ML18087A735: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
Created page by program invented by StriderTol
Line 38: Line 38:
                                                                                                                                           ;;fe/¢.1 CATE OR SHIFT SUPERVISOR
                                                                                                                                           ;;fe/¢.1 CATE OR SHIFT SUPERVISOR
         **SIGNATURE ALSO VERIFIES THAT APPLICABILITY TO BOTH UNITS HAS BEEN CONSIDERED.
         **SIGNATURE ALSO VERIFIES THAT APPLICABILITY TO BOTH UNITS HAS BEEN CONSIDERED.
ACCEPT ABLE:                                        POST CHANGE-REVIEW/APPROVAL YES          NO IZJ D                                o{i)ircdlz_          CEPARTMENT HEAD                                        I    ~ATE
ACCEPT ABLE:                                        POST CHANGE-REVIEW/APPROVAL YES          NO IZJ D                                o{i)ircdlz_          CEPARTMENT HEAD                                        I    ~ATE DD                                                                  SQAE                                                DATE DD                                                            SORC (CHAIRMANJ                                            DATE MEETING NO.
* DD                                                                  SQAE                                                DATE DD                                                            SORC (CHAIRMANJ                                            DATE MEETING NO.
             ~'          .....------.,  _
             ~'          .....------.,  _
GENERJ'.L MANAGER* SALEM OPERATIONS                                        DATE RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
GENERJ'.L MANAGER* SALEM OPERATIONS                                        DATE RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
FOLLOW-UP TO REJECTED ON-THE*SPOT CHANGE ACTION TAKEN:
FOLLOW-UP TO REJECTED ON-THE*SPOT CHANGE ACTION TAKEN:
  "      .8303160568 8303i4-~--
  "      .8303160568 8303i4-~--
  *
\..:.--  ~DR ADOCK 05000~b~
\..:.--  ~DR ADOCK 05000~b~
PERFORMED, BY:
PERFORMED, BY:
Line 84: Line 82:
* f -,; *                                                                                          *EXPIRES:
* f -,; *                                                                                          *EXPIRES:
ALL ON-THE-SPOT CHANGES TO BE CONSIDERED !"OR APPLICABILITY TO BOTH UNITS.
ALL ON-THE-SPOT CHANGES TO BE CONSIDERED !"OR APPLICABILITY TO BOTH UNITS.
                       ~UNIT!                                          PROCEDURENO.~~~'--r~\)~--\_~_-_,_,_._c_c_'_~_*~~~~                                                          REV. N O . - - - - CHANGE N0. _ _                                  2-
                       ~UNIT!                                          PROCEDURENO.~~~'--r~\)~--\_~_-_,_,_._c_c_'_~_*~~~~                                                          REV. N O . - - - - CHANGE N0. _ _                                  2-I)( I            UNIT 2                          PROCEDURENO._~_-::t_V_-_*\.>_-_\_~_._\_,~U~l~'-5_'_ _ _~                                                    REV. NO. _ _ _ _ CHANGE NO.
__
I)( I            UNIT 2                          PROCEDURENO._~_-::t_V_-_*\.>_-_\_~_._\_,~U~l~'-5_'_ _ _~                                                    REV. NO. _ _ _ _ CHANGE NO.
PROPOSED CHANGE:                                                    ~~'.\'t!.... °3~'.)
PROPOSED CHANGE:                                                    ~~'.\'t!.... °3~'.)
                                                 ?.~~ ~\~~- 5 ""* 5                                              "") \2
                                                 ?.~~ ~\~~- 5 ""* 5                                              "") \2
Line 102: Line 98:
s;; ~""' -<-
s;; ~""' -<-
AUTHOR I Z AT 10 N:                                        .
AUTHOR I Z AT 10 N:                                        .
                                                                                    '
dd            d.e_-4:-
dd            d.e_-4:-
                                                                                           *suPERVISOR IN CHARGE                                                                                                                              DATE
                                                                                           *suPERVISOR IN CHARGE                                                                                                                              DATE
Line 115: Line 110:


NOTE: PRESS HARD YOU ARE MAKING FIVE (5) COPIES
NOTE: PRESS HARD YOU ARE MAKING FIVE (5) COPIES
    ...
         .                          ADMINISTRATIVE PROCEDURE 3                                                                            CHANGE TYPE:
         .                          ADMINISTRATIVE PROCEDURE 3                                                                            CHANGE TYPE:
:
ON-THE-SPOT CHANGE
ON-THE-SPOT CHANGE
_P_R_O_C_E_D_U_R_E_T_l_T_L_E--s--.--~-
_P_R_O_C_E_D_U_R_E_T_l_T_L_E--s--.--~-
Line 125: Line 118:
                                                                                                                                           *EXP IR ES:
                                                                                                                                           *EXP IR ES:
                                                                                                                                                                 *TEMPORARY (ORANGE)
                                                                                                                                                                 *TEMPORARY (ORANGE)
  *
  '*        ALL. ON-THE-SPOT CHANGES TO BE CONSIDERED !="OR APPL.ICABIL.ITY TO BOTH UNITS.
  '*        ALL. ON-THE-SPOT CHANGES TO BE CONSIDERED !="OR APPL.ICABIL.ITY TO BOTH UNITS.
           ~UNIT 1            PROCEDURE NO. _                      PD-=-_-_\;...;B::;...._'_\_,_o_o__
           ~UNIT 1            PROCEDURE NO. _                      PD-=-_-_\;...;B::;...._'_\_,_o_o__
Line 141: Line 133:
rno MEETING    No.frZ13
rno MEETING    No.frZ13
                                                 ;t;K ~me                                        SQAE DD I 21 RETURN COMPL.ETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
                                                 ;t;K ~me                                        SQAE DD I 21 RETURN COMPL.ETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
FOL.LOW-UP TO REJECTED ON-THE-SPOT CHANGE
FOL.LOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:
* ACTION TAKEN:
PERFORMED BY:
PERFORMED BY:
SIGNATURE                                                    DATE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL. CYCL.E.
SIGNATURE                                                    DATE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL. CYCL.E.
FORM AP-3-1 REV. 9
FORM AP-3-1 REV. 9
                                                                                  ..................


  .    '
                 '                                                                                SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & GAS COMPANY ELECTRIC GENERATION DEPARTMENT SAFETY
                 '                                                                                SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & GAS COMPANY ELECTRIC GENERATION DEPARTMENT SAFETY
                                                                                                                                                             - . *- - . RELATED PROCEDURE APPROVAL COVER SHEET PROCEDURE:
                                                                                                                                                             - . *- - . RELATED PROCEDURE APPROVAL COVER SHEET PROCEDURE:
lPD-18.1.008 - SOLID STATE PROTECTION SYSTEM
lPD-18.1.008 - SOLID STATE PROTECTION SYSTEM REMARKS:                                                                      FUNCTIONAL TEST - TRAIN A REV. 1 - General Revision to incorporate On-The-Spot-Changes.
                                  .
REMARKS:                                                                      FUNCTIONAL TEST - TRAIN A REV. 1 - General Revision to incorporate On-The-Spot-Changes.
EED                        QA          SORC    STA. SUPT.
EED                        QA          SORC    STA. SUPT.
REV                            SUBMITTED                                                            APPROVED                              REVIEWED    REVIEWED    APPROVED 0                                                                                                                                                        82-\2:>
REV                            SUBMITTED                                                            APPROVED                              REVIEWED    REVIEWED    APPROVED 0                                                                                                                                                        82-\2:>
Line 159: Line 146:
  -. -- *: ....... "":' ...........~,. ...--:"**:"'";"*"**"- ."'1~""';.,,..*.-.."':*":".*,.. ,.-,..... _*~ ....... ~**-*****-;- .............. .
  -. -- *: ....... "":' ...........~,. ...--:"**:"'";"*"**"- ."'1~""';.,,..*.-.."':*":".*,.. ,.-,..... _*~ ....... ~**-*****-;- .............. .


x
x SALEM GENERATING STATION                                                                                                                                    NUMBER -    lPD-18 .1. 008 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)
'
DATE          5/24/82 TEST PROCEDURE                                                                                                                  PAGE  1    OF  50 TITLE                                                            SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A
SALEM GENERATING STATION                                                                                                                                    NUMBER -    lPD-18 .1. 008 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)
DATE          5/24/82 TEST PROCEDURE                                                                                                                  PAGE  1    OF  50
                                                                                                                                                                                                  ---
TITLE                                                            SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A


==1.0 Purpose==
==1.0 Purpose==
Line 176: Line 159:
2.1                        Solid State Protection System Manual.
2.1                        Solid State Protection System Manual.
2.2                        Wiring Diagrams:                                                            203688, 222885, 224305
2.2                        Wiring Diagrams:                                                            203688, 222885, 224305
                                                *
* I & C - 001
* I & C - 001
     ** ..*.. *-*. ,*-:***-......... :...~~***.- .... -.-.*.- :................... :~*---:*;-~-....~:"' .,..,.,_;;-"'--**--*-- ... *-****.- :*,*~**:* .. *~***.-.*.* ... -~., .. .
     ** ..*.. *-*. ,*-:***-......... :...~~***.- .... -.-.*.- :................... :~*---:*;-~-....~:"' .,..,.,_;;-"'--**--*-- ... *-****.- :*,*~**:* .. *~***.-.*.* ... -~., .. .
* x
 
* SALEM GENERATING STATION                    NUMBER -      lPD-18 .1. 008 REV. NO.      1 PERFORMANCE DEPARTMENT (I & C)
x SALEM GENERATING STATION                    NUMBER -      lPD-18 .1. 008 REV. NO.      1 PERFORMANCE DEPARTMENT (I & C)
DATE          5/24/82 TEST PROCEDURE                                PAGE    2    OF  50
DATE          5/24/82 TEST PROCEDURE                                PAGE    2    OF  50 TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A
                                                                        ---
TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A


==3.0 Precautions==
==3.0 Precautions==
Line 190: Line 170:
Solid State Protection Manual.
Solid State Protection Manual.
3.3  This procedure must be completed in the sequence given to insure successful completion .
3.3  This procedure must be completed in the sequence given to insure successful completion .
* I & C - 001
I & C - 001


           .* x SALEM GENERATING STATION                                                                            NUMBER -      lPD-18.1.008
           .* x SALEM GENERATING STATION                                                                            NUMBER -      lPD-18.1.008
Line 203: Line 183:
: 4. 3                If, during the _.,performance of this procedur~, the required status indication cannot be obtained, the Job Supervisor shall be notified immediately.                              Exceptions to the required indication, due to plant conditions at the time of the test, may be made by the' Job Supervisor.
: 4. 3                If, during the _.,performance of this procedur~, the required status indication cannot be obtained, the Job Supervisor shall be notified immediately.                              Exceptions to the required indication, due to plant conditions at the time of the test, may be made by the' Job Supervisor.
Any exceptions of this nature must be indicated and explained in the Remarks section of this procedure.
Any exceptions of this nature must be indicated and explained in the Remarks section of this procedure.
4.4                  An entry will be made in the Remarks section of this procedure indicating any deficiency and the corrective
4.4                  An entry will be made in the Remarks section of this procedure indicating any deficiency and the corrective action taken .
* action taken .
I & C - 001
I & C - 001
,.-.,.. * ._,. __.... _. * . __ ._.,.....,.,~,..~' **** - * * . .,,. ___ ,.. ____ _....,..._ ****r-****..,* ** *
,.-.,.. * ._,. __.... _. * . __ ._.,.....,.,~,..~' **** - * * . .,,. ___ ,.. ____ _....,..._ ****r-****..,* ** *


  ,X
  ,X SALEM GENERATING STATION                                          NUMBER -      lPD-18 .1. 008
    ..
SALEM GENERATING STATION                                          NUMBER -      lPD-18 .1. 008
* PERFORMANCE DEPARTMENT (I & C)
* PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE REV.NO.
TEST PROCEDURE REV.NO.
Line 219: Line 196:
Device Name                    PD No.              Recal. Date Fluke (2)
Device Name                    PD No.              Recal. Date Fluke (2)
Stop Watch
Stop Watch
*
*I & C - 001
*I & C - 001
               .. **.-**:-~**:.**-~r"*~- *..-*..-~*.**~-*
               .. **.-**:-~**:.**-~r"*~- *..-*..-~*.**~-*


..x
..x SALEM GENERATING STATION                  NUMBER -      lPD-18.1.008 REV. NO.      1 PERFORMANCE DEPARTMENT (I & C)
    ..
SALEM GENERATING STATION                  NUMBER -      lPD-18.1.008 REV. NO.      1 PERFORMANCE DEPARTMENT (I & C)
DATE          5/24/82 TEST PROCEDURE PAGE    5
DATE          5/24/82 TEST PROCEDURE PAGE    5
                                                                       ---  OF 50 TITLE        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A
                                                                       ---  OF 50 TITLE        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A
Line 234: Line 208:
Senior Shift Supervisor/Shift Supervisor Date/Time 6.3  The Control Operator is aware of all of the alarms
Senior Shift Supervisor/Shift Supervisor Date/Time 6.3  The Control Operator is aware of all of the alarms
                         .and indications that will result from the performance of this procedure.
                         .and indications that will result from the performance of this procedure.
Control Operator
Control Operator I & C - 001
* I & C - 001


  ,X
  ,X SALEM GENERATING STATION                                                                                                                                                          NUMBER -        lPD-18 .1. 008 REV. NO.        1 PERFORMANCE DEPARTMENT (I & C)
* SALEM GENERATING STATION                                                                                                                                                          NUMBER -        lPD-18 .1. 008 REV. NO.        1 PERFORMANCE DEPARTMENT (I & C)
DATE            5/24/82 TEST PROCEDURE PAGE    6    OF  50 TITLE                                            SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A 7.0                    System Line-up:
DATE            5/24/82 TEST PROCEDURE PAGE    6    OF  50
                                                                                                                                                                                                                      ---
TITLE                                            SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A 7.0                    System Line-up:
7.1                    The following conditions must be established and/or verified by the Control Operator.
7.1                    The following conditions must be established and/or verified by the Control Operator.
7.1.1                                                Reactor Trip Bypass Breaker B is open and in the Racked Out position.
7.1.1                                                Reactor Trip Bypass Breaker B is open and in the Racked Out position.
Line 249: Line 219:
: 3.                    Phase B Isolation
: 3.                    Phase B Isolation
: 4.                    Feedwater Isolation
: 4.                    Feedwater Isolation
: 5.                    Containment Ventilation Isolation from Safety Injection signal Control Operator
: 5.                    Containment Ventilation Isolation from Safety Injection signal Control Operator I & C - 001
* I & C - 001
           * * * * * . '/' ".'*' * .- ' - -~*---*"\,.,..-...-,*.**"":'*<"--=***** ...-.".;;.*-"?"'""" ..._-.,.. **;** *. '-~-* ~ ......-.*r * ~ **' *. * -, ,. * .. , .... .. *.*.. ~* .. -.. . . . - ,........
           * * * * * . '/' ".'*' * .- ' - -~*---*"\,.,..-...-,*.**"":'*<"--=***** ...-.".;;.*-"?"'""" ..._-.,.. **;** *. '-~-* ~ ......-.*r * ~ **' *. * -, ,. * .. , .... .. *.*.. ~* .. -.. . . . - ,........


Line 275: Line 244:
PERFORMANCE DEPARTMENT (I & C)
PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE DATE
TEST PROCEDURE DATE
                                                                 -5/24/82
                                                                 -5/24/82 PAGE  9    OF 50
                                                                  -------
PAGE  9    OF 50
                                                                   -=----
                                                                   -=----
TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A
TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A
Line 287: Line 254:
: 8. 6. 9  1/4 8.6.10    2/2 8.6.11    2/3 8.6.12    2/4 I & C - 001
: 8. 6. 9  1/4 8.6.10    2/2 8.6.11    2/3 8.6.12    2/4 I & C - 001


  ~x
  ~x SALEM GENERATING STATION                                                                NUMBER -                lPD-18 .1. 008 REV. NO.                1 PERFORMANCE DEPARTMENT (I & C)
    ..
SALEM GENERATING STATION                                                                NUMBER -                lPD-18 .1. 008 REV. NO.                1 PERFORMANCE DEPARTMENT (I & C)
DATE                    5/24/82 TEST PROCEDURE PAGE          10          OF      50 TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A
DATE                    5/24/82 TEST PROCEDURE PAGE          10          OF      50 TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A


Line 309: Line 274:
* 001
* 001


.
  .x SALEM GENERATING STATION                  NUMBER -    lPD-18 .1. 008
  .x SALEM GENERATING STATION                  NUMBER -    lPD-18 .1. 008
* PERFORMANCE DEPARTMENT (I & C)
* PERFORMANCE DEPARTMENT (I & C)
Line 349: Line 313:
x SALEM GENERATING STATION                                                                                                                NUMBER-    lPD-18.1.008 REV.NO.  ~l~~~~~~-
x SALEM GENERATING STATION                                                                                                                NUMBER-    lPD-18.1.008 REV.NO.  ~l~~~~~~-
PERFORMANCE DEPARTMENT (I & C) .
PERFORMANCE DEPARTMENT (I & C) .
                                                                                                                                                   . DATE        5/24/82 TEST PROCEDURE                                                                                                          PAGE  13    OF 50
                                                                                                                                                   . DATE        5/24/82 TEST PROCEDURE                                                                                                          PAGE  13    OF 50 TITLE                                          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A
                                                                                                                                                                  ---
TITLE                                          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A


