ML19269C470: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:
LOCAL .
LOCAL .
w-January 23,    '
w-January 23,    '
                                                                  -,
* oi e
* oi e
9          WJP UNITED STATES OF AMERICA NUCLEAR REGULATORY CCMMISSION    If" 9-    g4 g ',i,lc75 ) [- ,
9          WJP UNITED STATES OF AMERICA NUCLEAR REGULATORY CCMMISSION    If" 9-    g4 g ',i,lc75 ) [- ,
Y;'. " *; ' .,
Y;'. " *; ' .,
ns. -~-    c r
ns. -~-    c r
                                                            ,
b?g{f%
b?g{f%
4    %
4    %
Line 38: Line 36:
2  It is unclear to Applicant what relief Intervenors are seeking in their motion. Contrary to the requirements of 10 C.F.R. S 2.730(b), Intervenors have not stated with particularity the relief sought, much less the grounds for the motion. Intervenors have not asserted that based on the information in the NCUC Report the construction permits for the Harris units should be suspended or in any way amended.
2  It is unclear to Applicant what relief Intervenors are seeking in their motion. Contrary to the requirements of 10 C.F.R. S 2.730(b), Intervenors have not stated with particularity the relief sought, much less the grounds for the motion. Intervenors have not asserted that based on the information in the NCUC Report the construction permits for the Harris units should be suspended or in any way amended.
Intervenors have not asserted that there is no longer a need for the Barris Plant or that the new forecast and the projected revisions to the construction plan could conceivably result in more than a slight modification to the construction schedule for the Harris units. As far as Applicant can surmise from Intervenor's motion, Intervenors simply would like the Licensing Board to "take further evidence regarding {the need- fo r -powe r ] issue" and to make an " independent investigation of those issues which are to be covered" by the NCUC in hearings to be held in mid-1979.        It is also unclear whether Intervenors would have the Licensing Board provide such a duplicative function prior to, concurrent with, or subsequent to the NCUC's hearings.
Intervenors have not asserted that there is no longer a need for the Barris Plant or that the new forecast and the projected revisions to the construction plan could conceivably result in more than a slight modification to the construction schedule for the Harris units. As far as Applicant can surmise from Intervenor's motion, Intervenors simply would like the Licensing Board to "take further evidence regarding {the need- fo r -powe r ] issue" and to make an " independent investigation of those issues which are to be covered" by the NCUC in hearings to be held in mid-1979.        It is also unclear whether Intervenors would have the Licensing Board provide such a duplicative function prior to, concurrent with, or subsequent to the NCUC's hearings.
remanded issue. The Licensing Board's jurisdiction in this proceeding is limited to the one issue of Applicant's management capability as per the Commission's Order of September 5, 1978. The Appeal Board has retained jurisdiction only with respect to the radon issue.4 Within thirty days after the date of an Appeal Board decision, the Commission may "in cases of exceptional legal or policy importance", review the decision on its own motion. 10 C.F.R. S 2.786(a). The Appeal Board decision was dated August 23, 1978. The only action by the Commission between the Appeal Board decision and thirty days thereafter was to issue the September 5, 1978 Order remanding the proceeding to the Licensing Board for further hearings on Applicant's management capabilities. The remand was prompted by the concerns expressed in the August 30, 1978 letter from the Licensing Board. The Commission did not move to review any other aspect of the Appeal Board decision nor did the Commission state that it was reserving its jurisdiction over any other aspect of the Appeal Board decision. No other party filed a petition for review with the Commission within the fifteen day period required by 10 C.F.R. S 2.786(b)(1).
remanded issue. The Licensing Board's jurisdiction in this proceeding is limited to the one issue of Applicant's management capability as per the Commission's Order of September 5, 1978. The Appeal Board has retained jurisdiction only with respect to the radon issue.4 Within thirty days after the date of an Appeal Board decision, the Commission may "in cases of exceptional legal or policy importance", review the decision on its own motion. 10 C.F.R. S 2.786(a). The Appeal Board decision was dated August 23, 1978. The only action by the Commission between the Appeal Board decision and thirty days thereafter was to issue the September 5, 1978 Order remanding the proceeding to the Licensing Board for further hearings on Applicant's management capabilities. The remand was prompted by the concerns expressed in the August 30, 1978 letter from the Licensing Board. The Commission did not move to review any other aspect of the Appeal Board decision nor did the Commission state that it was reserving its jurisdiction over any other aspect of the Appeal Board decision. No other party filed a petition for review with the Commission within the fifteen day period required by 10 C.F.R. S 2.786(b)(1).
As contemplated by 10 C.F.R. S 2.770 when the Commission reviews a decision it may " limit the issues to be reviewed". It is at least implicit in the regulations with 4  See note 3 suora.
As contemplated by 10 C.F.R. S 2.770 when the Commission reviews a decision it may " limit the issues to be reviewed". It is at least implicit in the regulations with 4  See note 3 suora.
 
respect to the Commission's review of Licensing Board and Appeal Board decisions (see 10 C.F.R. S 2.770 and 2.786) that the findings and decisions concerning issues, which the Commission in its discretion choses not to review, represent the final findings and decisions of the Commission. This should be especially true where initiation of the sole remanded issue here was in response to the Licensing Board's administrative communication with the Commission. This interpretation of the Commission's jurisdiction in this proceeding is consistent with the rule of practice, based on sound policy that, when an issue is once decided and reviewed, that should be the end of the matter. The unreserved decision on a question of law or fact made during the course of litigation settles that question for all subsequent stages of the suit.5 INTERVENORS HAVE NOT MET AND CANNOT MEET THE BURDEN OF PROOF REQUIRED OF THE MOVING PARTY BEFORE THE COMMISSION CAN REMAND TO THE LICENSING BOARD, REOPEN THE RECORD AND RECONSIDER AN ISSUE PREVIOUSLY FULLY CONSIDERED AND DECIDED BY THE LICENSING BOARD AND APPEAL BOARD We are reluctant to have the Commission deny Intervenors' motion solely for failure to state with 5  Barrett v. Baylor, 457 F.2d 119, 123 (7th Cir. 1972)
respect to the Commission's review of Licensing Board and Appeal Board decisions (see 10 C.F.R. S 2.770 and 2.786) that the findings and decisions concerning issues, which the Commission in its discretion choses not to review, represent the final findings and decisions of the Commission. This should be especially true where initiation of the sole remanded issue here was in response to the Licensing Board's
,
administrative communication with the Commission. This interpretation of the Commission's jurisdiction in this proceeding is consistent with the rule of practice, based on sound policy that, when an issue is once decided and reviewed, that should be the end of the matter. The unreserved decision on a question of law or fact made during the course of litigation settles that question for all subsequent stages of the suit.5 INTERVENORS HAVE NOT MET AND CANNOT MEET THE BURDEN OF PROOF REQUIRED OF THE MOVING PARTY BEFORE THE COMMISSION CAN REMAND TO THE LICENSING BOARD, REOPEN THE RECORD AND RECONSIDER AN ISSUE PREVIOUSLY FULLY CONSIDERED AND DECIDED BY THE LICENSING BOARD AND APPEAL BOARD We are reluctant to have the Commission deny Intervenors' motion solely for failure to state with 5  Barrett v. Baylor, 457 F.2d 119, 123 (7th Cir. 1972)
(citations omitted)(distincuished in Public Service Company of Indiana (Marble Hill Nuclear Generating Station, Units 1 and 2), ALAB-493, 8 NRC 253, 259-60 (1978)); Cf. Public Service Company of New Hampshire (Seabrook Station, Units 1 and 2), ALAB-513, 8 NRC      (December 21, 1978).
(citations omitted)(distincuished in Public Service Company of Indiana (Marble Hill Nuclear Generating Station, Units 1 and 2), ALAB-493, 8 NRC 253, 259-60 (1978)); Cf. Public Service Company of New Hampshire (Seabrook Station, Units 1 and 2), ALAB-513, 8 NRC      (December 21, 1978).
particularity the relief requested and the grounds for such relief, or for want of jurisdiction. A party could properly fashion a petition to reopen the record on the basis of newly discovered evidence and challenge a construction permit.      See e.a. 10 C.F.R. S 2.206. Assuming arouendo that the Commission has jurisdiction to entertain this motion 6 and that Intervenors had fashioned an understandable motion to remand to the Licensing Board, to reopen the record and to reconsider the issue of the need for the plant (with some relief requested),
particularity the relief requested and the grounds for such relief, or for want of jurisdiction. A party could properly fashion a petition to reopen the record on the basis of newly discovered evidence and challenge a construction permit.      See e.a. 10 C.F.R. S 2.206. Assuming arouendo that the Commission has jurisdiction to entertain this motion 6 and that Intervenors had fashioned an understandable motion to remand to the Licensing Board, to reopen the record and to reconsider the issue of the need for the plant (with some relief requested),
the motion should be denied because Intervenors have failed both to offer a significant new circumstance, new trend or new fact sufficient to justify reopening the record and to demonstrate that a different result would have been reached initially had such new information been considered.
the motion should be denied because Intervenors have failed both to offer a significant new circumstance, new trend or new fact sufficient to justify reopening the record and to demonstrate that a different result would have been reached initially had such new information been considered.
In its initial decision, the Licensing Board found that "the four Shearon Harris Nuclear power units will be needed as now scheduled, or sooner, and that this need is not diminished by increased consumer use of alternative energy sources or energy conservation or increasing electrical rates over the next 15 years."    7 NRC at 139. The Licensing Board 6  In Duke Power Company (Catawba Nuclear Station, Units 1 and 2), ALAB-359, 4 NRC 619, 621 (1976), the Appeal Board similarly dismissed a motion to reopen where the issue of jurisdiction was unclear (but the proper disposition of the petition was clear) by assuming arouendo jurisdiction was with the Appeal Board.
In its initial decision, the Licensing Board found that "the four Shearon Harris Nuclear power units will be needed as now scheduled, or sooner, and that this need is not diminished by increased consumer use of alternative energy sources or energy conservation or increasing electrical rates over the next 15 years."    7 NRC at 139. The Licensing Board 6  In Duke Power Company (Catawba Nuclear Station, Units 1 and 2), ALAB-359, 4 NRC 619, 621 (1976), the Appeal Board similarly dismissed a motion to reopen where the issue of jurisdiction was unclear (but the proper disposition of the petition was clear) by assuming arouendo jurisdiction was with the Appeal Board.
indicated that its conclusions as to need-for-power would remain unchanged "even if forecasts credicted an even lower peak demand in the forecasted period".    (emphasis supplied).
indicated that its conclusions as to need-for-power would remain unchanged "even if forecasts credicted an even lower peak demand in the forecasted period".    (emphasis supplied).
The Board also noted that " applicant has in the past demonstrated that it is ready to and capable of deferring its scheduled construction when required by conditions in its industry."    For example, the Board noted that CP&L "could certainly delay its nebulous 1150 megawatt nuclear plant labelled ' SRI' which is currently scheduled for operation in 1989."  Id.
The Board also noted that " applicant has in the past demonstrated that it is ready to and capable of deferring its scheduled construction when required by conditions in its industry."    For example, the Board noted that CP&L "could certainly delay its nebulous 1150 megawatt nuclear plant labelled ' SRI' which is currently scheduled for operation in 1989."  Id.
In ALAB 490, the Appeal Board affirmed the Licensing Board's initial decision while specifically addressing only one issue, i.e. the need for the power to be generated by the facility. The Appeal Board noted that following the close of the evidentiary hearing , the Applicant transmitted to the Licensing Board for its information (1) a revised forecast which embodied somewhat lower growth rates than had the earlier forecast proffered by its witness; and (2) the newest (1978)
In ALAB 490, the Appeal Board affirmed the Licensing Board's initial decision while specifically addressing only one issue, i.e. the need for the power to be generated by the facility. The Appeal Board noted that following the close of the evidentiary hearing , the Applicant transmitted to the Licensing Board for its information (1) a revised forecast which embodied somewhat lower growth rates than had the earlier forecast proffered by its witness; and (2) the newest (1978)
NCUC Public Staff forecast of growth rates. The new forecasts predicted a lower growth rate than the forecasts that were in evidence at the hearing. 8 NRC at 238-239. In its decision, the Appeal Board gave great weight to the NCUC forecast. NCUC is under a statutory obligation to keep current analyses of long-range needs for expansion of facilities for the generation of electricity in North Carolina. Where the NCUC forecast was
NCUC Public Staff forecast of growth rates. The new forecasts predicted a lower growth rate than the forecasts that were in evidence at the hearing. 8 NRC at 238-239. In its decision, the Appeal Board gave great weight to the NCUC forecast. NCUC is under a statutory obligation to keep current analyses of long-range needs for expansion of facilities for the generation of electricity in North Carolina. Where the NCUC forecast was subject to scrutiny and cross-examination and not found to be flawed, the Appeal Board held that the NRC could attach heavy reliance on the judgment of the local Commission which has a legal obligation to ensure that utilities meet customer demands. 8 NRC at 240-241.
 
subject to scrutiny and cross-examination and not found to be flawed, the Appeal Board held that the NRC could attach heavy reliance on the judgment of the local Commission which has a legal obligation to ensure that utilities meet customer demands. 8 NRC at 240-241.
The NCUC Report relies primarily on the same 1978 NCUC Public Staf f forecast that    Ts before the Licensing Board and Appeal Board. The NCUC has determined that the probable range of annual peak load growth for Applicant through 1992 is 4.4% to 6.5%. Within this range the most probable peak load growth rata for planning was found to be 5. 2%. NCUC Report at
The NCUC Report relies primarily on the same 1978 NCUC Public Staf f forecast that    Ts before the Licensing Board and Appeal Board. The NCUC has determined that the probable range of annual peak load growth for Applicant through 1992 is 4.4% to 6.5%. Within this range the most probable peak load growth rata for planning was found to be 5. 2%. NCUC Report at
: 9. In reaching this conclusion, the NCUC basically adopted the NCUC Public Stuff's 1978 base case forecast of 6.7% growth and qualitatively adjusted it to account for actual 1978 peaks and to incorporate the NCUC's belief that conservation and load management can reduce the rate of peak load growth.      Id. at 19-21. The NCUC recognized, however, that the proposed reductions " depend upon increased levels of conservation and load management" (id. at 21) and stated that "significant efforts should be expended by the utilities to help effect
: 9. In reaching this conclusion, the NCUC basically adopted the NCUC Public Stuff's 1978 base case forecast of 6.7% growth and qualitatively adjusted it to account for actual 1978 peaks and to incorporate the NCUC's belief that conservation and load management can reduce the rate of peak load growth.      Id. at 19-21. The NCUC recognized, however, that the proposed reductions " depend upon increased levels of conservation and load management" (id. at 21) and stated that "significant efforts should be expended by the utilities to help effect
. .  . changes in usage patterns."    Id. at 22.
. .  . changes in usage patterns."    Id. at 22.
Based upon its expectation of achieving a reduction in the rate of growth to 5.2%, the NCUC concluded that the inservice dates for Applicant's units under construction could be extended at least one year, but in no case greater than two
Based upon its expectation of achieving a reduction in the rate of growth to 5.2%, the NCUC concluded that the inservice dates for Applicant's units under construction could be extended at least one year, but in no case greater than two years and still maintain adequate reserves. Id. at 22 and 24.
 
years and still maintain adequate reserves. Id. at 22 and 24.
The NCUC recognized, however, the " paucity of conrete data available  . . . concerning actual methods of achieving the expected levels of conservation and load management" (id. at
The NCUC recognized, however, the " paucity of conrete data available  . . . concerning actual methods of achieving the expected levels of conservation and load management" (id. at
: 26) and its " responsibility to insure that the continued economic growth of the state is not impaired by lack of adequate utility services" (id. at 27), specifically noting that industry expanded in 1978 at about twice the rate of the previous year (id. at 26). Therefore, the NCUC deferred any decision to require Applicant or other electric utilities to adjust their construction schedules until after completion of hearings planned for mid-1979. Before any decision to require adjustment of construction schedules the NCUC desires to examine more detailed projections of industrial usage and the planning model of the State Budget Office, in addition to the information to be provided by the utilities. Id. at 26-27.
: 26) and its " responsibility to insure that the continued economic growth of the state is not impaired by lack of adequate utility services" (id. at 27), specifically noting that industry expanded in 1978 at about twice the rate of the previous year (id. at 26). Therefore, the NCUC deferred any decision to require Applicant or other electric utilities to adjust their construction schedules until after completion of hearings planned for mid-1979. Before any decision to require adjustment of construction schedules the NCUC desires to examine more detailed projections of industrial usage and the planning model of the State Budget Office, in addition to the information to be provided by the utilities. Id. at 26-27.
On December 20, 1978, Applicant submitted a revised forecast and construction schedule to its Board of Directors
On December 20, 1978, Applicant submitted a revised forecast and construction schedule to its Board of Directors (which along with the NCUC Report was submitted to the Of fice of Nuclear Reactor Regulation with copies to the Commission by letter of January 3, 1979).7  Applicant also forecasts a slightly slower growth (5.35% through 1992) than the Company's 7  Applicant's revised forecast and capacity plan are incorporated herein by reference.
                                                                .
(which along with the NCUC Report was submitted to the Of fice of Nuclear Reactor Regulation with copies to the Commission by letter of January 3, 1979).7  Applicant also forecasts a slightly slower growth (5.35% through 1992) than the Company's 7  Applicant's revised forecast and capacity plan are incorporated herein by reference.
 
previous forecast (5.7%). Applicant's generating capacity addition schedule eliminates a 1150 MW undesignated nuclear unit (" SRI") formerly projected for 1989 and adds two undesignated 720 megawatt units for 1991 and 1992, respectively. However, no changes in the construction schedule or  inservice dates are currently projected by Applicant for units under construction, including the four Harris units.
previous forecast (5.7%). Applicant's generating capacity addition schedule eliminates a 1150 MW undesignated nuclear unit (" SRI") formerly projected for 1989 and adds two undesignated 720 megawatt units for 1991 and 1992, respectively. However, no changes in the construction schedule or  inservice dates are currently projected by Applicant for units under construction, including the four Harris units.
The burden required of a moving party to reopen the record and the sound policy reasons behind that burden were articulated in denying a motion for reconsideration of the need- fo r-power issue on the basis of new avidence in Duke Power Company (Catawba Nuclear Station, Units 1 and 2), supra at 620-21, and bear repeating here:
The burden required of a moving party to reopen the record and the sound policy reasons behind that burden were articulated in denying a motion for reconsideration of the need- fo r-power issue on the basis of new avidence in Duke Power Company (Catawba Nuclear Station, Units 1 and 2), supra at 620-21, and bear repeating here:
After a decision has been rendered, a dissatisfied litigant who seeks to persuade us - or any tribunal for that matter - to reopen a record and reconsider "because some new circumstance has arisen, some new trend has been observed or some new fact discovered," has a difficult burden to bear. The reasons for this were cogently given by Mr. Justice Jackson more than thirty years ago in ICC v. Jersev Citv, 322 U.S. 503, 514 (1944):
After a decision has been rendered, a dissatisfied litigant who seeks to persuade us - or any tribunal for that matter - to reopen a record and reconsider "because some new circumstance has arisen, some new trend has been observed or some new fact discovered," has a difficult burden to bear. The reasons for this were cogently given by Mr. Justice Jackson more than thirty years ago in ICC v. Jersev Citv, 322 U.S. 503, 514 (1944):
One of the grounds of resistance to administrative orders throughout federal experience with the administrative process has been the claims of private litigants to be entitled to rehearings to bring the record up to date and meanwhile to stall the enforcemer* of the administrative order. Administrative consideration of evidence - parcicularly where the evidence is taken by an e.:aminer , his
One of the grounds of resistance to administrative orders throughout federal experience with the administrative process has been the claims of private litigants to be entitled to rehearings to bring the record up to date and meanwhile to stall the enforcemer* of the administrative order. Administrative consideration of evidence - parcicularly where the evidence is taken by an e.:aminer , his report submitted to the parties, and a hearing held on their exceptions to it - always creates a gap between the time the record is closed and the time the administrative decision is promulgated.
 
report submitted to the parties, and a hearing held on their exceptions to it - always creates a gap between the time the record is closed and the time the administrative decision is promulgated.
This is especially true if the issues are difficult, the evidence intricate, and the consideration of the case deliberate and careful. If upon the coming down of the order litigants might demand rehearings as a matter of law because some new cir:umstance has arisen, some new trend has been observed, or some new fact discovered, there would be little hope that the administrative process could ever be consummated in an ord                  be subject to reopening.gr that would not This " difficult burden" includes a showing that "a different result would have been reached initially had [the new information] been considered".9 The Appeal Board has consistently ruled that a minor change in the forecast of the electric demand in an applicant's service area is not significant new evidence that would warrant reopening a proceeding on a construction permit application.
This is especially true if the issues are difficult, the evidence intricate, and the consideration of the case deliberate and careful. If upon the coming down of the order litigants might demand rehearings as a matter of law because some new cir:umstance has arisen, some new trend has been observed, or some new fact discovered, there would be little hope that the administrative process could ever be consummated in an ord                  be subject to reopening.gr that would not This " difficult burden" includes a showing that "a different result would have been reached initially had [the new information] been considered".9 The Appeal Board has consistently ruled that a minor change in the forecast of the electric demand in an applicant's service area is not significant new evidence that would warrant reopening a proceeding on a construction permit application.
The decisions of the Appeal Board have recognized the
The decisions of the Appeal Board have recognized the
Line 82: Line 65:
Cleveland Electric Illuminating Company (Perry Nuclear Power Plant, Units 1 and 2), ALAB-443, 6 NRC 741, 750-51 (1977).
Cleveland Electric Illuminating Company (Perry Nuclear Power Plant, Units 1 and 2), ALAB-443, 6 NRC 741, 750-51 (1977).
9  Northern Indiana Public Service Company (Bailly Generating Station, Nuclear-1), sacra, at 418, citina Unarco Industries, Inc. v. Evans Products Company, 403 F.2d 638 (7th Cir. 1968); and Knight v. Hersh, 313 F.2d 879 (D.C. Cir.-1961).
9  Northern Indiana Public Service Company (Bailly Generating Station, Nuclear-1), sacra, at 418, citina Unarco Industries, Inc. v. Evans Products Company, 403 F.2d 638 (7th Cir. 1968); and Knight v. Hersh, 313 F.2d 879 (D.C. Cir.-1961).
Thus in Niacara Mohawk Pcwer Corporation (Nine Mile Point Nuclear Sta. tion, Unit 2), ALAB-264, 1 NRC 347, 365-66 (1975),
Thus in Niacara Mohawk Pcwer Corporation (Nine Mile Point Nuclear Sta. tion, Unit 2), ALAB-264, 1 NRC 347, 365-66 (1975),
the appeal Board found a two year difference between applicant's and intervenors' forecasts within the margin of uncertainty. A two year difference in the forec asted need for the plant was also found to be within the margin of uncertainty in Kansas Gas and Electric Company (Wolf Creek Generating Station, Unit 1), ALAB-477, 7 NRC 766, 770 (1978), and, thereby, the new forecast was insufficient new information to grant a petition for reconsideration. Even if the NCUC adopts its proposed capacity plan based on its new forecast, the inservice dates for Applicant's units under construction could be extended generally only one year, and in no case greater than two years. NCUC Report at 22 and 24.
the appeal Board found a two year difference between applicant's and intervenors' forecasts within the margin of uncertainty. A two year difference in the forec asted need for the plant was also found to be within the margin of uncertainty in Kansas Gas and Electric Company (Wolf Creek Generating Station, Unit 1), ALAB-477, 7 NRC 766, 770 (1978), and, thereby, the new forecast was insufficient new information to grant a petition for reconsideration. Even if the NCUC adopts its proposed capacity plan based on its new forecast, the inservice dates for Applicant's units under construction could be extended generally only one year, and in no case greater than two years. NCUC Report at 22 and 24.
Here, there really is little new information. The NCUC Report is based on the NCUC Public Staff forecast which was befort the Licensing Board and Appeal Board. While the actual 1978 peaks are now available, the main rationale of the somewhat reduced probable peak load growth rate (5.2%) for planning purposes is a more optimistic view    of the effects of O
Here, there really is little new information. The NCUC Report is based on the NCUC Public Staff forecast which was befort the Licensing Board and Appeal Board. While the actual 1978 peaks are now available, the main rationale of the somewhat reduced probable peak load growth rate (5.2%) for planning purposes is a more optimistic view    of the effects of O
conservation and load management.      Id. at 19-21. This 10  The probable range of annual peak-load growth for Applicant is 4.4% to 6.5%. NCUC Report at 9. Under Applicant's present construction plan for the Harris units, Applicant would not have sufficient reserves if the high-end of that range (6.5%) were achieved. See
conservation and load management.      Id. at 19-21. This 10  The probable range of annual peak-load growth for Applicant is 4.4% to 6.5%. NCUC Report at 9. Under Applicant's present construction plan for the Harris units, Applicant would not have sufficient reserves if the high-end of that range (6.5%) were achieved. See optimism is admittedly based on a " paucity of concrete data".
 
optimism is admittedly based on a " paucity of concrete data".
Id. at 26. The NCUC recognizes the paramount importance of flexibility in its capacity plan. Id. at 17. The NCUC has the responsibility of ensuring that the continued economic growth of the state is not impaired by a lack of adequate utility service. Id. at 27. Thus, the NCUC plans annual updates of its forecast and capacity plan. Id. at 17. Flexibility will permit delays in construction schedules if conservation and load management programs are even more successful than predicted, or acceleration of construction schedules if industrial growth is faster than predicted or if conservacion and load management programs do not significantly impact the peakload growth rate. Because the NCUC recognized the inherent uncertainties in its own forecast and capacity plan, applicant and other utilities are not required to delay their construction schedules pending further examination of these issues in detail in mid-year 1979. Id. at 27.
Id. at 26. The NCUC recognizes the paramount importance of flexibility in its capacity plan. Id. at 17. The NCUC has the responsibility of ensuring that the continued economic growth of the state is not impaired by a lack of adequate utility service. Id. at 27. Thus, the NCUC plans annual updates of its forecast and capacity plan. Id. at 17. Flexibility will permit delays in construction schedules if conservation and load management programs are even more successful than predicted, or acceleration of construction schedules if industrial growth is faster than predicted or if conservacion and load management programs do not significantly impact the peakload growth rate. Because the NCUC recognized the inherent uncertainties in its own forecast and capacity plan, applicant and other utilities are not required to delay their construction schedules pending further examination of these issues in detail in mid-year 1979. Id. at 27.
It is particularly inappropriate that Intervenors petition the Commission to " direct the Licensing Board to make an independent investigation of the issues to be covered in the f NCUC mid-1979 hearings."  As stated by the Appeal Board in (continued) 7 NRC at 138. It is reasonable for a utility company to favor the high side of forecast load demand to ensure it is always prepared for unexpectedly high demands. Niagara Mohawk Power Corporation (Nine Mile Point Nuclear Station, Unit 2), supra at 366.
It is particularly inappropriate that Intervenors petition the Commission to " direct the Licensing Board to make an independent investigation of the issues to be covered in the f NCUC mid-1979 hearings."  As stated by the Appeal Board in (continued) 7 NRC at 138. It is reasonable for a utility company to favor the high side of forecast load demand to ensure it is always prepared for unexpectedly high demands. Niagara Mohawk Power Corporation (Nine Mile Point Nuclear Station, Unit 2), supra at 366.
Rochester Gas and Electric Corcoration (Sterling Power Project Nuclear Unit 1), ALAB-502, 8 NRC        ,    (slip opinion at 5)(October 19, 1978), in response to a petition to reopen the record on need-for-power, "little useful purpose would be served were we now to undertake a duplication of the inquiry being made by the state body (with jurisdiction over the issue]."    Further, as established by the Appeal Board decision in this proceeding, the findings of the NCUC, as that state body charged by law with the responsibility of providing up-to-date analyses of, inter alia, the probable future growth of the use of electricity, are entitled to be given great weight. 8 NRC at 240.    'ae National Environmental Policy Act does not require a completely independent investigation of the projected load forecasts of each applicant for a construction permit in the first instance; " heavy reliance" may be placed on the judgment of local regulatory bodies.      There is no rational basis for suggesting that a NRC Licensing Board should independently investigate a state utilities commission's annual review of electricity forecasts and capacity plans, especially where the Licenning Board and Appeal Board have already found the benefit of the power from a facility, now under construction, is needed and outweighs any environmental impacts
Rochester Gas and Electric Corcoration (Sterling Power Project Nuclear Unit 1), ALAB-502, 8 NRC        ,    (slip opinion at 5)(October 19, 1978), in response to a petition to reopen the record on need-for-power, "little useful purpose would be served were we now to undertake a duplication of the inquiry being made by the state body (with jurisdiction over the issue]."    Further, as established by the Appeal Board decision in this proceeding, the findings of the NCUC, as that state body charged by law with the responsibility of providing up-to-date analyses of, inter alia, the probable future growth of the use of electricity, are entitled to be given great weight. 8 NRC at 240.    'ae National Environmental Policy Act does not require a completely independent investigation of the projected load forecasts of each applicant for a construction permit in the first instance; " heavy reliance" may be placed on the judgment of local regulatory bodies.      There is no rational basis for suggesting that a NRC Licensing Board should independently investigate a state utilities commission's annual review of electricity forecasts and capacity plans, especially where the Licenning Board and Appeal Board have already found the benefit of the power from a facility, now under construction, is needed and outweighs any environmental impacts
- a determination based, in part, on the same state utilities commission's earlier credible findings.
- a determination based, in part, on the same state utilities commission's earlier credible findings.
             "'Need for power' is a shorthand expression for the
             "'Need for power' is a shorthand expression for the
' benefit' side of the cost-benefit balance which NEPA mandates
' benefit' side of the cost-benefit balance which NEPA mandates for a proceeding considering the licensing of a nuclear power plant."  Public Service Co. of Nev Hampshire (Seabrook Station, Units 1 and 2), ALAB-422, 6 NRC 33, 90 (1977). At the outset, inqui.y must be made into whether there exists a genuine need for the electricity to be produced. Thereafter, the focus shifts to the relative costs and benefits of alternatives to the proposed facility. Finally there is an overall balancing of costs and benefits; the costs associated with the selected alternative must be balanced against the benefit achieved by meeting the degree of demand anticipated. Vermont Yankee Nuclear Power Corporation (Vermont Yankee Nuclear Power Station), ALAB-179, 7 AEC 159, 175-76 (1974). In other words, the need-for-power issue is important to ensure environmental costs are not incurred where there is no countervailing benefit. A need-for-power in Applicant's service area was found and the Harris facility was found to be the preferred alternative. The benefit from the power to be generated by the plant was found to outweigh any environmental impacts.
 
Construction activity has been on-going at the Harris site since the issuance of a constcuction permit over a year ago. As can be seen in the photographs attached to the Affidavit of Mr. M. A. McDuffie  (attached hereto as Appendix A) and as attested to by hr. M. A. McDuffie, considerable progress has been made in placing concrete and reinforcing steel at the plant site, particularly in the lower elevations of the Unit 1 power block. In addition, the main reservoir has been cleared and work is proceeding on the dam where Applicant is excavating, cleaning, mapping and grouting the core trench.
for a proceeding considering the licensing of a nuclear power plant."  Public Service Co. of Nev Hampshire (Seabrook Station, Units 1 and 2), ALAB-422, 6 NRC 33, 90 (1977). At the outset, inqui.y must be made into whether there exists a genuine need for the electricity to be produced. Thereafter, the focus shifts to the relative costs and benefits of alternatives to the proposed facility. Finally there is an overall balancing of costs and benefits; the costs associated with the selected alternative must be balanced against the benefit achieved by meeting the degree of demand anticipated. Vermont Yankee Nuclear Power Corporation (Vermont Yankee Nuclear Power Station), ALAB-179, 7 AEC 159, 175-76 (1974). In other words, the need-for-power issue is important to ensure environmental costs are not incurred where there is no countervailing benefit. A need-for-power in Applicant's service area was found and the Harris facility was found to be the preferred alternative. The benefit from the power to be generated by the plant was found to outweigh any environmental impacts.
Construction activity has been on-going at the Harris site since the issuance of a constcuction permit over a year ago. As can be seen in the photographs attached to the Affidavit of Mr. M. A. McDuffie  (attached hereto as Appendix A) and as attested to by hr. M. A. McDuffie, considerable progress has been made in placing concrete and reinforcing steel at the plant site, particularly in the lower elevations
 
of the Unit 1 power block. In addition, the main reservoir has been cleared and work is proceeding on the dam where Applicant is excavating, cleaning, mapping and grouting the core trench.
The west auxiliary reservoir has been cleared and work is progressing on excavating, cleaning, mapping and grouting the core trench for that dam. In all, Unit 1 is 12% complete while Units 2, 3, and 4 are less than 1% complete. Applicant has thus far spent $570,000,000 on the Harris project and has outstanding contractual commitments for an additional
The west auxiliary reservoir has been cleared and work is progressing on excavating, cleaning, mapping and grouting the core trench for that dam. In all, Unit 1 is 12% complete while Units 2, 3, and 4 are less than 1% complete. Applicant has thus far spent $570,000,000 on the Harris project and has outstanding contractual commitments for an additional
$269,000,000. Approximately 3,400 personnel are employed working on the Harris construction effort.
$269,000,000. Approximately 3,400 personnel are employed working on the Harris construction effort.
Thus, the environmental impacts of the Harris facility have to a large extent been realized. Considerable economic resources have been expended. The actual cost-benefit balance at this moment is heavily tipped to the cost side, awaiting ' e expected benefits. Rehashing the need-for-power issue at this point makes no sense. It is no longer relevant in the NEPA context, particularly where almost all non-operational environmental impacts have already occurred and where even with a change in the inservice date for Harris Unit 1 to coincide with the capacity plan in the NCUC Report, construction work would not be suspended. See Appendix A at 2-3. Whether any unit of the Harris facility should be delayed from its present construction schedule is purely an economic issue, which is very much the concern of the NCUC. The Appeal
Thus, the environmental impacts of the Harris facility have to a large extent been realized. Considerable economic resources have been expended. The actual cost-benefit balance at this moment is heavily tipped to the cost side, awaiting ' e expected benefits. Rehashing the need-for-power issue at this point makes no sense. It is no longer relevant in the NEPA context, particularly where almost all non-operational environmental impacts have already occurred and where even with a change in the inservice date for Harris Unit 1 to coincide with the capacity plan in the NCUC Report, construction work would not be suspended. See Appendix A at 2-3. Whether any unit of the Harris facility should be delayed from its present construction schedule is purely an economic issue, which is very much the concern of the NCUC. The Appeal Board decisions discussed acove, which declined to reopen the record and reconsider the need-for-power question due to new forecasts, have all the more effect here where the issue of the delay of units under construction is a straightforward economic issue, exclusively within the jurisdiction of st 'te regulatory bodies.
 
Board decisions discussed acove, which declined to reopen the record and reconsider the need-for-power question due to new forecasts, have all the more effect here where the issue of the delay of units under construction is a straightforward economic issue, exclusively within the jurisdiction of st 'te regulatory bodies.
Respectfully submitted, SHAW, PITTMAN, POTTS & TROWBRIDGE A%        -
Respectfully submitted, SHAW, PITTMAN, POTTS & TROWBRIDGE A%        -
                                               ~ AWbIs
                                               ~ AWbIs
Line 111: Line 84:
                                         . ~Trowbridge J .
                                         . ~Trowbridge J .
[
[
Dated: January 23, 1979
Dated: January 23, 1979 APPENDIX A AFFIDAVIT OF M. A. MCDUFFIE M. A. McDuffie, having been first duly sworn, hereby deposes and says as follows.
 
APPENDIX A
.
AFFIDAVIT OF M. A. MCDUFFIE M. A. McDuffie, having been first duly sworn, hereby deposes and says as follows.
: 1. My name is M. A. McDuffie. My business address is Carolina Power & Light Company, 411 Fayetteville Street Mall, Raleigh, North Carolina 27602.
: 1. My name is M. A. McDuffie. My business address is Carolina Power & Light Company, 411 Fayetteville Street Mall, Raleigh, North Carolina 27602.
: 2. I an employed by Carolina Power & Light Company as Senior Vice President, Engineering and Construction. As Senior Vice President in charge of the Engineering and Construction Group, I am responsible for supervision of personnel in the Power Plant Engineering Department, the Power Plant Construction Department, the Engineering and Construction Support Services Department, the Technical Services Department, and the Transmission System Engineering and Construction Deparrment who have responsibilities for the engineering, design and construction of the Shearon Harris Nuclear Power Plant.
: 2. I an employed by Carolina Power & Light Company as Senior Vice President, Engineering and Construction. As Senior Vice President in charge of the Engineering and Construction Group, I am responsible for supervision of personnel in the Power Plant Engineering Department, the Power Plant Construction Department, the Engineering and Construction Support Services Department, the Technical Services Department, and the Transmission System Engineering and Construction Deparrment who have responsibilities for the engineering, design and construction of the Shearon Harris Nuclear Power Plant.
Line 130: Line 99:
: 6. Under no presently foreseeable shift in in-service dates, including the in-service schedule proposed in the North Carolina Utilities Commission's December 1978 Load Forecast and Capacity Plan, would it be more economical to halt construction than to adjust the pace of construction. Neither would a halt in construction associated with a change in in-service dates materially reduce or alter the environmental impacts which are associated with utilization of the Harris site.
: 6. Under no presently foreseeable shift in in-service dates, including the in-service schedule proposed in the North Carolina Utilities Commission's December 1978 Load Forecast and Capacity Plan, would it be more economical to halt construction than to adjust the pace of construction. Neither would a halt in construction associated with a change in in-service dates materially reduce or alter the environmental impacts which are associated with utilization of the Harris site.
k & kWM. A. MCDUFFl?
k & kWM. A. MCDUFFl?
Sworn to and subscribed before me
Sworn to and subscribed before me this s I'd      day of      s. c. Z .. e    , 1979.
_
this s I'd      day of      s. c. Z .. e    , 1979.
v V);;/.iu'./ W, f/. /
v V);;/.iu'./ W, f/. /
     ^
     ^
Line 146: Line 113:
TO
TO
                       ,/            34 OUD
                       ,/            34 OUD
                     <                                                                        (,0
                     <                                                                        (,0 s      e s',            4-NEW HILL h
            ,
s      e s',            4-NEW HILL h
                                                                ,
       )
       )
               \
               \
                                            '
a
a
                                                     /
                                                     /
f A XI
f A XI na                                                TO HALEIGH x8 s                                              !
                                                                  .:
na                                                TO HALEIGH x8
                                                                  .,,
'
s                                              !
i; ' . '
i; ' . '
                                                                                      .-
9 6-l  .,
9 6-l  .,
                                                                                          .-
                <
                                    ,
Sf                                          ~'
Sf                                          ~'
$ \,                        +    (M
$ \,                        +    (M
    '                                      ..    ,
  ,                            '
     #                                MAIN Ag DAM iN                                ++                        '
     #                                MAIN Ag DAM iN                                ++                        '
                                                                      ,  ''
                                                  -
                                                      '
                 \
                 \
s
s
                              -
                                   -                                                                              CINITy GAP
                                   -                                                                              CINITy GAP
                   \.      <
                   \.      <
                                     $L
                                     $L
               .t*,*fCO*
               .t*,*fCO*
                                                                                    .
                                       \                                                                      NEW gggg_, N.C.
                                       \                                                                      NEW gggg_, N.C.
                                                                                                                                ,,,
        -
                 \
                 \
                                                                                       \
                                                                                       \
FIGUlm 1
FIGUlm 1


.._... .- _ __. . .        . . - . . . . . . . . . . .          ..      ..  . . .          . _                _
COOLING                                                                              COOLING TOWER                                                                                TOW ER NO.4                                                                                NO 3 TURBINE UNIT 4                          TURBINE UNIT 3 t
COOLING                                                                              COOLING
      '
TOWER                                                                                TOW ER NO.4                                                                                NO 3
__
_
TURBINE UNIT 4                          TURBINE UNIT 3 t
l g REACTOR            REACTOR REACTO R l AUXILIARY AUX                    AUXILI      ARY l g
l g REACTOR            REACTOR REACTO R l AUXILIARY AUX                    AUXILI      ARY l g
i UNIT 4              COMM          UNIT J        l
i UNIT 4              COMM          UNIT J        l CONT            . _ . .
_.
CONT WASTE PROC        ^ FUEL HANDLING BLDG ' '                              -
CONT            . _ . .
CONT
                                            ,
WASTE PROC        ^ FUEL HANDLING BLDG ' '                              -
M BLDd        ., _ , , ,
M BLDd        ., _ , , ,
CONT                            CONT 1                              2 I
CONT                            CONT 1                              2 I
Line 211: Line 146:


1
1
      .
                      -
                                 --~~. ._                    . - f . 3 ~~' ~~
                                 --~~. ._                    . - f . 3 ~~' ~~
        .. ._ __
e-              _      _
e-              _      _
                                                                               ,n                  ,        ._                          n
                                                                               ,n                  ,        ._                          n em,                *
_
[ ,,,,    .a              g                            ,    ,e w -  .
                                                                                                                                                        -        -
                                                                                                                                                                                    .
_
em,                *
                                                          *$
                                                            '
[ ,,,,    .a              g                            ,    ,e
                                                                                                                                                                                                ,
w -  .
                                     - %.r .ea si n & % _w=a m                        . - -
                                     - %.r .ea si n & % _w=a m                        . - -
                                                                                                -
                                                                                                  .
_
                                                                                                                                                .
                                                                                                                                                           -6                  _7 .@                = ..    ,
                                                                                                                                                           -6                  _7 .@                = ..    ,
t
t
                                                                                                                   ' .a w' a$ '.,=m..Q
                                                                                                                   ' .a w' a$ '.,=m..Q w            d                                  t-.                  { .          *
                            *"'""
w            d                                  t-.                  { .          *
-m.                  -              ~ ..            . . .  .
-m.                  -              ~ ..            . . .  .
                                                                  ,          ..      -  .
                                                                                               =m                      .                                                            - -
                                                                                               =m                      .                                                            - -
'"'**        ~h A            ?
'"'**        ~h A            ?
Line 245: Line 161:
                                                                                 .,                        ..                                    s
                                                                                 .,                        ..                                    s
                                                                         , ,E                    :  .3 C ; mL M & $ Y k-                                                                                      '
                                                                         , ,E                    :  .3 C ; mL M & $ Y k-                                                                                      '
        ....              .._.            _                    __                                    -
_                      -                    s a
_                      -                    s
                                                                                                                                                                                        --
a
                    -
                                      .
                                        .
                                       !^
                                       !^
                                                      .
_-
                                                                                                            -
wm ~.m
wm ~.m
                                                                                                                          .
                                                                                                                                                                                                       .n 1<r.
                                                                                                                              --
                                                                                                                                                                                                   .-          ~r lE%h          .
                                                                                                                                        .-
                                                                                                                                                - ,_                    _      ,.
                                                                                                                                                                                                      .
                                                                                                                                                                                                       .n
                                                                                                                                                                                                      .
1<r.
                                                                    ..
                                                                                                                                                                                              .
                                                                                                                                                                                                   .-          ~r
                                                                                                                                                                                                                . ,
lE%h          .
SL .                                                                  '*-
SL .                                                                  '*-
                                                                                              --
                                                                                                         ,,,              -:                  m =.                    -            te .3                        -
                                                                                                         ,,,              -:                  m =.                    -            te .3                        -
_
_
_-      ''*      '      - ~? ,                      g                  ,
_-      ''*      '      - ~? ,                      g                  ,
3..g
3..g
                                                                   ..                                W 5!                          g{k(5                                                      $
                                                                   ..                                W 5!                          g{k(5                                                      $
y=m -- n                                              n                    ..,
y=m -- n                                              n                    ..,
_,.,
                                                                                                                                                                             -.                              c 1
                                                                                                                                                                             -.                              c
                                                                                                                                                                                                              .
                                                                                                                                                                                                                    ,
                                                                                                                                                                                                              -
1
                                                                                                                                                          .-
                                                                                                                                                               *~
                                                                                                                                                               *~
---
p
p
                                                 ' "            _-                                                                                                                                        I ,.k.
                                                 ' "            _-                                                                                                                                        I ,.k.
                                .      -
m --                        w_                                                                      __ _=- . " t . m          _
m --                        w_                                                                      __ _=- . " t . m          _
                                                                                                                                                                                                , . . , ,
                  *-
                  .,
e                              ,,
e                              ,,
                                                                                      -
                                                                                                                                            - .                                          '
                                                                                                                ,_                _
                                                                                                                                                                                                          .
L-.
L-.
n_;
n_;
                                                                                                                           -a y            ,,                .
                                                                                                                           -a y            ,,                .
                                                                                                                                                                               -                            --      }
                                                                                                                                                                               -                            --      }
                              '
:G;;h .                  'l                      ..,
:G;;h .                  'l                      ..,
                                                                                                                                                         ,' 'W'-
                                                                                                                                                         ,' 'W'-
                                                                                                                                                                                                       .. *w
                                                                                                                                                                                                       .. *w
                                                                                                                                                                                                                *
                                                                                                                                        #_.
                                                                                                                  .                                            _-                    -.
: t.                      - .
: t.                      - .
                                                                                                              -
SYg~'J_-                          i  -g-              %q.1 g up                      ..
SYg~'J_-                          i  -g-              %q.1 g up                      ..
_
y                                        .            -
y                                        .            -
                                                                                               .. s g                                                  _ _ _
                                                                                               .. s g                                                  _ _ _
                                                                                                                                                                      *
                                                                                                                                                                             -%        ^& yrgG
                                                                                                                                                                             -%        ^& yrgG
  @                                                                                                                        w
  @                                                                                                                        w
Line 323: Line 194:
                                                                                           - - . , ~ , , - - . . ~ . - - ~ . - - . - - - - - ~ - - --                                                                                                                                                                                    ---~---: . - - - --
                                                                                           - - . , ~ , , - - . . ~ . - - ~ . - - . - - - - - ~ - - --                                                                                                                                                                                    ---~---: . - - - --
     .-..:..---:-:,--:                    ---2:
     .-..:..---:-:,--:                    ---2:
                                          .
                                                           -----y,....-
                                                           -----y,....-
                                                              . ..
                                                                                              ,
                                                                                                                                                                                                                                          ,
                                                                                                                                                                                                                                                                                                                                       *
                                                                                                                                                                                                                                                                                                                                       *
* we
* we
..:.          m-by :.,
..:.          m-by :.,
                                  -
3 v,.            k..                          -
3
                                                                          ,                                      ,                                  ,
                                                                                                                                                                                          ..                                  .-  '.
* v,.            k..                          -
                                                                                                                                                                                                                                                                                                                            ,            ,,
t,
t,
                                                                                                                                                                                                                                                                                                                                                                     - - b;x w
                                                                                                                                                                                                                                                                                                                                                                     - - b;x w
                                                                                                    . ,                                                                    ..                                  ,
t                          .
t                          .
m            ww                                                            * . .                            <                                % <
m            ww                                                            * . .                            <                                % <
E, .+g;i ,
E, .+g;i ,
* geis    ..
* geis    ..
                                    . .
                                      .
                                                                      '
                                                                                 .-                              .g *
                                                                                 .-                              .g *
* p
* p f
                                                                                                                        ,
                                                                                                                                                                                                                                                 -o 3
                                                                                                                                            .
f
                                                                                                                                                                    .,
                                                                                                                                                                                            ,,
                                                                                                                                                                                                                              *
                                                                                                                                                                                                                                        .
                                                                                                                                                                                                                                                 -o
                                                                                                                                                                                                                                                        -
                                                                                                                                                                                                                                                            *
                                                                                                                                                                                                                                                                          -
* 3
                                                                                                                                                                                                                                                                                                                         *3
                                                                                                                                                                                                                                                                                                                         *3
                                                                                                                                                                                                                                                                                                                                   ,            <a 5
                                                                                                                                                                                                                                                                                                                                   ,            <a 5
4-#2
4-#2
                                                                                                                                                                                                                                                                                                                                                                          .
                                                                                                                                                                                                                                                                                                                                                                                         /          y
                                                                                                                                                                                                                                                                                                                                                                                         /          y
                                                                                                                                                                                                                                                                                                                                                                                                     ;; e
                                                                                                                                                                                                                                                                                                                                                                                                     ;; e
Line 370: Line 216:
e,
e,
* x4      y                                                                            .                        ,
* x4      y                                                                            .                        ,
                                                                                                                                                                                                                                                                                                                            ,
                                                                                                                                                                                                                                                                                                                                                   ,r                        .
                                                                                                                                                                                                                                                                                                                                                   ,r                        .
1        :
1        :
l                                                                                        '
l                                                                                        '
* s :!.                                        r., L A                            ;E z ,. .,% n
* s :!.                                        r., L A                            ;E z ,. .,% n
                                  >                            .
                                                            . . .
[,<-
[,<-
                                                                                        .
                                                                                                  -
                                                                                                                                                *
                                                                                                                                                          .
                                                                                                                                                                       .y                          ~
                                                                                                                                                                       .y                          ~
                                                                                                                                                                                                                  ,.
                                                                                                                                                                                                                      .                                    .                              ..                          ,                                .
(si
(si
                                                                                                                                                                                                                                                                                                                                                                               ..                    hh m .;
                                                                                                                                                                                                                                                                                                                                                                               ..                    hh m .;
Line 392: Line 229:
                                                                                                                                                                                                                                                                                                                                                                                                 ;
                                                                                                                                                                                                                                                                                                                                                                                                 ;
                                                                                                                     /          *C                                    '+                            -
                                                                                                                     /          *C                                    '+                            -
e
e w
                                                                                                                                                                                                                          ,
w
                                                                                                                                                                                                                                                                        *                *
                                                                                                                                                                                                                                                                                                                   %                  *L                      " n                                i  x~
                                                                                                                                                                                                                                                                                                                   %                  *L                      " n                                i  x~
   ,-,i!*i.g
   ,-,i!*i.g zerd y:%      s hp y    r: -
              ,
* y ,,-
zerd
                    , . ,
y:%      s hp y    r: -
* _,
                                                                                            .'
                                                                                            '
                                                                                                  ,
y ,,-
                                                                                                                                         ' . S ,, *    -
                                                                                                                                         ' . S ,, *    -
2-
2-
Line 414: Line 240:
4 s.
4 s.
                                                                                                                                                                                                                                                                     ;
                                                                                                                                                                                                                                                                     ;
                                                                                                                                                                                                                                                                              .
1 J.
1 J.
                                                                                                                                                                                                                                                                                                   * % p
                                                                                                                                                                                                                                                                                                   * % p
                                                                                                                                                                                                                                                                                                           .      .9 i
                                                                                                                                                                                                                                                                                                           .      .9 i
                                                                                                                                                                                                                                                                                                                             .dw.m ,a,.                                            . ~ ,.' 3
                                                                                                                                                                                                                                                                                                                             .dw.m ,a,.                                            . ~ ,.' 3 h
                                                                                              #
h
                                                                                                                                                                                                                         !$r-[                                                                                                        *
                                                                                                                                                                                                                         !$r-[                                                                                                        *
                                                                                                                                  *
.(.4 ..                                                                                                                    3                            , ,                                                                        ' .                          .* ",.                          [ w .Y \                                  -                                                  i 2-g p:.)
.(.4 ..                                                                                                                    3                            , ,                                                                        ' .                          .* ",.                          [ w .Y \                                  -                                                  i
                                                                                                                                                                                                                                                                                                                                                                                                    -$
2-g p:.)
k k ' . ' '' %
k k ' . ' '' %
                   % , +. . -.;
                   % , +. . -.;
                                                                       *2
                                                                       *2 3        .*                            ,    ,,7,.                                . V                g , h, .
_
                                                                                                                      '
                                                                                                                                . , - ,
3        .*                            ,    ,,7,.                                . V                g , h, .
                                                                                                                                                                                                                                                          ,.
                                                                                                                                                                                                                                                                                      *'
                                                                                                                                                                                                                                                                                             .q, v jn t. ww.
                                                                                                                                                                                                                                                                                             .q, v jn t. ww.
3' b                --
3' b                --
:
s..g.
s..g.
js-
js-h
                                                                                                                                                                                                                                                                                                                                                                                                <"-
h
                                                                                      '
                                                                                                  *
                             .                          it                                                                                                    ]                                                                                                                          ;
                             .                          it                                                                                                    ]                                                                                                                          ;
                                                                                  .
                                                                                                -
                                                                                                                        .                            . ..                                      .
as R.                                                                                                                                                                                                                                        l"l s%@~                    w                        w&                                                Q                                l                4                    :            ?              W{        F                      C                  @%w          7                2s :gi;                                                                                  m&
as R.                                                                                                                                                                                                                                        l"l s%@~                    w                        w&                                                Q                                l                4                    :            ?              W{        F                      C                  @%w          7                2s :gi;                                                                                  m&
                                                                                                                                                                                .
m.,7.                                                          $                y                  W                      ';N$
m.,7.                                                          $                y                  W                      ';N$
f #N;OF P %g%i q                                                                                                                                      :.C:                                                                        n
f #N;OF P %g%i q                                                                                                                                      :.C:                                                                        n Al,gdger 3 agfp-
                                                                                                              -
Al,gdger
                                                                                                                    -                                                                                                                                      .
3 agfp-
  -
           . w.yu,n  s                            s. ~; g,.
           . w.yu,n  s                            s. ~; g,.
                                                      .                    ..
: n.            w,~
: n.            w,~
                                                                                                                %,                                  , , .
                                                                                                                                                                        .
                                                                                                                                                                            -
                                                                                                                                                                                    .
                                                                                                                                                                                       .e  -
                                                                                                                                                                                       .e  -
x, .
x, .
e                        j ;
e                        j ;
q (
q (
:
                                                                                                                                                                                                                                                                                                      ,
: s. nu w -.%.
: s. nu w -.%.
ge .:      ,"j,
ge .:      ,"j, k              m, gw e h ; fjh .,' s ly , ' y % j#~                                                                                                            q l sf s7g[ .p -.j                                                                    La
                                                                                                                                                                                                                                                                                                                                                        .
k              m,
                                                                                                                                                                                                                                                                                                                                                                                  .
gw e h ; fjh .,' s ly , ' y % j#~                                                                                                            q l sf
* s7g[ .p -.j                                                                    La
                                                                                                                                                                                                                                                                                                                                                                        '
                                                                                                                                                                                                                                                                                                                                                                               'yQf[.,2
                                                                                                                                                                                                                                                                                                                                                                               'yQf[.,2
[ 3 $',i c
[ 3 $',i c
                                                                                                                                             " ~ "'
                                                                                                                                             " ~ "'
                                                                                                                                                                                                                    ,
( ['        .
( ['        .
                                                                                                                                                                                                                                                                                                                                                                                                      .
if                                                                                                          J 9              ,y                                      :                  ;                              ..
if                                                                                                          J
4{{3 h k w3 L
                                                                                                                              .
p.,nyc g                          .w yv a ,. -
9              ,y                                      :                  ;                              ..
4{{3 h k w3
                                                                                                                                                                            .
L p.,nyc g                          .w yv a ,. -
v ,~. ;
v ,~. ;
                                                                                                                              .
                                                                                                                                         - - -: ,p
                                                                                                                                         - - -: ,p
                                                                                                                                                    .
                                                                                                                                                            -
                                                                                                                                                                      ,
                                                                                                                                                                       -.                                                .            o>3 +; y.,n u.,
                                                                                                                                                                       -.                                                .            o>3 +; y.,n u.,
w                  n.a,g s.,.g;                                ,.
w                  n.a,g s.,.g;                                ,.
y ,p 3
y ,p 3
                                                                                                                        .
                                                                                                                , .
                                                                                                                                                                                                                       ., , ..;.,                                          ;
                                                                                                                                                                                                                       ., , ..;.,                                          ;
                                                                                                                                                                                                                                                                             ,                      a y; x, .. . bg'.A.
                                                                                                                                                                                                                                                                             ,                      a y; x, .. . bg'.A.
                                                                                                                                                                                                                                                                                                        ..
                                                                                                                                           ,e,
                                                                                                                                           ,e,
                                                                                                                                                                                      .
                                               . ;.                                                                                                                                                                .
                                               . ;.                                                                                                                                                                .
                                                                                                                                                                                                                                                                                                                              .
p 1                  9      0              1 g y.s . ji                                                                                                                                                '!                                  Jl                                              : W E.                                                    . ~3 g. w yW^ ~, Jp a y                                    Wh                !                                                    R                            , 4e + .. < -                                                                                                    '
p 1                  9      0              1 g y.s . ji                                                                                                                                                '!                                  Jl                                              : W E.                                                    . ~3 g. w yW^ ~, Jp a y                                    Wh                !                                                    R                            , 4e + .. < -                                                                                                    '
: r.                                                    :"*%                                                .L.y:
: r.                                                    :"*%                                                .L.y:
A                                                                                                                                                                                                                                                                                        . . ,, d 2 g'
A                                                                                                                                                                                                                                                                                        . . ,, d 2 g'
ga
ga t                                                                c                                          ..-                                                                      .
:'
                                                                                                            .
                                                                                                                                                                                                                                                  .
t                                                                c                                          ..-                                                                      .
                                                                                                                                                                                                                  -
                                                                                                                                                                                                                                         ?                                  l i              e                                                                                      w p +. g* t-
                                                                                                                                                                                                                                         ?                                  l i              e                                                                                      w p +. g* t-
                                                                                                                                                                        ,                                                                        -
  -
                                .
                                   '+
                                   '+
                                                 .. . h
                                                 .. . h
Line 527: Line 292:
vs                  ~~
vs                  ~~
w
w
                                                                                                                                                            ,
                                                                                                                                                              *
                                                                                                                                                                                             ;
                                                                                                                                                                                             ;
                                                                                                                                                                                                             .,;
                                                                                                                                                                                                             .,;
                                                                                                                                                                                                                                     .;
                                                                                                                                                                                                                                     .;
                                                                                                                                                                                                                                         $a
                                                                                                                                                                                                                                         $a
                                                                                                                                                                                                                                                                                            -
                                                                                                                                                                                                                                                                                                      %
                                                                                                                                                                                                                                                                                                            .
                                                                                                                                                                                                                                                                                                                            ',
                                                                                                                                                                                                                                                                                                                                   ;.
                                                                                                                                                                                                                                                                                                                                   ;.
                                                                                                                                                                                                                                                                                                                                                     ,1                      .
                                                                                                                                                                                                                                                                                                                                                     ,1                      .
                                                                                                                                                                                                                                                                                                                                                                                . .
                                                                                                                                                                                                                                                                                                                                                                                 ,%,;
                                                                                                                                                                                                                                                                                                                                                                                 ,%,;
3 n
3 n
   .q: ~,f, r.? -                                          , .                        .m                                                                            s.                              .,                              , .                        ;                                                                              ,1                                  ..      ~. 4*        .
   .q: ~,f, r.? -                                          , .                        .m                                                                            s.                              .,                              , .                        ;                                                                              ,1                                  ..      ~. 4*        .
                                                                                                                                                                                                                                                                                          '
       *i                                                                                                                                                                                  * ,                                                                                                                                S
       *i                                                                                                                                                                                  * ,                                                                                                                                S
                                                                            !      :
                                                                                                                                                              -
                                                                                                                                                                                                                                                                                                                   \' m % +d                                                                  -
                                                                                                                                                                                                                                                                                                                   \' m % +d                                                                  -
i ve 4e{4
i ve 4e{4
                                                  , .
   .e4 . .
   .e4 . .
e, s.g .;; '
e, s.g .;; '
Line 556: Line 310:
                                                                                               ;                          s.
                                                                                               ;                          s.
                                                                                                                                   '. ; ,.. e
                                                                                                                                   '. ; ,.. e
                                                                                                                                              .
                                                                                                                                                         -4 6;  ,                                  ;..
                                                                                                                                                         -4
                                                                                                                                                              ..
                                                                                                                                                                      ,,
6;  ,                                  ;..
                                                                                                                                                                                                                                              . .
1 e .i..        4
1 e .i..        4
                                                                                                                                                                                                                                                                                                                       ;- _g, twor#
                                                                                                                                                                                                                                                                                                                       ;- _g, twor#
                                                                                                                                                                                                                                                                                                                                    .        .
4-          .p m
4-          .p m
                                                                                                                                                                                                                                                                                                                                                                                ,,
                                                                                                                                                                                                                                                                                                                                                                                             .v ,up ,-
                                                                                                                                                                                                                                                                                                                                                                                             .v ,up ,-
y
y
                                                                                                                                                                                                                                                                                                                                                                                                       . .;
                                                                                                                                                                                                                                                                                                                                                                                                       . .;
                                                                                      *                                                                  *                                                      '                                                                                                                                                                  *
                                                *
                                                                                                                                                                                                                                                           =;                            (                                          * [                        -
                                                                                                                                                                                                                                                           =;                            (                                          * [                        -
                                                                                                                      ,
g                                                                                                      ,                                        p                                                  - f.
g                                                                                                      ,                                        p                                                  - f.
                                                                                                                                                                                                                                                                                                                                                                                                     .g
                                                                                                                                                                                                                                                                                                                                                                                                     .g
                  ,                                                                                                                                                                                                                        ,
                           ; w [,-                                      ;y y-                                              ,, ft .,
                           ; w [,-                                      ;y y-                                              ,, ft .,
                                                                                                                                                                                       .(;                                  .                                                    :
                                                                                                                                                                                       .(;                                  .                                                    :
w                . y.                        yy                                            .
w                . y.                        yy                                            .
m              ,v. j + .--                                        +.            4t                                      -
m              ,v. j + .--                                        +.            4t                                      -
                                                                                                                                                                .
4 ye.3 .Q,y,;a;,.,;.                                                                                      .,..,x.,              t
                                                                                                                                                                                  .
4
                                                                                                                                                                                                              -
ye.3 .Q,y,;a;,.,;.                                                                                      .,..,x.,              t
                                                                                                                                                                                                                                                                                                                                                                                  .
                                                                                                                                                                                                                                                                                                                                                                                           . m%
                                                                                                                                                                                                                                                                                                                                                                                           . m%
                                                                                                                                                                                                                                                                                                                                                                                                          ,
y;.y 7 ._                  -
y;.y 7 ._                  -
                              -                  -
                                                                                                -
A.
A.
g v ,y                                        ~, .... ' ^-J n;y , L gyJ ggs , g 3*ga- wy;
g v ,y                                        ~, .... ' ^-J n;y , L gyJ ggs , g 3*ga- wy;
                                                                                                                                                           'J                        .
                                                                                                                                                           'J                        .
                                                                                                                                                                                               ~
                                                                                                                                                                                               ~
                                                                                                                                                                                                        ..                          ,
a Qj.e g,p y                                y                                                    ,o                                      (                              pu m                                          .. -
                                                                                                                                                                                                                                                                                                                                  ..
1 ,l p; j g y.Q.3 Y'                                                                    i f
                                                                                                                                                                                                                                                                                                                                          -
a Qj.e g,p
                                . ,.
                                                        ' .
y                                y                                                    ,o                                      (                              pu m                                          .. -
                                                                                                                                                                                                                                                                                                                                          '
1 ,l p; j g y.Q.3 Y'                                                                    i
                                                                                                                                                                                                                                                                                '
f
                                                                                                                                        ,
         +W
         +W
                                                                                                                                                                                                                                                                ,                                                              .
                                                                                                                                                                                                                                                                                                                                                      ,
                                                                                                                                                                                                                                                  .                        .
                                                                                                                                                                                                                                                                                                                       . ,- 5 J Q i ' /.
                                                                                                                                                                                                                                                                                                                       . ,- 5 J Q i ' /.
                                                                              .
                                                                                                                       >                                                                                              /                                                                                              +n                                                                                  ~~
                                                                                                                       >                                                                                              /                                                                                              +n                                                                                  ~~
v .m.                        g. .    . .
v .m.                        g. .    . .
n
n
                                                                                          --
                                                                                              .
                                                                                                                       .              m      1fg          ; '
                                                                                                                       .              m      1fg          ; '
                                                                                                                                                                                             +
                                                                                                                                                                                             +
g                            .
g                            .
                                                                                                                                                                                                                                ,.
                                                                                                                                                                                                                                        '.
                                                                                                                                                                                                                                                   +            :
                                                                                                                                                                                                                                                   +            :
y                  n          ,
y                  n          ,
                                                                                                                                                                                                                                                                                                                            '
                                                                                                                                                                                                                                                                                                                                       - %                    ^
                                                                                                                                                                                                                                                                                                                                       - %                    ^
                                                                                                                                                                                                                                                                                                                                                                 +.;<
                                                                                                                                                                                                                                                                                                                                                                 +.;<
:l ,
:l ,
                                                                                                                                                                                                                                                                                                                                                                                                        -
l9 m                                    >
l9 m                                    >
                                                                                                                                                   ~'4                            p'                                            e                    nn '                            x                            ..                                                .
                                                                                                                                                   ~'4                            p'                                            e                    nn '                            x                            ..                                                .
Line 636: Line 351:
                                                           ;                                                                                                t                                                                                                                                          ?-
                                                           ;                                                                                                t                                                                                                                                          ?-
a 4,.a,1                                  .
a 4,.a,1                                  .
                                                  .
                                                                                    .
                                                                                                                          ,,,        .
                                                                                                                                                      ,
                                                                                                                                                      ,
                                                                                                                                                                   *,. W'g      A s& i r tfH . O 4( ..                                                                                                            -
                                                                                                                                                                   *,. W'g      A s& i r tfH . O 4( ..                                                                                                            -
                                                                                                                                                                                                                                                                                                                          .
                                                                                                                                                                                                                                                                                                                                                                       .      f '~ . M. 4'c
                                                                                                                                                                                                                                                                                                                                                                       .      f '~ . M. 4'c
                                                                                                                                                                                                                                                                                                                                                                                          -
                                                                                                                                                                                                     * . . 'jf f*
                                                                                                                                                                                                     * . . 'jf f*
{: ..
{: ..
                                                                                                                                                                                                                                                                                                  "
1 i ., .                                                %y
* 1 i ., .                                                %y
                                                                                                                                                                                                                                               -                                      s                                                  ,,3                  .                                                .
                                                                                                                                                                                                                                               -                                      s                                                  ,,3                  .                                                .
Af A b.k.J .'
Af A b.k.J .'
r,[.N                                      ".~        . ,                                                  .
r,[.N                                      ".~        . ,                                                  .
                                                                                                                                                                  $                                                                                      -
                                                                                                                                                                                                                                                                                                                          "
                                                                                                                                                                                                                                                                                                                                                                              ,
                                                                                                                                                                                                                                                                                                                                                                              .
                                                            -
                                                                                                                                    .
g            ht,                                        . v1          <                                                s                                  4 4 , e;e.m.
g            ht,                                        . v1          <                                                s                                  4 4 , e;e.m.
[                                                    ;4  f
[                                                    ;4  f
                                                                                                                          '
                                                                                                                                                -
                                                                                                                                                  '
                                                                                                                                                                       ;                  k-                                                                                                  *
                                                                                                                                                                       ;                  k-                                                                                                  *
                                                                                                                                                                                                                                                                                                                       +-
                                                                                                                                                                                                                                                                                                                       +-
sy    yp.
sy    yp.
                          ,.
                                     ,              y i                      -                        .
                                     ,              y i                      -                        .
                                                                                                                                -
                                                                                                                                       .                    pJr.g.                                                                ;
                                                                                                                                       .                    pJr.g.                                                                ;
[ a,
[ a,
                                                                                                                                                                                                                                                                                                    ,
                                                                                                                                                                                                                                                                                                                                                                         ; wm 45' 3A4u g                                                                                                                                                                                                                    ~                                          .
                                                                                                                                                                                                                                                                                                  ..
                                                                                                                                                                                                                                                                                                                                            .
                                                                                                                                                                                                                                                                                                                                                                         ; wm 45' 3A4u
                                                                                                                                                                                                                                                                                                                                                    .
g                                                                                                                                                                                                                    ~                                          .
                                                                                                -
s~~                                                                                                                                        .
s~~                                                                                                                                        .
                                                                                                                                                                                                                                                                                                                                                                                             .e - -
                                                                                                                                                                                                                                                                                                                                                                                             .e - -
n.n
n.n 4th                                                  R.                          '.                  ' i',' ~. h. ,N&.*N                                                                                .. % %
                                                                                                                                                                                                                                                                                                                .                                            .
4th                                                  R.                          '.                  ' i',' ~. h. ,N&.*N                                                                                .. % %
                                                                 . v". ,,,, ."v 3                                                                                    )*
                                                                 . v". ,,,, ."v 3                                                                                    )*
                                       . a
                                       . a
     .p;p                              ,y ',                                                                *
     .p;p                              ,y ',                                                                *
                                                                                                                                    ,
                                                                                                                                        ,.
                                                                                                                                                                                              *
                                                                                                                                                                                                             . x f.j .                            :
                                                                                                                                                                                                             . x f.j .                            :
                                                                                                                                                                                                                                                                         's  .,
                                                                                                                                                                                                                                                                         's  .,
                                                                                                                                                                                                                                                                                                              -
g .m.i,.  .
                                                                                                                                                                                                                                                                                                                    ,
* g .m.i,.  .
M e.                                        e..
M e.                                        e..
                                                                    '                                                                                    '
                                                                                                                                                                       ,)J                        g f y $ .3                                                                                -~                    r -
                                                                                                                                                                       ,)J                        g f y $ .3                                                                                -~                    r -
4.4                                              tYy 7/                                    Qe                                *
4.4                                              tYy 7/                                    Qe                                *
                                                                                  ,
                                                                                                           =
                                                                                                           =
K.W                        .y g,&    %.4                                      ,;,
K.W                        .y g,&    %.4                                      ,;,
                                                                                                                                                                                                                                                                                          %
s,]3,"-;4 j
s,]3,"-;4 j
                                                                                                                                                                                                                                                                                                                                             ,9
                                                                                                                                                                                                                                                                                                                                             ,9 ag s,                                                                                                                  ,s ,; ,- Q.                                                                                                                                                                                                                        ~.2,
                                                                                                                                                                                                                                                                                                                                                                      ,
ag s,                                                                                                                  ,s ,; ,- Q.                                                                                                                                                                                                                        ~.2,
                                                                                                                                                                                                                                                                                                                                      -
:. :                                        ,                                                            .                                                                                                                                                                    .
                                                                                                                                                                                                                                                                                                                                                               , u .,
                                                                                                                                                                                                                                                                                                                                                               , u .,
     . . , .                                            , ,                                      . n, .                                      <                                                                          g                                                                      ...,g                                        ,u;                                                        ;
     . . , .                                            , ,                                      . n, .                                      <                                                                          g                                                                      ...,g                                        ,u;                                                        ;
                     .t                                              9              4 g                        s
                     .t                                              9              4 g                        s
                                                                                                                                *                                          *                                            **                                                                                  "
                                                                                                                                                                                                                                                                                                                                                            - **
                                                                                                                                                                                                                                                                                                                                                                                                           -)
                                                                                                                                                                                                                                                                                                                                                                                                           -)
     -g                                                                                                                                    ,.^                                      ' ' g. . a . p,$ .. yJ *
     -g                                                                                                                                    ,.^                                      ' ' g. . a . p,$ .. yJ *
* th( * '' ' . v. , ,,                                                                                                      - ,9 * #. sw
* th( * '' ' . v. , ,,                                                                                                      - ,9 * #. sw
                                                                                                                                                                                          .
                                             - - 31                                                                                                                        .
                                             - - 31                                                                                                                        .
                                                                                                                                                                                                                                                               ,S
                                                                                                                                                                                                                                                               ,S
                                                                                                                                                                                                                                                                                                                                                                        .
       ;.-jp. _. _ . _ . _ _ k.l . A ' l-,                          ,              -_ _ _ . .;.
       ;.-jp. _. _ . _ . _ _ k.l . A ' l-,                          ,              -_ _ _ . .;.
* _
g,_. . . .._
* g,_. . . .._
y s N m'T__ $ / igh.                                                                            [ *)
y s N m'T__ $ / igh.                                                                            [ *)
_-_.'f*..'i                                        1               *
_-_.'f*..'i                                        1
                                                                                                                                                                                                                                                                                                                                                , ,. - .
* 4              .i
4              .i
                                                                                                                                                                                                                                                                                                                                                                                                           ,,a
                                                                                                                                                                                                                                                                                                                                                                                                           ,,a


