|
---|
Category:Letter
MONTHYEARML24311A1232024-11-14014 November 2024 – Report for the Aging Management Audit Regarding the License Renewal Application Review IR 05000275/20240102024-11-0707 November 2024 Biennial Problem Identification and Resolution Inspection Report 05000275/2024010 and 05000323/2024010 IR 05000275/20244022024-11-0707 November 2024 Security Baseline Inspection Report 05000275/2024402 and 05000323/2024402 IR 07200026/20244012024-11-0606 November 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200026/2024401 DCL-24-095, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20232024-11-0606 November 2024 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2023 ML24302A2622024-11-0101 November 2024 Letter to CA SHPO Regarding DCPP Dseis ML24302A1942024-11-0101 November 2024 Ltr to K. Kahn Santa Ynez Band of Chumash Indians Re DCPP Dseis ML24302A1932024-11-0101 November 2024 Letter to G. Pierce Salinan Tribe of Monterey, SLO Re DCPP Dseis ML24302A2612024-11-0101 November 2024 Letter to Achp Re DCPP Dseis ML24302A1952024-11-0101 November 2024 Ltr to M. Olivas Tucker Ytt Re DCPP Dseis ML24302A1922024-11-0101 November 2024 Ltr to G. Frausto Coastal Band of Chumash Indians Re DCPP Dseis ML24302A1962024-11-0101 November 2024 Ltr to SLO County Chumash Indians Re DCPP Dseis ML24302A1912024-11-0101 November 2024 Ltr to C. Mcdarment Tule River Tribe Re DCPP Dseis ML24302A1972024-11-0101 November 2024 Letter to V. Sage Walker Northern Chumash Tribal Council Re DCPP Dseis IR 05000275/20240032024-10-30030 October 2024 Integrated Inspection Report 05000275/2024003 and 05000323/2024003 and Independent Spent Fuel Storage Installation Report 07200026/2024001 ML24276A1482024-10-30030 October 2024 NRC to Fws Request for Concurrence with Endangered Species Act Determinations for Diablo Canyon Power Plant, Units 1, 2, ISFSI Proposed License Renewals in San Luis Obispo Co, CA ML24275A0622024-10-30030 October 2024 NRC to NMFS Request Initiate Formal Endangered Species Act Consultation and Abbreviated Essential Fish Habitat for Proposed License Renewal of DCP Plant Units 1, 2 ML24269A0122024-10-29029 October 2024 OEDO-24-00083 2.206 Petition Diablo Canyon Seismic CDF - Response to Petitioner Letter ML24284A3122024-10-28028 October 2024 Ltr to P Ting, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants ML24284A3112024-10-28028 October 2024 Ltr to a Peck, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants IR 05000275/20240132024-10-28028 October 2024 – License Renewal Report 05000275/2024013 and 05000323/2024013 ML24261B9492024-10-24024 October 2024 Issuance of Amendment Nos. 246 and 248 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 IR 05000275/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000275/2024404 and 05000323/2024404 ML24277A0292024-10-18018 October 2024 NRC to Fws Req. for Concurrence W. Endangered Species Act Determinations for Diablo Canyon Power Plant Units 1,2, ISFSI Proposed License Renewals in San Luis Obispo Co., CA DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 IR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation ML24240A0222024-09-20020 September 2024 Letter to A. Peck Environmental Impact Statement Scoping Summary Report for Diablo Canyon Nuclear Power Plant Units 1 and 2 ML24260A1222024-09-14014 September 2024 14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis IR 05000275/20240122024-07-31031 July 2024 License Renewal Report 05000275/2024012 and 05000323/2024012 DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 2024-09-09
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000275/20233012023-07-25025 July 2023 NRC Initial Operator Licensing Examination Approval 05000275/2023301, 05000323/2023301 IR 05000275/20163012016-06-0707 June 2016 NRC Examination Report 05000275/2016301; 05000323/2016301 ML15265A0802015-09-21021 September 2015 Notification of NRC Initial Operator Licensing Examination 05000275/2016301; 05000323/2016301 IR 05000275/20143012014-09-25025 September 2014 Er 050002752014301; 050003232014301; on August 8 - August 27, 2014; Diablo Canyon Power Plant, Units 1 and 2; Initial Operator Licensing Examination Report IR 05000275/20123022013-01-0303 January 2013 IR 05000275-12-302; Pacific Gas & Electric Company; 05000323-12-302;11/21- 12/3/ 2012; Diablo Canyon Power Plant, Units 1 and 2; Initial Operator Licensing Examination Report IR 05000275/20123012012-04-0303 April 2012 Er 05000275-12-301, 05000323-12-301, March 9, 2012 to March 27, 2012, Diablo Canyon Power Plant, Units 1 and 2, Initial Operator Licensing Retake Written Examination Report IR 