Line 31: Line 31:
NRC modifications to changes, and other changes identified by the staff as generic. Any change proposed by TXX-88512 and not addressed in the previous two meetings, or not included in this meeting's agenda may be considered incor-porated as a pl6nt-specific change to to the Proof and Review version of the Unit 1 TS scheduled for issuance in early December. The actions taken with regard to the changes covered in agenda item 2 are summarized in Enclosure 4.
NRC modifications to changes, and other changes identified by the staff as generic. Any change proposed by TXX-88512 and not addressed in the previous two meetings, or not included in this meeting's agenda may be considered incor-porated as a pl6nt-specific change to to the Proof and Review version of the Unit 1 TS scheduled for issuance in early December. The actions taken with regard to the changes covered in agenda item 2 are summarized in Enclosure 4.
The staff and applicant also reviewed the list of Safety Evaluation Report (SER) items for which technical specifications are required, provided as Enclosure 2 to the NRC letter forwarding the typed first draft Unit 1 TS to TV Electric on January 6,1988 (see attachment to corrected agenda in Enclosure 2 of this summary). Of the 9 items on that list, it was agreed that 7 have been appropriately incorporated in the proposed Unit 1 TS. Item 8 is still under TV Electric evaluation and item 2 requires staff reassessment.
The staff and applicant also reviewed the list of Safety Evaluation Report (SER) items for which technical specifications are required, provided as Enclosure 2 to the NRC letter forwarding the typed first draft Unit 1 TS to TV Electric on January 6,1988 (see attachment to corrected agenda in Enclosure 2 of this summary). Of the 9 items on that list, it was agreed that 7 have been appropriately incorporated in the proposed Unit 1 TS. Item 8 is still under TV Electric evaluation and item 2 requires staff reassessment.
TV Electric comitted to providing by November 11, 1988 a formal response to Enclosure 2 of NRC's January 6, 1988 letter, addressing how each of the items have been or will be covered in the proposed Unit 1 TS.
TV Electric comitted to providing by November 11, 1988 a formal response to Enclosure 2 of NRC's {{letter dated|date=January 6, 1988|text=January 6, 1988 letter}}, addressing how each of the items have been or will be covered in the proposed Unit 1 TS.
* See "5umary of Neeting on October 5-6, 1988 - CPSES Unit 1 Technical Specifications," Docket No. 50-445, October 31, 1988.
* See "5umary of Neeting on October 5-6, 1988 - CPSES Unit 1 Technical Specifications," Docket No. 50-445, October 31, 1988.
pwe myhs                                                          t
pwe myhs                                                          t

Latest revision as of 19:40, 6 December 2021

Summary of 881019 Meeting W/Util in Rockville,Md Re Unit 1 Tech Specs.Meeting Notice,Corrected Agenda & List of Attendees Encl
ML20205N791
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 10/31/1988
From: Malloy M
NRC OFFICE OF SPECIAL PROJECTS
To:
NRC OFFICE OF SPECIAL PROJECTS
References
GL-88-11, NUDOCS 8811040348
Download: ML20205N791 (13)


Text

.

sa nun

![' smt'g j o UNITED STATES NUCLE AR REGULATORY COMMISSION s* .i WASHINGTON, D. C. 20555

% / October 31, 1988 Docket No. 50-445 APPLICANT: TexasUtilitiesElectricCompany(TVElectric) ,

FACILITY: Comanche Peak Steam Electric Station (CPSES), Unit 1

SUBJECT:

SUMMARY

OF NEETING ON OCTOBER 19, 1988 - CPSES UNIT 1 TECHNICAL SPECIFICATIONS NRC staff and representatives of TV Electric met on October 19, 1988 in Rockville, Maryland to discuss the CPSES Unit 1 Technical Specifications (TS) which are under development. The meeting notice, corrected agenda, and list of attendees are provided as Enclosures 1, 2, and 3, respectively, to this sumary.

This meeting was a follow-up to the meeting held on October 5-6, 1988.*

It focused primarily on discussion of changes to the second draft Unit 1 TS proposed by the applicant (TXX-88512 dated June 23,1988) and not covered in the previous two meetings (September 22 and October 5-6,1988).

The agenda's listing of TS changes (by their identification number from TXX-88512) included changes needing more justification, unacceptable changes.

