Letter Transmitting Draft Safety Evaluations of Technical Specifications Task Force Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition
ML19017A222
Person / Time
Site: Technical Specifications Task Force
Issue date: 05/29/2019
From: Pete Snyder
Office of Nuclear Reactor Regulation
To:
Technical Specifications Task Force
Honcharik M, 301-415-1774, NRR/DSS
Shared Package
ML19017A219 List:
References
EPID L-2018-PMP-0002
Download: ML19017A222 (3)


Text

May 29, 2019 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852

SUBJECT:

DRAFT SAFETY EVALUATIONS OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-569, REVISION 1, REVISE RESPONSE TIME TESTING DEFINITION (EPID L-2018-PMP-0002)

Dear Members of the Technical Specifications Task Force:

By letter dated October 31, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18304A026), the Technical Specifications Task Force (TSTF) submitted to the U.S. Nuclear Regulatory Commission (NRC) for review and approval Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition. The NRC staffs draft safety evaluation (SE) of the traveler and a draft model SE are enclosed.

Thirty calendar days are provided for you to comment on any factual errors or clarity concerns contained in the enclosed draft SEs. The final SEs will be issued by August 29, 2019, after making any necessary changes. To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft SEs showing proposed changes and provide a summary table of the proposed changes.

If you have any questions, please contact Michelle Honcharik at 301-415-1774 or via e-mail at Michelle.Honcharik@nrc.gov.

Sincerely,

/RA/

Peter J. Snyder, Acting Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753

Enclosures:

1. Draft Traveler SE
2. Draft Model SE cc: See next page

Technical Specifications Task Force Project No. 753 cc:

Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com James P. Miksa Entergy Nuclear Operations, Inc.

Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 E-mail: jmiksa@entergy.com Jordan L. Vaughan Duke Energy EC07C / P.O. Box 1006 Charlotte, NC 28202 E-mail: jordan.vaughan@duke-energy.com Ryan M. Joyce Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-274-EC Birmingham, AL 35243 E-mail: rmjoyce@southernco.com David M. Gullott Exelon Generation 4300 Winfield Road Warrenville IL 60555 E-mail: David.Gullott@exeloncorp.com Wesley Sparkman Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-226-EC Birmingham, AL 35242 E-mail: wasparkm@southernco.com

Package: ML19017A219, Cover letter: ML19017A222, Draft traveler SE: ML19017A220, Draft model SE: ML19017A217

  • concurred via e-mail NRR-106 OFFICE NRR/DORL/LSPB/LA* NRR/DORL/LPL3/BC* NRR/DE/EICB/BC*

NAME JBurkhardt DWrona MWaters DATE 5/10/2019 5/28/2019 2/8/2019 OFFICE OGC/NLO* NRR/DSS/STSB/PM* NRR/DSS/STSB/BC NAME JWachutka MHoncharik PSnyder DATE 5/23/2019 5/29/2019 5/29/2019