7            ...,-...-._m-__.7                                    ------m.-_..
7            ...,-...-._m-__.7                                    ------m.-_..
                                                                                                     ,        ,- -. . ;-                          ,,..--,                                      .
                                                                                                     ,        ,- -. . ;-                          ,,..--,                                      .
                                                                                                                                                                                                                        .                      ..
                                                                                                                                                                                                                                                         .....___y                -
                                                                                                                                                                                                                                                         .....___y                -
_.
_..-----y    .
_..-----y    .
7,
7,
[. .h% ~ ~ , -. <
[. .h% ~ ~ , -. <
* 9 f
* 9 f
                                                                                                                                                                                      '
  % j'                                                                        ;              * -
  % j'                                                                        ;              * -
                                                                                                           %,          ., }                        ]q            4                          '
                                                                                                           %,          ., }                        ]q            4                          '
y;
y;
                                                                                                                 , M; i'                fi .g
                                                                                                                 , M; i'                fi .g
                                        .,                ,
                                                                                                                                                                                                                                                                                                                                  .
                                                                                                                                                                                                                                                     ,'_ -
                                                                                                                                                                                                                                                     ,'_ -
* yns:r . ;,
* yns:r . ;,
                                                                        '
1l%:
1l%:
r,..
r,..
y fs
y fs
                                     .y
                                     .y s s
                                                          ,
                                                                                  -
s s
                                                                                                                         \
                                                                                                                         \
                                                                                                                                            .
                                                                                                                                                                                           , 4y4 -                                                        ~~ p                                          -
                                                                                                                                                                                           , 4y4 -                                                        ~~ p                                          -
                                                                                                                                                                                                                                                                                                                                 .~
                                                                                                                                                                                                                                                                                                                                 .~
                                                                                                                                                                                                                                                                                                                                     .s          .: a    9
                                                                                                                                                                                                                                                                                                                                     .s          .: a    9
                                                                                                                                                                               &yl-} f) . >_.
                                                                                                                                                                               &yl-} f) . >_.
                                                                                                                                                                .
a                              %;&"
a                              %;&"
                                     .l h ?l                                                                                            l                                                                                                    .
                                     .l h ?l                                                                                            l                                                                                                    .
                                                                                                                                                                                                                                                                      ,, _
   . #_w- .s &,
   . #_w- .s &,
p,.            .,      *,
p,.            .,      *,
                                                                .
                                                                                   ..,,,s.
                                                                                   ..,,,s.
                                                                                        ,
                                                                                                      ,, _-                  ..
j
j
                                                                                                                                                             %, ; .
                                                                                                                                                             %, ; .
                                                                                                                                                            -.%
_              ,e .o ys 4 a fg                ,.      ,
_              ,e .o
                                                                                                                                                                                                      ,
ys 4 a fg                ,.      ,
                                                                                                                                                                                                                                                                    .
s m .
s m .
                                                                                                                                                                                                                                                                                     - w m,
                                                                                                                                                                                                                                                                                     - w m,
                                                                                                                                                                                                                                                                                                                        ,
                                                                                                                                                                                                                                                                                                                                         ~
                                                                                                                                                                                                                                                                                                                                         ~
a 2m
a 2m
Line 787: Line 437:
           %. '?p [.-h ' ] cI * $ . ,< y %y +                                                                                                                                  g%                                , $.p,4                                        .;      1 yQ+ 4,y.(:{                                                                  E
           %. '?p [.-h ' ] cI * $ . ,< y %y +                                                                                                                                  g%                                , $.p,4                                        .;      1 yQ+ 4,y.(:{                                                                  E
           +              .
           +              .
                                                                                    .                                .
n                                                                                        .                                                  w .
n                                                                                        .                                                  w .
          -
             . ., , s V              .. n. ww              -                                . y.g                    L ,.                                                                                                <.
             . ., , s V              .. n. ww              -                                . y.g                    L ,.                                                                                                <.
                                                                                                                                                                                                                            .
_
                                                                                                                                                                                                                                                 .. w
                                                                                                                                                                                                                                                 .. w
                                                                                                                                                                                                                                                              -        .
                                                                                                                                                                                                                                                                         .        g m.. ,e. .-.. n.s ;?                                -
                                                                                                                                                                                                                                                                         .        g m.. ,e. .-.. n.s ;?                                -
                                                                                                                                                                                                                                                                                                                                                  ,
f                                                                                                                                                                                                                                lh
f                                                                                                                                                                                                                                lh
                                                                                                                                                                                                                                                            '
                                                                                                                                                                                                                                                                                                                                                             ;;
                                                                                                                                                                                                                                                                                                                                                             ;;
                                                                                                                                                                                                              '
                                                                                                                                                                                                                                                                                              "
,
                     .                          1                            . . f ~*f -                                            \                                                                                    -
                     .                          1                            . . f ~*f -                                            \                                                                                    -
g                z
g                z
['
['
1.t xp c; m : 1. was;
1.t xp c; m : 1. was;
                                                                                                                                    -
:. A                                    @rq @p                            :
:. A                                    @rq @p                            :
                                                                                       .e y .-                                                                                                                                                                                                                                                        *r w$ym.M;1x
                                                                                       .e y .-                                                                                                                                                                                                                                                        *r w$ym.M;1x
   ,r                  w
   ,r                  w 2
                                        !
2
                                                       -,_ m
                                                       -,_ m
                                                                                 - w                                                .7. .y >
                                                                                 - w                                                .7. .y >
Line 819: Line 456:
                                                                                                                                                                                                                               ,T,yM                                  m              d              6  A              $@f                              $w                  .
                                                                                                                                                                                                                               ,T,yM                                  m              d              6  A              $@f                              $w                  .
                                                                                                                                                                                                                                                                                                                                       %_ w' a
                                                                                                                                                                                                                                                                                                                                       %_ w' a
                                                                                                    - -
                               ...                "s p. .
                               ...                "s p. .
                                                  .
                                                                                                   ;
                                                                                                   ;
                                                                                                                                                                                                                                              .. _
                                                                                                                                                                                                                                                                                      .
Q ? l* , -                                                                                                    *                                                            -s'                .T                                            1,                        "
Q ? l* , -                                                                                                    *                                                            -s'                .T                                            1,                        "
y                                                      '
y                                                      '
                          .
                                                        .
                                                                   .; ; 3 9
                                                                   .; ; 3 9
                                                                    -
                                                                                              ,
                                                                                                          , ,
                                                                                                          ,              -.
                                                                                                                                                 ' . , .i g;
                                                                                                                                                 ' . , .i g;
                                                                                                                                                                                                                    .
                                                                                                                                                                                                                      .                  .
w ., , -                              -
w ., , -                              -
o~              c                ?.y L ,- 9;                .                  .
o~              c                ?.y L ,- 9;                .                  .
tV
tV r, ,                                                                                                      '
                                                                                                                                                                                                                                                                                                                -
:                                                                                                                      -
r, ,                                                                                                      '
e)( . -'"r .. 4r %e"f.,.                                                                                              's
e)( . -'"r .. 4r %e"f.,.                                                                                              's
:
                   .e                                                                ',            s                                                                      '                                      ,
                   .e                                                                ',            s                                                                      '                                      ,
                                                                                                                                                                                                                                                                                    **
4 Y..'
4 Y..'
  '-
                                                                                                   .= .'                  A 1'.y                                                                                  ~~
                                                                                                   .= .'                  A 1'.y                                                                                  ~~
i.' t%                                                ,
i.' t%                                                ,
4:
4:
l
l lllt , %                          _.7,                            1                  *s                        *
                  .
lllt , %                          _.7,                            1                  *s                        *
:.) .'                                                                                                  *                = i                                                    " ?&
:.) .'                                                                                                  *                = i                                                    " ?&
4.;                                          ' * *  , ,, ' ,                          ';.          $'                      w ..,                  y                    .,
4.;                                          ' * *  , ,, ' ,                          ';.          $'                      w ..,                  y                    .,
y
y
                                                                                                                                                                                     +  ,          .,*                                            , .
                                                                                                                                                                                     +  ,          .,*                                            , .
                                                                                                                                                                                                                                                      , -
A'                                                              O ~ 7 Q,                              '-
A'                                                              O ~ 7 Q,                              '-
                                             ', J . ,
                                             ', J . ,
                                                                                '
[          :
[          :
                                                                          -                                        .
g                                                                                            - 4 ,                                                                              .y e
g                                                                                            - 4 ,                                                                              .y e
3 a                                    '.                e                      ;; . . -                                                                                    ,
3 a                                    '.                e                      ;; . . -                                                                                    ,
                                                                                                                                                                                                    '
y                                      ,
y                                      ,
                                                                                                                                                                                                                                                                                                                                                                      .
f-J  g
f-J  g
                                        .
[=
[=
                                                                                                               +
                                                                                                               +
                                                                                                                                      '..
:
qpa " ,                                                        ' .y 7 .s                    ' ; 4' ye    ,.
qpa " ,                                                        ' .y 7 .s                    ' ; 4' ye    ,.
                    ,
l ''-5'. e^
l ''-5'. e^
                                                                              .,
                                                                                            *
                                                                                                          *
                                                                                                                              ,,.
                                                                                                                                  #
                                                                                                                                                                        -
: ,
                                                                                                                                                                                                                                '
                                                                                                                                                                                                                                      -
9.
9.
                                                                                                                                                                                                                                                   . . ,r . .
                                                                                                                                                                                                                                                   . . ,r . .
                                                                                                                                                                                                                                                         " [;                      '-
                                                                                                                                                                                                                                                         " [;                      '-
                                                                                                                                                                                                                                                                                            '
                                                                                                                                                                                                                                                                                                .
                                                                                                                                                                                                                                                                                                                       *                  . = $g5Q
                                                                                                                                                                                                                                                                                                                       *                  . = $g5Q
                                                                                                                                                                                                                                                                                                                                          ,
                                                               .N                                                                                                                                                                                    $
                                                               .N                                                                                                                                                                                    $
                                                                                                                                                                                                                                                                                                                  '
p .
p .
s                      .'                                      .
s                      .'                                      .
                                                                                                      * -                      .
i v nf. ;:                                                .
i v nf. ;:                                                .
                                                                                                                                                                                                                                                            .    .
                                                                                                                                                                                                                                                                                    .
                                                                                                                                                                                                                                                                                                  .
                                                                                                                                                                                                                                                                                                              .
                                                                                                                                                                                                                                                                                                             . n'
                                                                                                                                                                                                                                                                                                             . n'
                                                                                                                                                                                                                                                                                                                                     .s                            ,
                                                                                                                                                                                                                                                                                                                                     .s                            ,
g ik                                            . ' .
g ik                                            . ' .
                                                            .              .
                                                                                       *^
                                                                                       *^
                                                                                                .
                                                                                                            ,
(n . .          .
(n . .          .
I                        ~                                              +
I                        ~                                              +
                                                                                                                                                                                                                                                            "
                                                                                                                                                                                                                                                                                 . V                  y I
                                                                                                                                                                                                                                                                                 . V                  y I
yQ.. ~;f.F',.y ;eff,[;                                                                                                                                                                                                                                                                                }yff' ' mf 'y
yQ.. ~;f.F',.y ;eff,[;                                                                                                                                                                                                                                                                                }yff' ' mf 'y
: y. .                y                            n
: y. .                y                            n
[.    ,
[.    ,
                                                                                      .
j                          ;
j                          ;
                                                                                                                                           >]9m
                                                                                                                                           >]9m
                                                                                                                                              .
                                                                                                                                                                              -
                                                                                                                                                                                      ..
[ &, . L f f, J f,c
[ &, . L f f, J f,c
                                                                                                                                                                                                         .                        ;.
                                                                                                                                                                                                         .                        ;.
                                                                                                                                                                                                                                                 ,,e g
                                                                                                                                                                                                                                                 ,,e g
                                                                                                                                                                                                                                                                          .
                                                                                                                                                                                                                                                                          .
                                                                                                                                                                                                                                                                                     ~
                                                                                                                                                                                                                                                                                     ~
                                                                                                                                                                                                                                                                                                   - p              x                    ..            .n .
                                                                                                                                                                                                                                                                                                   - p              x                    ..            .n .
                                                                                                                                                                                                                                                                                                                                                                          .
[t                                                                                                                                                                                                                            +(
[t                                                                                                                                                                                                                            +(
* 5 .. J 3 [;
* 5 .. J 3 [;
m..'"
m..'"
          -
s          K                              21                                                        ,
s          K                              21                                                        ,
2 J, W,-
2 J, W,-
                                                                                                                                                                                    ,
                                                                               \=
                                                                               \=
                                                                                                                                                                                                                                                                                              "
   ]                                                                                                                          i        "p~.*if.                                                                                      fi ~.
   ]                                                                                                                          i        "p~.*if.                                                                                      fi ~.
* 9g                                                                                                  p Iy.l                ~.fy                                                                  - }q!u e                                      .            _,.
* 9g                                                                                                  p Iy.l                ~.fy                                                                  - }q!u e                                      .            _,.
                                                                                                                                                                '
                                                                                                                                                                                       %i s
                                                                                                                                                                                       %i s
                                                                                                                                                                                                                                                         ~"
                                                                                                                                                                                                                                                         ~"
Line 951: Line 526:
g
g
                                                                                                                             .                                                                                                              ^
                                                                                                                             .                                                                                                              ^
y'                                                                                                                                                                                                      e
y'                                                                                                                                                                                                      e g_1 .                      m;h                ' %}d            .                                                                                                                ..                                                                                                                                                      .
                                                                                                                  -
                                                                                                                                                                                                                                                                                                              -
g_1 .                      m;h                ' %}d            .                                                                                                                ..                                                                                                                                                      .
                                                                                             }^1> .                    g .'                                                                                                  e. fM                                                                      ..,                                  is
                                                                                             }^1> .                    g .'                                                                                                  e. fM                                                                      ..,                                  is
                                                                                                                                                                                                                                                                                                                                                 ;
                                                                                                                                                                                                                                                                                                                                                 ;
* g.'            M
* g.'            M
   '. .'; ;
   '. .'; ;
                                                                                                                                             . y: g-t  .k; , g , . . , ' , *
                                                                                                                                             . y: g-t  .k; , g , . . , ' ,
                                                                                                                                                                                                                                                                                                                                ,
* s      >g                          .. e                                                r            a                                                                                        %                                            e                              . , . .
s      >g                          .. e                                                r            a                                                                                        %                                            e                              . , . .
y4,                          -                                    ;<*                                i,                                                                                      .n.                                                                                              ~                      .
y4,                          -                                    ;<*                                i,                                                                                      .n.                                                                                              ~                      .
                                                                                                                                                                                                                                                                                                                                                          , ,.
                                                                                                                                                                                                                                                                                                                                                                        ,
g$.~~t
g$.~~t
                                                                                                                                                  .
                                                ,
                                                 *                                                  .e                                                  *g                                                                                                                                                                                          :
                                                 *                                                  .e                                                  *g                                                                                                                                                                                          :
h }e ,
h }e ,
                                                                                                                                                                                                          -.
r                                                                                                                                                                                                                  4 "x                                                  ,4
r                                                                                                                                                                                                                  4 "x                                                  ,4
                                                     ..                                                                                                                                                                            .                                                                                                                              ;
                                                     ..                                                                                                                                                                            .                                                                                                                              ;
Q
Q
                                       ~
                                       ~
                                                                                                                                                                                                                                                                                                    '                ''
s                                                                                                      .~*                      4
s                                                                                                      .~*                      4
                                                                                                                                                                                                                   ..,-                                    +
                                                                                                                                                                                                                   ..,-                                    +
                                                                                                                                                                                                                                                                 .3  '%                                                                        %
                                                                                                                                                                                                                                                                 .3  '%                                                                        %
m,                                                                                                                              : v-                                                                                                                                                                                                      , ";,+. *V '
m,                                                                                                                              : v-                                                                                                                                                                                                      , ";,+. *V '
                                                                                                                                                                                  .                                                                                                                                                                        , '
                                                                 .y                                                                                                                                    *
                                                                 .y                                                                                                                                    *
                                                                                                                                                                                   .'*2m - n"'
                                                                                                                                                                                   .'*2m - n"'
                                                  -                                                                                                                                                                                                                                                  '
                                          -
                                                                                   ,            Ng . .                                                                                                                                                                              c
                                                                                   ,            Ng . .                                                                                                                                                                              c
                                                                                                                                                                                                                                                                                                           ;          +
                                                                                                                                                                                                                                                                                                           ;          +
4* og              y,                      n
4* og              y,                      n
* b ,t 3 ', ; , 5 47
* b ,t 3 ', ; , 5 47
                                                              - '              -
                                                                                                                                                   ,./                          4 9                                  F
:
                                                                                                                                                                                                                                                                                         .. w l
                                                                                                                                                   ,./                          4
                                                                                                                                                                                      -
                                                                                                                                                                                                            -
                                                                                                                                                                                                                              .
9                                  F
                                                                                                                                                                                                                                                                              .
                                                                                                                                                                                                                                                                                         .. w
                                                                                                                                                                                                                                                                                                                        ..
                                                                                                                                                                                                                                                                                                                          ,,
                                                                                                                                                                                                                                                                                                                                '
l
      .
{                      . *        >
{                      . *        >
f i                                                                      ,'
f i                                                                      ,'
                                                                                                                                                                                     ~#
                                                                                                                                                                                     ~#
                                                                                                                                                                                               ) ,$                                                              $ 40                                      i f ;;, .                        .%'e
                                                                                                                                                                                               ) ,$                                                              $ 40                                      i f ;;, .                        .%'e
                                                                                                                                                                                                                                                                                                                                                        '
:          ?                    .          .
:          ?                    .          .
                                                               $g                    g.,          g      ij      *    .1Av              {      :    4      A      f      .'    '. 7;                  1, <                                  *i                                  .v                  m
                                                               $g                    g.,          g      ij      *    .1Av              {      :    4      A      f      .'    '. 7;                  1, <                                  *i                                  .v                  m
                                                                                                                                                                                                                                                                                                                               *      - >              lidp; sd                            ;#
                                                                                                                                                                                                                                                                                                                               *      - >              lidp; sd                            ;#
                                    .
:.
: s. J AM
: s. J AM
: 4. . m . m_ . . -  ~
: 4. . m . m_ . . -  ~
                                                                                                        ,                              .          - -
i A r $ %,. .q
i A r $ %,. .q
                                                                                                                                                                  ,
                                                                                                                                                                   .              w-e                                                    e ..
                                                                                                                                                                   .              w-e                                                    e ..
                                                                                                                                                                                                                                                .-
                                                                                                                                                                                                                                                                    ,
                                                                                                                                                                                                                                                                            "
F .e                  (M tQ                          n.
F .e                  (M tQ                          n.
x,$g,                '                                                                                                                                                                                                                                                                                                                  ~ , s7 hi
x,$g,                '                                                                                                                                                                                                                                                                                                                  ~ , s7 hi
                                                                                                                                                                                                                                         ~
                                                                                                                                                                                                                                         ~
9'                                                                                                                                                                                                                                                          .~ :.
9'                                                                                                                                                                                                                                                          .~ :.
                                                                                                                                -
                                ,                                                    .
                                                                                                         , '; .                                                                                                                                                                                ',
                                                                                                         , '; .                                                                                                                                                                                ',
                                                                                                                                                                                                                .
f                        %.            "y%, p s, 'TL j                                                          <?g                  O'                        ' * % '. ; '. ..,
* f                        %.            "y%, p s, 'TL j                                                          <?g                  O'                        ' * % '. ; '. ..,
                                                                                                                                                                                                           . . f. 4 4
                                                                                                                                                                                                           . . f. 4
g
                                                                                                                                                                                                          '"#
4
* g
                                            *
['          ,["                        .;
['          ,["                        .;
                                                                                                            *
                                                                                                                               *                            :    .*              y h{y '. ' j. ye . ? ''lE g [x..
                                                                                                                               *                            :    .*              y h{y '. ' j. ye . ? ''lE g [x..
1 4y.                          , e .
1 4y.                          , e .
                                                                                                       ~ <r a                  + x                                    wa.,                                                                                      :
                                                                                                       ~ <r a                  + x                                    wa.,                                                                                      :
     &a.P ev
     &a.P ev
:
                                                           %        y
                                                           %        y
                                                                      ..
* J.                  -
* J.                  -
                                                                                                                              ..
1              _
1              _
                                                                                                                                                               +/ -
                                                                                                                                                               +/ -
                                                                                                                                                                     -              -r.
                                                                                                                                                                     -              -r.
                                                                                                                                                                                 . . ; s,
                                                                                                                                                                                 . . ; s,
                                                                                                                                                                                  *
                                                                                                                                                                                                             . ,,c .-
                                                                                                                                                                                                             . ,,c .-
                                                                                                                                                                                                                                   =+
                                                                                                                                                                                                                                   =+
                                                                                                                                                                                                                                                                                          .
                                                                                                                                                                                                                                                                                           .            't m
                                                                                                                                                                                                                                                                                           .            't
                                                                                                                                                                                                                                                                                                                -
m
                                                                                                                                                                                                                                                                                                                                 . . . . , w "A
                                                                                                                                                                                                                                                                                                                                 . . . . , w "A
         %y%.xsr* <a ~ y g .s.N. y. - >;m.e _Fy*
         %y%.xsr* <a ~ y g .s.N. y. - >;m.e _Fy*
                                                                                                              .
                                                                                                                                                                                                                                                                                                   .      : agh      : ' <p;wt.                  :
                                                                                                                                                                                                                                                                                                   .      : agh      : ' <p;wt.                  :
           .. _ -                                                                                                                      n            .. .,                                                                                        - . .- :                                                                                      .          ..
           .. _ -                                                                                                                      n            .. .,                                                                                        - . .- :                                                                                      .          ..
                                                                                                                                                                                                                                                                                                                                                                        -


UNITED STATES OF AI1 ERICA NUCLEAR REGULATORY CCMMISSION In the Matter of                      )
UNITED STATES OF AI1 ERICA NUCLEAR REGULATORY CCMMISSION In the Matter of                      )
Line 1,072: Line 598:
                                               \
                                               \
c s              ,      .
c s              ,      .
                                                        '
John H. O'Neill, J    .
John H. O'Neill, J    .
Dated:  January 23, 1979
Dated:  January 23, 1979
Line 1,082: Line 607:
Chairman                                10807 Atwell U.S. Nr. clear Regulatory Commission    Houston, Texas    77096 Washington, D.C. 20555 Dennis P. Myers, Esquire The Honorable Victor Gilinsky          Associate Attorney General Commissioner                            State of North Carolina U.S. Nuclear Regulatory Commission      P. O. Box 629 Washington, D.C. 20555                Raleigh, North Carolina 27602 The Honorable Richard T. Kennedy        Charles A. Barth, Esquire Commissioner                            Office of the Executive Legal U.S. Nuclear Regulatory Commission        Director hachington, D.C. 20555                U.S. Nuclear Regulatory Commission Washington, D.C.      20555 The Honorable Peter A. Bradford Commissioner                            Thomas S. Erwin, Esquire U.S. Nuclear Regulatory Commission      P. O. Box 928 Washington, D.C. 20555                115 West Morgan Street Raleigh, North Carolina 27602 The Honorable John F. Ahearne Commissioner                            Docketing and Service Section U.S. Nuclear Regulatory Commission      Office of the Secretary Washington, D.C. 20555                U.S. Nuclear Regulatory Commission Washington, D.C.      20555 Ivan W. Smith, Esquire Chairma..
Chairman                                10807 Atwell U.S. Nr. clear Regulatory Commission    Houston, Texas    77096 Washington, D.C. 20555 Dennis P. Myers, Esquire The Honorable Victor Gilinsky          Associate Attorney General Commissioner                            State of North Carolina U.S. Nuclear Regulatory Commission      P. O. Box 629 Washington, D.C. 20555                Raleigh, North Carolina 27602 The Honorable Richard T. Kennedy        Charles A. Barth, Esquire Commissioner                            Office of the Executive Legal U.S. Nuclear Regulatory Commission        Director hachington, D.C. 20555                U.S. Nuclear Regulatory Commission Washington, D.C.      20555 The Honorable Peter A. Bradford Commissioner                            Thomas S. Erwin, Esquire U.S. Nuclear Regulatory Commission      P. O. Box 928 Washington, D.C. 20555                115 West Morgan Street Raleigh, North Carolina 27602 The Honorable John F. Ahearne Commissioner                            Docketing and Service Section U.S. Nuclear Regulatory Commission      Office of the Secretary Washington, D.C. 20555                U.S. Nuclear Regulatory Commission Washington, D.C.      20555 Ivan W. Smith, Esquire Chairma..
Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Glenn O. Bright Atomic' Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Glenn O. Bright Atomic' Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555
_


      .
Table 1 CP&L Load Forecast and Capacity Addition Schedule LOAD    ADDITION YEAR                    OM)      OM) 1979      S            6056 W            6056 1980      S            6442      720 W            6442 1981      S            6816 W            6816 1982      S            7223      720 W            7223 1983      S            7627 W ,,
Table 1 CP&L Load Forecast and Capacity Addition Schedule LOAD    ADDITION YEAR                    OM)      OM) 1979      S            6056 W            6056 1980      S            6442      720 W            6442 1981      S            6816 W            6816 1982      S            7223      720 W            7223 1983      S            7627 W ,,
7627 1984      S            8079      900 W            8079 1985      S            8536      720 W            8536 1986      S          8980        900 W          8980 1987      S            9449 W            9449 1988      S            9911      900 W            9911 1989      S          10389 W          10189 1990      S          10859        900 W          10859 1991      S          11400        720 W          11400 1992      S          11930        720 W          11930 5.357 1979-1992 Legend:
7627 1984      S            8079      900 W            8079 1985      S            8536      720 W            8536 1986      S          8980        900 W          8980 1987      S            9449 W            9449 1988      S            9911      900 W            9911 1989      S          10389 W          10189 1990      S          10859        900 W          10859 1991      S          11400        720 W          11400 1992      S          11930        720 W          11930 5.357 1979-1992 Legend:
Line 1,090: Line 613:


e.
e.
            .                                      .
ee FUTURE ELECTRICITY NEEDS FOR NORTH CAROLINA:
_
ee
        -
_
FUTURE ELECTRICITY NEEDS FOR NORTH CAROLINA:
~~
~~
LOAD FORECAST AND CAPACITY PLAN
LOAD FORECAST AND CAPACITY PLAN 1978 NORTH CAROLINA UTILITIES COMMISSION RALEIGH, NORTH CAROLINA DECEMBER 1978 e
-
1978
...
._
                                                  .
        ,
  ..
NORTH CAROLINA UTILITIES COMMISSION
    -
RALEIGH, NORTH CAROLINA DECEMBER 1978 e
      $
-
M e
M e
ep M
ep M
et
et


TABLE OF CONTI:NTS Page
TABLE OF CONTI:NTS Page EXECUTIVE  
--
EXECUTIVE  


==SUMMARY==
==SUMMARY==
         . . . . . . . . . . . . . . .                          1 I. INTRODUCTION      . . . . . . . . . . . . . . . . .                              3 II.  ' HIE 1978 LOAD FORECAST AND CAPACITY PLAN                            . . .      7 A. Introduction .      . . . . . . . . . . . . . . .                            7 B.  "indings of Fact . . . . . . . . . . . . .          .                      9 C. Load Forecast and Capacity Plan                        . . . . . .          16 III. FORECAST OF NATIONAL A!!D STATE ECONOMIC AND DEMOGRAPHIC GROUTH            . . . . . . . . . . . .                      34 A. Introduction . . . . . . . . . . . . . . . .                                34 B. The National Forecast . . . . . .                          . , , ,        . 36 C. Historical Comparisons Between the Economies of the United States and 11 orth Carolina                            . . 39 D. The Long-Term Forecast for North Carolina                                  . 42 E. Conclusion . . . . . . . . . . . . . . . . .                                  45 IV. LONG-TERM ELECTRIC ENERGY AND PEAK-LOAD FORECAST          . . . . . . . . .  . . . . .                        47
         . . . . . . . . . . . . . . .                          1 I. INTRODUCTION      . . . . . . . . . . . . . . . . .                              3 II.  ' HIE 1978 LOAD FORECAST AND CAPACITY PLAN                            . . .      7 A. Introduction .      . . . . . . . . . . . . . . .                            7 B.  "indings of Fact . . . . . . . . . . . . .          .                      9 C. Load Forecast and Capacity Plan                        . . . . . .          16 III. FORECAST OF NATIONAL A!!D STATE ECONOMIC AND DEMOGRAPHIC GROUTH            . . . . . . . . . . . .                      34 A. Introduction . . . . . . . . . . . . . . . .                                34 B. The National Forecast . . . . . .                          . , , ,        . 36 C. Historical Comparisons Between the Economies of the United States and 11 orth Carolina                            . . 39 D. The Long-Term Forecast for North Carolina                                  . 42 E. Conclusion . . . . . . . . . . . . . . . . .                                  45 IV. LONG-TERM ELECTRIC ENERGY AND PEAK-LOAD FORECAST          . . . . . . . . .  . . . . .                        47 A. Introduction .      . . . . . . . . . . . . . . .                            47 B. The Use of Econometric Analysia . . . . . .                                47 C. Forecast of Electricity Sales to Residential Customers . . . . . . . . . . .                                  51 D. The Forecast of Ele =tricity Sales to Commercial Customers . . . . . . . . . . . .                                56 E. The Forecast of Electricity Sales to Industrial Customers . . . . . . . . . . . .                                60 F. The Peak-Load Forecast . . . . . . . . . . .                                62 G. Comments by Public Witnesses anc Intervenors                                67 V. RESERVE CRITERIA, GENERATION MIX, AND CAPACITY PLANS . . . . . . . . . . . . . . . .                                  71 A. Reserve Criteria . . . . . . . . . . . . . .                                  71 B. Generation Mix . . . . .. . . . . . . . . .                                  73 C. Generating Capacity Plan . . . . . . . .                  . .                83 VI. OUTLOOK FOR CO' >ERVATION AND LOAD MANAGD1ENT; A SURVEY OF ALTERNATIVE CIERGY SOURCES                            . . . .        87
'
A. Introduction .      . . . . . . . . . . . . . . .                            47 B. The Use of Econometric Analysia . . . . . .                                47 C. Forecast of Electricity Sales to Residential Customers . . . . . . . . . . .                                  51 D. The Forecast of Ele =tricity Sales to Commercial Customers . . . . . . . . . . . .                                56 E. The Forecast of Electricity Sales to Industrial Customers . . . . . . . . . . . .                                60 F. The Peak-Load Forecast . . . . . . . . . . .                                62 G. Comments by Public Witnesses anc Intervenors                                67
''
V. RESERVE CRITERIA, GENERATION MIX, AND CAPACITY PLANS . . . . . . . . . . . . . . . .                                  71 A. Reserve Criteria . . . . . . . . . . . . . .                                  71
-
B. Generation Mix . . . . .. . . . . . . . . .                                  73 C. Generating Capacity Plan . . . . . . . .                  . .                83 VI. OUTLOOK FOR CO' >ERVATION AND LOAD MANAGD1ENT; A SURVEY OF ALTERNATIVE CIERGY SOURCES                            . . . .        87
~
~
A. Introduction . . . . . . . . . . . . . . . .                                87 D. Legislation . . . . . . . . . . . . . . . .                                  88 C. Utilities Conmission end Public Staff Activities on Conservation and Load
A. Introduction . . . . . . . . . . . . . . . .                                87 D. Legislation . . . . . . . . . . . . . . . .                                  88 C. Utilities Conmission end Public Staff Activities on Conservation and Load Management . . . . . . . . . . . . . . . . .                                91 D. The Electric Utilities' Conservation and Load Management Programs . . . . . . . . . .                                95
-
Management . . . . . . . . . . . . . . . . .                                91 D. The Electric Utilities' Conservation and Load Management Programs . . . . . . . . . .                                95
_.      E. Alternative Energy Sources . . . . . . . . .                                  102 VII. CONCLUSIONS  . . . . . . . . . . . . . . . . . .                                116
_.      E. Alternative Energy Sources . . . . . . . . .                                  102 VII. CONCLUSIONS  . . . . . . . . . . . . . . . . . .                                116


I'.TDEZ OF TABLES
I'.TDEZ OF TABLES Page "E    A. Commission Load Forecasts...................                  23 "ABLE  n. Comm.tssion Plan for Capacity Additions and ReH ements............................. 2n
                                                                                ,
Page "E    A. Commission Load Forecasts...................                  23 "ABLE  n. Comm.tssion Plan for Capacity Additions and ReH ements............................. 2n
   *M    C. Co= mission Load Forecasts, Ca and Ref., cit.nt Reserves.......pacity      Plans
   *M    C. Co= mission Load Forecasts, Ca and Ref., cit.nt Reserves.......pacity      Plans
                                                 ...............            25 TABLE  1. Capacity Addition Plans for VEPCO........... 118 TALLE  2. Reserves Which Will Result From Capacity Plans if the VEPCO Forecast Occurs . . . . . . . . . . 119 TABLE  3. Reserves Which Will Result From Capacity Pla m if the Public Staff Forecast Occurs. .. 120 TABLE  4 Levels and Growth Rates of Demographic variables Used in the Public Staff's Energy Forecasts and Load Forecasts.........                121 TABLE  5. Public Staff TREiD Forecast of CPCL Ener Consumption by Custcmer Class...........gy          .... 122 TABLE  6. Public Staff TRE11D Forecast of Duke Ener Consumption by Customer Class...........gy
                                                 ...............            25 TABLE  1. Capacity Addition Plans for VEPCO........... 118 TALLE  2. Reserves Which Will Result From Capacity Plans if the VEPCO Forecast Occurs . . . . . . . . . . 119 TABLE  3. Reserves Which Will Result From Capacity Pla m if the Public Staff Forecast Occurs. .. 120 TABLE  4 Levels and Growth Rates of Demographic variables Used in the Public Staff's Energy Forecasts and Load Forecasts.........                121 TABLE  5. Public Staff TREiD Forecast of CPCL Ener Consumption by Custcmer Class...........gy          .... 122 TABLE  6. Public Staff TRE11D Forecast of Duke Ener Consumption by Customer Class...........gy
_
                                                                   .... 123 TABLE  7. Comparisons of Growth Rates of Electricity Prices and Inflation Measures . . . . . . . . . . . . . . . 124 TABLE        CPEL's Energy 8.
                                                                   .... 123 TABLE  7. Comparisons of Growth Rates of Electricity Prices and Inflation Measures . . . . . . . . . . . . . . . 124 TABLE        CPEL's Energy 8.
Forecast......................            125 TABLE  9. Duke's Energy Forecast......................                126 TABLE 10.    ^vt.xCD's Energy Forecast..................... 127 TABLE 11. Public Staff's lioneconometric Energy Estimates for the Residential Sector. . . . . . .          128 TABLE 12. Public Staff's Noneconometric Energy Estimates for Commercial Sector.............                129 TABLE 13. CPEL's Load Forecast......................... 130
Forecast......................            125 TABLE  9. Duke's Energy Forecast......................                126 TABLE 10.    ^vt.xCD's Energy Forecast..................... 127 TABLE 11. Public Staff's lioneconometric Energy Estimates for the Residential Sector. . . . . . .          128 TABLE 12. Public Staff's Noneconometric Energy Estimates for Commercial Sector.............                129 TABLE 13. CPEL's Load Forecast......................... 130 TABLE 14 Duke's Summ e Peak Load Forecas t. . . . . . . . . . . . 131 TABLE 15.
            .
TABLE 14 Duke's Summ e Peak Load Forecas t. . . . . . . . . . . . 131 TABLE 15.
Duke's Winter Peak Load Forecast............ 132 TABLE 16. Public Staff's Capacity Addition Schedule... 133
Duke's Winter Peak Load Forecast............ 132 TABLE 16. Public Staff's Capacity Addition Schedule... 133


TABLE 17A. Reserve Margins Based Upon the Public Staff Addition 3chedule........................... 133 TABLE 17B. Loss of Load Probabilities Expected Tron P ublic S ta ff Addi tions . . . . . . . . . . . . . . . . . . . . . . 134
TABLE 17A. Reserve Margins Based Upon the Public Staff Addition 3chedule........................... 133 TABLE 17B. Loss of Load Probabilities Expected Tron P ublic S ta ff Addi tions . . . . . . . . . . . . . . . . . . . . . . 134 TADLE 18. Public Staf f Projections of Percent of Plant Operated as Base Load, Cycling and Peaking................................. 135 TABLE 19A. CPCL's Capacity Addition Schedule........... 136 TABLE 19D. CP&L's Projected Su=ner Peak Reserves....... 136 TABLE 20. Duke's Summary of Load, Capacity and Reserves....................................                            137 TABLE 21. Duke's Summary of Projected Load Management Goals.......................................                            139 w
_
TADLE 18. Public Staf f Projections of Percent of Plant Operated as Base Load, Cycling and Peaking................................. 135 TABLE 19A. CPCL's Capacity Addition Schedule........... 136 TABLE 19D. CP&L's Projected Su=ner Peak Reserves....... 136 TABLE 20. Duke's Summary of Load, Capacity and Reserves....................................                            137 TABLE 21. Duke's Summary of Projected Load Management Goals.......................................                            139
  .
* w
%
he e
he e
m
m


      .
EIECUTIVE SUMBARY The    Gen eral    Assembly    in    1975    directed the U tilities Commission to develop a nd kee p current an                analysis of the long-range need f or electric pt ver in North Carolina. This report is submitted to the Governor and to the Ge neral Asse mbly in compliance with that aandate.
EIECUTIVE SUMBARY The    Gen eral    Assembly    in    1975    directed the U tilities Commission to develop a nd kee p current an                analysis of the long-range need f or electric pt ver in North Carolina. This report is submitted to the Governor and to the Ge neral Asse mbly in compliance with that aandate.
In    preparing this report, the Co mmission has consider ed evidence presented by the Public Staff - Nori.h Ca rolina Utilities commission, Ca rolina Po we r S Light Company, Duke Power Compan y, Virginia Electric and Power Company, and other parties in Docket Bos. E- 10 0, Sub 32,                        the load fo r e ca st d oc te t, a nd 5- 100, S ub 78, the conservation and load management do ctet.
In    preparing this report, the Co mmission has consider ed evidence presented by the Public Staff - Nori.h Ca rolina Utilities commission, Ca rolina Po we r S Light Company, Duke Power Compan y, Virginia Electric and Power Company, and other parties in Docket Bos. E- 10 0, Sub 32,                        the load fo r e ca st d oc te t, a nd 5- 100, S ub 78, the conservation and load management do ctet.
This report makes the f ollowing findings:
This report makes the f ollowing findings:
1      The      planning      pe riod      unde r  consideration    for construction of new genera ting units is 1978-1992.
1      The      planning      pe riod      unde r  consideration    for construction of new genera ting units is 1978-1992.
: 2. The    probable    range      of    annual peak-load growth for Carolina Power S Light Company is 4.4% to 6.5%. Eithin this
: 2. The    probable    range      of    annual peak-load growth for Carolina Power S Light Company is 4.4% to 6.5%. Eithin this range the          most probable peak-load growth rate for planning is 5.2 %, annually.
  -
range the          most probable peak-load growth rate for planning is 5.2 %, annually.
: 3.      The    probable    range      of    annual peak-load growth f or Duke Power Company is 4.6 % to 6.7%.                  Eithin this range the most        pro bable    pe ak-loa d    growth for planning is 5.4%,
: 3.      The    probable    range      of    annual peak-load growth f or Duke Power Company is 4.6 % to 6.7%.                  Eithin this range the most        pro bable    pe ak-loa d    growth for planning is 5.4%,
annually.
annually.
: 4.      The  gene ra ting    re se rves    nee ded  to  ensure  system reliability f or Duke, CPGL, and YEPC3 are 20% for                  both the
: 4.      The  gene ra ting    re se rves    nee ded  to  ensure  system reliability f or Duke, CPGL, and YEPC3 are 20% for                  both the summer and the win ter pea king seasons.
-
summer and the win ter pea king seasons.
'
: 5. The    most economical and efficient generation six for Duke, CPSL, and 7EPCO for the years                  1978-1992  consists of appror ina tely        one-half      ba se  capacity,    one-third cycling capacity, a nd one-sixth peaking capacity.
: 5. The    most economical and efficient generation six for Duke, CPSL, and 7EPCO for the years                  1978-1992  consists of appror ina tely        one-half      ba se  capacity,    one-third cycling capacity, a nd one-sixth peaking capacity.
;            6. The most economical method of electric generation for
;            6. The most economical method of electric generation for
  ~
  ~
Duke, CPSL, and YEPCO is a combination of hydroelectric genera tion          and    coal      fired a nd nuclear fueled steam genera tion ; the projected benefits to be derived from the development          and opera ti on        of    renawable energy sources including wind power and solar energy. when added to the combina tion          air of hyd ro , coal, and nuclear electric gene ration are in the public interest.
Duke, CPSL, and YEPCO is a combination of hydroelectric genera tion          and    coal      fired a nd nuclear fueled steam genera tion ; the projected benefits to be derived from the development          and opera ti on        of    renawable energy sources including wind power and solar energy. when added to the combina tion          air of hyd ro , coal, and nuclear electric gene ration are in the public interest.
..
: 7.      VEPCO    has cancelled n uclear units Surry No. 3 and Surry No. 4          7EPCO's present construction schedule will not meet the required reserve level of 20%.
: 7.      VEPCO    has cancelled n uclear units Surry No. 3 and Surry No. 4          7EPCO's present construction schedule will not
,
meet the required reserve level of 20%.
: 8. Conservation        and    load    management activities by the
: 8. Conservation        and    load    management activities by the
    .


2 Commission,      the  regulated utilities, and        the public can significantly      i= pact  future growth rates      in  peak-load demand.
2 Commission,      the  regulated utilities, and        the public can significantly      i= pact  future growth rates      in  peak-load demand.
Line 1,188: Line 664:
The      three      utilities    will  also  be  recuired  to  offer voluntary, experimental rates which incorporate time-o f-day pricing to customers who either install solar ecuipment, theraal storage equipment, or a combination of the two for the purpose of providing space heating.
The      three      utilities    will  also  be  recuired  to  offer voluntary, experimental rates which incorporate time-o f-day pricing to customers who either install solar ecuipment, theraal storage equipment, or a combination of the two for the purpose of providing space heating.


    .
3 CHAPTER I INTRO DU CTION In  1975  the    North  Carolina    General    Assembly    enacted
3 CHAPTER I INTRO DU CTION In  1975  the    North  Carolina    General    Assembly    enacted
: 3. 5. 6 2-I l o. l (c) which directed the Utilities Commission            to adevelop,    publicize,    and  keep    current an analysis of the long-range    n eeds  for  ex pa nsion  of  f acilities      for    the generation    of    electricity in North Carolina, including its es tiante of    the  probable    future    growth      of  the  us=    of electuicity,      the  probable    needed generating reserven, the extent, size, air and general location of generating                plants
: 3. 5. 6 2-I l o. l (c) which directed the Utilities Commission            to adevelop,    publicize,    and  keep    current an analysis of the long-range    n eeds  for  ex pa nsion  of  f acilities      for    the generation    of    electricity in North Carolina, including its es tiante of    the  probable    future    growth      of  the  us=    of electuicity,      the  probable    needed generating reserven, the extent, size, air and general location of generating                plants
Line 1,195: Line 670:
In  January    1977  the    Co mmission  held      its first public hearings pursuant to the statute and, theraafter, issned its first    repo rt , entitled Report of Analysis and Plan:            Futura Requirements fog Electricity Service            to  North    Car olina    -
In  January    1977  the    Co mmission  held      its first public hearings pursuant to the statute and, theraafter, issned its first    repo rt , entitled Report of Analysis and Plan:            Futura Requirements fog Electricity Service            to  North    Car olina    -
1977. In that Report the Connission concluded that:
1977. In that Report the Connission concluded that:
.
: l. The    probable    future    annual    rate of growth in peak load for both Carolina Power & Light Company (C ur.M and Du ke Power Company        (Duke) vill be apprcriaately 6.9% during the years 1976-1990.
: l. The    probable    future    annual    rate of growth in peak
'
load for both Carolina Power & Light Company (C ur.M and Du ke Power Company        (Duke) vill be apprcriaately 6.9% during the years 1976-1990.
--
: 2. The probable needed genera ting reserves will be 15%
: 2. The probable needed genera ting reserves will be 15%
to 20% in the sunner and no less than 20% in the vinter.
to 20% in the sunner and no less than 20% in the vinter.
-


4
4
Line 1,213: Line 683:
On  December              1977, (5,            the Public Staff filed with this Commission its J,,9,2,3, Public Staff Report:        Analysis  p,j  Lp_ttg Hanoe    Needs    f,g,E    Electric    Generatinc ?acilities in North Carolin a. The Public Staff Report wa s essentially an update of    the  commission's        1977 Beport of Analysis and Plan, but incorporated new data aad infornation that became availab le after    the  commission's I S77 Beport was issued.          The Public
On  December              1977, (5,            the Public Staff filed with this Commission its J,,9,2,3, Public Staff Report:        Analysis  p,j  Lp_ttg Hanoe    Needs    f,g,E    Electric    Generatinc ?acilities in North Carolin a. The Public Staff Report wa s essentially an update of    the  commission's        1977 Beport of Analysis and Plan, but incorporated new data aad infornation that became availab le after    the  commission's I S77 Beport was issued.          The Public


    -
5 Staff Report also included refinements            in    the  econom etric forecasting    models and in the capacity planning techniques.
5 Staff Report also included refinements            in    the  econom etric forecasting    models and in the capacity planning techniques.
New features included both long-tern economic forecasts                  for the United States and f or Eorth Carolina and analyses o f the potential      beneficial      e ffects    of    conse rva tion,      load ma na ge ment, and peak-load pricing.
New features included both long-tern economic forecasts                  for the United States and f or Eorth Carolina and analyses o f the potential      beneficial      e ffects    of    conse rva tion,      load ma na ge ment, and peak-load pricing.
In    Februa ry    1978    the  Commission      held    hearin gs    in preparation for its 1978 report.          The Public Staff        and  the three major electric utilities (operating in N orth Carolina) presented their forecasts        for    the    grow th    in  electricity sales  and    peak    load  in North Carolina and the generating capacity needed to meet        this  projected      gro wth.      Runerous i
In    Februa ry    1978    the  Commission      held    hearin gs    in preparation for its 1978 report.          The Public Staff        and  the three major electric utilities (operating in N orth Carolina) presented their forecasts        for    the    grow th    in  electricity sales  and    peak    load  in North Carolina and the generating capacity needed to meet        this  projected      gro wth.      Runerous i
other  parties    intervened and participated in the hearings:
other  parties    intervened and participated in the hearings:
,
the Attorney General of North Carolina, the              North  Carolina Electric seabership Corpoca tion, the Carolina Environmental Stud y Group, the Conservation Council of North Carolina, the Lea gue  of  V omen Voters, the Joseph Le Conte Chapter of the Sierra Club, and the North Carolina Oil Jobbers Association.
the Attorney General of North Carolina, the              North  Carolina Electric seabership Corpoca tion, the Carolina Environmental Stud y Group, the Conservation Council of North Carolina, the
  '
Lea gue  of  V omen Voters, the Joseph Le Conte Chapter of the Sierra Club, and the North Carolina Oil Jobbers Association.
In    addition,      a    number  of    public    witnesses      provided informatien and consent to the Commission.
In    addition,      a    number  of    public    witnesses      provided informatien and consent to the Commission.
Thereafter, the Commission held extensive hearinas in July and September 1978 in its Docket No.            5-100,    Sub  78. The purpose    of  this d ocke t a nd the hearings held therein is to investigate the load ma nagement          prog rams    of    the  electric utilities    and the conservation prograns of the electric and gas utilities opera ting in the state.            The    publication      of
Thereafter, the Commission held extensive hearinas in July and September 1978 in its Docket No.            5-100,    Sub  78. The purpose    of  this d ocke t a nd the hearings held therein is to investigate the load ma nagement          prog rams    of    the  electric utilities    and the conservation prograns of the electric and gas utilities opera ting in the state.            The    publication      of
.


6 the        commission's I 978 load forecast report has been delayed in order to assaan the evidence presented in this docke t and to        detsemina      what      effects  the  load  management and conservation programs vill have on the long-range growth              of electricity in North Carolina.
6 the        commission's I 978 load forecast report has been delayed in order to assaan the evidence presented in this docke t and to        detsemina      what      effects  the  load  management and conservation programs vill have on the long-range growth              of electricity in North Carolina.
The          Commission's I 978 report, entitled Future Electricity Needs igg, sorth Carolina:            Lo.5j Porecast gas cacacity flag -
The          Commission's I 978 report, entitled Future Electricity Needs igg, sorth Carolina:            Lo.5j Porecast gas cacacity flag -
M,              is  submitted    in  compliance with the aandate of the General Assembly, as set f acth in G.S.            62-110 1 (c) .
M,              is  submitted    in  compliance with the aandate of the General Assembly, as set f acth in G.S.            62-110 1 (c) .
_ _ _ . . _ . _        ___ -                  -


7 CHAPTER II THE 1978 LOAD FOREC AST AND CAP ACITY PL AN A. Introductiq3 General. S ta tu te    62-l j 0.l (c)    requires the North Carolina Utilities Commission to prepare and keep current an analysis of    the  long-ra nge      needs    for the expansion of electricity generating f acilities in Worth            Carolina.      To    comply    wi th this    manda te from the General Assembly, the Commission must estima te    the    probable      future  growth    of    the    use    of electricity,      the    probable      needed generating reserves, and the extent, size, sir, and general              location    of  genera ting capacity to meet the future growth of electricity use.
7 CHAPTER II THE 1978 LOAD FOREC AST AND CAP ACITY PL AN A. Introductiq3 General. S ta tu te    62-l j 0.l (c)    requires the North Carolina Utilities Commission to prepare and keep current an analysis of    the  long-ra nge      needs    for the expansion of electricity generating f acilities in Worth            Carolina.      To    comply    wi th this    manda te from the General Assembly, the Commission must estima te    the    probable      future  growth    of    the    use    of electricity,      the    probable      needed generating reserves, and the extent, size, sir, and general              location    of  genera ting capacity to meet the future growth of electricity use.
,
I The    Public    Staff    performed    independent analyses of the load growth in CPGL's and Duke's              service    areas. H owe ve r, the    Public    S taff  adopted      and recommended the same growth rates for YEPCO that had been determined by                an    independent consulting      firm f or the Virginia Corporation commission two years previously and reaf firmed by the Virginia                C orporation commission      Staff    in    la te  1977. The studies made by the Public Staff, the regulated utilities, and other                  interest ed parties    in    the    load forecast proceedings presented a wide range of opinion as          to    the  electric  generatin g    capacity needed    in  North    Carolina over the next 20 years.            sost of these    studies      were    based    on  accepted    scientific      load forecast      me th ods. The se    studies  incorporate      different
I
'
The    Public    Staff    performed    independent analyses of the load growth in CPGL's and Duke's              service    areas. H owe ve r, the    Public    S taff  adopted      and recommended the same growth rates for YEPCO that had been determined by                an    independent consulting      firm f or the Virginia Corporation commission two years previously and reaf firmed by the Virginia                C orporation commission      Staff    in    la te  1977. The studies made by the
'
Public Staff, the regulated utilities, and other                  interest ed parties    in    the    load forecast proceedings presented a wide range of opinion as          to    the  electric  generatin g    capacity needed    in  North    Carolina over the next 20 years.            sost of these    studies      were    based    on  accepted    scientific      load forecast      me th ods. The se    studies  incorporate      different


8 levels    of  economic    activities,        conservation    and    load mana gement      efforts,      popula tion      novesents,      custoser e.cceptance of new appliances, air conditioning and                electric heel ing saturation, and other f actors.
8 levels    of  economic    activities,        conservation    and    load mana gement      efforts,      popula tion      novesents,      custoser e.cceptance of new appliances, air conditioning and                electric heel ing saturation, and other f actors.
Line 1,259: Line 718:


11
11
: 4. The  _qe nera t i ne    re se rve s  needed    to    enstre    system reliability fol Duke, @ , and VEPCO age 201 for both Me sagagg ad De vinter pea kinq seasons. As pointed out by the Public Staff, there is no level of reserve                      margin    that will    absolutely guarantee reliability.                Although the P ublic
: 4. The  _qe nera t i ne    re se rve s  needed    to    enstre    system reliability fol Duke, @ , and VEPCO age 201 for both Me sagagg ad De vinter pea kinq seasons. As pointed out by the Public Staff, there is no level of reserve                      margin    that will    absolutely guarantee reliability.                Although the P ublic staff recommended reserves of 15% to 20% for                    both  seasons, Duke witnesses indicated that 20% reserves are a ainlaus for reliable service to its customers. The commission concludes t ha t , for this planning period, a miniana 20% reserve margin f or bo th summer and winter peaking seasons is reasonable and ne ce ssary.      In  so deciding, the Commission has considered, am on g other things, the difficulties of the                  three    electric utilities      in providing service during 1977 and 1978 and the recommendations of the Federal Energy Regulatory Commission Staff.
.
: 5. Ihg  most economical gasl efficient generation mig Jgg M, E, ansl VEPCO $2I. th_e_ vears                    I978-I992    consists    of ggprorisately        one- ha lf      b ase  ca paci ty , one-third      cyclin o capa ci t y, ggd one-sixth Deakinc capacity.              The Public      Staff pointed out that optimal generation six satisfies the demand for    electricity      at      miniana      cost    and    with    acceptable reliability.      The studies of the Public Staff concluded that the generation air adopted herein is the proper one for the three major electric utilities serving the State.
staff recommended reserves of 15% to 20% for                    both  seasons, Duke witnesses indicated that 20% reserves are a ainlaus for reliable service to its customers. The commission concludes t ha t , for this planning period, a miniana 20% reserve margin f or bo th summer and winter peaking seasons is reasonable and ne ce ssary.      In  so deciding, the Commission has considered, am on g other things, the difficulties of the                  three    electric utilities      in providing service during 1977 and 1978 and the
,
  ,
recommendations of the Federal Energy Regulatory Commission Staff.
: 5. Ihg  most economical gasl efficient generation mig Jgg
,
M, E, ansl VEPCO $2I. th_e_ vears                    I978-I992    consists    of ggprorisately        one- ha lf      b ase  ca paci ty , one-third      cyclin o capa ci t y, ggd one-sixth Deakinc capacity.              The Public      Staff pointed out that optimal generation six satisfies the demand for    electricity      at      miniana      cost    and    with    acceptable reliability.      The studies of the Public Staff concluded that the generation air adopted herein is the proper one for the three major electric utilities serving the State.
: 6. The most economical meth od 2f electric generation f or Duke, CPGt, and 7EPCO            is    a  combination    of  hydroelectric
: 6. The most economical meth od 2f electric generation f or Duke, CPGt, and 7EPCO            is    a  combination    of  hydroelectric
_


12 cenera tion      agf      co51    fired    ni nuclear        fueled      steau eenera tion; j;h proineted benefits 19 h              deri  ad    from        the d evelo cuent      and    operati on    of    renewable    enerav      sources inelad inc  M        power    and    solar    enerev    to    add    j;oo      the sonb ina tion      Q      of  h yd ro,  coal,    and    nuclear      electric ceneration a re in the public interest              The Public Staff and the utilities presented a number of studies indicating tha t, in    the  preser.t    planning    period,    nuclear    generation              is czpected    to    be    more economical than fossil generation f or new base load units.          The resnits of the total life            studies show    that    nuclear generation is expected to average ainost six-tenths of a cent          per  kilowa tt-ho ur    less      than    frssil generation.        Generation six vill continue to be reviewed by the commission on an annual basis.
12 cenera tion      agf      co51    fired    ni nuclear        fueled      steau eenera tion; j;h proineted benefits 19 h              deri  ad    from        the d evelo cuent      and    operati on    of    renewable    enerav      sources inelad inc  M        power    and    solar    enerev    to    add    j;oo      the sonb ina tion      Q      of  h yd ro,  coal,    and    nuclear      electric ceneration a re in the public interest              The Public Staff and the utilities presented a number of studies indicating tha t, in    the  preser.t    planning    period,    nuclear    generation              is czpected    to    be    more economical than fossil generation f or new base load units.          The resnits of the total life            studies show    that    nuclear generation is expected to average ainost six-tenths of a cent          per  kilowa tt-ho ur    less      than    frssil generation.        Generation six vill continue to be reviewed by the commission on an annual basis.
_ .. __ .._ _ _
vi tnesses    at  the load forecast bearings in February I978 expressed    concern      about    the    safety    and    reliability              of nuclear    generation.        The  issues raised by these witnesses included the problem of storing spent nuclear fuel, the lack of      assurance      of    uranina      supply,    and  the    continuing escalation of costs in nuclear plant construction. There vas also evidence that zuclear generation is clean, safe, and available.        In addition, evidence in dicated            tha t    there is increasing opinion among the technical comannity that the hazards    to  the    public    from    nuclear    generation        ma y      be considerably      le ss    than the ha=ards from alternative fossil f uel systems, such        as    coal.      Altho ugh  it    is    true      tha t increasing      costs      for    nuclear      plant  construction          and
vi tnesses    at  the load forecast bearings in February I978 expressed    concern      about    the    safety    and    reliability              of nuclear    generation.        The  issues raised by these witnesses included the problem of storing spent nuclear fuel, the lack of      assurance      of    uranina      supply,    and  the    continuing escalation of costs in nuclear plant construction. There vas also evidence that zuclear generation is clean, safe, and available.        In addition, evidence in dicated            tha t    there is increasing opinion among the technical comannity that the hazards    to  the    public    from    nuclear    generation        ma y      be considerably      le ss    than the ha=ards from alternative fossil f uel systems, such        as    coal.      Altho ugh  it    is    true      tha t increasing      costs      for    nuclear      plant  construction          and


Line 1,278: Line 728:
: 7. VEPCO    has    ca ncelled    n uclea r    units Sorry Eo. 1 and Surry Io. E.      VE PCO's presen t construction schedu le will not meet  the recuired reserve level of 2 0%.                The Commission has concluded    elsewhere      in  this    chapter        that,      with      the cancellatior of Surry N o.        3 a nd S urry No.      4,  VEPCO's present construction schedule is insufficient to prevent its                        systen reserves from falling below the level found necessary by the cornission      for  adequate        and    reliable        service.        The Commission      will    req uire    YEPCO    to    presen t    at    the    1979 hearings a full analysis of the company's expected loads and required generation through 1993.
: 7. VEPCO    has    ca ncelled    n uclea r    units Sorry Eo. 1 and Surry Io. E.      VE PCO's presen t construction schedu le will not meet  the recuired reserve level of 2 0%.                The Commission has concluded    elsewhere      in  this    chapter        that,      with      the cancellatior of Surry N o.        3 a nd S urry No.      4,  VEPCO's present construction schedule is insufficient to prevent its                        systen reserves from falling below the level found necessary by the cornission      for  adequate        and    reliable        service.        The Commission      will    req uire    YEPCO    to    presen t    at    the    1979 hearings a full analysis of the company's expected loads and required generation through 1993.
: 8. Conservation      3 pod  lond o      manaoement activities hI thq commission, Ah3 re c ula t ed        Utilities,      and    the    public    can siqu ifica ntly      ispact futsu          crowth    ya              pea k-loa d in demand.      The forecast adopted          by    the    cc<tission        in  this repo rt    is  based    on the premise that conservation and load management      efforts    are    not    a  temporary        phenomenon      but represent      permanent      changes    in    the    attitude      of society toward the      use  of    energy.      As  a    result      of    increasing nece ssity    for    funding      alternatives      to our present energy
: 8. Conservation      3 pod  lond o      manaoement activities hI thq commission, Ah3 re c ula t ed        Utilities,      and    the    public    can siqu ifica ntly      ispact futsu          crowth    ya              pea k-loa d in demand.      The forecast adopted          by    the    cc<tission        in  this repo rt    is  based    on the premise that conservation and load management      efforts    are    not    a  temporary        phenomenon      but represent      permanent      changes    in    the    attitude      of society toward the      use  of    energy.      As  a    result      of    increasing nece ssity    for    funding      alternatives      to our present energy
        .


I4 sources, significant          ene rgy-rela ted    legislation      has  been enacted    in    the last two years.          The North Carolina General Assembly enacted the important Energy Conservation Act of 1977,    which    encoura ges      solar    energy    and    insulation for residential and        business      use.      In  addition,    the  United States    Congress      has    recently    enacted the National Energy Conservation Policy Act of l 978.              Both of    these    acts    will substantially          affect      state      and    local    efforts      on conservation.
I4 sources, significant          ene rgy-rela ted    legislation      has  been enacted    in    the last two years.          The North Carolina General Assembly enacted the important Energy Conservation Act of 1977,    which    encoura ges      solar    energy    and    insulation for residential and        business      use.      In  addition,    the  United States    Congress      has    recently    enacted the National Energy Conservation Policy Act of l 978.              Both of    these    acts    will substantially          affect      state      and    local    efforts      on conservation.
Line 1,286: Line 735:
15 July    and    September      1978  established    that  numerous    and div erse    c onse rva tion    and  load  management    programs    are underway throughout the State.
15 July    and    September      1978  established    that  numerous    and div erse    c onse rva tion    and  load  management    programs    are underway throughout the State.
: 9. Ibe    capacitV    addition    plans,  adopted herein, will enable GZE1 a nd Duke 12 seet the          Consission's    f oreca st  2f g      demand    1su;  3he    vears 1979- 1992 and tp have adeoua te reserves ing continoencies.            This is an interim plan and        is subject    to    revies    by  the  Commission on an annual basis.
: 9. Ibe    capacitV    addition    plans,  adopted herein, will enable GZE1 a nd Duke 12 seet the          Consission's    f oreca st  2f g      demand    1su;  3he    vears 1979- 1992 and tp have adeoua te reserves ing continoencies.            This is an interim plan and        is subject    to    revies    by  the  Commission on an annual basis.
Because it is impossible to e xactly p redict the future,                the companies      must    maintain    flexibility in their construction schedules in order to          economically    adjust    to  changes    in pea t-l oad    growth    as    they  occur. The  utilities will be required in the mid-1979 hearing to            show  the  reasons,    if any,    why their construction schedules should not be delayed
Because it is impossible to e xactly p redict the future,                the companies      must    maintain    flexibility in their construction schedules in order to          economically    adjust    to  changes    in pea t-l oad    growth    as    they  occur. The  utilities will be required in the mid-1979 hearing to            show  the  reasons,    if any,    why their construction schedules should not be delayed to match the commission's ca pacity plan.                New    generating f acili ties    should    be  located on sites which are near load centers or ma jor        transmission                    and facilities          which    have ample    water    for    cooling.      Because of the long lead times required, site licensing and preparation have already begun for most f acilities coming into service during the next l0 to 15 years and relocation of those f acilities would not be economical.
,
to match the commission's ca pacity plan.                New    generating f acili ties    should    be  located on sites which are near load centers or ma jor        transmission                    and facilities          which    have ample    water    for    cooling.      Because of the long lead times required, site licensing and preparation have already begun for most f acilities coming into service during the next l0 to 15 years and relocation of those f acilities would not be economical.
: 10. supering    f orecast i no    of the effects of conservation ggd 193.1 m,gnacement is needed.          The commission is      directing the    utilities    and    the    Public  Staff    to present detailed analyses concerning these matters in the 1979 hearings.                    To
: 10. supering    f orecast i no    of the effects of conservation ggd 193.1 m,gnacement is needed.          The commission is      directing the    utilities    and    the    Public  Staff    to present detailed analyses concerning these matters in the 1979 hearings.                    To
.


16 allow sufficient time those hearings are being moved to mid-year.      The forecast of future electrical poser demands,              the generation          reserve    requiremen ts,    and    the  types  of  new generating capacity will continue                to  be  reviewed  by  the Consission        on    an    annual    basis  in  order    to  adequa tely incorporate changing conditions.                The  Commission,    through its  S taff      and    through    the Public Staff, vill continue to consider regional interchanges of power                and    power  pooling arrangements          by    its  participation    in    the  Southeastern Re1inbility Council aad the              Virginia-Carolin as    Interregion planning efforts.
16 allow sufficient time those hearings are being moved to mid-year.      The forecast of future electrical poser demands,              the generation          reserve    requiremen ts,    and    the  types  of  new generating capacity will continue                to  be  reviewed  by  the Consission        on    an    annual    basis  in  order    to  adequa tely incorporate changing conditions.                The  Commission,    through its  S taff      and    through    the Public Staff, vill continue to consider regional interchanges of power                and    power  pooling arrangements          by    its  participation    in    the  Southeastern Re1inbility Council aad the              Virginia-Carolin as    Interregion planning efforts.
C. Id2nd Forwasts 3g51 Capacity 21gg The guestions before the Commission are threefold:
C. Id2nd Forwasts 3g51 Capacity 21gg The guestions before the Commission are threefold:
      - ___      ..
1      What are the most likely load growth rates?
1      What are the most likely load growth rates?
: 2.      What levels of reserve capacities are required?
: 2.      What levels of reserve capacities are required?
Line 1,302: Line 747:


17 vide    variety    of  expected load growths, all dependent upon diff erent levels of economic activity, conservation and load mana ge ment efforts, popula tion novement, customer acceptance of new appliances, air          conditioning      and    electric    hea ting saturation, and other factors.
17 vide    variety    of  expected load growths, all dependent upon diff erent levels of economic activity, conservation and load mana ge ment efforts, popula tion novement, customer acceptance of new appliances, air          conditioning      and    electric    hea ting saturation, and other factors.
This    chapter      presents        the    Co mmission's    conclusions regarding the projected future electricity                requirements      in N ort h  Ca rolina.      The    chapters      which follow summari=e the evidence of the parties in these hearings.                Based    upon  the best    evidence    a vailable      to    the  Commission      today,  the electricity growth plan adopted by the Commission represents
This    chapter      presents        the    Co mmission's    conclusions regarding the projected future electricity                requirements      in N ort h  Ca rolina.      The    chapters      which follow summari=e the evidence of the parties in these hearings.                Based    upon  the best    evidence    a vailable      to    the  Commission      today,  the electricity growth plan adopted by the Commission represents a prudent and realistic strategy for meeting our electricity needs. The plan    necessa rily      dema nds  fle xibility    in  the adopted      constr ection      schedule.        Annual    u pda tes  of  the Commission      forecast    a nd    ca pacity    plan    will    enable  the Commission      to  reflect      both    improv ements      in  forecasting techniques and new evidence            regardin g  the    utilization    of electricity.        Accordingly,        the tiaing of later plants must be regarded as tenta tive.
  -.
The consission has examined in detail the level of reserve capacity which        should    be    required. Reserve      ca pacity  is necessary      to  mee t  increased        capacity requirctente due to severe    weather,    planned      maintenance      outages,      unerpected equipment      o uta ges,    unexpected      load    growth,    and  other factors.      The    adeguacy      of    'actricity    supply      directly affects    the    ability    of    our    citizens to utilize adequa te
a prudent and realistic strategy for meeting our electricity needs. The plan    necessa rily      dema nds  fle xibility    in  the adopted      constr ection      schedule.        Annual    u pda tes  of  the Commission      forecast    a nd    ca pacity    plan    will    enable  the Commission      to  reflect      both    improv ements      in  forecasting techniques and new evidence            regardin g  the    utilization    of electricity.        Accordingly,        the tiaing of later plants must be regarded as tenta tive.
The consission has examined in detail the level of reserve capacity which        should    be    required. Reserve      ca pacity  is necessary      to  mee t  increased        capacity requirctente due to
                                                                      .
severe    weather,    planned      maintenance      outages,      unerpected equipment      o uta ges,    unexpected      load    growth,    and  other factors.      The    adeguacy      of    'actricity    supply      directly affects    the    ability    of    our    citizens to utilize adequa te
.