NRC modifications to changes, and other changes identified by the staff as generic. Any change proposed by TXX-88512 and not addressed in the previous two meetings, or not included in this meeting's agenda may be considered incor-porated as a pl6nt-specific change to to the Proof and Review version of the Unit 1 TS scheduled for issuance in early December. The actions taken with regard to the changes covered in agenda item 2 are summarized in Enclosure 4.

The staff and applicant also reviewed the list of Safety Evaluation Report (SER) items for which technical specifications are required, provided as Enclosure 2 to the NRC letter forwarding the typed first draft Unit 1 TS to TV Electric on January 6,1988 (see attachment to corrected agenda in Enclosure 2 of this summary). Of the 9 items on that list, it was agreed that 7 have been appropriately incorporated in the proposed Unit 1 TS. Item 8 is still under TV Electric evaluation and item 2 requires staff reassessment.

TV Electric comitted to providing by November 11, 1988 a formal response to Enclosure 2 of NRC's January 6, 1988 letter, addressing how each of the items have been or will be covered in the proposed Unit 1 TS.

  • See "5umary of Neeting on October 5-6, 1988 - CPSES Unit 1 Technical Specifications," Docket No. 50-445, October 31, 1988.

pwe myhs t

l Summary of Meeting on October 19, 1988 TV Electric stated that it anticipates providing the staff a mini-submittal at the end of October or early November 1988 containing various additional infor-mation it agreed to provide at recent TS meetings. The applicant also expects to provide its risk surveys on specifictions relocated to the CPSES TS Improve-ment Program by November 11, 1988. TV Electric requested information on TS changes they can expect in conjunction with Generic Letter 88-11 (July 12,1988),

"NRC Position on Radiation Embrittlement of Reactor Vessel Materials and Its .

Impact on Plant Operations." The s W f will confer with the Materials Engineer-ing Branch on this matter and advise TV Electric.

The meeting was adjourned on the afternoon of October 19, 1988.

iy l Melinda Malloy, Project M ager Comanche Peak Project Division Office of Special Projects

Enclosures:

1. Meeting Notice
2. Corrected Agenda
3. List of Attendees
4. Action Taken on Agenda items cc: See next page

October 31, 1988 Suar.ary of Heeting on October 19, 1988 TU Electric stated that it anticipates providing the staff a mini-submittal at the end of October or early November 1988 containing various additional infor-mation it agreed to provide at recent TS meetings. The applicant also expects to provide its risk surveys on specifictions relocated to the CPSES TS Improve-n=.st Program by Noverrber 11, 1988. TV Electric requested information on TS change; they can expect in conjunction with Generic Letter 88-11 (July 12,198t),

"NRC Position on Radiation Embrittlement of Reactor Vessel Materials and its Impact on Piant Operations." The staff will confer with the Materials Engineer-ing Branch on this matter and advise TV Electric.

The meeting was adjourned on the afternoon of October 19, 1988.

- (original signed by)

Melinda Halloy, Project Manager Comanche Peak Project Division Office of Special Projects

Enclosures:

1. Meeting Notice
2. Corrected Agenda
3. List of Attendees
4. Action Taken on Agenda items cc: See next page

. DISTRIBUTION .

l t Docket File NRC PDR Local POR OSP Reading CPPD Reading JPartlow CGrimes/PMcKee ,

l JLyons RWarnick JHWilson MMalloy JWiebe EButcher RGiardina ,

RWhite, LLNL OGC f

0Crutchfield Edordan BGrimes ACRS(10)

Pb)0M AD:CPPD: SP Ftia lloy:cm:cb JHWilsog'd'y 10bt7/88 10/3s /88 ,

o W. G. Counsil Comanche Peak Steam Electric Station Texas Utilities Electric Company Units 1 and 2 Cc:

Jack R. Newman, Esq. Asst. Director for Inspec. Programs Newman & Holtzinger, P.C. Comanche Peak Project Division Suite 1000 U.S. Nucioar Regulatory Commission .

1615 L Street, N.W. P. O. Box 1029 Washington 0.C. 20036 Granbury. Texas 76048 Robert A. Wooldridge, Esq. Regional Administrator, Region IV Worsham, Forsythe, Sampels & U.S. Nuclear Regulatory Connission Wooldridge 611 Ryan Plaza 0 *"2, Suite 1000 2001 Bryan Tower, Suite 2500 Arlington, Texas 76011 Dallas, Texas 75201 Lanny A. Sinkin Mr. Homer C. Schmidt Christic Institute Director of Nuclear Services 1324 North Capitol Street Texas Utilities Electric Company Washington, D.C. 20002 Skyway Twer 400 North Olive Street, L.B. 81 Ms. Billie Pirner Garde. Esq.

