| {{#Wiki_filter:October 13, 2006Technical Specifications Task Force 11921 Rockville Pike, Suite 100Rockville, MD 20852 | | {{#Wiki_filter:October 13, 2006 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| Acceptance for Review and Establishment of Milestone Schedule for TSTFTraveler 495, Revision 0, "Bases Change to Address GE Part 21 SC05-03." | | Acceptance for Review and Establishment of Milestone Schedule for TSTF Traveler 495, Revision 0, Bases Change to Address GE Part 21 SC05-03. |
| Docket No: PROJ0753 (TAC MD2672) | | Docket No: PROJ0753 (TAC MD2672) |
|
| |
|
| ==Dear Members of the TSTF:== | | ==Dear Members of the TSTF:== |
|
| |
|
| By letter (ML061990227), dated July 18, 2006, you requested The Nuclear RegulatoryCommission (NRC) to review and approve a non-consolidated line item improvement process(non-CLIIP) review of TSTF Traveler 495, Revision 0, "Bases Change to Address GE Part 21 SC05-03." Section 170.21 of Title 10 of the Code of Federal Regulations requires that TSTF Travelers besubject to fees based on the full cost of the review. You did not request a fee exemption; therefore, staff hours and the contractor cost, if applicable, will be billed, per your request, tothe Boiling Water Reactor Owners' Group (BWROG). Technical staff have completed a preliminary review of your submission and determined it to be sufficiently complete and an appropriate submission to initiate a more comprehensive review, consistent with your request. The enclosed review milestone schedule has been established and was mutually-agreed upon by supporting Nuclear Regulatory Commission (NRC) staff andby your representative, Mr. Brian Mann, by telephone on September 14, 2006.Should circumstances lead to anticipated or actual schedule slippage, the causing party shouldpromptly inform and coordinate with the impacted party to reach a new agreement and publish an appropriately revised schedule. This is of particular importance in connection with TSTF response to NRC staff requests for additional information (RAIs) as failure to provide a timelyresponsive reply, in accordance with the agreed schedule, or to successfully negotiate a revised schedule, may result in termination of the review process and closure of the TAC. Early completion of any activity will not necessitate schedule revision. Schedule revisions willbe published by letter similar to this and will remain in effect unless superceded by anotherpublished schedule. The current published schedule will be posted to the NRC InspectionTechnical Specifications Branch (ITSB) web page. Task ForceRavinder Grover (301-415-2166; Email: rpg2@nrc.gov) has been assigned as the TechnicalSpecifications Branch (ITSB) project lead. Please contact Mr. Grover in coordinating activities specific to this review. Ross Telson may also be contacted at (301) 415-2256 or rdt@nrc.gov inthe event Mr. Grover is unavailable or should you have questions or need further information in connection with the TSTF traveler review process or other ongoing TSTF traveler reviews.Sincerely,/RA/Timothy J. Kobetz, ChiefTechnical Specifications Branch Division of Inspection and Regional Support Office of Nuclear Reactor Regulation | | By letter (ML061990227), dated July 18, 2006, you requested The Nuclear Regulatory Commission (NRC) to review and approve a non-consolidated line item improvement process (non-CLIIP) review of TSTF Traveler 495, Revision 0, Bases Change to Address GE Part 21 SC05-03. |
| | Section 170.21 of Title 10 of the Code of Federal Regulations requires that TSTF Travelers be subject to fees based on the full cost of the review. You did not request a fee exemption; therefore, staff hours and the contractor cost, if applicable, will be billed, per your request, to the Boiling Water Reactor Owners' Group (BWROG). |
| | Technical staff have completed a preliminary review of your submission and determined it to be sufficiently complete and an appropriate submission to initiate a more comprehensive review, consistent with your request. The enclosed review milestone schedule has been established and was mutually-agreed upon by supporting Nuclear Regulatory Commission (NRC) staff and by your representative, Mr. Brian Mann, by telephone on September 14, 2006. |