18 space    conditioning      to  remain    comfortable    and    healthy.
18 space    conditioning      to  remain    comfortable    and    healthy.
Line 1,326: Line 766:
Significant      changes    in  conservation and load management efforts are occurring and will be of sign 4"ir ant assistance in    the    1980's. After    examination    of  the    assnaptions underlying each scenario,          the  Commission    cont /.ludes  that, based    upon    the  evidence avallable at this time, it is not reason able    to  expect    that    both  conservation      and    load management will be practiced substantially enough to produce the effects of the combined load annagement and conservation scenario.        However,    it    does  appear    that, with effectim effort    by  utilities,      consumer    groups    and      government, combined      reductions      in 1 cad growth equivalent to the level of either the full        load    management    or  full    conserva tion scenario      can    be realized (i.e. , approximately I % reduction in growth from the abase casc a) .
Significant      changes    in  conservation and load management efforts are occurring and will be of sign 4"ir ant assistance in    the    1980's. After    examination    of  the    assnaptions underlying each scenario,          the  Commission    cont /.ludes  that, based    upon    the  evidence avallable at this time, it is not reason able    to  expect    that    both  conservation      and    load management will be practiced substantially enough to produce the effects of the combined load annagement and conservation scenario.        However,    it    does  appear    that, with effectim effort    by  utilities,      consumer    groups    and      government, combined      reductions      in 1 cad growth equivalent to the level of either the full        load    management    or  full    conserva tion scenario      can    be realized (i.e. , approximately I % reduction in growth from the abase casc a) .


.
21 Since      the  time of the hearings, the 1977-1978 winter and 1978 summer peaks have been established at such lower values than      had  been    predic te d.      The      conaission has taken into account the two additional actual peaks in its adopted                        load fo reca st.      Although    some    of    this reduction was obviously weather rela ted, a substantial            c ortion    of the remainder must be    at tribu ted    to concervation and load management measures by cus tomers.      The commission expects            that    customers    will continue      to  add    such    sea sures in the near term future to aristing      installations      and    to    des ign    them    into  f uture expansion      and construction.        A t some point, however, it can be    expected      that    these    seasures        will    be    sufficiently employed        so    th at    normal    growth      of    the  economy    and population in North Carolina will raise the rates of                      growth a g ai n. The  Commission      concludes that the most reasonable expectation for the possible reduction in abase case" growth ra tes    over    the planning period is 60% of the combined load manage ment a nd conserva tion scenario reduction.
21 Since      the  time of the hearings, the 1977-1978 winter and 1978 summer peaks have been established at such lower values than      had  been    predic te d.      The      conaission has taken into account the two additional actual peaks in its adopted                        load fo reca st.      Although    some    of    this reduction was obviously weather rela ted, a substantial            c ortion    of the remainder must be    at tribu ted    to concervation and load management measures by cus tomers.      The commission expects            that    customers    will continue      to  add    such    sea sures in the near term future to aristing      installations      and    to    des ign    them    into  f uture expansion      and construction.        A t some point, however, it can be    expected      that    these    seasures        will    be    sufficiently employed        so    th at    normal    growth      of    the  economy    and population in North Carolina will raise the rates of                      growth a g ai n. The  Commission      concludes that the most reasonable expectation for the possible reduction in abase case" growth ra tes    over    the planning period is 60% of the combined load manage ment a nd conserva tion scenario reduction.
The    commission      concludes      t ha t ,  for    planning purposes, CPGL's load can be expected to grow                  at    an    average  annu al rate      of  5.25. Duke's    load can be expected to grow at an av er age    annual    ra te  of  5. 4 % .      The se  growth    rat es  are approrisately        15%      (CPCI)    and    13%      (Duke) less than the Public Staff base case          recommendations.            These  red uc tions depend      upon  increased      levels      of    conserva tion    and    load ma na ge ment.      The    Commission      concludes      that    significant
The    commission      concludes      t ha t ,  for    planning purposes, CPGL's load can be expected to grow                  at    an    average  annu al rate      of  5.25. Duke's    load can be expected to grow at an av er age    annual    ra te  of  5. 4 % .      The se  growth    rat es  are approrisately        15%      (CPCI)    and    13%      (Duke) less than the Public Staff base case          recommendations.            These  red uc tions depend      upon  increased      levels      of    conserva tion    and    load ma na ge ment.      The    Commission      concludes      that    significant


22
22 effort    should  be  expended by the utilities to help effect such changes in usage patterns.
                                                                              .
The  Commission    presents      in  Table    a  the  adopted load growths    ured  in  developing      its    plan    for  the  capacity additions    shown  in  Table    B. Table    C shows the percent reserves which will      result    if    these    lead    forecasts  and capacity    addition    plans  a re    me t. The  result    of these capacity    addition    plans    is      to      delay    the  cor plete construction schedule of CPGL at least one year and to delay CPGL's    proposed    units  SHI    and    SR 2  (totaling    2300  5E) completely    boycad    the  planning      period. CPGL provided no evidence, either economic or operational, to              indicate    that its    present  construction schedule should not be delayed to match the expected load growth. Duke, on the other han d, provided    evidence  that    the    ratepayers would benefit from lower not operating costs if its early units              are  completed as    previously  scheduled.      The Public Staf.f supported this evidence and the Commission concurs.
effort    should  be  expended by the utilities to help effect such changes in usage patterns.
The  Commission    presents      in  Table    a  the  adopted load growths    ured  in  developing      its    plan    for  the  capacity additions    shown  in  Table    B. Table    C shows the percent reserves which will      result    if    these    lead    forecasts  and capacity    addition    plans  a re    me t. The  result    of these capacity    addition    plans    is      to      delay    the  cor plete construction schedule of CPGL at least one year and to delay CPGL's    proposed    units  SHI    and    SR 2  (totaling    2300  5E) completely    boycad    the  planning      period. CPGL provided no evidence, either economic or operational, to              indicate    that
.
its    present  construction schedule should not be delayed to match the expected load growth. Duke, on the other han d, provided    evidence  that    the    ratepayers would benefit from lower not operating costs if its early units              are  completed as    previously  scheduled.      The Public Staf.f supported this evidence and the Commission concurs.


:3 TABLE A. Co mJ.ssion Load Forecasts (MW)
:3 TABLE A. Co mJ.ssion Load Forecasts (MW)
Carolina Power & Light Cc=pany Duke Power Co=pany YEAR                    LOAD (MW)                LOAC ( M'.C 1979      5                5830                    9860 W                5930                    10070 1980      S                6133                  10392 W                6238                  10614
Carolina Power & Light Cc=pany Duke Power Co=pany YEAR                    LOAD (MW)                LOAC ( M'.C 1979      5                5830                    9860 W                5930                    10070 1980      S                6133                  10392 W                6238                  10614 1981      S                6452                    10954 W                6563                    11187 1982      5                6788                    11545 W                6904                    11791 1983      5                7141                    12169 W                7263                    12428 1984    5                7512                    12!26 W                7641                    13099 1985    S                7902                    13518 W                8038                    13806 1956    S                8313                    14248 W                8456                    14552 1987      5                8746                    15010 W                8896                    15337 1988      S                9200 W                                        15829 9358                  16166 1989      5                9679 W                                        16683 9845                  17039 1990      S              10182                    17584 W                10357                    17959 1991    S                10712                    18534 W                10895                    18929 1992    S                11269                    19535
  -
1981      S                6452                    10954 W                6563                    11187 1982      5                6788                    11545 W                6904                    11791 1983      5                7141                    12169 W                7263                    12428
,
1984    5                7512                    12!26 W                7641                    13099 1985    S                7902                    13518 W                8038                    13806 1956    S                8313                    14248 W                8456                    14552 1987      5                8746                    15010 W                8896                    15337 1988      S                9200 W                                        15829 9358                  16166 1989      5                9679 W                                        16683 9845                  17039 1990      S              10182                    17584 W                10357                    17959 1991    S                10712                    18534 W                10895                    18929 1992    S                11269                    19535
,            W                11462                    19951 5.2%                      5.4%
,            W                11462                    19951 5.2%                      5.4%
Per                      Per Year                    Year Legend:
Per                      Per Year                    Year Legend:
Sc=mer S Winter W
Sc=mer S Winter W
_


24
24 TABLE B. CcI:: mission Plan for Capacitf Additions and Retirements Carolina Power &
    .
TABLE B. CcI:: mission Plan for Capacitf Additions and Retirements Carolina Power &
Year                  I.1ght Cor::pany                      Duke Power Cc:::pany e
Year                  I.1ght Cor::pany                      Duke Power Cc:::pany e
l  McGuire 1979  Sl                                        8 we l @ 1180 W 1980 5!                                          l We                                        i I
l  McGuire 1979  Sl                                        8 we l @ 1180 W 1980 5!                                          l We                                        i I
                      '                                  !
i                      Roxboro 1981 5! 4 720 MW                                !' 2 1180 Mw n
i                      Roxboro 1981 5! 4 720 MW                                !' 2 1180 Mw
l1 1145 MW 1982 S!
                "
n
                      ,
l1
                                                        .
1145 MW 1982 S!
                 "l  ,                                  l e
                 "l  ,                                  l e
                     '      MN                        !
                     '      MN                        !
1983  S
1983  S
               .Q  ,      720 MW                      l @ 1145 MW (69 MW)
               .Q  ,      720 MW                      l @ 1145 MW (69 MW) 1984 3l                                        l                (228 Mw) wi                                      .
                                                        ,
                    '
                                                        !
1984 3l                                        l                (228 Mw) wi                                      .
I 1985                            @ Harris 900 MWjl    1280@  Cherokee 3
I 1985                            @ Harris 900 MWjl    1280@  Cherokee 3
wl,                                                  MW  (251 Mw)
wl,                                                  MW  (251 Mw) 1986  S!
:
1986  S!
W.        @ 720 Mw                    l                (93 MW) t g
W.        @ 720 Mw                    l                (93 MW) t g
1987  Sl Wg                                    l(2)1280MW a
1987  Sl Wg                                    l(2)1280MW a
Line 1,385: Line 801:
25 TABLE C. Cort: mission Load Forecasts, Capacity Plans _nd Resultant Reserves Carolina Power & Licht C moany                      Duke Pnwer Ccspany LCID    AODITION CAPAC!n RESERVES            LOAO AOD 2'l* 2 CN CAPACITi' yan              (MW)      (MW)
25 TABLE C. Cort: mission Load Forecasts, Capacity Plans _nd Resultant Reserves Carolina Power & Licht C moany                      Duke Pnwer Ccspany LCID    AODITION CAPAC!n RESERVES            LOAO AOD 2'l* 2 CN CAPACITi' yan              (MW)      (MW)
RISE. TIES (MW)      (t1          (wwi    (MW)        (MW)
RISE. TIES (MW)      (t1          (wwi    (MW)        (MW)
                   ,                    =                      i It) l                                            I 1979 Sj 5830*                          7433    27.5      8 9860                  12317      24.9 We 5930                        7773    31.1          10070    1180        13497      34.0
                   ,                    =                      i It) l                                            I 1979 Sj 5830*                          7433    27.5      8 9860                  12317      24.9 We 5930                        7773    31.1          10070    1180        13497      34.0 1980            6133                  7433    21.2          10392                13497      29.9 Sl 6238 i
                  !
1980            6133                  7433    21.2          10392                13497      29.9 Sl 6238 i
7773    24.6      ,10614 e
7773    24.6      ,10614 e
13497      27.2
13497      27.2
               ~l                                              !
               ~l                                              !
1981 S8 6452              720        8153    26.4      l 109 54    1180          1467-      3?.0 Wl 6563                        8493    29.4      s11187      1145          15822 I
1981 S8 6452              720        8153    26.4      l 109 54    1180          1467-      3?.0 Wl 6563                        8493    29.4      s11187      1145          15822 I
41.4
41.4 1982 58 6788                          8153    20.1      ' 11545                  15S22    37.0 WI 6904                        8493    23.0    l11791                    15622    34.2 I
                                                              !
1983    Sl' 7141          720          8873    24.3          12169  1145-69      16698    38.9 W! 7263                        9213    26.8    !' 12428                  16898    36.0 l                                            l 1984 Si 7512                          R873  18.1    8 12826      -22',        16670 Wl 7641                                                                              30.C 9213  20.6    !13099                      16670    27.3 l                                          l 1985 Si 7902              900          9773  23.7                  -261 Wl 8038                                        l1351                      16409      21.4 10113    25.8    s1380t      1280          17689      28.1 1986 Se 8313              720      10493    26.2                    -93 WI B456                      10833 l 1420                    17596      23.5 28.1    .
1982 58 6788                          8153    20.1      ' 11545                  15S22    37.0 WI 6904                        8493    23.0    l11791                    15622    34.2 I
252                17596      20.9 1987 S8 8746                        10493    20.0                  1280          18876 Wl 8896                      10833 l15018                              25.7 21.8    e15337                      18876    23.1 1988 Si 9200              900      11393    23.B Wl 9356                                        l15829                      18876    19.2 41733    25.4    e 16166        500        19376    19.9
1983    Sl' 7141          720          8873    24.3          12169  1145-69      16698    38.9 W! 7263                        9213    26.8    !' 12428                  16898    36.0 l                                            l 1984 Si 7512                          R873  18.1    8 12826      -22',        16670 Wl 7641                                                                              30.C 9213  20.6    !13099                      16670    27.3 l                                          l 1985 Si 7902              900          9773  23.7                  -261 Wl 8038                                        l1351                      16409      21.4 10113    25.8    s1380t      1280          17689      28.1
                !                                          !
1986 Se 8313              720      10493    26.2                    -93 WI B456                      10833 l 1420                    17596      23.5 28.1    .
                                                            '
252                17596      20.9 1987 S8 8746                        10493    20.0                  1280          18876 Wl 8896                      10833 l15018                              25.7 21.8    e15337                      18876    23.1
                !                                          !
1988 Si 9200              900      11393    23.B Wl 9356                                        l15829                      18876    19.2 41733    25.4    e 16166        500        19376    19.9
                 ;                                .          l 1989 Sj 9679                        11393    17 7    l 1668 3      1280          20656    23.8 W 9845            900        12633    28.3    i17039                      20656 l
                 ;                                .          l 1989 Sj 9679                        11393    17 7    l 1668 3      1280          20656    23.8 W 9845            900        12633    28.3    i17039                      20656 l
21.2
21.2 1990    58                          12293    20.7                  1280                                '
                                                            !
1990    58                          12293    20.7                  1280                                '
We'10182 10357                                    l 17584                    21936    24.7 12633    22.0    #17959                      21936    22.1 I                                            !
We'10182 10357                                    l 17584                    21936    24.7 12633    22.0    #17959                      21936    22.1 I                                            !
1991 5i10712              900        13193    23.2          18534    500        22436 Wl10895                                                                              21.1 13533    24.2  l18929 s
1991 5i10712              900        13193    23.2          18534    500        22436 Wl10895                                                                              21.1 13533    24.2  l18929 s
22436    18.5
22436    18.5 1992 3:11269              720        13913    23.5          19535  1280          23716 Wlll462                                                                              21.4 14253    24.4  !'19951                      23716    18.9 5.2%                                          5.4%
              !                                          !
1992 3:11269              720        13913    23.5          19535  1280          23716 Wlll462                                                                              21.4
              !
14253    24.4  !'19951                      23716    18.9
_                                                          !
5.2%                                          5.4%
Per                                          Per Year                                          Year
Per                                          Per Year                                          Year
   ~
   ~
Line 1,425: Line 824:
The commission vinhes to see more
The commission vinhes to see more


27 detailed projections of industrial          u sa ge. The    Commissi on has the responsibility to ensure that the continued economic growth of the state is not impaired by a              lack    of    adequa te utility    se rvices. For these reasons, the Cosaission holds open the time      to  require  t he  utilities      to    dela y    their construction schedules pending examination of this matter in
27 detailed projections of industrial          u sa ge. The    Commissi on has the responsibility to ensure that the continued economic growth of the state is not impaired by a              lack    of    adequa te utility    se rvices. For these reasons, the Cosaission holds open the time      to  require  t he  utilities      to    dela y    their construction schedules pending examination of this matter in detail in the l979 hearing.
  .
detail in the l979 hearing.
If  the capacity plan is completed as herein shown and the reduction in annual load growth achieved, both CPGL and Duke vill  meet the 20% reserve requirement which this commission concludes is necessary for reliable system operation.                  It is im perative    that    generating unit construction be so planned as to be economically deferable in the event that'even                    more significa nt reductions in load growth can be effected.
If  the capacity plan is completed as herein shown and the reduction in annual load growth achieved, both CPGL and Duke vill  meet the 20% reserve requirement which this commission concludes is necessary for reliable system operation.                  It is im perative    that    generating unit construction be so planned as to be economically deferable in the event that'even                    more significa nt reductions in load growth can be effected.
In  the early years of the adopted capacity addition plan, both companies are expected to have reserve capacities which are    above    the  levels  uhich    the    Commission      fin ds    are reasonable and      necessary  for    operational      purposes      only.
In  the early years of the adopted capacity addition plan, both companies are expected to have reserve capacities which are    above    the  levels  uhich    the    Commission      fin ds    are reasonable and      necessary  for    operational      purposes      only.
A fter  examination of Duke's evidence and the Public Staff's supporting    c omments    concerning    the    costs      of      delaying
A fter  examination of Duke's evidence and the Public Staff's supporting    c omments    concerning    the    costs      of      delaying
  ~
  ~
construction      of    the  units    which    are    near    comple tion
construction      of    the  units    which    are    near    comple tion (inc17 ding the increased inflation costs) and            the    benefits which  can    be    gained from completing the units on schedule (including the reduced overall fuel          costs)    the    Conaission concludes that it will be advan tageous to bring Duke's early units on line as pla'ned.        Even though this will          result      in
_
(inc17 ding the increased inflation costs) and            the    benefits which  can    be    gained from completing the units on schedule
-
(including the reduced overall fuel          costs)    the    Conaission concludes that it will be advan tageous to bring Duke's early
-
units on line as pla'ned.        Even though this will          result      in


28 high  reserves un til the mid-l980's, the result will be less total cost to the consumer than if the            units    are  delayed.
28 high  reserves un til the mid-l980's, the result will be less total cost to the consumer than if the            units    are  delayed.
Line 1,446: Line 837:
If  it  appears    that    the  State's    economic      forecast is revised upward or that the reduction in peak demands through load    a aagement      and    conservation      will    not  occur    as projected, then it is important          that    this    information    be
If  it  appears    that    the  State's    economic      forecast is revised upward or that the reduction in peak demands through load    a aagement      and    conservation      will    not  occur    as projected, then it is important          that    this    information    be


29 provided to the Commission as early as possible and no la ter than the subsequent yearly hearings so that the capacity plans      can be revised to meet demand requirements.              Governor H un t 's  Ad ainistra tion      has    been  e xtremely    successful    in at tracting      high    vage    industry to North Carolina; whatever capacity plan that is adopted aust              be  flexible    enough    to assure      adeq uate    electric    power    to potential or expanding industry.        This Administration *s emphasis on providing            more
29 provided to the Commission as early as possible and no la ter than the subsequent yearly hearings so that the capacity plans      can be revised to meet demand requirements.              Governor H un t 's  Ad ainistra tion      has    been  e xtremely    successful    in at tracting      high    vage    industry to North Carolina; whatever capacity plan that is adopted aust              be  flexible    enough    to assure      adeq uate    electric    power    to potential or expanding industry.        This Administration *s emphasis on providing            more and better jobs for North Carolinians must not fail for lack of adequate planning for electrical power.
  -
Based      on    the evidence received in this docket and in the load management and conserva tion docket, the                commission    is of    the    opinion that the forecasts f or electrical power for CPGL and Duke are as            accu ra te  as  possible    under  present conditions.          The Commission also concludes that its adopted capacity addition plans are reasonable -and will result in adequate      and    economical electrical power in North Carolina for the future period up through 1992.
and better jobs for North Carolinians must not fail for lack of adequate planning for electrical power.
Based      on    the evidence received in this docket and in the load management and conserva tion docket, the                commission    is of    the    opinion that the forecasts f or electrical power for CPGL and Duke are as            accu ra te  as  possible    under  present
.
conditions.          The Commission also concludes that its adopted capacity addition plans are reasonable -and will result in adequate      and    economical electrical power in North Carolina for the future period up through 1992.
s .      With    respect      to YEPCO, the Commission concludes that the available evidence is conflicting              in  many  respects. The
s .      With    respect      to YEPCO, the Commission concludes that the available evidence is conflicting              in  many  respects. The
~
~
Public      S taff    adopted and recommended the same gravth rates for    YEPCD    that    had    been  determined    by  an  independent
Public      S taff    adopted and recommended the same gravth rates for    YEPCD    that    had    been  determined    by  an  independent cons ultant      for    the  Virginia    Corporation Commission.      The
..
. rate      of  peak    growth    wa s    appro ximately    5.8%.      VEPCO recommended        tha t  the    prope r  rate    of growth for planning purposes was approximately S. 45.                Neither  party    presented
cons ultant      for    the  Virginia    Corporation Commission.      The
. rate      of  peak    growth    wa s    appro ximately    5.8%.      VEPCO recommended        tha t  the    prope r  rate    of growth for planning
-
purposes was approximately S. 45.                Neither  party    presented


30 clear    evidence    of    the  underlying factors used to develop these growth rates.
30 clear    evidence    of    the  underlying factors used to develop these growth rates.
Line 1,472: Line 855:
r
r
  !      The    Commission    concludes      that YEPco is planning neither adequate nor      efficient      electrical      genera ting    facili ties.
  !      The    Commission    concludes      that YEPco is planning neither adequate nor      efficient      electrical      genera ting    facili ties.
The    Commission    f urther concludes that YEPCO and the Public Staff present in the 1979 bearing            a  complete      analysis      of
The    Commission    f urther concludes that YEPCO and the Public Staff present in the 1979 bearing            a  complete      analysis      of e xpected  loa ds    and    required    generation for VEPCO through 1993.
  -
The    Commission    concludes that it is reasonable to expect that the planned reduction in annual growth rates for Duke and    CPSL  will    be set      This will require that significa nt changes occur in the levels of usage and the                  time    of    that usage.      The    Consission        now    has    underway      extensi ve exp eriaents    in  ti me-of-da y    pricing      and  load    management techin ques.      The    Commission      vill intensify its efforts to
e xpected  loa ds    and    required    generation for VEPCO through
.
1993.
The    Commission    concludes that it is reasonable to expect that the planned reduction in annual growth rates for Duke
_
and    CPSL  will    be set      This will require that significa nt changes occur in the levels of usage and the                  time    of    that usage.      The    Consission        now    has    underway      extensi ve exp eriaents    in  ti me-of-da y    pricing      and  load    management
.
techin ques.      The    Commission      vill intensify its efforts to


32 promote conservation and load management and encourages                  the utilities to increase their efforts accordingly.
32 promote conservation and load management and encourages                  the utilities to increase their efforts accordingly.
Line 1,488: Line 863:


33 Commission  can  expect  and of how soon that help can reach significant proportions. These are matters  which  must    be considered ca refully in the 1979 hearing. Especially needed is better evidence on the need for generating plan ts near the end of the planning period. The 1979 hearings are being delayed to mid-year in order to give the Public Staff and othe r  parties  time    to  adequately  develop  reliable forecasting information on these satters.
33 Commission  can  expect  and of how soon that help can reach significant proportions. These are matters  which  must    be considered ca refully in the 1979 hearing. Especially needed is better evidence on the need for generating plan ts near the end of the planning period. The 1979 hearings are being delayed to mid-year in order to give the Public Staff and othe r  parties  time    to  adequately  develop  reliable forecasting information on these satters.
.
p k
p k
o
o
[
[
  -
._
%
e
e


34 CHAPTER III FO RECIST OF NATION AL AND ST ATE ECONOMIC AND DZ30 GRAPHIC GROETH A. Introduction Electricity    is  an  essen tial    inp ut to the production of g oods  and  services      by    factories,      institutions,        and commercial    establishments.        It is also used in the home to provide    services    and  ente rtain ment.        The      demand    for electricity is similar to the demand for other resources and depends upon its      price    and    the  cost,    availability,      and efficiency    of  the equipment ahich utilizes it.            The demand also depends upon costs asso ciated with            the alterna tives to electricity.      Most importan t is the level of demand for the service which electricity can          rendec. Further,      bo th  the level    of    deman d  for    the    service    and    the    costs  a nd availabilities      of  electricity      and  its    alternatives      are influenced by the level of economic activity.
34 CHAPTER III FO RECIST OF NATION AL AND ST ATE ECONOMIC AND DZ30 GRAPHIC GROETH A. Introduction Electricity    is  an  essen tial    inp ut to the production of g oods  and  services      by    factories,      institutions,        and commercial    establishments.        It is also used in the home to provide    services    and  ente rtain ment.        The      demand    for electricity is similar to the demand for other resources and depends upon its      price    and    the  cost,    availability,      and efficiency    of  the equipment ahich utilizes it.            The demand also depends upon costs asso ciated with            the alterna tives to electricity.      Most importan t is the level of demand for the service which electricity can          rendec. Further,      bo th  the level    of    deman d  for    the    service    and    the    costs  a nd availabilities      of  electricity      and  its    alternatives      are influenced by the level of economic activity.
The  Public  Staff    Report    presented    the    results of the November 1977      forecast    of    econcadc    conditions      in  North Carolina, which was completed by economists in the Office of State Budget and Management of the North Carolina Department of    Administration.      This    forecast    for the 14-year period I 977-l 990 utilized    an  econometric      model    of  the    State's economy.      This    model    was  developed    by    Budget    Office econoeists    in  conjunction      with  consultants        from    Da ta
The  Public  Staff    Report    presented    the    results of the November 1977      forecast    of    econcadc    conditions      in  North Carolina, which was completed by economists in the Office of State Budget and Management of the North Carolina Department of    Administration.      This    forecast    for the 14-year period I 977-l 990 utilized    an  econometric      model    of  the    State's economy.      This    model    was  developed    by    Budget    Office econoeists    in  conjunction      with  consultants        from    Da ta
                                                              .


35 Besources,      Inc.,    a  national consulting firm in Lexington, Massachusetts.        A f orecast of the national economy to 1990, which    had    been made by Dat a Resources in the f all of 1977, served as the foundation            of    the  North  Carolina    economic forecast.
35 Besources,      Inc.,    a  national consulting firm in Lexington, Massachusetts.        A f orecast of the national economy to 1990, which    had    been made by Dat a Resources in the f all of 1977, served as the foundation            of    the  North  Carolina    economic forecast.
The Public Staff Report on the forecast is in three parts.
The Public Staff Report on the forecast is in three parts.
The first sets forth a description of the national                  forecast to    establish      the    basic assumptions of the State forecast.
The first sets forth a description of the national                  forecast to    establish      the    basic assumptions of the State forecast.
-
The    second      part    discuss es    the    historical    rela tionship between      economic      growth    in the United States and economic growth in North Carolina.            The third part presents a summary of  the    lon g-term      forecast for sorth Carolina.        As will be explained in more detail            belo w,    a  decision  was  made  to constrain      t he    econome tric    model    results in the last five years of the forecast to reflect an anticipated dampening of the    growth      ra tes of income and employment.          Thus, strictly speaking, the State economic model was followed                  only  until 1985.      The    national    forecast      from  Data  Resources    was accepted as give o throughout the en tire period 1977-( s90.
The    second      part    discuss es    the    historical    rela tionship between      economic      growth    in the United States and economic growth in North Carolina.            The third part presents a summary of  the    lon g-term      forecast for sorth Carolina.        As will be explained in more detail            belo w,    a  decision  was  made  to constrain      t he    econome tric    model    results in the last five years of the forecast to reflect an anticipated dampening of the    growth      ra tes of income and employment.          Thus, strictly speaking, the State economic model was followed                  only  until
'
1985.      The    national    forecast      from  Data  Resources    was accepted as give o throughout the en tire period 1977-( s90.
The results of these forecasts are significant because the
The results of these forecasts are significant because the
~
~
level of national and state economic activity will grea tly affect    t he    future growth in the use of electricity in this state. The Commission presents below a shortened version of
level of national and state economic activity will grea tly affect    t he    future growth in the use of electricity in this state. The Commission presents below a shortened version of the Public S taf f Report.
_
the Public S taf f Report.
-


36
36
: 3. The National Forecast Real  growth  in  the    gross  national      product    (GNP)    is expected to occur at a faster rate in the              period    1977-1935 than    in the period 1985-1990.      In the 1977-1985 period, the average annual rate of growth in real GNP is expected to                  be 4%; in the 1985-1990 period, that rate of growth is expected to  average  abcut    3%.      The    difference        reflects    the expectation    that underlying conditions will be different in the two periods.      The    forecast  assumes      that    the  current levels    of  plant    capacity and unemployn:ent are not at full utilization.      The slack in the      economy      is  assumed    to  be gradually    absorbed    so  that,  by  1956,      the  economy will operate at full employment of both          capital      and  labor  and will    continue  to  operate    at that leve1 to the end of the
: 3. The National Forecast Real  growth  in  the    gross  national      product    (GNP)    is expected to occur at a faster rate in the              period    1977-1935 than    in the period 1985-1990.      In the 1977-1985 period, the average annual rate of growth in real GNP is expected to                  be 4%; in the 1985-1990 period, that rate of growth is expected to  average  abcut    3%.      The    difference        reflects    the expectation    that underlying conditions will be different in the two periods.      The    forecast  assumes      that    the  current levels    of  plant    capacity and unemployn:ent are not at full utilization.      The slack in the      economy      is  assumed    to  be gradually    absorbed    so  that,  by  1956,      the  economy will operate at full employment of both          capital      and  labor  and will    continue  to  operate    at that leve1 to the end of the forecast period.      As increased production absorbs the excess industrial    capacity    in  the .early    period 1977-1985, real growth will be      higher    than  long-term      trend    levels. In addition,    the labor force growth rate and the capital s~ack growth rate will slow down over          the  forecast      period  and, consequently,      the  long-te==t growth rate will decline.          The increasing participation of women in the              labor    force  only partly offsets the decline in the labor force growth rate.
_
forecast period.      As increased production absorbs the excess industrial    capacity    in  the .early    period 1977-1985, real growth will be      higher    than  long-term      trend    levels. In addition,    the labor force growth rate and the capital s~ack growth rate will slow down over          the  forecast      period  and, consequently,      the  long-te==t growth rate will decline.          The increasing participation of women in the              labor    force  only partly offsets the decline in the labor force growth rate.
The    severity of the 1974-1975 recession and the increased uncertainty about business conditions have slowed the growth rate of investment since 1975 and is expected to continue a dampen investment      plans.      The  rate  of      increase  of  the
The    severity of the 1974-1975 recession and the increased uncertainty about business conditions have slowed the growth rate of investment since 1975 and is expected to continue a dampen investment      plans.      The  rate  of      increase  of  the


Line 1,525: Line 887:
expenditure requirements in the area of pollution              abatement are    expected  to  absorb funds that earlier would have gone into investments to expand productive capacity.
expenditure requirements in the area of pollution              abatement are    expected  to  absorb funds that earlier would have gone into investments to expand productive capacity.
Prices    are  forecast    to  increase  at  fairly high rates throughout the period, but the forecast shows a            pattern    of declining    rates  of    increase. From  an inflation rate of
Prices    are  forecast    to  increase  at  fairly high rates throughout the period, but the forecast shows a            pattern    of declining    rates  of    increase. From  an inflation rate of
'
;
;
around 65 as of February 1978, the forecast shows            a    fairly
around 65 as of February 1978, the forecast shows            a    fairly continuous decline in inflation rates to 1990, at which time the rate of growth of the        Consumer  Price    Index    (CPI)    is expected    to  be in the neighborhood of 4%.        The persistence of inflation      in  the    forecast    is  predica ted  on    several assumptions, as follows:
  .
continuous decline in inflation rates to 1990, at which time the rate of growth of the        Consumer  Price    Index    (CPI)    is expected    to  be in the neighborhood of 4%.        The persistence of inflation      in  the    forecast    is  predica ted  on    several assumptions, as follows:
,
(a)  Energy  prices will coatinue to increase ahead of the
(a)  Energy  prices will coatinue to increase ahead of the
~
~
general price level,'sveraging 13.C% through 1980, and                then will    moderate    toward    the rate of increase for the general price level, but will never get below a 65 annual rate;
general price level,'sveraging 13.C% through 1980, and                then will    moderate    toward    the rate of increase for the general price level, but will never get below a 65 annual rate; (b)  Energy  prices will contribute at least an additional percentage      point  to    the  inflation  rate    throughout    the forecast; and
-
(b)  Energy  prices will contribute at least an additional
.
percentage      point  to    the  inflation  rate    throughout    the forecast; and


38 (c)    Wage  settlements will continue to be in the range of 7 1/2:: to 9 1/2%.
38 (c)    Wage  settlements will continue to be in the range of 7 1/2:: to 9 1/2%.
Line 1,544: Line 898:
Growth in nonmanufacturing employment            is    forecast    to    be
Growth in nonmanufacturing employment            is    forecast    to    be


    .
39 grester than growth in        manufacturing      employment,    but  the
39 grester than growth in        manufacturing      employment,    but  the
   ,    difference      is not expected to be as great as it has been in the last 15 years.
   ,    difference      is not expected to be as great as it has been in the last 15 years.
Past trend.s in the composition of industrial expansion are continued in the forecast wi th a few exceptions. In dus trial production is forecast to grow at an annual average rate of 5.3% through      1985. The    changing    age  structure    of  the popula tion    is  fo recast    to    boost  the  rate  of household formation in the 1980's, and this trend is            strengthened    by the    trend  towa rd    single individuals establishing separate households.      The increasing affluence of        these  middle-aged
Past trend.s in the composition of industrial expansion are continued in the forecast wi th a few exceptions. In dus trial production is forecast to grow at an annual average rate of 5.3% through      1985. The    changing    age  structure    of  the popula tion    is  fo recast    to    boost  the  rate  of household formation in the 1980's, and this trend is            strengthened    by the    trend  towa rd    single individuals establishing separate households.      The increasing affluence of        these  middle-aged
   ~
   ~
households    is  forecast      to    result  in  strong demands for
households    is  forecast      to    result  in  strong demands for housing,      travel,    recreation,        med ical  services,    home
,
housing,      travel,    recreation,        med ical  services,    home
;      furnis hings,      and  nona u tomotive    durables  throughout    the 1980's. The only significant break with past trends is that th e  automobile industry is not forecast to grew as strongly as it has in the recent past.
;      furnis hings,      and  nona u tomotive    durables  throughout    the 1980's. The only significant break with past trends is that th e  automobile industry is not forecast to grew as strongly as it has in the recent past.
C. Historical Comparisons Between the Economies of the United States and North Carolina An  exa mina tion  of    the    16 years from 196l to 1976 gives some perspective on the relationship between growth in the
C. Historical Comparisons Between the Economies of the United States and North Carolina An  exa mina tion  of    the    16 years from 196l to 1976 gives some perspective on the relationship between growth in the
~
~
national      economy    and growth in the North Carolina economy.
national      economy    and growth in the North Carolina economy.
.
The economy of North Carolina has been growing more rapidly than    the  national    economy.      Annual population growth has been marginally higher in North Carolina than in the nation, ha ving    averaged    1.l4%    in    North Carolina as compared with
The economy of North Carolina has been growing more rapidly than    the  national    economy.      Annual population growth has been marginally higher in North Carolina than in the nation, ha ving    averaged    1.l4%    in    North Carolina as compared with


40
40
: 1. I i 5 for the nation.      !!overer, total annual nonagricultural em ploy ment    growth    in  the  (96(-1976 period has averaged a f ull percentage point higher in llorth Carolina than                in  the na tion:    3.45    compared    to  2.45. The movement away from
: 1. I i 5 for the nation.      !!overer, total annual nonagricultural em ploy ment    growth    in  the  (96(-1976 period has averaged a f ull percentage point higher in llorth Carolina than                in  the na tion:    3.45    compared    to  2.45. The movement away from a gricultural employment occurred            later    in    North  Carolina than    in  the  United      States. This fact, together with the rapid      growth    in    the  labor  force    in    North    Carolina, especially      among women, ac=ounts for the difference between popula tion growth and employment growth              in  North  Carolina and in the nation as a wholm.
                                                                                ,
a gricultural employment occurred            later    in    North  Carolina than    in  the  United      States. This fact, together with the rapid      growth    in    the  labor  force    in    North    Carolina, especially      among women, ac=ounts for the difference between popula tion growth and employment growth              in  North  Carolina and in the nation as a wholm.
The    labor    force    for manufacturing in Barth Carolina has gr own at triple the rate of that in the United States,                  2.65 av erag e    ananal      growth    compared      to    0.85.      In  the monaanufacturing categories of            e xployment,    North  Carolina averaged a 1 % higher growth rate than did the United States:
The    labor    force    for manufacturing in Barth Carolina has gr own at triple the rate of that in the United States,                  2.65 av erag e    ananal      growth    compared      to    0.85.      In  the monaanufacturing categories of            e xployment,    North  Carolina averaged a 1 % higher growth rate than did the United States:
4%    compared    to    3%. Thus,  Barth    Carolina    has    become increasingly        more depende at on manufacturing in 'the last 16 years and the United States has become less so. Within the manufacturing        sector, growth in nondurable goods employment increased three times faster in North Carolina than                  in    the United      Sta tes:    3.05    coupared    to I.I5. Annual growth in noedurable goods employment in North Carolina outpaced                    the United States: 2. 4% compared to 0.55.
4%    compared    to    3%. Thus,  Barth    Carolina    has    become increasingly        more depende at on manufacturing in 'the last 16 years and the United States has become less so. Within the manufacturing        sector, growth in nondurable goods employment increased three times faster in North Carolina than                  in    the United      Sta tes:    3.05    coupared    to I.I5. Annual growth in noedurable goods employment in North Carolina outpaced                    the United States: 2. 4% compared to 0.55.
The    rapid    growth    of  manufacturing      employment in North Carolina can be attributed to a t least four factors.                  First, the    shift    from    fara    employment,    which    gained  somentua
The    rapid    growth    of  manufacturing      employment in North Carolina can be attributed to a t least four factors.                  First, the    shift    from    fara    employment,    which    gained  somentua


  -
41 throughout the 1950's, created a            large    pool  of  po ten tial manu f a cturing    e mployees.      This    movement was reinforced by the relatively lov employment in              the    rural  areas    of    the State.      Second, the investment in roads in North Carolina in the late 1950's and early 1960's opened up the                  rural    areas for      industrial      de velop men t,    cr eating    an  abundance      of relatively inexpensive open space for new                plant    locations.
41 throughout the 1950's, created a            large    pool  of  po ten tial manu f a cturing    e mployees.      This    movement was reinforced by the relatively lov employment in              the    rural  areas    of    the State.      Second, the investment in roads in North Carolina in the late 1950's and early 1960's opened up the                  rural    areas for      industrial      de velop men t,    cr eating    an  abundance      of relatively inexpensive open space for new                plant    locations.
Third,    the traditional industries in North Carolina, lumber and    wood,    f urniture,    and    te xtil es,    creat ed    a    videly dispersed ne twork of viable small towns which have served as nuclei for new industrial development throughout the                    S ta te.
Third,    the traditional industries in North Carolina, lumber and    wood,    f urniture,    and    te xtil es,    creat ed    a    videly dispersed ne twork of viable small towns which have served as nuclei for new industrial development throughout the                    S ta te.
Finally,      the central loca tion of Ecrth Carolina between the grea t northeastern markets a nd the surging southern                markets has    made    it  an    at tractiv e    location for manufacturers of consumer goods.
Finally,      the central loca tion of Ecrth Carolina between the grea t northeastern markets a nd the surging southern                markets has    made    it  an    at tractiv e    location for manufacturers of consumer goods.
Th e    rapid  growth    in  employment      opportunities in North Ca rolina, the increasing labor            force    participation      ra tes, and    the    growth    of  higher wage, consumer goods industries
Th e    rapid  growth    in  employment      opportunities in North Ca rolina, the increasing labor            force    participation      ra tes, and    the    growth    of  higher wage, consumer goods industries
_    have all combined to produce a higher rate of growth in                      per capita      personal    i ncome    in North Carolina than that in the
_    have all combined to produce a higher rate of growth in                      per capita      personal    i ncome    in North Carolina than that in the na ti on. In real terms, per capita income grew at an average annual rate of 4.0% in North Carolina between 1961 and 1976, whereas the same measure averaged a 2.9% rate of                  gro wth    in the    United S tates.      Comparative data on housing starts, car sa les, bank deposits, a nd        re tail    sales    all  confirm      that growth in North Carolina has proceeded at a faster pace than in the nation.
  -
na ti on. In real terms, per capita income grew at an average annual rate of 4.0% in North Carolina between 1961 and 1976, whereas the same measure averaged a 2.9% rate of                  gro wth    in the    United S tates.      Comparative data on housing starts, car sa les, bank deposits, a nd        re tail    sales    all  confirm      that growth in North Carolina has proceeded at a faster pace than in the nation.


42 is rapidly as economic activity in North Carolina has been growing relative to activity          in  the    nation,    the  state's level    of  economic    welfare remains significantly below the national level.      In 1976 per capita income in North Carolina was  85%    of  the comparable national figure; in l960 it was 7l%. The same kind of relationship between            North    Carolina and  the    nation can be observed in other areas from housing starts per person to expenditures per            pupil  in    education.
42 is rapidly as economic activity in North Carolina has been growing relative to activity          in  the    nation,    the  state's level    of  economic    welfare remains significantly below the national level.      In 1976 per capita income in North Carolina was  85%    of  the comparable national figure; in l960 it was 7l%. The same kind of relationship between            North    Carolina and  the    nation can be observed in other areas from housing starts per person to expenditures per            pupil  in    education.
Line 1,581: Line 926:
However,    in  order    to  reflect  the    decele ration    of  the catching    up process, lower growth rates than those obte.ined from the model were imposed on          economic    variables    in  the period    1985-1990.      Q uite  clearly,    there is an element of catching    up  in  the    recent  North    Cr.rolina    development experience.      Growth    has been especially rapid in the areas
However,    in  order    to  reflect  the    decele ration    of  the catching    up process, lower growth rates than those obte.ined from the model were imposed on          economic    variables    in  the period    1985-1990.      Q uite  clearly,    there is an element of catching    up  in  the    recent  North    Cr.rolina    development experience.      Growth    has been especially rapid in the areas


  -
43 of  durable      ma nuf act ures,    e xcluding      furniture ;      in      the mondurable      areas    of    chemicals      and    rubber;    and    in    the nomaanufacturing areas of finance, insurance,                    real    estate, state    and local governments, services, and trade.                  For some manuf acturing industries, initial levels                  of  em ploy men t    in the    early    1960's      were    so very small that modest absolute increases in employment in these                categories      produced      ve ry f
43 of  durable      ma nuf act ures,    e xcluding      furniture ;      in      the
.
mondurable      areas    of    chemicals      and    rubber;    and    in    the nomaanufacturing areas of finance, insurance,                    real    estate, state    and local governments, services, and trade.                  For some manuf acturing industries, initial levels                  of  em ploy men t    in the    early    1960's      were    so very small that modest absolute increases in employment in these                categories      produced      ve ry f
high, and probably unsustainable, annual percentage rates of grow th . The model equations in these areas picked up                    the se high    ra tes    of  g rowth    and projected them into the future.
high, and probably unsustainable, annual percentage rates of grow th . The model equations in these areas picked up                    the se high    ra tes    of  g rowth    and projected them into the future.
However, there vill almost certainly be a slowing                    in    these 1
However, there vill almost certainly be a slowing                    in    these 1
rates      of    growth      in  the    future    as    the  proportion        of employment in these industries in sorth csrolina                    reaches      a balance    with the market opportunities in North Carolina and 4
rates      of    growth      in  the    future    as    the  proportion        of employment in these industries in sorth csrolina                    reaches      a balance    with the market opportunities in North Carolina and 4
adjacent      areas.      A    simila r    argument      applies      in      the nonaanufacturing          areas.      It    was  a  matter    of    inf ormed judgment to determine at            wha t    point    in  the  forecast        to override      the model results, and a decision was made to make that point the year 1985.
adjacent      areas.      A    simila r    argument      applies      in      the nonaanufacturing          areas.      It    was  a  matter    of    inf ormed judgment to determine at            wha t    point    in  the  forecast        to override      the model results, and a decision was made to make that point the year 1985.
.
The    Pub lic    S taff    Report    of  the Budget Office forecast
The    Pub lic    S taff    Report    of  the Budget Office forecast
.. indica tes that population in North Carolina is                  expected        to increase      at  a    1.2%    ann ual    average    rate    throughout the f orecast period.        This    compares      with    the  Data    Resources forecast of 0.9% annual growth in population for the na tion.
.. indica tes that population in North Carolina is                  expected        to increase      at  a    1.2%    ann ual    average    rate    throughout the f orecast period.        This    compares      with    the  Data    Resources forecast of 0.9% annual growth in population for the na tion.
The    forecast for employmen t growth to 1985 indica tes that past trends will        be    accelerating.          Total  nonagricultural
The    forecast for employmen t growth to 1985 indica tes that past trends will        be    accelerating.          Total  nonagricultural


44
44 employment is forecast to increase at an annoal average rate o f 4. l %  from    1977    to  1995.      Continued      decline    in    the unemployment        rate,    furthec    shrinka ge      in the agricultural sector, and some        increases    in    labor    force    participa tion rates    enable    total    nona gricultural        labor force growth to outpace      population      growth.      Within      the    nonagrienitural employment category, maanfacturing employment is forecast to grow at an annual average rate of 3.6%, and nonmanufacturing employment      is  fo recast    to  gram      at a 4.3% average annua.1 rate.      Thus, North Carolina is being forecast to follow                  the national      trend    toward  boccaing      a    acre  service-oriented economy.        Within    the  manufacturing        employment    category, durable      goods    industries    are    forecast      to increase their employment at twice the growth rate of the nond".rable                    goods indust ries-      durable goods employment is forecast to grow at an average annual rate of 5.65 and nondurable                  goods    at  an average      annual    rate of 2.7%.      Thus, the "burdent al' groeth is placed on the never industries in North                Carolina,      e. g. ,
                                                            .
employment is forecast to increase at an annoal average rate o f 4. l %  from    1977    to  1995.      Continued      decline    in    the unemployment        rate,    furthec    shrinka ge      in the agricultural sector, and some        increases    in    labor    force    participa tion rates    enable    total    nona gricultural        labor force growth to outpace      population      growth.      Within      the    nonagrienitural employment category, maanfacturing employment is forecast to grow at an annual average rate of 3.6%, and nonmanufacturing employment      is  fo recast    to  gram      at a 4.3% average annua.1 rate.      Thus, North Carolina is being forecast to follow                  the national      trend    toward  boccaing      a    acre  service-oriented economy.        Within    the  manufacturing        employment    category, durable      goods    industries    are    forecast      to increase their employment at twice the growth rate of the nond".rable                    goods indust ries-      durable goods employment is forecast to grow at an average annual rate of 5.65 and nondurable                  goods    at  an average      annual    rate of 2.7%.      Thus, the "burdent al' groeth is placed on the never industries in North                Carolina,      e. g. ,
electric al machinery, stone, clay, glass, fabricated metals, instru ments, and nonelect=ic          machinery.        These    industries are    forecast    to  grow  quickly      at the national level, and North Carolina should continne            to    increase      its  share    of e m ploy ment    in  these    industries      because of its continuing locatianal a4vantageu.
electric al machinery, stone, clay, glass, fabricated metals, instru ments, and nonelect=ic          machinery.        These    industries are    forecast    to  grow  quickly      at the national level, and North Carolina should continne            to    increase      its  share    of e m ploy ment    in  these    industries      because of its continuing locatianal a4vantageu.
Real    per  capita income is forecast to groy at an average annual rate of 3.8%        from    1977    to    l985. The comparable forecast      for  the United States is .3.3%. From 1985 to 1990
Real    per  capita income is forecast to groy at an average annual rate of 3.8%        from    1977    to    l985. The comparable forecast      for  the United States is .3.3%. From 1985 to 1990


45
45 the ra te of g ro wth of      real    per    capita  income    for  North Carolina      is  forecast to be an a verage annual rate of 3 1 %,
.
the ra te of g ro wth of      real    per    capita  income    for  North
-
Carolina      is  forecast to be an a verage annual rate of 3 1 %,
whereas the national forecast is for an average annual                  rate of    2.7%. Total real personal income is forecast to grow at an annual rate of 5.0% through 1985 and at an annual rate of 4.3% during the 1985-1990 pe rio d.            The same forces operating
whereas the national forecast is for an average annual                  rate of    2.7%. Total real personal income is forecast to grow at an annual rate of 5.0% through 1985 and at an annual rate of 4.3% during the 1985-1990 pe rio d.            The same forces operating
. at the national level will tend            to  slow  North    Carolina's growth in the mid- 198 0 's and la te- 198 0 's.        Real retail sales are expected to grow at an annual average rate                of  4.7%    to 1985    and  at  an  annu al    average rate of 4 1% from 1985 to 1990.
. at the national level will tend            to  slow  North    Carolina's growth in the mid- 198 0 's and la te- 198 0 's.        Real retail sales are expected to grow at an annual average rate                of  4.7%    to 1985    and  at  an  annu al    average rate of 4 1% from 1985 to 1990.
E. Conclusion In  summary,    the  forecast      for  North  Carolina over the period 1976 to 1990,        as    set  forth    in  the  Public    Staff Re po rt ,  is that the grow th trends established in the period 1960 to 1976 will continue          but    not  at  the  same    le vels.
E. Conclusion In  summary,    the  forecast      for  North  Carolina over the period 1976 to 1990,        as    set  forth    in  the  Public    Staff Re po rt ,  is that the grow th trends established in the period 1960 to 1976 will continue          but    not  at  the  same    le vels.
North      Carolina    vill continue tc grow more rapidly than the nation but the dif ferences in growth            rates  will    diminish.
North      Carolina    vill continue tc grow more rapidly than the nation but the dif ferences in growth            rates  will    diminish.
As the levels of economic welfare in North Carolina approach national levels, s ome mode ra ting in the State's growth                rate
As the levels of economic welfare in North Carolina approach national levels, s ome mode ra ting in the State's growth                rate is expected.
_
is expected.
The national forecast of strong growth in industries which are    not    raw  mate rial    orie n ted ,  such  as    nonantomotive consumer durables, plastics, and electronics, bodes well f or North Carolina.        These  industries      have  located    in  North Carolina      in  the past to take advantage of the availability
The national forecast of strong growth in industries which are    not    raw  mate rial    orie n ted ,  such  as    nonantomotive consumer durables, plastics, and electronics, bodes well f or North Carolina.        These  industries      have  located    in  North Carolina      in  the past to take advantage of the availability


Line 1,617: Line 950:


47 CHAPTER IV LONG-T ERB ELECTRIC ENERGY AND PEAK-LOAD FORECAST
47 CHAPTER IV LONG-T ERB ELECTRIC ENERGY AND PEAK-LOAD FORECAST
: 1. Introduction The    Public    staff    of    the    North    Carolina    U tilities commission presented the most complete and detailed                  set    of studies    on  the long-term forecast of electric energy sales
: 1. Introduction The    Public    staff    of    the    North    Carolina    U tilities commission presented the most complete and detailed                  set    of studies    on  the long-term forecast of electric energy sales and    the  growth    in  peak    loa d    in  North  Carolina.      The Commission 's    own  forecasts      are derived from the forecasts made by the Public Staf f.        Bajor emphasis was placed on          the
  -
and    the  growth    in  peak    loa d    in  North  Carolina.      The Commission 's    own  forecasts      are derived from the forecasts made by the Public Staf f.        Bajor emphasis was placed on          the
       " base  case" with significan t downward adjustment to ceflect the Commission's consideration of the effects of                the  " load ma na ge ment"  and  "conservationa        scenarios.      This    chapter examin es    the  studies    of  the    Public  Staff,    Duke  Po wer Compan y,    Carolina    Power G Light company, Virginia Electric and Power Company, and the va rious            in tervenors  and .public witnesses      whose      testimony      influenced    the  Commission's u
       " base  case" with significan t downward adjustment to ceflect the Commission's consideration of the effects of                the  " load ma na ge ment"  and  "conservationa        scenarios.      This    chapter examin es    the  studies    of  the    Public  Staff,    Duke  Po wer Compan y,    Carolina    Power G Light company, Virginia Electric and Power Company, and the va rious            in tervenors  and .public witnesses      whose      testimony      influenced    the  Commission's u
decisions. Bajor considerations leading to the Commission's
decisions. Bajor considerations leading to the Commission's conclu sion that the " base case" forecast would not occur and leading to the C ommission's          ul timate    reduced    load    growth
.
  -_  e xpectations    are  co nt ained    in    Chapter    YI,  " Outlook f or Conservation and Load Bana gement; A            Survey  of  Alternative Energy Sources."
conclu sion that the " base case" forecast would not occur and leading to the C ommission's          ul timate    reduced    load    growth
  -_  e xpectations    are  co nt ained    in    Chapter    YI,  " Outlook f or Conservation and Load Bana gement; A            Survey  of  Alternative
''
Energy Sources."
    -
B. The Use of Econometric Analysis
B. The Use of Econometric Analysis
_        The basis of econometric forecastin g is the formulation of historical models of electricity consumption.                Within    these
_        The basis of econometric forecastin g is the formulation of historical models of electricity consumption.                Within    these
Line 1,648: Line 974:
: 4. No dramatic change in energ y-related technology;
: 4. No dramatic change in energ y-related technology;
: 5. A    continua tion    of  the present form of rate design; and
: 5. A    continua tion    of  the present form of rate design; and
: 6. No    direct  conside ra tion    for  possible    ener gy    a nd pe ak-loa d    reduc tions  due    to  c on se rr- tion programs      and
: 6. No    direct  conside ra tion    for  possible    ener gy    a nd pe ak-loa d    reduc tions  due    to  c on se rr- tion programs      and policies, system load management, and peak-load pricing.
'
The      Pu blic  S taff  base    case  forecast    was    gene rally consistent with the 28th A nnugl Electrical Industrv Porecast (Elect rical    World,    September    15, 1977), which is based on
policies, system load management, and peak-load pricing.
The      Pu blic  S taff  base    case  forecast    was    gene rally consistent with the 28th A nnugl Electrical Industrv Porecast
.
(Elect rical    World,    September    15, 1977), which is based on


50 similar assumptions.        The 1978 Electri_ cal World forecast          is lower    than    the  1977 forecast:      the average annual rate of growth in peah inad for the nation is            now  forecast      to  be only  5.0%    until    1985,    then dropping to 4.6% by 1995.            In each of the energy sales sectors,            the  tyc    North    Carolina companies    have    historically      grown    more  rapidly than the industry as a whole.        This    relationship      should    certainly continue    for  the  1976-1990    pe riod ,  given    the    probable outlook f or economic growth in the Caroli tas.
50 similar assumptions.        The 1978 Electri_ cal World forecast          is lower    than    the  1977 forecast:      the average annual rate of growth in peah inad for the nation is            now  forecast      to  be only  5.0%    until    1985,    then dropping to 4.6% by 1995.            In each of the energy sales sectors,            the  tyc    North    Carolina companies    have    historically      grown    more  rapidly than the industry as a whole.        This    relationship      should    certainly continue    for  the  1976-1990    pe riod ,  given    the    probable outlook f or economic growth in the Caroli tas.
Line 1,660: Line 982:
Duke's    forecast    of    future peak loads and sales included several na jor assumptions.        First,    Duke    assnaed    that    its service    area  vill    continue    to grow, especially since the governments of North        and  south    Carolina    are    encouraging industrial    growth. However, as Duke witnesses pointed out, the econcay of D uka's service        area    vill    grow    at  a    acre moderate    rate compared with the fast pace of the 1960's and early 1970's; customers will contribute to the lower                  growth by  continuing      their  conse rva tion    efforts and by adopting Duke 's suggestious for load        napagesent    programs.      Second,
Duke's    forecast    of    future peak loads and sales included several na jor assumptions.        First,    Duke    assnaed    that    its service    area  vill    continue    to grow, especially since the governments of North        and  south    Carolina    are    encouraging industrial    growth. However, as Duke witnesses pointed out, the econcay of D uka's service        area    vill    grow    at  a    acre moderate    rate compared with the fast pace of the 1960's and early 1970's; customers will contribute to the lower                  growth by  continuing      their  conse rva tion    efforts and by adopting Duke 's suggestious for load        napagesent    programs.      Second,


51
51 Duke's      fo recast    assumed      that  there    will  not  be    an extraordinary conversion f rom fossil fuels              to  electricity.
.-
Duke's      fo recast    assumed      that  there    will  not  be    an extraordinary conversion f rom fossil fuels              to  electricity.
Duke    made    sales  projections      for  a  number    of different classes of customers and utilized more than one                methon    for each    group      whenever      possible.      The  methods    involved projecting      the  usage    per    custcaer    and  the  nunber      of customers,      rela tion ships      between    sales    and  economic variables, and historical growth patterns.              The  projec tions were first made including the ef fect of load management that has already occurred.        Ad j ust me nts  to  the  sales    forecast were    then    made for the effects on sales of additional load ma na ge ment. The sum of D uke 's sales pr .*jections by customer classes    yields    the  forecast of company regular sales that are set forth in Table 9.
Duke    made    sales  projections      for  a  number    of different classes of customers and utilized more than one                methon    for each    group      whenever      possible.      The  methods    involved projecting      the  usage    per    custcaer    and  the  nunber      of customers,      rela tion ships      between    sales    and  economic variables, and historical growth patterns.              The  projec tions were first made including the ef fect of load management that has already occurred.        Ad j ust me nts  to  the  sales    forecast were    then    made for the effects on sales of additional load ma na ge ment. The sum of D uke 's sales pr .*jections by customer classes    yields    the  forecast of company regular sales that are set forth in Table 9.
,    TEPCO's current energy forecast for the years 1977-1987 is sh own on Table 10.      The compound annual kilowatt-hour growth rate    for    this  pe riod  is 6.61.      Little explanation of the underlying methodologies was given by the company.
,    TEPCO's current energy forecast for the years 1977-1987 is sh own on Table 10.      The compound annual kilowatt-hour growth rate    for    this  pe riod  is 6.61.      Little explanation of the underlying methodologies was given by the company.
C. Forecast of Electricity Sales t2 R esidential C ustomers In    its bsse case, the Public Staff forecasted residential sales for CPSL and Du ke, as follows:
C. Forecast of Electricity Sales t2 R esidential C ustomers In    its bsse case, the Public Staff forecasted residential sales for CPSL and Du ke, as follows:


                                            .
Carolina Power p I.icht Company - Besidential Sales t976factua1)            1985          I990        g GHH . ales              6 ,4 91          l 0,7 22      14,024        15,6{4
Carolina Power p I.icht Company - Besidential Sales t976factua1)            1985          I990        g GHH . ales              6 ,4 91          l 0,7 22      14,024        15,6{4
% Rate of grovth                  5. 7%            5. 5%        5.5%
% Rate of grovth                  5. 7%            5. 5%        5.5%
Line 1,673: Line 992:
% Rate of growth                  5.45              5.55          5.5%
% Rate of growth                  5.45              5.55          5.5%
The  analytical    ap proach    used    by  the    Public      Staff to forecast the demand for electricity by residential customers eas.  .to    estimate      econone tric        models      of  residential electricity demand using multiple regression analysis.                      The residential    forecast , was      based on the assumption that the residential demand for electricity is. basically                  a    function of  se veral  economic      variables,      including      the    number of residential customers, % real price                of  electricity ,      and the    amount    of    real    income    available        to  residential customers.
The  analytical    ap proach    used    by  the    Public      Staff to forecast the demand for electricity by residential customers eas.  .to    estimate      econone tric        models      of  residential electricity demand using multiple regression analysis.                      The residential    forecast , was      based on the assumption that the residential demand for electricity is. basically                  a    function of  se veral  economic      variables,      including      the    number of residential customers, % real price                of  electricity ,      and the    amount    of    real    income    available        to  residential customers.
                                                                                .
The  Public  S taff    use d    multiple reg'ession r        models which describe the determinants of residential elechricity                    demand to  derire estimates of the isclated effects that changes in particular variables have          on  the    residential      demand    for ele ctricity.      Long-run      elasticities      of    these    variables (e.g. , the real average price of electricity,. real. personal income , and seasonally adjusted real retail sales) were used with the forecast growth rates of the              variables        to  obtain
The  Public  S taff    use d    multiple reg'ession r        models which describe the determinants of residential elechricity                    demand to  derire estimates of the isclated effects that changes in particular variables have          on  the    residential      demand    for ele ctricity.      Long-run      elasticities      of    these    variables (e.g. , the real average price of electricity,. real. personal income , and seasonally adjusted real retail sales) were used with the forecast growth rates of the              variables        to  obtain


Line 1,679: Line 997:
In    order    to  check the reasonableness of the econometric fore ca st,    the    P ublic    S taff      investigated      several noneconometric        forecasts.      Basically,      these    forecasts consisted of perforning linear          and    e xponential    trends  on historical      data,    su:h as:  the number of customers, actual energy sales, actual peak load, historical average                use  per customer,      and  a ppliance  sa tura tion.      Table  ll shows the 4
In    order    to  check the reasonableness of the econometric fore ca st,    the    P ublic    S taff      investigated      several noneconometric        forecasts.      Basically,      these    forecasts consisted of perforning linear          and    e xponential    trends  on historical      data,    su:h as:  the number of customers, actual energy sales, actual peak load, historical average                use  per customer,      and  a ppliance  sa tura tion.      Table  ll shows the 4
re sults    of  the  Public    Staff  residential      noneconome tric energy      forecasts. These results support the results of the econometric forecasts.
re sults    of  the  Public    Staff  residential      noneconome tric energy      forecasts. These results support the results of the econometric forecasts.
Carolina Power E Licht Compa ny
Carolina Power E Licht Compa ny To f orecast residential energy usage, CPCL first estimated the total number of customers tha t would be on its system in the future.        Since the total nuater of residential customers on CPSL's system correlated closely with the total number of housing      and    mobile    home  units    in    the na tion , CPSL used projections of the future totr i national number                of  housing and mobile hore units to rotecast the total system number of future residential customers.
.
To f orecast residential energy usage, CPCL first estimated the total number of customers tha t would be on its system in the future.        Since the total nuater of residential customers
-
on CPSL's system correlated closely with the total number of housing      and    mobile    home  units    in    the na tion , CPSL used projections of the future totr i national number                of  housing and mobile hore units to rotecast the total system number of future residential customers.


54 within    the  reside ntial    sector, CPSL's largest number of customers is in the class which uses electric water                  hea ters but  does    not use electric hea t.        In order to deternine the relative proportions of each type of              residential      customer, OPSL  correla ted    the    historical      rate    of growth of " water heated onlya residential customers to the              total    number    of housing    units    and mobile homes.        Using projections for the total number of housing units and mobile              homes    for    future years,    and    assuming    that the rate of growth of this class customer would follow historical pa2 tarns, CPCL was able                  to forecast    the  total    number    of    residential customers with electric water heaters but without electric                heat. It  was assumed    that a large portion of those residential customers presently using      natural    gas    would    continue      to  have  it
54 within    the  reside ntial    sector, CPSL's largest number of customers is in the class which uses electric water                  hea ters but  does    not use electric hea t.        In order to deternine the relative proportions of each type of              residential      customer, OPSL  correla ted    the    historical      rate    of growth of " water heated onlya residential customers to the              total    number    of housing    units    and mobile homes.        Using projections for the total number of housing units and mobile              homes    for    future years,    and    assuming    that the rate of growth of this class customer would follow historical pa2 tarns, CPCL was able                  to forecast    the  total    number    of    residential customers with electric water heaters but without electric                heat. It  was assumed    that a large portion of those residential customers presently using      natural    gas    would    continue      to  have  it available,    even with the curtailment of natural gas.                These customers    re prese nt  a  large    preportion      of  minimum    use electric      custome rs.      The ref ore ,    the    total    number  of customers    in  this    class    was  assumed      to    decline    only slight ly.      (5 absequent even ts ha ve shown that prediction to be a good one.      The natural gas utilities          ha ve  enough    gas available    now,  due    to decreased curtallments, to actively pursue    new    residential    customers.)      By  subtractin g      the customers    in  these    two  classes      from    the total expected number  of    reside ntial    c ustomars,    CPCL    arrived    at    the forecast for the number of customers with electric heat.                  As a result of these assumptions, CPGL now expects a saturation of  electric    heating    customers of 385 by 1997.          This is an
-
available,    even with the curtailment of natural gas.                These customers    re prese nt  a  large    preportion      of  minimum    use electric      custome rs.      The ref ore ,    the    total    number  of customers    in  this    class    was  assumed      to    decline    only slight ly.      (5 absequent even ts ha ve shown that prediction to be a good one.      The natural gas utilities          ha ve  enough    gas available    now,  due    to decreased curtallments, to actively pursue    new    residential    customers.)      By  subtractin g      the customers    in  these    two  classes      from    the total expected number  of    reside ntial    c ustomars,    CPCL    arrived    at    the forecast for the number of customers with electric heat.                  As a result of these assumptions, CPGL now expects a saturation of  electric    heating    customers of 385 by 1997.          This is an
                                                                                .


55 in crea se    over    the    23%    sa t ura tion      of    electric      heating customers in 1976.
55 in crea se    over    the    23%    sa t ura tion      of    electric      heating customers in 1976.
Line 1,703: Line 1,014:
Carolina Power & Licht company - Commercial Sales 1976          1985        1990        1992 GBH Sales                  4,016          7,018        9,662      l0,979
Carolina Power & Licht company - Commercial Sales 1976          1985        1990        1992 GBH Sales                  4,016          7,018        9,662      l0,979
   % Growth rate                    6.4%          6.6%        6.6%
   % Growth rate                    6.4%          6.6%        6.6%
Duke Po wer Com pan y - Commercial Sales
Duke Po wer Com pan y - Commercial Sales 1976          1985        1990        g GWH Sales                7,987          13,959      19,2l4      2l,834
.
1976          1985        1990        g GWH Sales                7,987          13,959      19,2l4      2l,834
   % Growth rate                    6. 4 %        6.6%        6.6%
   % Growth rate                    6. 4 %        6.6%        6.6%
As    discussed    in  de tail    in the Public Staff Beport, the commercial      econ ome tric  models    used    the    following    as dependent variables:        the real average price of electricity, the real retail sales, the real price of #2 fuel oil, and                    a weather      variable.      Alter na tive    model  specifica tions were
As    discussed    in  de tail    in the Public Staff Beport, the commercial      econ ome tric  models    used    the    following    as dependent variables:        the real average price of electricity, the real retail sales, the real price of #2 fuel oil, and                    a weather      variable.      Alter na tive    model  specifica tions were
Line 1,716: Line 1,025:
59 historical avera ge          use    per  c ustome r    and    multiply    these trends      by  the    linear    trend      cf commercial customers.          As show n    in    Table    12  this    type    of  analysis    resul ted    in forecasts      which    lie between the af orementioned historical sales trends.        Table 12 aJso includes an a vera ge of all commercial      e ne rgy  estima te s    e i    the    average of the most likely estima tes.
59 historical avera ge          use    per  c ustome r    and    multiply    these trends      by  the    linear    trend      cf commercial customers.          As show n    in    Table    12  this    type    of  analysis    resul ted    in forecasts      which    lie between the af orementioned historical sales trends.        Table 12 aJso includes an a vera ge of all commercial      e ne rgy  estima te s    e i    the    average of the most likely estima tes.
Carolina Poweg G Licht Co r ea ny In order to estimate commercial customers, CPGL developed a trend which tied the growth              in    commercial      customers    to reside ntial        customers.      This    assumed      that the two growth ra tes would stay reasonably close in the future.
Carolina Poweg G Licht Co r ea ny In order to estimate commercial customers, CPGL developed a trend which tied the growth              in    commercial      customers    to reside ntial        customers.      This    assumed      that the two growth ra tes would stay reasonably close in the future.
-
As    in    the  case    of  its    residential      cust omers,    CPGL estima ted the average use per ccamercial customer                      by  using historical        data to determine the eff ects of wea ther,              growth in    the  customer      class,    price,    abnormal      usa ge    d uring December,        a nd  c on se rva tion. In    order    to project future usage, the occurrences of normal weather and a real increase in the price of electricity of 15 per year were assumed.
As    in    the  case    of  its    residential      cust omers,    CPGL estima ted the average use per ccamercial customer                      by  using historical        data to determine the eff ects of wea ther,              growth in    the  customer      class,    price,    abnormal      usa ge    d uring December,        a nd  c on se rva tion. In    order    to project future usage, the occurrences of normal weather and a real increase in the price of electricity of 15 per year were assumed.
_
Duke Power company Duke's commercial customers are served under the company's General Service Schedules (G and GA) .                    For    each    schedule, t he kilowatt-hours per customer were analyzed separately to allow adjustment for the effects                on    usage  of    changes    in ambien t      temperature        and  to calculato estimates for 1977.
Duke Power company Duke's commercial customers are served under the company's General Service Schedules (G and GA) .                    For    each    schedule, t he kilowatt-hours per customer were analyzed separately to allow adjustment for the effects                on    usage  of    changes    in ambien t      temperature        and  to calculato estimates for 1977.


Line 1,734: Line 1,041:
Carolina Power E Licht Com pa ny CPGL's      industrial        energy      forecast      was  basically      a consensus of the        estimates        of    its    customers,      i. e. ,    the company's      industrial        sales    manager      called upon its large industrial customers to learn their f uture plans.
Carolina Power E Licht Com pa ny CPGL's      industrial        energy      forecast      was  basically      a consensus of the        estimates        of    its    customers,      i. e. ,    the company's      industrial        sales    manager      called upon its large industrial customers to learn their f uture plans.
Egle Power Company Duke e s  textile      sales,    which      a mo unted    to  56%    of    its industrial energy sales in            1976,      were    forecast    using      an econometric      m odel.      This    p rcjectio n      was su pported b y t wo other models, one involving the textile production indez and the  other      using    textile      mill      consumption of fiber.          The tertile    sales    forecast      wa s    be t wee n  the    two    alter nate proj ec tions.      Sales      to  other      industrial      customers      were projected    in    two    parts:        man-made      fiber    plants,      which comprise about 22% of these sales in 1976, and the renaining group. The 1978-1979 projec tions f or man-made                fibers      were es tima ted  by    Duke 's m arketing department based on expected
Egle Power Company Duke e s  textile      sales,    which      a mo unted    to  56%    of    its industrial energy sales in            1976,      were    forecast    using      an econometric      m odel.      This    p rcjectio n      was su pported b y t wo other models, one involving the textile production indez and the  other      using    textile      mill      consumption of fiber.          The tertile    sales    forecast      wa s    be t wee n  the    two    alter nate proj ec tions.      Sales      to  other      industrial      customers      were projected    in    two    parts:        man-made      fiber    plants,      which comprise about 22% of these sales in 1976, and the renaining group. The 1978-1979 projec tions f or man-made                fibers      were es tima ted  by    Duke 's m arketing department based on expected
              .