Dallas, Texas 75201 Govei nent Accountability Project Midwest Office Mr. R. W. Ackley 104 East Wisconsin Avenue Stone & Webster Appleton, Wisconsin 54911 Comanche Peak Steam Electric Station P. O. Box 1002 David R. Pigott, Esq.

Glen Rose Texas 76043 Orrick, Herrington & Sutcliffe 600 Montgomery Street Mr. J. L. Vota San Francisco, California 94111 Westinghouse Electric Corporation P. O. Box 355 Anthony Z. Roisman, Esq.

Pittsburgh, Pennsylvania 15230 Suite 600 1401 New York Avenue, NW Susan M. Theisen Washington 0.C. 20005 Assistant Attorney General Environmental Protection Division Robert Jablon P. O. Box 12548, Capitol Station Bonnie S. Blair Austin, Texas 78711-1548 Spiegel & McDiarmid 1350 New York Avenue, NW Mrs. Juanita Ellis, President Washington, D.C. 20005-4798 Citizens Association for Sound Energy 1416 South Polk George A. Parker, Chairman Dallas, Texas 75224 Public Utility Connittee Senior Citizens Alliance Of Ms. Nancy H. Williams Tarrant County, Inc.

CYGNA Energy Services (048 Wonder Drive 2121 N. California Blvd., Suite 390 Fort Worth, Texas 76133 Walnut Creek, CA 94596

W. G. Counsil Comanche Peak Electric Station Texas Utilities Electric Company Units 1 and 2 cc:

Joseph F. Fulbright Fulbright 4 Jaworski 1301 McKinney Street .

Houston, Texas 77010 Roger D. Welker Manager, Nuclear Licensing Texas Utilities Electric Company Skyway Tower 400 North Olive Street, L.B. 81 Dallas, T2xas 75201 Texas Utilities Electric Company c/o Bethesda Licensing 3 Metro Center, Suite 610 Bethesda, Maryland 20614 William A. Burchette. Esq.

Counsel for Tex-La Electric Cooperative of Texas Heron, Burchette, Ruckert & Rothwell Suite 700 1025 Thomas Jefferson Street, NW Washington, D.C. 20007 GDS ASSOCIATES, INC.

Suite 720 1850 Parkway Place Marietta, Georgia 30067-8237

~- .

ENCLOSURE 1

/** "D'% ^*

UNITED STATES f- *

i j NUCLE AR REGULATORY COMMISSION W AsmMQ ton, o, C. 20084

/ f;7,

,.m 0

Occket 8to. 50-445 ,

ObM O f MEMORANDUM FOR: Christopher 1. Grimes, Director Comancho Peak Project Division .

Office of Special Projects THRU: James H. Wilson, Assistant Director for Projects Comanche Peak Project Division Office of Special Projects FROM: Melinda Halloy, Project Manager Comanche Peak Project Division Office of Special Projects

SUBJECT:

FORTHCOMING NEETING WITH TU ELECTRIC Date and Tire: October 19-20, 1988 '

8:00 am - 6:00 pm (each day) -

Location: One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Room 4-B-11

Purpose:

Discussion of proposed changes to the Comanche Peak Unit 1 Technical Specifications and preparation of the "Proof & Review" vercion of the Technical Specifications

-k w n '. . )

Participants:

NRC TV Electric M. Malloy D. Woodlan R. Giardina J. Kelley N. Hood

' fjf l h Melinda Malloy, Project Man Comanche Peak Project Division Office of Special Projects cc: See next page CONTACT (s): Melinda Halloy or James H. Wilson (301)492-0736 (301) 492-3306

  • Meetings between iiRC technical staff and applicants for licenses are epen for interested mercers of the put,lic, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meetings and Statement of hRC Staff Policy," 43 Federal Register 16:58, 6/25/78.

$ ktj'S$ W el. OVs 0CbW N) 5 YO l'n t l d e . m a k k fMWA ,

-q J(uppo (C1 [ g

OC)>bk",ita

- m W 5 N C5 h l W. G. Counsil Comanche Peak Steam Electric Station Texas Utilities Electric Company Units 1 and 2 cc:

Jack R. Newman, Esq. Asst. Director for Inspec. Programs Newman & Holtzinger, P.C. Comanche Peak Project Division Suite 1000 U.S. Nuclear Regulatory Comission .

