{{#Wiki_filter: | {{#Wiki_filter:une 13, 2014 | ||
==SUBJECT:== | |||
RIVER BEND STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000458/2014404 | |||
SUBJECT: RIVER BEND STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000458/2014404 | |||
==Dear Mr. Olson:== | ==Dear Mr. Olson:== | ||
On April 3, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the River Bend Station. On April 3, 2014, April 30, 2014, and June 10, 2014, the NRC inspectors discussed the results of this inspection, with you on one occasion and with other members of your staff on other occasions. The Inspectors documented the results of this inspection in the enclosed inspection report. | On April 3, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the River Bend Station. On April 3, 2014, April 30, 2014, and June 10, 2014, the NRC inspectors discussed the results of this inspection, with you on one occasion and with other members of your staff on other occasions. The Inspectors documented the results of this inspection in the enclosed inspection report. | ||
NRC inspectors documented two findings of very low security significance (Green) in this report. Both of these findings involved violations of NRC requirements. Further, inspectors documented a licensee-identified violation which was determined to be of very low security significance in this report. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy. | NRC inspectors documented two findings of very low security significance (Green) in this report. | ||
Both of these findings involved violations of NRC requirements. Further, inspectors documented a licensee-identified violation which was determined to be of very low security significance in this report. The NRC is treating these violations as non-cited violations (NCVs) | |||
consistent with Section 2.3.2.a of the Enforcement Policy. | |||
If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspectors at the River Bend Station. | If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspectors at the River Bend Station. | ||
Line 35: | Line 35: | ||
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV; and the NRC resident inspectors at the River Bend Station. | If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV; and the NRC resident inspectors at the River Bend Station. | ||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of | ||
" " this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information-Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). | However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information-Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). | ||
Line 43: | Line 44: | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 05000458 License No.: NPF-47 | Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 05000458 License No.: NPF-47 Nonpublic Enclosure: | ||
Inspection Report 05000458/2014404 w/Attachment: Supplemental Information cc w/enclosure: | |||
Nonpublic Enclosure: Inspection Report 05000458/2014404 w/Attachment: Supplemental Information | |||
cc w/enclosure: | |||
Mr. Todd Santy Manager, Security Entergy Operations, Inc. | Mr. Todd Santy Manager, Security Entergy Operations, Inc. | ||
River Bend Station | River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775 cc: Electronic Distribution for River Bend Station ML14164A676 Entire Report: Non-Sensitive Publicly Available Keyword: | ||
SUNSI Review by: MSH Sensitive Non-Publicly Available MD 3.47 Non-Public A.3 Cover Letter Only: Non-Sensitive Publicly Available Keyword: | |||
5485 U.S. Highway 61N St. Francisville, LA 70775 | SUNSI Review by: MSH Sensitive Non-Publicly Available SUNSI Review Complete OFFICE PSI:PSB1 PSI:PSB1 PSI:PSB1 C:PSB1 C:PBC C:PSB1 NAME JBuchanan/dch MBrooks AMeyen MHaire DAllen MHaire SIGNATURE /RA/ msh for /RA/ msh for /RA/ msh for /RA/ /RA/ /RA/ | ||
DATE 6/10/2014 6/10/2014 6/10/2014 6/12/2014 6/13/2014 6/13/2014 Letter to Eric from Mark S. Haire, dated June 13, 2014 Electronic distribution by RIV w/enclosure: | |||
cc: Electronic Distribution for River Bend Station | Security Specialist/NSIR (Eric.Wharton@nrc.gov) | ||
Security Specialist/NSIR (Niry.Simonian@nrc.gov) | |||
ML14164A676 Entire Report: SUNSI Review by: MSH | Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov) | ||
/RA/ msh for /RA/ msh for /RA/ msh for /RA//RA//RA/ DATE 6/10/2014 6/10/2014 6/10/2014 6/12/2014 6/13/2014 6/13/2014 Letter to Eric from Mark S. Haire, dated June 13, 2014 | Security Specialist/NSIR (Douglas.Garner@nrc.gov) | ||
Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov) | |||
Electronic distribution by RIV w/enclosure: | Branch Chief, RII DRS/PSB2 (Binoy.Desai@nrc.gov) | ||
Security Specialist/NSIR (Eric.Wharton@nrc.gov) Security Specialist/NSIR (Niry.Simonian@nrc.gov) | Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov) | ||
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov) | Senior Resident Inspector (Grant.Larkin@nrc.gov) | ||
RBS Administrative Assistant (Lisa.Day@nrc.gov) | |||
Security Specialist/ | Electronic distribution by RIV: | ||
Branch Chief, RII DRS/PSB2 (Binoy.Desai@nrc.gov) Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov) Senior Resident Inspector (Grant.Larkin@nrc.gov) | Regional Administrator (Marc.Dapas@nrc.gov) | ||