| | Should circumstances lead to anticipated or actual schedule slippage, the causing party should promptly inform and coordinate with the impacted party to reach a new agreement and publish an appropriately revised schedule. This is of particular importance in connection with TSTF response to NRC staff requests for additional information (RAIs) as failure to provide a timely responsive reply, in accordance with the agreed schedule, or to successfully negotiate a revised schedule, may result in termination of the review process and closure of the TAC. |
| | Early completion of any activity will not necessitate schedule revision. Schedule revisions will be published by letter similar to this and will remain in effect unless superceded by another published schedule. The current published schedule will be posted to the NRC Inspection Technical Specifications Branch (ITSB) web page. |
| | |
| | Task Force Ravinder Grover (301-415-2166; Email: rpg2@nrc.gov) has been assigned as the Technical Specifications Branch (ITSB) project lead. Please contact Mr. Grover in coordinating activities specific to this review. Ross Telson may also be contacted at (301) 415-2256 or rdt@nrc.gov in the event Mr. Grover is unavailable or should you have questions or need further information in connection with the TSTF traveler review process or other ongoing TSTF traveler reviews. |
| | Sincerely, |
| | /RA/ |
| | Timothy J. Kobetz, Chief Technical Specifications Branch Division of Inspection and Regional Support Office of Nuclear Reactor Regulation |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| As statedcc:P. Infanger, BWOGB. Woods, CEOG W. Sparkman, WOG D. Hoffman, EXCEL B. Mann, EXCEL Task ForceRavinder Grover (301-415-2166; Email: rpg2@nrc.gov) has been assigned as the TechnicalSpecifications Branch (ITSB) project lead. Please contact Mr. Grover in coordinating activities specific to this review. Ross Telson may also be contacted at (301) 415-2256 or rdt@nrc.gov inthe event Mr. Grover is unavailable or should you have questions or need further information in connection with the TSTF traveler review process or other ongoing TSTF traveler reviews.Sincerely,/RA/Timothy J. Kobetz, ChiefTechnical Specifications Branch Division of Inspection and Regional Support Office of Nuclear Reactor Regulation | | |
| | As stated cc: P. Infanger, BWOG B. Woods, CEOG W. Sparkman, WOG D. Hoffman, EXCEL B. Mann, EXCEL |
| | |
| | Task Force Ravinder Grover (301-415-2166; Email: rpg2@nrc.gov) has been assigned as the Technical Specifications Branch (ITSB) project lead. Please contact Mr. Grover in coordinating activities specific to this review. Ross Telson may also be contacted at (301) 415-2256 or rdt@nrc.gov in the event Mr. Grover is unavailable or should you have questions or need further information in connection with the TSTF traveler review process or other ongoing TSTF traveler reviews. |
| | Sincerely, |
| | /RA/ |
| | Timothy J. Kobetz, Chief Technical Specifications Branch Division of Inspection and Regional Support Office of Nuclear Reactor Regulation |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| As statedcc:P. Infanger, BWOGB. Woods, CEOG W. Sparkman, WOG D. Hoffman, EXCEL B. Mann, EXCELDISTRIBUTION
| |
| :ITSB r/f ITSB Staff RidsNrrAdro RidsNrrDirsItsbADAMS ACCESSION NO: ML062790178OFFICITSB:DIRSITSB:DIRSBC:(TECHBC:ITSB:DIRSNAMERGroverRDTelsonTJKobetzDATE10/12/200610/12/200610/12/200610/13/2006OFFICIAL RECORD COPY
| |
|
| |
|
| Milestones for Non-CLIIP review of TSTF Traveler 495, Rev. 0, "BasesChange to Address GE Part 21 SC05-03."ScheduleDate Receive TSTF 495, Rev. 0 for review (TAC No. MD2672 Application Date)7/18/06Issue Request for Additional Information (RAI), if applicable1/15/07 Receive TSTF RAI response letter, if applicable4/15/07 Issue Draft TSTF Traveler to Federal Register Notice for Comment (FR NFC)8/15/07 Issue Final TSTF Traveler Federal Register Notice of Availability (FR NOA)10/30/07}} | | As stated cc: P. Infanger, BWOG B. Woods, CEOG W. Sparkman, WOG D. Hoffman, EXCEL B. Mann, EXCEL DISTRIBUTION: |
| | ITSB r/f ITSB Staff RidsNrrAdro RidsNrrDirsItsb ADAMS ACCESSION NO: ML062790178 OFFIC ITSB:DIRS ITSB:DIRS BC:(TECH BC:ITSB:DIRS NAME RGrover RDTelson TJKobetz DATE 10/12/2006 10/12/2006 10/12/2006 10/13/2006 OFFICIAL RECORD COPY |
| | |
| | Milestones for Non-CLIIP review of TSTF Traveler 495, Rev. 0, Bases Schedule Change to Address GE Part 21 SC05-03. Date Receive TSTF 495, Rev. 0 for review (TAC No. MD2672 Application Date) 7/18/06 Issue Request for Additional Information (RAI), if applicable 1/15/07 Receive TSTF RAI response letter, if applicable 4/15/07 Issue Draft TSTF Traveler to Federal Register Notice for Comment (FR NFC) 8/15/07 Issue Final TSTF Traveler Federal Register Notice of Availability (FR NOA) 10/30/07}} |