62 KV load and hours use of          demand    for  each    customer.      The long-range      projaction        was    based      on    the    historical  '
62 KV load and hours use of          demand    for  each    customer.      The long-range      projaction        was    based      on    the    historical  '
rela tionship    be tween  Duke 8s      sales      and    the    national production of man-made fibers.
rela tionship    be tween  Duke 8s      sales      and    the    national production of man-made fibers.
The  remainder of the industrial class was projected using a  declining    growth    ra te    trend.      Duke    added      to    this proj ection    the    energy    associated with a 100 5E industrial plant that Duke expected to          start    serving    in    1981      The forecasts    of    sales    to    other classes were based on growth factors from historical trends, except for interdepartmental sales. The    la tter  sales    were    projected      based upon the experience ,of the manager in charge of the water systems.
The  remainder of the industrial class was projected using a  declining    growth    ra te    trend.      Duke    added      to    this proj ection    the    energy    associated with a 100 5E industrial plant that Duke expected to          start    serving    in    1981      The forecasts    of    sales    to    other classes were based on growth factors from historical trends, except for interdepartmental sales. The    la tter  sales    were    projected      based upon the experience ,of the manager in charge of the water systems.
F. *h Peak-Loa d Forecast
F. *h Peak-Loa d Forecast The  Public    Staff    ande its estimates of abase-case          a peak demand by utilizing three independent              but    closely    related forecast methods.        First, a peak forecast was developed from the forecast of total systen energy production                  through    use of an average (7 years) s ysten load f actor.              Second, a peak-load forecast was calculated by using              forecasts      of  future K7H    sales for each major customer class in conjunction with average (6-7 years)        class    coincidental      peak-load      factors which    had  been    obtained    from    his torical cost-of-service studies.      The    third    method    used    a  direct      econometric es tima tion. The    Public    5taff    deterzined that the second method, the customer class energy requirement - load factor method,    was    the    most  reliable      approach    to developing a
                                                                                -
The  Public    Staff    ande its estimates of abase-case          a peak demand by utilizing three independent              but    closely    related forecast methods.        First, a peak forecast was developed from the forecast of total systen energy production                  through    use of an average (7 years) s ysten load f actor.              Second, a peak-load forecast was calculated by using              forecasts      of  future K7H    sales for each major customer class in conjunction with average (6-7 years)        class    coincidental      peak-load      factors which    had  been    obtained    from    his torical cost-of-service studies.      The    third    method    used    a  direct      econometric es tima tion. The    Public    5taff    deterzined that the second method, the customer class energy requirement - load factor method,    was    the    most  reliable      approach    to developing a


63 f orecast of peak demand.      The econesetric      peak-1 cad    m odels were  used  only as checks on the validity of the results of the  load-f a ctor  estimates,    due  to    statistical    problems inherent in the econome tric models.        The strong point of the customer class approach is that it provides a direct linkage between    the  customer    class energy forecast and the systen peak-load forecast.      The customer class approach        recognizes changes    in  the air in energy sale s by class of service and directly reflects them in the        pea k-load    es timates    through the coincident peak customer class load factors.
63 f orecast of peak demand.      The econesetric      peak-1 cad    m odels were  used  only as checks on the validity of the results of the  load-f a ctor  estimates,    due  to    statistical    problems inherent in the econome tric models.        The strong point of the customer class approach is that it provides a direct linkage between    the  customer    class energy forecast and the systen peak-load forecast.      The customer class approach        recognizes changes    in  the air in energy sale s by class of service and directly reflects them in the        pea k-load    es timates    through the coincident peak customer class load factors.
Line 1,753: Line 1,057:
64 reasonable upper limits of the impact of conservation and/or load    mana gement    on    capaci ty      e xpansion    planning.      These -
64 reasonable upper limits of the impact of conservation and/or load    mana gement    on    capaci ty      e xpansion    planning.      These -
scenarios are:
scenarios are:
.
I. Coaservation      -  a    15% reduction in estimated system energy sales by 1992 with a constant load fuctor;
I. Coaservation      -  a    15% reduction in estimated system energy sales by 1992 with a constant load fuctor;
: 2. Load  management      -
: 2. Load  management      -
Line 1,761: Line 1,064:


65 was  found    by  the Public S taf f that such "overbuilding" of genera ting facilities would not      dramatically    in crease    the price  of    electricity    during  the    study period. The study shows that the net effect of the additional plant would be a l % to 2.5% increase over the nominal price of electricity.
65 was  found    by  the Public S taf f that such "overbuilding" of genera ting facilities would not      dramatically    in crease    the price  of    electricity    during  the    study period. The study shows that the net effect of the additional plant would be a l % to 2.5% increase over the nominal price of electricity.
Carolina Power G Licht Compa ny As  pointed    out  by  the  company, CPGL's estimate of the f uture electrical load which its customers will place on the system  is    to a large extent based on estimates of customer energy reguirements.        CPGL  first    estimated    total    energy
Carolina Power G Licht Compa ny As  pointed    out  by  the  company, CPGL's estimate of the f uture electrical load which its customers will place on the system  is    to a large extent based on estimates of customer energy reguirements.        CPGL  first    estimated    total    energy requirements    for the system. Then, in order to develop the
,
,    company's load forecast , CPGL      determined    coinciden t    peak-load    factors    for  each  energy classification and combined them into a composite annual systen load factor.            The    tot al projected    systen    energy  input  and    the  projected annual systen load f actors were then      used    to  forecast    the  CPGL system    pea k  load  for each year. C PGL's current peak-load forecast is set out in Table 13.
requirements    for the system. Then, in order to develop the
,    company's load forecast , CPGL      determined    coinciden t    peak-load    factors    for  each  energy classification and combined them into a composite annual systen load factor.            The    tot al projected    systen    energy  input  and    the  projected annual
  ,
systen load f actors were then      used    to  forecast    the  CPGL system    pea k  load  for each year. C PGL's current peak-load forecast is set out in Table 13.
Duke Power Company Several  assumptions    underlying    Duke's projection of its sy st em future peak loads have been discussed previously, but it is important to reiterate that Duke's projections of peak load take into accuInt the effects of its load management program and the conservation efforts of its customers.
Duke Power Company Several  assumptions    underlying    Duke's projection of its sy st em future peak loads have been discussed previously, but it is important to reiterate that Duke's projections of peak load take into accuInt the effects of its load management program and the conservation efforts of its customers.


66
66 In  making    its    forecast    of  peak  loads, Duke projected separately the summer and          the  winter  peak    loads. These  s peaks  have    been    growing    at  different    rates    due to the degrees of      saturn tion    of  air  conditioning    and  electric heating.      The    sunser    and winter peak loads were separated into two components:        tem pera ture-responsive loads and        base loads  by using regression analysis techniques. The company determined growth factors for both ty', es of loads. Duke's long-range    forecast      of  summer p .cs is shown on Table 14.
                                                      .
In  making    its    forecast    of  peak  loads, Duke projected separately the summer and          the  winter  peak    loads. These  s peaks  have    been    growing    at  different    rates    due to the degrees of      saturn tion    of  air  conditioning    and  electric heating.      The    sunser    and winter peak loads were separated into two components:        tem pera ture-responsive loads and        base loads  by using regression analysis techniques. The company determined growth factors for both ty', es of loads. Duke's long-range    forecast      of  summer p .cs is shown on Table 14.
Its forecast of winter peaks is shown on Table              15. D uke 's peak-load    forecasts are lower than the " base case" forecast of the Public Staff and are approximately the same as the Public  Staff's conservation scenario.            Duke's forecast also showed that the company will remain a summer peaking company                  ,
Its forecast of winter peaks is shown on Table              15. D uke 's peak-load    forecasts are lower than the " base case" forecast of the Public Staff and are approximately the same as the Public  Staff's conservation scenario.            Duke's forecast also showed that the company will remain a summer peaking company                  ,
through 1990.                                                                _.
through 1990.                                                                _.
                                                                                '
Vireinia Electric and Power Coeceev YEPCD's      current    peak-load    projections    mere    based  on econometric        models,      weather      models,    and    historical projection      techniques.        The  compan y  used    the service of outside coasaltants to provide an independent forecast for a review    of    the  reasonableness of YEPCD's een forecast.            As pointed out      by    the  compan y,    7ZPCD  is  a    summer-peaking company    and, barring unusual growth in winter load, expects to remain    a  summer-peaking      company    for  the  foreseeable future.      TEPCo
Vireinia Electric and Power Coeceev YEPCD's      current    peak-load    projections    mere    based  on econometric        models,      weather      models,    and    historical projection      techniques.        The  compan y  used    the service of outside coasaltants to provide an independent forecast for a review    of    the  reasonableness of YEPCD's een forecast.            As pointed out      by    the  compan y,    7ZPCD  is  a    summer-peaking company    and, barring unusual growth in winter load, expects to remain    a  summer-peaking      company    for  the  foreseeable future.      TEPCo
* s  suaner    peak-load forecast for the period I 978-f 987 is shown on Table 2.          Growth is expected to remain
* s  suaner    peak-load forecast for the period I 978-f 987 is shown on Table 2.          Growth is expected to remain
                                                                              -


67 well    below the long-tern historical growth rate and will be af fected by implementation          of    load  management    techniques beginning      in    1980. The    compound    annual    growth    ra te predicted by the company f or the 1977-1987 period is 5.3%.
67 well    below the long-tern historical growth rate and will be af fected by implementation          of    load  management    techniques beginning      in    1980. The    compound    annual    growth    ra te predicted by the company f or the 1977-1987 period is 5.3%.
G. Comments hv Public Witnesses and Intervenors The Commission encourages participa tion in its hearings by public witnesses who have concerns about the                sa tters  under discussico      or    suggestions for commission consideration.              A airture    of    concerns,    critic 3sas,      and    suggestions        for improvement      of    the forecasting methodologies of the Public
G. Comments hv Public Witnesses and Intervenors The Commission encourages participa tion in its hearings by public witnesses who have concerns about the                sa tters  under discussico      or    suggestions for commission consideration.              A airture    of    concerns,    critic 3sas,      and    suggestions        for improvement      of    the forecasting methodologies of the Public Staff and the companies vera            offered    during    the  February 1978  hearings.        Response    to    ccncerns relating to nuclear power safety will be trea ted          in    another  section    of  this repo rt.
,
A  novel      approach    to      f orecastin g,    utilizing    only residential meters as a predictor f or total                sys ten  growt h, was    presented        to    the      Commission      by    the  Carolina Environmental Study Group          (CESG) .      It  was  asserted    that electricity      consumers    will shortly saturate their usage at 9000 watts.      After fitting an integral of          the    ordinate    of t he  nor mal    curve    of error      (IONCOE) to recent historical data, CESG      asserted      that  Duke      would  gradually    peak    at
Staff and the companies vera            offered    during    the  February 1978  hearings.        Response    to    ccncerns relating to nuclear power safety will be trea ted          in    another  section    of  this
>
'
repo rt.
!
.
A  novel      approach    to      f orecastin g,    utilizing    only
'
residential meters as a predictor f or total                sys ten  growt h, was    presented        to    the      Commission      by    the  Carolina Environmental Study Group          (CESG) .      It  was  asserted    that electricity      consumers    will shortly saturate their usage at 9000 watts.      After fitting an integral of          the    ordinate    of t he  nor mal    curve    of error      (IONCOE) to recent historical data, CESG      asserted      that  Duke      would  gradually    peak    at
   !!,000 ME      in    a  few  yea rs. At tha t time, the growth rate would be zero.
   !!,000 ME      in    a  few  yea rs. At tha t time, the growth rate would be zero.


Line 1,800: Line 1,086:
The    apparent      delit.erate    attempt    by  CESG    to    force saturation by choosing the parameters of              the    IoscoZ      curve cannot    be    judged    to  be  a  credible    examination of past history or expectations for the future planning period.                      To    ,
The    apparent      delit.erate    attempt    by  CESG    to    force saturation by choosing the parameters of              the    IoscoZ      curve cannot    be    judged    to  be  a  credible    examination of past history or expectations for the future planning period.                      To    ,


69 assume      t ha t  the    per  capi ta    elec tricity      use  of      Borth Carolina's citizens is saturated would imply                    that  (1) . all prog ra ms    to  upgrade      the standard of living of citizens in this State are not working            or    (2)  conserva tion      and      load ma na ge ment are practiced so effectively that they completely o ffset the additional ene rgy used to upgrade the standard of living.        For    conservation      and    loa d    management    to be so practiced is an admirable goal and should                  be    pursued,      but that    does      not appear attainable within the planning period of this report.        The CESG testimony did, however, present                  a good explanation of the nhenomena of peak loads occurring at times of extreme coldness            or    varaness      of    ambient    ground
69 assume      t ha t  the    per  capi ta    elec tricity      use  of      Borth Carolina's citizens is saturated would imply                    that  (1) . all prog ra ms    to  upgrade      the standard of living of citizens in this State are not working            or    (2)  conserva tion      and      load ma na ge ment are practiced so effectively that they completely o ffset the additional ene rgy used to upgrade the standard of living.        For    conservation      and    loa d    management    to be so practiced is an admirable goal and should                  be    pursued,      but that    does      not appear attainable within the planning period of this report.        The CESG testimony did, however, present                  a good explanation of the nhenomena of peak loads occurring at times of extreme coldness            or    varaness      of    ambient    ground temperature as a result of the differences in radiant energy available in different son ths.            This information mLv          be      of valu e    in    future    st udies    attempting to further define the probability of peak-inducing weather conditions.
'
temperature as a result of the differences in radiant energy
'
available in different son ths.            This information mLv          be      of valu e    in    future    st udies    attempting to further define the probability of peak-inducing weather conditions.
The      " load    m an agement "  scenario      of  the    Pcblic    Staff utilized a        nazimum    improvement      in    load    factor    of      10 %.
The      " load    m an agement "  scenario      of  the    Pcblic    Staff utilized a        nazimum    improvement      in    load    factor    of      10 %.
Several        public      witnesses    e xpressed      concern    that      this improvement was too low an            expecta tion.        However,    it    was
Several        public      witnesses    e xpressed      concern    that      this improvement was too low an            expecta tion.        However,    it    was pointed    out    that    daily load factors are already over 80%.
  '
pointed    out    that    daily load factors are already over 80%.
Since most of the load management and conservation aids                        now under    practical        consideration      involve improving the daily load f actor and do not involve            trans ferring      loads    between seasons,      it    would be cztremely difficult for these aids to improve the annual load            factor    beyond      approzinately        75 %.
Since most of the load management and conservation aids                        now under    practical        consideration      involve improving the daily load f actor and do not involve            trans ferring      loads    between seasons,      it    would be cztremely difficult for these aids to improve the annual load            factor    beyond      approzinately        75 %.
Even    if    such improvement could be accomplished, the effect
Even    if    such improvement could be accomplished, the effect
Line 1,815: Line 1,095:
The  expected  limit  of I 5% on conservation effect during the planning period, which wa: used      in  the
The  expected  limit  of I 5% on conservation effect during the planning period, which wa: used      in  the
* conservation" scenario    of  the  Pu blic  Staff, appears at this time to be reasonable. Studies by the Tennessee Talley Authority have indica tad  that even less conservation may be the practical 11ai t.
* conservation" scenario    of  the  Pu blic  Staff, appears at this time to be reasonable. Studies by the Tennessee Talley Authority have indica tad  that even less conservation may be the practical 11ai t.
__
_
                                                                      .
                                                                      .


71 CHAPTER Y RESERVE CBIT ERI A,  GEN EBATION HII, AND CAP ACITY PLANS A. Peserve Criteria The    ma gnitude    of    a    sys tem 's    generation      reserve requirenents depends upon the            nature  of  the    system,    the
71 CHAPTER Y RESERVE CBIT ERI A,  GEN EBATION HII, AND CAP ACITY PLANS A. Peserve Criteria The    ma gnitude    of    a    sys tem 's    generation      reserve requirenents depends upon the            nature  of  the    system,    the characteristics      of  the    loa d ,  and  the quality of service required by the system's        customers.      Since    these    factors chan ge  over    ti me, a reserve which was adequate in the past may    be  inadeguate    in  the    future.      Consequently,      the commission      reco gnizes  the    need for periodic review of the genera ting re.wrve requirement.
  '
In  developing its future capacity plans, the Public Staff made several important investigations prior to its selection of    the  set of generating facilities it recommends that the electric    utilities    should    construct.      The  first      study involved    the  selection    of  acceptable reserve criteria to provide    for  the    day-to-day        variations      in    operating cor'2tions.        These    variations        include    main tena nce    on genera ting aquipment, partia1 outages due            to  physical    and ambient      conditions,      unerpected        (forced)      outages      of generating facilities, changes in load pattern,                and  errors in    projected    load  estimates.        It should be noted that an allowance for delays in        the    commercial      operation    of  new facilities      i.s not generally included in a utility's reserve capacity.
characteristics      of  the    loa d ,  and  the quality of service required by the system's        customers.      Since    these    factors chan ge  over    ti me, a reserve which was adequate in the past may    be  inadeguate    in  the    future.      Consequently,      the commission      reco gnizes  the    need for periodic review of the genera ting re.wrve requirement.
,
In  developing its future capacity plans, the Public Staff made several important investigations prior to its selection of    the  set of generating facilities it recommends that the electric    utilities    should    construct.      The  first      study involved    the  selection    of  acceptable reserve criteria to provide    for  the    day-to-day        variations      in    operating cor'2tions.        These    variations        include    main tena nce    on genera ting aquipment, partia1 outages due            to  physical    and
_
ambient      conditions,      unerpected        (forced)      outages      of generating facilities, changes in load pattern,                and  errors in    projected    load  estimates.        It should be noted that an allowance for delays in        the    commercial      operation    of  new facilities      i.s not generally included in a utility's reserve capacity.


72 There    are    various      methods    to    deteraine    reserve requirements.      These methods can be      broken    down  in to    two 7 broad    groups:~    the nonprobah414 %ic (ROPROB) group and the            #
72 There    are    various      methods    to    deteraine    reserve requirements.      These methods can be      broken    down  in to    two 7 broad    groups:~    the nonprobah414 %ic (ROPROB) group and the            #
Line 1,832: Line 1,103:
The 'nore common NOPROB methods are (!) the standard              percent reserve    and    (2)  the    loss    of the largest unit. The most sidely used probabilistic meserve          requirmaant    is  Loss    of Load Probability (LOLP) .
The 'nore common NOPROB methods are (!) the standard              percent reserve    and    (2)  the    loss    of the largest unit. The most sidely used probabilistic meserve          requirmaant    is  Loss    of Load Probability (LOLP) .
It  was the conclusion of the Public Staff, based upon its detailed analysis of the historical peak-load conditions for Duke,    CPSL,    an d  YEPCO,. that a reserve criterion of l55 to          ' -
It  was the conclusion of the Public Staff, based upon its detailed analysis of the historical peak-load conditions for Duke,    CPSL,    an d  YEPCO,. that a reserve criterion of l55 to          ' -
                                                                                      .
. . .
                                                                                  ,
205 for both saamer and winter sould            provide    adeguata    and reliable electric service to the citizens of sorth Carolina.
205 for both saamer and winter sould            provide    adeguata    and reliable electric service to the citizens of sorth Carolina.
The    Public    Staff    also  concluded    that  a  loss  of  load probability      not    to  exceed    15 days per season (based upon seekday peak hour loads) should also be usad in the planning of North Carolina's future capacity requirements.
The    Public    Staff    also  concluded    that  a  loss  of  load probability      not    to  exceed    15 days per season (based upon seekday peak hour loads) should also be usad in the planning of North Carolina's future capacity requirements.
Duke    witnesses    testified .that a 205 reserve would be the miniana necessary for        North    Carolina    during  the  present planning    period.      This    is  consistent with Federal Energy Regulatory Commission recommendations of 155            to  25%,    with f aster growing areas using the higher reserve margins.
Duke    witnesses    testified .that a 205 reserve would be the miniana necessary for        North    Carolina    during  the  present planning    period.      This    is  consistent with Federal Energy Regulatory Commission recommendations of 155            to  25%,    with f aster growing areas using the higher reserve margins.
                                                                                    .


73 Since    t he  rese rve    margins  have  been    substantially in excess    of    these    values  in  recent    years    and      wea ther conditions      have  still    caused  difficulties in maintaining service, the commission concludes            that  a  mi niaan    of  20%
73 Since    t he  rese rve    margins  have  been    substantially in excess    of    these    values  in  recent    years    and      wea ther conditions      have  still    caused  difficulties in maintaining service, the commission concludes            that  a  mi niaan    of  20%
Line 1,849: Line 1,116:


74 reservoirs and yet        have  relatively    low    operation    costs.
74 reservoirs and yet        have  relatively    low    operation    costs.
T hese    units    are  gene ra11y limited to peaking mode in this
T hese    units    are  gene ra11y limited to peaking mode in this area, due to water availability.          Pea ting    units,    depending on    the    type    and systas, can operat e as much as 30% of the time.
                                                                              '
T he  hours    of  operation for each type of capacity depend upon the costs (capital and energy) of the capacity and                  the demand.      To  provide    the  most  economical energy to their co nsumers,      electric    utilities    should      determine      which generating      facilities    to  operate  based upon the relatim energy production cost of each facility.              (The capital    cost of    each    unit is ignored for operational purposes after the unit is      in  service.)    The  unit  with    the    lowest  energy production cost is assigned the first increment of load.                  As s
area, due to water availability.          Pea ting    units,    depending on    the    type    and systas, can operat e as much as 30% of the time.
T he  hours    of  operation for each type of capacity depend upon the costs (capital and energy) of the capacity and                  the demand.      To  provide    the  most  economical energy to their co nsumers,      electric    utilities    should      determine      which generating      facilities    to  operate  based upon the relatim energy production cost of each facility.              (The capital    cost of    each    unit is ignored for operational purposes after the unit is      in  service.)    The  unit  with    the    lowest  energy
                                                                              '
production cost is assigned the first increment of load.                  As s
each additional increment of load is added              to  the  system, the    unit    with  the  next  lowest energy productica cost is placed into service.        This process continues until        the  on-line      generation      equals  the  coincident    demand    of  the consumers.      The units    wi th  the  lowest    energy    production expense      would    be considered base load units,        is new units are added to a system, some base generation              facilities    may no longer have a relatively lower ene egy production cost. and may become reclassified as intermediate units.                Proper    six is considered to be the optimal six of generation ca pacities which will satisfy the demand at einimum cost.              The  optimal six    of  generation      camacities is determined by the utility
each additional increment of load is added              to  the  system, the    unit    with  the  next  lowest energy productica cost is placed into service.        This process continues until        the  on-line      generation      equals  the  coincident    demand    of  the consumers.      The units    wi th  the  lowest    energy    production expense      would    be considered base load units,        is new units are added to a system, some base generation              facilities    may no longer have a relatively lower ene egy production cost. and may become reclassified as intermediate units.                Proper    six is considered to be the optimal six of generation ca pacities which will satisfy the demand at einimum cost.              The  optimal six    of  generation      camacities is determined by the utility


75 load curve, which is a graphical display                of  demand    versus time.
75 load curve, which is a graphical display                of  demand    versus time.
In  arriving      at    the proper mix of generating capacities, the Public Staff investigated the typical hours of operation for  base    and    peaking ca pacity of the three North Carolina utilities, the standards of            operation    using    a  pea k  week hourly    loa d    curve ,  and    hours of operation compared to an annual load duration curve.            The Public Staff      also    assumed that peaking units would operate no more than 1000 hours and th at base units would operate at least              6000    hours.      Based upon    the    above, the Public Staf f concluded that the proper genera ting    air    for  D uke ,  CPGL,    and    YEPCO    should      be approximately      one-half      base    capacity,    one-third    cycling capaci ty, an d one-sixth peaking capacity.                Other    witnesses generally      supported        this    mixture ,  and    the  commission
In  arriving      at    the proper mix of generating capacities, the Public Staff investigated the typical hours of operation for  base    and    peaking ca pacity of the three North Carolina utilities, the standards of            operation    using    a  pea k  week hourly    loa d    curve ,  and    hours of operation compared to an annual load duration curve.            The Public Staff      also    assumed that peaking units would operate no more than 1000 hours and th at base units would operate at least              6000    hours.      Based upon    the    above, the Public Staf f concluded that the proper genera ting    air    for  D uke ,  CPGL,    and    YEPCO    should      be approximately      one-half      base    capacity,    one-third    cycling capaci ty, an d one-sixth peaking capacity.                Other    witnesses generally      supported        this    mixture ,  and    the  commission concurs.
                                                .
concurs.
Hajor    con t ro versy  e xists    concernin g    the use of nuclear versus    fossil    ge ne ra tion. The  debate    centers    both    on economic    and    saf ety grounds.        Ebether nuclear is more cost e ffective than fossil        generation      depends    upon  the    to tal costs    of    construction,        life time    main tenance,    and  fuel consumed.      In addition to its own studies, the Public                S taf f presented      the    re sults    of  a    number  of    studies of these matters    by  the    Electric      Power    Re sear ch  Institute,      the Federal      Energy      Admi nis tr ation,    the  Euclear    Begulatory Co nsis sion,    the    Federal      Po wer  Commission,      the    Ener gy
Hajor    con t ro versy  e xists    concernin g    the use of nuclear versus    fossil    ge ne ra tion. The  debate    centers    both    on economic    and    saf ety grounds.        Ebether nuclear is more cost e ffective than fossil        generation      depends    upon  the    to tal costs    of    construction,        life time    main tenance,    and  fuel consumed.      In addition to its own studies, the Public                S taf f presented      the    re sults    of  a    number  of    studies of these matters    by  the    Electric      Power    Re sear ch  Institute,      the Federal      Energy      Admi nis tr ation,    the  Euclear    Begulatory Co nsis sion,    the    Federal      Po wer  Commission,      the    Ener gy


Line 1,869: Line 1,130:


77 The  Public    Staff analyzed the sensitivity of its studie=
77 The  Public    Staff analyzed the sensitivity of its studie=
by calculating the ef fect which would            be  produced    by    (1) doubling    the  nuc lea r  fuel costs and ( 2) by increasin g the nuclear capital costs by 25%.          The results of these' studies, as  well  as  those    of  t he  companies,    were    that nuclear generation demonstrated an e xpected economic advantage                over
by calculating the ef fect which would            be  produced    by    (1) doubling    the  nuc lea r  fuel costs and ( 2) by increasin g the nuclear capital costs by 25%.          The results of these' studies, as  well  as  those    of  t he  companies,    were    that nuclear generation demonstrated an e xpected economic advantage                over fossil    generation    for    base    load    additions    d uring    this planning period.      It is emphasized that these results            apply to  the present planning period.          Stu dies f or the generation capacity which will follow          those    units  presently    in    the planning    stage    may    demonstrat e    that  other    me thod s    of prov iding  electric    gene ration    may  become    preferable      in f uture planning periods.
,
Questions    were  raised    concerning    the    availa bility      of nuclear fuel to be crad in scheduled reactors.              The evidence indica tes that sufficient quantities of nuclear fuel will be available to be used during the lifetime of plar.ts now being planned.      However,    when    these plants need to be replaced, there is a    definite    q ues tion  of    whether    there    will    be sufficient    nuclear    f uel to be a ble to replace these plants with nuclear generation        u nless    a  reprocessing    system      is started.
fossil    generation    for    base    load    additions    d uring    this planning period.      It is emphasized that these results            apply to  the present planning period.          Stu dies f or the generation capacity which will follow          those    units  presently    in    the planning    stage    may    demonstrat e    that  other    me thod s    of prov iding  electric    gene ration    may  become    preferable      in
Several    witnesses    at    the  Co m mission 's  February      1978 hearings    expressed    their    concern    about    the  safety    a nd reliability of nuclear fueled generation.              The issues raised by these witnesses included:
.
f uture planning periods.
,
.
Questions    were  raised    concerning    the    availa bility      of nuclear fuel to be crad in scheduled reactors.              The evidence indica tes that sufficient quantities of nuclear fuel will be available to be used during the lifetime of plar.ts now being
'
planned.      However,    when    these plants need to be replaced, there is a    definite    q ues tion  of    whether    there    will    be sufficient    nuclear    f uel to be a ble to replace these plants with nuclear generation        u nless    a  reprocessing    system      is started.
Several    witnesses    at    the  Co m mission 's  February      1978 hearings    expressed    their    concern    about    the  safety    a nd reliability of nuclear fueled generation.              The issues raised
.
by these witnesses included:


78 1    The problems of storing spent nuclear ' fuel,
78 1    The problems of storing spent nuclear ' fuel,
                                                                          -
: 2. The lack cf firn assurances of uranium supply toward the end of the century,
: 2. The lack cf firn assurances of uranium supply toward the end of the century,
: 3. The continuing escalation cf costs associated with nuclear plant construction,
: 3. The continuing escalation cf costs associated with nuclear plant construction,
Line 1,890: Line 1,140:
: 5. Threats from terrorist groups against nuclear plants.
: 5. Threats from terrorist groups against nuclear plants.
Th ere  was  also testimony, however, that nuclear poser is clean, safe, and availahle.        The    saf sty  of  nuclear    poser plants    can be illustrated by the observation that thcre has been almost 2000 reactoc-years of commercial plant operation worldw ide    without    a    single    fatality    as a consequence of nuclear-related plant        salfunction.      There  is  continually increasing    o pinion  in  the    technical    community    that the hazards to      the  ge neral    public    from  nuclear  plants    are considerably      less  than    the    hazards from many alternative systems, such as coni.          The    agreenhouse"    effects    on  our atmosphere    causad    by    carbon    dioxide  resulting  from the combustion of coal and eil na y be a          problem    of  even    nors widespread    and  potential      seriousness    than  the localized problems of nuclear safety.          In addition, nuclear      units    do not    have  the  sulfur tad other emission problems of fossil units. An increasing segment of the technical community            is boginning    to  express    the  vie w  that  nuclear  plants are
Th ere  was  also testimony, however, that nuclear poser is clean, safe, and availahle.        The    saf sty  of  nuclear    poser plants    can be illustrated by the observation that thcre has been almost 2000 reactoc-years of commercial plant operation worldw ide    without    a    single    fatality    as a consequence of nuclear-related plant        salfunction.      There  is  continually increasing    o pinion  in  the    technical    community    that the hazards to      the  ge neral    public    from  nuclear  plants    are considerably      less  than    the    hazards from many alternative systems, such as coni.          The    agreenhouse"    effects    on  our atmosphere    causad    by    carbon    dioxide  resulting  from the combustion of coal and eil na y be a          problem    of  even    nors widespread    and  potential      seriousness    than  the localized problems of nuclear safety.          In addition, nuclear      units    do not    have  the  sulfur tad other emission problems of fossil units. An increasing segment of the technical community            is boginning    to  express    the  vie w  that  nuclear  plants are
                                                                          '


79 perhaps too conservatively designed, i.e., that the ma ny redundant safety systems a te not justified by experience.
79 perhaps too conservatively designed, i.e., that the ma ny redundant safety systems a te not justified by experience.
Line 1,901: Line 1,150:
80 asserted that the present fuel cost difference would              lessen and  make  future      nuclear  units le:ss economical and, since      -
80 asserted that the present fuel cost difference would              lessen and  make  future      nuclear  units le:ss economical and, since      -
nuclear units are the projected units in question,              the  new units  should      not be built. However, since nuclear fuel is presently at 4 mills per K115 and coal at [ 4. 8 mills per K1IH, the  relative difference would widen, not lessen, within the lifetime of the plants.        The Public Staff's calculations are correct.
nuclear units are the projected units in question,              the  new units  should      not be built. However, since nuclear fuel is presently at 4 mills per K115 and coal at [ 4. 8 mills per K1IH, the  relative difference would widen, not lessen, within the lifetime of the plants.        The Public Staff's calculations are correct.
It  was  contended      that  large  nuclear  units    are  more expensive to build and operate than small          coal    units.      It vas also contended that there would be less financial impact as well as less environmental impact if genera ting units were smaller and decentralized. The table belos shows that, if units are costed out in the        same  time  frame    and    with  3
It  was  contended      that  large  nuclear  units    are  more expensive to build and operate than small          coal    units.      It vas also contended that there would be less financial impact as well as less environmental impact if genera ting units were smaller and decentralized. The table belos shows that, if units are costed out in the        same  time  frame    and    with  3 comparable environmental treatment requirements, small units are more expensive to construct          per  kilowatt  of    capacity than  large  units.      Since. nuclear    fuel  is  so much less expensive than fossil fuels, nuclear units          are  economical.
                  -
                                                                          -
comparable environmental treatment requirements, small units are more expensive to construct          per  kilowatt  of    capacity than  large  units.      Since. nuclear    fuel  is  so much less expensive than fossil fuels, nuclear units          are  economical.
In    addition,    approximately    the  same number of people are required to    run    a  plant  on  an  around-the-clock    basis, regardless    of the size; doubling the number of plants would double the aanpower requirement.          It would also make    higher voltage    transmission        lines  less  economical    and  would increase the use        of  lan d  required    for  transmission      and genera tion  facilities.      Smaller units are less efficient in water use and would be environmental 1T less desirable.
In    addition,    approximately    the  same number of people are required to    run    a  plant  on  an  around-the-clock    basis, regardless    of the size; doubling the number of plants would double the aanpower requirement.          It would also make    higher voltage    transmission        lines  less  economical    and  would increase the use        of  lan d  required    for  transmission      and genera tion  facilities.      Smaller units are less efficient in water use and would be environmental 1T less desirable.
                                                                          -


81 Cost Comparison Illustrating Economies of Scale I. Duk e's coal P la nts, with Scrubbers Added, l976 Dollars Capacity ME___                      S/KW Allen i                            165                        374 Allen 5                            275                          348 Barshall I                        350                        344 Clif fside 5                      54 5                        328 Marshall 3                        650                        283 Belevs Creek l                    {{40                        275 II. Duke's Nuclear Plants, as Built, 1976 Dollars Oconee 1                          86 0                        230 S cGuire 1                      l180                          293 The  Public Staff Report was criticized because it did not trea t cogeneration      as  an    alt erna tive  to  separa te  power prod uc tion    pla nts. This ma tter will be treated in depth in f uture hearings.      A study of this matter has been funded              by the  N orth Carolina Energy Research Institute and the United
81 Cost Comparison Illustrating Economies of Scale I. Duk e's coal P la nts, with Scrubbers Added, l976 Dollars Capacity ME___                      S/KW Allen i                            165                        374 Allen 5                            275                          348 Barshall I                        350                        344 Clif fside 5                      54 5                        328 Marshall 3                        650                        283 Belevs Creek l                    {{40                        275 II. Duke's Nuclear Plants, as Built, 1976 Dollars Oconee 1                          86 0                        230 S cGuire 1                      l180                          293 The  Public Staff Report was criticized because it did not trea t cogeneration      as  an    alt erna tive  to  separa te  power prod uc tion    pla nts. This ma tter will be treated in depth in f uture hearings.      A study of this matter has been funded              by the  N orth Carolina Energy Research Institute and the United States Department of Energy. Besults of that study may be available for the Commission's 1979 hearings.
,
,
States Department of Energy. Besults of that study may be available for the Commission's 1979 hearings.
.
Questions    were    also raised by intervenors concerning the viability of using tower cooling versus lake                cooling,    with specific    reference      to  t he    possibility    of  moving D uke's proposed Perkins nuclear plant to Lake Norman.                Perkins    and its sister units h ave been designed to use cooling towers as a result of an EPA mandate in past years. By designing a nd constructing      all    the  units the same, efficiencies will be e rperien ced    during    constru ction      and  operation.      It    is neit her  economica l, nor permissable to move Perkins to La ke Norman.      The  lake    is  reserved      for  future    units;  the
Questions    were    also raised by intervenors concerning the viability of using tower cooling versus lake                cooling,    with specific    reference      to  t he    possibility    of  moving D uke's proposed Perkins nuclear plant to Lake Norman.                Perkins    and its sister units h ave been designed to use cooling towers as a result of an EPA mandate in past years. By designing a nd constructing      all    the  units the same, efficiencies will be e rperien ced    during    constru ction      and  operation.      It    is neit her  economica l, nor permissable to move Perkins to La ke Norman.      The  lake    is  reserved      for  future    units;  the


                        -
R2 Environmental      Protection    Agency    will allow no units t) be added until experience has been            gained  with  operation      of  -
R2
.
    -
Environmental      Protection    Agency    will allow no units t) be added until experience has been            gained  with  operation      of  -
scGuire and tests of cater guality have been conducted.                          '
scGuire and tests of cater guality have been conducted.                          '
Tbsre  are    benefits    other than economics associa tad with nuclear generation.        Nuclear fuel, unlike coal,        avoids      the problem    of    toxic  stack    gases. It is noted that nuclear plants    are    required    to  have    lower  contine    radioactive emissions    than are currently allowed at many plants burning low sulphur vestern coal which          contains    small  amounts      of uranins.
Tbsre  are    benefits    other than economics associa tad with nuclear generation.        Nuclear fuel, unlike coal,        avoids      the problem    of    toxic  stack    gases. It is noted that nuclear plants    are    required    to  have    lower  contine    radioactive emissions    than are currently allowed at many plants burning low sulphur vestern coal which          contains    small  amounts      of uranins.
Line 1,925: Line 1,162:
but it is well recognized that security controls at              nuclear plants have been considerably increased under the new United -
but it is well recognized that security controls at              nuclear plants have been considerably increased under the new United -
3 States Nuc1mav Regt.latory. Commission Guidelines                    -          /
3 States Nuc1mav Regt.latory. Commission Guidelines                    -          /
                                                                                  .
The    concerns      about    nuclear    power  expre:tsed    by    some witnesses are Iagitimate and          the  commission  shares      these concerns. The evidence, however, is more than sufficient to support a finding that the projacted benefits to be              derived from the development and operation of anclear power outwigh any associated risks.        There is    little  question    but    that there  are    economic      advantages in the use of nuclear power and, based on de evidence in            this  case. The  commission finds    no  reason    to  try  to    avrest  away*    the  primary responsibility and jurisdiction cf the United States Nuclear Regula tory    Comaission      in  determining    or  setting    safety standards for nuelear plants.                                                  ;
The    concerns      about    nuclear    power  expre:tsed    by    some witnesses are Iagitimate and          the  commission  shares      these concerns. The evidence, however, is more than sufficient to support a finding that the projacted benefits to be              derived from the development and operation of anclear power outwigh any associated risks.        There is    little  question    but    that there  are    economic      advantages in the use of nuclear power and, based on de evidence in            this  case. The  commission finds    no  reason    to  try  to    avrest  away*    the  primary responsibility and jurisdiction cf the United States Nuclear Regula tory    Comaission      in  determining    or  setting    safety
                                                                                            '
standards for nuelear plants.                                                  ;
  .
O
O


63 C. Genera ting Ca pacity E] g In    developing    its f uture capacity addition requirements, the    Public Staf f made certain major planning assumptions:
63 C. Genera ting Ca pacity E] g In    developing    its f uture capacity addition requirements, the    Public Staf f made certain major planning assumptions:
1      No  oil  or    gas    b urnin g bas e  gen eration  v ould be constructed;
1      No  oil  or    gas    b urnin g bas e  gen eration  v ould be constructed;
'
: 2. Only    base    and peaking capacity would be constructed by the utilities; and
: 2. Only    base    and peaking capacity would be constructed by the utilities; and
: 3.      Retirements      of generating facilities reported by the utilities pursuant to Commission Rule R8-43 would be carried out.
: 3.      Retirements      of generating facilities reported by the utilities pursuant to Commission Rule R8-43 would be carried out.
  .
In    determining        an    appropriate    generating    addition schedule, it is necessary to consider the type of facilities each m.
In    determining        an    appropriate    generating    addition schedule, it is necessary to consider the type of facilities each m.
utility currently has under construction, the proposed retirement of facilities, and the proposed units on which engineering        has  been    completed  and  licenses  have    been requested or granted.          It is also necessary to consider        the lead      time    required to construct new generating facilities.
utility currently has under construction, the proposed retirement of facilities, and the proposed units on which engineering        has  been    completed  and  licenses  have    been requested or granted.          It is also necessary to consider        the lead      time    required to construct new generating facilities.
If an unplanned additional 1000 ME of capacity were required
If an unplanned additional 1000 ME of capacity were required 10    years    hence,    a  coal unit would have to be constructed beca use it is impossible to design, ecnstruct, and license a nuclear      unit    within a 10-year period under Current federal regulatory conditions.            The f ollowing are various    estimates of    lead times for ne w units made by the three utilities and the Public Staff.
-
10    years    hence,    a  coal unit would have to be constructed
-
beca use it is impossible to design, ecnstruct, and license a nuclear      unit    within a 10-year period under Current federal regulatory conditions.            The f ollowing are various    estimates of    lead times for ne w units made by the three utilities and the Public Staff.


84 Lead Times for Iow Units (Honths)                                    -
84 Lead Times for Iow Units (Honths)                                    -
Public g                            E          DUKE      YEPCO        Staff Huclear                              13 1      159          iS1        144 Coal Low Sulfur                            79        54*          90          86
Public g                            E          DUKE      YEPCO        Staff Huclear                              13 1      159          iS1        144 Coal Low Sulfur                            79        54*          90          86 High Sulfur                          79        54*          96          86 Pumped Storage                        1l0        130        120          120 combustion Turbine                      37        30          24          36
                                                                                -
* Construction time only Based    upon      all    of the analyses discussed above and upon the " base case" onergy and peal-load forecast, the Public Staff    developed        what    it considered a prudent construction schedule for additional generating capacity for each of                    the three    major      electric utilities operating in North Carolina based upon supplying the native peak                load.      The  schedules are    shown      in table 16.      The expected reserve margins, loss of load probability, and operational breakdown are shown                    in Tables    1 7 A ,-  173,    and    18,  respectively. At the time the Public Staff developed these tables,                the  1977-1978    wintec peak    and    the    1978    summec    peak  were    not    known    their estimates have not been adjusted for                this  new    information and are consequently deemed overstated.
High Sulfur                          79        54*          96          86 Pumped Storage                        1l0        130        120          120 combustion Turbine                      37        30          24          36
* Construction time only Based    upon      all    of the analyses discussed above and upon the " base case" onergy and peal-load forecast, the Public Staff    developed        what    it considered a prudent construction schedule for additional generating capacity for each of                    the three    major      electric utilities operating in North Carolina based upon supplying the native peak                load.      The  schedules
_
are    shown      in table 16.      The expected reserve margins, loss of load probability, and operational breakdown are shown                    in Tables    1 7 A ,-  173,    and    18,  respectively. At the time the Public Staff developed these tables,                the  1977-1978    wintec peak    and    the    1978    summec    peak  were    not    known    their estimates have not been adjusted for                this  new    information and are consequently deemed overstated.
The  construction        program      of  CPSL is set forth in Table 19A. As the table indica tes,            the  company    now    has  seven generating        units    either    under construction or planned for service between now and 1990.              CPGI's  current    constructisan program    will      result      in  system reserves as shown in Table
The  construction        program      of  CPSL is set forth in Table 19A. As the table indica tes,            the  company    now    has  seven generating        units    either    under construction or planned for service between now and 1990.              CPGI's  current    constructisan program    will      result      in  system reserves as shown in Table
                              .


85 19B. Except for one year,          these  re serves  are    above    t he
85 19B. Except for one year,          these  re serves  are    above    t he
  ,  miniana      15%    sunner    level which the Commission required in its 1977 Beport.
  ,  miniana      15%    sunner    level which the Commission required in its 1977 Beport.
Ta bl e  20  shows    D uke 's  forecast    suaner peak loads, its scheduled unit addition, and the reserves at                the    times    of thes e    peaks    for    the years 1978 through 1990.          The current
Ta bl e  20  shows    D uke 's  forecast    suaner peak loads, its scheduled unit addition, and the reserves at                the    times    of thes e    peaks    for    the years 1978 through 1990.          The current Duke    forecast    is    predicated      on  the  successful        future L aplementa tion      of its comprehensive load management prog ram for    which    no  precedent      has    been  established      to  date; consequently,          generating        capacity    additions    have    been scheduled to provide a degree              of  fle xibilit y    commensurate with      the  un known    eff ectiv eness    of    the  loa d    ma na geme nt progra m.
'
Duke's      sch eduled    reserves      through    1983 are higher than design reserve requirement s.              Duke considered    changing      the schedules      for    the    in-service dates of McGuire I and 2 and Catawba i      and    2. Howev er ,    as  Duke    witnesses      Lee  and S terre tt    pointed      out, the in-service dates for these u ni ts reflect the substan tial construction work already                  completed on    th ose    units    and  the    economic    benefits    derived from following the present construction schedule.                    Consequently, D uke 's    schedule      is  as  follows:    McGuire I will come into service in time for the vinter peak of 19 79- l 98 0                McG uire 2, by    the    suaser peak of 198l : Ca ta uba        I, for the vinter peak of 198 l- 1982 ; and Catauba 2, for the sunser peak of 1983.
Duke    forecast    is    predicated      on  the  successful        future L aplementa tion      of its comprehensive load management prog ram for    which    no  precedent      has    been  established      to  date; consequently,          generating        capacity    additions    have    been scheduled to provide a degree              of  fle xibilit y    commensurate with      the  un known    eff ectiv eness    of    the  loa d    ma na geme nt progra m.
Duke's      sch eduled    reserves      through    1983 are higher than design reserve requirement s.              Duke considered    changing      the schedules      for    the    in-service dates of McGuire I and 2 and
<
Catawba i      and    2. Howev er ,    as  Duke    witnesses      Lee  and S terre tt    pointed      out, the in-service dates for these u ni ts reflect the substan tial construction work already                  completed on    th ose    units    and  the    economic    benefits    derived from
.
following the present construction schedule.                    Consequently, D uke 's    schedule      is  as  follows:    McGuire I will come into service in time for the vinter peak of 19 79- l 98 0                McG uire 2, by    the    suaser peak of 198l : Ca ta uba        I, for the vinter peak of 198 l- 1982 ; and Catauba 2, for the sunser peak of 1983.
.


86
86 For the years 1985 and beyond, Duka plans the construction of  a  combinatica    of  base  load  and    peaking      ca pacity,    -
                                                                          .
For the years 1985 and beyond, Duka plans the construction of  a  combinatica    of  base  load  and    peaking      ca pacity,    -
retaining    anzisua    flexibility in the scheduling of ongoing generating units.      These  plans    include    six  standardized nuclear units and four duplicate pumped-storage units, these units being the most      economical    types    of  base    load  and peakin g  ge neration,    raspectively. For example, Cherokee 2 is scheduled to come into service for          the    summer    peak  of 1987,    but the flexible schedule sonld allow this unit to be brough t into service for the winter of 1986-1987 or            delayed to the summer of 1988.
retaining    anzisua    flexibility in the scheduling of ongoing generating units.      These  plans    include    six  standardized nuclear units and four duplicate pumped-storage units, these units being the most      economical    types    of  base    load  and peakin g  ge neration,    raspectively. For example, Cherokee 2 is scheduled to come into service for          the    summer    peak  of 1987,    but the flexible schedule sonld allow this unit to be brough t into service for the winter of 1986-1987 or            delayed to the summer of 1988.
TEPCO's  planned generation additions to meet its forecast peak loads are set forth in Table 2.          TEPCD's peak      load  is
TEPCO's  planned generation additions to meet its forecast peak loads are set forth in Table 2.          TEPCD's peak      load  is expected    by the company to grow at a compound annual growth
                                                                              ,
expected    by the company to grow at a compound annual growth
                                                                           -..s cate of 5.3% over this period of tina.          The effect of      these generating    addition    plans on YEPCD's reserTe margin during the 1978-1987 period is shown in Tables 2          and  3. TEPCO's reserve    margin  for    planning  purposes during this 10-year period ranges from 1700 58      to  2100    HE. YZPCOs s  current generation    addition    plan  will    not  meet the Commission's reserve criteria.
                                                                           -..s cate of 5.3% over this period of tina.          The effect of      these generating    addition    plans on YEPCD's reserTe margin during the 1978-1987 period is shown in Tables 2          and  3. TEPCO's reserve    margin  for    planning  purposes during this 10-year period ranges from 1700 58      to  2100    HE. YZPCOs s  current generation    addition    plan  will    not  meet the Commission's reserve criteria.
                                                                            -


87 CHAPTER VI
87 CHAPTER VI DUTLOOK FOR CONSERV ATION AND LOAD BAN AGEMENT; A SUR VEY OF ALTER N ATIVE ENEFGY SOU RCES A. Introduction The    forecast      adopted    by    the  Commission for the f uture growth in electricity usage in North Carolina                  is    based    in pa rt    upon the premise that conservation and load ma na ge me n t will reduce the ra te of            growth      in  electricity      use.      As pointed      out    by    Public Staff witness Taylor        H. Bingham, an economist with the Besearch Triangle Institute, conservation of    energy      sources      should be a matter of concern for North Carolina.      This State imports morE than 955 of              its    primary fuels.      The    availability        of    these  f uels  depends u pon a
                                .
  ;    variety of        factors,      including      price,    fede ral    and  state reg ula tion,      international        agreements,    su pplier con tracts, court    rulingc,        and    the      cost    and    availability        of transportation for these f uels.
  .
DUTLOOK FOR CONSERV ATION AND LOAD BAN AGEMENT; A SUR VEY OF ALTER N ATIVE ENEFGY SOU RCES A. Introduction The    forecast      adopted    by    the  Commission for the f uture growth in electricity usage in North Carolina                  is    based    in pa rt    upon the premise that conservation and load ma na ge me n t will reduce the ra te of            growth      in  electricity      use.      As
-
pointed      out    by    Public Staff witness Taylor        H. Bingham, an economist with the Besearch Triangle Institute, conservation
'
of    energy      sources      should be a matter of concern for North Carolina.      This State imports morE than 955 of              its    primary fuels.      The    availability        of    these  f uels  depends u pon a
  ;    variety of        factors,      including      price,    fede ral    and  state
!
reg ula tion,      international        agreements,    su pplier con tracts, court    rulingc,        and    the      cost    and    availability        of
,
transportation for these f uels.
.
'
The    evidence that is available to the Commission makes it
The    evidence that is available to the Commission makes it
.-
     = lear that present conservation and load management efforts are    not    a    tempo rary    phen omenon    but  represent permanent changes in        the    attitude      of    society    toward    energy    use.
     = lear that present conservation and load management efforts are    not    a    tempo rary    phen omenon    but  represent permanent changes in        the    attitude      of    society    toward    energy    use.
Beca use      ma ny    of    the  c onserva tion    and  load    management programs are in the early stages of development,                    the    total
Beca use      ma ny    of    the  c onserva tion    and  load    management programs are in the early stages of development,                    the    total impact      of th ese programs cannot te assessed in this .eport.
-
impact      of th ese programs cannot te assessed in this .eport.
The Commissi ca recommends tha t              the  Public    Staff    and  the
The Commissi ca recommends tha t              the  Public    Staff    and  the
_


88 electric utilities present additional evidence of the impact of conservation and load management as such evidence becomes              -
88 electric utilities present additional evidence of the impact of conservation and load management as such evidence becomes              -
availa ble.      This  chapter    vill  exa mine some of the recent eff orts to promote conservation and load management in North Carolina.      T he  chapter  will    also  survey    the  status of alternative energy services.
availa ble.      This  chapter    vill  exa mine some of the recent eff orts to promote conservation and load management in North Carolina.      T he  chapter  will    also  survey    the  status of alternative energy services.
B. Lecislation The      1977      General      Assembly    enacted    significant energy-related legislation.        The most    noteworthy    enactment is House Bill 1003, the Energy Conservation Act of 1977.              In this    Act,  the    General  Assembly    stated    that  the  North Caroli na    economy    and the welfare of its citizens have been jeopardized by shortages        of  natural    gas,  petroleum,  and electric power.      The Act contianes:                                .
B. Lecislation The      1977      General      Assembly    enacted    significant energy-related legislation.        The most    noteworthy    enactment is House Bill 1003, the Energy Conservation Act of 1977.              In this    Act,  the    General  Assembly    stated    that  the  North Caroli na    economy    and the welfare of its citizens have been jeopardized by shortages        of  natural    gas,  petroleum,  and electric power.      The Act contianes:                                .
                                                                            ,
   .  .  . It  is therefore declared to be the polic7 of the State of North Carolina to enen)nrage and promote the conservation of energy in 211 forms and to establish requirements and enforcement nonsures                for    mandatory conservation of energy in North Carolina, in order to prevent or reduce an adverse impact upon the economy of this state and in order to pesvent interruption of employment of the citizens of this state in commerce and industry and in order to prevent injury to their health and welfare due to shortage and high cost of energy in their homes . . .
   .  .  . It  is therefore declared to be the polic7 of the State of North Carolina to enen)nrage and promote the conservation of energy in 211 forms and to establish requirements and enforcement nonsures                for    mandatory conservation of energy in North Carolina, in order to prevent or reduce an adverse impact upon the economy of this state and in order to pesvent interruption of employment of the citizens of this state in commerce and industry and in order to prevent injury to their health and welfare due to shortage and high cost of energy in their homes . . .
The    clear    purpose  of    this  legislation    is  to  make conservation a matter of State          polic y  by  encouragine    the residential and business usa of sclar energy and insula tion.
The    clear    purpose  of    this  legislation    is  to  make conservation a matter of State          polic y  by  encouragine    the residential and business usa of sclar energy and insula tion.
The act provides a tax r.rrdit to any person or corporation that constructs or installs a solar hot water heating, space
The act provides a tax r.rrdit to any person or corporation that constructs or installs a solar hot water heating, space
                                                                            -


89 heatin g, or space      cooling      systes    in    any    residential      or commercial building in North Carclina.              The tax credit is to be an amount equal to 255 of the installation and                    equipment cost  of  the solar hot water, he a tin g,          or cooling equipment but not exceeding $l000.          Ho use Bill l003 also allows a            tax credit    during    the    period    January    l,  l977 - December 31, 1978, to any person or          corporaticn    t ha t  installs      new  or additional    insula tion, stora vindows, or storm doors in any building in the State which            was  constructed        and    occ upied p rior  to  Jan ua ry    l,    1977. The  tax    credit is to be an amount, not exceeding $1000, equal to 25%                of    the    cost    of such  insulation,      storm windows, or doors.            House Bill 1003 also  provides    tha t    no    single    family        or    multi-unit residential    building      on  which construction is begun on or afte:: January 1,    1978, shall be cccupied and              connected      for electricity    until    the    b uilding  is in compliance with the miniana insulation standards for recidential ecnstruction as prescribed in the North Carolina State Building Code.
89 heatin g, or space      cooling      systes    in    any    residential      or commercial building in North Carclina.              The tax credit is to be an amount equal to 255 of the installation and                    equipment cost  of  the solar hot water, he a tin g,          or cooling equipment but not exceeding $l000.          Ho use Bill l003 also allows a            tax credit    during    the    period    January    l,  l977 - December 31, 1978, to any person or          corporaticn    t ha t  installs      new  or additional    insula tion, stora vindows, or storm doors in any building in the State which            was  constructed        and    occ upied p rior  to  Jan ua ry    l,    1977. The  tax    credit is to be an amount, not exceeding $1000, equal to 25%                of    the    cost    of such  insulation,      storm windows, or doors.            House Bill 1003 also  provides    tha t    no    single    family        or    multi-unit residential    building      on  which construction is begun on or afte:: January 1,    1978, shall be cccupied and              connected      for electricity    until    the    b uilding  is in compliance with the miniana insulation standards for recidential ecnstruction as prescribed in the North Carolina State Building Code.
Line 2,020: Line 1,211:
appropriated      $125,000    for  the    years  1977-1979  to North Carolina state University for the          development  of  a  solar thereal conversion unit which will prodoce a minimum of 1000 K9H of electricity per month; the unit is to be designed              to operate    independent of any outside energy source as auch as possible and should      be  reliable    and  relatively  free    of main tenance.        The  legislation      specifically    set  as  a guideline for the project that the size and operation of the              '
appropriated      $125,000    for  the    years  1977-1979  to North Carolina state University for the          development  of  a  solar thereal conversion unit which will prodoce a minimum of 1000 K9H of electricity per month; the unit is to be designed              to operate    independent of any outside energy source as auch as possible and should      be  reliable    and  relatively  free    of main tenance.        The  legislation      specifically    set  as  a guideline for the project that the size and operation of the              '
unit should be practical for use by a home or business.
unit should be practical for use by a home or business.
                                                              .
The    United  states    Congress  has    recently  enacted    the N ational Energy Conservation Policy Act.          This Act  strongly encourages    the    states  to  undertake    a residential energy conservation program under rules and guidelines          promulgated by  the    Secretary    of the Department of Energy.      Within 180 days of the promulgation of these          rules,  the  Governor    of each    state    or  an authorized state agent any submit to the secretary a proposed residential energy          conservation    pla n.
The    United  states    Congress  has    recently  enacted    the N ational Energy Conservation Policy Act.          This Act  strongly encourages    the    states  to  undertake    a residential energy conservation program under rules and guidelines          promulgated by  the    Secretary    of the Department of Energy.      Within 180 days of the promulgation of these          rules,  the  Governor    of each    state    or  an authorized state agent any submit to the secretary a proposed residential energy          conservation    pla n.
Althou gh    the    specific  rules  are not yet available, it is clear that this Act will materially affect state            and  local efforts on conservation.
Althou gh    the    specific  rules  are not yet available, it is clear that this Act will materially affect state            and  local efforts on conservation.
                                                                        -


91 C.
91 C.
Line 2,029: Line 1,218:
,                              The Commission has entered into a number of research projects wi th            the    coope ration    of    the    Public
,                              The Commission has entered into a number of research projects wi th            the    coope ration    of    the    Public
  . Staff,      th e  Research    Trian gle        Institute,    ICF, Inc., Duke power Company, Carolina Powe r & Light                  Company,      B lue    Ridge Electric      seabership    C orpora tion ,      and other organizations.
  . Staff,      th e  Research    Trian gle        Institute,    ICF, Inc., Duke power Company, Carolina Powe r & Light                  Company,      B lue    Ridge Electric      seabership    C orpora tion ,      and other organizations.
One current program is stu dying                the    effects    of    pea k-loa d pricin g on residen tial electricity consunption ; this pro gram is f unded by the United          States        Depa rtmen t          Ene rg y    and
One current program is stu dying                the    effects    of    pea k-loa d pricin g on residen tial electricity consunption ; this pro gram is f unded by the United          States        Depa rtmen t          Ene rg y    and of involves the cooperation of CPGL and Blue Rid ge EMC.
_
of involves the cooperation of CPGL and Blue Rid ge EMC.


92 As  a  part  of    one cooperative agreement-, the Commission initia ted Docket No. 5-100, S ub 78, e ntitled              " Invest igation s of    Cost-Based    Hat es ,    Load  Banagement,      and  Conservation    -'
92 As  a  part  of    one cooperative agreement-, the Commission initia ted Docket No. 5-100, S ub 78, e ntitled              " Invest igation s of    Cost-Based    Hat es ,    Load  Banagement,      and  Conservation    -'
Line 2,041: Line 1,228:
Particular    atte n tion    is called to the evidence presented by the Public Staff at the July and              September    hearings    in Docket    No. 5-100, Sub 78.        The Public Staff evidence showed        J
Particular    atte n tion    is called to the evidence presented by the Public Staff at the July and              September    hearings    in Docket    No. 5-100, Sub 78.        The Public Staff evidence showed        J


93 that    the  State
93 that    the  State could    benefit    greatly from a residential energy conservation program.              It  was  estimated    that,    if every    homeowner      installed      conservation      measures    up to a level that gave him the greatest possible                net  saving,    the average    annual residential gas consumption could be reduced by as much as 47 dekatherms (Dth) or 47.45; statewide                    usage could    fall by 11,444,000 Dth, which is 17% of total current gas consumption.        Further, potential energy savings            for    an average electrically heated home could be 1,996 KUH per year or 17% of      annual      heating    consumption;      statewide    savings could reach 663,500,000 KWH.              The Public Staff recommended a residential        conservation      program      for    all    residential customers .
                      ,
The    Public    S taff  also    offered evidence that the use of load management techniques by the electric                  utilities    could reduce the demand on the system at selected times, alter the required generating plant construction program,                  and    result in  savings to the utilities in generation plant investment.
could    benefit    greatly from a residential energy conservation program.              It  was  estimated    that,    if every    homeowner      installed      conservation      measures    up to a level that gave him the greatest possible                net  saving,    the average    annual residential gas consumption could be reduced by as much as 47 dekatherms (Dth) or 47.45; statewide                    usage could    fall by 11,444,000 Dth, which is 17% of total current gas consumption.        Further, potential energy savings            for    an average electrically heated home could be 1,996 KUH per year or 17% of      annual      heating    consumption;      statewide    savings could reach 663,500,000 KWH.              The Public Staff recommended a
_
residential        conservation      program      for    all    residential customers .
_
The    Public    S taff  also    offered evidence that the use of load management techniques by the electric                  utilities    could
-
reduce the demand on the system at selected times, alter the required generating plant construction program,                  and    result in  savings to the utilities in generation plant investment.
The testimony offered            by  witness    Spann    focussed    on    two programs.          First,    the    utilities    could    control    certain industrial loads by interrupting those loads through the use of radio controlled switches:              in exchange, these industrial customers would receive            a    discount    based    on  the    KW  of controlled      load.      The  second program involves the utility control of residential water-heating loads:                  in exchange for a    flat  monthly      discount,      the    residential customer would allow the utility          to    use  a  radio    controlled    switch    to interrupt      residential water-heating service.              Both programs
The testimony offered            by  witness    Spann    focussed    on    two programs.          First,    the    utilities    could    control    certain industrial loads by interrupting those loads through the use of radio controlled switches:              in exchange, these industrial customers would receive            a    discount    based    on  the    KW  of controlled      load.      The  second program involves the utility control of residential water-heating loads:                  in exchange for a    flat  monthly      discount,      the    residential customer would allow the utility          to    use  a  radio    controlled    switch    to interrupt      residential water-heating service.              Both programs


Line 2,056: Line 1,236:
Bingham stated that if the custcaers were offered                  a  cr>>dit of about 31 50 per month, all existing customers with heater sizes of 66 gallons or larger would            appear    to  benefit    by accepting the controlled water heating rate.                Customers with available space would benefit by replacing their small unter heaters      with  66-gallon    units. seu home buyers would also find it beneficial to install a 66-gallon                or    larger  unit.  . . ,
Bingham stated that if the custcaers were offered                  a  cr>>dit of about 31 50 per month, all existing customers with heater sizes of 66 gallons or larger would            appear    to  benefit    by accepting the controlled water heating rate.                Customers with available space would benefit by replacing their small unter heaters      with  66-gallon    units. seu home buyers would also find it beneficial to install a 66-gallon                or    larger  unit.  . . ,
Lithough      not all residential customers would be expected to choose the controlled water heating rate, the Public Staff concluded      that, given monthly credits in the $1 00 to 32.00 range, the demand for the rate cculd              be  significant.      The Public      Staff  also  found    that  there      are about 100 large industrial customers in the          Duke    an d    CP&L  service    areas which    voeld    have  an  immediate    interest in interruptible serv ice, if such service could be          ertended      to    noncritical loads.      Under the assumptions and -}udgments used by witness Spann, the reduction in peak demand in 1990                resultin g    from the    interruptible industrial rates would be Sl0 HE for Duke and Ii0 55 for CPGL.        The  residential      water    heating  ra te
Lithough      not all residential customers would be expected to choose the controlled water heating rate, the Public Staff concluded      that, given monthly credits in the $1 00 to 32.00 range, the demand for the rate cculd              be  significant.      The Public      Staff  also  found    that  there      are about 100 large industrial customers in the          Duke    an d    CP&L  service    areas which    voeld    have  an  immediate    interest in interruptible serv ice, if such service could be          ertended      to    noncritical loads.      Under the assumptions and -}udgments used by witness Spann, the reduction in peak demand in 1990                resultin g    from the    interruptible industrial rates would be Sl0 HE for Duke and Ii0 55 for CPGL.        The  residential      water    heating  ra te
                                                                                    -


95 would    reduce the 1990 peak demand by 175 MW for Duke and 75 MW for CPGL.
95 would    reduce the 1990 peak demand by 175 MW for Duke and 75 MW for CPGL.
D. The Electric Utilities' Conservation a nd Load Management Pro grass The    electric    u tilities    a re  enga ged    in  a  variety  of conservation and load management programs.                  Each company    is making    a  se rious commitmen t to the concept of conserva tion and    load  ma na geme nt. The    approach      of    the    companies, s
D. The Electric Utilities' Conservation a nd Load Management Pro grass The    electric    u tilities    a re  enga ged    in  a  variety  of conservation and load management programs.                  Each company    is making    a  se rious commitmen t to the concept of conserva tion and    load  ma na geme nt. The    approach      of    the    companies, s
however,    has    been cautious, consisting of experimental and pilot-scale        pro jects        rather        th an        vide-ranging i mplem entation.      The    com panies    have    concluded    that this approach is necessary to ensure that the                benefits    of  such p rog rams  outweigh    the    costs which will be incurred by the companies and their customers.            There are programs involving little    cost,    but  many    of    the    load    management progra ms require costly switching and acnitoring equipment.
however,    has    been cautious, consisting of experimental and pilot-scale        pro jects        rather        th an        vide-ranging i mplem entation.      The    com panies    have    concluded    that this approach is necessary to ensure that the                benefits    of  such p rog rams  outweigh    the    costs which will be incurred by the companies and their customers.            There are programs involving little    cost,    but  many    of    the    load    management progra ms require costly switching and acnitoring equipment.
Duke P ower C ompany Duke    Power  c om pany,    in  the    loa d  forecast hearings in
Duke P ower C ompany Duke    Power  c om pany,    in  the    loa d  forecast hearings in Docket No. E-100, Sub 32, and in the conservation                    and  load ma na ge ment  hearings      in Docket No. 5-l 00, Sub 78, presented the    most  de tailed    evidence      of    any    company      on  its conservation and load management programs.
,
According    to    Duke    wit ness    Donald    H. Denton, Jr.,    Vice Pr esident of Marke ting, Duke 's Load Management Program  has as    its  goal    the  reduction in the growth of the company's
Docket No. E-100, Sub 32, and in the conservation                    and  load ma na ge ment  hearings      in Docket No. 5-l 00, Sub 78, presented the    most  de tailed    evidence      of    any    company      on  its conservation and load management programs.
According    to    Duke    wit ness    Donald    H. Denton, Jr.,    Vice Pr esident of Marke ting, Duke 's Load Management
'
Program  has as    its  goal    the  reduction in the growth of the company's


96 kilowatt    peak    load    and kilowatt-hour sales          This procran encompasses all sectors          of    Duke's                                '
96 kilowatt    peak    load    and kilowatt-hour sales          This procran encompasses all sectors          of    Duke's                                '
Line 2,087: Line 1,262:
Carolina Power & Licht Concany In    Docket    so. 5-100,  Sub    78, CPSL witness Barris Edge testified regarding the ongoing activities of              CPSL  in  the ares    of  conservation      and  load management. CPSL provides support to the Edison Electric Institute's program              on  load na na gement    a =d    participa tes  in the national study of rate design. In addition, auch work on load management is            being performed      in-house.      According    to  ftr. Edge, the various activities have grown to the point that CPGL is establishing a  permanent      staff with the technical expertise to make the appropriate analyses and recommendations for load management activities      and to follow through with the implementation of such activities.
Carolina Power & Licht Concany In    Docket    so. 5-100,  Sub    78, CPSL witness Barris Edge testified regarding the ongoing activities of              CPSL  in  the ares    of  conservation      and  load management. CPSL provides support to the Edison Electric Institute's program              on  load na na gement    a =d    participa tes  in the national study of rate design. In addition, auch work on load management is            being performed      in-house.      According    to  ftr. Edge, the various activities have grown to the point that CPGL is establishing a  permanent      staff with the technical expertise to make the appropriate analyses and recommendations for load management activities      and to follow through with the implementation of such activities.
The CPSL load management program current 1T consists of the following:        The    Common  Sense / Wrap  Up  Program;  customer
The CPSL load management program current 1T consists of the following:        The    Common  Sense / Wrap  Up  Program;  customer
                                                                          -


  '
99 education      regarding      heat    pumps,    insulation,      a nd  e ne rg y e fficient    a ppliances;      free  energy      audits;      advice      to customers in obtaining financing, materials, and contractors for energy conserva tion activities; and several experimental proj ec ts.
99 education      regarding      heat    pumps,    insulation,      a nd  e ne rg y e fficient    a ppliances;      free  energy      audits;      advice      to customers in obtaining financing, materials, and contractors for energy conserva tion activities; and several experimental
_
proj ec ts.
The    Connon    Sen se    Programs    en co urage  high    levels    of c
The    Connon    Sen se    Programs    en co urage  high    levels    of c
insula tion and the use of energy efficient appliances in new houses,      new  apartments, and new business structures.              CPSL estima tes tha t a n a vera ge 1500 sguare-foo t house            conforming to    the    programs    will sa ve 4,300 kilowatt-hours on heating and cooling requirements.          The Common Sense House Program is also    being    extended    to    manufa ct ur ed  homes. These homes represent a substantial proportion of new                CPSL    connections each    year.      The  Erap-Up Program is the cou nterpart of the Common      Sense    Program      which    is  applicable    to    existing buildings.        These    programs,      as  well  as  other    means of
insula tion and the use of energy efficient appliances in new houses,      new  apartments, and new business structures.              CPSL estima tes tha t a n a vera ge 1500 sguare-foo t house            conforming to    the    programs    will sa ve 4,300 kilowatt-hours on heating and cooling requirements.          The Common Sense House Program is also    being    extended    to    manufa ct ur ed  homes. These homes represent a substantial proportion of new                CPSL    connections each    year.      The  Erap-Up Program is the cou nterpart of the Common      Sense    Program      which    is  applicable    to    existing buildings.        These    programs,      as  well  as  other    means of conserving energy, are being promoted through bill                    inserts, personal contacts, and media advertisement.                The educational efforts concerning proper lighting, efficient a pplia nces (in commercial cooking and processing, as well as in residential use) ,    use  of    heat    pumps,    and  proper      insulation      a re applicable        to  all    custome r    cla sse s. For  customers who desire to install equipment to automatically regulate their load, CPGL will install (for a monthly facilities charge) equipment to        provide    the    me te r  pulses    needed    for  such continuous monitoring.
'
conserving energy, are being promoted through bill                    inserts, personal contacts, and media advertisement.                The educational efforts concerning proper lighting, efficient a pplia nces (in
,
commercial cooking and processing, as well as in residential
'
use) ,    use  of    heat    pumps,    and  proper      insulation      a re applicable        to  all    custome r    cla sse s. For  customers who desire to install equipment to automatically regulate their
_
load, CPGL will install (for a monthly facilities charge) equipment to        provide    the    me te r  pulses    needed    for  such continuous monitoring.
'


100 CPGL's    load    managenest    program    also  includes    various experimental activities.          CPGL is involved in a      time-o f-day  3 rate    demonstration      project      in    cooperation    with    the
100 CPGL's    load    managenest    program    also  includes    various experimental activities.          CPGL is involved in a      time-o f-day  3 rate    demonstration      project      in    cooperation    with    the Commission    and    the    Blue    addge      Electric    5embership Corporauion.      This    three-year    project,    scheduled    to  be completed in the summer of l 979, should provide            substantial evidence on the effectiveness        fi.e., customer acceptance and re sponse) of time-of-day rates in redistributing peak loads.
                                                                            '
Commission    and    the    Blue    addge      Electric    5embership Corporauion.      This    three-year    project,    scheduled    to  be completed in the summer of l 979, should provide            substantial evidence on the effectiveness        fi.e., customer acceptance and re sponse) of time-of-day rates in redistributing peak loads.
Other    experimental    activities include a two-year project that examines      the  potential    of    interrupting    service    to reside ntial    customers via radio control.        In addition, CPGL -
Other    experimental    activities include a two-year project that examines      the  potential    of    interrupting    service    to reside ntial    customers via radio control.        In addition, CPGL -
has surveyed the possibility          of  interruptible    service      to large industrial and commercial customers.
has surveyed the possibility          of  interruptible    service      to large industrial and commercial customers.
Line 2,113: Line 1,273:
vireinia Electric gd Power connant The    load    ma nageme nt  efforts    and  energy  conservation activities of YEPCC were also presented in Docket No. 5-100,                ,
vireinia Electric gd Power connant The    load    ma nageme nt  efforts    and  energy  conservation activities of YEPCC were also presented in Docket No. 5-100,                ,


lol
lol Sub    78. Edmond      Vickham,      Directot    of  L oad    Management Applications      for    YE PCO ,    testified    th at  an    active    load management      program      is    bein g  undertaken      purs ua n t  to    a corporate goal of reducing the projected peak load by 500 MW by 1985. The VEPCO load forecast and resulting construction schedule takes account of this proposed reduction.
_
Sub    78. Edmond      Vickham,      Directot    of  L oad    Management Applications      for    YE PCO ,    testified    th at  an    active    load management      program      is    bein g  undertaken      purs ua n t  to    a corporate goal of reducing the projected peak load by 500 MW by 1985. The VEPCO load forecast and resulting construction schedule takes account of this proposed reduction.
According      to    testimony by company witness Roach, VE PCO 's conservation activities include providing energy                    audits    on an inf ormal basis to residential customers a t the customer's request. Vepco ha s plans fo r a pilot program which may be expanded      to    a    more    formal    program.      Ccamercial      and industrial customers are curren tly of fered various ma te rials to    aid _them          in    performing      their    own    energy      audit.
According      to    testimony by company witness Roach, VE PCO 's conservation activities include providing energy                    audits    on an inf ormal basis to residential customers a t the customer's request. Vepco ha s plans fo r a pilot program which may be expanded      to    a    more    formal    program.      Ccamercial      and industrial customers are curren tly of fered various ma te rials to    aid _them          in    performing      their    own    energy      audit.
Insulation and lighting          reconnenda tions        are    a vailable    to    ,
Insulation and lighting          reconnenda tions        are    a vailable    to    ,
cust om ers. C onse rva tion      is encoura ged through educational materials and advertisements.              VIP CO is    revising      its  heat pump    program    tc    en co ura ge heat pump aanufacturers to make availa ble efficient, reliable beat pu mps.                Other programs in planning    or  in developmental stages include the following:
cust om ers. C onse rva tion      is encoura ged through educational materials and advertisements.              VIP CO is    revising      its  heat pump    program    tc    en co ura ge heat pump aanufacturers to make availa ble efficient, reliable beat pu mps.                Other programs in planning    or  in developmental stages include the following:
Electric Energy Efficient Bone Program (similar to CPGL's
Electric Energy Efficient Bone Program (similar to CPGL's Common    Sense    Program and Duke'; Energy Efficient Structure Progras),      a    reference        manual    on    load      ma na ge me nt ,
'
experimental      activities        on  alterna te    energy sources, and experimental projects on load management techniques.
Common    Sense    Program and Duke'; Energy Efficient Structure Progras),      a    reference        manual    on    load      ma na ge me nt ,
experimental      activities        on  alterna te    energy sources, and
_
experimental projects on load management techniques.
The  experimental load management activities tha t VEPc0 is currently    planning      in volve    both    direct      and      indirect
The  experimental load management activities tha t VEPc0 is currently    planning      in volve    both    direct      and      indirect


Line 2,134: Line 1,288:
necent                                and    escalating      prices    of conventional fossil fuel or nuclear fuel energy systems have encouraged a close examination of the practical potential of other energy        sources.        Economic    considerations      of  other alternatives        will    ultimately involve both the direct costs associated with each of the new scur=es and their effects on the    health    of    the    Stat e's    economy. The    availability, reliability, and cost of energy, from whatever source,                    will largely    determine        the    cha racter  and levels of industrial growth    and    resulting        employment    oppo rtunities    in  North Carolina.
necent                                and    escalating      prices    of conventional fossil fuel or nuclear fuel energy systems have encouraged a close examination of the practical potential of other energy        sources.        Economic    considerations      of  other alternatives        will    ultimately involve both the direct costs associated with each of the new scur=es and their effects on the    health    of    the    Stat e's    economy. The    availability, reliability, and cost of energy, from whatever source,                    will largely    determine        the    cha racter  and levels of industrial growth    and    resulting        employment    oppo rtunities    in  North Carolina.
The vulnerability of this State's economy to both national
The vulnerability of this State's economy to both national
                                                                                  -


103
103 and internationa l actions f urther encourages development                      of
  .
   -    a  range      of energy options.          The 1973 oil embargo adversely a ffected both the personal an d the            business    ope rations      of Morth    Ca rolinia ns.      In    addition, the extreme shortages of natural gas severely crippled the state                in    the    wi nte r    of 1976.      If severe economic and social consequences resulting from such occurrences are to be avoided                in    the    future,      a range    of    options    must    be  available    to    meet the energy demands of N orth Ca rolina.            While the present employaent            of alternative      energy    sources      appears    to be supplemental in nature, the potential of the se            sources    must    Le    ex am ined.
and internationa l actions f urther encourages development                      of
Conservation,      whi ch    the    Commission    considers      to  be    an extremely importan t        alternative      energy    source,      has    been examined in an earlier section.              However, in addition to the conservation efforts of            t he    utilities,    cther    groups    a re ma kin g  contribu tions.        The    North Carolina Energy Pesearch Institute has several projects dealing with ccnservation and alternative      energy      sources.      The  Energy    Division of the North    Carolina      Department      of  Commerce    has    developed      a Comprehensive        S ta tewide    Energy Conservation Pl a n , which is s.
   -    a  range      of energy options.          The 1973 oil embargo adversely a ffected both the personal an d the            business    ope rations      of Morth    Ca rolinia ns.      In    addition, the extreme shortages of natural gas severely crippled the state                in    the    wi nte r    of 1976.      If severe economic and social consequences resulting
,
,
from such occurrences are to be avoided                in    the    future,      a
'
range    of    options    must    be  available    to    meet the energy
'
demands of N orth Ca rolina.            While the present employaent            of alternative      energy    sources      appears    to be supplemental in nature, the potential of the se            sources    must    Le    ex am ined.
Conservation,      whi ch    the    Commission    considers      to  be    an extremely importan t        alternative      energy    source,      has    been examined in an earlier section.              However, in addition to the conservation efforts of            t he    utilities,    cther    groups    a re ma kin g  contribu tions.        The    North Carolina Energy Pesearch
,
Institute has several projects dealing with ccnservation and
-
alternative      energy      sources.      The  Energy    Division of the North    Carolina      Department      of  Commerce    has    developed      a
',
Comprehensive        S ta tewide    Energy Conservation Pl a n , which is s.
designed to conserve 8.05% of the                State's    total      projected
designed to conserve 8.05% of the                State's    total      projected
,    1980    energy    consumption        of    1,736.08    trillion      BTU's,      a t
,    1980    energy    consumption        of    1,736.08    trillion      BTU's,      a t
savings of l39.72 trillion B TU 's.              The ma jor program for t he residential        sec tor    is Proj ect Conserve, which provides the
savings of l39.72 trillion B TU 's.              The ma jor program for t he residential        sec tor    is Proj ect Conserve, which provides the homeowner with        an    objective      analysis    of    the    costs    and saving s    likely    to    result      from such sensures as adding or increasing insulation, installing stors windows                    and    doors,
'
homeowner with        an    objective      analysis    of    the    costs    and
_
saving s    likely    to    result      from such sensures as adding or increasing insulation, installing stors windows                    and    doors,
.


