{{#Wiki_filter:EMERGENCY PLAN ENTERGY VERMONT YANKEE VERNON, VERMONT  
{{#Wiki_filter:Redacted Version of Document - Publicly Available EMERGENCY PLAN ENTERGY VERMONT YANKEE VERNON, VERMONT REVISION 54 Effective Date  12/19/13 Redacted Version of Document - Publicly Available


REVISION 54
ENTERGY VERMONT YANKEE EMERGENCY PLAN REVISION  
 
Effective Date 12/19/13 
 
Emergency Plan Revision 54 Revision Summary
 
Page i of ix Entergy Vermont Yankee ENTERGY VERMONT YANK EE EMERGENCY PLAN  
 
REVISION  


==SUMMARY==
==SUMMARY==


DATE REVISION DESCRIPTION 04/28/04 39 Replaced Framatome ANS servic es and the DE&S Mutual Assistance Agreement with the Corporate Service Center from White Plains.
DATE     REVISION     DESCRIPTION 04/28/04     39       Replaced Framatome ANS services and the DE&S Mutual Assistance Agreement with the Corporate Service Center from White Plains.
Updated information about the NAS to the new NAS system that was installed. Added Mechanical Maintenance to the Repair & Corrective Actions section for the 60 min. response in Table 8-4. Removed the EOFC Asst. and Communications positions. Removed requirement  
Updated information about the NAS to the new NAS system that was installed. Added Mechanical Maintenance to the Repair & Corrective Actions section for the 60 min. response in Table 8-4. Removed the EOFC Asst. and Communications positions. Removed requirement for drills to include a PASS sample.
 
03/15/05     40       Removed references to satellite phones. Revised Figures 7.1 and 7.2.
for drills to include a PASS sample. 03/15/05 40 Removed references to satellite phones. Revised Figures 7.1 and 7.2. Updated Evacuation Time Estimate (Appendix F) based on study conducted in 2004. Updated Table 4.2 and Figures 4.3, 4.4 and 4.5 based on 2000 census data per UFSAR Rev. 19. Updated Section 4.2 for latest population figures per UFSAR Rev. 19. Joint News Center activation changed from SAE to Alert. Removed references to "typically filled by" titles and "designated alternates" due to change to four teams. Deleted Table 8.1. Changed alternate Joint News Center location from Marlborough, MA to Landmark College. Revised Figure 6.3 for new OSC Communication Center location. Revised Figure 6.4 for new EOF/RC Center Layout. Section 8.2.1 SRM responsibilities revised. Section 8.2.2 TSC Coordinator responsibilities revised. Security Coordinator position reports to off site command center instead of the TSC. Revised Figure 8.3.
Updated Evacuation Time Estimate (Appendix F) based on study conducted in 2004. Updated Table 4.2 and Figures 4.3, 4.4 and 4.5 based on 2000 census data per UFSAR Rev. 19. Updated Section 4.2 for latest population figures per UFSAR Rev. 19. Joint News Center activation changed from SAE to Alert. Removed references to "typically filled by" titles and "designated alternates" due to change to four teams. Deleted Table 8.1. Changed alternate Joint News Center location from Marlborough, MA to Landmark College. Revised Figure 6.3 for new OSC Communication Center location. Revised Figure 6.4 for new EOF/RC Center Layout. Section 8.2.1 SRM responsibilities revised. Section 8.2.2 TSC Coordinator responsibilities revised. Security Coordinator position reports to off site command center instead of the TSC. Revised Figure 8.3.
Removed requirement for TS Coordinator to appoint an OSC Coordinator due to four team assignments. Revised Section 9.0 to require activation of the Joint News Center at the Alert. Revised Table 9.1. Updated Appendix E with recent letters of agreement from DOE/REAC and INPO. Deleted letters of agreement with Duke Engineering & Services for old alternate joint news center and Yankee Rowe for lab sample analysis and decontamination services. Updated Appendix G with new procedures AP 3549 and OP 3550. Removed reference to JNC Guidelines which were replaced by OP 3550.
Removed requirement for TS Coordinator to appoint an OSC Coordinator due to four team assignments. Revised Section 9.0 to require activation of the Joint News Center at the Alert. Revised Table 9.1. Updated Appendix E with recent letters of agreement from DOE/REAC and INPO. Deleted letters of agreement with Duke Engineering & Services for old alternate joint news center and Yankee Rowe for lab sample analysis and decontamination services. Updated Appendix G with new procedures AP 3549 and OP 3550. Removed reference to JNC Guidelines which were replaced by OP 3550.
Changed OP 3505 to AP 3505 and OP 3712 to AP 3712. Deleted Section 8.2.7 Radiological Coordinator. Section 8.2.6 revised Rad Assistant responsibilities. Revised Table 8.4 to remove reference to Radiological Coordinator. Revised Figure 8.2 to delete Radiological Coordinator. Revised Figure 8.5 to delete Radiological Coordinator and communicators. Replaced with Radio Operator and RP staff.
Changed OP 3505 to AP 3505 and OP 3712 to AP 3712. Deleted Section 8.2.7 Radiological Coordinator. Section 8.2.6 revised Rad Assistant responsibilities. Revised Table 8.4 to remove reference to Radiological Coordinator. Revised Figure 8.2 to delete Radiological Coordinator. Revised Figure 8.5 to delete Radiological Coordinator and communicators. Replaced with Radio Operator and RP staff.
Revised Figure 8.7 to reflect changes due to four team rotation.
Revised Figure 8.7 to reflect changes due to four team rotation.
Emergency Plan Revision 54 Revision Summary Page i of ix Entergy Vermont Yankee Redacted Version of Document - Publicly Available
REVISION  
REVISION  