Letter Sequence Acceptance Review |
---|
TAC:MD2672, Bases Change to Address GE Part 21 SC05-03 (Approved, Closed) |
|
MONTHYEARML0906404412005-12-0101 December 2005 Enclosure 7: Case Study 3: Rejection of TSTF-495, Bases Change to Address GE Part 21 SC05-03 - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf Project stage: Meeting ML0627901782006-10-13013 October 2006 Acceptance for Review and Establishment of Milestone Schedule for TSTF Traveler 495, Revision 0, Bases Change to Address GE Part 21 SC05-03. Project stage: Acceptance Review TSTF-07-13, Response to NRC Request for Additional Information (RAI) Regarding TSTF-495, Revision 0, Bases Change to Address GE Part 21 SC05-03', Dated January 11, 20072007-04-0404 April 2007 Response to NRC Request for Additional Information (RAI) Regarding TSTF-495, Revision 0, Bases Change to Address GE Part 21 SC05-03', Dated January 11, 2007 Project stage: Response to RAI ML0723401132007-08-27027 August 2007 TSTF-495 Denial Letter and Safety Evaluation Project stage: Approval 2006-10-13
[Table View] |
|
---|
Category:Letter
MONTHYEARML23325A2132023-12-18018 December 2023 Cover Letter for Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML23262B2292023-09-21021 September 2023 Cover Letter Transmitting Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program ML23124A2212023-09-11011 September 2023 Cover Letter for Final SEs of TSTF-589, Eliminate Automatic Diesel Generator (DG) Start During Shutdown ML23206A1242023-07-31031 July 2023 TSTF-584 Cover Letter for Final SE ML23205A2342023-07-0606 July 2023 Draft TSTF-601, 'Extend Shield Building Completion Time After Refueling' ML23012A2812023-03-13013 March 2023 Draft SEs of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML23059A3342023-02-28028 February 2023 TSTF-576 Open Issues Letter ML23010A2592023-01-11011 January 2023 Request for Additional Information Traveler TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22272A5542022-10-0707 October 2022 Request for Additional Information Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program TSTF-22-07, Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2022-07-19019 July 2022 Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22193A2372022-07-12012 July 2022 Request for Additional Information TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown TSTF-22-06, Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability2022-07-0808 July 2022 Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability ML22110A1712022-04-26026 April 2022 Acceptance for Review Regarding Traveler Tstf-584, Rev 0, Eliminate Automatic RWCU System Isolation on SLC Initiation TSTF-22-04, Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program2022-03-22022 March 2022 Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program ML21188A2782021-07-11011 July 2021 Cover Letter Transmitting Final SEs of CLIIP TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR (Residual Heat Removal) Shutdown Cooling TSTF-21-03, TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 12021-06-23023 June 2021 TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 1 ML21054A2512021-05-26026 May 2021 Cover Letter Transmitting Draft SEs of CLIIP TSTF-580, RHR Shutdown Cooling System - Hot Shutdown ML21106A2452021-04-20020 April 2021 Cover Letter Transmitting Final Model SE of TSTF 554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21098A2422021-04-14014 April 2021 Cover Letter for Final SEs of TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML21068A4012021-03-24024 March 2021 Cover Letter for Draft SEs TSTF 577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections TSTF-21-01, Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2021-01-26026 January 2021 Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML20322A3612020-12-18018 December 2020 TSTF-554 Cover Letter for Final SE ML20308A6562020-11-0606 November 2020 Request for Additional Information Traveler TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20168A3962020-10-30030 October 2020 Cover Letter Transmitting Draft SE of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML20265A1152020-10-0909 October 2020 Cover