==8.0 Instructions==
==8.0 Instructions==
Line 376: Line 338:
I & C - 001
I & C - 001


x SAL        NERATING STATION
x SAL        NERATING STATION NUMBER -      lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C)                                    REV. NO. 1 TEST PROCEDUflE                                            DATE          5/24/82
                                                                                                                  .-
NUMBER -      lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C)                                    REV. NO. 1 TEST PROCEDUflE                                            DATE          5/24/82
~1                                                                              PAGE  15  - OF 50
~1                                                                              PAGE  15  - OF 50
;
;
Line 386: Line 346:
x SAL        ERATING STATION                                          NUMBER -    lPD-18 .1. 008            ..
x SAL        ERATING STATION                                          NUMBER -    lPD-18 .1. 008            ..
PERFORMANCE DEPARTMENT (I & Ct                                      REV. NO. 1
PERFORMANCE DEPARTMENT (I & Ct                                      REV. NO. 1
*'*<
:l
:l
=---
=---
.*1 TEST PROCEDUHE                                              DATE'        5/24/82
.*1 TEST PROCEDUHE                                              DATE'        5/24/82 PAGE  16    OF 50 TITLE          SOLID STATE PROTECTION* SYSTEM FUNCTIONAL TEST TRAIN A
  ,
PAGE  16    OF 50 TITLE          SOLID STATE PROTECTION* SYSTEM FUNCTIONAL TEST TRAIN A
*;i
*;i
   ~
   ~
Line 402: Line 359:
* SIVE        FUNCTION                    REQUIRED    ACTUAL    BLOCKS . INHIBITED 7    24      24    24    OFF    PRESSURIZER, HIGH PRESSURE TRIP    2/4 8    24      24    24    OFF    PRESSURIZER, HIGH WATER LEVEL      2/3 TRIP 9    24      24      24  OFF    LOW FEEDWATER FLOW, LOOP 1          1/2 10    24      24      24  OFF    LOW FEEDWATER .FLOW, LOOP 1        1/2 11      24      24      24  OFF    LOW FEEDWATER FLOW, LOOP 2          1/2 12    24      24      24  OFF    LOW FEEDWATER FLOW, LOOP 2          1/2
* SIVE        FUNCTION                    REQUIRED    ACTUAL    BLOCKS . INHIBITED 7    24      24    24    OFF    PRESSURIZER, HIGH PRESSURE TRIP    2/4 8    24      24    24    OFF    PRESSURIZER, HIGH WATER LEVEL      2/3 TRIP 9    24      24      24  OFF    LOW FEEDWATER FLOW, LOOP 1          1/2 10    24      24      24  OFF    LOW FEEDWATER .FLOW, LOOP 1        1/2 11      24      24      24  OFF    LOW FEEDWATER FLOW, LOOP 2          1/2 12    24      24      24  OFF    LOW FEEDWATER FLOW, LOOP 2          1/2


x SAL        ERA TING ST A TION                                    NUMBER~      lPD-18 .1. 008
x SAL        ERA TING ST A TION                                    NUMBER~      lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C)                                    REV. NO.      1 TEST PROCEDURE                                            DATE          5/24/82 PAGE  17    OF 50
                                                                                                                ..
PERFORMANCE DEPARTMENT (I & C)                                    REV. NO.      1 TEST PROCEDURE                                            DATE          5/24/82 PAGE  17    OF 50
.,
  '.i  TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                              FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS LOGIC    LOGIC    LOGIC    LOGIC MIS-        TEST                                            INHIBIT      NOT A        B      C        D  SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 13      24      24        24  OFF  LOW FEEDWATER FLOW, LOOP 3          1/2 14      24      24        24  OFF  LOW FEEDWATER FLOW, LOOP 3          1/2 15      24      24        24 OFF  LOW FEEDWATER FLOW, LOOP 4          1/2 16      24      24        24 OFF  LOW FEEDWATER FLOW, LOOP 4          1/2 17      24      24        24 OFF  OIL PRESSURE SWITCHES REACTOR      2/3 TRIP 18      24      24        24 OFF  STOP VALVES GENERATOR TRIP          2/2 19      24      24        24 OFF  STOP VALVES GENERATOR TRIP          2/2
  '.i  TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                              FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS LOGIC    LOGIC    LOGIC    LOGIC MIS-        TEST                                            INHIBIT      NOT A        B      C        D  SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 13      24      24        24  OFF  LOW FEEDWATER FLOW, LOOP 3          1/2 14      24      24        24  OFF  LOW FEEDWATER FLOW, LOOP 3          1/2 15      24      24        24 OFF  LOW FEEDWATER FLOW, LOOP 4          1/2 16      24      24        24 OFF  LOW FEEDWATER FLOW, LOOP 4          1/2 17      24      24        24 OFF  OIL PRESSURE SWITCHES REACTOR      2/3 TRIP 18      24      24        24 OFF  STOP VALVES GENERATOR TRIP          2/2 19      24      24        24 OFF  STOP VALVES GENERATOR TRIP          2/2


x SAL      NERA TING ST ATION NUMBER -    lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C)
x SAL      NERA TING ST ATION NUMBER -    lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C)
REV. NO. 1 TEST PROCEDUBE DATE        5/24/82 PAGE  18    OF  50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES
REV. NO. 1 TEST PROCEDUBE DATE        5/24/82 PAGE  18    OF  50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                            FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS
  ..
:
FUNCTION SELECTORS                                            FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS
.,      LOGIC                                                                                        INHIBIT      NOT LOGIC    LOGIC  LOGIC  MIS-        TEST A        B      c        D  SIVE      FUNCTION                  REQUIRED    ACTUAL    BLOCKS INHIBITED 20    24      24      24  OFF  STOP VALVES REACTOR TRIP            2/2 21    24      24      24  *OFF  SOURCE RANGE ,TRIP                  2/2 22    24      24        24  OFF  SOURCE RANGE TRIP                  2/2 23    24      24        24  OFF  FEED THRU TO-LOGIC B 23      1      24        24  OFF  INTERMEDIATE RANGE TRIP            2/2 23      2      24        24  OFF  INTERMEDIATE RANGE TRIP            2/2 23      3      24        24  OFF  POWER RANGE, LOW SETPOINT TRIP      2/4
.,      LOGIC                                                                                        INHIBIT      NOT LOGIC    LOGIC  LOGIC  MIS-        TEST A        B      c        D  SIVE      FUNCTION                  REQUIRED    ACTUAL    BLOCKS INHIBITED 20    24      24      24  OFF  STOP VALVES REACTOR TRIP            2/2 21    24      24      24  *OFF  SOURCE RANGE ,TRIP                  2/2 22    24      24        24  OFF  SOURCE RANGE TRIP                  2/2 23    24      24        24  OFF  FEED THRU TO-LOGIC B 23      1      24        24  OFF  INTERMEDIATE RANGE TRIP            2/2 23      2      24        24  OFF  INTERMEDIATE RANGE TRIP            2/2 23      3      24        24  OFF  POWER RANGE, LOW SETPOINT TRIP      2/4