1615 L Street, N.W. P. O. Box 1029 Washington. 0.C. 20036 Granbury Texas 76048 Robert A. Wooldridge, Esq. Regional Administrator, Region IV Worsham, Forsythe, Sampels & . U.S. Nuclear Regulatory Comission Wooldridge 611 Ryan Plaza Drive, Suite 1000 2001 Bryan Tower Suite 2500 ' Arlington, Texas 76011 Dallas, Texas 75201 Lanny A. Sinkin Mr. Homer C. Schmidt Christic Institute Otractor of Nuclear Services 1324 North Capitol Street Texas Utilities Electric Company Washington, D.C. 20002 Skyway Tower 400 North Olive Street, L.B. 81 Ms. Billie Pirner Garde Esq. -

Dallas, Texas 75201 Government Accountability Project Midwest Office Mr. R. W. Ackley 104 East Wisconsin Avenue Stone & Webster Appleton, Wisconsin 54911 Comanche Peak Steam Electric Statien David R. Pigott, Esq.

P. O. Box 1002 Orrick, Herrington & Sutcliffe Glen Rose. Texas 76043 600 Montgomery Street Mr. J, t.. Vota San Francisco, California 94111 Westinghouse Electric Corporation P. O. Box 355 Anthony Z. Roisman, Esq.

Pittsburgh, Pennsylvania 15230 Suite 600 1401 New York Avenue, NW Susan M. Theisen Washington D.C. 20005 Assistant Attorney General Environrental Protection Division Robert Jablon P. O. Eox 12548 Capitol Station bonnie S. Blair Austin, Texas 78711-1548 Spiegel & McDiamid 1350 New York Avenue, NW Hrs. Juanita Ellis, President Washington, D.C. 20005 4798 Citizens Association for Sound Energy George A Parker, Chairnan 1426 South Polk Public Utility Comittee Dallas, Texas 75224 Senior Citizens Alliance Of Ms. Nancy H. hilliams Tarrant County, Inc.

CYGNA Energy Services 6048 Wonder Ortve 2121 N. California Blvd., Suite 390 Fort kcrth, Texas 76133 [

1 Walnut Creek, CA 94596 l

i i

. .?]

cWg hkei W. G. Counsil- Comanche Peak Electric Station Texar, Utilities Electric Company Units 1 and 2 cc:

Joseph F. Fulbright Fulbright & Jewerski 1301 McKinney Street .

Houston, Texas 77010 Roger D. Walker Manager Nuclear Licensing Texas Utilities Electric company-Skyway Tower .

400 North Olive Street, L.B. 81 Dallas, Texas 75201 Texas Utilities Electric Company c/o Bethesda Licensing 3 Netro Center, Suite 610 Bethesda, Maryland 20814 William A. Burchette, Esq. -

Counsel for Tex-La Electric Cooperative of Texas Heron, Burchette, Ruckert & Rothwell Suite 700 1025 Thomas Jefferson Street NW Washington 0.C. 20007 GD5 ASSOCIATES, INC.

Suite 720 1550 Parkway Place Marietta, Georgia 30067-8237

  • . . ENCLOSURE NRC/TU ELECTRIC MEETING ON CPSES UNIT 1 TECHNICAL SPECIFICATIONS OCTOBER 19-20, 1988 AGENDA 10/19/88 1. Opening remarks and agenda review (8:00-8:15) 10/19/88 2. Discussion of proposed changes to second draft 8:15-12:00) CP5E5 Unit 1 T5 (reference TAX-855I2 dated 6/23/88 1:00 6:00)

Discussion of TU Electric's proposed changes to the second draft Unit 1 TS (including items needing more

  • justification, unacceptable changes, NRC modifications to changes, and other generic-type changes), as follows:
a. Section 3/4.3 5
  • Item 17, p. 3/4 3-3 (no I.D. No.)
  • 1.D. No. 0137
  • 1.D. No. 0123
  • 1.0, No. 0601 1.0. No. 0145
  • I.D. No. 0602 10/20/88 1.0. No. 0605
  • 8 p. 3/4 3-5
  • Action a, p. 3/4 3-57 (8:00-12:00)

