ML090140564: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Jun 30 08 07:56a PG&E Utility User 8055454004 p.2 Pacific Gas and Electric Company'" James A, BeGker Diablo Canyon POIVeT Planl Site Vice President and Mail Code 104/5/502 Station DirectoJ POBox 56 Avila Beach. CA S3424 June 27,2008 805.545.3462 1"lemal; 691.3462 Fax: a05.545.4234 PG& E letter Del-OS-055 Mr. Elmo E. Collins Regional Administrator U.S. Nuclear Regulatory Commission, Region IV 611 Ryan Plaza Dr., Suite 400 Arlington, TX 76011-4005 ATTN: Steve Garchow, Chief Examiner Docket No. 50-275. Ol-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant. Unit Nos. 1 and 2 -Initial Operating License Examinatlon Post Examination Submittal (05000275/2008-301:
{{#Wiki_filter:Jun 30 08 07:56a       PG&E Utility User                                         8055454004                           p.2
301)  
      ~
Pacific Gas and Electric Company'"
      ~;.~1                                                                    James A, BeGker             Diablo Canyon POIVeT Planl Site Vice President and     Mail Code 104/5/502 Station DirectoJ           POBox 56 Avila Beach. CA S3424 June 27,2008                                                                                 805.545.3462 1"lemal; 691.3462 Fax: a05.545.4234 PG& E letter Del-OS-055 Mr. Elmo E. Collins Regional Administrator U.S. Nuclear Regulatory Commission, Region IV 611 Ryan Plaza Dr., Suite 400 Arlington, TX 76011-4005 ATTN: Steve Garchow, Chief Examiner Docket No. 50-275. Ol-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant. Unit Nos. 1 and 2 - Initial Operating License Examinatlon Post Examination Submittal (05000275/2008-301: 0500032312008 301)


==Dear Mr. Collins:==
==Dear Mr. Collins:==
In accordance with NUREG 1021, "Operator Licensing Examination Standards for Power Reactors," Section ES-501, Initial Post Examination Activities, the following items are included as Enclosures 1 through 4, as described below: 1. The graded written examinations and an original answer key 2. Completed Form ES-403-1, "Written Examination Grading Quality Checklist" 3. Written examination performance analysis results 4. Current copy of Form ES-201-3, "Examination Security Agreement" Additionally, all examination items missed by 50 percent or more of the candidates have been reviewed for training program deficiencies, and/or remedial training.
 
The enclosures with this letter contain personal information.
In accordance with NUREG 1021, "Operator Licensing Examination Standards for Power Reactors," Section ES-501, Initial Post Examination Activities, the following items are included as Enclosures 1 through 4, as described below:
Therefore, Pacific Gas and Electric Company (PG&E) requests that the enclosures be removed pursuant to 10 CFR 2.390 (a)(6) prior to this letter being placed in the Public Document Room. PG&E makes no regUlatory commitments in this letter, If you have questions, please contact David L. Burns, NRC Examination Supervisor, at (805) 545-3173.
: 1. The graded written examinations and an original answer key
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway' Comanche Peak
: 2. Completed Form ES-403-1, "Written Examination Grading Quality Checklist"
: 3. Written examination performance analysis results
: 4. Current copy of Form ES-201-3, "Examination Security Agreement" Additionally, all examination items missed by 50 percent or more of the candidates have been reviewed for training program deficiencies, and/or remedial training.
The enclosures with this letter contain personal information. Therefore, Pacific Gas and Electric Company (PG&E) requests that the enclosures be removed pursuant to 10 CFR 2.390 (a)(6) prior to this letter being placed in the Public Document Room.
PG&E makes no regUlatory commitments in this letter, If you have questions, please contact David L. Burns, NRC Examination Supervisor, at (805) 545-3173.
A member of     the STARS   (Strategic Teaming and Resource     Sharing)     Alliance Callaway' Comanche Peak
* Diablo Ca:1yon
* Diablo Ca:1yon
* PaLo Verde
* PaLo Verde
* South Texas Projec:
* South Texas Projec:
* Wolf Creek Jun 30 08 07:57a PG&E Utility 8055454004 p3 Mr. Elmo E. Collins PG&E letter Del-08-055 June 27,2008 Page 2 Sincerely, , C--. Site Vice President and Station' Director John T. Conway, Senior Vice President  
* Wolf Creek
& Ch[ef Nuclear Officer Michael S. Peck, NRC Senior Resident A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
 