... '.
x SAL      NERATING STATION                                        NUMBER -      lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C)                                  R.EV. NO.      1 TEST PROCEDURE                                            DATE          5/24/82 PAGE  19    OF  50 TITLE        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                              FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                      BLOCKS.
x SAL      NERATING STATION                                        NUMBER -      lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C)                                  R.EV. NO.      1 TEST PROCEDURE                                            DATE          5/24/82 PAGE  19    OF  50 TITLE        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                              FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                      BLOCKS.
* LOGIC  LOGIC  LOGIC  LOGIC  MIS-        TEST                                              INHIBIT      NOT A      B      c      1'  SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23      4      24    24    OFF /POWER RANGE, HIGH SETPOINT TRIP      2/4 23      5      24    24  *OFF  OVERTEMPERATURE DELTA T TRIP        2/4 23      6      24      24  OFF  OVERPOWER DELTA T TRIP              2/4 23      7      24      24  OFF  RCP UNDERVOLTAGE TRIP                2/4 23      8      24      24  OFF  RCP UNDERVOLTAGE TRIP                1/2 23      9      24      24  OFF  RCP UNDERVOLTAGE, TURB. FEED        1(2 PUMP
* LOGIC  LOGIC  LOGIC  LOGIC  MIS-        TEST                                              INHIBIT      NOT A      B      c      1'  SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23      4      24    24    OFF /POWER RANGE, HIGH SETPOINT TRIP      2/4 23      5      24    24  *OFF  OVERTEMPERATURE DELTA T TRIP        2/4 23      6      24      24  OFF  OVERPOWER DELTA T TRIP              2/4 23      7      24      24  OFF  RCP UNDERVOLTAGE TRIP                2/4 23      8      24      24  OFF  RCP UNDERVOLTAGE TRIP                1/2 23      9      24      24  OFF  RCP UNDERVOLTAGE, TURB. FEED        1(2 PUMP
Line 422: Line 372:
*.:'          FUNCTION SELECTORS                                              FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS
*.:'          FUNCTION SELECTORS                                              FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS
*i,
*i,
)        LOGIC  LOGIC    LOGIC  LOGIC  MIS-        TEST                                            INHIBIT      NOT A        B      c      D    SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23      10      24    24    OFF  RCP UNDERVOLTAGE, TURB. FEED        2/4
)        LOGIC  LOGIC    LOGIC  LOGIC  MIS-        TEST                                            INHIBIT      NOT A        B      c      D    SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23      10      24    24    OFF  RCP UNDERVOLTAGE, TURB. FEED        2/4 PUMP 23      11      24    24    OFF  LOW STEAMLINE PRESSURE              2/4
"
PUMP 23      11      24    24    OFF  LOW STEAMLINE PRESSURE              2/4
*.;
*.;
23      12      24      24    OFF  HIGH STEAMLINE FLOW, LOOP 1        1/2 23      13      24      24    OFF  HIGH STEAMLINE FLOW, LOOP 2        1/2 23      14      24      24    OFF  HIGH STEAMLINE FLOW, LOOP 3        1/2 23      15      24      24    OFF  HIGH STEAMLINE FLOW., LOOP 4        1/2
23      12      24      24    OFF  HIGH STEAMLINE FLOW, LOOP 1        1/2 23      13      24      24    OFF  HIGH STEAMLINE FLOW, LOOP 2        1/2 23      14      24      24    OFF  HIGH STEAMLINE FLOW, LOOP 3        1/2 23      15      24      24    OFF  HIGH STEAMLINE FLOW., LOOP 4        1/2
Line 430: Line 378:
x*
x*
SAL      NE RATING ST A TION NUMBER-    lPD-18.1.008
SAL      NE RATING ST A TION NUMBER-    lPD-18.1.008
'
-***~-*-
-***~-*-
PERFORMANCE DEPARTMENT (I & C)
PERFORMANCE DEPARTMENT (I & C)
REV. NO. 1 TEST PROCEDURE DATE        5/24/82 PAGE  21    OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                              FUNCTION LOGIC      BLOCKING FUNCTION TEST SWITCH PER-                                                                BLOCKS LOGIC  LOGIC  LOGIC    LOGIC  MIS-        TEST                                          INHIBIT      NOT A        B      c        D  SIVE      FUNCTION                  REQUIRED    ACTUAL,  BLOCKS INHIBITED 23    16      24        24    OFF  STEAMLINE ISOLATION                2/4 23    17*    24        24  *OFF  HIGH CONTAINMENT PRESSURE,        2/3 SAFETY INJECTION
REV. NO. 1 TEST PROCEDURE DATE        5/24/82 PAGE  21    OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                              FUNCTION LOGIC      BLOCKING FUNCTION TEST SWITCH PER-                                                                BLOCKS LOGIC  LOGIC  LOGIC    LOGIC  MIS-        TEST                                          INHIBIT      NOT A        B      c        D  SIVE      FUNCTION                  REQUIRED    ACTUAL,  BLOCKS INHIBITED 23    16      24        24    OFF  STEAMLINE ISOLATION                2/4 23    17*    24        24  *OFF  HIGH CONTAINMENT PRESSURE,        2/3 SAFETY INJECTION 23    18      24        24  OFF  HI-HI CONTAINMENT PRESSURE,        2/4 SPRAY ACTUATION 23    19      24        24  OFF  HI-HI CONTAINMENT PRESSURE,        2/4 SPRAY ACTUATION 23    20      24        24  OFF  HI-HI CONTAINMENT PRESSURE,        2/4 STEAM STOP VALVES
.:
23    18      24        24  OFF  HI-HI CONTAINMENT PRESSURE,        2/4 SPRAY ACTUATION 23    19      24        24  OFF  HI-HI CONTAINMENT PRESSURE,        2/4 SPRAY ACTUATION 23    20      24        24  OFF  HI-HI CONTAINMENT PRESSURE,        2/4 STEAM STOP VALVES


x SALE      ERATING STATION PERFORMANCE DEPARTMENT (I & C)
x SALE      ERATING STATION PERFORMANCE DEPARTMENT (I & C)
Line 450: Line 395:
lPD-18 .1. 008 1
lPD-18 .1. 008 1
5/24/82
5/24/82
                                                                                                          *      ..
                                                                                 . PAGE  23    OF 50 J
                                                                                 . PAGE  23    OF 50 J
1.
1.
Line 456: Line 400:


x SAL      NERATING STATION                                      NUMBER_      lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C)                                  REV. NO. 1
x SAL      NERATING STATION                                      NUMBER_      lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C)                                  REV. NO. 1
-~          TEST PROCEDURE DATE        5/24/82
-~          TEST PROCEDURE DATE        5/24/82 PAGE 24    OF 50 TITLE        SOLID STATE  P~OTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                            FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                  BLOCKS LOGIC    LOGIC  LOGIC  LOGIC  MIS-        TEST                                            INHIBIT      NOT A        B      C      D    SIVE      FUNCTION                    REQUIRED    ACTUAL  BLOCKS INHIBITED 23    24      8      24    OFF  STEAM GENERATOR LO-LO WATER        2/3 LEVEL LOOP 1 23    24      9      24    OFF  STEAM GENERATOR LO-LO WATER LEVEL LOOP 2 23    24      10      24    OFF  STEAM GENERATOR LO-LO WATER        2/3 LEVEL LOOP 3 23    24      11      24    OFF  STEAM GENERATOR LO-LO WATER        2/3 LEVEL LOOP 4 23    24      12      24    OFF  STEAM GENERATOR LO-LO WATER        1/4 LEVEL TRIP
**.
PAGE 24    OF 50
                                                                                      ---      ---
TITLE        SOLID STATE  P~OTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                            FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                  BLOCKS LOGIC    LOGIC  LOGIC  LOGIC  MIS-        TEST                                            INHIBIT      NOT A        B      C      D    SIVE      FUNCTION                    REQUIRED    ACTUAL  BLOCKS INHIBITED 23    24      8      24    OFF  STEAM GENERATOR LO-LO WATER        2/3 LEVEL LOOP 1 23    24      9      24    OFF  STEAM GENERATOR LO-LO WATER LEVEL LOOP 2 23    24      10      24    OFF  STEAM GENERATOR LO-LO WATER        2/3 LEVEL LOOP 3 23    24      11      24    OFF  STEAM GENERATOR LO-LO WATER        2/3 LEVEL LOOP 4 23    24      12      24    OFF  STEAM GENERATOR LO-LO WATER        1/4 LEVEL TRIP


x SAL        ERA TING ST A TION                                                  NUMBER -    lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C)                                                  REV. NO. 1
x SAL        ERA TING ST A TION                                                  NUMBER -    lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C)                                                  REV. NO. 1
Line 471: Line 411:
                                                                 , I
                                                                 , I
     *~
     *~
..
23      24      13        24  OFF  STEAM GENERA( 10R/LO-LO WATER
23      24      13        24  OFF  STEAM GENERA( 10R/LO-LO WATER
                                                               '        ......... _ _.. I 1/4 LEVEL, MOTO:i.-..>.r'EED PUMP 23      24      14        24  OFF  STEAM GENERATOR LO-LO WATER                      2/4 LEVEL, TURBINE FEED PUMP 23      24      15        24  OFF  STEAM GENERATOR HI-HI LEVEL,                      2/3 GENERATOR 1 23      24      16        24  OFF  STEAM GENERATOR HI-HI LEVEL,                      2/3 GENERATOR 2
                                                               '        ......... _ _.. I 1/4 LEVEL, MOTO:i.-..>.r'EED PUMP 23      24      14        24  OFF  STEAM GENERATOR LO-LO WATER                      2/4 LEVEL, TURBINE FEED PUMP 23      24      15        24  OFF  STEAM GENERATOR HI-HI LEVEL,                      2/3 GENERATOR 1 23      24      16        24  OFF  STEAM GENERATOR HI-HI LEVEL,                      2/3 GENERATOR 2
Line 480: Line 419:
REV. NO.
REV. NO.
DATE lPD-18 .1. 008 1
DATE lPD-18 .1. 008 1
5/24/82
5/24/82 PAGE    26    OF  50 TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                            FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS LOGIC    LOGIC    LOGIC  LOGIC  MIS-        TEST                                              INHIBIT      NOT A        B      c      D  SIVE      FUNCTION                  'REQUIRED      ACTUAL    BLOCKS INHIBITED 23      24      18      24  OFF  STEAM GENERATOR HI-HI LEVEL,        2/3 GENERATOR 4 23      24      19      24  OFF  LOW TAVG                            2/4 23      24      20      24  OFF  TAVG AND REACTOR TRIPPED            2/2 23      24      21      24  OFF  UV DIODES AND OUTPUT                1/4 23      24      22      24  OFF  SAFETY INJECTION DIODES & OUTPPT 1/4 23      24      23      24  OFF  UV DIODES AND OUTPUT                1/4
* PAGE    26    OF  50
                                                                                  ---      ---
TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                            FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS LOGIC    LOGIC    LOGIC  LOGIC  MIS-        TEST                                              INHIBIT      NOT A        B      c      D  SIVE      FUNCTION                  'REQUIRED      ACTUAL    BLOCKS INHIBITED 23      24      18      24  OFF  STEAM GENERATOR HI-HI LEVEL,        2/3 GENERATOR 4 23      24      19      24  OFF  LOW TAVG                            2/4 23      24      20      24  OFF  TAVG AND REACTOR TRIPPED            2/2 23      24      21      24  OFF  UV DIODES AND OUTPUT                1/4 23      24      22      24  OFF  SAFETY INJECTION DIODES & OUTPPT 1/4 23      24      23      24  OFF  UV DIODES AND OUTPUT                1/4