104 and set *%g back ther:cstats.
104 and set *%g back ther:cstats.
Line 2,169: Line 1,302:
: 1. nuclear fusion
: 1. nuclear fusion
: 2. wind                                                                  's
: 2. wind                                                                  's
_.
                                                .. ...                .  . ,'
: 3. geothermal 4    biomass and plant energy
: 3. geothermal 4    biomass and plant energy
: 5. fuel cells G. tar sands /cil shale
: 5. fuel cells G. tar sands /cil shale
: 7. coal gasification/liquifica* den
: 7. coal gasification/liquifica* den
: 3. solar Electric    generation systems which use wave ac* don and tidal energy, both of which were discussed in last year's                Report, appear    un1_ ikely  to be developed further during the present planning period.      The technology required to          obtain  energy from  wave action i= very complex and expensive.              Therefore,
: 3. solar Electric    generation systems which use wave ac* don and tidal energy, both of which were discussed in last year's                Report, appear    un1_ ikely  to be developed further during the present planning period.      The technology required to          obtain  energy from  wave action i= very complex and expensive.              Therefore,
                                                                              .


105
105 wave generation systems will prctably be delayed until                          less complex      alternative        sources      of    gene ra tion      have    been perfected and accepted.          Due to    the    nature        of  the  tidal conditions    off    the    mid- A tlan tic    shores,        it appears that there will be little application for tidal energy generators in this area.      However, there has been limited discussion of r    placing these units in some of the inlets between the                        outer Banks    to  take    a d van tage    of  the concentra ted tidal water flows at those locations.            In addition, some examina tion                is bein g    made    of    ocean    the rmal    energy        gradient      devices, although there is        little    expectation        of    any    substantial development of this source in the near future.
  -.
wave generation systems will prctably be delayed until                          less complex      alternative        sources      of    gene ra tion      have    been perfected and accepted.          Due to    the    nature        of  the  tidal conditions    off    the    mid- A tlan tic    shores,        it appears that there will be little application for tidal energy generators in this area.      However, there has been limited discussion of r    placing these units in some of the inlets between the                        outer Banks    to  take    a d van tage    of  the concentra ted tidal water flows at those locations.            In addition, some examina tion                is bein g    made    of    ocean    the rmal    energy        gradient      devices, although there is        little    expectation        of    any    substantial development of this source in the near future.
Posion                                                ._ _
Posion                                                ._ _
Research    on    the    nuclear fusion system has progressed to the    point  that      most      plasma      physicists          accept      i ts technological      feasibility.        The fact tha t the actual fusion
Research    on    the    nuclear fusion system has progressed to the    point  that      most      plasma      physicists          accept      i ts technological      feasibility.        The fact tha t the actual fusion device is presently          bein g    designed    is      certainly      a  step towards    a  powe r- prod ucing      system. However, the practical utiliza tion    of    such    a  source    remains        uncertain,        due m
-
primarily to the high costs and the problems associa ted with the very high temperatures involved.                However, the fact that the    supply    of    f uel for this source of energy is virtually inexhaustible and that there are no major radioactive                          vaste disposal      proble ms      make    nuclear    fusion        ve ry    attractive.
device is presently          bein g    designed    is      certainly      a  step towards    a  powe r- prod ucing      system. However, the practical utiliza tion    of    such    a  source    remains        uncertain,        due m
Nevertheless, recent          shifts      cf  research        and    development f und in g    from    fusion      research      to    solar      resea rch    ha ve
primarily to the high costs and the problems associa ted with the very high temperatures involved.                However, the fact that the    supply    of    f uel for this source of energy is virtually inexhaustible and that there are no major radioactive                          vaste
'
disposal      proble ms      make    nuclear    fusion        ve ry    attractive.
Nevertheless, recent          shifts      cf  research        and    development
_
f und in g    from    fusion      research      to    solar      resea rch    ha ve


l06 significantly delayed the program; it now appears that                this country      will not see any najar impact of this source during              s the twentieth century.
l06 significantly delayed the program; it now appears that                this country      will not see any najar impact of this source during              s the twentieth century.
Line 2,196: Line 1,318:
Carolina,      a wind turbine is to be built near Boone for the Blue Ridge Electrical 5embership Corporation.                It  will  be the    largest    wind  turbine ever conste.d and will supply 500 homes      with    required    electricity.      Although    work  is continuing on this source of energy, few expect it to have a significant impact on the supply picture in the next few years.
Carolina,      a wind turbine is to be built near Boone for the Blue Ridge Electrical 5embership Corporation.                It  will  be the    largest    wind  turbine ever conste.d and will supply 500 homes      with    required    electricity.      Although    work  is continuing on this source of energy, few expect it to have a significant impact on the supply picture in the next few years.
Geothermal Within    the    last  year. interest    in  geothermal    energy sources and optimisa concerning their practical                application have      grown.      However,  the  optimisa    for  more    extensive
Geothermal Within    the    last  year. interest    in  geothermal    energy sources and optimisa concerning their practical                application have      grown.      However,  the  optimisa    for  more    extensive
                                                                              .


107 application continues to          be    associa ted        with    the    western United    States    and  vill probably have little impact on the anergy requirements and sources of North Carolina.
107 application continues to          be    associa ted        with    the    western United    States    and  vill probably have little impact on the anergy requirements and sources of North Carolina.
Biomass The    possibility      of  using    biomass      as    a fuel source is receiving such attention f rom          national        and    local    groups.
Biomass The    possibility      of  using    biomass      as    a fuel source is receiving such attention f rom          national        and    local    groups.
The Institute of Gas Technology (IGT) is involved in several such projects.      For example, the          design      and    poten tial      of large    advanced digestive sys tems which involve a mixture of water hyacinth, Bermuda grass, municipal                  solid      vaste,    and
The Institute of Gas Technology (IGT) is involved in several such projects.      For example, the          design      and    poten tial      of large    advanced digestive sys tems which involve a mixture of water hyacinth, Bermuda grass, municipal                  solid      vaste,    and sewage sludge are being investigated on a pilot plant scale.
  -
Earlier laboratory testing          indica ted      that      the se    mix tur es would produce more methane than what many would designa te as pure biomass.      In other    p ro jec ts ,    IGT    examined      additives that    may accelerate anaerobic sewage sludge digestion which may allow up to double the loadings.                En    anaerobic      process for  converting      ocean    kelp    to    s yn the tic    natural gas was studied, and testing was conducted on                processes        to  ob tain fuel from the thermochemical conversion of biomass.
sewage sludge are being investigated on a pilot plant scale.
Earlier laboratory testing          indica ted      that      the se    mix tur es
                        '
would produce more methane than what many would designa te as pure biomass.      In other    p ro jec ts ,    IGT    examined      additives that    may accelerate anaerobic sewage sludge digestion which may allow up to double the loadings.                En    anaerobic      process for  converting      ocean    kelp    to    s yn the tic    natural gas was studied, and testing was conducted on                processes        to  ob tain fuel from the thermochemical conversion of biomass.
The    North  Carolina Ene rgy Division, Duke University, and Duke Power Company        are  examining        alternative        sources      of ener gy ,    which    include    pla nt    energy      and      other    biomass so urces. A recent project funded            by  the    Energy      Division investigated        the    use    of    wood      for    small-s cal e      power
The    North  Carolina Ene rgy Division, Duke University, and Duke Power Company        are  examining        alternative        sources      of ener gy ,    which    include    pla nt    energy      and      other    biomass so urces. A recent project funded            by  the    Energy      Division investigated        the    use    of    wood      for    small-s cal e      power
~
~
Line 2,216: Line 1,333:
The    work    on  coal    gasificatice    and  liquification    is continuing.      The      E nvironmental      Protaction    Agency    is conducting      several      projects    on  the  various  processes involved; however, the          carcinogenic    and  mutagenic  agents that    result    from    these processes continue to be important        '
The    work    on  coal    gasificatice    and  liquification    is continuing.      The      E nvironmental      Protaction    Agency    is conducting      several      projects    on  the  various  processes involved; however, the          carcinogenic    and  mutagenic  agents that    result    from    these processes continue to be important        '


l09
l09 c once rn s. Since    no    maj or  breakthroughs      have      occ urred recen tly,    it  is  probable that this technology will not be accelerated in the near future.
_.
Puel cells Th e  development of fuel cells has advanced from the first generation phosphoric-acid cells to              the  second    generation stage    of    molten carbonate cells.          The Department of Energy has funded several projects to improve the                performance      and endura nce    of  these    second      generation    cells. Production methods,      selection    of    sta ble    anode    materials,    and    the optimization      of  the    fuel cell elec trolyte (mainly through the production of a lithina aluminate electrolyte tile) ha ve been    studied    in  the    ongoing    efforts to improve the cost effectiveness of this source.            Other    experimental      progra ms have    evaluated the feasibility of using heavy fuel oils for producing fuel      cell  quality      fuels    through    processes      of hy drogasification,      steam    re formin g,    hydrod esulf uriza tio n ,
c once rn s. Since    no    maj or  breakthroughs      have      occ urred
  -
recen tly,    it  is  probable that this technology will not be accelerated in the near future.
Puel cells Th e  development of fuel cells has advanced from the first generation phosphoric-acid cells to              the  second    generation stage    of    molten carbonate cells.          The Department of Energy has funded several projects to improve the                performance      and endura nce    of  these    second      generation    cells. Production methods,      selection    of    sta ble    anode    materials,    and    the
-
optimization      of  the    fuel cell elec trolyte (mainly through the production of a lithina aluminate electrolyte tile) ha ve been    studied    in  the    ongoing    efforts to improve the cost effectiveness of this source.            Other    experimental      progra ms have    evaluated the feasibility of using heavy fuel oils for producing fuel      cell  quality      fuels    through    processes      of hy drogasification,      steam    re formin g,    hydrod esulf uriza tio n ,
and hydrocracking.        Development has also been initiated            for a    reversible    ele ctrochemical      cell, serving both as a f uel cell and an electroly er.
and hydrocracking.        Development has also been initiated            for a    reversible    ele ctrochemical      cell, serving both as a f uel cell and an electroly er.
The    Edison    Power    Resear ch    Institute    is  involved in a multi-year endeavor to develop fuel cell components that can function      even  if  the    f uel gas stream contains as much as 200 ppa sulfur by volume.          Sulfur tolerant        anode  ca ta lys ts
The    Edison    Power    Resear ch    Institute    is  involved in a multi-year endeavor to develop fuel cell components that can function      even  if  the    f uel gas stream contains as much as 200 ppa sulfur by volume.          Sulfur tolerant        anode  ca ta lys ts and anode polarization must be studied.
-
and anode polarization must be studied.
_.


ilo In  New  York  City, the Consolidated Edison Power Company recently received approval for          a  4. 8    megawatt    fuel    cell '
ilo In  New  York  City, the Consolidated Edison Power Company recently received approval for          a  4. 8    megawatt    fuel    cell '
demonstration      pla n t  which  vi u  involve EPRI, DOE, United Technologies, and several        u tilities. The    Bev  York    City Board of Standards and Appeals ruled that fuel cells are not refineries ant thus approved the plan for            the    installation of    the    planned      equip ment. This    approval    is    quite significant and makes fusi cells the            only  power-generating equipment    that    can be installad in the city.          In addition, the acceptance of this planned demonstration              plant    by  the nanhattaa    residents is allowing the schedule to move ahead, in contrast to other energy related projects.              The areas    to be    investigated    during the projeet include verification of e mission,    load  following    characteristics,      and  aesthetic c?cracteristics of the plant.          If the results are favorable,        J it is anticipated that comaercial development of              the    plant will begir Solar The  interest    in    solar energy as an alternative fuel has been onhanced because of the rising costs of oil and gas and becaus e    ma ny  perscas    consider    it    the  most    att'. active alternative that is currently available.            A witness for      the Public    Staff    testified    that  the use of solar energy as a su pplement to conventional energy is now economical for some hot    water  heating    applications. With the tax credits now available to users of solar energy and the increasing prices                ,
demonstration      pla n t  which  vi u  involve EPRI, DOE, United Technologies, and several        u tilities. The    Bev  York    City Board of Standards and Appeals ruled that fuel cells are not refineries ant thus approved the plan for            the    installation of    the    planned      equip ment. This    approval    is    quite significant and makes fusi cells the            only  power-generating equipment    that    can be installad in the city.          In addition, the acceptance of this planned demonstration              plant    by  the nanhattaa    residents is allowing the schedule to move ahead, in contrast to other energy related projects.              The areas    to be    investigated    during the projeet include verification of e mission,    load  following    characteristics,      and  aesthetic c?cracteristics of the plant.          If the results are favorable,        J it is anticipated that comaercial development of              the    plant will begir Solar The  interest    in    solar energy as an alternative fuel has been onhanced because of the rising costs of oil and gas and becaus e    ma ny  perscas    consider    it    the  most    att'. active alternative that is currently available.            A witness for      the Public    Staff    testified    that  the use of solar energy as a su pplement to conventional energy is now economical for some hot    water  heating    applications. With the tax credits now available to users of solar energy and the increasing prices                ,
                                                                              .


lit of conventional fuel, some builders of new homes are fi nding that solar assisted heating of the              structures    is  beccaing m ore    at tractive. Pchlic witnesses presented inf ormation on solar potential in North Carolina.              Currently, projects      are being    conducted by local universities, priva te individ uals, and other interest groups.            There seems to be agreement tha t the    potential of solar energy as an alternative fuel source deserves serious consideration.            An extensive program      being conducted by the United States Department cf Energy attempts to identify possible commercial and industrial                  applications of    this    technology.      This work may result in an increased
lit of conventional fuel, some builders of new homes are fi nding that solar assisted heating of the              structures    is  beccaing m ore    at tractive. Pchlic witnesses presented inf ormation on solar potential in North Carolina.              Currently, projects      are being    conducted by local universities, priva te individ uals, and other interest groups.            There seems to be agreement tha t the    potential of solar energy as an alternative fuel source deserves serious consideration.            An extensive program      being conducted by the United States Department cf Energy attempts to identify possible commercial and industrial                  applications of    this    technology.      This work may result in an increased
      '
-          market and a decreased price.            In a report from a      concerned te chnical      group    which    investigated conceptual designs and photovoltaics through computer simula tion, opportunities for both    improved performance and reduced cost were identified, but even minor market penetratica for the residential sector was not projected before the 1980's.
-          market and a decreased price.            In a report from a      concerned te chnical      group    which    investigated conceptual designs and photovoltaics through computer simula tion, opportunities for both    improved performance and reduced cost were identified, but even minor market penetratica for the residential sector was not projected before the 1980's.
-
_
The    use    of solar thermal energy (above 4000F) to produce
The    use    of solar thermal energy (above 4000F) to produce
_        energy-intensive chemical products as well as various                  types of    solar      coller; tion    and    s tora ge  has  recently    been investigated.          Some    researchers        now      believe      tha t conventional          sola r    sto ra ge    may    be  supplemented    with solar photochemical storage.              This procedure would      increa se
_        energy-intensive chemical products as well as various                  types of    solar      coller; tion    and    s tora ge  has  recently    been investigated.          Some    researchers        now      believe      tha t conventional          sola r    sto ra ge    may    be  supplemented    with solar photochemical storage.              This procedure would      increa se
_        both the temperature of the storage unit and its efficiency.
_        both the temperature of the storage unit and its efficiency.
    ,
Stanford      University    has    reported      that    the    efficiency achievable      in    their  thermo photevol taic      (TPV)  solar cell research has more than          do ubled    in    the  last  year. This
Stanford      University    has    reported      that    the    efficiency
  -
achievable      in    their  thermo photevol taic      (TPV)  solar cell research has more than          do ubled    in    the  last  year. This
__


112 research,      sponsored      by      ZPRI,    involves      conve rting incandescent light into electrical energy.              As improved call    s design    further    increases    performance,      the  35%  level of
112 research,      sponsored      by      ZPRI,    involves      conve rting incandescent light into electrical energy.              As improved call    s design    further    increases    performance,      the  35%  level of efficiency that could make TPY systems economical                in  large plants nos seems a definite possibility.
                                                                            '
Loca lly,  North Carolina Sta te University and the Basearch Triangle    Institute    are  both    doing  significant      work  in photovoltaics    and  appear    to    be  on the frontiers of such research. EPEI is also sponsoring projacts that involve the development    of  new concepts in solar energy, including the use    of  highly    concentrated      sunlight    in    high-efficiency photovoltaic    cells. Proenction      of  low-cost photovoltaic thin film, which could convert sunlight to              energy    directly and  e ff3cimatly ,  is  also    being examined.      This new fils, which would not      require    a    sunlight-concentrating        systaa, appears    promising,    both    in    terns  of  costs and relative efficiency.
efficiency that could make TPY systems economical                in  large plants nos seems a definite possibility.
Loca lly,  North Carolina Sta te University and the Basearch Triangle    Institute    are  both    doing  significant      work  in photovoltaics    and  appear    to    be  on the frontiers of such research. EPEI is also sponsoring projacts that involve the development    of  new concepts in solar energy, including the use    of  highly    concentrated      sunlight    in    high-efficiency photovoltaic    cells. Proenction      of  low-cost photovoltaic thin film, which could convert sunlight to              energy    directly and  e ff3cimatly ,  is  also    being examined.      This new fils,
                                                                            -
which would not      require    a    sunlight-concentrating        systaa, appears    promising,    both    in    terns  of  costs and relative efficiency.
Some proponents of solar energy expect large reductions in the costs of solar      systems      to  result    from    economies    of scale,    tech.nological    laprowmeats, and reduced labor costs as  the  ease  of  installation,        innovative      designs    and competition    all  increase.      Others    do not expect dramatic reducticas; the cost of      these      systems    is  mostly    in  tJe metal, glass, and plastic parts, the control systems and the 2ans and pumps, the costs of which are not expectsd to                come down.
Some proponents of solar energy expect large reductions in the costs of solar      systems      to  result    from    economies    of scale,    tech.nological    laprowmeats, and reduced labor costs as  the  ease  of  installation,        innovative      designs    and competition    all  increase.      Others    do not expect dramatic reducticas; the cost of      these      systems    is  mostly    in  tJe metal, glass, and plastic parts, the control systems and the 2ans and pumps, the costs of which are not expectsd to                come down.


Line 2,261: Line 1,357:
114 peak  use    days. N auxiliary heating systems will come on during some of the coldest hours of the morning              and    remain  ~
114 peak  use    days. N auxiliary heating systems will come on during some of the coldest hours of the morning              and    remain  ~
on  into    the  early    day, which will be coincident with the          '
on  into    the  early    day, which will be coincident with the          '
normal time of the electric system wintar peak.              This    type of  solar    system would make the load factor of the electric utilities      deteriorate    and    would  thus  cause  an    upward pressure on the cost of electricity.            In fact, the increased
normal time of the electric system wintar peak.              This    type of  solar    system would make the load factor of the electric utilities      deteriorate    and    would  thus  cause  an    upward pressure on the cost of electricity.            In fact, the increased cost from this effect may be greater            than  any  net  energy savings    from    the contribution of the solar equipment.          T he matter of acostrola of these systems,            then,  is  one    which must    be    carefully    analysed    in    the near futur.e. Thermal storage may be one        answer    if  consumers    insist  on    using backup    electric      heating    or  cooling systems. In order to encourage ins +=11a tion and proper *4-ing of thermal            storage equipment      where    electric backup. is used, with solar heating        -
                                                                                  .
cost from this effect may be greater            than  any  net  energy savings    from    the contribution of the solar equipment.          T he matter of acostrola of these systems,            then,  is  one    which must    be    carefully    analysed    in    the near futur.e. Thermal storage may be one        answer    if  consumers    insist  on    using backup    electric      heating    or  cooling systems. In order to encourage ins +=11a tion and proper *4-ing of thermal            storage equipment      where    electric backup. is used, with solar heating        -
installations,      the  commizzion    concludes    that    utilities should      make      voluntary      experimental    time-of-day    rates
installations,      the  commizzion    concludes    that    utilities should      make      voluntary      experimental    time-of-day    rates
                                                                                 ~
                                                                                 ~
available to such installa tions.
available to such installa tions.
_
suaverv Alternative      e nergy  sources do exist in varying stages of development.      However, the composite impact of these sources including      conse rvation    is  difficult    to quantify with the data currently available.          It is expected that some of thase so urces    will be further developed and will gradually become                  _
suaverv Alternative      e nergy  sources do exist in varying stages of development.      However, the composite impact of these sources
                                                                                "
including      conse rvation    is  difficult    to quantify with the
_
data currently available.          It is expected that some of thase so urces    will be further developed and will gradually become                  _
an integral part of the energy supply. While research and develo pment    in    these  potential    areas  is encouraged, the
an integral part of the energy supply. While research and develo pment    in    these  potential    areas  is encouraged, the
                                                                                 ~
                                                                                 ~


II5 Commission a ust continue to    plan  for  the  State's  energy needs  in  the  most  realistic  manner. Thus, the present f orecast cannot be reduced as much      as  some  pa rties  would like. However,    the  C ommission  expects    that,  in  future planning  periods,    some  of  these  areas    will    be  more quanti fiable and, thus, will play a larger role in supplying sor*h Carolin a's ener gy needs.
II5 Commission a ust continue to    plan  for  the  State's  energy needs  in  the  most  realistic  manner. Thus, the present f orecast cannot be reduced as much      as  some  pa rties  would like. However,    the  C ommission  expects    that,  in  future planning  periods,    some  of  these  areas    will    be  more quanti fiable and, thus, will play a larger role in supplying sor*h Carolin a's ener gy needs.
                          .


     !!6 CHAPTER VII
     !!6 CHAPTER VII COECLUSICES                                  j The    forecast    plan    adopted  in  this 1978 report shows a decline in the rate of growth          of    the    peak  loa d  of  both Carolina      Power    & Light Company and Duke Power Company.          In its 1977 Report        the    Commission    found    that  the  probable annual      rate  of    growth in peak load for both CPSL and Duke would be approximately 6.9% d uring the years I 976-1990.                In the    1978 report the Co==4 ==i on has adopted for its capacity plan an annual peak load growth rate of 5.2% for CPSL and
                                                                              ,
COECLUSICES                                  j The    forecast    plan    adopted  in  this 1978 report shows a decline in the rate of growth          of    the    peak  loa d  of  both Carolina      Power    & Light Company and Duke Power Company.          In its 1977 Report        the    Commission    found    that  the  probable
'
annual      rate  of    growth in peak load for both CPSL and Duke would be approximately 6.9% d uring the years I 976-1990.                In the    1978 report the Co==4 ==i on has adopted for its capacity plan an annual peak load growth rate of 5.2% for CPSL and
: 5. 4% for Duke.
: 5. 4% for Duke.
The Comm4 esion's t 978 forecast is based in large part upon the premise that conservation and            load    mana gement  efforts a
The Comm4 esion's t 978 forecast is based in large part upon the premise that conservation and            load    mana gement  efforts a
Line 2,293: Line 1,377:
a flat monthly        discount,    the  residential      customer    sould allow      the    utilities    to  use  a radio controlled switch to interrupt residential water-heating service. Second, the utility      control    of certain interruptible industrial leads:
a flat monthly        discount,    the  residential      customer    sould allow      the    utilities    to  use  a radio controlled switch to interrupt residential water-heating service. Second, the utility      control    of certain interruptible industrial leads:
in exchange for a discount based on            the  EN  of  controlled
in exchange for a discount based on            the  EN  of  controlled
                                                                                    -
_


117 load,  indust ria l  cu s tome rs  would  allow    the utilities to interrupt  certain    ind us trial    loads    through      a      ra dio cont rolled  switch.      The    commission    will  order the three electric utilities to file          proposed    plans  for  t he se    two programs within 270 days.
117 load,  indust ria l  cu s tome rs  would  allow    the utilities to interrupt  certain    ind us trial    loads    through      a      ra dio cont rolled  switch.      The    commission    will  order the three electric utilities to file          proposed    plans  for  t he se    two programs within 270 days.
Furthermore,    the three utilities will be required to file voluntary rates incorporating time-of-day pricing              to    th ose customers    who  either    ins tall  solar    equipment,      thermal storage equipment, or a        c ombina tion  of  the  two    for    the purpose of providing space heating.          The rate schedules will be filed on an experimental basis.          It is expected that t his experimental    rate vill of fer sufficient economic incentives to such customers so that the energy available from                such    a system  vill  be  used during the pea k times of the electric utilities and that the peak demand vill not be increased                  by solar systems.
Furthermore,    the three utilities will be required to file voluntary rates incorporating time-of-day pricing              to    th ose customers    who  either    ins tall  solar    equipment,      thermal storage equipment, or a        c ombina tion  of  the  two    for    the purpose of providing space heating.          The rate schedules will be filed on an experimental basis.          It is expected that t his experimental    rate vill of fer sufficient economic incentives to such customers so that the energy available from                such    a system  vill  be  used during the pea k times of the electric utilities and that the peak demand vill not be increased                  by solar systems.


118
118 TABLE 1. Capacity Addition Plans for Virginia Electric & Power Company ygga                vapco Plan                          .Public Staff Plan UNIT                  "W              C7!IT                  MW I                                i 19798lNorthAnna2                    907 l North Anna 2 + Update            934 W    i                                i t                                i 19808 I                                      P- 1=4a7 + Uprata            286 W'                                    l I                                :
                                                                                          -
    .
TABLE 1. Capacity Addition Plans for Virginia Electric & Power Company ygga                vapco Plan                          .Public Staff Plan UNIT                  "W              C7!IT                  MW I                                i 19798lNorthAnna2                    907 l North Anna 2 + Update            934 W    i                                i t                                i 19808 I                                      P- 1=4a7 + Uprata            286 W'                                    l I                                :
I 19813l                                    l North Anna 3                  907 wi                                    i i                                l 19823 ,' Bath County 1, 2, 3, 4    1500 l Uprats + Bath County 1, 2        731 W r Bath County 5, 6            750 I I                                I 19835 e                                    i North Anna 4                  907 WlBorthAnna3                    907 I I                                i 19848I                                    l Uprate + Bath County 3, 4      731 WlNorthAnna4                    907 g
I 19813l                                    l North Anna 3                  907 wi                                    i i                                l 19823 ,' Bath County 1, 2, 3, 4    1500 l Uprats + Bath County 1, 2        731 W r Bath County 5, 6            750 I I                                I 19835 e                                    i North Anna 4                  907 WlBorthAnna3                    907 I I                                i 19848I                                    l Uprate + Bath County 3, 4      731 WlNorthAnna4                    907 g
               ,                                i 19858 I                                    l Surry 3                        900 WI                                    l 1
               ,                                i 19858 I                                    l Surry 3                        900 WI                                    l 1
Line 2,313: Line 1,392:
1 1990S:                                    3 Base                          1100 WI                                    e I                                  i 1991S I                                  I Base                          1100 We                                    I 1                                  8 1952S I                                  8 1100 Wi 8
1 1990S:                                    3 Base                          1100 WI                                    e I                                  i 1991S I                                  I Base                          1100 We                                    I 1                                  8 1952S I                                  8 1100 Wi 8
lf Base NCTI: There appear to be differences in the values used for Bath County units Dy the two parties.
lf Base NCTI: There appear to be differences in the values used for Bath County units Dy the two parties.
                                                                                      -
                                                                                        -


119 TABLE 2. Reserves Which Will Result From Capacity Plans if the VEPCO Forecast Occurs VEPCO CAPACITY          PUBLIC STATT PLAN                CAPACITY P*.AN
119 TABLE 2. Reserves Which Will Result From Capacity Plans if the VEPCO Forecast Occurs VEPCO CAPACITY          PUBLIC STATT PLAN                CAPACITY P*.AN VEPCO TCRICAST OF    Installed              Installed PEAK LCAD      Capacity      Reserves Capacity      Reserves YEAR              (gw)        (Mw)          (g)      (Mw)          (g) 1979 Se        8,760'            10,432 l    19.1    10,483        19.7 Wl                6.160  10,736        31.6    10,735        31.6 1980 S !      9,260            10,468    8 13.0    10,769        16.3 Wj                8,670  10,773        24.3    11,021        27.1 l
                                                                                    .
VEPCO TCRICAST OF    Installed              Installed PEAK LCAD      Capacity      Reserves Capacity      Reserves YEAR              (gw)        (Mw)          (g)      (Mw)          (g)
                        !
                                                        '
1979 Se        8,760'            10,432 l    19.1    10,483        19.7 Wl                6.160  10,736        31.6    10,735        31.6
                                                        ,
1980 S !      9,260            10,468    8 13.0    10,769        16.3 Wj                8,670  10,773        24.3    11,021        27.1 l
                      .                                ,
1981 S        9,810            10,504    i    7.1    11,676        19.0 We                9,210  10,773    8    17.0    11,544        25.3 I                                i 1982 Sl10,250                    12,004    3 17.1    12,035        17.4 WI                9,760  12,613    ,  29.2    12,275        25.8 1
1981 S        9,810            10,504    i    7.1    11,676        19.0 We                9,210  10,773    8    17.0    11,544        25.3 I                                i 1982 Sl10,250                    12,004    3 17.1    12,035        17.4 WI                9,760  12,613    ,  29.2    12,275        25.8 1
1983  S                        12,3'44        16.8    12,947        22.4 Wl10,570 i            10,340    13,006 g
1983  S                        12,3'44        16.8    12,947        22.4 Wl10,570 i            10,340    13,006 g
Line 2,330: Line 1,399:
I 1987 Se 13,270                  14,796        11.5    15,971        20.4 W!              12,820    15,045    e  17.4    16,203        26.4 e                                  f
I 1987 Se 13,270                  14,796        11.5    15,971        20.4 W!              12,820    15,045    e  17.4    16,203        26.4 e                                  f
               % Growth Rate          5.3        5.8      4.5                    5.4
               % Growth Rate          5.3        5.8      4.5                    5.4
.- . . . ..._            ._


23 s
23 s
Line 2,336: Line 1,404:
W            11,627    14,603          25.6      14,104        21.3 1986 5  13.148                15,071          14.6      13,886        5.6 W            12,304    15.303          24.4      14,205        15.5 1987 5  13,913                15,971          14.8      14,796        6.3 W            13,020    16,102          24.4      15,045        15.6 1988 5  14,723                17,071          15.2                      7 W            13,777    17,303          25.6 1989 5  15,579                18,171          16.6                      ?
W            11,627    14,603          25.6      14,104        21.3 1986 5  13.148                15,071          14.6      13,886        5.6 W            12,304    15.303          24.4      14,205        15.5 1987 5  13,913                15,971          14.8      14,796        6.3 W            13,020    16,102          24.4      15,045        15.6 1988 5  14,723                17,071          15.2                      7 W            13,777    17,303          25.6 1989 5  15,579                18,171          16.6                      ?
W            14,579    18,403          26.2 1990 S  16,486                19,271          16.9                      7 W            15,423    19,503          26.4 1991 S  17,446                20,371          16.8                      7 W            16,326    20,403          26.2 1992 S  18,461              21,471          16.3                      7 W            17,276    21,703          25.6
W            14,579    18,403          26.2 1990 S  16,486                19,271          16.9                      7 W            15,423    19,503          26.4 1991 S  17,446                20,371          16.8                      7 W            16,326    20,403          26.2 1992 S  18,461              21,471          16.3                      7 W            17,276    21,703          25.6
   % Growth Rate      5.8        5.8        5.7                      4.5
   % Growth Rate      5.8        5.8        5.7                      4.5 W
                                              .
W


121 TABLE 4. Levels and Growth Rates of Demographic Variables Used in the Public Staff's Energy Forecasts and Load Forecasts Growtn              Growth N. C.              1476        :*te    1995        Rate  1gon
121 TABLE 4. Levels and Growth Rates of Demographic Variables Used in the Public Staff's Energy Forecasts and Load Forecasts Growtn              Growth N. C.              1476        :*te    1995        Rate  1gon
:                    i Poculation              5.469 i              6.084  l          6.465 (Milit:ns)                    8 (1.2%)              :  (1.2")
:                    i Poculation              5.469 i              6.084  l          6.465 (Milit:ns)                    8 (1.2%)              :  (1.2")
I
I Real Pe*sonal          '7.349                25.962 1          33. 3 *:)
                                                        '
Real Pe*sonal          '7.349                25.962 1          33. 3 *:)
Inccme (Billiens)            e (5.0;)              1 8
Inccme (Billiens)            e (5.0;)              1 8
(4.3-)
(4.3-)
Real Incare            3.172 8              4.432              5.157 Per Capita (OCO) l  (3.8-)            l (3.1 )
Real Incare            3.172 8              4.432              5.157 Per Capita (OCO) l  (3.8-)            l (3.1 )
:
I 1
I 1
Manufacturing          757.5                1050.3 i          1183.9 Employment (000)              :  (0.6-)            I (2.6;)
Manufacturing          757.5                1050.3 i          1183.9 Employment (000)              :  (0.6-)            I (2.6;)
Line 2,366: Line 1,429:
: (10.4%)
: (10.4%)
I l (5.5%)
I l (5.5%)
:
t
t
.


122
122 s
      .
s
                                                                                                    #
TABLE S.        Public Staff Trend Forecast of CP&L Energy Consumption by Customer Class (GWH)
TABLE S.        Public Staff Trend Forecast of CP&L Energy Consumption by Customer Class (GWH)
.
Growth              Grcntth              Grewtn Customer Class      1976        Rata  1985        Rate    1990        Rata  jogg 3                I                    I Residential          (Ac:ua 6.491 l) 3        10.722 8            14.024 1            15.614 Qi                        l(5.7%)          I (5.5%)
Growth              Grcntth              Grewtn Customer Class      1976        Rata  1985        Rate    1990        Rata  jogg 3                I                    I Residential          (Ac:ua 6.491 l) 3        10.722 8            14.024 1            15.614 Qi                        l(5.7%)          I (5.5%)
I                    l (5.5%)
I                    l (5.5%)
Line 2,385: Line 1,442:
i                                      I Total Sales          25.915 I          46.991              64.533 1            73.327
i                                      I Total Sales          25.915 I          46.991              64.533 1            73.327
: CH                          I(6.8%)
: CH                          I(6.8%)
                                        ,
l(6.6%)
l(6.6%)
e I (6.6%)
e I (6.6%)
Line 2,400: Line 1,456:
Growth              Growth              Growth Custene Class        ic76      Rate    1985        Rate    1990          Rate      199?
Growth              Growth              Growth Custene Class        ic76      Rate    1985        Rate    1990          Rate      199?
                         'Actuai;I
                         'Actuai;I
                        .
                                   '                  l                    l i
                                   '                  l                    l i
e Residential            11.327 I          18.237 i            23.776                  26,423
e Residential            11.327 I          18.237 i            23.776                  26,423
Line 2,406: Line 1,461:
l(5.4%)
l(5.4%)
Cc ne cial              '.937 l          13,959              19,213 8                21.E34 CH                        8 (6.45)          l (6.6%)
Cc ne cial              '.937 l          13,959              19,213 8                21.E34 CH                        8 (6.45)          l (6.6%)
                                                      ,
l(6.6%)
l(6.6%)
inctus trial          12.417 e          35,574 1            49.858 1                57,067
inctus trial          12.417 e          35,574 1            49.858 1                57,067
Line 2,421: Line 1,475:
g                  i SEPA                      254 1              277  .
g                  i SEPA                      254 1              277  .
277 1                    277 Lesses                  3,432l            b.261                8.6483l                9,846 3 3f                    I ictal Ener9y                              88.M3              122,436 1              139,297
277 1                    277 Lesses                  3,432l            b.261                8.6483l                9,846 3 3f                    I ictal Ener9y                              88.M3              122,436 1              139,297
     ' CH
     ' CH 48.759l'    (6.i4;          l(6.7%)
      ,
g 1 (6.7%)
48.759l'    (6.i4;          l(6.7%)
g
                                                      '
1 (6.7%)
-
Peak Demand              8.501 4          15.3S5              21.209 i                ~4.127
Peak Demand              8.501 4          15.3S5              21.209 i                ~4.127
: CH
: CH f(6.~1)            l(6.6%)            I (6.7%)
                                                                                                        ,
f(6.~1)            l(6.6%)            I (6.7%)
i                  I                  i 1976 : rany ferecast                                                                        '
i                  I                  i 1976 : rany ferecast                                                                        '
   ' Total sales x .C029 3(Tetal sales + ce=pany use - ! EPA) x .076
   ' Total sales x .C029 3(Tetal sales + ce=pany use - ! EPA) x .076
Line 2,437: Line 1,484:
124 s
124 s
                                                                                     /
                                                                                     /
TABLE 7. Comparisons of Growth Rates of Electricity Irices and Inflation Measures 1977. Anna t      1985    Annual  1990 Estimata-  Growth F,stimata    crowth Estimata Duka              28.0      6.3%      45.7    4.J%    56.5 Electricity Price        Mills /IMH          Mills /INE        Mills /IWH CPtL              29,8      6.7%      50.1    4.2%    61.6 Electricity Prica        Mills /INE          Mills /INE        Mills /INE Consumer Prica Indez          181.7      5.3%      275.5    4.4%  341.6 Wholesala Prica Indez          134.9      5.71      303.2    3.9%  367.5
TABLE 7. Comparisons of Growth Rates of Electricity Irices and Inflation Measures 1977. Anna t      1985    Annual  1990 Estimata-  Growth F,stimata    crowth Estimata Duka              28.0      6.3%      45.7    4.J%    56.5 Electricity Price        Mills /IMH          Mills /INE        Mills /IWH CPtL              29,8      6.7%      50.1    4.2%    61.6 Electricity Prica        Mills /INE          Mills /INE        Mills /INE Consumer Prica Indez          181.7      5.3%      275.5    4.4%  341.6 Wholesala Prica Indez          134.9      5.71      303.2    3.9%  367.5 a
__ . . _ . _
                                        ..  .
                                                                                  ,
a


125
125 TABLE 8. Carolina Power & Light Company's Energy Forecast Year                    E 1978              28,586,688 1979              30,301.864 1980              32.209,533 1931              34,208,255
  .
  -
    .
TABLE 8. Carolina Power & Light Company's Energy Forecast Year                    E 1978              28,586,688 1979              30,301.864 1980              32.209,533 1931              34,208,255
                   *SR2              36,329.294 1963              38,470.979 1946              40,779,364 198!              43,064,739 1986              45,475.140 19S7              47.884,926 1938              50,376,243
                   *SR2              36,329.294 1963              38,470.979 1946              40,779,364 198!              43,064,739 1986              45,475.140 19S7              47.884,926 1938              50,376,243
                                   ~
                                   ~
Icag              52,943,431 19?G              55,751.539 1991              58,594,868 I??2              61.574,611 1911              64.539.317 19'6              67,637,204 1753              7.7.816.153 ,
Icag              52,943,431 19?G              55,751.539 1991              58,594,868 I??2              61.574,611 1911              64.539.317 19'6              67,637,204 1753              7.7.816.153 ,
3016              74,256,144 19,7              77,777,593 i
3016              74,256,144 19,7              77,777,593 i
i
i w
.
h
w h


126 s
126 s
          .
TABLE 9. Duke Power Ccmpany's Energy Forecast Regular Territorial Sales    Energy Year                      GWR      GWR 1978                    48,988      52,915 1979                    51,798      55,918 1980                    54,830      59,138 1981                    58,750      83,308 1983                    81,881      88,825 1983                    85, 157      70,089 1984                    88,473      73,537 1985                    71,983      77,287' 1988                    75,599      81,128 1987                    79,4 2      85,183 1988                    83,430      89,385 1989                    87,807      93,793 1990                    92,004      98,425 e
        .
e
TABLE 9. Duke Power Ccmpany's Energy Forecast Regular Territorial Sales    Energy Year                      GWR      GWR 1978                    48,988      52,915
                                                            '
1979                    51,798      55,918 1980                    54,830      59,138 1981                    58,750      83,308 1983                    81,881      88,825 1983                    85, 157      70,089
._ _
                                                                    -
1984                    88,473      73,537 1985                    71,983      77,287' 1988                    75,599      81,128 1987                    79,4 2      85,183 1988                    83,430      89,385 1989                    87,807      93,793 1990                    92,004      98,425
_.
                    ,
e e
                                                                    #


127
127 TABLE 10. Virginia Electric & Power Company's Energy Forecast Annual Output            Increase g              (LfWi! x 103)            -
  -
TABLE 10. Virginia Electric & Power Company's Energy Forecast Annual Output            Increase g              (LfWi! x 103)            -
1577              38.578*                  -
1577              38.578*                  -
1978              41,500              7.5 1979              44.800              6. 0 1990              46.100              7.4 1981              51.400              G.9 1932              54,700              6.4 1953              58.100              6.2 1984              61.650              6.1 iDR3              63.350              6.0 1966              69.200              5.9 1957              73.200              5.8
1978              41,500              7.5 1979              44.800              6. 0 1990              46.100              7.4 1981              51.400              G.9 1932              54,700              6.4 1953              58.100              6.2 1984              61.650              6.1 iDR3              63.350              6.0 1966              69.200              5.9 1957              73.200              5.8
                     = Actual
                     = Actual O
- - - . - . ..-...
m
O m


128
128 TABLE 11. Public Staff's Noneconometric Energy Estimates for the Residential Sector (1000 MWH)
                                                                                                  -
TABLE 11. Public Staff's Noneconometric Energy Estimates for the Residential Sector (1000 MWH)
Historical Historical Sales        Average use      Trended Avg. Use txponen-              Exponen-          cxponen- Satura- Avg. of Avg. of
Historical Historical Sales        Average use      Trended Avg. Use txponen-              Exponen-          cxponen- Satura- Avg. of Avg. of
: al      .inear      tial    Linear    tial      tion  All  Most veer      Linea Trono {  Tr=nd!    Trono2    Tr.ne2 TrendJ      Tmd T m d E e matn Like1 4 i
: al      .inear      tial    Linear    tial      tion  All  Most veer      Linea Trono {  Tr=nd!    Trono2    Tr.ne2 TrendJ      Tmd T m d E e matn Like1 4 i
Line 2,492: Line 1,515:
I                                      i 1990 8
I                                      i 1990 8
21562    3S286 I 25977        32990    21562    34582 1 24551    23787  24353 I                  I 8                    8 l
21562    3S286 I 25977        32990    21562    34582 1 24551    23787  24353 I                  I 8                    8 l
1995      23425    4960a      30475      40132 8 23425      42069 1 26727    33694  26876
1995      23425    4960a      30475      40132 8 23425      42069 1 26727    33694  26876 Motes:
          ,                                                                                    ,
Motes:
I Trend of historical esicential consuusition fer the period 1955-1976.
I Trend of historical esicential consuusition fer the period 1955-1976.
2 Trend of historical 10A!/custumer times linear trend of customers.
2 Trend of historical 10A!/custumer times linear trend of customers.
Line 2,500: Line 1,521:
Mocified linear trend (no value above 100.0) for each apolianca multiplied by linear tnnd of resicential customers alltipliec by estimated annual consunption per custo-mer per top 11ance. totaled for esen year.
Mocified linear trend (no value above 100.0) for each apolianca multiplied by linear tnnd of resicential customers alltipliec by estimated annual consunption per custo-mer per top 11ance. totaled for esen year.
Average of sales linear trend, average use linear trend and saturation estimeta.
Average of sales linear trend, average use linear trend and saturation estimeta.
                                                                                                  -


129
129 TABLE 12. Public Staff's Noneconometric Energy Estimates for Commercial Sector (1000 MWH)
,
TABLE 12. Public Staff's Noneconometric Energy Estimates for Commercial Sector (1000 MWH)
Averane Use llistcrical Sales                Per Custoner              Averace  Average of 2
Averane Use llistcrical Sales                Per Custoner              Averace  Average of 2
I All  MUS* 'Ik'I/ '
I All  MUS* 'Ik'I/ '
Line 2,510: Line 1,528:
Exoonential 1
Exoonential 1
Linaar 2    E xoonanti al      Estimates  Estimates -
Linaar 2    E xoonanti al      Estimates  Estimates -
                                                                                                '
l Carolina Power an1 LinNt Cervanv i
l
              ,
Carolina Power an1 LinNt Cervanv i
1977        4311            4326      1      4333          4361      8    4345      4347
1977        4311            4326      1      4333          4361      8    4345      4347
               ;
               ;
e                                i 5456            6270            5825          612S      I      5920      5641 1902 3                                l                                8 1
e                                i 5456            6270            5825          612S      I      5920      5641 1902 3                                l                                8 1
1907        6601            9088            7470          C484              7914      7035 8,
1907        6601            9088            7470          C484              7914      7035 8,
l                              l 1992 3        7746          13172      1      0318          . i39
l                              l 1992 3        7746          13172      1      0318          . i39 1    10461      8532 1                                i
* 1    10461      8532 1                                i
:                                                                                s475 1895          8433          16458      l    10525          13947      l    12341 I
:                                                                                s475 1895          8433          16458      l    10525          13947      l    12341 I
i Duka Dowar Comoany l
i Duka Dowar Comoany l
Line 2,525: Line 1,539:
1992        15276          25977            17118          18663        l  19259      16197 n
1992        15276          25977            17118          18663        l  19259      16197 n
i                              ,                                ,
i                              ,                                ,
1995 1 16616                32407      l    19060          21196        3  22320      178386
1995 1 16616                32407      l    19060          21196        3  22320      178386 l
  ._
14ctes:
l 14ctes:
Based on historical data for the period 1969-1976.
Based on historical data for the period 1969-1976.
Historical trend (1969-1976) of averace use per custcmer multi: lied linear trend of cower:141 customers.
Historical trend (1969-1976) of averace use per custcmer multi: lied linear trend of cower:141 customers.
Averace of historical linear trend and everace use linear trend.
Averace of historical linear trend and everace use linear trend.
-


130
130
                                                  -
     "'ABLE 13. Carolina Power & Light Company's Load Forecast Tese                  g 1s78                sa2s 1979                6203 IMO                6414 1931                7034 1982                1480 15E3                7323 1984                8427 1985                8914 IS86                9424 1987                9933 1984              10463 1981              2D983 1990              11549 1992.              1:122      __
                                        .
     "'ABLE 13. Carolina Power & Light Company's
    .
Load Forecast Tese                  g 1s78                sa2s 1979                6203 IMO                6414 1931                7034 1982                1480 15E3                7323 1984                8427 1985                8914 IS86                9424 1987                9933 1984              10463 1981              2D983 1990              11549 1992.              1:122      __
                                          .
__ -
1992              22732 12*3              13337 1994              13?S9 1995              14393 1996              15286 1997              159E1
1992              22732 12*3              13337 1994              13?S9 1995              14393 1996              15286 1997              159E1
                                                  -


.
131 TABLE 14. Duke Power Cor::pany's Summer Peak Load Forecast Load Peak                Growth        Factors Year      MW M_W        %          %
131 TABLE 14. Duke Power Cor::pany's Summer Peak Load Forecast Load Peak                Growth        Factors Year      MW M_W        %          %
1978      9,522        396      4.34      63.4 % .
1978      9,522        396      4.34      63.4 % .
1979    10,036          514      5.40      63.6 1980    10,601          565      5.63      63.6 1981    11.335          734      6.92      63.8 1982    11,907        57        5.05      63.9 19C3    12,521        614      5.16      63.9 1984    13,170      , 649      5.18      63.8 1985    13,857        687      5.22      63.7 1986    14,583        726      5.24      63.5 1987    15,333          770      5.28      63,3 1988    16,175          822      5.35      63.1 1989    17.028          853      5.27      62.9 1990    17,941          913      5.36      62.6 Peak loads through 1980 were recuced slightly from " trend" to match better with the conservative energy forecast.
1979    10,036          514      5.40      63.6 1980    10,601          565      5.63      63.6 1981    11.335          734      6.92      63.8 1982    11,907        57        5.05      63.9 19C3    12,521        614      5.16      63.9 1984    13,170      , 649      5.18      63.8 1985    13,857        687      5.22      63.7 1986    14,583        726      5.24      63.5 1987    15,333          770      5.28      63,3 1988    16,175          822      5.35      63.1 1989    17.028          853      5.27      62.9 1990    17,941          913      5.36      62.6 Peak loads through 1980 were recuced slightly from " trend" to match better with the conservative energy forecast.


132
132 "aBLE 15. Duke Power Company's Winter Peak Load Forecast Year                  Peak          Growth ww      Mw          %
                                                                                        .
            .
    .
                .
                              .
                    "aBLE 15. Duke Power Company's Winter Peak Load Forecast Year                  Peak          Growth ww      Mw          %
M77-75                  9,261  441        3.00 1978-79                9,792  331        3.73 1979-80                10,376  344        3.M IMO-41                  11,132  736        7.29 USI-42                  11,730 3M            3.37 iss2                12,232  622        3.30
M77-75                  9,261  441        3.00 1978-79                9,792  331        3.73 1979-80                10,376  344        3.M IMO-41                  11,132  736        7.29 USI-42                  11,730 3M            3.37 iss2                12,232  622        3.30
                                                                                       ~
                                                                                       ~
1M3-44                  12,996  644        3.21 ~
1M3-44                  12,996  644        3.21 ~
1M6-43                  D ,464  444        3.14 Ut3-46                  14.368  706        3.13 1946-47                U ,009  721        3.02
1M6-43                  D ,464  444        3.14 Ut3-46                  14.368  706        3.13 1946-47                U ,009  721        3.02
                     '1M7-44                  U ,238  749        4.M 1964-49                14.512  774        4.M 1M9-90                  17,4D    801        4.32
                     '1M7-44                  U ,238  749        4.M 1964-49                14.512  774        4.M 1M9-90                  17,4D    801        4.32 Peak. loads through '79-80 winter were rechaced slightly fnun " trend >
      - - .
                  .
                                                  .
Peak. loads through '79-80 winter were rechaced slightly fnun " trend >
to match better with the conservative energy forecast.
to match better with the conservative energy forecast.
                                                                                      .


      -
133 TABLE 16. Public Staff's Capacity Addition Schedule (MW)
    .
133
  .
  .
          .
TABLE 16. Public Staff's Capacity Addition Schedule (MW)
YEAD                  CPR                          DUKE                        VESCO I                                                      1 1978 5 I            -                  I          -
YEAD                  CPR                          DUKE                        VESCO I                                                      1 1978 5 I            -                  I          -
1 North Anna 1      (898) wl            -
1 North Anna 1      (898) wl            -
Line 2,584: Line 1,571:
Wl            -                  1                          I l                                                      8 19S1 5      i Peaking + Ucrates (212) 1 McGuire 2        (1180) : North Anna 3        (907)
Wl            -                  1                          I l                                                      8 19S1 5      i Peaking + Ucrates (212) 1 McGuire 2        (1180) : North Anna 3        (907)
W    ,        -
W    ,        -
g
g g            -
                                                          -
g            -
1982 5 i Hayo 1                (72C) 1          -                1 Uprate + P.S.      (731)
1982 5 i Hayo 1                (72C) 1          -                1 Uprate + P.S.      (731)
Wl            -
Wl            -
Line 2,593: Line 1,578:
lNnrthAnna4          (907)
lNnrthAnna4          (907)
Ws            -
Ws            -
I Catawba 2      (1153)  g
I Catawba 2      (1153)  g 1984 5 I Mayo 2                                  -                1 Uprate + P.S.      (7 31)
                                                                                      -
1984 5 I Mayo 2                                  -                1 Uprate + P.S.      (7 31)
W3          -
W3          -
l720) l Cherokee (1280) 1                      -
l720) l Cherokee (1280) 1                      -
Line 2,613: Line 1,596:
1990 5            -
1990 5            -
(250)      Base            1100 I                                                      I W
(250)      Base            1100 I                                                      I W
                ,
                           -                      Base '
                           -                      Base '
lPcaktno          (1280)  ,
lPcaktno          (1280)  ,
                                                                                      -
1991 5 l Harris 4              (900) 1 Peaking            (250)  g    Base            1100 W j Peaking                  250 i Base              (1280) g            -
1991 5 l Harris 4              (900) 1 Peaking            (250)  g    Base            1100 W j Peaking                  250 i Base              (1280) g            -
1992 5 l Basa                  (115C) l Peaking - Cycling (500) i Base                  1100 WI            -
1992 5 l Basa                  (115C) l Peaking - Cycling (500) i Base                  1100 WI            -
Line 2,625: Line 1,606:
                 .ocate - Increase L eatin; cf esistiag units
                 .ocate - Increase L eatin; cf esistiag units


134
134 TABLE 17A. Reserve Marg 2.ns Based upon the Public Staff Addition Schedule (%)
    .
CMt.                  (UKE 13g    Su:m=P        wintee Sussaw VEPt0 winte-  g              wintee        .
                                                                                            .
                                          .
TABLE 17A. Reserve Marg 2.ns Based upon the Public Staff Addition Schedule (%)
CMt.                  (UKE 13g    Su:m=P        wintee
                                    .
Sussaw VEPt0 winte-  g              wintee        .
1978  22.7          22.4    25.5          22.5 1979    16.7          16.3                          14.2          25.3 1980                          18.5          14.7    18.5 20.0          19.1    21.6                                  29.6 1981    15.5                                17.3    15.0            25.3 14.5    23.9          20.0 1982    17.6          16.2                          17.8          24.5 1983                          16.0          21.2    14.8 21.2          19.4    16.7                                25.1 1984  21.8                                  21 .4  16.6          24.9      -
1978  22.7          22.4    25.5          22.5 1979    16.7          16.3                          14.2          25.3 1980                          18.5          14.7    18.5 20.0          19.1    21.6                                  29.6 1981    15.5                                17.3    15.0            25.3 14.5    23.9          20.0 1982    17.6          16.2                          17.8          24.5 1983                          16.0          21.2    14.8 21.2          19.4    16.7                                25.1 1984  21.8                                  21 .4  16.6          24.9      -
19.7    15.8        20.8 1985    15.8          15.3                          14.7          24.7 1986                          15.1          19.6    15.7 19.3          16.9    15.2                                  25.6 1987  23.0                                19.1    14.6            24.4 20.2    15.3          18.8 1988    15.6          20.6                          14.8            24.4 1989                          16.3          19.4    15.9 16.1          22.4    15.5                                  25.6 1990    18.1                                18.2    16.6          25J 15.0    15.5          17.8 1991    17.6          16.1                          16.9          25.4
19.7    15.8        20.8 1985    15.8          15.3                          14.7          24.7 1986                          15.1          19.6    15.7 19.3          16.9    15.2                                  25.6 1987  23.0                                19.1    14.6            24.4 20.2    15.3          18.8 1988    15.6          20.6                          14.8            24.4 1989                          16.3          19.4    15.9 16.1          22.4    15.5                                  25.6 1990    18.1                                18.2    16.6          25J 15.0    15.5          17.8 1991    17.6          16.1                          16.9          25.4 1992                          15.1          17.0    16.8 20.2          16.7    15.3                                26.2 16.9    16.3          25.6
                                                                                      '
1992                          15.1          17.0    16.8 20.2          16.7    15.3                                26.2 16.9    16.3          25.6
                                                                                            .-
       =.Ju1LE 173. Los.3 of Load Probabilities Expected Fre::                      1 Public Staff Additions (days per season) mt                    curr                'nPc0 Yeae  Suw          winter  Sumer        winter  Summer        wintee '
       =.Ju1LE 173. Los.3 of Load Probabilities Expected Fre::                      1 Public Staff Additions (days per season) mt                    curr                'nPc0 Yeae  Suw          winter  Sumer        winter  Summer        wintee '
1978      3.3          5.5    2.6            3.7    9.5            4.5 1979    6.0            9.8    6.1          8.2                    *'
1978      3.3          5.5    2.6            3.7    9.5            4.5 1979    6.0            9.8    6.1          8.2                    *'
Line 2,643: Line 1,615:
7.9    4.5          6.2    9.5 1981    7.2          12.1 4.6 3.6          5.0    7.5            5.9 1982      6.0          10.7      8.1          4.4 1983      4.3                                          9.8            4.9 7.9    7.6          4.3    8.3            5.1 1984      4.1            7.7    8.4 1985 4.7    9.1            4.6 7.1          11.9      9.0          5.3 1986      5.1 8.3            A.1
7.9    4.5          6.2    9.5 1981    7.2          12.1 4.6 3.6          5.0    7.5            5.9 1982      6.0          10.7      8.1          4.4 1983      4.3                                          9.8            4.9 7.9    7.6          4.3    8.3            5.1 1984      4.1            7.7    8.4 1985 4.7    9.1            4.6 7.1          11.9      9.0          5.3 1986      5.1 8.3            A.1
: 9. 9    !.8          5.4    8.7 1987      3.5                                                        4.2 7.2    8.7          5.6    9.1            4.1 1988      7.1          6.7    7.8            5.1    8.2            3.6 1989      6.6          5.4    8.4            5.3 1990    5.3                                          7.7            3.3 11.0    8.3          5.8    7.5            3.1 1991    5.4            9.9' Ing                            9.1          6.2    7.6            3.2 4.1            9.1    8.7          f.1    8.0            3.3
: 9. 9    !.8          5.4    8.7 1987      3.5                                                        4.2 7.2    8.7          5.6    9.1            4.1 1988      7.1          6.7    7.8            5.1    8.2            3.6 1989      6.6          5.4    8.4            5.3 1990    5.3                                          7.7            3.3 11.0    8.3          5.8    7.5            3.1 1991    5.4            9.9' Ing                            9.1          6.2    7.6            3.2 4.1            9.1    8.7          f.1    8.0            3.3
                                                                        .
                                                                                            *


  .
135 TABLE 18. Public Staff Projections of Percent of Plant Operated as Bace T/.ad, Cycling and Peaking Year          Bas?            Cyc1,13 g    Peaking Ce o'ina Power and Licht Cemeany 1976          48.6              27.4          24.0 1979          48.9              27.5          23.6 1980          E3.4              25.1          21.5 1991          52.8              24.4          22.8 1982          49.              30.0          20.9 1983          5?.7              27.2          19.1 1984          50.1              32.1          17.8 1985          15.4              31.7          18.9 1985          52.6              23.9          18.5 19S7          01.3              31.9          16.8 1983          51.3              31.9          16.8 1989          54.4              29.8          15.8 1990          53.1              32.3          14.6 1991          55.7              30.5          13.8 1992          54.0              31.9          14.1 Duve Power Commanv 1978          49.7              32.2          18.1 1979          49.7              31.2          18.1 19B0          89.4              34.1          16.5 1981          49.2              35.6          15.2 1982          49.2              35.6          15.2 1983          C3.1              28.9          18.0 1988          50.3              34.i          15.5
      .
,                1985          54.6              32.1          13.3 1986          51.9              36.1          12.0 1987          55.0              33.9          11.1 1988          55.9              31.5          11.6 1989          55.3              33.5          10.9 1990          57.4              31.4          11.2 1991          55.6              32.8          11.5 1992          53.5              33.8          12.7 Virginia Electric and Power Comsary 1978          49.5              38.7          11.8 1979          54.0              35.3          10.7 1980          52.9              34.3          12.8 1981          50.9              37.3          11.8 1932          49.7              35.3          15.0 1923          53.2              32.9          13.9 1934          51.3              30.1          18.6 1935          48.8              33.3          17.4 1986          46.5              32.2          21.3 1987          49.5              30.4          20.0 1988          48.0              33.2          18.8 19?9          51.1              31.2          17.7 1990          49.9              33.5          16.6 1991          52.6              31.7          15.7 1992          55.0              30.0          15.0
    .
135
.
        .
TABLE 18. Public Staff Projections of Percent of Plant Operated as Bace T/.ad, Cycling and Peaking Year          Bas?            Cyc1,13 g    Peaking Ce o'ina Power and Licht Cemeany 1976          48.6              27.4          24.0 1979          48.9              27.5          23.6 1980          E3.4              25.1          21.5 1991          52.8              24.4          22.8 1982          49.              30.0          20.9 1983          5?.7              27.2          19.1 1984          50.1              32.1          17.8 1985          15.4              31.7          18.9 1985          52.6              23.9          18.5 19S7          01.3              31.9          16.8 1983          51.3              31.9          16.8 1989          54.4              29.8          15.8 1990          53.1              32.3          14.6 1991          55.7              30.5          13.8 1992          54.0              31.9          14.1 Duve Power Commanv 1978          49.7              32.2          18.1 1979          49.7              31.2          18.1 19B0          89.4              34.1          16.5 1981          49.2              35.6          15.2 1982          49.2              35.6          15.2 1983          C3.1              28.9          18.0 1988          50.3              34.i          15.5
,                1985          54.6              32.1          13.3 1986          51.9              36.1          12.0
'
1987          55.0              33.9          11.1 1988          55.9              31.5          11.6 1989          55.3              33.5          10.9 1990          57.4              31.4          11.2 1991          55.6              32.8          11.5 1992          53.5              33.8          12.7 Virginia Electric and Power Comsary 1978          49.5              38.7          11.8
'
1979          54.0              35.3          10.7 1980          52.9              34.3          12.8 1981          50.9              37.3          11.8 1932          49.7              35.3          15.0 1923          53.2              32.9          13.9 1934          51.3              30.1          18.6 1935          48.8              33.3          17.4 1986          46.5              32.2          21.3 1987          49.5              30.4          20.0 1988          48.0              33.2          18.8 19?9          51.1              31.2          17.7 1990          49.9              33.5          16.6 1991          52.6              31.7          15.7 1992          55.0              30.0          15.0


136 TABLE 19A. Caroli:s Power & Light Company's capacity Addition Schedule
136 TABLE 19A. Caroli:s Power & Light Company's capacity Addition Schedule 5d" 1 a thJe                capaciev (?G)        Ooera tiets saxame 04                      no                uso sayn it.                        7:D                1982 uare oz                        no                uns sar:sa et                      900              . uss Harria #2                      900                1986 Isrria #3                      900                1990 Earris #4                      900                USA n e srs czst u.n:: mer s 53-1                          1150                1989 sa-2                          1150                1991
    - _ .
                                                                        -
5d" 1 a thJe                capaciev (?G)        Ooera tiets saxame 04                      no                uso sayn it.                        7:D                1982 uare oz                        no                uns sar:sa et                      900              . uss Harria #2                      900                1986 Isrria #3                      900                1990 Earris #4                      900                USA n e srs czst u.n:: mer s 53-1                          1150                1989 sa-2                          1150                1991
          .
                                                                         /
                                                                         /
             "J' u3LE 19B. Carolina Power & Light E'mpey's
             "J' u3LE 19B. Carolina Power & Light E'mpey's
                             . Projected Summer Peak Reserves Year                        taserve 197a                          20.4 1979                          22.3 iMO                          u.s isst                          u.s  .
                             . Projected Summer Peak Reserves Year                        taserve 197a                          20.4 1979                          22.3 iMO                          u.s isst                          u.s  .
US:                          20.4 1943                          U.6 1984                          U.6 1985                          19.2 1966                          22.3 1987                          16.1 1988                          13.3 1929                          23.6 1990                          25.4 1991                          28.9 D*2                            22.7
US:                          20.4 1943                          U.6 1984                          U.6 1985                          19.2 1966                          22.3 1987                          16.1 1988                          13.3 1929                          23.6 1990                          25.4 1991                          28.9 D*2                            22.7
                                                                        -


137
137
Line 2,676: Line 1,631:
                                                                 ~
                                                                 ~
3 450        30.4 SCI &C Ccetract Term (-21) 1982    11 907    cetawba 1 (1143)            15 930    4 023        33.8 1983    12 521    Catawba 2 (1145)            17 006    4 485        35.8 setirewnts (-69) 1984    13 170    metirements (-228)          16 778    3 608        27.4 1985    13 857    cherokee 1 (1280)            17 797    3 940        28.4 Retteenents ( 261) 1986    14 583    Retiresents (-93)            17 704    3 121        21.4 1987    15 353    Cheroh*e 2 (1280)          18 984    3 631        23.7 1988    16 175    Perkins 1 (1280)            20 264    4 089        25.3 1989    17 028    Diernkee 3 (1280)          21 544    4 516        26.5 1990    17 941    None                        21 544    3 603        20.0
3 450        30.4 SCI &C Ccetract Term (-21) 1982    11 907    cetawba 1 (1143)            15 930    4 023        33.8 1983    12 521    Catawba 2 (1145)            17 006    4 485        35.8 setirewnts (-69) 1984    13 170    metirements (-228)          16 778    3 608        27.4 1985    13 857    cherokee 1 (1280)            17 797    3 940        28.4 Retteenents ( 261) 1986    14 583    Retiresents (-93)            17 704    3 121        21.4 1987    15 353    Cheroh*e 2 (1280)          18 984    3 631        23.7 1988    16 175    Perkins 1 (1280)            20 264    4 089        25.3 1989    17 028    Diernkee 3 (1280)          21 544    4 516        26.5 1990    17 941    None                        21 544    3 603        20.0
.