(12:00-4:00) b. Section 3/4.4

  • Table 3-4.2, p. 3/4 4-25
  • I.D. No. 0244
  • 1.D. No. 0238 * !.D. No. 0245 l.D. No. 0240
  • I.D. No. 0480
  • 1.0. No. 0478
  • 1.0, No. 0906
  • 1.D. No. 0242
  • 1.0. No. 0938
c. Section 3/4.6 -

I.D. No. 0276 '

' 1.D. No. 0286

!.D. No. 0285

d. Section 3/4.7 I.D. No. 0300 * !.D. No. 0314
  • 1.0. No. 0302 * !.0. No. 0322 I.D. No. 0309 ' !.D. No. 0331

!.D. No. 0321 ' 1.D. No. 0340 l.D. No. 0327 ' l.D. No. 0~41 1.D. No. 0310

e. Section 3/4.8
  • I.D. No. 0925

Agenda for meeting of October 19-20,1988(continued) l f.* Section 3/4.10 f 5, p. 3/4 10-1 Section 3/4.11 ,

9 *. J.D. No. 0410 ' p. 6-10 . l f.D. No. 0419

  • I.D. No. 0534  ;
  • 1.D. No. 0430  ;
p. 6-3  !

!.D. No. 0518  :

  • I.D. No. 0520  ;

i i

10/20/88 3. SER'SSER-required channes I (4:00-5:00) ,

Discussion of items identified in Enclosure 2 of NRC letter i

.(Grimes to Counsil) dated January 6,1988 for which TS  :

changes still need to be proposed by TU Electric i 10/20/88 4 Sumary of actions and plans for future meetings (5:00-5:30) l l

k h

l t

i I

  • I i

i r

I l

i t

t i

- - - . _ , _ . . _ _ _ - ._________.____.J

ENCLOSURE 2 NRC/TV ELECTRIC MEETING ON CpSES UNIT 1 TECHNICAL SPECIFICATIONS OCTOBER 19-96, 1988 COM6cMb AGENDA 10/19/88 1. Opening remarks and agenda review (8:00-8:15) 10/19/88 2. Discussion of proposed changes to second draft (8:15-12:00) CP5E5 Unit 1 T5 (reference IAA-88512 dated 6/23/88 (1:00-6:00)

Discussion of TU Electric's proposed changes to the second draf t Unit 1 TS (i$cluding items needing more justification, unacceptable changes, NRC modifications to changes, and other generic-type changes), as follows:

a. Section 3/4.3 9 Z,p Me,0084 *-

Item 17,p.3/43-3(noI.D.No.) *1.D.No.0147 F 1.D. ha. 0123

  • 1.0 No. 0601
  • I.D. No. 0602 1.D. No. 0145 10/20/88 1.D. No. 0605 ' B, p. 3/4 3-5 (8:00-12:00)
  • Action a, p. 3/4 3-57 be ED. Mo.)

(12:00-4:00) b. Section 3/4.4 1.D. No. 0244 Table

!.D. No.3-4.2, 0238 p. 3/4 4-25(e.r.6,4' !.D. No. 0245 T'D No* oY70

1.D. No. 0240

  • 1.D. No. 0480
  • I.D. No. 0906 1.0. No. 0478 1.D. No. 0242
  • 1.D. No. 0938 l c. Section 3/4.6 l

' ;;. n. 2 5

.

  • 1.D. No. 0286 l 1.D. No. 0285 l

l

d. Section 3/4.7 I.D. No. 0300 * !.D. No. 0314 1.D. No. 0302
  • 1.D. No. 0322
  • 1.D. No. 0331 1.D. No. 0309 1.D. No. 0321
  • 1.D. No. 0340 1.0 No. 0327 ' 1.D. No. 0341 I.D. No. 0310

.r. 0, 4. 0159 'p Section 3/4.6 l

I.D. No. 0928 i

l i

. Agenda for meeting of October 194fr.1988 (continued)

f. Section 3/4.10
  • B, p. 3/4 10-1
g. Section 3/4.11
  • I.D. No. 0410 p. 6-10
  • I.D. No. 0419  %('*I.D.No.0534 '
4. Sed /en 6 f.D. No. 0430 ( e r p, Ne, cgr7

'p . 6-15

  • I.D. No. 0518 I.D. No. 0520 10/20/88 3. SER/SSER-required changes (4:00-5:00)