x SALE      ERA TING ST A TION PERFORMANCE DEPARTMENT (I & C)
x SALE      ERA TING ST A TION PERFORMANCE DEPARTMENT (I & C)
Line 489: Line 425:
REV. NO.
REV. NO.
DATE lPD-18 .1. 008 1
DATE lPD-18 .1. 008 1
5/24/82
5/24/82 PAGE  27    OF  50 TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELEC'l'ORS                                              FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PE'R-                                                                      BLOCKS LOGIC  LOGIC    LOGIC    LOGIC MIS-        .TEST                                              INHIBIT        NOT A        B      c        D  SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23      24      24        24  OFF  FEED THRU TO LOGIC D 23      24      24        1  OFF  SAFETY INJECTION DIODES & OUTPUT 1/3 23      24      24        2  OFF  UV DIODES AND OUTPUT                1/4 23      24      24        3  OFF  UV DIODES AND OUTPUT                1/4 23      24      24        4  OFF  UV DIODES AND OUTPUT                1/4 23      24      24        5  OFF  UV DIODES AND .OUTPUT                1/4 23      24      24        6  OFF  UV DIODES AND OUTPUT                1/4}}
                                                                                                          *    ..
PAGE  27    OF  50 TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELEC'l'ORS                                              FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PE'R-                                                                      BLOCKS LOGIC  LOGIC    LOGIC    LOGIC MIS-        .TEST                                              INHIBIT        NOT A        B      c        D  SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23      24      24        24  OFF  FEED THRU TO LOGIC D 23      24      24        1  OFF  SAFETY INJECTION DIODES & OUTPUT 1/3 23      24      24        2  OFF  UV DIODES AND OUTPUT                1/4 23      24      24        3  OFF  UV DIODES AND OUTPUT                1/4 23      24      24        4  OFF  UV DIODES AND OUTPUT                1/4 23      24      24        5  OFF  UV DIODES AND .OUTPUT                1/4 23      24      24        6  OFF  UV DIODES AND OUTPUT                1/4}}

Revision as of 07:47, 3 February 2020

Rev 1 to safety-related, Solid State Protection Sys Functional Test Train A.
ML18087A735
Person / Time
Site: Salem  
Issue date: 03/12/1983
From:
Public Service Enterprise Group
To:
Shared Package
ML18087A720 List:
References
1PD-18.1.008, NUDOCS 8303160568
Download: ML18087A735 (32)


Text

",) NOTE: PRESS HARD YOU ARE MAKING FIVE (5) COPIES CHANGE TYPE:

ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE ~ PERMANENT (GREENJ D *TEMPORARY ORANGE

  • EXPIRES:

ALL ON-THE-SPOT CHAl'IGES TO BE CONSIDERED FOR APPLICABILITY TO BOTH UNITS.

[29 UNIT 1 PROCEDURENO.~-\~\:> t:>__-____,~s~*~'~*~[)~o..;;;._CC>=-----~

____ REV. NO. _ _.__ _ CHANGE No._L/_._*_ _

UNIT 2 PRocEDURENo. P.........,~=--~'~B~,~'-*~O~a~o""'-~~-

.......... REV. NO. _ _._l*_ _ CHANGE N0. _ _ 1~-

PROPOSED CHANGE: r~':)e., \O Q-~ \e.'f'- c.\..o1 ~~;\'.' 'o..-..._.p..¥.,t,-s ~ ** b ~Pt<;s b~e . . . ~c.t-s f\1'-<a..... 'f\C.. \I...~~

0 cv-X> {\~ ~ \-e.~~~!V~ 0 ~ ~~\'r-c'}(... \ ~ \JC~ \S "1-o r '1"1\~L ..)

REASON FOR CHANGE:

\o . C\.?<r~~~ ~\'\,) ~~\'fC'J-

  • If\\\

\\t'~ r .f...c.~~ d e> v....\:-.

ACTION TAKEN FOR OTHER UNIT:

'5~~

AUTHORIZATION:

    • SUPERVISOR IN CHARGE 4/~-JA--

CUTY SENIOR $..;:rsUPERVISOR

fe/¢.1 CATE OR SHIFT SUPERVISOR
    • SIGNATURE ALSO VERIFIES THAT APPLICABILITY TO BOTH UNITS HAS BEEN CONSIDERED.

ACCEPT ABLE: POST CHANGE-REVIEW/APPROVAL YES NO IZJ D o{i)ircdlz_ CEPARTMENT HEAD I ~ATE DD SQAE DATE DD SORC (CHAIRMANJ DATE MEETING NO.

~' .....------., _

GENERJ'.L MANAGER* SALEM OPERATIONS DATE RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.

FOLLOW-UP TO REJECTED ON-THE*SPOT CHANGE ACTION TAKEN:

" .8303160568 8303i4-~--

\..:.-- ~DR ADOCK 05000~b~

PERFORMED, BY:

SIGNATURE DATE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.

FORMAP.3-1 REV, 12

'\

NOTE: PRESS HARD YOU ARE MAKING FIVE (5) COPIES

~,.-- ......~~~~~~~~~~~-~~~~~~~-~~--~~-~~~-~~~---~~~~-~~~-~~-~~~~~

...... CHANGE TYPE:

.,,.. ADMINISTRATIVE PROCEDURE 3 ON*THE*SPOT CHANGE 5(:1 PERMANENT(GREEN) D *TEMPORARY ORANGE PRocEDURE TITLE SS/}s pc.,oJCT1DrJkk yg:;;;:,= *EXPIRES:

ALL ON*THE-SPOT CHANGES TO BE CONSIDERED FOR APPLICABILITY TO BOTH UNITS.

0 'UNIT I PROCEDURENO.~~/_P_D;;;._-__._/~8'°'--'-,/'--,=0~C)~'8=--~----~ REV. No. _ _, ___ CHANGE No._3 _ __

12(] UNIT 2 PROCEDURENO.~_.Z__'f'__D_-__J~g_,_J_,_~-~--~---------- REV. NO. _ _/ : - - - CHANGE N0._3____

PROPOSED CHANGE:

{J1-)-C, E tf 7 - //11-4J4

  • 0. 2. 51. /f

~Al 9 g- 77Zri-//f/ Tx!J'f-1 IV ~

  • REASON FOR CHANGE:

ACTION TAKEN FOR OTHER UNIT:

AUTHORIZATION:

DATE OR SHIFT SUPERVISOR

    • SIGNATURE AL.SO VERIFIES THAT APPL.ICABIL.ITY TO BOTH UNITS HAS BEEN CONSIDERED.

ACCEPTABLE: POST CHANGE-REVIEW/APPROVAL Q~

YES NO

/~~<AD I DATE Jz.)2.L-/!L SORC (CHAIRMAN) 7 DNfE

?1 MEETJNG NO.

r---..

RETURN COMPL.ETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.

FOLLOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:

PERFORMED BY:

SIGNATURE DATE RETURN TO DEPARTMENT HEAD FOR ROUTING THR-:JUGH POST CHANGE-REVIEW/APPROVAL. CYCL.E.

AP.3 FORM AP-3-1 REV. 1Z

NOTE: PRESS HARD YOU ARE MAKING FIVE (5) COPIES

. ADMINISTRATIVE PROCEDURE 3 NGE TYPE:

  • TEMPORARY ON-THE-SPOT CHANGE PERMANENTD (GREEN) (ORANGE)

PROCEDURE TITLE *.:;, ')

  • f -,; * *EXPIRES:

ALL ON-THE-SPOT CHANGES TO BE CONSIDERED !"OR APPLICABILITY TO BOTH UNITS.

~UNIT! PROCEDURENO.~~~'--r~\)~--\_~_-_,_,_._c_c_'_~_*~~~~ REV. N O . - - - - CHANGE N0. _ _ 2-I)( I UNIT 2 PROCEDURENO._~_-::t_V_-_*\.>_-_\_~_._\_,~U~l~'-5_'_ _ _~ REV. NO. _ _ _ _ CHANGE NO.

PROPOSED CHANGE: ~~'.\'t!.... °3~'.)

?.~~ ~\~~- 5 ""* 5 "") \2

\'"* ..,,\:'II~

\',..,.'I P

' " ,I l\w -~ \'":> \ ~'\' ~s ..:.;t ., . , . <:..... \-t ~ \-

\'~,...::'...\....- * 1c:: r*, \. ~ \~ '1 \')~ *.:_i,*>i t5 C; \. .¥-. ~v\)

~ \o{..)J... ' \I... ~ c"~ ) \(. I..;> (; '-\ ' ~ "-'

\J' -,Q e J \c:_ lei.)'\ I *~ ~\(; )

\\1..:d ""\....*\\ \e.\'f>.'\~.

