| Q | CCA | Title |
---|
05000458/FIN-2013005-01 | 2013Q4 | P.2 | Failure to Perform a Survey on Water Leak |
05000458/FIN-2013005-03 | 2013Q4 | | Operations Prohibited by Technical Specifications for Operations with a Potential to Drain the Reactor Vessel |
05000458/FIN-2013007-04 | 2013Q4 | | Unresolved Item Associated with the Isolation of the Alternative Shutdown System |
05000458/FIN-2013007-06 | 2013Q4 | | Failure to Implement the Engineering Change Process for Appendix R Lighting |
05000458/FIN-2013007-05 | 2013Q4 | H.2 | Failure to Maintain Communication Systems Required for Alternative Shutdown Scenarios |
05000458/FIN-2013007-03 | 2013Q4 | H.14 | Failure to Properly Calculate the Time Available for Operator Actions |
05000458/FIN-2013007-02 | 2013Q4 | | Inadequate Alternative Shutdown Procedure |
05000458/FIN-2013007-01 | 2013Q4 | H.2 | Failure to Resolve Noncompliances Associated with Multiple Spurious Operations in a Timely Manner |
05000458/FIN-2013005-02 | 2013Q4 | | Failure to Periodically Update the Updated Safety Analysis Report |
05000458/FIN-2014301-01 | 2014Q1 | | Failure of the Plant Referenced Simulator to Demonstrate Expected Plant Response with Four Examples |
05000458/FIN-2014002-04 | 2014Q1 | P.5 | Failure to Promptly Correct a Degraded Emergency Diesel Generator Voltage Regulator |
05000458/FIN-2014002-03 | 2014Q1 | | Failure to Adequately Control Design Basis Documents for the Emergency Diesel Generators |
05000458/FIN-2014002-02 | 2014Q1 | H.3 | Failure to Assess and Manage Risk for Electrical Switchyard Impacting Maintenance |
05000458/FIN-2014002-01 | 2014Q1 | | Failure to Maintain Design Control for Performance Testing of the Control Building Chillers |
05000458/FIN-2014404-02 | 2014Q2 | | Security |
05000458/FIN-2014404-01 | 2014Q2 | | Security |
05000458/FIN-2014003-01 | 2014Q2 | H.12 | Failure to Follow Tagging Clearance Instructions |
05000458/FIN-2014405-01 | 2014Q2 | | Security |
05000458/FIN-2014405-02 | 2014Q2 | | Security |