ML101410394: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 2: Line 2:
| number = ML101410394
| number = ML101410394
| issue date = 05/21/2010
| issue date = 05/21/2010
| title = 05/11/2010 Summary of Public Meeting with Entergy to Discuss the 2009 Palisades End-of-Cycle Performance Assessment
| title = Summary of Public Meeting with Entergy to Discuss the 2009 Palisades End-of-Cycle Performance Assessment
| author name = Giessner J
| author name = Giessner J
| author affiliation = NRC/RGN-III/DRP/B4
| author affiliation = NRC/RGN-III/DRP/B4

Latest revision as of 19:11, 6 December 2019

Summary of Public Meeting with Entergy to Discuss the 2009 Palisades End-of-Cycle Performance Assessment
ML101410394
Person / Time
Site: Palisades  Entergy icon.png
Issue date: 05/21/2010
From: Jack Giessner
Reactor Projects Region 3 Branch 4
To:
References
Download: ML101410394 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 21, 2010 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF THE MAY 11, 2010, PUBLIC MEETING TO DISCUSS THE 2009 PALISADES END-OF-CYCLE PERFORMANCE ASSESSMENT On May 11, 2010, the Nuclear Regulatory Commission (NRC) held a public meeting at the Holiday Inn Express Conference Room in South Haven, Michigan. The meeting was between NRC Region III management and Entergy representatives to discuss the NRCs assessment of the safety performance of Palisades Nuclear Plant for the period from January 1, 2009, through December 31, 2009. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML101040711 and ML101300433, respectively.

The NRC began the meeting with an overview of the NRCs Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Palisades performance in 2009, which was documented in the March 3, 2010, End-Of-Cycle assessment letter (ML100610274).

The licensee then provided a response to the NRCs assessment. The licensee presentation can be found in the ADAMS as ML101330508. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. Several members of the public asked questions that covered the emergency plan, ground water monitoring, spent fuel, reactor head and steam generator replacements, and license renewal. A list of principal meeting attendees can be found in the attached enclosure.

/RA/

John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket No. 50-255;72-007 License No. DPR-20

Enclosure:

As Stated cc w/encl: Distribution via ListServ

PUBLIC MEETING PRINCIPAL ATTENDEES May 11, 2010 Nuclear Regulatory Commission S. West, Director, Division of Reactor Projects, RIII J. Giessner, Branch Chief, Division of Reactor Projects, RIII J. Ellegood, Senior Resident Inspector, Palisades T. Taylor, Resident Inspector, Palisades E. Duncan, Chief, Plant Support Branch, Division of Reactor Safety, RIII C. Lipa, Chief, Materials Control, ISFSI, and Decommissioning Branch, Division of Nuclear Materials Safety, RIII J. Cassidy, Senior Health Physicist, Division of Reactor Safety, RIII F. Tran, Reactor Engineer, Division of Reactor Projects, RIII M. Chawla, Project Manager, Office of Nuclear Reactor Regulation V. Mitlyng, Senior Public Affairs Officer, RIII C. Hernandez, Resident Office Assistant, Palisades Entergy Nuclear Operations, Inc.

C. Schwarz, Site Vice President T. Kirwin, Plant Manager A. Blind, Entergy D. Hamilton, Entergy M. Savage, Entergy K. Madden, Entergy Other Attendees T. Davis, Public D. Rozanski, Public J. Bredeweg, Dont Waste Michigan C. Lowe, IGE - Dont Waste Michigan F. Jason, Dont Waste Michigan M. Merla B. Burr, City of South Haven

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 21, 2010 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF THE MAY 11, 2010, PUBLIC MEETING TO DISCUSS THE 2009 PALISADES END-OF-CYCLE PERFORMANCE ASSESSMENT On May 11, 2010, the Nuclear Regulatory Commission (NRC) held a public meeting at the Holiday Inn Express Conference Room in South Haven, Michigan. The meeting was between NRC Region III management and Entergy representatives to discuss the NRCs assessment of the safety performance of Palisades Nuclear Plant for the period from January 1, 2009, through December 31, 2009. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML101040711 and ML101300433, respectively.

The NRC began the meeting with an overview of the NRCs Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Palisades performance in 2009, which was documented in the March 3, 2010, End-Of-Cycle assessment letter (ML100610274).

The licensee then provided a response to the NRCs assessment. The licensee presentation can be found in the ADAMS as ML101330508. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. Several members of the public asked questions that covered the emergency plan, ground water monitoring, spent fuel, reactor head and steam generator replacements, and license renewal. A list of principal meeting attendees can be found in the attached enclosure.

/RA/

John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket No. 50-255;72-007 License No. DPR-20

Enclosure:

As Stated cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\Branch TSS\ALL EOC\EOC CY 2009\EOC Letters\EOC Meeting Summaries\Palisades EOC 09 Public Meeting Summary.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME FTran:dpt JGiessner DATE 05/19/2010 05/21/2010 OFFICIAL RECORD COPY

Letter to Entergy Nuclear Operations, Inc. from J. Giessner dated May 21, 2010.

SUBJECT:

SUMMARY

OF THE MAY 11, 2010, PUBLIC MEETING TO DISCUSS THE 2009 PALISADES END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-1 RidsNrrPMPalisades Resource RidsNrrDirsIpab Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource