{{#Wiki_filter:Summer Inspection / Activity Plan 03/01/2007
{{#Wiki_filter:Page 1 of 1                                                                                    Summer 03/01/2007    11:16:53                                                                Inspection / Activity Plan Report 22 03/01/2007 - 09/30/2007 Unit                                                                                                          No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                    Title                        on Site       Start    End            Type TFP           - TRIENNIAL FIRE PROTECTION                                                                 4 1              IP 7111105T              Fire Protection [Triennial]                                                          03/19/2007 03/23/2007 Baseline Inspections 1             IP 7111105T             Fire Protection [Triennial]                                                           04/02/2007 04/06/2007 Baseline Inspections PSB1-RP       - RP OCCUPATIONAL PRE-INSP VISIT                                                             1 1              IP 7112101              Access Control to Radiologically Significant Areas                                    05/14/2007 05/16/2007 Baseline Inspections OL PREP       - INITIAL EXAM PREP                                                                         3 1                V23265                SUMMER/JUNE 2007 EXAM AT POWER FACILITIES                                            05/14/2007 05/18/2007 Not Applicable OL EXAM        - INITIAL EXAM                                                                              3 1                 V23265               SUMMER/JUNE 2007 EXAM AT POWER FACILITIES                                             06/04/2007 06/08/2007 Not Applicable PSB1-RP       - RP OCCUPATIONAL BASELINE INSP                                                             2 1             IP 7112101               Access Control to Radiologically Significant Areas                                   06/04/2007 06/08/2007 Baseline Inspections 1             IP 7112202               Radioactive Material Processing and Transportation                                   06/04/2007 06/08/2007 Baseline Inspections 1             IP 71151                 Performance Indicator Verification                                                   06/04/2007 06/08/2007 Baseline Inspections EB3-HS         - HEAT SINK                                                                                 1 1              IP 7111107B              Heat Sink Performance                                                                09/10/2007 09/14/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.                                                                                   Enclosure This report shows only on-site and announced inspection procedures.}}
-09/30/2007 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 1 03/01/2007 11:16:53 Report 22 4 TFP-TRIENNIAL FIRE PROTECTION Baseline Inspections 03/19/2007 03/23/2007 1     7111105T IP Fire Protection [Triennial]
Baseline Inspections 04/02/2007 04/06/2007 1    7111105T IP Fire Protection [Triennial]
1 PSB1-RP-RP OCCUPATIONAL PRE-INSP VISIT Baseline Inspections 05/14/2007 05/16/2007 1    7112101 IP A ccess Control to Radiologically Significant Areas 3 OL PREP-INITIAL EXAM PREP Not Applicable 05/14/2007 05/18/2007 1     V23265 SUMMER/JUNE 2007 EXAM AT POWER FACILITIES 3 OL EXAM-INITIAL EXAM Not Applicable 06/04/2007 06/08/2007 1    V23265 SUMMER/JUNE 2007 EXAM AT POWER FACILITIES 2 PSB1-RP-RP OCCUPATIONAL BASELINE INSP Baseline Inspections 06/04/2007 06/08/2007 1     7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 06/04/2007 06/08/2007 1     7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 06/04/2007 06/08/2007 1     71151 IP Performance Indicator Verification 1 EB3-HS-HEAT SINK Baseline Inspections 09/10/2007 09/14/2007 1    7111107B IP Heat Sink Performance This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 10:03, 23 November 2019

Inspection / Activity Plan for 03/01/2007 - 09/30/2007
ML070600346
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/01/2007
From:
Division Reactor Projects II
To:
Shared Package
ML070600337 List:
References
Download: ML070600346 (1)


Text

Page 1 of 1 Summer 03/01/2007 11:16:53 Inspection / Activity Plan Report 22 03/01/2007 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type TFP - TRIENNIAL FIRE PROTECTION 4 1 IP 7111105T Fire Protection [Triennial] 03/19/2007 03/23/2007 Baseline Inspections 1 IP 7111105T Fire Protection [Triennial] 04/02/2007 04/06/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL PRE-INSP VISIT 1 1 IP 7112101 Access Control to Radiologically Significant Areas 05/14/2007 05/16/2007 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 1 V23265 SUMMER/JUNE 2007 EXAM AT POWER FACILITIES 05/14/2007 05/18/2007 Not Applicable OL EXAM - INITIAL EXAM 3 1 V23265 SUMMER/JUNE 2007 EXAM AT POWER FACILITIES 06/04/2007 06/08/2007 Not Applicable PSB1-RP - RP OCCUPATIONAL BASELINE INSP 2 1 IP 7112101 Access Control to Radiologically Significant Areas 06/04/2007 06/08/2007 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 06/04/2007 06/08/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 06/04/2007 06/08/2007 Baseline Inspections EB3-HS - HEAT SINK 1 1 IP 7111107B Heat Sink Performance 09/10/2007 09/14/2007 Baseline Inspections This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.