ML120260505: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 37: Line 37:


ML#120260505_______X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE                RII:DRS        RII:DRS      RII:DRS SIGNATURE              /RA/          /RA/        /RA/
ML#120260505_______X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE                RII:DRS        RII:DRS      RII:DRS SIGNATURE              /RA/          /RA/        /RA/
NAME              A. SENGUPTA        L. LAKE      S. VIAS DATE              1/ 25 /2012    1/ 25 /2012  1/ 26 /2012 E-MAIL COPY          YES      NO  YES      NO YES        NO  YES    NO    YES    NO  YES      NO YES NO
NAME              A. SENGUPTA        L. LAKE      S. VIAS DATE              1/ 25 /2012    1/ 25 /2012  1/ 26 /2012 E-MAIL COPY          YES      NO  YES      NO YES        NO  YES    NO    YES    NO  YES      NO YES NO 3
 
PROGRESS ENERGY cc w/encl:
3 PROGRESS ENERGY cc w/encl:
Edward L. Wills, Jr.                        Senior Resident Inspector Director Site Operations                    U.S. Nuclear Regulatory Commission Brunswick Steam Electric Plant              Brunswick Steam Electric Plant Electronic Mail Distribution                U.S. NRC 8470 River Road, SE Robert J. Duncan II                        Southport, NC 28461 Vice President Nuclear Operations                          Joseph W. Donahue Progress Energy                            Vice President Electronic Mail Distribution                Nuclear Oversight Progress Energy Joseph M. Frisco, Jr Plant General Manager                      John H. O'Neill, Jr.
Edward L. Wills, Jr.                        Senior Resident Inspector Director Site Operations                    U.S. Nuclear Regulatory Commission Brunswick Steam Electric Plant              Brunswick Steam Electric Plant Electronic Mail Distribution                U.S. NRC 8470 River Road, SE Robert J. Duncan II                        Southport, NC 28461 Vice President Nuclear Operations                          Joseph W. Donahue Progress Energy                            Vice President Electronic Mail Distribution                Nuclear Oversight Progress Energy Joseph M. Frisco, Jr Plant General Manager                      John H. O'Neill, Jr.
Brunswick Steam Electric Plant              Shaw, Pittman, Potts & Trowbridge Progress Energy                            2300 N. Street, NW Electronic Mail Distribution                Washington, DC 20037-1128 Phyllis N. Mentel                          Peggy Force Manager, Support Services                  Assistant Attorney General Brunswick Steam Electric Plant              State of North Carolina Progress Energy Carolinas, Inc.            P.O. Box 629 Electronic Mail Distribution                Raleigh, NC 27602 Annette H. Pope                            Chairman Supervisor, Licensing/Regulatory Programs  North Carolina Utilities Commission Brunswick Steam Electric Plant              Electronic Mail Distribution Progress Energy Carolinas, Inc.
Brunswick Steam Electric Plant              Shaw, Pittman, Potts & Trowbridge Progress Energy                            2300 N. Street, NW Electronic Mail Distribution                Washington, DC 20037-1128 Phyllis N. Mentel                          Peggy Force Manager, Support Services                  Assistant Attorney General Brunswick Steam Electric Plant              State of North Carolina Progress Energy Carolinas, Inc.            P.O. Box 629 Electronic Mail Distribution                Raleigh, NC 27602 Annette H. Pope                            Chairman Supervisor, Licensing/Regulatory Programs  North Carolina Utilities Commission Brunswick Steam Electric Plant              Electronic Mail Distribution Progress Energy Carolinas, Inc.

Latest revision as of 19:42, 6 February 2020

Notification of Inspection and Request for Information
ML120260505
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/26/2012
From: Vias S
NRC/RGN-II/DRS/EB3
To: Annacone M
Carolina Power & Light Co
References
Download: ML120260505 (9)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 26, 2012 Mr. Michael J. Annacone Vice President Carolina Power and Light Company Brunswick Steam Electric Plant P.O. Box 10429 Southport, NC 28461-0429

SUBJECT:

BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Annacone:

From March 12 to March 16, 2012, the NRC will perform the baseline in-service inspection (ISI) at the Brunswick Steam Electric Plant, Unit 1 (NRC Inspection Procedure 71111.08).