138 s
138 s
TABLE 21. Duke Power Company's Summa.mf of Projscted Load Management Gcals stmea:a      w!mst          atInst REDUC 710Bf  REDUCTION    REDUCTIC38 TEAR          (MM? ,      (MW)        (MKwit) 1977          las          196            469 1978          281          313            838 1979          392          416          1130 1980          511          532          1458 1381          635          666          1809
TABLE 21. Duke Power Company's Summa.mf of Projscted Load Management Gcals stmea:a      w!mst          atInst REDUC 710Bf  REDUCTION    REDUCTIC38 TEAR          (MM? ,      (MW)        (MKwit) 1977          las          196            469 1978          281          313            838 1979          392          416          1130 1980          511          532          1458 1381          635          666          1809 1982          759          808          2130 1983          884          960          2572 1984        1008          1128          3377 1985        1143          1295          3422 1986        1270          1486          3893 1987        1385          1644          4334    s 1988        1501          1896          4789 1989        1615          2124          5259 1990        1721          2364          5474 NOTE:
    -
1982          759          808          2130 1983          884          960          2572 1984        1008          1128          3377 1985        1143          1295          3422 1986        1270          1486          3893 1987        1385          1644          4334    s 1988        1501          1896          4789 1989        1615          2124          5259 1990        1721          2364          5474 NOTE:
: 1. Summer and wtater megawatt reductions are 4 & 21atave
: 1. Summer and wtater megawatt reductions are 4 & 21atave
: 2. Energy reductions are annual values
: 2. Energy reductions are annual values
                                                             .}}
                                                             .}}

Revision as of 20:11, 1 February 2020

Applicant'S Response to Conservation Council of Nc & Wake Environ Inc Motion to Remand to ASLB for Further Hearings. Sees No Sense in Reopening Need for Power Issue.W/Photos, Affidavit,Certificate of Svc & Capacity Plan
ML19269C470
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 01/23/1979
From: Trowbridge G
SHAW, PITTMAN, POTTS & TROWBRIDGE
To:
References
NUDOCS 7902030014
Download: ML19269C470 (166)


Text

{{#Wiki_filter:- LOCAL . w-January 23, '

  • oi e

9 WJP UNITED STATES OF AMERICA NUCLEAR REGULATORY CCMMISSION If" 9- g4 g ',i,lc75 ) [- , Y;'. " *; ' ., ns. -~- c r b?g{f% 4  % In the Matter of )

                                             ) DOCKET NOS. 50-400, CAROLINA POWER & LIGHT COMPANY             )                 50-401, 7

(Shearon Harris Nuclear Power ) 50-402 Plant Units 1, 2, 3, and 4) ) and 50-403 APPLICANT 'S RESPONSE TO CONSERVATION COUNCIL OF NORTH CAROLINA AND WAKE ENVIRONMENT, INC.'S MOTION TO REMAND TO LICENSING BOARD FOR FURTHER HEARINGS __ By motion dated January 8, 1979, Conservaticn Council of North Carolina and Wake Environment, Inc. (intervenors in the above-captioned proceeding)(hereinafter "Intervenors") moved to the Commission "to remand to the Licensing Board the issue as to whether there is a need for the proposed (Harris] facility within the time frame set forth in the construction permits and to direr.t the Licensing Board to take further evidence regarding this issue." In. support of its motion, Intervenors point to an order entered on December 28, 1978 by the North Carolina Utilities Commission (hereinafter "NCUC") which formally adopted a 1978 load forecast and capacity plan for North Carolina. The load forecast and capacity plan is contained in a report entitled, Future Electricity Needs for North Carolina: Load Forecast and Cacacity - 1973, (December, 7 9 0 2 0 3 0 0\'k

1978)(hereinafter "NCUC Report"), previously forwarded by letter from Applicant dated January 3, 1979, to the NRC Office of Nuclear Reactor Regulation with a copy to the Commissioners, among others.1 Intervenors also note that the NCUC has scheduled a hearing to be held in mid-year 1979, whereby Applicant and other utilities serving customers in North Carolina will be required to demonstrate why their construction schedules should not be modified to match the NCUC capacity plan. Intervenors further move that "the Commission direct the Licensing Board to make an independent investigation of the issues to be covered in the NCUC mid-1979 hearings." For the reasons set forth below, Applicant requests that the Commission deny Intervenors' motion.2 1 The NCUC Report is incorporated herein by reference. 2 It is unclear to Applicant what relief Intervenors are seeking in their motion. Contrary to the requirements of 10 C.F.R. S 2.730(b), Intervenors have not stated with particularity the relief sought, much less the grounds for the motion. Intervenors have not asserted that based on the information in the NCUC Report the construction permits for the Harris units should be suspended or in any way amended. Intervenors have not asserted that there is no longer a need for the Barris Plant or that the new forecast and the projected revisions to the construction plan could conceivably result in more than a slight modification to the construction schedule for the Harris units. As far as Applicant can surmise from Intervenor's motion, Intervenors simply would like the Licensing Board to "take further evidence regarding {the need- fo r -powe r ] issue" and to make an " independent investigation of those issues which are to be covered" by the NCUC in hearings to be held in mid-1979. It is also unclear whether Intervenors would have the Licensing Board provide such a duplicative function prior to, concurrent with, or subsequent to the NCUC's hearings. remanded issue. The Licensing Board's jurisdiction in this proceeding is limited to the one issue of Applicant's management capability as per the Commission's Order of September 5, 1978. The Appeal Board has retained jurisdiction only with respect to the radon issue.4 Within thirty days after the date of an Appeal Board decision, the Commission may "in cases of exceptional legal or policy importance", review the decision on its own motion. 10 C.F.R. S 2.786(a). The Appeal Board decision was dated August 23, 1978. The only action by the Commission between the Appeal Board decision and thirty days thereafter was to issue the September 5, 1978 Order remanding the proceeding to the Licensing Board for further hearings on Applicant's management capabilities. The remand was prompted by the concerns expressed in the August 30, 1978 letter from the Licensing Board. The Commission did not move to review any other aspect of the Appeal Board decision nor did the Commission state that it was reserving its jurisdiction over any other aspect of the Appeal Board decision. No other party filed a petition for review with the Commission within the fifteen day period required by 10 C.F.R. S 2.786(b)(1). As contemplated by 10 C.F.R. S 2.770 when the Commission reviews a decision it may " limit the issues to be reviewed". It is at least implicit in the regulations with 4 See note 3 suora. respect to the Commission's review of Licensing Board and Appeal Board decisions (see 10 C.F.R. S 2.770 and 2.786) that the findings and decisions concerning issues, which the Commission in its discretion choses not to review, represent the final findings and decisions of the Commission. This should be especially true where initiation of the sole remanded issue here was in response to the Licensing Board's administrative communication with the Commission. This interpretation of the Commission's jurisdiction in this proceeding is consistent with the rule of practice, based on sound policy that, when an issue is once decided and reviewed, that should be the end of the matter. The unreserved decision on a question of law or fact made during the course of litigation settles that question for all subsequent stages of the suit.5 INTERVENORS HAVE NOT MET AND CANNOT MEET THE BURDEN OF PROOF REQUIRED OF THE MOVING PARTY BEFORE THE COMMISSION CAN REMAND TO THE LICENSING BOARD, REOPEN THE RECORD AND RECONSIDER AN ISSUE PREVIOUSLY FULLY CONSIDERED AND DECIDED BY THE LICENSING BOARD AND APPEAL BOARD We are reluctant to have the Commission deny Intervenors' motion solely for failure to state with 5 Barrett v. Baylor, 457 F.2d 119, 123 (7th Cir. 1972) (citations omitted)(distincuished in Public Service Company of Indiana (Marble Hill Nuclear Generating Station, Units 1 and 2), ALAB-493, 8 NRC 253, 259-60 (1978)); Cf. Public Service Company of New Hampshire (Seabrook Station, Units 1 and 2), ALAB-513, 8 NRC (December 21, 1978). particularity the relief requested and the grounds for such relief, or for want of jurisdiction. A party could properly fashion a petition to reopen the record on the basis of newly discovered evidence and challenge a construction permit. See e.a. 10 C.F.R. S 2.206. Assuming arouendo that the Commission has jurisdiction to entertain this motion 6 and that Intervenors had fashioned an understandable motion to remand to the Licensing Board, to reopen the record and to reconsider the issue of the need for the plant (with some relief requested), the motion should be denied because Intervenors have failed both to offer a significant new circumstance, new trend or new fact sufficient to justify reopening the record and to demonstrate that a different result would have been reached initially had such new information been considered. In its initial decision, the Licensing Board found that "the four Shearon Harris Nuclear power units will be needed as now scheduled, or sooner, and that this need is not diminished by increased consumer use of alternative energy sources or energy conservation or increasing electrical rates over the next 15 years." 7 NRC at 139. The Licensing Board 6 In Duke Power Company (Catawba Nuclear Station, Units 1 and 2), ALAB-359, 4 NRC 619, 621 (1976), the Appeal Board similarly dismissed a motion to reopen where the issue of jurisdiction was unclear (but the proper disposition of the petition was clear) by assuming arouendo jurisdiction was with the Appeal Board. indicated that its conclusions as to need-for-power would remain unchanged "even if forecasts credicted an even lower peak demand in the forecasted period". (emphasis supplied). The Board also noted that " applicant has in the past demonstrated that it is ready to and capable of deferring its scheduled construction when required by conditions in its industry." For example, the Board noted that CP&L "could certainly delay its nebulous 1150 megawatt nuclear plant labelled ' SRI' which is currently scheduled for operation in 1989." Id. In ALAB 490, the Appeal Board affirmed the Licensing Board's initial decision while specifically addressing only one issue, i.e. the need for the power to be generated by the facility. The Appeal Board noted that following the close of the evidentiary hearing , the Applicant transmitted to the Licensing Board for its information (1) a revised forecast which embodied somewhat lower growth rates than had the earlier forecast proffered by its witness; and (2) the newest (1978) NCUC Public Staff forecast of growth rates. The new forecasts predicted a lower growth rate than the forecasts that were in evidence at the hearing. 8 NRC at 238-239. In its decision, the Appeal Board gave great weight to the NCUC forecast. NCUC is under a statutory obligation to keep current analyses of long-range needs for expansion of facilities for the generation of electricity in North Carolina. Where the NCUC forecast was subject to scrutiny and cross-examination and not found to be flawed, the Appeal Board held that the NRC could attach heavy reliance on the judgment of the local Commission which has a legal obligation to ensure that utilities meet customer demands. 8 NRC at 240-241. The NCUC Report relies primarily on the same 1978 NCUC Public Staf f forecast that Ts before the Licensing Board and Appeal Board. The NCUC has determined that the probable range of annual peak load growth for Applicant through 1992 is 4.4% to 6.5%. Within this range the most probable peak load growth rata for planning was found to be 5. 2%. NCUC Report at

9. In reaching this conclusion, the NCUC basically adopted the NCUC Public Stuff's 1978 base case forecast of 6.7% growth and qualitatively adjusted it to account for actual 1978 peaks and to incorporate the NCUC's belief that conservation and load management can reduce the rate of peak load growth. Id. at 19-21. The NCUC recognized, however, that the proposed reductions " depend upon increased levels of conservation and load management" (id. at 21) and stated that "significant efforts should be expended by the utilities to help effect

. . . changes in usage patterns." Id. at 22. Based upon its expectation of achieving a reduction in the rate of growth to 5.2%, the NCUC concluded that the inservice dates for Applicant's units under construction could be extended at least one year, but in no case greater than two years and still maintain adequate reserves. Id. at 22 and 24. The NCUC recognized, however, the " paucity of conrete data available . . . concerning actual methods of achieving the expected levels of conservation and load management" (id. at

26) and its " responsibility to insure that the continued economic growth of the state is not impaired by lack of adequate utility services" (id. at 27), specifically noting that industry expanded in 1978 at about twice the rate of the previous year (id. at 26). Therefore, the NCUC deferred any decision to require Applicant or other electric utilities to adjust their construction schedules until after completion of hearings planned for mid-1979. Before any decision to require adjustment of construction schedules the NCUC desires to examine more detailed projections of industrial usage and the planning model of the State Budget Office, in addition to the information to be provided by the utilities. Id. at 26-27.

On December 20, 1978, Applicant submitted a revised forecast and construction schedule to its Board of Directors (which along with the NCUC Report was submitted to the Of fice of Nuclear Reactor Regulation with copies to the Commission by letter of January 3, 1979).7 Applicant also forecasts a slightly slower growth (5.35% through 1992) than the Company's 7 Applicant's revised forecast and capacity plan are incorporated herein by reference. previous forecast (5.7%). Applicant's generating capacity addition schedule eliminates a 1150 MW undesignated nuclear unit (" SRI") formerly projected for 1989 and adds two undesignated 720 megawatt units for 1991 and 1992, respectively. However, no changes in the construction schedule or inservice dates are currently projected by Applicant for units under construction, including the four Harris units. The burden required of a moving party to reopen the record and the sound policy reasons behind that burden were articulated in denying a motion for reconsideration of the need- fo r-power issue on the basis of new avidence in Duke Power Company (Catawba Nuclear Station, Units 1 and 2), supra at 620-21, and bear repeating here: After a decision has been rendered, a dissatisfied litigant who seeks to persuade us - or any tribunal for that matter - to reopen a record and reconsider "because some new circumstance has arisen, some new trend has been observed or some new fact discovered," has a difficult burden to bear. The reasons for this were cogently given by Mr. Justice Jackson more than thirty years ago in ICC v. Jersev Citv, 322 U.S. 503, 514 (1944): One of the grounds of resistance to administrative orders throughout federal experience with the administrative process has been the claims of private litigants to be entitled to rehearings to bring the record up to date and meanwhile to stall the enforcemer* of the administrative order. Administrative consideration of evidence - parcicularly where the evidence is taken by an e.:aminer , his report submitted to the parties, and a hearing held on their exceptions to it - always creates a gap between the time the record is closed and the time the administrative decision is promulgated. This is especially true if the issues are difficult, the evidence intricate, and the consideration of the case deliberate and careful. If upon the coming down of the order litigants might demand rehearings as a matter of law because some new cir:umstance has arisen, some new trend has been observed, or some new fact discovered, there would be little hope that the administrative process could ever be consummated in an ord be subject to reopening.gr that would not This " difficult burden" includes a showing that "a different result would have been reached initially had [the new information] been considered".9 The Appeal Board has consistently ruled that a minor change in the forecast of the electric demand in an applicant's service area is not significant new evidence that would warrant reopening a proceeding on a construction permit application. The decisions of the Appeal Board have recognized the " substantial marcin of uncertainty" inherent in any forecast. 8 Accord, United States v. ICC, 396 U.S. 491, 521 (1970); Northern Indiana Public Service Company (Bailly Generating Station, Nuclear-1), ALAB-227, 8 AEC 416, 418 fn, 4 (1974); Cleveland Electric Illuminating Company (Perry Nuclear Power Plant, Units 1 and 2), ALAB-443, 6 NRC 741, 750-51 (1977). 9 Northern Indiana Public Service Company (Bailly Generating Station, Nuclear-1), sacra, at 418, citina Unarco Industries, Inc. v. Evans Products Company, 403 F.2d 638 (7th Cir. 1968); and Knight v. Hersh, 313 F.2d 879 (D.C. Cir.-1961). Thus in Niacara Mohawk Pcwer Corporation (Nine Mile Point Nuclear Sta. tion, Unit 2), ALAB-264, 1 NRC 347, 365-66 (1975), the appeal Board found a two year difference between applicant's and intervenors' forecasts within the margin of uncertainty. A two year difference in the forec asted need for the plant was also found to be within the margin of uncertainty in Kansas Gas and Electric Company (Wolf Creek Generating Station, Unit 1), ALAB-477, 7 NRC 766, 770 (1978), and, thereby, the new forecast was insufficient new information to grant a petition for reconsideration. Even if the NCUC adopts its proposed capacity plan based on its new forecast, the inservice dates for Applicant's units under construction could be extended generally only one year, and in no case greater than two years. NCUC Report at 22 and 24. Here, there really is little new information. The NCUC Report is based on the NCUC Public Staff forecast which was befort the Licensing Board and Appeal Board. While the actual 1978 peaks are now available, the main rationale of the somewhat reduced probable peak load growth rate (5.2%) for planning purposes is a more optimistic view of the effects of O conservation and load management. Id. at 19-21. This 10 The probable range of annual peak-load growth for Applicant is 4.4% to 6.5%. NCUC Report at 9. Under Applicant's present construction plan for the Harris units, Applicant would not have sufficient reserves if the high-end of that range (6.5%) were achieved. See optimism is admittedly based on a " paucity of concrete data". Id. at 26. The NCUC recognizes the paramount importance of flexibility in its capacity plan. Id. at 17. The NCUC has the responsibility of ensuring that the continued economic growth of the state is not impaired by a lack of adequate utility service. Id. at 27. Thus, the NCUC plans annual updates of its forecast and capacity plan. Id. at 17. Flexibility will permit delays in construction schedules if conservation and load management programs are even more successful than predicted, or acceleration of construction schedules if industrial growth is faster than predicted or if conservacion and load management programs do not significantly impact the peakload growth rate. Because the NCUC recognized the inherent uncertainties in its own forecast and capacity plan, applicant and other utilities are not required to delay their construction schedules pending further examination of these issues in detail in mid-year 1979. Id. at 27. It is particularly inappropriate that Intervenors petition the Commission to " direct the Licensing Board to make an independent investigation of the issues to be covered in the f NCUC mid-1979 hearings." As stated by the Appeal Board in (continued) 7 NRC at 138. It is reasonable for a utility company to favor the high side of forecast load demand to ensure it is always prepared for unexpectedly high demands. Niagara Mohawk Power Corporation (Nine Mile Point Nuclear Station, Unit 2), supra at 366. Rochester Gas and Electric Corcoration (Sterling Power Project Nuclear Unit 1), ALAB-502, 8 NRC , (slip opinion at 5)(October 19, 1978), in response to a petition to reopen the record on need-for-power, "little useful purpose would be served were we now to undertake a duplication of the inquiry being made by the state body (with jurisdiction over the issue]." Further, as established by the Appeal Board decision in this proceeding, the findings of the NCUC, as that state body charged by law with the responsibility of providing up-to-date analyses of, inter alia, the probable future growth of the use of electricity, are entitled to be given great weight. 8 NRC at 240. 'ae National Environmental Policy Act does not require a completely independent investigation of the projected load forecasts of each applicant for a construction permit in the first instance; " heavy reliance" may be placed on the judgment of local regulatory bodies. There is no rational basis for suggesting that a NRC Licensing Board should independently investigate a state utilities commission's annual review of electricity forecasts and capacity plans, especially where the Licenning Board and Appeal Board have already found the benefit of the power from a facility, now under construction, is needed and outweighs any environmental impacts - a determination based, in part, on the same state utilities commission's earlier credible findings.

           "'Need for power' is a shorthand expression for the

' benefit' side of the cost-benefit balance which NEPA mandates for a proceeding considering the licensing of a nuclear power plant." Public Service Co. of Nev Hampshire (Seabrook Station, Units 1 and 2), ALAB-422, 6 NRC 33, 90 (1977). At the outset, inqui.y must be made into whether there exists a genuine need for the electricity to be produced. Thereafter, the focus shifts to the relative costs and benefits of alternatives to the proposed facility. Finally there is an overall balancing of costs and benefits; the costs associated with the selected alternative must be balanced against the benefit achieved by meeting the degree of demand anticipated. Vermont Yankee Nuclear Power Corporation (Vermont Yankee Nuclear Power Station), ALAB-179, 7 AEC 159, 175-76 (1974). In other words, the need-for-power issue is important to ensure environmental costs are not incurred where there is no countervailing benefit. A need-for-power in Applicant's service area was found and the Harris facility was found to be the preferred alternative. The benefit from the power to be generated by the plant was found to outweigh any environmental impacts. Construction activity has been on-going at the Harris site since the issuance of a constcuction permit over a year ago. As can be seen in the photographs attached to the Affidavit of Mr. M. A. McDuffie (attached hereto as Appendix A) and as attested to by hr. M. A. McDuffie, considerable progress has been made in placing concrete and reinforcing steel at the plant site, particularly in the lower elevations of the Unit 1 power block. In addition, the main reservoir has been cleared and work is proceeding on the dam where Applicant is excavating, cleaning, mapping and grouting the core trench. The west auxiliary reservoir has been cleared and work is progressing on excavating, cleaning, mapping and grouting the core trench for that dam. In all, Unit 1 is 12% complete while Units 2, 3, and 4 are less than 1% complete. Applicant has thus far spent $570,000,000 on the Harris project and has outstanding contractual commitments for an additional $269,000,000. Approximately 3,400 personnel are employed working on the Harris construction effort. Thus, the environmental impacts of the Harris facility have to a large extent been realized. Considerable economic resources have been expended. The actual cost-benefit balance at this moment is heavily tipped to the cost side, awaiting ' e expected benefits. Rehashing the need-for-power issue at this point makes no sense. It is no longer relevant in the NEPA context, particularly where almost all non-operational environmental impacts have already occurred and where even with a change in the inservice date for Harris Unit 1 to coincide with the capacity plan in the NCUC Report, construction work would not be suspended. See Appendix A at 2-3. Whether any unit of the Harris facility should be delayed from its present construction schedule is purely an economic issue, which is very much the concern of the NCUC. The Appeal Board decisions discussed acove, which declined to reopen the record and reconsider the need-for-power question due to new forecasts, have all the more effect here where the issue of the delay of units under construction is a straightforward economic issue, exclusively within the jurisdiction of st 'te regulatory bodies. Respectfully submitted, SHAW, PITTMAN, POTTS & TROWBRIDGE A% -

                                              ~ AWbIs
                             'Gy rg e/F O'Neill, vehn H.
                                        . ~Trowbridge J .

[ Dated: January 23, 1979 APPENDIX A AFFIDAVIT OF M. A. MCDUFFIE M. A. McDuffie, having been first duly sworn, hereby deposes and says as follows.

1. My name is M. A. McDuffie. My business address is Carolina Power & Light Company, 411 Fayetteville Street Mall, Raleigh, North Carolina 27602.
2. I an employed by Carolina Power & Light Company as Senior Vice President, Engineering and Construction. As Senior Vice President in charge of the Engineering and Construction Group, I am responsible for supervision of personnel in the Power Plant Engineering Department, the Power Plant Construction Department, the Engineering and Construction Support Services Department, the Technical Services Department, and the Transmission System Engineering and Construction Deparrment who have responsibilities for the engineering, design and construction of the Shearon Harris Nuclear Power Plant.
3. Since the construction permit was issued for the Shearon Harris Plant in January,1978, construction has proceeded at an accelerated pace in order to recover time previously lost in the licensing process.

Conettruction is progressing in three main areas. These are (1) the plant site, (2) the Main Reservoir, and (3) the West Auxiliary Reservoir. Relative locations of these facilities are noted on Figure 1, Vicinity Map.

At this stage of construction, our major efforts at the plant site are directed toward placing reinforcing steel and concrete in the lower elevations of the Unit 1 power block. The Unit 1 power block (as shown on Figure 2) is composed of Containment 1, Reactor Auxiliary 1, Reactor Auxiliary Common, Turbine 1, Fuel Handling and Waste Processing. Most foundation mats for these buldings have been placed and walls and columns are beginning to rise. The floor liner plate has been installed and installation of the wall liner plate is active in Containment 1. Other work in progress can be seen on Figure 3, which is an aerial photo of the plant site. The Main Reservoir has been cleared except for about 250 out of a total of 4,000 acres and work is proceeding on the dam where we are excavating, cleaning, mapping and grouting the core trench. The diversion conduit is also being installed. The West Auxiliary Reservoir has been cleared and work is progressing on excavating, cleaning, mapping, and grouting the core trench for that dam. In all, Unit 1 is 12% complete. While Units 2, 3, and 4 are each less than 1% complete, becausa of the unique nature of the site, major environmental i= pacts associated with site utilization have occurred for these units as well as for Unit 1.

4. As a result of construction activities to date, most of the non-operational environmental i= pacts associated with plant construction have already occurred and major co=mitments of resources in the form of equipment and supplies have been made as a result of the advanced stage of procurement of the nuclear steam supply system. Not only has most of the 4,000-acre Main Reservoir been cleared (see Figure 4) , but so too has 2

the West Auxiliary Reservoir. In addition, excavation has begun for both the Main and Auxiliary Dams (see Figure 5).

5. As of December 31,1978, just over $570 million has been spent on the Harris project. At the present time there are approximately 3,400 personnel actively associated with engineering, design or construction activities. In addition to the $570 million already expended on the proj ect , another $269 million in contractual obligacions is currently outstanding.
6. Under no presently foreseeable shift in in-service dates, including the in-service schedule proposed in the North Carolina Utilities Commission's December 1978 Load Forecast and Capacity Plan, would it be more economical to halt construction than to adjust the pace of construction. Neither would a halt in construction associated with a change in in-service dates materially reduce or alter the environmental impacts which are associated with utilization of the Harris site.

k & kWM. A. MCDUFFl? Sworn to and subscribed before me this s I'd day of s. c. Z .. e , 1979. v V);;/.iu'./ W, f/. /

   ^
        / Notary Public ,

My commission expires: s x4 l/fYf f

                      .,    /

a

                                                                                                          /

a

                                                                                                      /
        \

TO

                      ,/             34 OUD
                    <                                                                        (,0 s      e s',            4-NEW HILL h
     )
             \

a

                                                    /

f A XI na TO HALEIGH x8 s  ! i; ' . ' 9 6-l ., Sf ~' $ \, + (M

   #                                 MAIN Ag DAM iN                                 ++                         '
                \

s

                                  -                                                                              CINITy GAP
                 \.      <
                                    $L
             .t*,*fCO*
                                      \                                                                       NEW gggg_, N.C.
               \
                                                                                     \

FIGUlm 1

COOLING COOLING TOWER TOW ER NO.4 NO 3 TURBINE UNIT 4 TURBINE UNIT 3 t l g REACTOR REACTOR REACTO R l AUXILIARY AUX AUXILI ARY l g i UNIT 4 COMM UNIT J l CONT . _ . . CONT WASTE PROC ^ FUEL HANDLING BLDG ' ' - M BLDd ., _ , , , CONT CONT 1 2 I l REACTOR REACTOR REACTOR AUXILIARY AUX AU XILI ARY UNIT 1 COMM UNIT 2 I I i TURBINE UNIT 1 TURBINE UNIT 2

       ~'

SHADED AREA DENOTES UNIT 1 POWER BLOCK BUILDING ARRANGEMENT COOLING COOLING TOWER ' NEW HILL, N.C. TOWER NO 1 NO 2 FIGL'?E 2

1

                               --~~. ._                     . - f . 3 ~~' ~~

e- _ _

                                                                             ,n                   ,        ._                           n em,                *

[ ,,,, .a g , ,e w - .

                                   - %.r .ea si n & % _w=a m                         . - -
                                                                                                                                                          -6                  _7 .@                = ..     ,

t

                                                                                                                 ' .a w' a$ '.,=m..Q w             d                                   t-.                  { .          *

-m. - ~ .. . . . .

                                                                                              =m                       .                                                             - -

'"'** ~h A  ?

                                               *C"C&y                                                 ' -           s** i

/MMMN-

                                                                                .,                         ..                                     s
                                                                       , ,E                     :   .3 C ; mL M & $ Y k-                                                                                      '

_ - s a

                                      !^

wm ~.m

                                                                                                                                                                                                     .n 1<r.
                                                                                                                                                                                                  .-          ~r lE%h           .

SL . '*-

                                                                                                       ,,,               -:                  m =.                    -            te .3                         -

_- * ' - ~? , g , 3..g

                                                                 ..                                 W 5!                           g{k(5                                                       $

y=m -- n n ..,

                                                                                                                                                                           -.                              c 1
                                                                                                                                                             *~

p

                                                ' "             _-                                                                                                                                        I ,.k.

m -- w_ __ _=- . " t . m _ e ,, L-. n_;

                                                                                                                         -a y             ,,                .
                                                                                                                                                                             -                             --      }
G;;h . 'l ..,
                                                                                                                                                       ,' 'W'-
                                                                                                                                                                                                     .. *w
t. - .

SYg~'J_- i -g- %q.1 g up .. y . -

                                                                                              .. s g                                                   _ _ _
                                                                                                                                                                           -%        ^& yrgG
@                                                                                                                        w
                                                                                          - - . , ~ , , - - . . ~ . - - ~ . - - . - - - - - ~ - - --                                                                                                                                                                                     ---~---: . - - - --
   .-..:..---:-:,--:                    ---2:
                                                          -----y,....-
                                                                                                                                                                                                                                                                                                                                      *
  • we

..:. m-by :., 3 v,. k.. - t,

                                                                                                                                                                                                                                                                                                                                                                   - - b;x w

t . m ww * . . <  % < E, .+g;i ,

  • geis ..
                                                                                .-                              .g *
  • p f
                                                                                                                                                                                                                                               -o 3
                                                                                                                                                                                                                                                                                                                        *3
                                                                                                                                                                                                                                                                                                                                  ,             <a 5

4-#2

                                                                                                                                                                                                                                                                                                                                                                                        /           y
                                                                                                                                                                                                                                                                                                                                                                                                    ;; e

.i . m f. e,

  • x4 y . ,
                                                                                                                                                                                                                                                                                                                                                 ,r                        .

1  : l '

  • s :!. r., L A ;E z ,. .,% n

[,<-

                                                                                                                                                                      .y                          ~

(si

                                                                                                                                                                                                                                                                                                                                                                             ..                     hh m .;

x

g. , . , , ,

y _ e . . , , g, ;, -

                                                                                                                                                                                                                                                                                                                                                                                                ;
                                                                                                                   /          *C                                    '+                            -

e w

                                                                                                                                                                                                                                                                                                                 %                  *L                      " n                                 i   x~
 ,-,i!*i.g zerd y:%      s hp y     r: -
  • y ,,-
                                                                                                                                       ' . S ,, *     -

2-

  • t ,.
                                                                                                                                                                                                                         .% ,4
                                                                                                                                                                                                                        . g -                     ,

4 s.

                                                                                                                                                                                                                                                                   ;

1 J.

                                                                                                                                                                                                                                                                                                 * % p
                                                                                                                                                                                                                                                                                                          .       .9 i
                                                                                                                                                                                                                                                                                                                            .dw.m ,a,.                                             . ~ ,.' 3 h
                                                                                                                                                                                                                        !$r-[                                                                                                         *

.(.4 .. 3 , , ' . .* ",. [ w .Y \ - i 2-g p:.) k k ' . '  %

                 % , +. . -.;
                                                                     *2 3        .*                            ,     ,,7,.                                . V                g , h, .
                                                                                                                                                                                                                                                                                            .q, v jn t. ww.

3' b -- s..g. js-h

                           .                           it                                                                                                     ]                                                                                                                           ;

as R. l"l s%@~ w w& Q l 4  :  ? W{ F C @%w 7 2s :gi; m& m.,7. $ y W ';N$ f #N;OF P %g%i q  :.C: n Al,gdger 3 agfp-

          . w.yu,n  s                            s. ~; g,.
n. w,~
                                                                                                                                                                                     .e  -

x, . e j ; q (

s. nu w -.%.

ge .: ,"j, k m, gw e h ; fjh .,' s ly , ' y % j#~ q l sf s7g[ .p -.j La

                                                                                                                                                                                                                                                                                                                                                                              'yQf[.,2

[ 3 $',i c

                                                                                                                                           " ~ "'

( [' . if J 9 ,y  :  ; .. 4{{3 h k w3 L p.,nyc g .w yv a ,. - v ,~. ;

                                                                                                                                        - - -: ,p
                                                                                                                                                                      -.                                                .            o>3 +; y.,n u.,

w n.a,g s.,.g; ,. y ,p 3

                                                                                                                                                                                                                      ., , ..;.,                                           ;
                                                                                                                                                                                                                                                                           ,                      a y; x, .. . bg'.A.
                                                                                                                                          ,e,
                                              . ;.                                                                                                                                                                .

p 1 9 0 1 g y.s . ji '! Jl  : W E. . ~3 g. w yW^ ~, Jp a y Wh  ! R , 4e + .. < - '

r.  :"*% .L.y:

A . . ,, d 2 g' ga t c ..- .

                                                                                                                                                                                                                                       ?                                   l i               e                                                                                      w p +. g* t-
                                 '+
                                               .. . h
                                                     ~

y L 9. vs ~~ w

                                                                                                                                                                                           ;
                                                                                                                                                                                                            .,;
                                                                                                                                                                                                                                    .;
                                                                                                                                                                                                                                        $a
                                                                                                                                                                                                                                                                                                                                 ;.
                                                                                                                                                                                                                                                                                                                                                   ,1                      .
                                                                                                                                                                                                                                                                                                                                                                                ,%,;

3 n

 .q: ~,f, r.? -                                          , .                         .m                                                                             s.                               .,                               , .                        ;                                                                              ,1                                   ..       ~. 4*         .
     *i                                                                                                                                                                                  * ,                                                                                                                                 S
                                                                                                                                                                                                                                                                                                                 \' m % +d                                                                  -

i ve 4e{4

 .e4 . .

e, s.g .;; ' 3

                                        . .                                      .g
                                                                                             ;                          s.
                                                                                                                                  '. ; ,.. e
                                                                                                                                                        -4 6;   ,                                  ;..

1 e .i.. 4

                                                                                                                                                                                                                                                                                                                      ;- _g, twor#

4- .p m

                                                                                                                                                                                                                                                                                                                                                                                            .v ,up ,-

y

                                                                                                                                                                                                                                                                                                                                                                                                      . .;
                                                                                                                                                                                                                                                         =;                             (                                           * [                         -

g , p - f.

                                                                                                                                                                                                                                                                                                                                                                                                   .g
                          ; w [,-                                       ;y y-                                               ,, ft .,
                                                                                                                                                                                      .(;                                   .                                                     :

w . y. yy . m ,v. j + .-- +. 4t - 4 ye.3 .Q,y,;a;,.,;. .,..,x., t

                                                                                                                                                                                                                                                                                                                                                                                         . m%

y;.y 7 ._ - A. g v ,y ~, .... ' ^-J n;y , L gyJ ggs , g 3*ga- wy;

                                                                                                                                                          'J                        .
                                                                                                                                                                                             ~

a Qj.e g,p y y ,o ( pu m .. - 1 ,l p; j g y.Q.3 Y' i f

        +W
                                                                                                                                                                                                                                                                                                                     . ,- 5 J Q i ' /.
                                                                                                                     >                                                                                              /                                                                                              +n                                                                                  ~~

v .m. g. . . . n

                                                                                                                     .              m      1fg           ; '
                                                                                                                                                                                            +

g .

                                                                                                                                                                                                                                                  +             :

y n ,

                                                                                                                                                                                                                                                                                                                                      - %                     ^
                                                                                                                                                                                                                                                                                                                                                               +.;<
l ,

l9 m >

                                                                                                                                                  ~'4                            p'                                            e                    nn '                             x                            ..                                                .

[

                                                          ;                                                                                                 t                                                                                                                                           ?-

a 4,.a,1 .

                                                                                                                                                                  *,. W'g      A s& i r tfH . O 4( ..                                                                                                            -
                                                                                                                                                                                                                                                                                                                                                                      .       f '~ . M. 4'c
                                                                                                                                                                                                    * . . 'jf f*

{: .. 1 i ., . %y

                                                                                                                                                                                                                                             -                                      s                                                  ,,3                  .                                                .

Af A b.k.J .' r,[.N ".~ . , . g ht, . v1 < s 4 4 , e;e.m. [ ;4 f

                                                                                                                                                                      ;                   k-                                                                                                  *
                                                                                                                                                                                                                                                                                                                     +-

sy yp.

                                    ,               y i                       -                        .
                                                                                                                                     .                    pJr.g.                                                                ;

[ a,

                                                                                                                                                                                                                                                                                                                                                                       ; wm 45' 3A4u g                                                                                                                                                                                                                     ~                                           .

s~~ .

                                                                                                                                                                                                                                                                                                                                                                                            .e - -

n.n 4th R. '. ' i',' ~. h. ,N&.*N .. % %

                                                               . v". ,,,, ."v 3                                                                                     )*
                                     . a
   .p;p                               ,y ',                                                                *
                                                                                                                                                                                                            . x f.j .                             :
                                                                                                                                                                                                                                                                        's  .,

g .m.i,. . M e. e..

                                                                                                                                                                      ,)J                         g f y $ .3                                                                                 -~                    r -

4.4 tYy 7/ Qe *

                                                                                                          =

K.W .y g,&  %.4 ,;, s,]3,"-;4 j

                                                                                                                                                                                                                                                                                                                                            ,9 ag s,                                                                                                                  ,s ,; ,- Q.                                                                                                                                                                                                                         ~.2,
                                                                                                                                                                                                                                                                                                                                                              , u .,
   . . , .                                             , ,                                      . n, .                                       <                                                                           g                                                                      ...,g                                        ,u;                                                        ;
                    .t                                              9               4 g                        s
                                                                                                                                                                                                                                                                                                                                                                                                          -)
    -g                                                                                                                                     ,.^                                      ' ' g. . a . p,$ .. yJ *
  • th( * ' . v. , ,, - ,9 * #. sw
                                           - - 31                                                                                                                        .
                                                                                                                                                                                                                                                              ,S
      ;.-jp. _. _ . _ . _ _ k.l . A ' l-,                          ,              -_ _ _ . .;.

g,_. . . .._ y s N m'T__ $ / igh. [ *) _-_.'f*..'i 1

  • 4 .i
                                                                                                                                                                                                                                                                                                                                                                                                          ,,a

7 ...,-...-._m-__.7 ------m.-_..

                                                                                                   ,        ,- -. . ;-                          ,,..--,                                      .
                                                                                                                                                                                                                                                       .....___y                -

_..-----y . 7, [. .h% ~ ~ , -. <

  • 9 f
% j'                                                                        ;              * -
                                                                                                         %,           ., }                         ]q            4                          '

y;

                                                                                                               , M; i'                 fi .g
                                                                                                                                                                                                                                                   ,'_ -
  • yns:r . ;,

1l%: r,.. y fs

                                   .y s s
                                                                                                                       \
                                                                                                                                                                                          , 4y4 -                                                        ~~ p                                          -
                                                                                                                                                                                                                                                                                                                               .~
                                                                                                                                                                                                                                                                                                                                    .s           .: a    9
                                                                                                                                                                              &yl-} f) . >_.

a  %;&"

                                    .l h ?l                                                                                             l                                                                                                    .
 . #_w- .s &,

p,. ., *,

                                                                                 ..,,,s.

j

                                                                                                                                                           %, ; .

_ ,e .o ys 4 a fg ,. , s m .

                                                                                                                                                                                                                                                                                    - w m,
                                                                                                                                                                                                                                                                                                                                        ~

a 2m

                                                                                                                                                                                                                                                                                                                                                          =

a

         %. '?p [.-h ' ] cI * $ . ,< y %y +                                                                                                                                  g%                                , $.p,4                                        .;       1 yQ+ 4,y.(:{                                                                  E
         +               .

n . w .

           . ., , s V               .. n. ww              -                                . y.g                    L ,.                                                                                                 <.
                                                                                                                                                                                                                                               .. w
                                                                                                                                                                                                                                                                        .         g m.. ,e. .-.. n.s ;?                                -

f lh

                                                                                                                                                                                                                                                                                                                                                            ;;
                    .                           1                             . . f ~*f -                                            \                                                                                    -

g z [' 1.t xp c; m : 1. was;

. A @rq @p  :
                                                                                     .e y .-                                                                                                                                                                                                                                                        *r w$ym.M;1x
 ,r                   w 2
                                                      -,_ m
                                                                               - w                                                .7. .y >
                                                                                                                                                                                                 /

xe- w o A

                                                                                                                                                                                                                              ,T,yM                                   m              d              6  A              $@f                              $w                   .
                                                                                                                                                                                                                                                                                                                                     %_ w' a
                             ...                 "s p. .
                                                                                                 ;

Q ? l* , - * -s' .T 1, " y '

                                                                 .; ; 3 9
                                                                                                                                               ' . , .i g;

w ., , - - o~ c  ?.y L ,- 9; . . tV r, , ' e)( . -'"r .. 4r %e"f.,. 's

                  .e                                                                ',             s                                                                       '                                      ,

4 Y..'

                                                                                                 .= .'                   A 1'.y                                                                                   ~~

i.' t% , 4: l lllt , % _.7, 1 *s *

.) .' * = i " ?&

4.; ' * * , ,, ' , ';. $' w .., y ., y

                                                                                                                                                                                   +   ,          .,*                                             , .

A' O ~ 7 Q, '-

                                            ', J . ,

[  : g - 4 , .y e 3 a '. e  ;; . . - , y , f-J g [=

                                                                                                              +

qpa " , ' .y 7 .s ' ; 4' ye ,. l -5'. e^ 9.

                                                                                                                                                                                                                                                 . . ,r . .
                                                                                                                                                                                                                                                        " [;                       '-
                                                                                                                                                                                                                                                                                                                     *                  . = $g5Q
                                                              .N                                                                                                                                                                                    $

p . s .' . i v nf. ;: .

                                                                                                                                                                                                                                                                                                           . n'
                                                                                                                                                                                                                                                                                                                                   .s                            ,

g ik . ' .

                                                                                     *^

(n . . . I ~ +

                                                                                                                                                                                                                                                                               . V                  y I

yQ.. ~;f.F',.y ;eff,[; }yff' ' mf 'y

y. . y n

[. , j  ;

                                                                                                                                         >]9m

[ &, . L f f, J f,c

                                                                                                                                                                                                        .                        ;.
                                                                                                                                                                                                                                                ,,e g
                                                                                                                                                                                                                                                                                    ~
                                                                                                                                                                                                                                                                                                  - p               x                     ..             .n .

[t +(

  • 5 .. J 3 [;

m..'" s K 21 , 2 J, W,-

                                                                              \=
 ]                                                                                                                           i         "p~.*if.                                                                                      fi ~.
  • 9g p Iy.l ~.fy - }q!u e . _,.
                                                                                                                                                                                     %i s
                                                                                                                                                                                                                                                        ~"
                                                                                                                                                                                                                                                                                                                           .            }}g' g . A_                                                                                     n e y'is.                                                                              . .mg                                                                      .

n* .. g

                                                                                                                           .                                                                                                               ^

y' e g_1 . m;h ' %}d . .. .

                                                                                           }^1> .                     g .'                                                                                                   e. fM                                                                       ..,                                   is
                                                                                                                                                                                                                                                                                                                                               ;
  • g.' M
 '. .'; ;
                                                                                                                                           . y: g-t  .k; , g , . . , ' ,
  • s >g .. e r a  % e . , . .

y4, -  ;<* i, .n. ~ . g$.~~t

                                               *                                                   .e                                                   *g                                                                                                                                                                                          :

h }e , r 4 "x ,4

                                                    ..                                                                                                                                                                             .                                                                                                                               ;

Q

                                      ~

s .~* 4

                                                                                                                                                                                                                  ..,-                                     +
                                                                                                                                                                                                                                                                .3  '%                                                                        %

m,  : v- , ";,+. *V '

                                                               .y                                                                                                                                    *
                                                                                                                                                                                 .'*2m - n"'
                                                                                 ,            Ng . .                                                                                                                                                                              c
                                                                                                                                                                                                                                                                                                          ;          +

4* og y, n

  • b ,t 3 ', ; , 5 47
                                                                                                                                                 ,./                          4 9                                   F
                                                                                                                                                                                                                                                                                       .. w l

{ . * > f i ,'

                                                                                                                                                                                    ~#
                                                                                                                                                                                             ) ,$                                                              $ 40                                      i f ;;, .                        .%'e
? . .
                                                              $g                    g.,          g      ij      *     .1Av               {      :    4       A       f       .'     '. 7;                  1, <                                   *i                                  .v                  m
                                                                                                                                                                                                                                                                                                                             *      - >              lidp; sd                             ;#
s. J AM
4. . m . m_ . . - ~

i A r $ %,. .q

                                                                                                                                                                  .              w-e                                                     e ..

F .e (M tQ n. x,$g, ' ~ , s7 hi

                                                                                                                                                                                                                                       ~

9' .~ :.

                                                                                                       , '; .                                                                                                                                                                                 ',

f  %. "y%, p s, 'TL j <?g O' ' * % '. ; '. ..,

                                                                                                                                                                                                          . . f. 4 4

g [' ,[" .;

                                                                                                                             *                             :     .*               y h{y '. ' j. ye . ? lE g [x..

1 4y. , e .

                                                                                                     ~ <r a                  + x                                    wa.,                                                                                      :
   &a.P ev
                                                         %        y
  • J. -

1 _

                                                                                                                                                             +/ -
                                                                                                                                                                   -              -r.
                                                                                                                                                                               . . ; s,
                                                                                                                                                                                                           . ,,c .-
                                                                                                                                                                                                                                 =+
                                                                                                                                                                                                                                                                                          .            't m
                                                                                                                                                                                                                                                                                                                               . . . . , w "A
        %y%.xsr* <a ~ y g .s.N. y. - >;m.e _Fy*
                                                                                                                                                                                                                                                                                                  .      : agh       : ' <p;wt.                  :
         .. _ -                                                                                                                       n             .. .,                                                                                        - . .- :                                                                                      .           ..

UNITED STATES OF AI1 ERICA NUCLEAR REGULATORY CCMMISSION In the Matter of )

                                     )

CAROLINA POWER & LIGHT COMPANY ) Docket Nos. 50-400

                                     )              50-401 (Shearon Harris Nuclear Power         )              50-402 Plant, Units 1, 2, 3 and 4            )              50-403 CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing

" APPLICANT'S RESPONSE TO CONSERVATION COUNCIL OF NORTH CAROLINA AND WAKE ENVIRONMENT, INC. ' S MOTION TO REMMD TO LICENSING BOARD FOR FURTHER HEARINGS" have been served upon each of the persons listed on the attached service list by mail, postage prepaid, or by hand-delivery, this 23rd day of January, 1979.

                                             \

c s , . John H. O'Neill, J . Dated: January 23, 1979

UNITED GTATES OF AMERICA NUCLEAR REGULATORY COMMISSICN In the Matter of )'

                                    )

CAROLINA POWER & LIGHT COMPANY ) Docket Nos. 50-400

                                    )                 50-401 (Shearon Harris Nuclear Power        )                 50-402 Plant, Units 1, 2, 3 and 4)          )                 50-403 SERVICS LIST The Honorable Joseph M. Hendrie         Dr. J. V. Leeds, Jr.

Chairman 10807 Atwell U.S. Nr. clear Regulatory Commission Houston, Texas 77096 Washington, D.C. 20555 Dennis P. Myers, Esquire The Honorable Victor Gilinsky Associate Attorney General Commissioner State of North Carolina U.S. Nuclear Regulatory Commission P. O. Box 629 Washington, D.C. 20555 Raleigh, North Carolina 27602 The Honorable Richard T. Kennedy Charles A. Barth, Esquire Commissioner Office of the Executive Legal U.S. Nuclear Regulatory Commission Director hachington, D.C. 20555 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 The Honorable Peter A. Bradford Commissioner Thomas S. Erwin, Esquire U.S. Nuclear Regulatory Commission P. O. Box 928 Washington, D.C. 20555 115 West Morgan Street Raleigh, North Carolina 27602 The Honorable John F. Ahearne Commissioner Docketing and Service Section U.S. Nuclear Regulatory Commission Office of the Secretary Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Ivan W. Smith, Esquire Chairma.. Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Glenn O. Bright Atomic' Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Table 1 CP&L Load Forecast and Capacity Addition Schedule LOAD ADDITION YEAR OM) OM) 1979 S 6056 W 6056 1980 S 6442 720 W 6442 1981 S 6816 W 6816 1982 S 7223 720 W 7223 1983 S 7627 W ,, 7627 1984 S 8079 900 W 8079 1985 S 8536 720 W 8536 1986 S 8980 900 W 8980 1987 S 9449 W 9449 1988 S 9911 900 W 9911 1989 S 10389 W 10189 1990 S 10859 900 W 10859 1991 S 11400 720 W 11400 1992 S 11930 720 W 11930 5.357 1979-1992 Legend: Summer S Winter W

e. ee FUTURE ELECTRICITY NEEDS FOR NORTH CAROLINA: ~~ LOAD FORECAST AND CAPACITY PLAN 1978 NORTH CAROLINA UTILITIES COMMISSION RALEIGH, NORTH CAROLINA DECEMBER 1978 e M e ep M et

TABLE OF CONTI:NTS Page EXECUTIVE

SUMMARY

       . . . . . . . . . . . . . . .                           1 I. INTRODUCTION      . . . . . . . . . . . . . . . . .                              3 II.  ' HIE 1978 LOAD FORECAST AND CAPACITY PLAN                            . . .      7 A. Introduction .       . . . . . . . . . . . . . . .                            7 B.  "indings of Fact . . . . . . . . . . . . .           .                       9 C. Load Forecast and Capacity Plan                         . . . . . .           16 III. FORECAST OF NATIONAL A!!D STATE ECONOMIC AND DEMOGRAPHIC GROUTH             . . . . . . . . . . . .                       34 A. Introduction . . . . . . . . . . . . . . . .                                34 B. The National Forecast . . . . . .                           . , , ,        . 36 C. Historical Comparisons Between the Economies of the United States and 11 orth Carolina                             . . 39 D. The Long-Term Forecast for North Carolina                                  . 42 E. Conclusion . . . . . . . . . . . . . . . . .                                  45 IV. LONG-TERM ELECTRIC ENERGY AND PEAK-LOAD FORECAST          . . . . . . . . .  . . . . .                         47 A. Introduction .       . . . . . . . . . . . . . . .                            47 B. The Use of Econometric Analysia . . . . . .                                 47 C. Forecast of Electricity Sales to Residential Customers . . . . . . . . . . .                                  51 D. The Forecast of Ele =tricity Sales to Commercial Customers . . . . . . . . . . . .                                 56 E. The Forecast of Electricity Sales to Industrial Customers . . . . . . . . . . . .                                60 F. The Peak-Load Forecast . . . . . . . . . . .                                 62 G. Comments by Public Witnesses anc Intervenors                                 67 V. RESERVE CRITERIA, GENERATION MIX, AND CAPACITY PLANS . . . . . . . . . . . . . . . .                                   71 A. Reserve Criteria . . . . . . . . . . . . . .                                  71 B. Generation Mix . . . . .. . . . . . . . . .                                   73 C. Generating Capacity Plan . . . . . . . .                   . .                83 VI. OUTLOOK FOR CO' >ERVATION AND LOAD MANAGD1ENT; A SURVEY OF ALTERNATIVE CIERGY SOURCES                            . . . .        87

~ A. Introduction . . . . . . . . . . . . . . . . 87 D. Legislation . . . . . . . . . . . . . . . . 88 C. Utilities Conmission end Public Staff Activities on Conservation and Load Management . . . . . . . . . . . . . . . . . 91 D. The Electric Utilities' Conservation and Load Management Programs . . . . . . . . . . 95 _. E. Alternative Energy Sources . . . . . . . . . 102 VII. CONCLUSIONS . . . . . . . . . . . . . . . . . . 116

I'.TDEZ OF TABLES Page "E A. Commission Load Forecasts................... 23 "ABLE n. Comm.tssion Plan for Capacity Additions and ReH ements............................. 2n

 *M     C. Co= mission Load Forecasts, Ca and Ref., cit.nt Reserves.......pacity      Plans
                                               ...............             25 TABLE  1. Capacity Addition Plans for VEPCO........... 118 TALLE  2. Reserves Which Will Result From Capacity Plans if the VEPCO Forecast Occurs . . . . . . . . . . 119 TABLE  3. Reserves Which Will Result From Capacity Pla m if the Public Staff Forecast Occurs. .. 120 TABLE   4 Levels and Growth Rates of Demographic variables Used in the Public Staff's Energy Forecasts and Load Forecasts.........                121 TABLE  5. Public Staff TREiD Forecast of CPCL Ener Consumption by Custcmer Class...........gy          .... 122 TABLE  6. Public Staff TRE11D Forecast of Duke Ener Consumption by Customer Class...........gy
                                                                  .... 123 TABLE  7. Comparisons of Growth Rates of Electricity Prices and Inflation Measures . . . . . . . . . . . . . . . 124 TABLE        CPEL's Energy 8.

Forecast...................... 125 TABLE 9. Duke's Energy Forecast...................... 126 TABLE 10. ^vt.xCD's Energy Forecast..................... 127 TABLE 11. Public Staff's lioneconometric Energy Estimates for the Residential Sector. . . . . . . 128 TABLE 12. Public Staff's Noneconometric Energy Estimates for Commercial Sector............. 129 TABLE 13. CPEL's Load Forecast......................... 130 TABLE 14 Duke's Summ e Peak Load Forecas t. . . . . . . . . . . . 131 TABLE 15. Duke's Winter Peak Load Forecast............ 132 TABLE 16. Public Staff's Capacity Addition Schedule... 133

TABLE 17A. Reserve Margins Based Upon the Public Staff Addition 3chedule........................... 133 TABLE 17B. Loss of Load Probabilities Expected Tron P ublic S ta ff Addi tions . . . . . . . . . . . . . . . . . . . . . . 134 TADLE 18. Public Staf f Projections of Percent of Plant Operated as Base Load, Cycling and Peaking................................. 135 TABLE 19A. CPCL's Capacity Addition Schedule........... 136 TABLE 19D. CP&L's Projected Su=ner Peak Reserves....... 136 TABLE 20. Duke's Summary of Load, Capacity and Reserves.................................... 137 TABLE 21. Duke's Summary of Projected Load Management Goals....................................... 139 w he e m

EIECUTIVE SUMBARY The Gen eral Assembly in 1975 directed the U tilities Commission to develop a nd kee p current an analysis of the long-range need f or electric pt ver in North Carolina. This report is submitted to the Governor and to the Ge neral Asse mbly in compliance with that aandate. In preparing this report, the Co mmission has consider ed evidence presented by the Public Staff - Nori.h Ca rolina Utilities commission, Ca rolina Po we r S Light Company, Duke Power Compan y, Virginia Electric and Power Company, and other parties in Docket Bos. E- 10 0, Sub 32, the load fo r e ca st d oc te t, a nd 5- 100, S ub 78, the conservation and load management do ctet. This report makes the f ollowing findings: 1 The planning pe riod unde r consideration for construction of new genera ting units is 1978-1992.

2. The probable range of annual peak-load growth for Carolina Power S Light Company is 4.4% to 6.5%. Eithin this range the most probable peak-load growth rate for planning is 5.2 %, annually.
3. The probable range of annual peak-load growth f or Duke Power Company is 4.6 % to 6.7%. Eithin this range the most pro bable pe ak-loa d growth for planning is 5.4%,

annually.

4. The gene ra ting re se rves nee ded to ensure system reliability f or Duke, CPGL, and YEPC3 are 20% for both the summer and the win ter pea king seasons.
5. The most economical and efficient generation six for Duke, CPSL, and 7EPCO for the years 1978-1992 consists of appror ina tely one-half ba se capacity, one-third cycling capacity, a nd one-sixth peaking capacity.
6. The most economical method of electric generation for
~

Duke, CPSL, and YEPCO is a combination of hydroelectric genera tion and coal fired a nd nuclear fueled steam genera tion ; the projected benefits to be derived from the development and opera ti on of renawable energy sources including wind power and solar energy. when added to the combina tion air of hyd ro , coal, and nuclear electric gene ration are in the public interest.

7. VEPCO has cancelled n uclear units Surry No. 3 and Surry No. 4 7EPCO's present construction schedule will not meet the required reserve level of 20%.
8. Conservation and load management activities by the

2 Commission, the regulated utilities, and the public can significantly i= pact future growth rates in peak-load demand.

9. "he capacity addition plans, adopted herein, will enable CP.L and Duke to meet the Cor: mission 's forecast of peak demand for the years 1979-1992 and to have adecuate reserves for contingencies.
10. Superior forecasting and load managemant is needed. of the effects of conservation The result of the capacity additica plans, adopted herein, would delay the current construction schedule of CPCL at least one year and would postpone CPCL's proposed units SR1 and SR2 (totaling 2300 MW) beyond this planning period. It would also delay Duke's later plants sir months to one year, but would keep Duke's early plants on schedule for economic reasons.

The Commission will require that the utilities and the Public Staff presant in the mid-1979 hearing a full analysis of the present construction schedules and the reasons, if any, that the u*4 '_ities should not reschedule their construction according to the capacity plans adopted herein. This report anmi nes the studies which underlie the Commission's forecasts and evamines consemration and load management efforts that are underway in North Carolina, as well

CPCL, as the prospects for alternative energy sources. Duke, and VEPCO will be .6ed to file proposed plans for two voluntary load management programs:
1. Utility control of residential water heating, and
2. Utility cont:cl of interruptible industrial loads.

The three utilities will also be recuired to offer voluntary, experimental rates which incorporate time-o f-day pricing to customers who either install solar ecuipment, theraal storage equipment, or a combination of the two for the purpose of providing space heating.

3 CHAPTER I INTRO DU CTION In 1975 the North Carolina General Assembly enacted

3. 5. 6 2-I l o. l (c) which directed the Utilities Commission to adevelop, publicize, and keep current an analysis of the long-range n eeds for ex pa nsion of f acilities for the generation of electricity in North Carolina, including its es tiante of the probable future growth of the us= of electuicity, the probable needed generating reserven, the extent, size, air and general location of generating plants
,. and   arrangements      for   pooling     power .  . . .
                                                                  "  The    tatute requires the Commission to cond net public            hearin gs     in   the course    of making the analysis and developing the plan.                The statute further provides that the Commission submit                 to   the Governor     and   to   the appropriate committees of the Ganeral Assembly a report of its analysis and plan.

In January 1977 the Co mmission held its first public hearings pursuant to the statute and, theraafter, issned its first repo rt , entitled Report of Analysis and Plan: Futura Requirements fog Electricity Service to North Car olina - 1977. In that Report the Connission concluded that:

l. The probable future annual rate of growth in peak load for both Carolina Power & Light Company (C ur.M and Du ke Power Company (Duke) vill be apprcriaately 6.9% during the years 1976-1990.
2. The probable needed genera ting reserves will be 15%

to 20% in the sunner and no less than 20% in the vinter.

4

3. The economically efficient generating mix for both companies will be one-half base, one-third intermediate, and one-sixth peaking capacity.
4. The most economical type of base load capacity f or CPGL and Duke vill be nuclear fuel generation in most cases.
5. Euclear power provides acceptable, though not Zero, risk to the public.
6. It is the objective of the Commission to encourage the growth of industries which vill improve the systen load f actor through the promotion of interruptible rates.
7. Baziana conservation efforts should be encouraged.

On June 3, 1977, the General Assembly amended G.S. Chapter 52 to provide for a Public Staff within the organization of the Utilities commission to represent the usinc a nd consuming public in all matters affecting public utility ratas and service. Eith respect to the long-range forecast of capacity requirements and the capacity expansion plan, G.S. 62-15 was amended to state that-(d) It shall be the duty and responsibility of the public staff to. .. (5) interw ne on behalf of the using and consuming public in all certi.ficate applications filed pursuant to the provisions of G.S. 62-1I0 1, and provide assista nce to the commission in making the analysis and plans required pursuant to the provisions of G.S. 62-110 1 and G.S. 6 2-155; . .. On December 1977, (5, the Public Staff filed with this Commission its J,,9,2,3, Public Staff Report: Analysis p,j Lp_ttg Hanoe Needs f,g,E Electric Generatinc ?acilities in North Carolin a. The Public Staff Report wa s essentially an update of the commission's 1977 Beport of Analysis and Plan, but incorporated new data aad infornation that became availab le after the commission's I S77 Beport was issued. The Public

5 Staff Report also included refinements in the econom etric forecasting models and in the capacity planning techniques. New features included both long-tern economic forecasts for the United States and f or Eorth Carolina and analyses o f the potential beneficial e ffects of conse rva tion, load ma na ge ment, and peak-load pricing. In Februa ry 1978 the Commission held hearin gs in preparation for its 1978 report. The Public Staff and the three major electric utilities (operating in N orth Carolina) presented their forecasts for the grow th in electricity sales and peak load in North Carolina and the generating capacity needed to meet this projected gro wth. Runerous i other parties intervened and participated in the hearings: the Attorney General of North Carolina, the North Carolina Electric seabership Corpoca tion, the Carolina Environmental Stud y Group, the Conservation Council of North Carolina, the Lea gue of V omen Voters, the Joseph Le Conte Chapter of the Sierra Club, and the North Carolina Oil Jobbers Association. In addition, a number of public witnesses provided informatien and consent to the Commission. Thereafter, the Commission held extensive hearinas in July and September 1978 in its Docket No. 5-100, Sub 78. The purpose of this d ocke t a nd the hearings held therein is to investigate the load ma nagement prog rams of the electric utilities and the conservation prograns of the electric and gas utilities opera ting in the state. The publication of

6 the commission's I 978 load forecast report has been delayed in order to assaan the evidence presented in this docke t and to detsemina what effects the load management and conservation programs vill have on the long-range growth of electricity in North Carolina. The Commission's I 978 report, entitled Future Electricity Needs igg, sorth Carolina: Lo.5j Porecast gas cacacity flag - M, is submitted in compliance with the aandate of the General Assembly, as set f acth in G.S. 62-110 1 (c) .

7 CHAPTER II THE 1978 LOAD FOREC AST AND CAP ACITY PL AN A. Introductiq3 General. S ta tu te 62-l j 0.l (c) requires the North Carolina Utilities Commission to prepare and keep current an analysis of the long-ra nge needs for the expansion of electricity generating f acilities in Worth Carolina. To comply wi th this manda te from the General Assembly, the Commission must estima te the probable future growth of the use of electricity, the probable needed generating reserves, and the extent, size, sir, and general location of genera ting capacity to meet the future growth of electricity use. I The Public Staff performed independent analyses of the load growth in CPGL's and Duke's service areas. H owe ve r, the Public S taff adopted and recommended the same growth rates for YEPCO that had been determined by an independent consulting firm f or the Virginia Corporation commission two years previously and reaf firmed by the Virginia C orporation commission Staff in la te 1977. The studies made by the Public Staff, the regulated utilities, and other interest ed parties in the load forecast proceedings presented a wide range of opinion as to the electric generatin g capacity needed in North Carolina over the next 20 years. sost of these studies were based on accepted scientific load forecast me th ods. The se studies incorporate different

8 levels of economic activities, conservation and load mana gement efforts, popula tion novesents, custoser e.cceptance of new appliances, air conditioning and electric heel ing saturation, and other f actors. The Conaission has e valuated these studies in order to estimate the probable future growth of electricity use in sorth Carolina. In making its forecasts and evaluations, the commi== ion takes judicial notice of the conservation and load management evidence which isas presented in its hearings in Docket 5o. 5-100, Sub 78. Duht Power C ompany and Carolina Power & Light Cospany provide 95% of the electricity genecation utilized in North Carolina. Virginia Electric and Power Company (YZPCO) and mantahala Poser and Light Company (Eantahala) supply the remaining 55 of electricity generation. Additional generation required to serve new lo&ds of Mantahala are planned by the Tennessee Talley Authority (TY1) , to whom all of Nantahala's generation is con tracted. YZPCD does not plan to add generating facilities in North Carolina in the foreseechle future. The informa tion presented to the Cocaission concerning the expected groeth on the YEPCO system is inconclusive. The major thrust of the Commission's l978 report is, therefore, directed to the service areas of CPGL and Duke. In making its forecast, the commission has recognized that the public policy of the State of North Carolina enco urages

9 the growth of indnstry in order to provide jobs for and to raise the living standa rds of the ci tizens of the State. Th e Commission has the duty under the Public Utilities Act to ensure that adequate electric service is available a t all times in North Carolina to provide for growth in the State's economy. B. Findinos of Fact

l. Ike plannine period under consideration for construction 2f Aev cenerating acits is 1978-1992. The current planning period must extend at least la years in order to allow consideration of f uture construction of both nuclear and fossil fueled generating units beca use 14 yea rs must be allowed for designing, licensing, and constructing a nuclear unit.
2. The probable I nn ge 21 annua l peak-load crowth for Carolina Power G Licht Co m pa n y is 4,4% to 6.5%. within this canot the most probable peak-load crowth rate for planning (g 1223, annually. The Commission has used a growth rate of 5.2% in derel; ping its load forecast for CPSL as shown in Table 1. The generating capacity addition plan to meet this growth rate is shown in Table B. CP&L's own Jeak-load forecast is 5.72% for the years 1979-1992.

The Commission's use of the 5.2% growth rate is based upon its conclusion tha t CPCL's conservation and load management programs are embryonic and that customer acceptance of these

10 programs will therefore accelerate. Under the Commission's forecast the expected I 985 sanaer peak load is 7,902 59; and the 1990 sunser peak load is 10,182 HW. For the years 1965-1977 the peak-load growth rates for CPGL have ranged from -i.0% (1978) to 24. 8% (1968); within the past five years the range has been from -l.05 (1978) to 9.3% (1977).

3. 15;g, probable rance si annual ocak-load crowth is.g P212. Power Company h M 19, M. Within @ ran ce the 3g.g.1 oro bable pea k-loa d growth M plannine h 5. a %,

a nn u allv. The Comeission has used a growth rate of 5.4% in developing its load forecast for Duke as shown in Table A. The generating capacity addition plan to meet this growth rate is shown in Table B. The S.4% growth rate reflects the Commission's conclusion tha t Duke's load man agemen t and conservation programs are pcogressing well and vill continue to gain acceptance among its customers. Duke's own saaner peak-load forecast, which projected a range of growth rates from 5.05% to 6.92% for the years 1979-1990, reflects the effects of its ongoing load management program. Under the Commission's forecast the expected 1985 summer pest load is 13,518 SW; and for the 1990 summer peak load is 17,584 5E. For the years (965-1977 the peal-load growth rates for Duke have ranged from -2 1% (1974) to 18.0% (1968); within the past five years the peak-load growth rate has ranged from -2 1% (1974) to l l .6 % ( 1977) .