==SUMMARY==
==SUMMARY==
(Continued)
(Continued)
Emergency Plan Revision 54 Revision Summary
DATE     REVISION     DESCRIPTION 01/18/06     41       Incorporated changes per NRC Bulletin 2005-02 (ECL definition changes, Security drills, Hostile Action definitions). Changed "Unusual Event" to "Notification of Unusual Event" to conform to industry standards. Changed title - Director of Public Affairs to Manager of Communications. Changed reference from Plant Operations Review Committee to On-Site Safety Review Committee. Letters of agreement reviewed annually in conjunction with annual review of the E-Plan. Updated respiratory protection locations per RP changes.
 
Updated letters of agreement for States, DOE-REAC/TS and Vernon Fire Department. Added letters of agreement for States regarding Alert & Notification System (ANS). Added OP 3548 and OP 3551 to list of Implementing Procedures in Appendix G. Updated Appendix H for the implementation of the new siren system.
Page ii of ix Entergy Vermont Yankee DATE REVISION DESCRIPTION 01/18/06 41 Incorporated changes per NRC Bulletin 2005-02 (ECL definition changes, Security drills, Hostile Action definitions). Changed "Unusual Event" to "Notification of Unusual Event" to conform to industry standards. Changed title - Director of Public Affairs to Manager of Communications. Changed reference from Plant Operations Review Committee to On-Site Safety Review Committee. Letters of agreement reviewed annually in conjunction with annual review of the E-Plan. Updated respiratory protection locations per RP changes. Updated letters of agreement for States, DOE-REAC/TS and Vernon Fire Department. Added letters of agreement for States regarding  
06/22/06     42       Corrected Hostile Force definition - "overtly" had been omitted from the last revision (WT-VTY-2006-00000 CA#00463). Revised thermal rated power per License Amendment #229, issued March 2, 2006 (CR-VTYLO-2006-0004 CA#23). Removed reference to gross electrical output. Per Regulatory Information Summary 2003-18, Supplement 2, issued December 12, 2005, removed the requirement for states to concur with changes to the Emergency Action Levels.
 