05000275/20113022012-01-18018 January 2012 Er 05000275-11-302; 05000323-11-302; November 15 - 21, 2011; Diablo Canyon Power Plant, Units 1 and 2; Initial Operator Licensing Examination Report IR 05000275/20113012011-09-20020 September 2011 Er 05000275-11-301; 05000323-11-301; July 8 - August 22, 2011; Diablo Canyon Power Plant, Units 1 and 2; Initial Operator Licensing Examination Report DCL-11-074, Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations2011-07-0101 July 2011 Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20103012010-02-24024 February 2010 Er 05000275-10-301, 05000323-10-301; on January 8 - 28, 2010; Diablo Canyon Power Plant, Units 1 & 2; Initial Operator Licensing Examination Report IR 05000275/20093012009-03-31031 March 2009 IR 05000275-09-301, 05000323-09-301 on 02/06/09 - 02/20/09 for Diablo Canyon, Units 1 and 2, Initial Operator Licensing Examination Report IR 05000275/20083012008-07-22022 July 2008 Er 05000275-08-301, 05000323-08-301, on June 13 - 23, 2008, Diablo Canyon Power Plant, Units 1 and 2; Initial Operator Licensing Examination Report ML0901405642008-06-27027 June 2008 DC - 2008 -06 - Post Examination Comments DCL-05-107, Response to NRC Regulatory Issue Summary 2005-19; Preparation and Scheduling of Operator Licensing Examinations2005-09-16016 September 2005 Response to NRC Regulatory Issue Summary 2005-19; Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20053012005-03-31031 March 2005 Er 05000275-05-301 and 05000323-05-301, on 2/8-16/2005, Diablo Canyon Generating Station, Operator Licensing Examinations ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination DCL-02-078, Response to NRC Regulatory Issue Summary 2002-09; Preparation and Scheduling of Operator Licensing Examinations2002-07-12012 July 2002 Response to NRC Regulatory Issue Summary 2002-09; Preparation and Scheduling of Operator Licensing Examinations 2023-07-25
[Table view] |
Text
Jun 30 08 07:56a PG&E Utility User 8055454004 p.2
~
Pacific Gas and Electric Company'"
~;.~1 James A, BeGker Diablo Canyon POIVeT Planl Site Vice President and Mail Code 104/5/502 Station DirectoJ POBox 56 Avila Beach. CA S3424 June 27,2008 805.545.3462 1"lemal; 691.3462 Fax: a05.545.4234 PG& E letter Del-OS-055 Mr. Elmo E. Collins Regional Administrator U.S. Nuclear Regulatory Commission, Region IV 611 Ryan Plaza Dr., Suite 400 Arlington, TX 76011-4005 ATTN: Steve Garchow, Chief Examiner Docket No. 50-275. Ol-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant. Unit Nos. 1 and 2 - Initial Operating License Examinatlon Post Examination Submittal (05000275/2008-301: 0500032312008 301)
Dear Mr. Collins:
In accordance with NUREG 1021, "Operator Licensing Examination Standards for Power Reactors," Section ES-501, Initial Post Examination Activities, the following items are included as Enclosures 1 through 4, as described below:
- 1. The graded written examinations and an original answer key
- 2. Completed Form ES-403-1, "Written Examination Grading Quality Checklist"
- 3. Written examination performance analysis results
- 4. Current copy of Form ES-201-3, "Examination Security Agreement" Additionally, all examination items missed by 50 percent or more of the candidates have been reviewed for training program deficiencies, and/or remedial training.
The enclosures with this letter contain personal information. Therefore, Pacific Gas and Electric Company (PG&E) requests that the enclosures be removed pursuant to 10 CFR 2.390 (a)(6) prior to this letter being placed in the Public Document Room.
PG&E makes no regUlatory commitments in this letter, If you have questions, please contact David L. Burns, NRC Examination Supervisor, at (805) 545-3173.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway' Comanche Peak
Jun 30 08 07:57a PG&E Utility User 8055454004 p3 Mr. Elmo E. Collins PG&E letter Del-08-055 June 27,2008 Page 2 Sincerely, ~
, ~/~
C-- '~~~- ~------
. ~. Becker~, ~
Site Vice President and Station' Director swh/3449 Enclosures cc: John T. Conway, Senior Vice President & Ch[ef Nuclear Officer Michael S. Peck, NRC Senior Resident A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
June 2008 Diablo Canyon NRC Written Exam Analysis This table is designed to meet the intent of item 6 from ES-403 "Written Examination Grading Quality Checklist".
All questions missed by more than half the students will be evaluated for validity of the question.
Question # RO/SRO Percentage missed Question valid? Remediation Improvement in Required Training Materials Required?
12 5710 YES YES No 27 5010 YES YES No 31 5710 YES YES YES 40 5010 YES YES No 78 100/0 YES YES No