Discussion of items identified in Enclosure 2 of NRC letter (Grimes to Counsil) dated January 6,1988 for which S changes still need to be proposed by TV Electric ( O 10/20/88 4 Sumary of actions and plans for future meetings (5:00-5:30)

O

from NRC(C.I. Grimes) lotter to

, W.G.Counsil(TV Elcctric) dated January 6,1988 ENCLOSURE 2 SER ITEMS FOR WHICH IECHNICAL SPECIFICATICNS NEED TU BE PROPOSE 0

. 1. The Comanche Peak Steam Electric Station (CPSES) Safety Evaluation Report (SER) Section 4.4.1 states the following:

"The staff will require the applicant to present an acceptable method of accomodating the thermal margin reducticn ... so that appropriato provisions may be incorporated in the Technical Specifications." The applicant should insert into the basis of the proposed Technical Speci-fications any plant-specific or generic margin that may be used to offset the reduction in departure from rucleate ooiling ratio (DNBR) caused by rod bowing and should also reference the source and staff approval of each generic margin."

The marked-up version of the Westinghouse Standard Technical Specifications (STS) submitted by TV Electric on Octcber 30, 1987 (TXX-6905) does not seem to address this SER requirement. TU Electric net.os to show that the require-ment has been incorporated into the October 30, 1987 marked-up STS or pro-pose appropriate technical specifications to meet the requirenent.

2. SER Section 4.4.1 requires that appropriate surveillance recuirements be includes its the Technical Specifications to recognize any rapid crud buildup in the reactor cere. TU Electric has not proposeo any survell-lance requirements to nitet this SER requirement and needs to provide the apprcpriate requirements.
3. Secticn 7.2.6 of Supplement !? to the SER describes how the CPSES r.cets the ceneric implications of the anticipated transient without scram (ATWS) event at the Salem Nuclear Power Plant (Generic Letter 83-28).

TU Electric modified the reactor trip system in order to meet Action Item 4.3 of the Generic Letter, Autcnatic Actiation of the Breaker Shunt Trip Attachment. That todificaticn was found to be acceptable by the staff. However, Action Item 4.3 of Generic letter 83-28 and Generic Letter 85-09 reoutre that technical specifications be proposed fer the autcratic actuation of the breaker shunt trip attachment modification.

This has not been included in the October 30, 1987 marked-up STS ard TU Electric needs .o provide the appropriete technical specifications.

4. Section 7.3.1.S of Supplement 3 to the SER stated that when a ste n generator level channel is not operable, the high stear, generator level protection channel selected for control of feedwater line isolation actuation will be placed in a hich level trip condition. This was tc be included in the Limiting Conditiens for Operation (LCO) of the plant.

TV Electric did not include this LCO in T.S. //4.3.2 of the October 30, IS67 rurked-up STS and needs to provice the apprs riate LCO.

F. SER Section 8.2.4 recuires specific Technical Specifications (LCOs),

surveillance requirerents, and trip setpoints with einimum and maximum limits for the first and second level of undervoltage protection. Neither the Octcber 1987 Fir.al Draft Cecanche Peak TS nor the October 30, 1987 earked-up STS appear to incluce these recuirements, particularly with regard to the mintntm and maximen trip setpoints. TV Electric needs to provice the apprcpriate technical specifications.

2

6. SER Section 8.4.3 and Branch Technical Position ICSB 18 (PSB) requires all valves requiring a power lockout in order to mect the single fatture criterion be listed in the Technical Specifications. Neither the October 1984 Final Draft Comanche Peak TS nor the October 30 marked-up ,

STS includes such a list. TU Electric needs to provide the apprcpriate <

technical specification. ,

j I

7. SER Section 11.2.1.2 requires that because the tilter /denineralizers for the consensate clean-up system are automatically backwashed, the Teebr.ical Specifications will reouire resin sampling and analysis for radioactivity. ,

Table 4.11-1, "kadioactive Liquid Waste Sampling and Analysis Program," ,

coes not appear to include this SER requirement. TV Electric needs to i either shew that the requirement is included in the Table or to include l the requirement in the TS.  !

8. SER Section 15.4.5 states that when the emergency core cooling syster. (ECCS) pumps are operating under accident conditions, a negative pressure of at least 1/8 in, water guage will be established by the emergency ventilatitr.