RBS Administrative Assistant (Lisa.Day@nrc.gov) | Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | ||
Electronic distribution by RIV | |||
Acting DRP Director (Troy.Pruett@nrc.gov) | Acting DRP Director (Troy.Pruett@nrc.gov) | ||
DRP Deputy Director - Vacant DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Grant.Larkin@nrc.gov) | DRP Deputy Director - Vacant DRS Director (Anton.Vegel@nrc.gov) | ||
DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Senior Resident Inspector (Grant.Larkin@nrc.gov) | |||
Resident Inspector (Andy.Barrett@nrc.gov) | Resident Inspector (Andy.Barrett@nrc.gov) | ||
RBS Administrative Assistant (Lisa.Day@nrc.gov) | RBS Administrative Assistant (Lisa.Day@nrc.gov) | ||
Branch Chief, DRP/C (Don.Allen@nrc.gov) | Branch Chief, DRP/C (Don.Allen@nrc.gov) | ||
Senior Project Engineer (Ray.Azua@nrc.gov) | Senior Project Engineer (Ray.Azua@nrc.gov) | ||
Project Engineer (Paul.Nizov@nrc.gov) Project Engineer (Michael.Langelier@nrc.gov) | Project Engineer (Paul.Nizov@nrc.gov) | ||
Project Engineer (Michael.Langelier@nrc.gov) | |||
Public Affairs Officer (Victor.Dricks@nrc.gov) | Public Affairs Officer (Victor.Dricks@nrc.gov) | ||
Public Affairs Officer (Lara.Uselding@nrc.gov) | Public Affairs Officer (Lara.Uselding@nrc.gov) | ||
Project Manager (Alan.Wang@nrc.gov) | |||
Project Manager (Alan.Wang@nrc.gov) Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) | Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) | ||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
ACES (R4ACES@nrc.gov) | ACES (R4ACES@nrc.gov) | ||
Regional Counsel (Karla.Fuller@nrc.gov) | Regional Counsel (Karla.Fuller@nrc.gov) | ||
Technical Support Assistant (Loretta.Williams@nrc.gov) | Technical Support Assistant (Loretta.Williams@nrc.gov) | ||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV/ETA: OEDO (Joseph.Nick@nrc.gov) | Congressional Affairs Officer (Jenny.Weil@nrc.gov) | ||
RIV/ETA: OEDO (Joseph.Nick@nrc.gov) | |||
}} | }} |
Latest revision as of 03:24, 4 November 2019
ML14164A676 | |
Person / Time | |
---|---|
Site: | River Bend |
Issue date: | 06/13/2014 |
From: | Mark Haire Plant Support Branch-1 |
To: | Olson E Entergy Operations |
References | |
IR-14-404 | |
Download: ML14164A676 (4) | |
Text
une 13, 2014
SUBJECT:
RIVER BEND STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000458/2014404
Dear Mr. Olson:
On April 3, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the River Bend Station. On April 3, 2014, April 30, 2014, and June 10, 2014, the NRC inspectors discussed the results of this inspection, with you on one occasion and with other members of your staff on other occasions. The Inspectors documented the results of this inspection in the enclosed inspection report.
NRC inspectors documented two findings of very low security significance (Green) in this report.
Both of these findings involved violations of NRC requirements. Further, inspectors documented a licensee-identified violation which was determined to be of very low security significance in this report. The NRC is treating these violations as non-cited violations (NCVs)
consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspectors at the River Bend Station.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV; and the NRC resident inspectors at the River Bend Station.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of
" " this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information-Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 05000458 License No.: NPF-47 Nonpublic Enclosure:
Inspection Report 05000458/2014404 w/Attachment: Supplemental Information cc w/enclosure:
Mr. Todd Santy Manager, Security Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775 cc: Electronic Distribution for River Bend Station ML14164A676 Entire Report: Non-Sensitive Publicly Available Keyword:
SUNSI Review by: MSH Sensitive Non-Publicly Available MD 3.47 Non-Public A.3 Cover Letter Only: Non-Sensitive Publicly Available Keyword:
SUNSI Review by: MSH Sensitive Non-Publicly Available SUNSI Review Complete OFFICE PSI:PSB1 PSI:PSB1 PSI:PSB1 C:PSB1 C:PBC C:PSB1 NAME JBuchanan/dch MBrooks AMeyen MHaire DAllen MHaire SIGNATURE /RA/ msh for /RA/ msh for /RA/ msh for /RA/ /RA/ /RA/
DATE 6/10/2014 6/10/2014 6/10/2014 6/12/2014 6/13/2014 6/13/2014 Letter to Eric from Mark S. Haire, dated June 13, 2014 Electronic distribution by RIV w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSIR (Douglas.Garner@nrc.gov)
Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Branch Chief, RII DRS/PSB2 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov)
Senior Resident Inspector (Grant.Larkin@nrc.gov)
RBS Administrative Assistant (Lisa.Day@nrc.gov)
Electronic distribution by RIV:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director - Vacant DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Grant.Larkin@nrc.gov)
Resident Inspector (Andy.Barrett@nrc.gov)
RBS Administrative Assistant (Lisa.Day@nrc.gov)
Branch Chief, DRP/C (Don.Allen@nrc.gov)
Senior Project Engineer (Ray.Azua@nrc.gov)
Project Engineer (Paul.Nizov@nrc.gov)
Project Engineer (Michael.Langelier@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4ACES@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Joseph.Nick@nrc.gov)