Jun 30 08 07:57a       PG&E Utility User                                          8055454004               p3 Mr. Elmo E. Collins                                                   PG&E letter Del-08-055 June 27,2008 Page 2 Sincerely,         ~
                  ,       ~/~
C--           '~~~- ~------
        .   ~. Becker~,                  ~
Site Vice President and Station' Director swh/3449 Enclosures cc:      John T. Conway, Senior Vice President & Ch[ef Nuclear Officer Michael S. Peck, NRC Senior Resident A member of   the STARS   (Strategic Teaming and Resource Sharing) Alliance Callaway
* Comanche Peak
* Comanche Peak
* Diablo Canyon
* Diablo Canyon
* Palo Verde
* Palo Verde
* South Texas Project
* South Texas Project
* Wolf Creek June 2008 Diablo Canyon NRC Written Exam Analysis This table is designed to meet the intent of item 6 from ES-403 "Written Examination Grading Quality Checklist".
* Wolf Creek
 
June 2008 Diablo Canyon NRC Written Exam Analysis This table is designed to meet the intent of item 6 from ES-403 "Written Examination Grading Quality Checklist".
All questions missed by more than half the students will be evaluated for validity of the question.
All questions missed by more than half the students will be evaluated for validity of the question.
Question # RO/SRO Percentage missed Question valid? Remediation Required Improvement in Training Materials Required?
Question # RO/SRO         Percentage missed       Question valid?         Remediation             Improvement in Required            Training Materials Required?
12 5710 YES YES No 27 5010 YES YES No 31 5710 YES YES YES 40 5010 YES YES No 78 100/0 YES YES No}}
12                     5710                   YES                     YES                     No 27                     5010                   YES                     YES                     No 31                     5710                   YES                     YES                     YES 40                     5010                   YES                     YES                     No 78                   100/0                   YES                     YES                     No}}

Latest revision as of 09:53, 14 November 2019

DC - 2008 -06 - Post Examination Comments
ML090140564
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/27/2008
From: Becker J
Pacific Gas & Electric Co
To: Collins E
NRC Region 4
References
50-275/08-301, 50-323/08-301, DCL-O5-055
Download: ML090140564 (3)


Text

Jun 30 08 07:56a PG&E Utility User 8055454004 p.2

~

Pacific Gas and Electric Company'"

~;.~1 James A, BeGker Diablo Canyon POIVeT Planl Site Vice President and Mail Code 104/5/502 Station DirectoJ POBox 56 Avila Beach. CA S3424 June 27,2008 805.545.3462 1"lemal; 691.3462 Fax: a05.545.4234 PG& E letter Del-OS-055 Mr. Elmo E. Collins Regional Administrator U.S. Nuclear Regulatory Commission, Region IV 611 Ryan Plaza Dr., Suite 400 Arlington, TX 76011-4005 ATTN: Steve Garchow, Chief Examiner Docket No. 50-275. Ol-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant. Unit Nos. 1 and 2 - Initial Operating License Examinatlon Post Examination Submittal (05000275/2008-301: 0500032312008 301)

Dear Mr. Collins:

In accordance with NUREG 1021, "Operator Licensing Examination Standards for Power Reactors," Section ES-501, Initial Post Examination Activities, the following items are included as Enclosures 1 through 4, as described below:

1. The graded written examinations and an original answer key
2. Completed Form ES-403-1, "Written Examination Grading Quality Checklist"
3. Written examination performance analysis results
4. Current copy of Form ES-201-3, "Examination Security Agreement" Additionally, all examination items missed by 50 percent or more of the candidates have been reviewed for training program deficiencies, and/or remedial training.

The enclosures with this letter contain personal information. Therefore, Pacific Gas and Electric Company (PG&E) requests that the enclosures be removed pursuant to 10 CFR 2.390 (a)(6) prior to this letter being placed in the Public Document Room.

PG&E makes no regUlatory commitments in this letter, If you have questions, please contact David L. Burns, NRC Examination Supervisor, at (805) 545-3173.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway' Comanche Peak

  • Diablo Ca:1yon
  • PaLo Verde
  • Wolf Creek

Jun 30 08 07:57a PG&E Utility User 8055454004 p3 Mr. Elmo E. Collins PG&E letter Del-08-055 June 27,2008 Page 2 Sincerely, ~

, ~/~

C-- '~~~- ~------

. ~. Becker~, ~

Site Vice President and Station' Director swh/3449 Enclosures cc: John T. Conway, Senior Vice President & Ch[ef Nuclear Officer Michael S. Peck, NRC Senior Resident A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

June 2008 Diablo Canyon NRC Written Exam Analysis This table is designed to meet the intent of item 6 from ES-403 "Written Examination Grading Quality Checklist".

All questions missed by more than half the students will be evaluated for validity of the question.

Question # RO/SRO Percentage missed Question valid? Remediation Improvement in Required Training Materials Required?

12 5710 YES YES No 27 5010 YES YES No 31 5710 YES YES YES 40 5010 YES YES No 78 100/0 YES YES No