Letter Transmitting Model SE of TSTF-582 and TSTF-583-T ML20133J8832020-07-29029 July 2020 Letter Transmitting Draft SE of Traveler TSTF-582, Revision 0, RPV WIC Enhancements TSTF-20-04, Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections2020-06-0808 June 2020 Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20133J8152020-05-13013 May 2020 Letter Transmitting Revised Final SE of Traveler TSTF-564, Revision 2, Safety Limit MCPR, Using the Consolidated Line Item Improvement Process ML20132A1832020-05-11011 May 2020 Request for Additional Information TSTF-576, Revision 0, Revised Safety/Relief Valve Requirement TSTF-20-01, Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP)2020-04-0909 April 2020 Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP) TSTF-19-14, Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements2020-02-12012 February 2020 Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements TSTF-19-11, TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements2020-01-16016 January 2020 TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements ML19325C4362019-12-17017 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 TSTF-19-09, Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements2019-12-13013 December 2019 Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements ML19323E9282019-12-10010 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position TSTF-19-13, Technical Specifications Task Force - Updated TSTF Membership and Distribution2019-12-0303 December 2019 Technical Specifications Task Force - Updated TSTF Membership and Distribution TSTF-19-12, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position.2019-11-0505 November 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position. TSTF-19-10, Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-08-28028 August 2019 Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML19176A1892019-08-14014 August 2019 Cover Letter Transmitting Final Safety Evaluations of Traveler TSTF-569, Revision 2, Revise Response Time Testing Definition TSTF-19-03, Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter2019-07-0808 July 2019 Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter TSTF-19-08, Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements.2019-07-0303 July 2019 Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements. TSTF-19-06, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition2019-06-25025 June 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition TSTF-19-07, TSTF Handout for October 16, 2019, Meeting: Elimination of Commitment to Adopt TSTF-4932019-06-18018 June 2019 TSTF Handout for October 16, 2019, Meeting: Elimination of Commitment to Adopt TSTF-493 TSTF-19-05, Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-06-18018 June 2019 Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML19017A2222019-05-29029 May 2019 Letter Transmitting Draft Safety Evaluations of Technical Specifications Task Force Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition ML19028A2852019-02-21021 February 2019 Final SEs of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems (Transmittal Letter) TSTF-19-01, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems2019-01-17017 January 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML19007A2252019-01-15015 January 2019 Letter Transmitting Final SEs of Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program. ML18284A3772018-12-31031 December 2018 Incorporation of Technical Specifications Task Force (TSTF) Traveler TSTF-565, Revision 1, Revise the LCO 3.0.2 and LCO 3.0.3 Bases, Into the Next Revision of the Standard Technical Specifications TSTF-18-13, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program.2018-12-20020 December 2018 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program. 2023-09-21
[Table view] |
Text
October 13, 2006 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852
SUBJECT:
Acceptance for Review and Establishment of Milestone Schedule for TSTF Traveler 495, Revision 0, Bases Change to Address GE Part 21 SC05-03.
Docket No: PROJ0753 (TAC MD2672)
Dear Members of the TSTF:
By letter (ML061990227), dated July 18, 2006, you requested The Nuclear Regulatory Commission (NRC) to review and approve a non-consolidated line item improvement process (non-CLIIP) review of TSTF Traveler 495, Revision 0, Bases Change to Address GE Part 21 SC05-03.