Experience has shown that this inspection is resource intensive for both the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group (section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared. The second group (section B of the enclosure) identifies the information the inspectors will need upon arrival at the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be William Murray of your organization. Our inspection dates are subject to change based on your updated schedule of outage activities. If there are any questions about this inspection or the material requested, please contact the lead inspector Abhijit Sengupta at (404) 997-4430 (abhijit.sengupta@nrc.gov).

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room

2 PROGRESS ENERGY or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/

adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Steven J. Vias, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-325 License No. DPR-71

Enclosure:

Information Request for Brunswick Nuclear Power Plant cc w/encl: (See page 3 and 4)

ML#120260505_______X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE /RA/ /RA/ /RA/

NAME A. SENGUPTA L. LAKE S. VIAS DATE 1/ 25 /2012 1/ 25 /2012 1/ 26 /2012 E-MAIL COPY YES NO YES NO YES NO YES NO YES NO YES NO YES NO 3

PROGRESS ENERGY cc w/encl:

Edward L. Wills, Jr. Senior Resident Inspector Director Site Operations U.S. Nuclear Regulatory Commission Brunswick Steam Electric Plant Brunswick Steam Electric Plant Electronic Mail Distribution U.S. NRC 8470 River Road, SE Robert J. Duncan II Southport, NC 28461 Vice President Nuclear Operations Joseph W. Donahue Progress Energy Vice President Electronic Mail Distribution Nuclear Oversight Progress Energy Joseph M. Frisco, Jr Plant General Manager John H. O'Neill, Jr.

Brunswick Steam Electric Plant Shaw, Pittman, Potts & Trowbridge Progress Energy 2300 N. Street, NW Electronic Mail Distribution Washington, DC 20037-1128 Phyllis N. Mentel Peggy Force Manager, Support Services Assistant Attorney General Brunswick Steam Electric Plant State of North Carolina Progress Energy Carolinas, Inc. P.O. Box 629 Electronic Mail Distribution Raleigh, NC 27602 Annette H. Pope Chairman Supervisor, Licensing/Regulatory Programs North Carolina Utilities Commission Brunswick Steam Electric Plant Electronic Mail Distribution Progress Energy Carolinas, Inc.

Electronic Mail Distribution Robert P. Gruber Executive Director Randy C. Ivey Public Staff - NCUC Manager, Nuclear Oversight 4326 Mail Service Center Brunswick Steam Electric Plant Raleigh, NC 27699-4326 Progress Energy Carolinas, Inc.

Electronic Mail Distribution Anthony Marzano Director Paul E. Dubrouillet Brunswick County Emergency Services Manager, Training Electronic Mail Distribution Brunswick Steam Electric Plant Electronic Mail Distribution David T. Conley Senior Counsel Kelvin Henderson Legal Department General Manager Progress Energy Nuclear Fleet Operations Electronic Mail Distribution Progress Energy Electronic Mail Distribution cc w/encl: (contd on page 4)

4 PROGRESS ENERGY cc w/encl: (continued from page 3)

Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211 W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Warren Lee Emergency Management Director New Hanover County Department of Emergency Management 230 Government Center Drive Suite 115 Wilmington, NC 28403

INSERVICE INSPECTION DOCUMENT REQUEST Inspection Dates: March 12 - March 16, 2012 Inspection Procedures: IP 71111.08 AIn-Service Inspection (ISI) Activities@

Inspectors: Abhijit Sengupta, Reactor Inspector A. Information Requested for the In-Office Preparation Week The following information should be sent to the Region II office in hard copy or electronic format (CD preferred), in care of Abhijit Sengupta by February 27, 2012, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week (section B of this enclosure). We ask that the specific items selected from the lists be available and ready for review on the first day of inspection. Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the inspector as soon as possible.

A.1 ISI / Welding Programs and Schedule Information a) A detailed schedule (including preliminary dates) of:

i) Nondestructive examinations (NDEs) planned for Class 1 & 2 systems and containment, performed as part of your ASME Section XI, Risk Informed (if applicable), and augmented ISI Programs (e.g. Vessel Internals) during the upcoming outage.

Provide a status summary of the NDE inspection activities versus the required inspection period percentages for this Interval by category per ASME Section XI, IWX-2400 (Do not provide separately if other documentation requested contains this information).

ii) Examinations planned for Alloy 82/182/600 welds/components that are not included in the Section XI scope (If applicable).

iii) Welding activities that are scheduled to be completed during the upcoming outage (ASME Class 1, 2, or 3 structures, systems, or components (SSCs)).

b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety Evaluations applicable to the examinations identified above.

