DCL-02-078, Response to NRC Regulatory Issue Summary 2002-09; Preparation and Scheduling of Operator Licensing Examinations

From kanterella
Jump to navigation Jump to search
Response to NRC Regulatory Issue Summary 2002-09; Preparation and Scheduling of Operator Licensing Examinations
ML022040007
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/12/2002
From: Becker J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
50-275-OL, 50-323-OL, DCL-02-078
Download: ML022040007 (2)


Text

Pacific Gas and Electric Company James R. Becker Diablo Canyon Power Plant Station Director Mail Code 104/5/504 PO. Box 56 Avila Beach, CA 93424 July 12, 2002 805.545.3462 Fax: 805.545.4234 PG&E Letter DCL-02-078 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Response to NRC Reaulatorv Issue Summa@ 2002-09: Preparation and Scheduling of Operator, Licensing Examinations

Dear Commissioners and Staff:

Pursuant to the request for voluntary information identified in NRC Regulatory Issue Summary 2002-09, a completed NRC Form 536, "Operator Licensing Examination Data," is attached.

Ifyou have further questions, please contact David Burns at (805) 545-3173.

Sin I ames R. Becker ccs/1 753 Enclosure cc: David L. Bums Ellis W. Merschoff David L. Proutx Girija S. Shukla A member of the STARS (Strategic Teaming and Resource Sharing) Alifance Callaway a Comanche Peak

  • Diabto Canyon , Palo Verde
  • South Texas Project a Wolf Creek 2-.*

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. 3150-0131 EXPIRES: 07/3112002 (8-2000)

Estimated burden per response to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records Management Branch (T-6 E6), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to EXAMINATION DATA bjsl@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a mans used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond t, the information collection.

FACILITY NRC REGION Diablo Canyon Nuclear Power Plant IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2003 CY 2004 CY 2005 CY 2006 ESTIMATED NUMBER OF LICENSEE-PREPARED _

EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2003 CY 2004 CY 2005 CY 2006 NUMBER OF REACTOR OPERATORS - 10 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT -6 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED -

PROPOSED DATES - 512005 PRIMARY DATE ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2003 CY 2004 PROPOSED NUMBER FIRST SECOND THIRD FIRST SECOND THIRD ESTIMATED NUMBER OF CANDIDATES 0 0 16 0 0 0