{{#Wiki_filter:WAmeren MISSOURI May 10,2013 ULNRC-05992 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:
{{#Wiki_filter:~~
10 CFR2.101 10 CFR 2.109(b) 10 CFR 50.4 10 CFR 50.30 10 CFR 51.53(c) 10 CFR 54 DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO. FACILITY OPERATING LICENSE NPF-30 Cleve Reasoner Vice President Engineering Ameren Missouri Callaway Energy Center T 573.676.8241 F 573.676.4056 REQUEST TO DELAY SCHEDULED ACRS SUBCOMMITTEE MEETING DATE  
Cleve Reasoner Vice President Engineering WAmeren                                                                                           Ameren Missouri Callaway Energy Center T 573.676.8241 MISSOURI                                                                                         F 573.676.4056 May 10,2013 ULNRC-05992 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR2.101 10 CFR 2.109(b) 10 CFR 50.4 10 CFR 50.30 10 CFR 51.53(c) 10 CFR 54 Ladies and Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
FACILITY OPERATING LICENSE NPF-30 REQUEST TO DELAY SCHEDULED ACRS SUBCOMMITTEE MEETING DATE


==References:==
==References:==
: 1) ULNRC-05830 dated December 15, 2011 2) Safety Evaluation Report with Open Items Related to the License Renewal of Callaway Plant, Unit 1 (TAC No. ME7708)," dated April23, 2013. By the Reference 1 letter, Union Electric Company (Ameren Missouri) submitted a license renewal application (LRA) for Callaway Plant Unit 1. Reference 2 dated April23, 2013 transmitted the Safety Evaluation Report (SER) with Open Items in support of an ACRS Subcommittee meeting scheduled for May 22, 2013 in which the Callaway LRA and associated SER were to be discussed.
: 1) ULNRC-05830 dated December 15, 2011
Callaway Plant's nineteenth (19) refueling outage is currently in progress.
: 2) Safety Evaluation Report with Open Items Related to the License Renewal of Callaway Plant, Unit 1 (TAC No. ME7708)," dated April23, 2013.
Due to delays in the outage schedule and the need to focus on its completion, we are requesting that the ACRS Subcommittee discussion of the Callaway LRA be postponed to a later meeting. We will work with NRC staff to determine a future meeting date. Junction CC & Hwy 0 PO Box 620, MC CA-460 Fulton, MD 65251 AmerenMissouri.com ULNRC-05992 May 10,2013 Page 2 If you have any questions with regard to this request, please contact Ms. Sarah Kovaleski at (314) 225-1134.
By the Reference 1 letter, Union Electric Company (Ameren Missouri) submitted a license renewal application (LRA) for Callaway Plant Unit 1. Reference 2 dated April23, 2013 transmitted the Safety Evaluation Report (SER) with Open Items in support of an ACRS Subcommittee meeting scheduled for May 22, 2013 in which the Callaway LRA and associated SER were to be discussed.
DS/SGK/nls Cleveland
Callaway Plant's nineteenth (19) refueling outage is currently in progress. Due to delays in the outage schedule and the need to focus on its completion, we are requesting that the ACRS Subcommittee discussion of the Callaway LRA be postponed to a later meeting. We will work with NRC staff to determine a future meeting date.
: 0. Reasoner Vice President, Engineering ULNRC-05992 May 10,2013 Page 3 cc: U.S. Nuclear Regulatory Commission (Original)
Junction CC & Hwy 0 Fulton, MD 65251  AmerenMissouri.com PO Box 620, MC CA-460
Attn: Document Control Desk Washington, DC 20555-0001 Mr. Arthur T. Howell Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 John W. Lubinski Director, Division of License Renewal Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Y oira K. Diaz Sanabria Branch Chief, Project Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Mr. Samuel Cuadrado De Jesus Project Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Mr. Fred Lyon Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738 Mr. Gregory A. Pick U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 ULNRC-05992 May 10,2013 Page4 Index and send hardcopy to QA File A160.0761 Hardcopy:
 
ULNRC-05992 May 10,2013 Page 2 If you have any questions with regard to this request, please contact Ms. Sarah Kovaleski at (314) 225-1134.
a:A/~
Cleveland 0. Reasoner Vice President, Engineering DS/SGK/nls
 
ULNRC-05992 May 10,2013 Page 3 cc:   U.S. Nuclear Regulatory Commission (Original) Mr. Fred Lyon Attn: Document Control Desk                   Project Manager, Callaway Plant Washington, DC 20555-0001                     Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mr. Arthur T. Howell                         Mail Stop 0-8B 1 Regional Administrator                       Washington, DC 20555-2738 U.S. Nuclear Regulatory Commission Region IV                                     Mr. Gregory A. Pick 1600 East Lamar Boulevard                     U.S. Nuclear Regulatory Commission Arlington, TX 76011-4511                     Region IV 1600 East Lamar Boulevard Senior Resident Inspector                     Arlington, TX 76011-4511 Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 John W. Lubinski Director, Division of License Renewal Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Yoira K. Diaz Sanabria Branch Chief, Project Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Mr. Samuel Cuadrado De Jesus Project Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555
 