Section 170.21 of Title 10 of the Code of Federal Regulations requires that TSTF Travelers be subject to fees based on the full cost of the review. You did not request a fee exemption; therefore, staff hours and the contractor cost, if applicable, will be billed, per your request, to the Boiling Water Reactor Owners' Group (BWROG).
Technical staff have completed a preliminary review of your submission and determined it to be sufficiently complete and an appropriate submission to initiate a more comprehensive review, consistent with your request. The enclosed review milestone schedule has been established and was mutually-agreed upon by supporting Nuclear Regulatory Commission (NRC) staff and by your representative, Mr. Brian Mann, by telephone on September 14, 2006.
Should circumstances lead to anticipated or actual schedule slippage, the causing party should promptly inform and coordinate with the impacted party to reach a new agreement and publish an appropriately revised schedule. This is of particular importance in connection with TSTF response to NRC staff requests for additional information (RAIs) as failure to provide a timely responsive reply, in accordance with the agreed schedule, or to successfully negotiate a revised schedule, may result in termination of the review process and closure of the TAC.
Early completion of any activity will not necessitate schedule revision. Schedule revisions will be published by letter similar to this and will remain in effect unless superceded by another published schedule. The current published schedule will be posted to the NRC Inspection Technical Specifications Branch (ITSB) web page.
Task Force Ravinder Grover (301-415-2166; Email: rpg2@nrc.gov) has been assigned as the Technical Specifications Branch (ITSB) project lead. Please contact Mr. Grover in coordinating activities specific to this review. Ross Telson may also be contacted at (301) 415-2256 or rdt@nrc.gov in the event Mr. Grover is unavailable or should you have questions or need further information in connection with the TSTF traveler review process or other ongoing TSTF traveler reviews.
Sincerely,
/RA/
Timothy J. Kobetz, Chief Technical Specifications Branch Division of Inspection and Regional Support Office of Nuclear Reactor Regulation
Enclosure:
As stated cc: P. Infanger, BWOG B. Woods, CEOG W. Sparkman, WOG D. Hoffman, EXCEL B. Mann, EXCEL
Task Force Ravinder Grover (301-415-2166; Email: rpg2@nrc.gov) has been assigned as the Technical Specifications Branch (ITSB) project lead. Please contact Mr. Grover in coordinating activities specific to this review. Ross Telson may also be contacted at (301) 415-2256 or rdt@nrc.gov in the event Mr. Grover is unavailable or should you have questions or need further information in connection with the TSTF traveler review process or other ongoing TSTF traveler reviews.
Sincerely,
/RA/
Timothy J. Kobetz, Chief Technical Specifications Branch Division of Inspection and Regional Support Office of Nuclear Reactor Regulation
Enclosure:
As stated cc: P. Infanger, BWOG B. Woods, CEOG W. Sparkman, WOG D. Hoffman, EXCEL B. Mann, EXCEL DISTRIBUTION:
ITSB r/f ITSB Staff RidsNrrAdro RidsNrrDirsItsb ADAMS ACCESSION NO: ML062790178 OFFIC ITSB:DIRS ITSB:DIRS BC:(TECH BC:ITSB:DIRS NAME RGrover RDTelson TJKobetz DATE 10/12/2006 10/12/2006 10/12/2006 10/13/2006 OFFICIAL RECORD COPY
Milestones for Non-CLIIP review of TSTF Traveler 495, Rev. 0, Bases Schedule Change to Address GE Part 21 SC05-03. Date Receive TSTF 495, Rev. 0 for review (TAC No. MD2672 Application Date) 7/18/06 Issue Request for Additional Information (RAI), if applicable 1/15/07 Receive TSTF RAI response letter, if applicable 4/15/07 Issue Draft TSTF Traveler to Federal Register Notice for Comment (FR NFC) 8/15/07 Issue Final TSTF Traveler Federal Register Notice of Availability (FR NOA) 10/30/07