R-: \ 1"c *-- \ l'.l

\l ,:ii,~~\...

REASON FOR CHANGE:

ACTION TAKEN FOR OTHER UNIT:

s;; ~""' -<-

AUTHOR I Z AT 10 N: .

dd d.e_-4:-

  • suPERVISOR IN CHARGE DATE
    • SIGNATURE AL.SO VERIFIES THAT APPL.ICABILITY TO BOTH UNITS HAS BEE CONSIDERED.

ACCEPTABLE: POST CHANGE-REVIEW/APPROVAL YES NO 00 WD 1 ltZT N cyJ I I N

. \

RETURN COMPL.ETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.

FOLLOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:

I PERFORMED BY:

SIGNATURE DATE RETURN TO O . . ARTMENT HEAO *OR ROUT<NG THROUGH *OH CHANGE-REVOEWIA . . ROVAC CYCLE-FORM*AP-3-t REV. 9

  • .* *-** -*-.~'t"-*.-:**~**, ..**o.~11";",".*~-.--:-:---**,::*~~ .. ~:.-;"*::~--=-*;*:~* ---.*--;- .r ""* *-***-* **,* ***** - ** *"" * *,

NOTE: PRESS HARD YOU ARE MAKING FIVE (5) COPIES

. ADMINISTRATIVE PROCEDURE 3 CHANGE TYPE:

ON-THE-SPOT CHANGE

_P_R_O_C_E_D_U_R_E_T_l_T_L_E--s--.--~-

.*-P,.....-.s-,--~-\1.-bl_<" __\-.,-.u-....'-,p..-\_--\-"f'_..S._\-

____ \_'("_A_j_N__B_~

[$] p~:~:::tT D

  • EXP IR ES:
  • TEMPORARY (ORANGE)

'* ALL. ON-THE-SPOT CHANGES TO BE CONSIDERED !="OR APPL.ICABIL.ITY TO BOTH UNITS.

~UNIT 1 PROCEDURE NO. _ PD-=-_-_\;...;B::;...._'_\_,_o_o__

__,_\.... s______ "REV. NO. _ __._t__ CHANGE NO. _ _,\_ _

(ZJ UNIT 2 ~nr:. - \<l, \ \ ()0 co PROCEDURE NO. _......;;;;....;;;.,£U"--"~-"'""'-..!2=-"'--..;....;'-__.;_........;;______ \ \

REV. N O . - - - - - CHANGE N O * - - - ' - -

PROPOSED CHANGE: ~ ~~'"'- 30,,,

Q.~~~~ o~~\

~1"1' B.~\.\\ ) -s,~,.sJ co.a..\.\'\'

8. a.\.\ ) ta. ;l..\,°i '8. a...\ ' \'()

REASON FOR CHANGE:

ACTION TAKEN FOR OTHER UNIT:

    • SIGNATURE AL.SO VERIFIES THAT APPL.ICABIL.ITY TO BOTH UNITS HAS BEEN CONSIDERED.

~ OR SHi-FT SUPERVISOR ACCEPTABLE: POST CHANGE-REVIEW/APPROVAL YES NO 1~10 f-2-fz:-

rno MEETING No.frZ13

t;K ~me SQAE DD I 21 RETURN COMPL.ETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.

FOL.LOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:

PERFORMED BY:

SIGNATURE DATE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL. CYCL.E.

FORM AP-3-1 REV. 9

' SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & GAS COMPANY ELECTRIC GENERATION DEPARTMENT SAFETY

- . *- - . RELATED PROCEDURE APPROVAL COVER SHEET PROCEDURE:

lPD-18.1.008 - SOLID STATE PROTECTION SYSTEM REMARKS: FUNCTIONAL TEST - TRAIN A REV. 1 - General Revision to incorporate On-The-Spot-Changes.

EED QA SORC STA. SUPT.

REV SUBMITTED APPROVED REVIEWED REVIEWED APPROVED 0 82-\2:>

1

-. -- *: ....... "":' ...........~,. ...--:"**:"'";"*"**"- ."'1~""';.,,..*.-.."':*":".*,.. ,.-,..... _*~ ....... ~**-*****-;- .............. .

x SALEM GENERATING STATION NUMBER - lPD-18 .1. 008 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 1 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A

1.0 Purpose

1.1 The purpose of this procedure is to verify the operability _

of Solid State Protection System Train A.

1.2 To satisfy the train surveillance requirement of the technical specifications.

2.0

References:

2.1 Solid State Protection System Manual.

2.2 Wiring Diagrams: 203688, 222885, 224305

  • I & C - 001
    • ..*.. *-*. ,*-:***-......... :...~~***.- .... -.-.*.- :................... :~*---:*;-~-....~:"' .,..,.,_;;-"'--**--*-- ... *-****.- :*,*~**:* .. *~***.-.*.* ... -~., .. .

x SALEM GENERATING STATION NUMBER - lPD-18 .1. 008 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 2 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A

3.0 Precautions

3.1 Test conditions must be applied to only Train A. A reactor t~ip will occur if both trains have a general warning condition. Therefore, it is extremely important that the doors to only one train at a time are open, to preclude the introduction of test c6nditions into both trains.

3.2 Test conditions may be applied to one train using its built-in testers, while tne opp0site train is used to maintain the plant protection and provide data to the demultiplexers. If in the process of testing, mal-functions are detected, they can be isolated by care-fully following the procedures in Section 6 of th~

Solid State Protection Manual.

3.3 This procedure must be completed in the sequence given to insure successful completion .

I & C - 001

.* x SALEM GENERATING STATION NUMBER - lPD-18.1.008

  • PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE REV. NO.

DATE PAGE 1

5/24/82

- OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A 4.0 Limitations and Actions:

4.1 If, at any time during the performance of this test, there is any reason to suspect_ that the test equipment being used may not be performing properly, a comparison check shall be performed with a similar device or the device shall be checked*for calibration against a standard. This shall be done prior to taking any

    • 4.2 other corrective action.

If, during the performance of this test, the "As Found" data does no~ meet the requirements of the specified accuracy, the Job Supervisor shall be notified immediately and PD-14.1.001 shall be performed.

4. 3 If, during the _.,performance of this procedur~, the required status indication cannot be obtained, the Job Supervisor shall be notified immediately. Exceptions to the required indication, due to plant conditions at the time of the test, may be made by the' Job Supervisor.

Any exceptions of this nature must be indicated and explained in the Remarks section of this procedure.

4.4 An entry will be made in the Remarks section of this procedure indicating any deficiency and the corrective action taken .

I & C - 001

,.-.,.. * ._,. __.... _. * . __ ._.,.....,.,~,..~' **** - * * . .,,. ___ ,.. ____ _....,..._ ****r-****..,* ** *

,X SALEM GENERATING STATION NUMBER - lPD-18 .1. 008

  • PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE REV.NO.

DATE

____:l_ _ _ _ _ __

PAGE 5/24/82 4

--- OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A 5.0 Test Equipment:

Device Name PD No. Recal. Date Fluke (2)

Stop Watch

  • I & C - 001

.. **.-**:-~**:.**-~r"*~- *..-*..-~*.**~-*

..x SALEM GENERATING STATION NUMBER - lPD-18.1.008 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 5

--- OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A

6.0 Prerequisites

6.1 The individual assigned to perform this procedure is qualified to do so in accordance with Solid State Protection System Qualification Card 2.6.

Supervisor 6.2 The Senior ~hift Supervisor/Shift Supervisor* has granted permission to perform this procedure.

Senior Shift Supervisor/Shift Supervisor Date/Time 6.3 The Control Operator is aware of all of the alarms

.and indications that will result from the performance of this procedure.

Control Operator I & C - 001

,X SALEM GENERATING STATION NUMBER - lPD-18 .1. 008 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 6 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A 7.0 System Line-up:

7.1 The following conditions must be established and/or verified by the Control Operator.

7.1.1 Reactor Trip Bypass Breaker B is open and in the Racked Out position.

7 .1. 2 Safeguard actions which are being blocked by virtue of having been Reset from the Control Bezel will be re-initiated at the completion of this test if the necessary logic signal is present. The Safeguard actions involved are:

1. Containment Spray
2. Phase A Isolation
3. Phase B Isolation
4. Feedwater Isolation
5. Containment Ventilation Isolation from Safety Injection signal Control Operator I & C - 001
  • * * * * . '/' ".'*' * .- ' - -~*---*"\,.,..-...-,*.**"":'*<"--=***** ...-.".;;.*-"?"'""" ..._-.,.. **;** *. '-~-* ~ ......-.*r * ~ **' *. * -, ,. * .. , .... .. *.*.. ~* .. -.. . . . - ,........

x SALEM GENERATING STATION NUMBER - lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C) REV. NO. --=l'--------

DATE 5/24/82 TEST PROCEDURE PAGE _7..:..___ OF 5O TITLE .SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A

8.0 Instructions

8.1 Measure and record the following instrument Bus Voltages (Required llT + 10 VAC).

8.1.l Bus #1 TB-110 - 11 & 12 VAC 8.1.2 Bus #2 TB-210 - 11 & 12 VAC 8.1.3- Bus #3 TB-310 - 11 & 12 VAC 8 .1. 4 Bus #4 TB-410 - 11 & 12 VAC 8 .1. 5 Bus #1 TB-654 - 1 & 12 VAC 8.2 Open the front doors of Train A Logic Bay and Train A Output Relay Bay.