11

4. The _qe nera t i ne re se rve s needed to enstre system reliability fol Duke, @ , and VEPCO age 201 for both Me sagagg ad De vinter pea kinq seasons. As pointed out by the Public Staff, there is no level of reserve margin that will absolutely guarantee reliability. Although the P ublic staff recommended reserves of 15% to 20% for both seasons, Duke witnesses indicated that 20% reserves are a ainlaus for reliable service to its customers. The commission concludes t ha t , for this planning period, a miniana 20% reserve margin f or bo th summer and winter peaking seasons is reasonable and ne ce ssary. In so deciding, the Commission has considered, am on g other things, the difficulties of the three electric utilities in providing service during 1977 and 1978 and the recommendations of the Federal Energy Regulatory Commission Staff.
5. Ihg most economical gasl efficient generation mig Jgg M, E, ansl VEPCO $2I. th_e_ vears I978-I992 consists of ggprorisately one- ha lf b ase ca paci ty , one-third cyclin o capa ci t y, ggd one-sixth Deakinc capacity. The Public Staff pointed out that optimal generation six satisfies the demand for electricity at miniana cost and with acceptable reliability. The studies of the Public Staff concluded that the generation air adopted herein is the proper one for the three major electric utilities serving the State.
6. The most economical meth od 2f electric generation f or Duke, CPGt, and 7EPCO is a combination of hydroelectric

12 cenera tion agf co51 fired ni nuclear fueled steau eenera tion; j;h proineted benefits 19 h deri ad from the d evelo cuent and operati on of renewable enerav sources inelad inc M power and solar enerev to add j;oo the sonb ina tion Q of h yd ro, coal, and nuclear electric ceneration a re in the public interest The Public Staff and the utilities presented a number of studies indicating tha t, in the preser.t planning period, nuclear generation is czpected to be more economical than fossil generation f or new base load units. The resnits of the total life studies show that nuclear generation is expected to average ainost six-tenths of a cent per kilowa tt-ho ur less than frssil generation. Generation six vill continue to be reviewed by the commission on an annual basis. vi tnesses at the load forecast bearings in February I978 expressed concern about the safety and reliability of nuclear generation. The issues raised by these witnesses included the problem of storing spent nuclear fuel, the lack of assurance of uranina supply, and the continuing escalation of costs in nuclear plant construction. There vas also evidence that zuclear generation is clean, safe, and available. In addition, evidence in dicated tha t there is increasing opinion among the technical comannity that the hazards to the public from nuclear generation ma y be considerably le ss than the ha=ards from alternative fossil f uel systems, such as coal. Altho ugh it is true tha t increasing costs for nuclear plant construction and

13 operation have narrowed the economic advantages of nuclear power over coal, it is also true tha t nuclear generated electric power still retains a si gnifica n *. economic adv antage over coal and all other alternative neans of base load generation in the southeastern region of the U nited States.

7. VEPCO has ca ncelled n uclea r units Sorry Eo. 1 and Surry Io. E. VE PCO's presen t construction schedu le will not meet the recuired reserve level of 2 0%. The Commission has concluded elsewhere in this chapter that, with the cancellatior of Surry N o. 3 a nd S urry No. 4, VEPCO's present construction schedule is insufficient to prevent its systen reserves from falling below the level found necessary by the cornission for adequate and reliable service. The Commission will req uire YEPCO to presen t at the 1979 hearings a full analysis of the company's expected loads and required generation through 1993.
8. Conservation 3 pod lond o manaoement activities hI thq commission, Ah3 re c ula t ed Utilities, and the public can siqu ifica ntly ispact futsu crowth ya pea k-loa d in demand. The forecast adopted by the cc<tission in this repo rt is based on the premise that conservation and load management efforts are not a temporary phenomenon but represent permanent changes in the attitude of society toward the use of energy. As a result of increasing nece ssity for funding alternatives to our present energy

I4 sources, significant ene rgy-rela ted legislation has been enacted in the last two years. The North Carolina General Assembly enacted the important Energy Conservation Act of 1977, which encoura ges solar energy and insulation for residential and business use. In addition, the United States Congress has recently enacted the National Energy Conservation Policy Act of l 978. Both of these acts will substantially affect state and local efforts on conservation. The major electric utilities have undertaken conservation and load management programs. Especially noteworthy is the Load sana gement Program of Duke: the company 8s Energy Efficient Structure Program incorporates a conservation rate schedule which offers a acostary incentive by passing along the resultant savings in electric system costs to those residential customers who install insulation in accordance with program standards. Further, the Conaission has entered into cooperative agreements for research and experimentation with the United States Department of Enacgy. Under these agreements, the Commission is undertaking pilot demonstration projects on conservation and load management and is ernaining peak-pricing electricity rates. The Commission has also initia ted Docket No. 5-100, Sub 78, entitied " Investigation of Cost-Based Rat es , Load Banageme nt, and Conservation Oriented En d-U se Activities." Hearings in this docket in

15 July and September 1978 established that numerous and div erse c onse rva tion and load management programs are underway throughout the State.

9. Ibe capacitV addition plans, adopted herein, will enable GZE1 a nd Duke 12 seet the Consission's f oreca st 2f g demand 1su; 3he vears 1979- 1992 and tp have adeoua te reserves ing continoencies. This is an interim plan and is subject to revies by the Commission on an annual basis.

Because it is impossible to e xactly p redict the future, the companies must maintain flexibility in their construction schedules in order to economically adjust to changes in pea t-l oad growth as they occur. The utilities will be required in the mid-1979 hearing to show the reasons, if any, why their construction schedules should not be delayed to match the commission's ca pacity plan. New generating f acili ties should be located on sites which are near load centers or ma jor transmission and facilities which have ample water for cooling. Because of the long lead times required, site licensing and preparation have already begun for most f acilities coming into service during the next l0 to 15 years and relocation of those f acilities would not be economical.

10. supering f orecast i no of the effects of conservation ggd 193.1 m,gnacement is needed. The commission is directing the utilities and the Public Staff to present detailed analyses concerning these matters in the 1979 hearings. To

16 allow sufficient time those hearings are being moved to mid-year. The forecast of future electrical poser demands, the generation reserve requiremen ts, and the types of new generating capacity will continue to be reviewed by the Consission on an annual basis in order to adequa tely incorporate changing conditions. The Commission, through its S taff and through the Public Staff, vill continue to consider regional interchanges of power and power pooling arrangements by its participation in the Southeastern Re1inbility Council aad the Virginia-Carolin as Interregion planning efforts. C. Id2nd Forwasts 3g51 Capacity 21gg The guestions before the Commission are threefold: 1 What are the most likely load growth rates?

2. What levels of reserve capacities are required?
3. shat types of plant most economically, safely, and efficiently produce the required capacity?

These questions are interlocking to a great degree. Load growth requires additional load capacity and corresponding reserve capacity. The amount and types of plant affect the reliability of the system and the cost of providing electricity. The cost an d reliability of electricity in turn affact the rate of load growth. As a result of the evidence in its load forecast and load management hearings, the Commission has available to it a

17 vide variety of expected load growths, all dependent upon diff erent levels of economic activity, conservation and load mana ge ment efforts, popula tion novement, customer acceptance of new appliances, air conditioning and electric hea ting saturation, and other factors. This chapter presents the Co mmission's conclusions regarding the projected future electricity requirements in N ort h Ca rolina. The chapters which follow summari=e the evidence of the parties in these hearings. Based upon the best evidence a vailable to the Commission today, the electricity growth plan adopted by the Commission represents a prudent and realistic strategy for meeting our electricity needs. The plan necessa rily dema nds fle xibility in the adopted constr ection schedule. Annual u pda tes of the Commission forecast a nd ca pacity plan will enable the Commission to reflect both improv ements in forecasting techniques and new evidence regardin g the utilization of electricity. Accordingly, the tiaing of later plants must be regarded as tenta tive. The consission has examined in detail the level of reserve capacity which should be required. Reserve ca pacity is necessary to mee t increased capacity requirctente due to severe weather, planned maintenance outages, unerpected equipment o uta ges, unexpected load growth, and other factors. The adeguacy of 'actricity supply directly affects the ability of our citizens to utilize adequa te

18 space conditioning to remain comfortable and healthy. Disrup tion of electricity service at any time has the potential for reducing the econcaic output of the State and, thus, the income of its citizens. In recent periods of severe sea ther, the utilities serving North Carolina have had difficulty, at times, meeting consumer demand, even though high levels of reserves were in place. Seasures are being taken to prevent future occurrence of these antages. Houever, it is important to emphasize tha t reserves must cover probable loads and likely equipment outa ges. Testimony by witnesses from Duke indicates that 20% reserves are the minimum requirement for ce liable opera tion. This is althin the range indicated by the Federal Energy Begulatory Commission (FERC) of IS% to 25% and is consisten t sith the Frac staff reconaandation that the percent reserves should be on the high end of the range in fast growing areas. All witnesses agree that North Carolina is expected to continue to have rates of economic and demographic growth greater than the national average during the extant planning period. Although estimates of growth are less reliable for longer planning periods, the longer plannin g periods also allos more time to effect conse rva tion measures. Because the planning period is tied to the construction time required to build new generating facilities, it is laperative tha t the planned construction schedule be flexible enough in the

19 later years to 'be capable of ad j ustment to meet the requirements of unforeseen changes in load growth. Af ter reviewing recent experience, the commission concludes that a minimum 20% reserve margin is reasonable and necessary. After review of the evidence presented concerning the probabilities of variour occurrences, the most detailed a nd supported of which was that presented by the Public Staff, the commission concludes that the maximum growth rates which should be utilized in planning future capacity are those f or the " base case" presented by the Public Staff. This is essentially a forecast of futsre growth which assumes that the f actors causing the demand for electricity, including conservation and load management practices, will continue unchanged. Plant additions are not now scheduled at a rate fast enough to provide a dequate reserve margins for such loa ds; increased use of conserva tion and load managereat tech niques can be expected to obviate the need for such large neale cons: enetion. Various scenarios of the impact on growth rates of different levels of conservation and load ma nagement techniques we re presented by the Public Staff. Included were the f ollowing: 1 A 15% reduction in electric energy consumption by 1992 (conservation case) :

2. A 10% improvement in load factor by 1992 (load manage ent case) ; and

20

3. Both of the above.

The effects of either I or 2 are to reduce the average load growth approzinately 15 per year. sany benefits can be gained through increases in conservation and load management. For example, by 1992, CPGL vould have to provide an additional 10,977 HR under the base case but only 5,177 59 under Scesuario 3. For Duke, the required construction would fall from 17,890 59 to 10,770 av. If these savings could be accomplished, the combined construction requirements of CPG 1 and Duke would be reduced by more than $10, billion during this planning period. Significant changes in conservation and load management efforts are occurring and will be of sign 4"ir ant assistance in the 1980's. After examination of the assnaptions underlying each scenario, the Commission cont /.ludes that, based upon the evidence avallable at this time, it is not reason able to expect that both conservation and load management will be practiced substantially enough to produce the effects of the combined load annagement and conservation scenario. However, it does appear that, with effectim effort by utilities, consumer groups and government, combined reductions in 1 cad growth equivalent to the level of either the full load management or full conserva tion scenario can be realized (i.e. , approximately I % reduction in growth from the abase casc a) .

21 Since the time of the hearings, the 1977-1978 winter and 1978 summer peaks have been established at such lower values than had been predic te d. The conaission has taken into account the two additional actual peaks in its adopted load fo reca st. Although some of this reduction was obviously weather rela ted, a substantial c ortion of the remainder must be at tribu ted to concervation and load management measures by cus tomers. The commission expects that customers will continue to add such sea sures in the near term future to aristing installations and to des ign them into f uture expansion and construction. A t some point, however, it can be expected that these seasures will be sufficiently employed so th at normal growth of the economy and population in North Carolina will raise the rates of growth a g ai n. The Commission concludes that the most reasonable expectation for the possible reduction in abase case" growth ra tes over the planning period is 60% of the combined load manage ment a nd conserva tion scenario reduction. The commission concludes t ha t , for planning purposes, CPGL's load can be expected to grow at an average annu al rate of 5.25. Duke's load can be expected to grow at an av er age annual ra te of 5. 4 % . The se growth rat es are approrisately 15% (CPCI) and 13% (Duke) less than the Public Staff base case recommendations. These red uc tions depend upon increased levels of conserva tion and load ma na ge ment. The Commission concludes that significant

22 effort should be expended by the utilities to help effect such changes in usage patterns. The Commission presents in Table a the adopted load growths ured in developing its plan for the capacity additions shown in Table B. Table C shows the percent reserves which will result if these lead forecasts and capacity addition plans a re me t. The result of these capacity addition plans is to delay the cor plete construction schedule of CPGL at least one year and to delay CPGL's proposed units SHI and SR 2 (totaling 2300 5E) completely boycad the planning period. CPGL provided no evidence, either economic or operational, to indicate that its present construction schedule should not be delayed to match the expected load growth. Duke, on the other han d, provided evidence that the ratepayers would benefit from lower not operating costs if its early units are completed as previously scheduled. The Public Staf.f supported this evidence and the Commission concurs.

3 TABLE A. Co mJ.ssion Load Forecasts (MW)

Carolina Power & Light Cc=pany Duke Power Co=pany YEAR LOAD (MW) LOAC ( M'.C 1979 5 5830 9860 W 5930 10070 1980 S 6133 10392 W 6238 10614 1981 S 6452 10954 W 6563 11187 1982 5 6788 11545 W 6904 11791 1983 5 7141 12169 W 7263 12428 1984 5 7512 12!26 W 7641 13099 1985 S 7902 13518 W 8038 13806 1956 S 8313 14248 W 8456 14552 1987 5 8746 15010 W 8896 15337 1988 S 9200 W 15829 9358 16166 1989 5 9679 W 16683 9845 17039 1990 S 10182 17584 W 10357 17959 1991 S 10712 18534 W 10895 18929 1992 S 11269 19535 , W 11462 19951 5.2% 5.4% Per Per Year Year Legend: Sc=mer S Winter W

24 TABLE B. CcI:: mission Plan for Capacitf Additions and Retirements Carolina Power & Year I.1ght Cor::pany Duke Power Cc:::pany e l McGuire 1979 Sl 8 we l @ 1180 W 1980 5! l We i I i Roxboro 1981 5! 4 720 MW  !' 2 1180 Mw n l1 1145 MW 1982 S!

               "l   ,                                  l e
                    '       MN                         !

1983 S

              .Q   ,      720 MW                       l @ 1145 MW (69 MW) 1984 3l                                         l                (228 Mw) wi                                       .

I 1985 @ Harris 900 MWjl 1280@ Cherokee 3 wl, MW (251 Mw) 1986 S! W. @ 720 Mw l (93 MW) t g 1987 Sl Wg l(2)1280MW a e 8 1988 S! @ 900 Mw!l Bad wi I l @ Czeek500 .w Perkins 1989 S!w j

                                        @ 900 MWs                                   h 1280 MW 1990   S w       ,j                            ,

l @ 1280 Mw e 8 1991 S' w, @ 900 Mwf i Q 500 MW 8 Inter:sediata l 1992 Sl u, @ 720 MW j

                                                   ,                               @ 1280 MW Lagend Retirements ( )

Una: Number Summer S Hinter W

25 TABLE C. Cort: mission Load Forecasts, Capacity Plans _nd Resultant Reserves Carolina Power & Licht C moany Duke Pnwer Ccspany LCID AODITION CAPAC!n RESERVES LOAO AOD 2'l* 2 CN CAPACITi' yan (MW) (MW) RISE. TIES (MW) (t1 (wwi (MW) (MW)

                  ,                    =                       i It) l                                            I 1979 Sj 5830*                          7433    27.5       8 9860                   12317      24.9 We 5930                        7773    31.1          10070    1180         13497      34.0 1980            6133                   7433    21.2          10392                 13497      29.9 Sl 6238 i

7773 24.6 ,10614 e 13497 27.2

             ~l                                               !

1981 S8 6452 720 8153 26.4 l 109 54 1180 1467- 3?.0 Wl 6563 8493 29.4 s11187 1145 15822 I 41.4 1982 58 6788 8153 20.1 ' 11545 15S22 37.0 WI 6904 8493 23.0 l11791 15622 34.2 I 1983 Sl' 7141 720 8873 24.3 12169 1145-69 16698 38.9 W! 7263 9213 26.8  !' 12428 16898 36.0 l l 1984 Si 7512 R873 18.1 8 12826 -22', 16670 Wl 7641 30.C 9213 20.6 !13099 16670 27.3 l l 1985 Si 7902 900 9773 23.7 -261 Wl 8038 l1351 16409 21.4 10113 25.8 s1380t 1280 17689 28.1 1986 Se 8313 720 10493 26.2 -93 WI B456 10833 l 1420 17596 23.5 28.1 . 252 17596 20.9 1987 S8 8746 10493 20.0 1280 18876 Wl 8896 10833 l15018 25.7 21.8 e15337 18876 23.1 1988 Si 9200 900 11393 23.B Wl 9356 l15829 18876 19.2 41733 25.4 e 16166 500 19376 19.9

               ;                                .          l 1989 Sj 9679                         11393     17 7    l 1668 3      1280          20656     23.8 W 9845            900        12633     28.3    i17039                      20656 l

21.2 1990 58 12293 20.7 1280 ' We'10182 10357 l 17584 21936 24.7 12633 22.0 #17959 21936 22.1 I  ! 1991 5i10712 900 13193 23.2 18534 500 22436 Wl10895 21.1 13533 24.2 l18929 s 22436 18.5 1992 3:11269 720 13913 23.5 19535 1280 23716 Wlll462 21.4 14253 24.4  !'19951 23716 18.9 5.2% 5.4% Per Per Year Year

 ~

Legend: Su. sne r S Winter W

26 Duke's plants scheduled for 1985 and beyond are delayed in the plan by six months to one year, but its earlier plants remain on schedule for economic reasons. However, CPGL's complete schsdule is delayed. With regard to CPGL, the commission feels that the company has not provided satisfactory evidence concerning the economics of its construction schedule. The commission will require that the utilities and the Public Staff present to the Commi**4 on in its 1979 hearing a full analysis of the present construction schedules and the reasons, if any, that the utilities should not reschedule their construction accoriing to the capacity addi. tion plans adopted herein. The forecasts of expected loads adopted by the Commission are the result of the Commission's consideration of the evidence concerning rates of growth, including rates of reduction in growth due to conservation and load 9anagement, and the commission's subsequent finding of the most probable rates of growth in electric loads. The Commission is concerned about the paucity of concrete data available in this docket concerning actual methods of achieving the expected levels of conse rva tion and load management. Further quantification of these programs is ezpected in the 1979 hearings. In addition, the State Budget Office is making na jor modifications in its planning model and those results should be available in that hearing. The Commission is aware that industry has expanded this year at about twice the rate of last year. The commission vinhes to see more

27 detailed projections of industrial u sa ge. The Commissi on has the responsibility to ensure that the continued economic growth of the state is not impaired by a lack of adequa te utility se rvices. For these reasons, the Cosaission holds open the time to require t he utilities to dela y their construction schedules pending examination of this matter in detail in the l979 hearing. If the capacity plan is completed as herein shown and the reduction in annual load growth achieved, both CPGL and Duke vill meet the 20% reserve requirement which this commission concludes is necessary for reliable system operation. It is im perative that generating unit construction be so planned as to be economically deferable in the event that'even more significa nt reductions in load growth can be effected. In the early years of the adopted capacity addition plan, both companies are expected to have reserve capacities which are above the levels uhich the Commission fin ds are reasonable and necessary for operational purposes only. A fter examination of Duke's evidence and the Public Staff's supporting c omments concerning the costs of delaying

~

construction of the units which are near comple tion (inc17 ding the increased inflation costs) and the benefits which can be gained from completing the units on schedule (including the reduced overall fuel costs) the Conaission concludes that it will be advan tageous to bring Duke's early units on line as pla'ned. Even though this will result in

28 high reserves un til the mid-l980's, the result will be less total cost to the consumer than if the units are delayed. In other, less inflationary times, this decision vould not be valid. The commission concludes, however, that the later units should be delayed an d rescheduled in accordance with the reserve requirements which the commission finds necessary. Due to the large siz es of units presently planned for the later pars, occasionally there vill be abnormally high reserves for short periods of time. However, the reduced construction costs per kilowatt of installed capacity, reduced operating costs per kilowatt-hour, and reduced environmental impact of the larger units over the long-te rm overshados the short-tera excesses. The commission reiterates that it is absolutely imperative that the construction of the later units be planned so as to be economically deferrable in the event that load management and conservation afforts can significantly reduce the load grow th below present planning levels. The commission will require that the major parties in the 1979 hearings present detailed discussions of the economics of the various construction possibilities for planned units and the steps being taken to ensure mariana flezihility at minimum cost. If it appears that the State's economic forecast is revised upward or that the reduction in peak demands through load a aagement and conservation will not occur as projected, then it is important that this information be

29 provided to the Commission as early as possible and no la ter than the subsequent yearly hearings so that the capacity plans can be revised to meet demand requirements. Governor H un t 's Ad ainistra tion has been e xtremely successful in at tracting high vage industry to North Carolina; whatever capacity plan that is adopted aust be flexible enough to assure adeq uate electric power to potential or expanding industry. This Administration *s emphasis on providing more and better jobs for North Carolinians must not fail for lack of adequate planning for electrical power. Based on the evidence received in this docket and in the load management and conserva tion docket, the commission is of the opinion that the forecasts f or electrical power for CPGL and Duke are as accu ra te as possible under present conditions. The Commission also concludes that its adopted capacity addition plans are reasonable -and will result in adequate and economical electrical power in North Carolina for the future period up through 1992. s . With respect to YEPCO, the Commission concludes that the available evidence is conflicting in many respects. The ~ Public S taff adopted and recommended the same gravth rates for YEPCD that had been determined by an independent cons ultant for the Virginia Corporation Commission. The . rate of peak growth wa s appro ximately 5.8%. VEPCO recommended tha t the prope r rate of growth for planning purposes was approximately S. 45. Neither party presented

30 clear evidence of the underlying factors used to develop these growth rates. The Public Staff presented a capacity addition plan for VEPCO ukich would provide reserves at the time of the sunser paak fron l4.85 to I 8. 55 abo we the Public Staff forecast. This was generally consistent with its stated design objective of l55 to 205 reserves. YZPCO presented a capacity addition plan uhich would provide reserves at the time of the summer peak which escillate between 19 15 and

7. l %. This plan does not appear to be consistent with m design objective. The capacity plans of YZPCD and the Public 5taff are shoun in Table ]. The resulting toserve requirements are shown in Tables 2 and 3.

In Docket No .- E-22, Sub 224, YYPCO President Ragone indicated TEPCO's concern that it would not be able to build enou gh plants to satisf y the load. Tables 2 and 3 also show that, if YZPCO builds according to its plan and the load continues to grow at rat es equal to the Public Staff forecast, VEPCD's reseries will f all to the 5.6% level. On the other hand, if the lower TYPCO forecast occurs and the higher Public Staff capacity plan is set, the reserves over summer peak load will not rise above the 22.4% level. The f orner clearly violates reasonable construction planning policy and the latter is a reasonable reserve level. The foregoing consents speak to the probable inadequacy of the capacity of YEPCO's planned construction schedule.

31 Another major question of equal importance concerns the relative efficie ncy and ove rall opera ting cos ts of the planned con s truction. The Public Staff recommends use of nuclear units to provide base load capacity. VEPCO wi tness K eesecker testified in this d ocke t that VEPCO st udies indicated that nuclear generation was less costly than fossil base load gene ra tion. In Docke t No. E-22, Sub 224, VEPCO witness Profitt concurred in this conclusio.. Yet, the Comaission is faced with the decisions by VEPCO to canc el Surry U nit N o. 3 and Surry Unit No. 4 an d replace this necessary nuclear generation with fossil generation. This does not appear to be in the best interest of the ratepa yers of North Carolina. r

!      The    Commission     concludes      that YEPco is planning neither adequate nor      efficient      electrical      genera ting     facili ties.

The Commission f urther concludes that YEPCO and the Public Staff present in the 1979 bearing a complete analysis of e xpected loa ds and required generation for VEPCO through 1993. The Commission concludes that it is reasonable to expect that the planned reduction in annual growth rates for Duke and CPSL will be set This will require that significa nt changes occur in the levels of usage and the time of that usage. The Consission now has underway extensi ve exp eriaents in ti me-of-da y pricing and load management techin ques. The Commission vill intensify its efforts to

32 promote conservation and load management and encourages the utilities to increase their efforts accordingly. As part of its conservation programs, the commission vill go forward with additional e xamination of the effects of load reduction which it can enesurage through its own actions and those which may be enco uraged by actions of other bodies such as the utilities, the North Carolina Energy Division, the sorth Carolina Building code council, the schools, the Federal Governme nt, and others. It is imperative that policy makers and electricity consumers understand options open to them and the effects of their actions on the costs of delivering electricity. The 1979 hearings will consider studies now underway to further refine the commission's forecasts, to define the impact of changes in weather on electricity demand, to improve plant reliability, and to quantify the effects upon load and load factor of increased use of solar assistance and other alternative energy sources. The commission delayed publication of this year's report in order to examine the evidence obtained in its conservation and load ma nagement hearings is Docket Ec. 5-l00, Sub 78. There is abundant evidence on the possibilities of wind energy, biomass conversion, interruptible rates, radio controlled water heaters, peak-load pricing, and other tools to help lower future electricity demand. However, there is little evidence on predictions of the magnitude of help the

33 Commission can expect and of how soon that help can reach significant proportions. These are matters which must be considered ca refully in the 1979 hearing. Especially needed is better evidence on the need for generating plan ts near the end of the planning period. The 1979 hearings are being delayed to mid-year in order to give the Public Staff and othe r parties time to adequately develop reliable forecasting information on these satters. p k o [ e

34 CHAPTER III FO RECIST OF NATION AL AND ST ATE ECONOMIC AND DZ30 GRAPHIC GROETH A. Introduction Electricity is an essen tial inp ut to the production of g oods and services by factories, institutions, and commercial establishments. It is also used in the home to provide services and ente rtain ment. The demand for electricity is similar to the demand for other resources and depends upon its price and the cost, availability, and efficiency of the equipment ahich utilizes it. The demand also depends upon costs asso ciated with the alterna tives to electricity. Most importan t is the level of demand for the service which electricity can rendec. Further, bo th the level of deman d for the service and the costs a nd availabilities of electricity and its alternatives are influenced by the level of economic activity. The Public Staff Report presented the results of the November 1977 forecast of econcadc conditions in North Carolina, which was completed by economists in the Office of State Budget and Management of the North Carolina Department of Administration. This forecast for the 14-year period I 977-l 990 utilized an econometric model of the State's economy. This model was developed by Budget Office econoeists in conjunction with consultants from Da ta

35 Besources, Inc., a national consulting firm in Lexington, Massachusetts. A f orecast of the national economy to 1990, which had been made by Dat a Resources in the f all of 1977, served as the foundation of the North Carolina economic forecast. The Public Staff Report on the forecast is in three parts. The first sets forth a description of the national forecast to establish the basic assumptions of the State forecast. The second part discuss es the historical rela tionship between economic growth in the United States and economic growth in North Carolina. The third part presents a summary of the lon g-term forecast for sorth Carolina. As will be explained in more detail belo w, a decision was made to constrain t he econome tric model results in the last five years of the forecast to reflect an anticipated dampening of the growth ra tes of income and employment. Thus, strictly speaking, the State economic model was followed only until 1985. The national forecast from Data Resources was accepted as give o throughout the en tire period 1977-( s90. The results of these forecasts are significant because the ~ level of national and state economic activity will grea tly affect t he future growth in the use of electricity in this state. The Commission presents below a shortened version of the Public S taf f Report.

36

3. The National Forecast Real growth in the gross national product (GNP) is expected to occur at a faster rate in the period 1977-1935 than in the period 1985-1990. In the 1977-1985 period, the average annual rate of growth in real GNP is expected to be 4%; in the 1985-1990 period, that rate of growth is expected to average abcut 3%. The difference reflects the expectation that underlying conditions will be different in the two periods. The forecast assumes that the current levels of plant capacity and unemployn:ent are not at full utilization. The slack in the economy is assumed to be gradually absorbed so that, by 1956, the economy will operate at full employment of both capital and labor and will continue to operate at that leve1 to the end of the forecast period. As increased production absorbs the excess industrial capacity in the .early period 1977-1985, real growth will be higher than long-term trend levels. In addition, the labor force growth rate and the capital s~ack growth rate will slow down over the forecast period and, consequently, the long-te==t growth rate will decline. The increasing participation of women in the labor force only partly offsets the decline in the labor force growth rate.

The severity of the 1974-1975 recession and the increased uncertainty about business conditions have slowed the growth rate of investment since 1975 and is expected to continue a dampen investment plans. The rate of increase of the

37 productive capital stock is also expected to slow down in the mid-1980's. Worldwide excess capacity in some industries, such as the steel indus try, is expected to continue to dampen new investment in the foreseeable future. In addition, Data Resources predicted that the decline in spending on research and development in the United S tates will take its toll on future investment. Finally, increased r expenditure requirements in the area of pollution abatement are expected to absorb funds that earlier would have gone into investments to expand productive capacity. Prices are forecast to increase at fairly high rates throughout the period, but the forecast shows a pattern of declining rates of increase. From an inflation rate of

around 65 as of February 1978, the forecast shows a fairly continuous decline in inflation rates to 1990, at which time the rate of growth of the Consumer Price Index (CPI) is expected to be in the neighborhood of 4%. The persistence of inflation in the forecast is predica ted on several assumptions, as follows: (a) Energy prices will coatinue to increase ahead of the ~ general price level,'sveraging 13.C% through 1980, and then will moderate toward the rate of increase for the general price level, but will never get below a 65 annual rate; (b) Energy prices will contribute at least an additional percentage point to the inflation rate throughout the forecast; and

38 (c) Wage settlements will continue to be in the range of 7 1/2:: to 9 1/2%. Rea.' per capita income growth rates follow the same pattern as real income in the forecast, increasing faster between 1977 and the early 1980's than in the mid-1980's and late-1980's. Through 1982 the expected growth rate in real per capita income ranges from 3.3% to 4.2%, with the exception of the projected slowdown in 1979 when it bottoms at 1.7%. F cm 1983 to 1990 the expected growth rate in real per capita income ranges frcm 2.4% to 2.9%. As e::plained above, this pattern reflects the gradual elimination of the excess capacity in capital and labor. The rate of growth of total national nonagricultural employment is expected to stay above its long-term trend rate through 1982 and then is expected to taper off and settle into a lower long-term growth trend than that which actually occurred in the 1960's and 1970's. Manufaccuring employment should grow at a slower rate than total nonagricultural employment, continuing a trend which dates back to the 1950 's . Growth rates in employment are expected to drop from around a 3% annual rate in the early forecast period through 1981 to a 1.7% rate throughout the rest of the forecast period. Within manufacturing, employment growth in the durable goods industries is projected to continue as in the 1960's and early 1970's to be roughly twice as great as in the nondurable goods industries. Growth in nonmanufacturing employment is forecast to be

39 grester than growth in manufacturing employment, but the

  ,    difference      is not expected to be as great as it has been in the last 15 years.

Past trend.s in the composition of industrial expansion are continued in the forecast wi th a few exceptions. In dus trial production is forecast to grow at an annual average rate of 5.3% through 1985. The changing age structure of the popula tion is fo recast to boost the rate of household formation in the 1980's, and this trend is strengthened by the trend towa rd single individuals establishing separate households. The increasing affluence of these middle-aged

 ~

households is forecast to result in strong demands for housing, travel, recreation, med ical services, home

furnis hings, and nona u tomotive durables throughout the 1980's. The only significant break with past trends is that th e automobile industry is not forecast to grew as strongly as it has in the recent past.

C. Historical Comparisons Between the Economies of the United States and North Carolina An exa mina tion of the 16 years from 196l to 1976 gives some perspective on the relationship between growth in the ~ national economy and growth in the North Carolina economy. The economy of North Carolina has been growing more rapidly than the national economy. Annual population growth has been marginally higher in North Carolina than in the nation, ha ving averaged 1.l4% in North Carolina as compared with

40

1. I i 5 for the nation.  !!overer, total annual nonagricultural em ploy ment growth in the (96(-1976 period has averaged a f ull percentage point higher in llorth Carolina than in the na tion: 3.45 compared to 2.45. The movement away from a gricultural employment occurred later in North Carolina than in the United States. This fact, together with the rapid growth in the labor force in North Carolina, especially among women, ac=ounts for the difference between popula tion growth and employment growth in North Carolina and in the nation as a wholm.

The labor force for manufacturing in Barth Carolina has gr own at triple the rate of that in the United States, 2.65 av erag e ananal growth compared to 0.85. In the monaanufacturing categories of e xployment, North Carolina averaged a 1 % higher growth rate than did the United States: 4% compared to 3%. Thus, Barth Carolina has become increasingly more depende at on manufacturing in 'the last 16 years and the United States has become less so. Within the manufacturing sector, growth in nondurable goods employment increased three times faster in North Carolina than in the United Sta tes: 3.05 coupared to I.I5. Annual growth in noedurable goods employment in North Carolina outpaced the United States: 2. 4% compared to 0.55. The rapid growth of manufacturing employment in North Carolina can be attributed to a t least four factors. First, the shift from fara employment, which gained somentua

41 throughout the 1950's, created a large pool of po ten tial manu f a cturing e mployees. This movement was reinforced by the relatively lov employment in the rural areas of the State. Second, the investment in roads in North Carolina in the late 1950's and early 1960's opened up the rural areas for industrial de velop men t, cr eating an abundance of relatively inexpensive open space for new plant locations. Third, the traditional industries in North Carolina, lumber and wood, f urniture, and te xtil es, creat ed a videly dispersed ne twork of viable small towns which have served as nuclei for new industrial development throughout the S ta te. Finally, the central loca tion of Ecrth Carolina between the grea t northeastern markets a nd the surging southern markets has made it an at tractiv e location for manufacturers of consumer goods. Th e rapid growth in employment opportunities in North Ca rolina, the increasing labor force participation ra tes, and the growth of higher wage, consumer goods industries _ have all combined to produce a higher rate of growth in per capita personal i ncome in North Carolina than that in the na ti on. In real terms, per capita income grew at an average annual rate of 4.0% in North Carolina between 1961 and 1976, whereas the same measure averaged a 2.9% rate of gro wth in the United S tates. Comparative data on housing starts, car sa les, bank deposits, a nd re tail sales all confirm that growth in North Carolina has proceeded at a faster pace than in the nation.

42 is rapidly as economic activity in North Carolina has been growing relative to activity in the nation, the state's level of economic welfare remains significantly below the national level. In 1976 per capita income in North Carolina was 85% of the comparable national figure; in l960 it was 7l%. The same kind of relationship between North Carolina and the nation can be observed in other areas from housing starts per person to expenditures per pupil in education. Therefora, even if one takes the conservative position that growth in the North C.arolina economy has proceeded more rapidly than growth in the national economy solely because it is a catchin g up" with national levels of economic welfare, the fact that there is still considerable difference implies that growth rates in economic variables for North Carolina vill continue to be higher than those for the na tion. D. & Lone-Ters Forecast M jlgI,th Carolina The long-term forecast for North Carolina was divided into tvo time periods. The farocamt of the econometric mode 1 vas accepted by the Public Staff as given through 1985. However, in order to reflect the decele ration of the catching up process, lower growth rates than those obte.ined from the model were imposed on economic variables in the period 1985-1990. Q uite clearly, there is an element of catching up in the recent North Cr.rolina development experience. Growth has been especially rapid in the areas

43 of durable ma nuf act ures, e xcluding furniture ; in the mondurable areas of chemicals and rubber; and in the nomaanufacturing areas of finance, insurance, real estate, state and local governments, services, and trade. For some manuf acturing industries, initial levels of em ploy men t in the early 1960's were so very small that modest absolute increases in employment in these categories produced ve ry f high, and probably unsustainable, annual percentage rates of grow th . The model equations in these areas picked up the se high ra tes of g rowth and projected them into the future. However, there vill almost certainly be a slowing in these 1 rates of growth in the future as the proportion of employment in these industries in sorth csrolina reaches a balance with the market opportunities in North Carolina and 4 adjacent areas. A simila r argument applies in the nonaanufacturing areas. It was a matter of inf ormed judgment to determine at wha t point in the forecast to override the model results, and a decision was made to make that point the year 1985. The Pub lic S taff Report of the Budget Office forecast .. indica tes that population in North Carolina is expected to increase at a 1.2% ann ual average rate throughout the f orecast period. This compares with the Data Resources forecast of 0.9% annual growth in population for the na tion. The forecast for employmen t growth to 1985 indica tes that past trends will be accelerating. Total nonagricultural

44 employment is forecast to increase at an annoal average rate o f 4. l % from 1977 to 1995. Continued decline in the unemployment rate, furthec shrinka ge in the agricultural sector, and some increases in labor force participa tion rates enable total nona gricultural labor force growth to outpace population growth. Within the nonagrienitural employment category, maanfacturing employment is forecast to grow at an annual average rate of 3.6%, and nonmanufacturing employment is fo recast to gram at a 4.3% average annua.1 rate. Thus, North Carolina is being forecast to follow the national trend toward boccaing a acre service-oriented economy. Within the manufacturing employment category, durable goods industries are forecast to increase their employment at twice the growth rate of the nond".rable goods indust ries- durable goods employment is forecast to grow at an average annual rate of 5.65 and nondurable goods at an average annual rate of 2.7%. Thus, the "burdent al' groeth is placed on the never industries in North Carolina, e. g. , electric al machinery, stone, clay, glass, fabricated metals, instru ments, and nonelect=ic machinery. These industries are forecast to grow quickly at the national level, and North Carolina should continne to increase its share of e m ploy ment in these industries because of its continuing locatianal a4vantageu. Real per capita income is forecast to groy at an average annual rate of 3.8% from 1977 to l985. The comparable forecast for the United States is .3.3%. From 1985 to 1990

45 the ra te of g ro wth of real per capita income for North Carolina is forecast to be an a verage annual rate of 3 1 %, whereas the national forecast is for an average annual rate of 2.7%. Total real personal income is forecast to grow at an annual rate of 5.0% through 1985 and at an annual rate of 4.3% during the 1985-1990 pe rio d. The same forces operating . at the national level will tend to slow North Carolina's growth in the mid- 198 0 's and la te- 198 0 's. Real retail sales are expected to grow at an annual average rate of 4.7% to 1985 and at an annu al average rate of 4 1% from 1985 to 1990. E. Conclusion In summary, the forecast for North Carolina over the period 1976 to 1990, as set forth in the Public Staff Re po rt , is that the grow th trends established in the period 1960 to 1976 will continue but not at the same le vels. North Carolina vill continue tc grow more rapidly than the nation but the dif ferences in growth rates will diminish. As the levels of economic welfare in North Carolina approach national levels, s ome mode ra ting in the State's growth rate is expected. The national forecast of strong growth in industries which are not raw mate rial orie n ted , such as nonantomotive consumer durables, plastics, and electronics, bodes well f or North Carolina. These industries have located in North Carolina in the past to take advantage of the availability

46 of labor, open land, transportation, and access to growing markets and will continue to locate in N crth Carolina in the future. These ind astries vill raise average wage rates in the state and feed the expansion of the nonmanufacturing industries, such as: services, trade, finance, insurance, real estate, and construction. All of these forces point to a continuation of past trends into the future. Table 4 summarizes those Ea rts of the Budget office's economic forecast which were used in the Public Staff forecast.

47 CHAPTER IV LONG-T ERB ELECTRIC ENERGY AND PEAK-LOAD FORECAST

1. Introduction The Public staff of the North Carolina U tilities commission presented the most complete and detailed set of studies on the long-term forecast of electric energy sales and the growth in peak loa d in North Carolina. The Commission 's own forecasts are derived from the forecasts made by the Public Staf f. Bajor emphasis was placed on the
     " base   case" with significan t downward adjustment to ceflect the Commission's consideration of the effects of                 the   " load ma na ge ment"   and   "conservationa        scenarios.      This    chapter examin es    the   studies     of   the     Public   Staff,     Duke   Po wer Compan y,    Carolina     Power G Light company, Virginia Electric and Power Company, and the va rious             in tervenors   and .public witnesses      whose      testimony      influenced     the   Commission's u

decisions. Bajor considerations leading to the Commission's conclu sion that the " base case" forecast would not occur and leading to the C ommission's ul timate reduced load growth

-_   e xpectations     are   co nt ained    in    Chapter    YI,   " Outlook f or Conservation and Load Bana gement; A             Survey   of   Alternative Energy Sources."

B. The Use of Econometric Analysis _ The basis of econometric forecastin g is the formulation of historical models of electricity consumption. Within these

48 econometric models, the demand for electricity is rela ted to a set of relevant demographic and economic factors, such as: popula tion , inco me, employment, industrial activity, electricity prices, prices of alternate fuels, a nd temperature. With the use of historical data, statistical relationships can be developed between electrici ty consnaption and these social and economic factors. Given reasonable projections of the expected growth in population, income,. employment, and the like, the estimated historical relationships can be used to forecast the fu ture level of alectricity consumption. The reliability of the forecast is dependent on the fallowing: 1 The adeguacy of the econenetric model in explaining the historical rate of growth in electricity consumption;

2. The accuracy of the projections of economic and demographie growth; and
3. The degree of homogeneity between the historical period and the forecast period.

The Public 5 taff presented separate eco nonetric energy (KBH) models for the residential, commercial, and industrial customer classes. Summaries of the long-tern Public Staff TH EN D forecast for CPGL and Duke are provided in Tables 5 and 6. The TREND forecasts revealed an expected rnte of growth in energy sales of approzisately 6 3/4% for both companies. Peah demand projections were developed by

49 applying average customer class load f actors to the forecast ene rgy requirements. As pointed out by the Public S taf f, the TREND forecast must be consi dered an optimistic projection of energy sales in view of the assumptions upon which the forecast was based. These assumptions include the following: 1 Strong economic growth in North Carolina and South Carolina in the 1976-1990 period as evidenced by ra tes of growth for such indicators as:

n. c. S. C.

Real personal income 4.8% 5.0% Real retail sales 4.5% 4.7% sanufacturing employment 3.2% 3.5%

2. Electricity prices rising slightly above the general level of prices Crable 7) ;
3. Het substitution of electricity for alternate f uels;
4. No dramatic change in energ y-related technology;
5. A continua tion of the present form of rate design; and
6. No direct conside ra tion for possible ener gy a nd pe ak-loa d reduc tions due to c on se rr- tion programs and policies, system load management, and peak-load pricing.

The Pu blic S taff base case forecast was gene rally consistent with the 28th A nnugl Electrical Industrv Porecast (Elect rical World, September 15, 1977), which is based on

50 similar assumptions. The 1978 Electri_ cal World forecast is lower than the 1977 forecast: the average annual rate of growth in peah inad for the nation is now forecast to be only 5.0% until 1985, then dropping to 4.6% by 1995. In each of the energy sales sectors, the tyc North Carolina companies have historically grown more rapidly than the industry as a whole. This relationship should certainly continue for the 1976-1990 pe riod , given the probable outlook f or economic growth in the Caroli tas. The three najor electric utilities presented their forecasts of growth in electricity sales. CP&L, whose es tima tes of future electrical load were based on estimates of customer energy requirements, forecast an average compound growth rate in energy sales of approximately 5.7% through 1987, dropping to 5.4% through 1997 CPGL's f orecast of energy sales through 1997 is set out in Table 8. Duke's forecast of future peak loads and sales included several na jor assumptions. First, Duke assnaed that its service area vill continue to grow, especially since the governments of North and south Carolina are encouraging industrial growth. However, as Duke witnesses pointed out, the econcay of D uka's service area vill grow at a acre moderate rate compared with the fast pace of the 1960's and early 1970's; customers will contribute to the lower growth by continuing their conse rva tion efforts and by adopting Duke 's suggestious for load napagesent programs. Second,

51 Duke's fo recast assumed that there will not be an extraordinary conversion f rom fossil fuels to electricity. Duke made sales projections for a number of different classes of customers and utilized more than one methon for each group whenever possible. The methods involved projecting the usage per custcaer and the nunber of customers, rela tion ships between sales and economic variables, and historical growth patterns. The projec tions were first made including the ef fect of load management that has already occurred. Ad j ust me nts to the sales forecast were then made for the effects on sales of additional load ma na ge ment. The sum of D uke 's sales pr .*jections by customer classes yields the forecast of company regular sales that are set forth in Table 9. , TEPCO's current energy forecast for the years 1977-1987 is sh own on Table 10. The compound annual kilowatt-hour growth rate for this pe riod is 6.61. Little explanation of the underlying methodologies was given by the company. C. Forecast of Electricity Sales t2 R esidential C ustomers In its bsse case, the Public Staff forecasted residential sales for CPSL and Du ke, as follows:

Carolina Power p I.icht Company - Besidential Sales t976factua1) 1985 I990 g GHH . ales 6 ,4 91 l 0,7 22 14,024 15,6{4 % Rate of grovth 5. 7% 5. 5% 5.5% Duke Power Connan v - Residential Sale _s f 976 (actual) I985 t990 1992 GHH Sales i1,327 18,237 23,776 26,438 % Rate of growth 5.45 5.55 5.5% The analytical ap proach used by the Public Staff to forecast the demand for electricity by residential customers eas. .to estimate econone tric models of residential electricity demand using multiple regression analysis. The residential forecast , was based on the assumption that the residential demand for electricity is. basically a function of se veral economic variables, including the number of residential customers, % real price of electricity , and the amount of real income available to residential customers. The Public S taff use d multiple reg'ession r models which describe the determinants of residential elechricity demand to derire estimates of the isclated effects that changes in particular variables have on the residential demand for ele ctricity. Long-run elasticities of these variables (e.g. , the real average price of electricity,. real. personal income , and seasonally adjusted real retail sales) were used with the forecast growth rates of the variables to obtain

53 g row th rates in residential electricity sales for different tiso periods. The se estimated growth ra tes were applied to historical values of residential electricity sales to obtain forecasts of the expected le vels of sales of electricity to residential customers. In order to check the reasonableness of the econometric fore ca st, the P ublic S taff investigated several noneconometric forecasts. Basically, these forecasts consisted of perforning linear and e xponential trends on historical data, su:h as: the number of customers, actual energy sales, actual peak load, historical average use per customer, and a ppliance sa tura tion. Table ll shows the 4 re sults of the Public Staff residential noneconome tric energy forecasts. These results support the results of the econometric forecasts. Carolina Power E Licht Compa ny To f orecast residential energy usage, CPCL first estimated the total number of customers tha t would be on its system in the future. Since the total nuater of residential customers on CPSL's system correlated closely with the total number of housing and mobile home units in the na tion , CPSL used projections of the future totr i national number of housing and mobile hore units to rotecast the total system number of future residential customers.

54 within the reside ntial sector, CPSL's largest number of customers is in the class which uses electric water hea ters but does not use electric hea t. In order to deternine the relative proportions of each type of residential customer, OPSL correla ted the historical rate of growth of " water heated onlya residential customers to the total number of housing units and mobile homes. Using projections for the total number of housing units and mobile homes for future years, and assuming that the rate of growth of this class customer would follow historical pa2 tarns, CPCL was able to forecast the total number of residential customers with electric water heaters but without electric heat. It was assumed that a large portion of those residential customers presently using natural gas would continue to have it available, even with the curtailment of natural gas. These customers re prese nt a large preportion of minimum use electric custome rs. The ref ore , the total number of customers in this class was assumed to decline only slight ly. (5 absequent even ts ha ve shown that prediction to be a good one. The natural gas utilities ha ve enough gas available now, due to decreased curtallments, to actively pursue new residential customers.) By subtractin g the customers in these two classes from the total expected number of reside ntial c ustomars, CPCL arrived at the forecast for the number of customers with electric heat. As a result of these assumptions, CPGL now expects a saturation of electric heating customers of 385 by 1997. This is an

55 in crea se over the 23% sa t ura tion of electric heating customers in 1976. In order to estimate the average use per cust omer for the residential sec tor, CPCL used histocical data to determine the effects of w ea th er, growth in the residential class, price, abnormal usa ge d uring December (due to the holiday se as on) , and c on se rva tio n. In order to project future usage, CPGL assumed that normal weather would occur and assumed also that a real increase in the price of electricity (over the inflation rate) of l% per year would occur. u P ower Compa ny Euh Duke's residential sales f orecast was based on projections of two parameters: customers and kilowa tt- hours per customer. The customer forecast was based on the historical relationship between Duke's total residential customers and he popula tion of its service area. Duke used the popula tion estimates by the Bureau of Economic Analysis, United States Department of Commerce, to compute the number of customers. This estima te of total residential customers was then disaggregated to the individual residential ra te schedules. Proj ections of kilowat t-h ours per residential customer were developed by using multiple regression techniques to analyze monthly usages by ra te schedule and to estimate 1977

56 temperature-corrected sales. Projections for usage per customer were dev eloped by contining elasticities from econometric models vith grovth ra tes for the- applicable independent variables. Th e resulting projection of usage per customer multiplied by the number of customers yielded es tima tes for future KWH sales. The projections of usage per customer for each residential rate schedule were verified rf independent projections made by Duke's marketing department. D. The Forecast of Electricity Sales M Comme cial Customers The commercial energy sector encompasses a wide variety of customers and uses of electricity. The commercial classification is a he terogeneous six of wholesale and retail trade operations, service activities, a nd govern mental units. sany of the commercial uses of electricity are similar to residential uses, such as indoor ligh ting, refrigeration, cooking, air conditioning, and space heating. There are also specialized commercial uses of electricity, such as outdoor lighting displays and business nachinery. The 1964-1973 period was characterired by a rapid growth in the commercial consumption of electricity. As pointed out in the Public Staff Report, Duke and CPGL experienced an approrisata 12% annual gro wth rata in commercial sales during the 1964-l973 period. The combined effect of economic recession, rising real electricity prices, and

57 voluntary conse rva tion caused a da mpening of the annual g rowth rate in com mercial energy consumption down to approzinately 3% for both companies during 1973-1976. As a degree of stability was brou ght to the national economy and to the energy markets, sales to commercial customers achieved a modest growth rate of 5 l/21 to 6% during 1975-1976. The econometric forecast analysis of the Public Staff results in an estimated ra te of growth in commercial KWH sales for CPSL and Duke of approximately 6.5% for the 1976-1992 period. The forecast of commercial GWB sales for CPSL and Duke for selected years is set forth as follows: Carolina Power & Licht company - Commercial Sales 1976 1985 1990 1992 GBH Sales 4,016 7,018 9,662 l0,979

 % Growth rate                    6.4%           6.6%         6.6%

Duke Po wer Com pan y - Commercial Sales 1976 1985 1990 g GWH Sales 7,987 13,959 19,2l4 2l,834

 % Growth rate                     6. 4 %         6.6%         6.6%

As discussed in de tail in the Public Staff Beport, the commercial econ ome tric models used the following as dependent variables: the real average price of electricity, the real retail sales, the real price of #2 fuel oil, and a weather variable. Alter na tive model specifica tions were

58 estima ted using a data set for each company consisting of monthly observations over the period 1965 to 1976. The statis tical method of multiple re gression was used to separa te the effects of each of the variables which determine commer=ial KW deman d. Time lags were included in the models to e stima te the dynamic response of commercial customers to changes in the price of electricity, the level of re tail sales, and the price of fuel oil. An estimated rate of growth in commercial sales was generated by applying long-run elasticities to assumed growth rates in the model variables. The econometric analysis for CPSL and Duke results in an estimated rate of growth in commercial KEH sales of approzinately 6.5% for the period I976-1992. Alt hau gh this growth ::,te is above the expected future rate of growth in consercial sales for the United States, a -6. 5% grow th rate is well below the historical commercial growth ra tes of 9.8% and 10.I % over the period 1964 to 1976 for CPGL and Duke, respectively. As in the case of residential energy sales, the Public staff performed a noneconometric investigation of commercial sales to - check the reasonableness of the econcas tric fo recast. The initial analysis was to forecast energy sales wi th siaple linear and exponential trends of the available historical data. The exponential trend shown in Table 12 appears to increase dramatically after 1982 and was considered to be an upper bound estiaata. The second type of analy sis was to trend, linearly and exponentially, the

59 historical avera ge use per c ustome r and multiply these trends by the linear trend cf commercial customers. As show n in Table 12 this type of analysis resul ted in forecasts which lie between the af orementioned historical sales trends. Table 12 aJso includes an a vera ge of all commercial e ne rgy estima te s e i the average of the most likely estima tes. Carolina Poweg G Licht Co r ea ny In order to estimate commercial customers, CPGL developed a trend which tied the growth in commercial customers to reside ntial customers. This assumed that the two growth ra tes would stay reasonably close in the future. As in the case of its residential cust omers, CPGL estima ted the average use per ccamercial customer by using historical data to determine the eff ects of wea ther, growth in the customer class, price, abnormal usa ge d uring December, a nd c on se rva tion. In order to project future usage, the occurrences of normal weather and a real increase in the price of electricity of 15 per year were assumed. Duke Power company Duke's commercial customers are served under the company's General Service Schedules (G and GA) . For each schedule, t he kilowatt-hours per customer were analyzed separately to allow adjustment for the effects on usage of changes in ambien t temperature and to calculato estimates for 1977.

60 These usage per customer estimates, together with the number of estimated customers, were used to determine the - tenperature-corrected sales for Sched ules G and GA. Duke then applied declining growth rates from the historical trend to the 1977 estimates of General Service sales in order to calculate the long-range projection. E. Ihg Forecast sf Z_lectricity Sales M Industrial custosuGE The Public S taff's industrial sales forecast was the rasalt of the application of two methodologies. The first was based on multiple regression techniques. The second was bas ed on the histcrical rela ticuship between growth in manufacturing employment and growth in industrial KYS sales. The final forecast uns lased on a combinatio n of the two methodologies. The foreca st rates of annual- growth in - industrial KiB sal'es during the 1976-1985 period are 8.53% for CPGL and 7.59% for Duke. The 1985-1992 forecast annual growth rates are 7.89% for CPSL and 6.98% for Duke. The aain determinan t of the expectad growth in the indastrial use of electricity is the strong rate of growth in manufacturing employments in sorth Carolina and in South C arolina. The Public Staff concluded that the rates of growth in industrial sales for CPSL and Duke did not appear unreasonable in view of the current f orecast for groerth in manufacturing employment in the two states. The Public Staff forecast of ind ustrial.GWH sales for CPGL and Duke for selected years is set forth below:

61 Carolina PoweI E Light Company - Ind ustrial Sales 1976 f a ct u al) 1985 1990 1992 GWR Sales 8,759 18,293 26,738 3l,123 1 Growth rate 8.5% 7.9% 7.9% Ruke Pgver Company - Industrial Sales l 9 73 1985 1990 1992 GER Sales 18,417 35,574 49,858 57,067

% Growth rate                           7.6%           7.0%        7.0%

Carolina Power E Licht Com pa ny CPGL's industrial energy forecast was basically a consensus of the estimates of its customers, i. e. , the company's industrial sales manager called upon its large industrial customers to learn their f uture plans. Egle Power Company Duke e s textile sales, which a mo unted to 56% of its industrial energy sales in 1976, were forecast using an econometric m odel. This p rcjectio n was su pported b y t wo other models, one involving the textile production indez and the other using textile mill consumption of fiber. The tertile sales forecast wa s be t wee n the two alter nate proj ec tions. Sales to other industrial customers were projected in two parts: man-made fiber plants, which comprise about 22% of these sales in 1976, and the renaining group. The 1978-1979 projec tions f or man-made fibers were es tima ted by Duke 's m arketing department based on expected

62 KV load and hours use of demand for each customer. The long-range projaction was based on the historical ' rela tionship be tween Duke 8s sales and the national production of man-made fibers. The remainder of the industrial class was projected using a declining growth ra te trend. Duke added to this proj ection the energy associated with a 100 5E industrial plant that Duke expected to start serving in 1981 The forecasts of sales to other classes were based on growth factors from historical trends, except for interdepartmental sales. The la tter sales were projected based upon the experience ,of the manager in charge of the water systems. F. *h Peak-Loa d Forecast The Public Staff ande its estimates of abase-case a peak demand by utilizing three independent but closely related forecast methods. First, a peak forecast was developed from the forecast of total systen energy production through use of an average (7 years) s ysten load f actor. Second, a peak-load forecast was calculated by using forecasts of future K7H sales for each major customer class in conjunction with average (6-7 years) class coincidental peak-load factors which had been obtained from his torical cost-of-service studies. The third method used a direct econometric es tima tion. The Public 5taff deterzined that the second method, the customer class energy requirement - load factor method, was the most reliable approach to developing a

63 f orecast of peak demand. The econesetric peak-1 cad m odels were used only as checks on the validity of the results of the load-f a ctor estimates, due to statistical problems inherent in the econome tric models. The strong point of the customer class approach is that it provides a direct linkage between the customer class energy forecast and the systen peak-load forecast. The customer class approach recognizes changes in the air in energy sale s by class of service and directly reflects them in the pea k-load es timates through the coincident peak customer class load factors. The peak demand estimates f or CPSL and Duke resulting from this a nalysis are shown below: Carolina Power j Licht Company - Peak Deman d 1976factuall 1985 1990 1992 Peak Demand (59) 5,121 9,375 12,777 l4,486 , i Rate of Growth 6.9% 6.4% 6.5% Duke Power Company - Peak Demand 1976factuall 1985 1990 1992 Peak Demand (5W) 8,60l 15,385 21,209 24,127

 % Rate of Growth                6.7%           6.6%        6.7%

Using the long-tern TRE ND forecast as a bench mark, the Public Staff developed three alternative peak-loa d projec tions which a ttem pt to quantify the possible growth effects of such measures as new conservation progra ms a nd load management. These alternative scenarios reflect

64 reasonable upper limits of the impact of conservation and/or load mana gement on capaci ty e xpansion planning. These - scenarios are: I. Coaservation - a 15% reduction in estimated system energy sales by 1992 with a constant load fuctor;

2. Load management -

a los increase in system load factor (not exceeding a load facter of 755) by 1992; and

3. combination Load Banagement and conservation - a 155 systen energy sales reduction and a 10%- increase in load factor by 1992..

New construction schedules sere designed for each of these alternatives and new estimates of the price of electricity under each scenario were made. .s a fourth scenario was studied to determine the effect on the price of electricity of the overbuilding of electric generating facilities. It was assumed that generating facilities would be constructed under the " base cassa capa city erpansion sehedule with load actually growing as shoen under the combined Load Hanagement and conservation scenario. The impact of this occurrence would be to simultaneously raise and lower near tera prices because extra plant would be on line, but these more efficient new plants would have lower fuel costs. Prices of electricity in la ter Pears would be reduced because the plant cost included in the ra te base sould include less inflation. It -

65 was found by the Public S taf f that such "overbuilding" of genera ting facilities would not dramatically in crease the price of electricity during the study period. The study shows that the net effect of the additional plant would be a l % to 2.5% increase over the nominal price of electricity. Carolina Power G Licht Compa ny As pointed out by the company, CPGL's estimate of the f uture electrical load which its customers will place on the system is to a large extent based on estimates of customer energy reguirements. CPGL first estimated total energy requirements for the system. Then, in order to develop the , company's load forecast , CPGL determined coinciden t peak-load factors for each energy classification and combined them into a composite annual systen load factor. The tot al projected systen energy input and the projected annual systen load f actors were then used to forecast the CPGL system pea k load for each year. C PGL's current peak-load forecast is set out in Table 13. Duke Power Company Several assumptions underlying Duke's projection of its sy st em future peak loads have been discussed previously, but it is important to reiterate that Duke's projections of peak load take into accuInt the effects of its load management program and the conservation efforts of its customers.

66 In making its forecast of peak loads, Duke projected separately the summer and the winter peak loads. These s peaks have been growing at different rates due to the degrees of saturn tion of air conditioning and electric heating. The sunser and winter peak loads were separated into two components: tem pera ture-responsive loads and base loads by using regression analysis techniques. The company determined growth factors for both ty', es of loads. Duke's long-range forecast of summer p .cs is shown on Table 14. Its forecast of winter peaks is shown on Table 15. D uke 's peak-load forecasts are lower than the " base case" forecast of the Public Staff and are approximately the same as the Public Staff's conservation scenario. Duke's forecast also showed that the company will remain a summer peaking company , through 1990. _. Vireinia Electric and Power Coeceev YEPCD's current peak-load projections mere based on econometric models, weather models, and historical projection techniques. The compan y used the service of outside coasaltants to provide an independent forecast for a review of the reasonableness of YEPCD's een forecast. As pointed out by the compan y, 7ZPCD is a summer-peaking company and, barring unusual growth in winter load, expects to remain a summer-peaking company for the foreseeable future. TEPCo

  • s suaner peak-load forecast for the period I 978-f 987 is shown on Table 2. Growth is expected to remain

67 well below the long-tern historical growth rate and will be af fected by implementation of load management techniques beginning in 1980. The compound annual growth ra te predicted by the company f or the 1977-1987 period is 5.3%. G. Comments hv Public Witnesses and Intervenors The Commission encourages participa tion in its hearings by public witnesses who have concerns about the sa tters under discussico or suggestions for commission consideration. A airture of concerns, critic 3sas, and suggestions for improvement of the forecasting methodologies of the Public Staff and the companies vera offered during the February 1978 hearings. Response to ccncerns relating to nuclear power safety will be trea ted in another section of this repo rt. A novel approach to f orecastin g, utilizing only residential meters as a predictor f or total sys ten growt h, was presented to the Commission by the Carolina Environmental Study Group (CESG) . It was asserted that electricity consumers will shortly saturate their usage at 9000 watts. After fitting an integral of the ordinate of t he nor mal curve of error (IONCOE) to recent historical data, CESG asserted that Duke would gradually peak at

  !!,000 ME      in    a   few   yea rs. At tha t time, the growth rate would be zero.

68 Some, but not all, of the data used by CESG was adjusted for weather va ria nce. The da ta was adjusted by a - discretionary income ratio (DIR) between .99 and 1 02 and by a rate factor. This DIR level was criticized because a DIR of 10 implies that the real discre tionary income of North Carolinians would never increase and that all progra ms for upgrading jobs and wages in the Sta te arc a complete failure. Using a DIR of 1 02 implies a 25 annual growth in discretionary income. If the CESG methodology is used as corrected in the hearing by multiplying the claimed saturation point of 9000 watts per customer by the number of custcasts, by the CESG annual customer growth f actor of ].03, and by a DIR of 1 02 the result is a forecast of an eroonential crowth nie, ' af ter saturation, of S.065 per year. If the average DIR value of CESG's 17 years of data is used; namely, 1 02276, the rate of peak growth would increase to 5.344%. For - dema nd to level off at 11,000 EW as claimed by CESG, the number of customers would ha ve to start to decrease in the near future. Using CESG's methodology with realistic assumptions yields a forecast of future loads which is comparable to the companies' forecasts. The apparent delit.erate attempt by CESG to force saturation by choosing the parameters of the IoscoZ curve cannot be judged to be a credible examination of past history or expectations for the future planning period. To ,

69 assume t ha t the per capi ta elec tricity use of Borth Carolina's citizens is saturated would imply that (1) . all prog ra ms to upgrade the standard of living of citizens in this State are not working or (2) conserva tion and load ma na ge ment are practiced so effectively that they completely o ffset the additional ene rgy used to upgrade the standard of living. For conservation and loa d management to be so practiced is an admirable goal and should be pursued, but that does not appear attainable within the planning period of this report. The CESG testimony did, however, present a good explanation of the nhenomena of peak loads occurring at times of extreme coldness or varaness of ambient ground temperature as a result of the differences in radiant energy available in different son ths. This information mLv be of valu e in future st udies attempting to further define the probability of peak-inducing weather conditions. The " load m an agement " scenario of the Pcblic Staff utilized a nazimum improvement in load factor of 10 %. Several public witnesses e xpressed concern that this improvement was too low an expecta tion. However, it was pointed out that daily load factors are already over 80%. Since most of the load management and conservation aids now under practical consideration involve improving the daily load f actor and do not involve trans ferring loads between seasons, it would be cztremely difficult for these aids to improve the annual load factor beyond approzinately 75 %. Even if such improvement could be accomplished, the effect

70 would not be partienlarly helpful because, once load factor exceeds approxima tely 75%, the systaa has insufficient off- s peak time to perform najor maintenance and the system must add new units tu carry the load during maintenance. The expected limit of I 5% on conservation effect during the planning period, which wa: used in the

  • conservation" scenario of the Pu blic Staff, appears at this time to be reasonable. Studies by the Tennessee Talley Authority have indica tad that even less conservation may be the practical 11ai t.

71 CHAPTER Y RESERVE CBIT ERI A, GEN EBATION HII, AND CAP ACITY PLANS A. Peserve Criteria The ma gnitude of a sys tem 's generation reserve requirenents depends upon the nature of the system, the characteristics of the loa d , and the quality of service required by the system's customers. Since these factors chan ge over ti me, a reserve which was adequate in the past may be inadeguate in the future. Consequently, the commission reco gnizes the need for periodic review of the genera ting re.wrve requirement. In developing its future capacity plans, the Public Staff made several important investigations prior to its selection of the set of generating facilities it recommends that the electric utilities should construct. The first study involved the selection of acceptable reserve criteria to provide for the day-to-day variations in operating cor'2tions. These variations include main tena nce on genera ting aquipment, partia1 outages due to physical and ambient conditions, unerpected (forced) outages of generating facilities, changes in load pattern, and errors in projected load estimates. It should be noted that an allowance for delays in the commercial operation of new facilities i.s not generally included in a utility's reserve capacity.

72 There are various methods to deteraine reserve requirements. These methods can be broken down in to two 7 broad groups:~ the nonprobah414 %ic (ROPROB) group and the # probabilistic (PROB) grou p. Non probabilistic reserve capacity requirements are generally based on maintaining some minimum level of additional capacity above that required to meet the expected annual or seasonal peak load. The 'nore common NOPROB methods are (!) the standard percent reserve and (2) the loss of the largest unit. The most sidely used probabilistic meserve requirmaant is Loss of Load Probability (LOLP) . It was the conclusion of the Public Staff, based upon its detailed analysis of the historical peak-load conditions for Duke, CPSL, an d YEPCO,. that a reserve criterion of l55 to ' - 205 for both saamer and winter sould provide adeguata and reliable electric service to the citizens of sorth Carolina. The Public Staff also concluded that a loss of load probability not to exceed 15 days per season (based upon seekday peak hour loads) should also be usad in the planning of North Carolina's future capacity requirements. Duke witnesses testified .that a 205 reserve would be the miniana necessary for North Carolina during the present planning period. This is consistent with Federal Energy Regulatory Commission recommendations of 155 to 25%, with f aster growing areas using the higher reserve margins.

73 Since t he rese rve margins have been substantially in excess of these values in recent years and wea ther conditions have still caused difficulties in maintaining service, the commission concludes that a mi niaan of 20% reserves should be maintained until load growths settle down into a more predictable pa ttern. B. Generation 311 Once the gene ral level of reserve requirement is

                        ~

established, the next step in developing future genera ting capacity is to de termine the propor air of the three basic generating capacity types: base, intermediate (cycling) , and pea king. Base units are designed to run most ef ficiently at continuous full load, and generally operate over 60% of the time. Cycling units are generally designed with greater emphasis on lower investment cost an d with lesser emphasis on obtaining anziana operating efficiency. (With the passage of time, less efficient base units are used for cycling operations.) Cycling units do not operate as man y hours a day as base units and say be stopped a nd st arte d more frequently. They operate usually about 25% to 6 0% of the time. Peaking units, which consist mostly of gas turbine and internal combustion engines, are operated only a few hours a day. Theo retically, peaking unit investment costs should be lower and the operation ecsts higher than those of other types of units. However, hydro units, which are used for peaking, have high investment costs in Oaas and

74 reservoirs and yet have relatively low operation costs. T hese units are gene ra11y limited to peaking mode in this area, due to water availability. Pea ting units, depending on the type and systas, can operat e as much as 30% of the time. T he hours of operation for each type of capacity depend upon the costs (capital and energy) of the capacity and the demand. To provide the most economical energy to their co nsumers, electric utilities should determine which generating facilities to operate based upon the relatim energy production cost of each facility. (The capital cost of each unit is ignored for operational purposes after the unit is in service.) The unit with the lowest energy production cost is assigned the first increment of load. As s each additional increment of load is added to the system, the unit with the next lowest energy productica cost is placed into service. This process continues until the on-line generation equals the coincident demand of the consumers. The units wi th the lowest energy production expense would be considered base load units, is new units are added to a system, some base generation facilities may no longer have a relatively lower ene egy production cost. and may become reclassified as intermediate units. Proper six is considered to be the optimal six of generation ca pacities which will satisfy the demand at einimum cost. The optimal six of generation camacities is determined by the utility

75 load curve, which is a graphical display of demand versus time. In arriving at the proper mix of generating capacities, the Public Staff investigated the typical hours of operation for base and peaking ca pacity of the three North Carolina utilities, the standards of operation using a pea k week hourly loa d curve , and hours of operation compared to an annual load duration curve. The Public Staff also assumed that peaking units would operate no more than 1000 hours and th at base units would operate at least 6000 hours. Based upon the above, the Public Staf f concluded that the proper genera ting air for D uke , CPGL, and YEPCO should be approximately one-half base capacity, one-third cycling capaci ty, an d one-sixth peaking capacity. Other witnesses generally supported this mixture , and the commission concurs. Hajor con t ro versy e xists concernin g the use of nuclear versus fossil ge ne ra tion. The debate centers both on economic and saf ety grounds. Ebether nuclear is more cost e ffective than fossil generation depends upon the to tal costs of construction, life time main tenance, and fuel consumed. In addition to its own studies, the Public S taf f presented the re sults of a number of studies of these matters by the Electric Power Re sear ch Institute, the Federal Energy Admi nis tr ation, the Euclear Begulatory Co nsis sion, the Federal Po wer Commission, the Ener gy

76 Research and Development Administration, and others. These studies utili=ed a range of assumptions about future cost - trends. All of the studies projected costs of both nuclear and fossil generation from the present mid- 1980 ' s pla nning period into the twenty-first century. While some studies only calculated initial costs, others calculated the levelized total cost over the useful lives of the plants. The results indica ted that, in the present planning period, nu clear generation is expected to be more economical than fossil generation.

