Company (APS) 10 CFR 50.59 and 10 CFR 72.48 report for January 1, 2015, through December 31, 2015. The Commitment Change Report is for the period of January 1, 2015, through December 31, 2015.

In accordance with 10 CFR 50.59(d)(2), APS is providing a brief description and summary of the evaluations required by 10 CFR 50.59(d)(1) for each change completed during the period. This report contains the evaluations written during 2015, regardless of the implementation status of the evaluated action, and is included as Enclosure 1 to this letter.

In accordance with 10 CFR 72.48(d)(2), APS is reporting that there were no changes completed during the period that were required to be reported pursuant to 10 CFR 72.48.

In accordance with the APS commitment management program, APS is reporting two NRC commitment changes made during the referenced time period as described in to this letter. Other commitment changes made during 2015 that were reported in separate correspondence are not included in Enclosure 2.

No new commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Michael D. DiLorenzo, Regulatory Affairs, Section Leader, at (623) 393-3495.

Sincerely, Weber, Thomas Digitally signed by Weber, Thomas N(Z00499)

DN: cn=Weber, Thomas N(Z00499)

N(Z00499)

Reason: I am approving this document Date: 2016.05.06 09:38:33 -07'00' Thomas N. Weber Department Leader, Regulatory Affairs TNW/TMJ/akf

Enclosures:

1. 10 CFR 50.59 and 10 CFR 72.48 Report January 2015 - December 2015
2. Commitment Change Report January 2015 - December 2015 A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

ENCLOSURE 1 PALO VERDE NUCLEAR GENERATING STATION 10 CFR 50.59 and 10 CFR 72.48 Report January 2015 - December 2015

10 CFR 50.59 and 10 CFR 72.48 REPORT (JANUARY 2015 through DECEMBER 2015)

Log Doc Doc Number Description Summary Type E-14-0003 DMWO 3286783 THE LEGACY MAIN GENERATOR EXCITATION AND THIS CHANGE DOES NOT Rev.001 VOLTAGE REGULATOR SYSTEM (GENERREX) REQUIRE PRIOR NRC REPLACED WITH A NEW GENERAL ELECTRIC (GE) APPROVAL IN ACCORDANCE DIGITAL EXCITATION CONTROL SYSTEM WITH 10 CFR 50.59(C)(1).

(EX2100E).

E-15-0002 DMWO 4096894 THE DIGITAL ASSET PROTECTION SYSTEM (DAPS) THIS CHANGE DOES NOT Rev. 000 IS A CENTRALIZED MONITORING AND CYBER- REQUIRE PRIOR NRC SECURITY RESPONSE ARCHITECTURE FOR APPROVAL IN ACCORDANCE PROCESS SYSTEMS AT THE PALO VERDE NUCLEAR WITH 10 CFR 50.59(C)(1).

GENERATING STATION (PVNGS) FACILITIES.

E-07-0006 DMWO 2859190 THE MODIFICATION WILL REMOVE THE EXISTING THIS CHANGE DOES NOT Rev. 005 90VR PANEL THAT INCLUDES THE AUTOMATIC REQUIRE PRIOR NRC AND MANUAL VOLTAGE REGULATORS, THE MOTOR APPROVAL IN ACCORDANCE OPERATED POTENTIOMETERS (MOP) MOUNTED WITH 10 CFR 50.59(C)(1).

ADJACENT TO THE 90VR AND INSTALL A NEW 90VR PANEL THAT CONTAINS TWO AVRS AND TWO DIGITAL REFERENCE UNITS (DRU) AS REPLACEMENT FOR THE MOPS E-15-0001 DEC 00494.R001 THE PROPOSED ACTIVITY IS TO ISSUE DEC- THIS CHANGE DOES NOT Rev. 000 00494, REVISION 1, WHICH ACCEPTS AS-IS THE REQUIRE PRIOR NRC ORIGINAL ALLOY 600 NOZZLE REMNANT (WITH A APPROVAL IN ACCORDANCE FLAWED ALLOY 82 J-GROOVE WELD AND BOAT WITH 10 CFR 50.59(C)(1).

SAMPLE REMOVED) INSIDE THE REACTOR VESSEL AT BOTTOM MOUNTED INSTRUMENTATION (BMI) PENETRATION #3 FOR THE REMAINDER OF THE UNIT 3 LICENSED OPERATING LIFE.

E-13-0001 DMWO 3270069 THE LEGACY HONEYWELL PLANT COMPUTER (PC) THIS CHANGE DOES NOT Rev. 002 SYSTEM AND ASSOCIATED SOFTWARE ARE BEING REQUIRE PRIOR NRC REPLACED WITH A NEW ROLLS ROYCE SYSTEM. APPROVAL IN ACCORDANCE THE PROPOSED CHANGE IS APPLICABLE TO UNITS WITH 10 CFR 50.59(C)(1).

1, 2, AND 3.

Enclosure Page 1 of 2

10 CFR 50.59 and 10 CFR 72.48 REPORT (JANUARY 2015 through DECEMBER 2015)

Log Doc Doc Number Description Summary Type E-15-0004 CALC 13-JC-SF-0202 PROCEDURES AND A CALCULATION ARE BEING THIS CHANGE DOES NOT Rev. 000 PROC 90OP-9SF01 REVISED TO SUPPORT ALLOWING A GIVEN CEA REQUIRE PRIOR NRC TO BE HELD ON THE LOWER GRIPPER (LG) APPROVAL IN ACCORDANCE INSTEAD OF THE UPPER GRIPPER (UG). WITH 10 CFR 50.59(C)(1).