Enclosure

2 c) A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant, visual VT-1, VT-2, and VT-3) which have identified recordable indications (geometric or flaw) on Code Class 1 & 2 systems since the beginning of the last refueling outage. This should include the previousSection XI pressure test(s) conducted during start up and any evaluations associated with the results of the pressure tests. The list of NDE reports should include a brief description of the SSC where the recordable indication was identified.

d) A list with a brief description (e.g. system, material, pipe size, weld number, and NDE performed) of the welds in Code Class 1 and 2 systems which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage, or are planned to be fabricated this refueling outage.

e) If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the upcoming outage, provide a detailed description of the welds to be examined, and the extent of the planned examination. Please also provide reference numbers for applicable procedures that will be used to conduct these examinations.

f) Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.

g) A list of any temporary non-code repairs in service (GL 90-05 or code case N-513-1).

h) Copies of the most recent self assessments for the ISI and Welding programs.

i) A list with a brief description of ISI related issues (e.g. condition reports) entered into your corrective action program since the beginning of the last refueling outage (for Unit 1). For example, a list based upon data base searches using key words such as: ISI, ASME Code,Section XI, NDE, welding, cracks, wear, thinning, leakage, rust, corrosion, or errors in piping examinations.

j) Please provide names and phone numbers for the following program leads:

ISI contacts (Examination, planning)

Containment Exams Snubbers and Supports Repair and Replacement Program Manager Licensing Contact Site Welding Engineer Enclosure

3 B. Information to be provided on-site to the inspector at the entrance meeting (March 12, 2012):

B.1 ISI / Welding Programs and Schedule Information a) Updated schedules for ISI/NDE activities, planned welding activities, and schedule showing contingency repair plans, if available.

b) For ASME Class 1 and 2 welds selected by the inspector from the lists provided from section A of this enclosure, please provide copies of the following documentation for each subject weld:

i) Weld data sheet (traveler) ii) Weld configuration and system location iii) Applicable Code Edition and Addenda for weldment iv) Applicable Code Edition and Addenda for welding procedures v) Applicable weld procedures (WPS) used to fabricate the welds vi) Copies of procedure qualification records (PQRs) supporting the WPS from B.1.b.v vii) Copies of mechanical test reports identified in the PQRs above viii) Copies of the nonconformance reports for the selected welds (If Applicable) ix) Radiographs of the selected welds and access to equipment to allow viewing radiographs (If RT was performed) x) Copies of the pre-service examination records for the selected welds.

xi) Copies of welder performance qualifications records applicable to WPS, including documentation that welder maintained proficiency in the applicable welding processes specified in the WPS (At least six months prior to date subject work) xii) Copies of NDE personnel qualifications (VT, PT, UT, RT) As applicable c) For the ISI related corrective action issues selected by the inspector from section A of this enclosure, provide a copy of the corrective actions and supporting documentation.

d) For the NDE reports with recordable indications on Code Class 1 & 2 systems selected by the inspector from Section A above, provide a copy of the examination records, examiner qualification records, and associated corrective action documents.

e) A copy of (or ready access to) the most current revision of the ISI Program Manual and Plan for the current Interval.

f) For the NDEs selected by the inspector from section A of this enclosure, provide copy of the NDE procedures used to perform the examinations (including calibration and flaw characterization/sizing procedures). For ultrasonic examination procedures qualified in accordance with ASME Code,Section XI, Appendix VIII, provide documentation supporting the procedure qualification (e.g.

the EPRI performance demonstration qualification summary sheets). Also, include documentation of the specific equipment to be used (e.g. ultrasonic unit, cables, and transducers including serial numbers) and NDE personnel qualification records.

Enclosure

4 g) Ready access to (i.e. copies provided to the inspector for use during the on-site inspection, or room number and location where available): Applicable editions of the ASME Code (Sections V, IX and XI) for the in-service inspection and repair/replacement programs.

Inspector Contact Information:

Abhijit Sengupta Reactor Inspector 404-997-4430 Abhijit.sengupta@nrc.gov Mailing Address:

US NRC Region 2 Attn: Abhijit Sengupta 245 Peachtree Center Ave, NE Suite 1200 Atlanta, GA. 30303-4000 Enclosure