Changed TLD (thermoluminescent device) references to DLR (dosimeter of legal record) per Radiation Protection change. Replaced the annual INPO letter of agreement with the latest version. Updated the general letters of agreement with Vermont and New Hampshire.
Alert & Notification System (ANS). Added OP 3548 and OP 3551 to list of Implementing Procedures in Appendix G. Updated Appendix H for the implementation of the new siren system. 06/22/06 42 Corrected Hostile Force definition - "overtly" had been omitted from the last revision (WT-VTY-2006-00000 CA#00463). Revised thermal rated power per License Amendment #229, issued March 2, 2006 (CR-VTYLO-2006-0004 CA#23). Removed reference to gross electrical output. Per Regulatory Information Summary 2003-18, Supplement 2, issued December 12, 2005, removed the requirement for states to concur with changes to the Emergency Action Levels.
Added memorandum of understanding for Alert & Notification System with Vermont and New Hampshire. Added new procedure, OP 3552, Activation and Operation of the Alternate Joint News Center.
Changed TLD (thermoluminescent device) references to DLR (dosimeter of legal record) per Radiation Protection change. Replaced the annual INPO letter of agreement with the latest version. Updated the general letters of agreement with Vermont and New Hampshire. Added memorandum of understanding for Alert & Notification System with Vermont and New Hampshire. Added new procedure, OP 3552, Activation and Operation of the Alternate Joint News Center.
Emergency Plan Revision 54 Revision Summary Page ii of ix Entergy Vermont Yankee Redacted Version of Document - Publicly Available


REVISION  
REVISION  
Line 52: Line 46:
==SUMMARY==
==SUMMARY==
(Continued)
(Continued)
Emergency Plan Revision 54 Revision Summary
DATE     REVISION     DESCRIPTION 10/10/07     43       Changed TLD (thermoluminescent device) references to DLR (dosimeter of legal record) per Radiation Protection change. Replaced the annual INPO letter with the latest version. Updated the general letters of agreement with Franklin Medical Center, Brattleboro Memorial Hospital, Rescue, Inc. Ambulance Service, Vernon Fire Department, Brattleboro Fire Department, Vermont Yankee Nuclear Power Corporation. Appendix G - added new procedures, AP 3553, Administration and Maintenance of the Alert and Notification System, and AP 3554, Emergency Plan Teams; deleted references to procedures OP 3524, OP 3525 and OP 3531 which were incorporated into other procedures; added EN-EP-605, Corporate Incident Response Team. Changed Joint News Center to Joint Information Center throughout. Changed Figure 6.1 to reflect new location of Massachusetts Region III EOC. Revised Figure 6.3 to remove reference to the medical office and update Control Point personnel contamination monitor label. Changed reference from Vermont Operational Quality Assurance Manual to Entergy Quality Assurance Manual. Removed references to the Duty On Call Officer. Removed requirement for Plant Certification for the TSC Coordinator. Changed references to "corporatelevel" to reflect Entergy organization.
 
Revised EOF Coordinator and Radiological Assistant responsibilities to reflect organizational changes. Changed "onsite assistance teams" to "repair and corrective action teams." Revised Figure 8.5 to indicate that the EOF Coordinator is not needed for activation of the EOF.
Page iii of ix Entergy Vermont Yankee DATE REVISION DESCRIPTION 10/10/07 43 Changed TLD (thermoluminescent device) references to DLR (dosimeter of legal record) per Radiation Protection change. Replaced the annual INPO letter with the latest version. Updated the general letters of agreement with Franklin Medical Center, Brattleboro Memorial Hospital, Rescue, Inc. Ambulance Service, Vernon Fire Department, Brattleboro Fire Department, Vermont Yankee Nuclear Power Corporation. Appendix G - added new procedures, AP 3553, Administration and Maintenance of the Alert and Notification System, and AP 3554, Emergency Plan Teams; deleted references to procedures OP 3524, OP 3525 and OP 3531 which were incorporated into other procedures; added EN-EP-605, Corporate Incident Response Team. Changed Joint News Center to Joint Information Center throughout. Changed Figure 6.1 to reflect new location of Massachusetts Region III EOC. Revised Figure 6.3 to remove reference to the medical office and update Control Point personnel  
Removed references that required the TSC Coordinator to respond at the Notification of Unusual Event level and revised the responsibility to direct and coordinate all emergency response efforts. Revised Table 9.1 to reflect changes in the emergency response organization structure. Removed respiratory protection from the equipment inventory for the EOF. Revised "Emergency Broadcast Stations" to "Emergency Alert System stations." Removed reference to the Engineering Support Group as a separate entity. The Engineering Support Group is part of the TSC. Fire Brigade Leader changed from Shift Technical Advisor to Field Support Supervisor on Table 8.4.
 