  "he    average       result of the total life studies showed that nuclear generation is expected to be almost six-tenths of                       a cent     (5.86     mi t t a   in    1978 dollars) per kilowatt-hour less expensive than fossil              generation. These    estimates      range from a low of 0.264 per kilowatt-hour to a high of 0.90s per kilo va tt-ho ur.         A   saving- of      six-tenths    of   a   cent     per kilowa tt-hour,           the      wt      difference  in    capital     costs, maintenance costs, and fuel costs, would be a cost saving of 36.00     per     1000      KYH   gen ecated. For systems which are at least one-third nuelear generation, e. g. , the North Carolina utilities,       this means a savings of $2.00 per 1000 KEH.                  The studinq indicate that a consumer who uses an average of I 000 KEH    per month is erpected to save from approzinately $10.40 to $36.00 per year.              For    an   electric  heat     custcaer      who averages      2000      KWH per acuth, the savings would be expected to range from $25.00 to 586.40 per year.                In     1985   dollars, these savings would be more than double.                                          '

77 The Public Staff analyzed the sensitivity of its studie= by calculating the ef fect which would be produced by (1) doubling the nuc lea r fuel costs and ( 2) by increasin g the nuclear capital costs by 25%. The results of these' studies, as well as those of t he companies, were that nuclear generation demonstrated an e xpected economic advantage over fossil generation for base load additions d uring this planning period. It is emphasized that these results apply to the present planning period. Stu dies f or the generation capacity which will follow those units presently in the planning stage may demonstrat e that other me thod s of prov iding electric gene ration may become preferable in f uture planning periods. Questions were raised concerning the availa bility of nuclear fuel to be crad in scheduled reactors. The evidence indica tes that sufficient quantities of nuclear fuel will be available to be used during the lifetime of plar.ts now being planned. However, when these plants need to be replaced, there is a definite q ues tion of whether there will be sufficient nuclear f uel to be a ble to replace these plants with nuclear generation u nless a reprocessing system is started. Several witnesses at the Co m mission 's February 1978 hearings expressed their concern about the safety a nd reliability of nuclear fueled generation. The issues raised by these witnesses included:

78 1 The problems of storing spent nuclear ' fuel,

2. The lack cf firn assurances of uranium supply toward the end of the century,
3. The continuing escalation cf costs associated with nuclear plant construction,
4. The use of vast amounts of water for cooling in nuclear generation, and
5. Threats from terrorist groups against nuclear plants.

Th ere was also testimony, however, that nuclear poser is clean, safe, and availahle. The saf sty of nuclear poser plants can be illustrated by the observation that thcre has been almost 2000 reactoc-years of commercial plant operation worldw ide without a single fatality as a consequence of nuclear-related plant salfunction. There is continually increasing o pinion in the technical community that the hazards to the ge neral public from nuclear plants are considerably less than the hazards from many alternative systems, such as coni. The agreenhouse" effects on our atmosphere causad by carbon dioxide resulting from the combustion of coal and eil na y be a problem of even nors widespread and potential seriousness than the localized problems of nuclear safety. In addition, nuclear units do not have the sulfur tad other emission problems of fossil units. An increasing segment of the technical community is boginning to express the vie w that nuclear plants are

79 perhaps too conservatively designed, i.e., that the ma ny redundant safety systems a te not justified by experience. With respect to radioactive waste disposal, government efforts are underway to identify two high- le vel vaste re posi tory sites for eventual ultimate disposal of reactor vastes. This program envisions the possible transfer of vaste to these re positories during the aid-t o-l a t e- 19 80 's. Discussions of establishing i .teria storage repositories by have been initiat e d by TVA with the Federal 1983 Administration suggesting tha t TVA be funded to develop an interim storage system for the southeastern utilities a t Oak Ridge, Tennessee. It is true that in the past year increasing costs for capital construction, fuel, and safety systems of nuclear plan ts have na rrowed the economic advantage nuclear power holds over coal-fired plants. However, the southea ste rn region of the U nited s ta tes still shows a significant economic advantage for nuclear power over coal. Admittedly, the continually inc rea sing ca pital costs of nu clear facilities present a financing problem for atilities an d are a deterrent to the construction of new f acilities. The calculation of the changes in future electricity prices used by the Public Staff to develop the impacts of the "overbuildinga scenario were challenged. The basis of the challenge was the expectation of annual increases of 8% in nuclear f ue l costs and 6.55 in coal costs. It w as

80 asserted that the present fuel cost difference would lessen and make future nuclear units le:ss economical and, since - nuclear units are the projected units in question, the new units should not be built. However, since nuclear fuel is presently at 4 mills per K115 and coal at [ 4. 8 mills per K1IH, the relative difference would widen, not lessen, within the lifetime of the plants. The Public Staff's calculations are correct. It was contended that large nuclear units are more expensive to build and operate than small coal units. It vas also contended that there would be less financial impact as well as less environmental impact if genera ting units were smaller and decentralized. The table belos shows that, if units are costed out in the same time frame and with 3 comparable environmental treatment requirements, small units are more expensive to construct per kilowatt of capacity than large units. Since. nuclear fuel is so much less expensive than fossil fuels, nuclear units are economical. In addition, approximately the same number of people are required to run a plant on an around-the-clock basis, regardless of the size; doubling the number of plants would double the aanpower requirement. It would also make higher voltage transmission lines less economical and would increase the use of lan d required for transmission and genera tion facilities. Smaller units are less efficient in water use and would be environmental 1T less desirable.

81 Cost Comparison Illustrating Economies of Scale I. Duk e's coal P la nts, with Scrubbers Added, l976 Dollars Capacity ME___ S/KW Allen i 165 374 Allen 5 275 348 Barshall I 350 344 Clif fside 5 54 5 328 Marshall 3 650 283 Belevs Creek l {{40 275 II. Duke's Nuclear Plants, as Built, 1976 Dollars Oconee 1 86 0 230 S cGuire 1 l180 293 The Public Staff Report was criticized because it did not trea t cogeneration as an alt erna tive to separa te power prod uc tion pla nts. This ma tter will be treated in depth in f uture hearings. A study of this matter has been funded by the N orth Carolina Energy Research Institute and the United States Department of Energy. Besults of that study may be available for the Commission's 1979 hearings. Questions were also raised by intervenors concerning the viability of using tower cooling versus lake cooling, with specific reference to t he possibility of moving D uke's proposed Perkins nuclear plant to Lake Norman. Perkins and its sister units h ave been designed to use cooling towers as a result of an EPA mandate in past years. By designing a nd constructing all the units the same, efficiencies will be e rperien ced during constru ction and operation. It is neit her economica l, nor permissable to move Perkins to La ke Norman. The lake is reserved for future units; the

R2 Environmental Protection Agency will allow no units t) be added until experience has been gained with operation of - scGuire and tests of cater guality have been conducted. ' Tbsre are benefits other than economics associa tad with nuclear generation. Nuclear fuel, unlike coal, avoids the problem of toxic stack gases. It is noted that nuclear plants are required to have lower contine radioactive emissions than are currently allowed at many plants burning low sulphur vestern coal which contains small amounts of uranins. The likelihood of nuclear plant sabotage remains unknown. - but it is well recognized that security controls at nuclear plants have been considerably increased under the new United - 3 States Nuc1mav Regt.latory. Commission Guidelines - / The concerns about nuclear power expre:tsed by some witnesses are Iagitimate and the commission shares these concerns. The evidence, however, is more than sufficient to support a finding that the projacted benefits to be derived from the development and operation of anclear power outwigh any associated risks. There is little question but that there are economic advantages in the use of nuclear power and, based on de evidence in this case. The commission finds no reason to try to avrest away* the primary responsibility and jurisdiction cf the United States Nuclear Regula tory Comaission in determining or setting safety standards for nuelear plants.  ; O

63 C. Genera ting Ca pacity E] g In developing its f uture capacity addition requirements, the Public Staf f made certain major planning assumptions: 1 No oil or gas b urnin g bas e gen eration v ould be constructed;

2. Only base and peaking capacity would be constructed by the utilities; and
3. Retirements of generating facilities reported by the utilities pursuant to Commission Rule R8-43 would be carried out.

In determining an appropriate generating addition schedule, it is necessary to consider the type of facilities each m. utility currently has under construction, the proposed retirement of facilities, and the proposed units on which engineering has been completed and licenses have been requested or granted. It is also necessary to consider the lead time required to construct new generating facilities. If an unplanned additional 1000 ME of capacity were required 10 years hence, a coal unit would have to be constructed beca use it is impossible to design, ecnstruct, and license a nuclear unit within a 10-year period under Current federal regulatory conditions. The f ollowing are various estimates of lead times for ne w units made by the three utilities and the Public Staff.

84 Lead Times for Iow Units (Honths) - Public g E DUKE YEPCO Staff Huclear 13 1 159 iS1 144 Coal Low Sulfur 79 54* 90 86 High Sulfur 79 54* 96 86 Pumped Storage 1l0 130 120 120 combustion Turbine 37 30 24 36

  • Construction time only Based upon all of the analyses discussed above and upon the " base case" onergy and peal-load forecast, the Public Staff developed what it considered a prudent construction schedule for additional generating capacity for each of the three major electric utilities operating in North Carolina based upon supplying the native peak load. The schedules are shown in table 16. The expected reserve margins, loss of load probability, and operational breakdown are shown in Tables 1 7 A ,- 173, and 18, respectively. At the time the Public Staff developed these tables, the 1977-1978 wintec peak and the 1978 summec peak were not known their estimates have not been adjusted for this new information and are consequently deemed overstated.

The construction program of CPSL is set forth in Table 19A. As the table indica tes, the company now has seven generating units either under construction or planned for service between now and 1990. CPGI's current constructisan program will result in system reserves as shown in Table

85 19B. Except for one year, these re serves are above t he

,   miniana      15%    sunner     level which the Commission required in its 1977 Beport.

Ta bl e 20 shows D uke 's forecast suaner peak loads, its scheduled unit addition, and the reserves at the times of thes e peaks for the years 1978 through 1990. The current Duke forecast is predicated on the successful future L aplementa tion of its comprehensive load management prog ram for which no precedent has been established to date; consequently, generating capacity additions have been scheduled to provide a degree of fle xibilit y commensurate with the un known eff ectiv eness of the loa d ma na geme nt progra m. Duke's sch eduled reserves through 1983 are higher than design reserve requirement s. Duke considered changing the schedules for the in-service dates of McGuire I and 2 and Catawba i and 2. Howev er , as Duke witnesses Lee and S terre tt pointed out, the in-service dates for these u ni ts reflect the substan tial construction work already completed on th ose units and the economic benefits derived from following the present construction schedule. Consequently, D uke 's schedule is as follows: McGuire I will come into service in time for the vinter peak of 19 79- l 98 0 McG uire 2, by the suaser peak of 198l : Ca ta uba I, for the vinter peak of 198 l- 1982 ; and Catauba 2, for the sunser peak of 1983.

86 For the years 1985 and beyond, Duka plans the construction of a combinatica of base load and peaking ca pacity, - retaining anzisua flexibility in the scheduling of ongoing generating units. These plans include six standardized nuclear units and four duplicate pumped-storage units, these units being the most economical types of base load and peakin g ge neration, raspectively. For example, Cherokee 2 is scheduled to come into service for the summer peak of 1987, but the flexible schedule sonld allow this unit to be brough t into service for the winter of 1986-1987 or delayed to the summer of 1988. TEPCO's planned generation additions to meet its forecast peak loads are set forth in Table 2. TEPCD's peak load is expected by the company to grow at a compound annual growth

                                                                         -..s cate of 5.3% over this period of tina.          The effect of      these generating    addition    plans on YEPCD's reserTe margin during the 1978-1987 period is shown in Tables 2           and   3. TEPCO's reserve    margin   for    planning   purposes during this 10-year period ranges from 1700 58       to   2100    HE. YZPCOs s   current generation    addition    plan   will    not   meet the Commission's reserve criteria.

87 CHAPTER VI DUTLOOK FOR CONSERV ATION AND LOAD BAN AGEMENT; A SUR VEY OF ALTER N ATIVE ENEFGY SOU RCES A. Introduction The forecast adopted by the Commission for the f uture growth in electricity usage in North Carolina is based in pa rt upon the premise that conservation and load ma na ge me n t will reduce the ra te of growth in electricity use. As pointed out by Public Staff witness Taylor H. Bingham, an economist with the Besearch Triangle Institute, conservation of energy sources should be a matter of concern for North Carolina. This State imports morE than 955 of its primary fuels. The availability of these f uels depends u pon a

;    variety of        factors,      including      price,    fede ral    and   state reg ula tion,      international        agreements,     su pplier con tracts, court     rulingc,        and     the      cost     and    availability        of transportation for these f uels.

The evidence that is available to the Commission makes it

    = lear that present conservation and load management efforts are     not    a    tempo rary     phen omenon     but   represent permanent changes in        the    attitude      of    society    toward     energy    use.

Beca use ma ny of the c onserva tion and load management programs are in the early stages of development, the total impact of th ese programs cannot te assessed in this .eport. The Commissi ca recommends tha t the Public Staff and the

88 electric utilities present additional evidence of the impact of conservation and load management as such evidence becomes - availa ble. This chapter vill exa mine some of the recent eff orts to promote conservation and load management in North Carolina. T he chapter will also survey the status of alternative energy services. B. Lecislation The 1977 General Assembly enacted significant energy-related legislation. The most noteworthy enactment is House Bill 1003, the Energy Conservation Act of 1977. In this Act, the General Assembly stated that the North Caroli na economy and the welfare of its citizens have been jeopardized by shortages of natural gas, petroleum, and electric power. The Act contianes: .

  .   .   . It   is therefore declared to be the polic7 of the State of North Carolina to enen)nrage and promote the conservation of energy in 211 forms and to establish requirements and enforcement nonsures                for    mandatory conservation of energy in North Carolina, in order to prevent or reduce an adverse impact upon the economy of this state and in order to pesvent interruption of employment of the citizens of this state in commerce and industry and in order to prevent injury to their health and welfare due to shortage and high cost of energy in their homes . . .

The clear purpose of this legislation is to make conservation a matter of State polic y by encouragine the residential and business usa of sclar energy and insula tion. The act provides a tax r.rrdit to any person or corporation that constructs or installs a solar hot water heating, space

89 heatin g, or space cooling systes in any residential or commercial building in North Carclina. The tax credit is to be an amount equal to 255 of the installation and equipment cost of the solar hot water, he a tin g, or cooling equipment but not exceeding $l000. Ho use Bill l003 also allows a tax credit during the period January l, l977 - December 31, 1978, to any person or corporaticn t ha t installs new or additional insula tion, stora vindows, or storm doors in any building in the State which was constructed and occ upied p rior to Jan ua ry l, 1977. The tax credit is to be an amount, not exceeding $1000, equal to 25% of the cost of such insulation, storm windows, or doors. House Bill 1003 also provides tha t no single family or multi-unit residential building on which construction is begun on or afte:: January 1, 1978, shall be cccupied and connected for electricity until the b uilding is in compliance with the miniana insulation standards for recidential ecnstruction as prescribed in the North Carolina State Building Code. House Bill 607, which was also enacted by the 1977 General Assembly, provides that buildings equipped wi th a solar ener gy heating or cooling sys tem shall be assessed for taxation purposes as if su ch buildings were equipped with conventional heating or cooling systems. The bill makes it clear that no additional value should be assigned to the building for the difference in cost between a solar energy heating or cocling system and a conventional system.

90 House Bill l 171 a uthori=es the Housing Finance Agency to guarantee loans to los iscone persons for obtaining energy , conservation an terials for their residences; the mariana ' amount to be loaned is $1200. House Bill 654, which recognizes that " solar energy is the w orld' s most abundant and rene wable energy resource," appropriated $125,000 for the years 1977-1979 to North Carolina state University for the development of a solar thereal conversion unit which will prodoce a minimum of 1000 K9H of electricity per month; the unit is to be designed to operate independent of any outside energy source as auch as possible and should be reliable and relatively free of main tenance. The legislation specifically set as a guideline for the project that the size and operation of the ' unit should be practical for use by a home or business. The United states Congress has recently enacted the N ational Energy Conservation Policy Act. This Act strongly encourages the states to undertake a residential energy conservation program under rules and guidelines promulgated by the Secretary of the Department of Energy. Within 180 days of the promulgation of these rules, the Governor of each state or an authorized state agent any submit to the secretary a proposed residential energy conservation pla n. Althou gh the specific rules are not yet available, it is clear that this Act will materially affect state and local efforts on conservation.

91 C. U ti li ti es Commission and Public Etaff Activities sa Conserva tiog and Load M anacemen t The Commission is under a cont inuing manda te from the General Assembly "to p rom o te adeq unte, econ omical and efficient utili ty service to all of the citizens a nd residents of the Sta te. " North Carolina G.S. 62-l55, which was enacted in 1975, declares it to be the policy of the State to conserve energy through the efficie nt uti liza tion of all resources. Under this sta tute the Commission was expressly given the responsibility to study the fea sibili ty of chnrging electrici t y c cs to me rs by a system of nondiscriminatory peak pricing, with incentive ra tes f or the of f- peak use of electricity. Conse g ne n tly, the Commission has entered into cooperative agreements with the U nited States Department of Energy which provide that the Commission undertake demonstration projects directed toward the a ctual implementation of utility conservation a nd load mana gement programs and undertake the study of peak pricing electricity rates. , The Commission has entered into a number of research projects wi th the coope ration of the Public

. Staff,      th e   Research     Trian gle        Institute,     ICF, Inc., Duke power Company, Carolina Powe r & Light                  Company,      B lue    Ridge Electric       seabership     C orpora tion ,       and other organizations.

One current program is stu dying the effects of pea k-loa d pricin g on residen tial electricity consunption ; this pro gram is f unded by the United States Depa rtmen t Ene rg y and of involves the cooperation of CPGL and Blue Rid ge EMC.

92 As a part of one cooperative agreement-, the Commission initia ted Docket No. 5-100, S ub 78, e ntitled " Invest igation s of Cost-Based Hat es , Load Banagement, and Conservation -' oriented End-Use Activities. " In its order setting public hearings in the docket, the Commission set forth three specific problems presently confronting the Commission in this area of regulation: 1 The need to conserve scarce resources;

2. Equity among rate classes in the structure of electricity (and gas) rates; and
3. Economy of operation of the electric (and gas) utilities providing service in sorth Carolina.

The Commission 'seld public hearings on load management and conservation programs in July and September i978. The evidence presented at these 1978 hearings was sufficient to establish that numerous and diverse programs of conservation and load management are underway in North Carolina. The programs are being cond acted not only by- the utility companies regulated by this commission but also by other organizations and individuals. A summary of the electric utilities' conservation and load management activities are set out in Section D beloe. Particular atte n tion is called to the evidence presented by the Public Staff at the July and September hearings in Docket No. 5-100, Sub 78. The Public Staff evidence showed J

93 that the State could benefit greatly from a residential energy conservation program. It was estimated that, if every homeowner installed conservation measures up to a level that gave him the greatest possible net saving, the average annual residential gas consumption could be reduced by as much as 47 dekatherms (Dth) or 47.45; statewide usage could fall by 11,444,000 Dth, which is 17% of total current gas consumption. Further, potential energy savings for an average electrically heated home could be 1,996 KUH per year or 17% of annual heating consumption; statewide savings could reach 663,500,000 KWH. The Public Staff recommended a residential conservation program for all residential customers . The Public S taff also offered evidence that the use of load management techniques by the electric utilities could reduce the demand on the system at selected times, alter the required generating plant construction program, and result in savings to the utilities in generation plant investment. The testimony offered by witness Spann focussed on two programs. First, the utilities could control certain industrial loads by interrupting those loads through the use of radio controlled switches: in exchange, these industrial customers would receive a discount based on the KW of controlled load. The second program involves the utility control of residential water-heating loads: in exchange for a flat monthly discount, the residential customer would allow the utility to use a radio controlled switch to interrupt residential water-heating service. Both programs

94 would be voluntary. The Public Staff recommended that load mana gement programs ba sed on the utility control of residential vaner heating and on interruptible industrial loads should be developed by CPSI, Duke, and YEPCO. The Public Staff witnesses testified that CPGL and Duke residential customers with electric hot water heaters would find a controlled vater hea ting rate attractive. ar. Bingham stated that if the custcaers were offered a cr>>dit of about 31 50 per month, all existing customers with heater sizes of 66 gallons or larger would appear to benefit by accepting the controlled water heating rate. Customers with available space would benefit by replacing their small unter heaters with 66-gallon units. seu home buyers would also find it beneficial to install a 66-gallon or larger unit. . . , Lithough not all residential customers would be expected to choose the controlled water heating rate, the Public Staff concluded that, given monthly credits in the $1 00 to 32.00 range, the demand for the rate cculd be significant. The Public Staff also found that there are about 100 large industrial customers in the Duke an d CP&L service areas which voeld have an immediate interest in interruptible serv ice, if such service could be ertended to noncritical loads. Under the assumptions and -}udgments used by witness Spann, the reduction in peak demand in 1990 resultin g from the interruptible industrial rates would be Sl0 HE for Duke and Ii0 55 for CPGL. The residential water heating ra te

95 would reduce the 1990 peak demand by 175 MW for Duke and 75 MW for CPGL. D. The Electric Utilities' Conservation a nd Load Management Pro grass The electric u tilities a re enga ged in a variety of conservation and load management programs. Each company is making a se rious commitmen t to the concept of conserva tion and load ma na geme nt. The approach of the companies, s however, has been cautious, consisting of experimental and pilot-scale pro jects rather th an vide-ranging i mplem entation. The com panies have concluded that this approach is necessary to ensure that the benefits of such p rog rams outweigh the costs which will be incurred by the companies and their customers. There are programs involving little cost, but many of the load management progra ms require costly switching and acnitoring equipment. Duke P ower C ompany Duke Power c om pany, in the loa d forecast hearings in Docket No. E-100, Sub 32, and in the conservation and load ma na ge ment hearings in Docket No. 5-l 00, Sub 78, presented the most de tailed evidence of any company on its conservation and load management programs. According to Duke wit ness Donald H. Denton, Jr., Vice Pr esident of Marke ting, Duke 's Load Management Program has as its goal the reduction in the growth of the company's

96 kilowatt peak load and kilowatt-hour sales This procran encompasses all sectors of Duke's ' business - residential, I commarcial, industrial, agricultural, and resale. Table 21 reflects Duke's projections of its load management goals during the years 1978-1990. By 1985 the accumulative reduction in peak load will have equaled the output of one large generating unit. By 1990 an additional generating unit will have been saved as a result of these load manngement efforts. These figures were incorporated in the company's overall forecast. The Load Management Program includes the following activities: the Energy Efficient Structure Program (EES) for residential customersr the improvament of insulation levels in RA (all-electric) and in non-RA sL - es; the education of customers in the use of heat pumps and high efficiency central cooling systems; the reduction of KN da and in dairy =4 iled ng operations and in large poultry houses; and the reduction of lighting levels in new bn4174 gs. Particular attention should be directed to Duke's program to reduce the industrial customers' damand at the time of the company's system peak load; Duke estimates the peak demand savings to be 84 2W in the stmmar and 24.6 IW in the winter. In 1976 Duke launched its EES P'rogram for its residential - customers. This program promotes reduction in residential demand through the use of additional insulation which meets -

97 EES standards. The commission has approved a special c onservation rate (Besidential Schedule BC) which off ers a m oneta ry incen tive to tho se resid ential customers who install insulation in compliance with the EES standards. This incentive is e:aal to the savin gs in Duke's construction cost which result from the lower residential , demand of the Schedule RC custome rs. Duke esti ma tes tha t 12,367 EES units will be added to the system from 1975 through the summer of 1980. The air conditioning saturation in these units will approach 90%. EES activity will reduce weather-responsive loads in these structures. The com pa ny has also started its E ne rgy E fficient Appliance (EEA) Prog ra ms, which inform Duke's customers th rough participa ting applia nce dealers of th e benefits of purchasing home appliances that are energy efficient. Duke provides its larger industrial customers wi th electronic informa tion in the form of timed pulses; these customers are therefore able to continually monitor their loads and better control their maximum dem an ds. Du ke presen tly has 140 custo mers with some form of monitoring system or load con trol. Duke is undertaking studie s of customer lead control which include not only residential water heaters but also the interr uptible service to its larger customers. The compa ny is testing radio control equipment in the ho mes of e m ployee volunteers to de termine the ope ra ting characteristics of

98 this type of control. m Du ke is a participant in a solar research project with , Electric Power Research Institut2. The company ir also a subcon tractor in a project to define for the United States Department of Energy the best applications of photovoltaics for commercial and industrial customers. Duke's customers who have installed solar-assisted heating and water syste ms are placed on the company's sclar rate schedules. Duke is studying these customers in order to evaluate the benefits of this form of supplemental energy. Carolina Power & Licht Concany In Docket so. 5-100, Sub 78, CPSL witness Barris Edge testified regarding the ongoing activities of CPSL in the ares of conservation and load management. CPSL provides support to the Edison Electric Institute's program on load na na gement a =d participa tes in the national study of rate design. In addition, auch work on load management is being performed in-house. According to ftr. Edge, the various activities have grown to the point that CPGL is establishing a permanent staff with the technical expertise to make the appropriate analyses and recommendations for load management activities and to follow through with the implementation of such activities. The CPSL load management program current 1T consists of the following: The Common Sense / Wrap Up Program; customer

99 education regarding heat pumps, insulation, a nd e ne rg y e fficient a ppliances; free energy audits; advice to customers in obtaining financing, materials, and contractors for energy conserva tion activities; and several experimental proj ec ts. The Connon Sen se Programs en co urage high levels of c insula tion and the use of energy efficient appliances in new houses, new apartments, and new business structures. CPSL estima tes tha t a n a vera ge 1500 sguare-foo t house conforming to the programs will sa ve 4,300 kilowatt-hours on heating and cooling requirements. The Common Sense House Program is also being extended to manufa ct ur ed homes. These homes represent a substantial proportion of new CPSL connections each year. The Erap-Up Program is the cou nterpart of the Common Sense Program which is applicable to existing buildings. These programs, as well as other means of conserving energy, are being promoted through bill inserts, personal contacts, and media advertisement. The educational efforts concerning proper lighting, efficient a pplia nces (in commercial cooking and processing, as well as in residential use) , use of heat pumps, and proper insulation a re applicable to all custome r cla sse s. For customers who desire to install equipment to automatically regulate their load, CPGL will install (for a monthly facilities charge) equipment to provide the me te r pulses needed for such continuous monitoring.

100 CPGL's load managenest program also includes various experimental activities. CPGL is involved in a time-o f-day 3 rate demonstration project in cooperation with the Commission and the Blue addge Electric 5embership Corporauion. This three-year project, scheduled to be completed in the summer of l 979, should provide substantial evidence on the effectiveness fi.e., customer acceptance and re sponse) of time-of-day rates in redistributing peak loads. Other experimental activities include a two-year project that examines the potential of interrupting service to reside ntial customers via radio control. In addition, CPGL - has surveyed the possibility of interruptible service to large industrial and commercial customers. Joint efforts with industrial companies are also part of CPGL's experimental activities. Cne such project is testing a line carrier communication system which also attempts to determine an optimum carrier frequency. In another project, distribution automation options which can perform multiple load management functions are being tested. These activities are part of the continuing efforts to make many of the technically feasible load management options economically feasible as well. vireinia Electric gd Power connant The load ma nageme nt efforts and energy conservation activities of YEPCC were also presented in Docket No. 5-100, ,

lol Sub 78. Edmond Vickham, Directot of L oad Management Applications for YE PCO , testified th at an active load management program is bein g undertaken purs ua n t to a corporate goal of reducing the projected peak load by 500 MW by 1985. The VEPCO load forecast and resulting construction schedule takes account of this proposed reduction. According to testimony by company witness Roach, VE PCO 's conservation activities include providing energy audits on an inf ormal basis to residential customers a t the customer's request. Vepco ha s plans fo r a pilot program which may be expanded to a more formal program. Ccamercial and industrial customers are curren tly of fered various ma te rials to aid _them in performing their own energy audit. Insulation and lighting reconnenda tions are a vailable to , cust om ers. C onse rva tion is encoura ged through educational materials and advertisements. VIP CO is revising its heat pump program tc en co ura ge heat pump aanufacturers to make availa ble efficient, reliable beat pu mps. Other programs in planning or in developmental stages include the following: Electric Energy Efficient Bone Program (similar to CPGL's Common Sense Program and Duke'; Energy Efficient Structure Progras), a reference manual on load ma na ge me nt , experimental activities on alterna te energy sources, and experimental projects on load management techniques. The experimental load management activities tha t VEPc0 is currently planning in volve both direct and indirect

1 02 techniques. Indirect managemen t pro-j ects involve time-of-usage rat es. For purposes of education and s comparison, a selected group of residential customers will ' receive hypothetical time-o f-usag e bills in addition to actual bills. Another group of residential customers consisting only of volunteers will be actually charged by time-of-usage rates. Planned direct load management activities include several volunteer projects to test the effects of interrupting service to hot water heaters. The experiments will allow YEPCD to evaluate the required hardware and customer acceptance of such programs. E. Alternative Enecqv Sources fuel ~ shortages

                           ~

necent and escalating prices of conventional fossil fuel or nuclear fuel energy systems have encouraged a close examination of the practical potential of other energy sources. Economic considerations of other alternatives will ultimately involve both the direct costs associated with each of the new scur=es and their effects on the health of the Stat e's economy. The availability, reliability, and cost of energy, from whatever source, will largely determine the cha racter and levels of industrial growth and resulting employment oppo rtunities in North Carolina. The vulnerability of this State's economy to both national

103 and internationa l actions f urther encourages development of

  -    a  range      of energy options.          The 1973 oil embargo adversely a ffected both the personal an d the             business     ope rations       of Morth     Ca rolinia ns.       In    addition, the extreme shortages of natural gas severely crippled the state                 in    the    wi nte r    of 1976.      If severe economic and social consequences resulting from such occurrences are to be avoided                 in    the    future,      a range     of    options     must     be   available     to    meet the energy demands of N orth Ca rolina.            While the present employaent            of alternative       energy     sources      appears    to be supplemental in nature, the potential of the se             sources     must    Le    ex am ined.

Conservation, whi ch the Commission considers to be an extremely importan t alternative energy source, has been examined in an earlier section. However, in addition to the conservation efforts of t he utilities, cther groups a re ma kin g contribu tions. The North Carolina Energy Pesearch Institute has several projects dealing with ccnservation and alternative energy sources. The Energy Division of the North Carolina Department of Commerce has developed a Comprehensive S ta tewide Energy Conservation Pl a n , which is s. designed to conserve 8.05% of the State's total projected , 1980 energy consumption of 1,736.08 trillion BTU's, a t savings of l39.72 trillion B TU 's. The ma jor program for t he residential sec tor is Proj ect Conserve, which provides the homeowner with an objective analysis of the costs and saving s likely to result from such sensures as adding or increasing insulation, installing stors windows and doors,

104 and set *%g back ther:cstats. s The C 4asion reasserts its belief in the potential , impact of conservation. However, due to its extensive treatment in earlier sections, conservation will be c=itted from further discussions of alternative fuel sources. In Docket No. E-100, Sub 32, the public Staff and other-interested and concerned groups presented testimony regarding alternative energy sources. In additics, the c'=4ssion has taken judicial notice of other available material. The following energy sources have been brought *w the attention of the C- Aasion:

1. nuclear fusion
2. wind 's
3. geothermal 4 biomass and plant energy
5. fuel cells G. tar sands /cil shale
7. coal gasification/liquifica* den
3. solar Electric generation systems which use wave ac* don and tidal energy, both of which were discussed in last year's Report, appear un1_ ikely to be developed further during the present planning period. The technology required to obtain energy from wave action i= very complex and expensive. Therefore,

105 wave generation systems will prctably be delayed until less complex alternative sources of gene ra tion have been perfected and accepted. Due to the nature of the tidal conditions off the mid- A tlan tic shores, it appears that there will be little application for tidal energy generators in this area. However, there has been limited discussion of r placing these units in some of the inlets between the outer Banks to take a d van tage of the concentra ted tidal water flows at those locations. In addition, some examina tion is bein g made of ocean the rmal energy gradient devices, although there is little expectation of any substantial development of this source in the near future. Posion ._ _ Research on the nuclear fusion system has progressed to the point that most plasma physicists accept i ts technological feasibility. The fact tha t the actual fusion device is presently bein g designed is certainly a step towards a powe r- prod ucing system. However, the practical utiliza tion of such a source remains uncertain, due m primarily to the high costs and the problems associa ted with the very high temperatures involved. However, the fact that the supply of f uel for this source of energy is virtually inexhaustible and that there are no major radioactive vaste disposal proble ms make nuclear fusion ve ry attractive. Nevertheless, recent shifts cf research and development f und in g from fusion research to solar resea rch ha ve

l06 significantly delayed the program; it now appears that this country will not see any najar impact of this source during s the twentieth century. 12JL.d Interest in vind power continues to focus on the design of devices to be used as vind generators. However, the probles of la nd needed for giant vindmill installations has yet to be solved. For example, a University of California research study estimated that by the year 2025, 865 of that sta te's energy could come from renesable so urces, but tha t this effort would require 235 of the state 's land area for energy farms (for biomass fuel) and huge windmill installations. Recently, the California Energy Commission ordered 10 experimental vindmills to- further its studies. In North - Carolina, a wind turbine is to be built near Boone for the Blue Ridge Electrical 5embership Corporation. It will be the largest wind turbine ever conste.d and will supply 500 homes with required electricity. Although work is continuing on this source of energy, few expect it to have a significant impact on the supply picture in the next few years. Geothermal Within the last year. interest in geothermal energy sources and optimisa concerning their practical application have grown. However, the optimisa for more extensive

107 application continues to be associa ted with the western United States and vill probably have little impact on the anergy requirements and sources of North Carolina. Biomass The possibility of using biomass as a fuel source is receiving such attention f rom national and local groups. The Institute of Gas Technology (IGT) is involved in several such projects. For example, the design and poten tial of large advanced digestive sys tems which involve a mixture of water hyacinth, Bermuda grass, municipal solid vaste, and sewage sludge are being investigated on a pilot plant scale. Earlier laboratory testing indica ted that the se mix tur es would produce more methane than what many would designa te as pure biomass. In other p ro jec ts , IGT examined additives that may accelerate anaerobic sewage sludge digestion which may allow up to double the loadings. En anaerobic process for converting ocean kelp to s yn the tic natural gas was studied, and testing was conducted on processes to ob tain fuel from the thermochemical conversion of biomass. The North Carolina Ene rgy Division, Duke University, and Duke Power Company are examining alternative sources of ener gy , which include pla nt energy and other biomass so urces. A recent project funded by the Energy Division investigated the use of wood for small-s cal e power ~ gene ra tion in the State. Energy production f rom biomass a nd vastes is also receiving a ttention from private industry,

108 local universities, and technical groups. Champion Pa pers, Inc., proposed to convert annicipal garbage into energy to - be used for the production of paper at its mills in western North Carolina. The project proposes to use vaste-derived fuel and coal to produce 300,000 pounds of steam and 8,000 kilova tts per hour. In the load management hearing, a public witness, Thomas Guntar, tastified that vaste from agricultural processing, seunge sludge, residues from feed lots, and annicipal wastes are all potential biomass sour =es that are abundant in North Carolina. Thus the State's Potential for energy production from this alternative source is enormous; the question is the economic feasibility. T,gg 23.3d3, M Shale. S.agl casification 33g Licuification The use of tar ==nd= and. oil shales for processes that > yisla an oil-like matorial is both costly and environmentally guestionable. The large amounts of water needed for the processes and the solid waste disposal problems are primary concerns. Currently, the technology involved it in a very early stage of development and is not expected to contribute to alternate fuel . sources for many years. . The work on coal gasificatice and liquification is continuing. The E nvironmental Protaction Agency is conducting several projects on the various processes involved; however, the carcinogenic and mutagenic agents that result from these processes continue to be important '

l09 c once rn s. Since no maj or breakthroughs have occ urred recen tly, it is probable that this technology will not be accelerated in the near future. Puel cells Th e development of fuel cells has advanced from the first generation phosphoric-acid cells to the second generation stage of molten carbonate cells. The Department of Energy has funded several projects to improve the performance and endura nce of these second generation cells. Production methods, selection of sta ble anode materials, and the optimization of the fuel cell elec trolyte (mainly through the production of a lithina aluminate electrolyte tile) ha ve been studied in the ongoing efforts to improve the cost effectiveness of this source. Other experimental progra ms have evaluated the feasibility of using heavy fuel oils for producing fuel cell quality fuels through processes of hy drogasification, steam re formin g, hydrod esulf uriza tio n , and hydrocracking. Development has also been initiated for a reversible ele ctrochemical cell, serving both as a f uel cell and an electroly er. The Edison Power Resear ch Institute is involved in a multi-year endeavor to develop fuel cell components that can function even if the f uel gas stream contains as much as 200 ppa sulfur by volume. Sulfur tolerant anode ca ta lys ts and anode polarization must be studied.

ilo In New York City, the Consolidated Edison Power Company recently received approval for a 4. 8 megawatt fuel cell ' demonstration pla n t which vi u involve EPRI, DOE, United Technologies, and several u tilities. The Bev York City Board of Standards and Appeals ruled that fuel cells are not refineries ant thus approved the plan for the installation of the planned equip ment. This approval is quite significant and makes fusi cells the only power-generating equipment that can be installad in the city. In addition, the acceptance of this planned demonstration plant by the nanhattaa residents is allowing the schedule to move ahead, in contrast to other energy related projects. The areas to be investigated during the projeet include verification of e mission, load following characteristics, and aesthetic c?cracteristics of the plant. If the results are favorable, J it is anticipated that comaercial development of the plant will begir Solar The interest in solar energy as an alternative fuel has been onhanced because of the rising costs of oil and gas and becaus e ma ny perscas consider it the most att'. active alternative that is currently available. A witness for the Public Staff testified that the use of solar energy as a su pplement to conventional energy is now economical for some hot water heating applications. With the tax credits now available to users of solar energy and the increasing prices ,

lit of conventional fuel, some builders of new homes are fi nding that solar assisted heating of the structures is beccaing m ore at tractive. Pchlic witnesses presented inf ormation on solar potential in North Carolina. Currently, projects are being conducted by local universities, priva te individ uals, and other interest groups. There seems to be agreement tha t the potential of solar energy as an alternative fuel source deserves serious consideration. An extensive program being conducted by the United States Department cf Energy attempts to identify possible commercial and industrial applications of this technology. This work may result in an increased - market and a decreased price. In a report from a concerned te chnical group which investigated conceptual designs and photovoltaics through computer simula tion, opportunities for both improved performance and reduced cost were identified, but even minor market penetratica for the residential sector was not projected before the 1980's. The use of solar thermal energy (above 4000F) to produce _ energy-intensive chemical products as well as various types of solar coller; tion and s tora ge has recently been investigated. Some researchers now believe tha t conventional sola r sto ra ge may be supplemented with solar photochemical storage. This procedure would increa se _ both the temperature of the storage unit and its efficiency. Stanford University has reported that the efficiency achievable in their thermo photevol taic (TPV) solar cell research has more than do ubled in the last year. This

112 research, sponsored by ZPRI, involves conve rting incandescent light into electrical energy. As improved call s design further increases performance, the 35% level of efficiency that could make TPY systems economical in large plants nos seems a definite possibility. Loca lly, North Carolina Sta te University and the Basearch Triangle Institute are both doing significant work in photovoltaics and appear to be on the frontiers of such research. EPEI is also sponsoring projacts that involve the development of new concepts in solar energy, including the use of highly concentrated sunlight in high-efficiency photovoltaic cells. Proenction of low-cost photovoltaic thin film, which could convert sunlight to energy directly and e ff3cimatly , is also being examined. This new fils, which would not require a sunlight-concentrating systaa, appears promising, both in terns of costs and relative efficiency. Some proponents of solar energy expect large reductions in the costs of solar systems to result from economies of scale, tech.nological laprowmeats, and reduced labor costs as the ease of installation, innovative designs and competition all increase. Others do not expect dramatic reducticas; the cost of these systems is mostly in tJe metal, glass, and plastic parts, the control systems and the 2ans and pumps, the costs of which are not expectsd to come down.

ll3 Th e present technologies for solar heating are such that small water heating loads are at er better than a b rea k-e ve n cost; some water hea ting can the ref ore be accomplished through solar energy. However, it is not now economical, nor is it projected to be economical within the present pla nning period faced by the c o mmission and the power system designees, for heating requirements to be completely served by solar energy ca ptive systems. At pre sen t , it is only economical to use a ctive solar systems which provide approximately 50% of the total beating requirements in most cases. This means that the remainder of the requirements on peak days must he provided b y an alternate source. While the Commission is very supportive of solar energy utilization , it is concerned 2 bout solar heating systems with electrical backup. If the backup to a solar system is electric, it appears that either some design control or some economic ince nti ve shou ld be placed or of fe red , respectively, on solar installa tions in order to ensure (1 ) th at the energy availa ble from the solar captive system is used during peak times rather than off-peak times, and (2) that the peak demand on the electric system is reduced and not effectively increased by these systems. Because the undersizing of collectors and storage systems required by economics and because of the operational technolo gies of most of the sy stems now in place, the a vailable heat in storage vill be used in the late evenings and very early morning hours on

114 peak use days. N auxiliary heating systems will come on during some of the coldest hours of the morning and remain ~ on into the early day, which will be coincident with the ' normal time of the electric system wintar peak. This type of solar system would make the load factor of the electric utilities deteriorate and would thus cause an upward pressure on the cost of electricity. In fact, the increased cost from this effect may be greater than any net energy savings from the contribution of the solar equipment. T he matter of acostrola of these systems, then, is one which must be carefully analysed in the near futur.e. Thermal storage may be one answer if consumers insist on using backup electric heating or cooling systems. In order to encourage ins +=11a tion and proper *4-ing of thermal storage equipment where electric backup. is used, with solar heating - installations, the commizzion concludes that utilities should make voluntary experimental time-of-day rates

                                                                                ~

available to such installa tions. suaverv Alternative e nergy sources do exist in varying stages of development. However, the composite impact of these sources including conse rvation is difficult to quantify with the data currently available. It is expected that some of thase so urces will be further developed and will gradually become _ an integral part of the energy supply. While research and develo pment in these potential areas is encouraged, the

                                                                               ~

II5 Commission a ust continue to plan for the State's energy needs in the most realistic manner. Thus, the present f orecast cannot be reduced as much as some pa rties would like. However, the C ommission expects that, in future planning periods, some of these areas will be more quanti fiable and, thus, will play a larger role in supplying sor*h Carolin a's ener gy needs.

   !!6 CHAPTER VII COECLUSICES                                   j The    forecast    plan    adopted   in   this 1978 report shows a decline in the rate of growth          of    the    peak   loa d  of   both Carolina      Power    & Light Company and Duke Power Company.           In its 1977 Report        the    Commission    found    that   the   probable annual      rate   of    growth in peak load for both CPSL and Duke would be approximately 6.9% d uring the years I 976-1990.                In the     1978 report the Co==4 ==i on has adopted for its capacity plan an annual peak load growth rate of 5.2% for CPSL and
5. 4% for Duke.

The Comm4 esion's t 978 forecast is based in large part upon the premise that conservation and load mana gement efforts a vill have a substantial effect on the future growth of electricity usage in North Carolina. . The Commission has considered the commervation and load _ management activities presented in its Docket No. 5-100, Sub

78. The Public Staff recommended that CPGL, Duke, and YEPCD -

develop two load managenest programs. First, the utility control of residential sater-heating loads: in exchange for ~ a flat monthly discount, the residential customer sould allow the utilities to use a radio controlled switch to interrupt residential water-heating service. Second, the utility control of certain interruptible industrial leads: in exchange for a discount based on the EN of controlled

117 load, indust ria l cu s tome rs would allow the utilities to interrupt certain ind us trial loads through a ra dio cont rolled switch. The commission will order the three electric utilities to file proposed plans for t he se two programs within 270 days. Furthermore, the three utilities will be required to file voluntary rates incorporating time-of-day pricing to th ose customers who either ins tall solar equipment, thermal storage equipment, or a c ombina tion of the two for the purpose of providing space heating. The rate schedules will be filed on an experimental basis. It is expected that t his experimental rate vill of fer sufficient economic incentives to such customers so that the energy available from such a system vill be used during the pea k times of the electric utilities and that the peak demand vill not be increased by solar systems.

118 TABLE 1. Capacity Addition Plans for Virginia Electric & Power Company ygga vapco Plan .Public Staff Plan UNIT "W C7!IT MW I i 19798lNorthAnna2 907 l North Anna 2 + Update 934 W i i t i 19808 I P- 1=4a7 + Uprata 286 W' l I  : I 19813l l North Anna 3 907 wi i i l 19823 ,' Bath County 1, 2, 3, 4 1500 l Uprats + Bath County 1, 2 731 W r Bath County 5, 6 750 I I I 19835 e i North Anna 4 907 WlBorthAnna3 907 I I i 19848I l Uprate + Bath County 3, 4 731 WlNorthAnna4 907 g

              ,                                 i 19858 I                                    l Surry 3                        900 WI                                    l 1

1 19868I a Bath County 5, 6 700 WI l , 8 1 1987SlBaseLoadUnit W (fossil) 910 8 S urry 4 900 i  ! I t 1988SI VZPCD did not Base 1100 W l *orecast beyond 1987 I I i

                                               '                                1100 19895 W ;8 l Base 1

1 1990S: 3 Base 1100 WI e I i 1991S I I Base 1100 We I 1 8 1952S I 8 1100 Wi 8 lf Base NCTI: There appear to be differences in the values used for Bath County units Dy the two parties.

119 TABLE 2. Reserves Which Will Result From Capacity Plans if the VEPCO Forecast Occurs VEPCO CAPACITY PUBLIC STATT PLAN CAPACITY P*.AN VEPCO TCRICAST OF Installed Installed PEAK LCAD Capacity Reserves Capacity Reserves YEAR (gw) (Mw) (g) (Mw) (g) 1979 Se 8,760' 10,432 l 19.1 10,483 19.7 Wl 6.160 10,736 31.6 10,735 31.6 1980 S ! 9,260 10,468 8 13.0 10,769 16.3 Wj 8,670 10,773 24.3 11,021 27.1 l 1981 S 9,810 10,504 i 7.1 11,676 19.0 We 9,210 10,773 8 17.0 11,544 25.3 I i 1982 Sl10,250 12,004 3 17.1 12,035 17.4 WI 9,760 12,613 , 29.2 12,275 25.8 1 1983 S 12,3'44 16.8 12,947 22.4 Wl10,570 i 10,340 13,006 g 25.8 12,972 25.5 t 1 1984 58 12,757 3 13.9 13,471 20.3 Wl11,200 10,930 14,013 l 28.2 13,703 25.4 I i 1985 Si 11,860 13,795 g 16.3 14,371 21.2 W8 11,540 14,104 e 22.2 14.603 26.5 I i 1986 53 13,886  ! 10.6 15,071 20.1 Wl12,550 12,170 14,205 l 16.7 15,3r3 25.7 8 I 1987 Se 13,270 14,796 11.5 15,971 20.4 W! 12,820 15,045 e 17.4 16,203 26.4 e f

             % Growth Rate           5.3        5.8      4.5                    5.4

23 s

    'ZAB2 3. Reserves Which Will Result From Capacity Plans if the Public Staff Forecast Occurs Punr.:: c;,arr          vzPeo cAPAcr27 CAPACT2T PI.AN              PLAN PUBL2C STAFF FORECAST CF      2nstalled                 2nstalled PEAK LOC        Capacity         Reserves capacity      P.eserves YEAR          rMw)            freti           tt1       (MW)           (t) 1979 3    8,849                10,483          18.5     10,432        17.9 W               8,280    10,735          29.6     10,736        29.7 1980 S    9,364                10,769          15.0     13,468        11.8 W              8,762     11,021          25.8     10,773        23.0 1981 3    9,909               11,676           17.8     10,504         6.0 W              9,272    11,544           24.5     10,773        16.2 1982 S    10,485               12,025           14.8     12,004        14.5 W              9,812    12,275          25.1      12,613        28.5 1983 5   11.095                12,942          16.6      12.344        11.3 W             10,383    12,972          24.9      13,006        25.3 1984 S   11,741                13.471          14.7      12,757         8.7 W             10,987    13,703          24.7      14,013        27.5 1985 5   12,425                14,371          15.7      13,795        11.0    '

W 11,627 14,603 25.6 14,104 21.3 1986 5 13.148 15,071 14.6 13,886 5.6 W 12,304 15.303 24.4 14,205 15.5 1987 5 13,913 15,971 14.8 14,796 6.3 W 13,020 16,102 24.4 15,045 15.6 1988 5 14,723 17,071 15.2 7 W 13,777 17,303 25.6 1989 5 15,579 18,171 16.6  ? W 14,579 18,403 26.2 1990 S 16,486 19,271 16.9 7 W 15,423 19,503 26.4 1991 S 17,446 20,371 16.8 7 W 16,326 20,403 26.2 1992 S 18,461 21,471 16.3 7 W 17,276 21,703 25.6

  % Growth Rate       5.8         5.8        5.7                      4.5 W

121 TABLE 4. Levels and Growth Rates of Demographic Variables Used in the Public Staff's Energy Forecasts and Load Forecasts Growtn Growth N. C. 1476  :*te 1995 Rate 1gon

i Poculation 5.469 i 6.084 l 6.465 (Milit:ns) 8 (1.2%)  : (1.2")

I Real Pe*sonal '7.349 25.962 1 33. 3 *:) Inccme (Billiens) e (5.0;) 1 8 (4.3-) Real Incare 3.172 8 4.432 5.157 Per Capita (OCO) l (3.8-) l (3.1 ) I 1 Manufacturing 757.5 1050.3 i 1183.9 Employment (000)  : (0.6-) I (2.6;) i l Real Retai~ 13.657 8 20.654 1 25.25C Sales (Bill: ens) I (4.7-) I (4.1%) I Households 1.788 l 2.193 2.433 (Milliens) . 8 (2.3%) l (2.3%) I I e U. 5. l l 8 1 Industrial Procu: tion 1.295 8 2.056 2.540 Ino*x 8

                                '    (5.3-)           l (4.3%)

i s CP! 1.705 l 2.755 l 3.415

( 5. 5 *. ) (4.4-) .

I i WP!  !.230 ' 3.032 i 3.675 l ( 5. 8';) 8 (3.9%) Price Ceflator 1.644 2.846 8I 3.604 Gasoline Fuel 011 l (6.3%)

                                ,                         (4.8-)

WP! - Fuels 2.657 l 6.477 S.455

(10.4%)

I l (5.5%) t

122 s TABLE S. Public Staff Trend Forecast of CP&L Energy Consumption by Customer Class (GWH) Growth Grcntth Grewtn Customer Class 1976 Rata 1985 Rate 1990 Rata jogg 3 I I Residential (Ac:ua 6.491 l) 3 10.722 8 14.024 1 15.614 Qi l(5.7%) I (5.5%) I l (5.5%) Ccommercial 4.016 8 7.018 9.662 10.979

Of I(6.4%) II (6.6%) I (6.6%)

I i Incustrial 8.759 18.293 1 26.738  ; 31.123 13  : (8.5%) I (7.9%) g (7.9%) II I I Wholesale and Other 6.649 8 10.958 14.109 i 15.611

01 1(5.7%) l(5.2%) I (5.2%)

i I Total Sales 25.915 I 46.991 64.533 1 73.327

CH I(6.8%)

l(6.6%) e I (6.6%) i I I Comoany use 36 l 612: gg2 95 2 I I SEPA 125 l 121 121 121 3 3 Lossas 1.492 1 3.3023 3 4.532 3 5.148 I I I Total Ener9y 27.578 5 50.475 8 69.270 1 78.691

Of I(6.9%) 8 (6.5%) I' (6.6%)

Peak Demand 5.121 ! l(6.4%)12.777 i: (6.5%) 9.375 14.486

  • Of a(6.9%)  :

f i e Preliminary 1977 Company estinsees Total sales x .0013 3(Total sales + company use + SEPA) x .070 w

123 TABLE 6. Public Staff TREND Forecast of Duke Energy Consumption by Customer Class (GWH) Growth Growth Growth Custene Class ic76 Rate 1985 Rate 1990 Rate 199?

                       'Actuai;I
                                  '                   l                    l i

e Residential 11.327 I 18.237 i 23.776 26,423

CH (5.5%) (5.5%)

l(5.4%) Cc ne cial '.937 l 13,959 19,213 8 21.E34 CH 8 (6.45) l (6.6%) l(6.6%) inctus trial 12.417 e 35,574 1 49.858 1 57,067

CH I (7.6;) 1 1 (7.0%)

knolesale anc Otner

CH 7.227 l (7.6;) 13,951 Il(7.0%)

g I (7.6%) 20,132 Il(76%) . 23,330 1 g Tctal Sales 44. 59 I R1.721 1 112.980 e 123.669

CH I e (6.7%) 8 (6. 7*, )

I(6.91) g I Comoany Use 12; ' I 2382 1 33023 377 2 g i SEPA 254 1 277 . 277 1 277 Lesses 3,432l b.261 8.6483l 9,846 3 3f I ictal Ener9y 88.M3 122,436 1 139,297

    ' CH 48.759l'    (6.i4;           l(6.7%)

g 1 (6.7%) Peak Demand 8.501 4 15.3S5 21.209 i ~4.127

CH f(6.~1) l(6.6%) I (6.7%)

i I i 1976 : rany ferecast '

 ' Total sales x .C029 3(Tetal sales + ce=pany use - ! EPA) x .076

124 s

                                                                                   /

TABLE 7. Comparisons of Growth Rates of Electricity Irices and Inflation Measures 1977. Anna t 1985 Annual 1990 Estimata- Growth F,stimata crowth Estimata Duka 28.0 6.3% 45.7 4.J% 56.5 Electricity Price Mills /IMH Mills /INE Mills /IWH CPtL 29,8 6.7% 50.1 4.2% 61.6 Electricity Prica Mills /INE Mills /INE Mills /INE Consumer Prica Indez 181.7 5.3% 275.5 4.4% 341.6 Wholesala Prica Indez 134.9 5.71 303.2 3.9% 367.5 a

125 TABLE 8. Carolina Power & Light Company's Energy Forecast Year E 1978 28,586,688 1979 30,301.864 1980 32.209,533 1931 34,208,255

                  *SR2               36,329.294 1963               38,470.979 1946               40,779,364 198!               43,064,739 1986               45,475.140 19S7              47.884,926 1938              50,376,243
                                 ~

Icag 52,943,431 19?G 55,751.539 1991 58,594,868 I??2 61.574,611 1911 64.539.317 19'6 67,637,204 1753 7.7.816.153 , 3016 74,256,144 19,7 77,777,593 i i w h

126 s TABLE 9. Duke Power Ccmpany's Energy Forecast Regular Territorial Sales Energy Year GWR GWR 1978 48,988 52,915 1979 51,798 55,918 1980 54,830 59,138 1981 58,750 83,308 1983 81,881 88,825 1983 85, 157 70,089 1984 88,473 73,537 1985 71,983 77,287' 1988 75,599 81,128 1987 79,4 2 85,183 1988 83,430 89,385 1989 87,807 93,793 1990 92,004 98,425 e e

127 TABLE 10. Virginia Electric & Power Company's Energy Forecast Annual Output Increase g (LfWi! x 103) - 1577 38.578* - 1978 41,500 7.5 1979 44.800 6. 0 1990 46.100 7.4 1981 51.400 G.9 1932 54,700 6.4 1953 58.100 6.2 1984 61.650 6.1 iDR3 63.350 6.0 1966 69.200 5.9 1957 73.200 5.8

                   = Actual O

m

128 TABLE 11. Public Staff's Noneconometric Energy Estimates for the Residential Sector (1000 MWH) Historical Historical Sales Average use Trended Avg. Use txponen- Exponen- cxponen- Satura- Avg. of Avg. of

al .inear tial Linear tial tion All Most veer Linea Trono { Tr=nd! Trono2 Tr.ne2 TrendJ Tmd T m d E e matn Like1 4 i

B l Carolina 3%eee and '_ien* Coneany 1977 l 6980 7152 l7073 6991 l 6980 7085 7265 l 8594 7549 1982 8 8766 11623 9708 10793 10076 9748 10103l8766 l10770 1987 3 10522 18888 1 12501 14411 1 10522 16254 1 13137 13749 12503 8 8 I i 1992 ' 12333 30696 l15640 20341 1 12338 24256 1 15538  !!735 14505 I I I i 1995 's 13410 41078 8 17696 24907 1 13410 30697 8 16832 22575 15977 I

g. -

8 Duke Powe comoany 1977l12250 12143 l12548 12271 g 12250 12272 l 13936 12553 12345 1982l15354 10058 16838 17551 1 17408 16373 16533 17550l15354 I 1987 I 18458 26635 1 21615 24768l18458 24768 3 20893 22223 20322 8 I i 1990 8 21562 3S286 I 25977 32990 21562 34582 1 24551 23787 24353 I I 8 8 l 1995 23425 4960a 30475 40132 8 23425 42069 1 26727 33694 26876 Motes: I Trend of historical esicential consuusition fer the period 1955-1976. 2 Trend of historical 10A!/custumer times linear trend of customers. krend of sales divioed by trend of cus*m multiplied by linear trend of custcaers. Mocified linear trend (no value above 100.0) for each apolianca multiplied by linear tnnd of resicential customers alltipliec by estimated annual consunption per custo-mer per top 11ance. totaled for esen year. Average of sales linear trend, average use linear trend and saturation estimeta.

129 TABLE 12. Public Staff's Noneconometric Energy Estimates for Commercial Sector (1000 MWH) Averane Use llistcrical Sales Per Custoner Averace Average of 2 I All MUS* 'Ik'I/ ' Year Linese 1 Exoonential 1 Linaar 2 E xoonanti al Estimates Estimates - l Carolina Power an1 LinNt Cervanv i 1977 4311 4326 1 4333 4361 8 4345 4347

             ;

e i 5456 6270 5825 612S I 5920 5641 1902 3 l 8 1 1907 6601 9088 7470 C484 7914 7035 8, l l 1992 3 7746 13172 1 0318 . i39 1 10461 8532 1 i

s475 1895 8433 16458 l 10525 13947 l 12341 I

i Duka Dowar Comoany l 1 8574 8598 8664 8635 8630 8619 1977 l 1982 1 10808 12430 11251 11562 1 11513 11035 I i 1987 I 13042 17969 14068 14870 15077 13:55 l l I 1992 15276 25977 17118 18663 l 19259 16197 n i , , 1995 1 16616 32407 l 19060 21196 3 22320 178386 l 14ctes: Based on historical data for the period 1969-1976. Historical trend (1969-1976) of averace use per custcmer multi: lied linear trend of cower:141 customers. Averace of historical linear trend and everace use linear trend.

130

   "'ABLE 13. Carolina Power & Light Company's Load Forecast Tese                  g 1s78                 sa2s 1979                 6203 IMO                 6414 1931                7034 1982                1480 15E3                7323 1984                8427 1985                8914 IS86                 9424 1987                 9933 1984               10463 1981               2D983 1990               11549 1992.              1:122       __

1992 22732 12*3 13337 1994 13?S9 1995 14393 1996 15286 1997 159E1

131 TABLE 14. Duke Power Cor::pany's Summer Peak Load Forecast Load Peak Growth Factors Year MW M_W  %  % 1978 9,522 396 4.34 63.4 % . 1979 10,036 514 5.40 63.6 1980 10,601 565 5.63 63.6 1981 11.335 734 6.92 63.8 1982 11,907 57 5.05 63.9 19C3 12,521 614 5.16 63.9 1984 13,170 , 649 5.18 63.8 1985 13,857 687 5.22 63.7 1986 14,583 726 5.24 63.5 1987 15,333 770 5.28 63,3 1988 16,175 822 5.35 63.1 1989 17.028 853 5.27 62.9 1990 17,941 913 5.36 62.6 Peak loads through 1980 were recuced slightly from " trend" to match better with the conservative energy forecast.

132 "aBLE 15. Duke Power Company's Winter Peak Load Forecast Year Peak Growth ww Mw  % M77-75 9,261 441 3.00 1978-79 9,792 331 3.73 1979-80 10,376 344 3.M IMO-41 11,132 736 7.29 USI-42 11,730 3M 3.37 iss2 12,232 622 3.30

                                                                                     ~

1M3-44 12,996 644 3.21 ~ 1M6-43 D ,464 444 3.14 Ut3-46 14.368 706 3.13 1946-47 U ,009 721 3.02

                    '1M7-44                  U ,238   749         4.M 1964-49                 14.512   774         4.M 1M9-90                  17,4D    801        4.32 Peak. loads through '79-80 winter were rechaced slightly fnun " trend >

to match better with the conservative energy forecast.

133 TABLE 16. Public Staff's Capacity Addition Schedule (MW) YEAD CPR DUKE VESCO I 1 1978 5 I - I - 1 North Anna 1 (898) wl -

                                               ,          -                i           -

1979W5 l Ucrate (105) 1 - lNorthAnna+Ucrate(934)

                           -                   1          -                            -

g g 1980 5 i Roxtore 4 (720) I McGuire 1 (1180) l Peaking + Uprete (286) Wl - 1 I l 8 19S1 5 i Peaking + Ucrates (212) 1 McGuire 2 (1180) : North Anna 3 (907) W , - g g - 1982 5 i Hayo 1 (72C) 1 - 1 Uprate + P.S. (731) Wl - I Catawna 1 (1153) 1 - 19335l Harris 1 (900) I - lNnrthAnna4 (907) Ws - I Catawba 2 (1153) g 1984 5 I Mayo 2 - 1 Uprate + P.S. (7 31) W3 - l720) l Cherokee (1280) 1 - I 1935 5 i Peaking (15C) 1 - (900) W i Peaking (150) 1 Perkins (1230) l Su-ry 3 Harris 2 - I P.S. (700! t 19865l8 W - (97~.)l , Cherokee(1280) 1 - 1987 5 8 undesignated ' (1150) 1 - Surry 4 (900) Wl - I Perkins (1280) 3 e i 1983 5 l - l Peaking (250) l Brse 1100 W3 Harris 3 (9001 l Cnerokee (1280) l - 1989 5 - - I Base 1100 W l Undesignated (1150) lPerkins

(1230) 3 - e I I '

1990 5 - (250) Base 1100 I I W

                          -                       Base '

lPcaktno (1280) , 1991 5 l Harris 4 (900) 1 Peaking (250) g Base 1100 W j Peaking 250 i Base (1280) g - 1992 5 l Basa (115C) l Peaking - Cycling (500) i Base 1100 WI - I Base (1280) 1 - I t  ! Obtes () Parentheses tndicates MW addition P.S. Pumoed Stora;t

               .ocate - Increase L eatin; cf esistiag units

134 TABLE 17A. Reserve Marg 2.ns Based upon the Public Staff Addition Schedule (%) CMt. (UKE 13g Su:m=P wintee Sussaw VEPt0 winte- g wintee . 1978 22.7 22.4 25.5 22.5 1979 16.7 16.3 14.2 25.3 1980 18.5 14.7 18.5 20.0 19.1 21.6 29.6 1981 15.5 17.3 15.0 25.3 14.5 23.9 20.0 1982 17.6 16.2 17.8 24.5 1983 16.0 21.2 14.8 21.2 19.4 16.7 25.1 1984 21.8 21 .4 16.6 24.9 - 19.7 15.8 20.8 1985 15.8 15.3 14.7 24.7 1986 15.1 19.6 15.7 19.3 16.9 15.2 25.6 1987 23.0 19.1 14.6 24.4 20.2 15.3 18.8 1988 15.6 20.6 14.8 24.4 1989 16.3 19.4 15.9 16.1 22.4 15.5 25.6 1990 18.1 18.2 16.6 25J 15.0 15.5 17.8 1991 17.6 16.1 16.9 25.4 1992 15.1 17.0 16.8 20.2 16.7 15.3 26.2 16.9 16.3 25.6

     =.Ju1LE 173. Los.3 of Load Probabilities Expected Fre::                       1 Public Staff Additions (days per season) mt                     curr                 'nPc0 Yeae   Suw           winter   Sumer         winter  Summer         wintee '

1978 3.3 5.5 2.6 3.7 9.5 4.5 1979 6.0 9.8 6.1 8.2 *' 1980 4.6 6.8 .. 7.9 4.5 6.2 9.5 1981 7.2 12.1 4.6 3.6 5.0 7.5 5.9 1982 6.0 10.7 8.1 4.4 1983 4.3 9.8 4.9 7.9 7.6 4.3 8.3 5.1 1984 4.1 7.7 8.4 1985 4.7 9.1 4.6 7.1 11.9 9.0 5.3 1986 5.1 8.3 A.1

9. 9  !.8 5.4 8.7 1987 3.5 4.2 7.2 8.7 5.6 9.1 4.1 1988 7.1 6.7 7.8 5.1 8.2 3.6 1989 6.6 5.4 8.4 5.3 1990 5.3 7.7 3.3 11.0 8.3 5.8 7.5 3.1 1991 5.4 9.9' Ing 9.1 6.2 7.6 3.2 4.1 9.1 8.7 f.1 8.0 3.3

135 TABLE 18. Public Staff Projections of Percent of Plant Operated as Bace T/.ad, Cycling and Peaking Year Bas? Cyc1,13 g Peaking Ce o'ina Power and Licht Cemeany 1976 48.6 27.4 24.0 1979 48.9 27.5 23.6 1980 E3.4 25.1 21.5 1991 52.8 24.4 22.8 1982 49. 30.0 20.9 1983 5?.7 27.2 19.1 1984 50.1 32.1 17.8 1985 15.4 31.7 18.9 1985 52.6 23.9 18.5 19S7 01.3 31.9 16.8 1983 51.3 31.9 16.8 1989 54.4 29.8 15.8 1990 53.1 32.3 14.6 1991 55.7 30.5 13.8 1992 54.0 31.9 14.1 Duve Power Commanv 1978 49.7 32.2 18.1 1979 49.7 31.2 18.1 19B0 89.4 34.1 16.5 1981 49.2 35.6 15.2 1982 49.2 35.6 15.2 1983 C3.1 28.9 18.0 1988 50.3 34.i 15.5 , 1985 54.6 32.1 13.3 1986 51.9 36.1 12.0 1987 55.0 33.9 11.1 1988 55.9 31.5 11.6 1989 55.3 33.5 10.9 1990 57.4 31.4 11.2 1991 55.6 32.8 11.5 1992 53.5 33.8 12.7 Virginia Electric and Power Comsary 1978 49.5 38.7 11.8 1979 54.0 35.3 10.7 1980 52.9 34.3 12.8 1981 50.9 37.3 11.8 1932 49.7 35.3 15.0 1923 53.2 32.9 13.9 1934 51.3 30.1 18.6 1935 48.8 33.3 17.4 1986 46.5 32.2 21.3 1987 49.5 30.4 20.0 1988 48.0 33.2 18.8 19?9 51.1 31.2 17.7 1990 49.9 33.5 16.6 1991 52.6 31.7 15.7 1992 55.0 30.0 15.0

136 TABLE 19A. Caroli:s Power & Light Company's capacity Addition Schedule 5d" 1 a thJe capaciev (?G) Ooera tiets saxame 04 no uso sayn it. 7:D 1982 uare oz no uns sar:sa et 900 . uss Harria #2 900 1986 Isrria #3 900 1990 Earris #4 900 USA n e srs czst u.n:: mer s 53-1 1150 1989 sa-2 1150 1991

                                                                        /
           "J' u3LE 19B. Carolina Power & Light E'mpey's
                            . Projected Summer Peak Reserves Year                        taserve 197a                          20.4 1979                          22.3 iMO                           u.s isst                           u.s   .

US: 20.4 1943 U.6 1984 U.6 1985 19.2 1966 22.3 1987 16.1 1988 13.3 1929 23.6 1990 25.4 1991 28.9 D*2 22.7

137

        .0. Duke Power Company's Summary of Load, Cacacity and Reserves (MW)

Forecast Tcheduled Total scheduled Scheduled Summer Peek carecitv Addittems Capselty p e se rve s Re s e rve s ** 9 522 None 12 446 2 924 30.7 A 10 036 None 12 446 2 410 24.0 30 10 601 r.ccuire 1 (1180) 13 626 3 025 28.5 781 11 335 McCuire 2 (1180) 14 785

                                                                ~

3 450 30.4 SCI &C Ccetract Term (-21) 1982 11 907 cetawba 1 (1143) 15 930 4 023 33.8 1983 12 521 Catawba 2 (1145) 17 006 4 485 35.8 setirewnts (-69) 1984 13 170 metirements (-228) 16 778 3 608 27.4 1985 13 857 cherokee 1 (1280) 17 797 3 940 28.4 Retteenents ( 261) 1986 14 583 Retiresents (-93) 17 704 3 121 21.4 1987 15 353 Cheroh*e 2 (1280) 18 984 3 631 23.7 1988 16 175 Perkins 1 (1280) 20 264 4 089 25.3 1989 17 028 Diernkee 3 (1280) 21 544 4 516 26.5 1990 17 941 None 21 544 3 603 20.0

138 s TABLE 21. Duke Power Company's Summa.mf of Projscted Load Management Gcals stmea:a w!mst atInst REDUC 710Bf REDUCTION REDUCTIC38 TEAR (MM? , (MW) (MKwit) 1977 las 196 469 1978 281 313 838 1979 392 416 1130 1980 511 532 1458 1381 635 666 1809 1982 759 808 2130 1983 884 960 2572 1984 1008 1128 3377 1985 1143 1295 3422 1986 1270 1486 3893 1987 1385 1644 4334 s 1988 1501 1896 4789 1989 1615 2124 5259 1990 1721 2364 5474 NOTE:

1. Summer and wtater megawatt reductions are 4 & 21atave
2. Energy reductions are annual values
                                                            .}}