. This was a commitment rade by TV Electric and which the staff required to te includec in the Technical Specifications. The October 30, 1987 1 marked-up STS did not include this requirerent. TV Electric needs to provide appropriate technical specifications.

4

)

9. Section 22.2-!!.F.2 of Supplenent 6 to the SER, "Instrurentation fJr Cetection of Inadequate Core Coolics (ICC). "requires, prior to fuel i 1cading, that the technical specification for the ICC system be submitted l ey TV Electric and approved by the staff. Section J/4.3. "Instrumentation "

! of the October 30, 1987 marked-up STS does not contain these technical specifications. TV Electric needs to provide the required technical specifications.

I J

4 d

t I

i

ENCLOSURE 3 NRC/TU ELECTRIC MEETING ON CPSES UNIT 1 TECHNICAL SPECIFICATIONS OCTOBER 19, 1988 Narne Organization Title in L Q &RCfO$ffCfPD fYRW '

% 0IL TLt Elb, c Mulw 6}?wbH ca.w ihe s ro n a ra,e aucu ormocas

, \,3 cu b # W 6 t t e ve. i t._ si cus , g  !

2,+ s iz-saa r I S, d T0 Eg  ; .

ox cre m c A cc- e, cec. m , e.te

  1. W, . .*"..-

S*

7.s.UsG H M{"W'ffb z,. ,-t Q , p., ), (;,y$,e s AL L f M AY #

'"'"

  • H'" 4 gayc3 c. uA,to LLv L Jacs ~?cocimc. Tu C te t+r t d t ,% Kd. ( l C s/ I14 *C.I c ( ~'O. ( [ luar! LT OF3 l

l l

t .

o o

l ENCLOSthE 4 ACTION TAKEN ON AM.NDA ITEMS

!.D.No.*/0ther [

4 TS Section Identificatinn Action 3/4.3 Item 17, p. 3/4 3-3 NRC incorporatad correction in the  !

Proof & Review (PAR) version TS. ,

l 3/4.3 0084 NRC added "or maintenance" in line 4 f'

p. 3/4 3-7 of Action 8 after "testing," and stated TV's deletion and added "during which  !

time Action 8 applios" after "status" l in line 7 of Action 11. I 3/4.,3 0123 Considered a generic change by staff. [

p. 3/4 3-13 No further staf f action to be taken, t

, 3/4.3 0145 tonsidered a genenc change by the I

p. 3/4 3-30 staff. No further statf action to be  ;

taken. 7 i

3/4.3 0605 NRC incorporated proposed change in ,

p. 3/4 3-22 PAR version TS.

I i 3/4.3 Action a. NRC ircorperated proposed change in  !

! p. 3/4 3-57 P&R version T5, however, retained ,

J "accident monitoring instrumentation" l in line 1. ,

I 3/4.3 0197 NRC incor porated proposed ch4ng: . la i 0601 TS Table 3.3-8 except as followst l 0602 Item 6 to read "steam Generator r

p. 3/4 3-59 Weter Level - Wide Range or j Auvtitary Feedwater Flow ,

(Secondary Coolant Availabic)" and l required no. of ch M ets retained  !

at "1/ steam generatu ."

~

ltem 7 required no, of channels }

retained as "1/ steam generator."  :

1 Item 10 (ola item 12) steted in its entirety.

Old Itec 13 retained in its entirety.

  • Old Item 19 add in subcooling l monitors (TU proposed item 10).  !

" Identtitcatter neer for 15 change proposed in TAA-BS$12 dated June 23, 1988. f Page ros shown are from TXX-88512.  !

[

L, ~ , . ---__r.__., - , _ _ . _ , . - . _ - . _ . - - _ . _ . - , . . - _ _ . _ . - . , . _ . , _ . - -

(

l . -

, l I.D.No.*/0ther TS Section Identificatio.'s - Action 0197, 0601, and

  • Add 2 new items, containment 0602. continued isolation valve position and containment H, concentration.

SICB v'.11 propose total no. of channels and minimum channel ,

operable later.

3/4.3 0197 (Note: TXX-88512 incorrectly labeled Bases p. 83/4 3-5 ' change IDf0934). Bases retained in their entirety. Proposed deletion would constitute a generic change.

3/4.4 Table 3-4.2 NRC incorporated equais sign ("=")

in the p. 3/4 4-25 steady-state limit column for dissolved 32 and chloride.

3/4.4 0470 NRC incorporated proposed :Nnce in Bases p. B3/4 4-1 P&R version TS.