ULNRC-05992 May 10,2013 Page4 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Tech Spec ULNRC Distribution:
Electronic distribution for the following can be made via Tech Spec ULNRC Distribution:
A. C. Heflin F. M. Diya C. 0. Reasoner III B. L. Cox L. H. Graessle J. S. Geyer S. A. Maglio L. H. Kanuckel M. A McLachlan G. S. Kremer S. G. Kovaleski R. Holmes-Bobo NSRB Secretary T. B. Elwood G. G. Yates E. Blocher {STARS PAM COB) STARS RA Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP) Missouri Public Service Commission Ms. Leanne Tippett Mosby (DNR)}}
A. C. Heflin F. M. Diya C. 0. Reasoner III B. L. Cox L. H. Graessle J. S. Geyer S. A. Maglio L. H. Kanuckel M. A McLachlan G. S. Kremer S. G. Kovaleski R. Holmes-Bobo NSRB Secretary T. B. Elwood G. G. Yates E. Blocher {STARS PAM COB)
STARS RA Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)
Missouri Public Service Commission Ms. Leanne Tippett Mosby (DNR)}}

Latest revision as of 19:13, 4 November 2019

Request to Delay Scheduled ACRS Subcommittee Meeting Date
ML13134A304
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/10/2013
From: Reasoner C
Ameren Missouri, Union Electric Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
ULNRC-05992
Download: ML13134A304 (4)


Text

~~

Cleve Reasoner Vice President Engineering WAmeren Ameren Missouri Callaway Energy Center T 573.676.8241 MISSOURI F 573.676.4056 May 10,2013 ULNRC-05992 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR2.101 10 CFR 2.109(b) 10 CFR 50.4 10 CFR 50.30 10 CFR 51.53(c) 10 CFR 54 Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 REQUEST TO DELAY SCHEDULED ACRS SUBCOMMITTEE MEETING DATE

References:

1) ULNRC-05830 dated December 15, 2011
2) Safety Evaluation Report with Open Items Related to the License Renewal of Callaway Plant, Unit 1 (TAC No. ME7708)," dated April23, 2013.

By the Reference 1 letter, Union Electric Company (Ameren Missouri) submitted a license renewal application (LRA) for Callaway Plant Unit 1. Reference 2 dated April23, 2013 transmitted the Safety Evaluation Report (SER) with Open Items in support of an ACRS Subcommittee meeting scheduled for May 22, 2013 in which the Callaway LRA and associated SER were to be discussed.

Callaway Plant's nineteenth (19) refueling outage is currently in progress. Due to delays in the outage schedule and the need to focus on its completion, we are requesting that the ACRS Subcommittee discussion of the Callaway LRA be postponed to a later meeting. We will work with NRC staff to determine a future meeting date.

Junction CC & Hwy 0 Fulton, MD 65251 AmerenMissouri.com PO Box 620, MC CA-460

ULNRC-05992 May 10,2013 Page 2 If you have any questions with regard to this request, please contact Ms. Sarah Kovaleski at (314) 225-1134.

a:A/~

Cleveland 0. Reasoner Vice President, Engineering DS/SGK/nls

ULNRC-05992 May 10,2013 Page 3 cc: U.S. Nuclear Regulatory Commission (Original) Mr. Fred Lyon Attn: Document Control Desk Project Manager, Callaway Plant Washington, DC 20555-0001 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mr. Arthur T. Howell Mail Stop 0-8B 1 Regional Administrator Washington, DC 20555-2738 U.S. Nuclear Regulatory Commission Region IV Mr. Gregory A. Pick 1600 East Lamar Boulevard U.S. Nuclear Regulatory Commission Arlington, TX 76011-4511 Region IV 1600 East Lamar Boulevard Senior Resident Inspector Arlington, TX 76011-4511 Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 John W. Lubinski Director, Division of License Renewal Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Yoira K. Diaz Sanabria Branch Chief, Project Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Mr. Samuel Cuadrado De Jesus Project Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555

ULNRC-05992 May 10,2013 Page4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Tech Spec ULNRC Distribution:

A. C. Heflin F. M. Diya C. 0. Reasoner III B. L. Cox L. H. Graessle J. S. Geyer S. A. Maglio L. H. Kanuckel M. A McLachlan G. S. Kremer S. G. Kovaleski R. Holmes-Bobo NSRB Secretary T. B. Elwood G. G. Yates E. Blocher {STARS PAM COB)

STARS RA Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)

Missouri Public Service Commission Ms. Leanne Tippett Mosby (DNR)