8.3 On the Logic Tester* Panel, verify and record the following Power Supply Voltages 8.3.l +48VDC #1 Required 48.7 + 0.2 VDC As Found As Left

  • 8.3.2 +48VDC #2 Required 48.7 + 0.2 VDC As Found As Left I & C - 001

.x SALEM GENERATIN.G STATION NUMBER- lPD-18.1.008 REV.NO. __;;l_ _ _ _ _ __

PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE _8__ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A

8.0 Instructions

(Continued) Initial 8.3.3 +15VDC #1 Required 15.7 + 0.2 VDC As Found As Left 8.3.4 +~5VDC #2 Required 15.7 + 0.2 VDC As Found As Left 8.4 Verify the following Solid State Protection System General Warnings Lamps are Off.

8.4.1 General Warning Lamp - Train A 8.4.2 General Warning.Lamp - Train B 8.5 Depress the following General Warning Lamps and verify the Lamp Lights, and then remains OFF.

8.5.1 General Warning Lamp - Train A 8.5.2 General Warning Lamp - Train B 1& r.. nn1

.x

.. NUMBER_ lPD-18 .1. 008 SALEM GENERATING STATION REV.NO. _1_ _ _ _ _ _ __

PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE DATE

-5/24/82 PAGE 9 OF 50

-=----

TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A

8.0 Instructions

(Continued) Initial 8.6 On the Logic Test Panel, verify that each of the following indicators will light by depressing it.

8.6.1 Testing 8.6.2 Bad 8.6.3 Good 8.6.4 Continuity 8.6.5 Memory Set 8.6.6 1/1 8.6.7 1/2

8. 6. 8 1/3
8. 6. 9 1/4 8.6.10 2/2 8.6.11 2/3 8.6.12 2/4 I & C - 001

~x SALEM GENERATING STATION NUMBER - lPD-18 .1. 008 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 10 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A

8.0 Instructions

(Continued) Initial 8.7 Record UV Coil Voltage Meter Reading.

Required 43 VDC ~ 2 VDC (when shutdown 0 VDC + 2 VDC) As Found '\

c:1.;: \.;.',.,, .. i.:.1- -t~.,-. 't.i.-.:;,... t-~~ -:.- '~.., \-r"-::"; \i;,\!.....~*'('~ '?\1t::- ,-~*::.*.....!_~. (:_._\*' Pt J

( . " ,:J . /

1 1 8.8 O~~~~'~_.::b~~p~~{*~:la~ d..T"e~*t P*~~e ~ ; <~l~~e' the Mode Selector

  • Switch in the Test position.

8.9 Verify the Operate Lamp is not lighted.

8.10 Verify the General Warning Lamp is lighted.

8.11 Verify the operation of the Semi-Automatic Tester.

Self-check as follows:

-NOTE-Steps 8.11.6 through 8.11.11 will result in continuous alarms in the Control Room if there are any tripped inputs to the SSPS.

8 .11.1 Verify that the continuity lamp is lighted.

8 .11. 2 On the Tester PC Card (Al08), verify that the top four LED's (light emitting diodes) are lighted.

I & C

  • 001

.x SALEM GENERATING STATION NUMBER - lPD-18 .1. 008

  • PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE REV.NO.

DATE

~l~~~~~~~

PAGE 5/24/82 11 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A

8.0 Instructions

(Continued) Initial 8.11.3 Depress the test pushbutton. Verify that the continuity lamp and the top four LEDS on Al08 extinguish.

8.11.4 Release the TEST pushbutton. Verify that the continuity lamp and the top four LEDS on Al08 light.

8.11.5 On the Logic Test Panel, place the Input Error Inhibit switch to the Inhibit position.~~~-

8.11.6 Place the MULTIPLEXER TEST switch to the A & B position.

8.11.7 Place the BLOCKING FUNCTION TEST switch to the BLOCKS NOT INHIBITED position.

8.11.8 Depress and release the TEST pushbutton.

8.11.8.1 Verify that the amber testing lamp lights.

8.11.8.2 In approximately 1.6 seconds, verify that this lamp extinguishes.

8.11.8.3 Verify that the GOOD lamp lights.

I & C -001

.x

  • NUMBER - lPD-18 .1. 008 SALEM GENERATING STATION REV.NO. _1:::.-~~~~~~-

PERFORMANCE DEPARTMENT (I & C)

DATE _5~/_2_4~/_8_2~~~~

TEST PROCEDURE PAGE 12 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A

8.0 Instructions

(Continued) Initial 8.11."8.4 In approximately 1.6 seconds, verify

.that the good lamp extinguishes and repeatedly blinks on and off for

  • these periods.

8 .11. 9 Place the BLOCKING FUNCTION TEST switch to the INHIBIT BLOCKS position.

8.11.10 Depress and release the Test pushbutton.

8.11.10.1 Verify that the AMBER TESTING lamp LIGHTS.

8.11.10.2 Verify that the red BAD lamp lights.

8 .11. 11 Place the MULTIPLEXER TEST switch to INHIBIT.

8.12 Verify Reactor Trip Breaker A is CLOSED (if Reactor Trip Breaker is open have the Control Operator CLOSE Reactor Trip Breaker A) 8.13 Verify the following High Radiation ALARM Lights on panel lRPl are OFF.

8.13.1 lR-llA Containment or Vent Particulate I & C - 001

x SALEM GENERATING STATION NUMBER- lPD-18.1.008 REV.NO. ~l~~~~~~-

PERFORMANCE DEPARTMENT (I & C) .

. DATE 5/24/82 TEST PROCEDURE PAGE 13 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A

8.0 Instructions

(Continued) Initial 8.13.2 1R-12A Containment or Vent Gas Effluent.

8.13.3 1R-12B Containment or Vent Gas Effluent (Iodine) .

8 .14 If any high RADIATION ALARM. is present in Steps 8.13.1 through 8.13.3, lift the field lead on terminal TB-506-2.

8 .15 Perform the fo-llowing for LOGIC and PERMISSIVE testing. Record results on TABLE I ..

WARNING: If a malfunction within the logics is detected, the red BAD LAMP will come on at the instant of detection and remain on. It is then necessary to refer to Section 6.3 of the *solid State Protection System Manual to troubleshoot and define the cause.

8.15.1 Verify the following switches are in the positions indicated.

8.15.1.1 *Logic A OFF 8.15.1.2 Logic B 24 I & C

  • 001
    • .*-_-*.<"*~:**-* ... *,**.-.>-:.*:::*,.._...*~-***-*T .--~.- ....~--- .... ~-:-- ~,_ ""**:-* _.,... ............. ,, *.. -** ** **

x SALEM GENERATING STATION NUMBER - lPD-18 .1. 008 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE *so PAGE 14 OF TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A

8.0 Instructions

(Continued) Initial 8.15.1.3 Logic c 24 8.15.1.4 Logic D 24 8 .15 .1. 5 Permissives OFF

  • 8.15.2 8.15.1.6 Memories OFF Place Logic A switch to position "l" and verify that Function Logic Lamp 2/3 lights.

8.15.3 Depress and release the TEST pushbutton.

The amber testing lamp will LIGHT. After all combinations of logics are tested, the Amber TESTING Lamp should extinguish and the Green GOOD Lamp should light. The GOOD Lamp will extinguish the next time the TEST pushbutton is depressed.

8.15.4 Place the Blocking Function Test Switch to the opposite position and repeat Steps 8.15.2 and 8.15.3.

8.15.5 Using Table I, perform Step 8.15.2 through 8.15.4 for the positions of the logic and permissive switches as listed.

I & C - 001

x SAL NERATING STATION NUMBER - lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C) REV. NO. 1 TEST PROCEDUflE DATE 5/24/82

~1 PAGE 15 - OF 50

1 1 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED OFF 24 24 24 OFF OFF (GOOD OR BAD) 1 24 24 24 OFF LOSS OF FLOW, LOOP 1 2/3 2 24 24 24 OFF LOSS OF FLOW, LOOP 2 2/3 3 24 24 24 OFF LOSS OF FLOW~ LOOP 3 2/3 I

4 24 - 24 24 OFF LOSS OF FLOW, LOOP 4 2/3 5 24 24 24 OFF LOSS OF FLOW,. RCP 2/4 6 24 24 24 OFF PRESSURIZER, LOW PRESSURE TRIP 2/4

x SAL ERATING STATION NUMBER - lPD-18 .1. 008 ..