3/4.4 0238, p. 3/4 4-34 NRC incorporated the proposed changes and 0240, p. 3/4 4-34 in the P&R TS when TV clarified 3/4.4 0478, p. B3/4 4-8 the justification for these I.D. Nos.

Bases (appearing on of TXX-88512)that p. 5618.05 of 66,. F Attachment is the 7 maximum differential temperature "obtainab h.'

3/4.4 0242, p. 3/4 4-35 NRC incorporcted the proposed changes and 0244, p. 3/4 4-35 in the P&R TS.

3/4.4 0245, p. 3/4 4-36 Bases 0480, p. 83/4 4-15 3/4.4 0906 Considered a generic change by the

p. 3/4 4-11 staff. No further staff action to be taken.

I 3/4.4 0938 Changes not incorpcrated (staff

p. 3/4 4-23 would require a revised SER), however, Table 3.4-1 can be removed per G.L.

nd TV agreed to place Table in COSES-TSIP.

3/4.6 0285, p. 3/4 6-9 0 mges not incorporated pending 0286, p. 3/4 6-9 cm 'pt of cdditional information G mu TU.

3/4.7 0300 Changes not ?ncorporated pending

p. 3/4 7-3 NRC's completion of report on reduced surveillance testing at power and crafting of G.L.

2-

Y I.D.No.*/0ther 1S Section Identification Action 3/4.7 0302 NRC changed proposal by revising

p. 3/4 7-8a & b ending of action statements to c read "otherwise be in hot standby within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in hot

~

shutdown within the following '

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />."

3/4.7 0309, p. 3/4 7-15 Changes not incorporated pending staff review of exceptions to RG 1.52.

0321, p. 3/4 7-17 0327, p. 3/4 7-18 3/4.7 0310, p. 3/4 7-15 Changes not incorporated pending 0314, p. 3/4 7-16 staff review of exceptions to RG 1.52.

0322, p. 3/4 7-17 0331, p. 3/4 7-18 3/4.7 0340 NRC incorporated proposed changes

p. 3/4 7-29 in the P&R TS.

3/4.7 0341 Considered a generic change by staff. i

p. 3/4 7-30 Proposed spec will-not be included in  ;

the P&R TS unless TV provides a plant-specific justification.

3/4.8 0 NRC incorporated proposed changes in

p. 4 8-3 the P&R TS as follows:
  • Proposed deletion was steted and "60" changed to "80.5".
  • Added "after diesel generator breaker closure" after "seconds."

3/4.8 0928 Considered a generic change by staff,

p. 3/4 8-4 No further staff action to be taken.

3/4-10 Basis 3/4.10.3 TU withdrew proposed change.

Bases p. B3/4 10-1 3/4-11 Changes not incorporated in the P&R 0410, p. 3/4 11-1 TS as G.L. 87-09 covers. No further 0419, p. 3/4 11-8 staff action to be taken.

3/4-11 0430 Changes not incorporated in thw P&R

p. 3/4 11-15 TS pending staff developing "._, on RETS spec relocations.

3-

7 _

'l

,- l

~

1.D.No.*/0ther TS Section Identification Action 6 "*" Note Following "qualification" in the

p. 6-3 "*" Note, NRC added "described in Option 1 of the Consission Policy l Statement on Engineering Expertise, l 50 FR 43621, October 28, 1985" and .  !

deleted the rest of the sentence.

6 0518 NRC revised 6.3.1 by changing the

p. 6-4 last sentence to read: "Technicians and maintenance personnel are per-mitted to perform work in the specific tasks for which qualification has been demonstrated."

6 0520 NRC incorporate.d proposed changes in

p. 6-5 the P&R TS, ravising "Section 4.2.4" in line 4 of 6.5.1.2 to "Section 4.2 or 4.4."

6 p. 6-10 NRC revised 6.5.2.8 by deleting the second sentence on extension of audit in6ervals. (The proposed addition is considered by the staff to be a generic change.)

6 0534 NRC changed proposed frequency of

p. 6-10 CPSES-TOIP audit in 6.5.2.8.1 from 24 months to 12 months. TU to provide additional justification to justify 24 months.

k 6 0557 NRC incorporated proposed change in

p. 6-20 the P&R TS after modifying insertion to delete "Radioactive Effluent and Environmental Monitoring Manual."

.