E-15-0004 CALC 13-JC-SF-0202 CALCULATION 13-JC-SF-0202, PROCEDURE 40OP- THIS CHANGE DOES NOT Rev. 001 PROC 40OP-9SF01 9SF01, CLARIFICATION WAS ADDED THAT REQUIRE PRIOR NRC PROCEDURES IMPLEMENTING SOME ASPECTS OF APPROVAL IN ACCORDANCE TS LCO 3.1.7 FOR CEAS THAT ARE HELD BY THE WITH 10 CFR 50.59(C)(1).

LOWER GRIPPER ALSO HAVE A SLIGHTLY DIFFERENT POSITION REQUIREMENT.

E-14-0003 DMWO 3286783 THE LEGACY MAIN GENERATOR EXCITATION AND THIS CHANGE DOES NOT Rev. 002 VOLTAGE REGULATOR SYSTEM (GENERREX) IS REQUIRE PRIOR NRC TO BE REPLACED WITH A NEW GENERAL APPROVAL IN ACCORDANCE ELECTRIC (GE) DIGITAL EXCITATION CONTROL WITH 10 CFR 50.59(C)(1).

SYSTEM (EX2100E).

E-15-0003 PROC 73TI-9CH08 THE PROPOSED ACTIVITY IS TO IMPLEMENT TEST THIS CHANGE DOES NOT Rev. 000 INSTRUCTION (TI) PROCEDURE 73TI-9CH08, REQUIRE PRIOR NRC CHARGING PUMP SUCTION PRESSURE DATA APPROVAL IN ACCORDANCE COLLECTION. WITH 10 CFR 50.59(C)(1).

E-15-0005 TMWO 4712119 IMPLEMENT TEMPORARY MODIFICATION WORK THIS CHANGE DOES NOT Rev. 000 ORDER (TMWO) 4712119 PERTAINING TO THE REQUIRE PRIOR NRC MOVEMENT OF NEW FUEL ASSEMBLY P2Y107 AT APPROVAL IN ACCORDANCE CORE LOCATION C03 FROM THE REACTOR WITH 10 CFR 50.59(C)(1).

VESSEL TO THE FUEL TRANSFER MACHINE. THIS IS A ONE-TIME EVOLUTION TO BE PERFORMED DURING THE U2R19 REFUELING OUTAGE.

NOTE: There were no 10 CFR 72.48 Evaluations in 2015.

ACRONYMN/ABBREVIATION LIST CALC Calculation DMWO Design Modification Work Order LDCR Licensing Document Change Request PROC Procedure STDY Study TMWO Temporary Modification Work Order Enclosure Page 2 of 2

ENCLOSURE 2 PALO VERDE NUCLEAR GENERATING STATION Commitment Change Report January 2015 - December 2015

Enclosure 2 Page 1 of 2 COMMITMENT CHANGE 15-C003 The commitment change related to NRC Order EA-05-007 was finalized December 21, 2015.

Commitment Number: RCTSAI 2820524 Source Document(s): APS Letter 102-05317 response to NRC Order EA-05-007 Existing Commitment

Description:

NRC Order EA-05-007 (dated July 19, 2005) modifies PV's license for the transportation of radioactive material quantities of concern (RAMQC) and requires implementation of the order 90 days prior to PV's first RAMQC shipment. To ensure compliance with the order, a note will be added referencing NCR Order EA-05-007 in station procedure 76RP-0RW07 "Shipping Radioactive Material" as well as the list of isotopes/limits identified in the order.

Revised Commitment

Description:

This RCTSAI can be changed from an Active Y commitment to Active N closed as the NRC issued a rescission of the order.

Justification of Change:

The NRC rescission of order EA-05-007, Order Imposing Additional Security Measures dated 6/3/2015 had been evaluated by Security and Program Standards under evaluation 15-05745-002. This evaluation concluded the commitment to the rescinded Order was no longer necessary due to the regulatory requirements of 10 CFR Part 37. Procedures have been adjusted accordingly.

Enclosure 2 Page 2 of 2 COMMITMENT CHANGE 15-C005 The commitment change related to SIT level monitoring was finalized December 21, 2015.

Commitment Number: RCTSAI 3235215 Source Document(s): Generic Letter 2008-01 response letter 102-05910-JHH/DLK, 10/14/2008 Existing Commitment

Description:

Procedure 40DP-9OP06 will be revised to provide guidance on the amount of SIT level change that should be considered abnormal and require entry into the CAP to assess the cause of the leak and the potential for void formation when the threshold is exceeded. This corrective action is scheduled to be completed by January 15, 2009.

Revised Commitment

Description:

Procedures will provide guidance on the amount of SIT level change that should be considered abnormal and require entry into the CAP to assess the cause of the leak and the potential for void formation when the threshold is exceeded.

Justification of Change:

Originally the RCTSAI was to credit the Operations Repetitive Task Program, 40DP-9OP06, with the monitoring of the SIT levels by the STAs on shift.

Operations, Engineering, Operations Standards, and Regulatory Affairs discussed the feasibility of transferring the guidance to the trending performed by the system engineers. This change would remove redundancy of tracking, trending and documenting while improving Operational Focus in the control room.