PERFORMANCE DEPARTMENT (I & Ct REV. NO. 1

l

=---

.*1 TEST PROCEDUHE DATE' 5/24/82 PAGE 16 OF 50 TITLE SOLID STATE PROTECTION* SYSTEM FUNCTIONAL TEST TRAIN A

  • i

~

T TABL:E I i;

'i

';

LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER..- BLOCKS

LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT i

! A B C D

  • SIVE FUNCTION REQUIRED ACTUAL BLOCKS . INHIBITED 7 24 24 24 OFF PRESSURIZER, HIGH PRESSURE TRIP 2/4 8 24 24 24 OFF PRESSURIZER, HIGH WATER LEVEL 2/3 TRIP 9 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 1 1/2 10 24 24 24 OFF LOW FEEDWATER .FLOW, LOOP 1 1/2 11 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 2 1/2 12 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 2 1/2

x SAL ERA TING ST A TION NUMBER~ lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C) REV. NO. 1 TEST PROCEDURE DATE 5/24/82 PAGE 17 OF 50

'.i TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B C D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 13 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 3 1/2 14 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 3 1/2 15 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 4 1/2 16 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 4 1/2 17 24 24 24 OFF OIL PRESSURE SWITCHES REACTOR 2/3 TRIP 18 24 24 24 OFF STOP VALVES GENERATOR TRIP 2/2 19 24 24 24 OFF STOP VALVES GENERATOR TRIP 2/2

x SAL NERA TING ST ATION NUMBER - lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C)

REV. NO. 1 TEST PROCEDUBE DATE 5/24/82 PAGE 18 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS

., LOGIC INHIBIT NOT LOGIC LOGIC LOGIC MIS- TEST A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 20 24 24 24 OFF STOP VALVES REACTOR TRIP 2/2 21 24 24 24 *OFF SOURCE RANGE ,TRIP 2/2 22 24 24 24 OFF SOURCE RANGE TRIP 2/2 23 24 24 24 OFF FEED THRU TO-LOGIC B 23 1 24 24 OFF INTERMEDIATE RANGE TRIP 2/2 23 2 24 24 OFF INTERMEDIATE RANGE TRIP 2/2 23 3 24 24 OFF POWER RANGE, LOW SETPOINT TRIP 2/4

x SAL NERATING STATION NUMBER - lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C) R.EV. NO. 1 TEST PROCEDURE DATE 5/24/82 PAGE 19 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS.

  • LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c 1' SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 4 24 24 OFF /POWER RANGE, HIGH SETPOINT TRIP 2/4 23 5 24 24 *OFF OVERTEMPERATURE DELTA T TRIP 2/4 23 6 24 24 OFF OVERPOWER DELTA T TRIP 2/4 23 7 24 24 OFF RCP UNDERVOLTAGE TRIP 2/4 23 8 24 24 OFF RCP UNDERVOLTAGE TRIP 1/2 23 9 24 24 OFF RCP UNDERVOLTAGE, TURB. FEED 1(2 PUMP

x SA NEAATING STATION NUMBER - lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C, REV. NO. 1 TEST PROCEDURE DATE 5/24/82 PAGE 20 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES

  • .:' FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS
  • i,

) LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 10 24 24 OFF RCP UNDERVOLTAGE, TURB. FEED 2/4 PUMP 23 11 24 24 OFF LOW STEAMLINE PRESSURE 2/4

  • .;

23 12 24 24 OFF HIGH STEAMLINE FLOW, LOOP 1 1/2 23 13 24 24 OFF HIGH STEAMLINE FLOW, LOOP 2 1/2 23 14 24 24 OFF HIGH STEAMLINE FLOW, LOOP 3 1/2 23 15 24 24 OFF HIGH STEAMLINE FLOW., LOOP 4 1/2

x*

SAL NE RATING ST A TION NUMBER- lPD-18.1.008

-***~-*-

PERFORMANCE DEPARTMENT (I & C)

REV. NO. 1 TEST PROCEDURE DATE 5/24/82 PAGE 21 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL, BLOCKS INHIBITED 23 16 24 24 OFF STEAMLINE ISOLATION 2/4 23 17* 24 24 *OFF HIGH CONTAINMENT PRESSURE, 2/3 SAFETY INJECTION 23 18 24 24 OFF HI-HI CONTAINMENT PRESSURE, 2/4 SPRAY ACTUATION 23 19 24 24 OFF HI-HI CONTAINMENT PRESSURE, 2/4 SPRAY ACTUATION 23 20 24 24 OFF HI-HI CONTAINMENT PRESSURE, 2/4 STEAM STOP VALVES

x SALE ERATING STATION PERFORMANCE DEPARTMENT (I & C)

NUMBER -

REV. NO.

lPD-18.1.008 1

e.

TEST PROCEDURE DATE 5/24/82 PAGE 22 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 21 24 24 OFF HI-HI CONTAINMENT PRESSURE, 2/4 PHASE B ISOLATION 23 22 24 24 OFF SAFETY INJECTION, PHASE A . 1/1 ISOLATION 23 23 24 - 24 OFF SAFETY INJECTION, CONTAINMENT 1/2 VENTILATION ISOLATION 23 24 24 24 OFF FEED THRU TO LOGIC C 23 24 1 24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP l

x SAL NERATING ST A TION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDUHE NUMBER -

~EV.

DATE NO.

lPD-18 .1. 008 1

5/24/82

. PAGE 23 OF 50 J

1.

j TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS . FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 2 24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 2 23 24 3 24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 3 23 24 4 ,. 24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 4 23 24 5 24 OFF PRESSURIZER PRESSURE 2/3 23 24 6 24 OFF PRESSURIZER .PRESSURE 2/3 23 24 7 24 OFF PRESSURIZER PRESSURE 2/3

x SAL NERATING STATION NUMBER_ lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C) REV. NO. 1

-~ TEST PROCEDURE DATE 5/24/82 PAGE 24 OF 50 TITLE SOLID STATE P~OTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B C D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 8 24 OFF STEAM GENERATOR LO-LO WATER 2/3 LEVEL LOOP 1 23 24 9 24 OFF STEAM GENERATOR LO-LO WATER LEVEL LOOP 2 23 24 10 24 OFF STEAM GENERATOR LO-LO WATER 2/3 LEVEL LOOP 3 23 24 11 24 OFF STEAM GENERATOR LO-LO WATER 2/3 LEVEL LOOP 4 23 24 12 24 OFF STEAM GENERATOR LO-LO WATER 1/4 LEVEL TRIP

x SAL ERA TING ST A TION NUMBER - lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C) REV. NO. 1

  • TEST PROCEDURE DATE 5/24/82 PAGE 25 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION
  • '** TEST SWITCH

.J PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT

\

i A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED

/,,..:_,

, I

  • ~

23 24 13 24 OFF STEAM GENERA( 10R/LO-LO WATER

' ......... _ _.. I 1/4 LEVEL, MOTO:i.-..>.r'EED PUMP 23 24 14 24 OFF STEAM GENERATOR LO-LO WATER 2/4 LEVEL, TURBINE FEED PUMP 23 24 15 24 OFF STEAM GENERATOR HI-HI LEVEL, 2/3 GENERATOR 1 23 24 16 24 OFF STEAM GENERATOR HI-HI LEVEL, 2/3 GENERATOR 2

. 23 24 17 24 OFF STEAM GENER.Z\TOR HI-HI LEVEL, 2/3 GENERATOR 3

x SALE* ERA TING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18 .1. 008 1

5/24/82 PAGE 26 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c D SIVE FUNCTION 'REQUIRED ACTUAL BLOCKS INHIBITED 23 24 18 24 OFF STEAM GENERATOR HI-HI LEVEL, 2/3 GENERATOR 4 23 24 19 24 OFF LOW TAVG 2/4 23 24 20 24 OFF TAVG AND REACTOR TRIPPED 2/2 23 24 21 24 OFF UV DIODES AND OUTPUT 1/4 23 24 22 24 OFF SAFETY INJECTION DIODES & OUTPPT 1/4 23 24 23 24 OFF UV DIODES AND OUTPUT 1/4

x SALE ERA TING ST A TION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18 .1. 008 1

5/24/82 PAGE 27 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELEC'l'ORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PE'R- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- .TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 24 24 OFF FEED THRU TO LOGIC D 23 24 24 1 OFF SAFETY INJECTION DIODES & OUTPUT 1/3 23 24 24 2 OFF UV DIODES AND OUTPUT 1/4 23 24 24 3 OFF UV DIODES AND OUTPUT 1/4 23 24 24 4 OFF UV DIODES AND OUTPUT 1/4 23 24 24 5 OFF UV DIODES AND .OUTPUT 1/4 23 24 24 6 OFF UV DIODES AND OUTPUT 1/4