contamination monitor label. Changed reference from Vermont  
 
Operational Quality Assurance Manual to Entergy Quality Assurance Manual. Removed references to the Duty On Call Officer. Removed requirement for Plant Certification for the TSC Coordinator. Changed references to "corporate-level" to reflect Entergy organization.
Revised EOF Coordinator and Radiological Assistant responsibilities to reflect organizational changes. Changed "onsite assistance teams" to "repair and corrective action teams." Revised Figure 8.5 to indicate that the EOF Coordinator is not needed for activation of the EOF. Removed references that required the TSC Coordinator to respond at the Notification of Unusual Event level and revised the responsibility to direct and coordinate all emergency response efforts. Revised Table 9.1 to reflect changes in the emergency response organization structure. Removed respiratory protection from the equipment inventory for the EOF. Revised "Emergency Broadcast Stations" to "Emergency Alert System stations." Removed reference to the Engineering Support Group as a separate entity. The Engineering Support Group is part of the TSC. Fire Brigade Leader changed from Shift Technical Advisor to Field Support Supervisor on Table 8.4.
Removed specific number of federal agencies available. Revised the reference to the TSC capacity. Revised the OSC Coordinator location to direct the OSC. Removed "designee" to the SRM responsibility to approve press releases. Removed switchboard from the EOF.
Removed specific number of federal agencies available. Revised the reference to the TSC capacity. Revised the OSC Coordinator location to direct the OSC. Removed "designee" to the SRM responsibility to approve press releases. Removed switchboard from the EOF.
Removed NID Assistant from the JIC. Revised Table 9.1 to reflect ERO structure. Added the use of State Reception Center for decontamination efforts.
Removed NID Assistant from the JIC. Revised Table 9.1 to reflect ERO structure. Added the use of State Reception Center for decontamination efforts.
Emergency Plan Revision 54 Revision Summary Page iii of ix Entergy Vermont Yankee Redacted Version of Document - Publicly Available
REVISION  
REVISION  


==SUMMARY==
==SUMMARY==
(Continued)
(Continued)
Emergency Plan Revision 54 Revision Summary  
DATE      REVISION    DESCRIPTION 02/06/08      44      Implementation of the Independent Spent Fuel Storage Installation (ISFSI). Include ISFSI Emergency Action Level (EAL) for Notification of Unusual Event. Include definitions for ISFSI and Confinement Boundary. Update sections, tables and figures for title changes due to fleet alignment. Facility activation procedures incorporated into facility operation procedures.
08/21/08      45      Implementation of the fleet standard Emergency Response Organization (ERO). Joint Information Center relocation.
03/12/09      46      Reference to Federal Radiological Emergency Response Plan (FRERP) changed to National Response Framework (NRF). Editorial changes. Rearrange OSC and EOF layouts. Annual Update of Letters of Agreement - no content change. Additional sirens added to Appendix H. Add FVY reference numbers to letters cited in Table 8.4 Note 1.
12/15/09      47      Revised Section 5.0 to indicate that the revised Emergency Action Levels are based on NUMARC/NESP-007 (NEI 99-01), "Methodology for Development of Emergency Action Levels", Rev. 5, dated February 2008. Revised 6.2.3, Meteorological Capability, to reflect the as-built elevations for the temperature instruments. Deleted reference to the UHF radio antennas being mounted on the primary meteorological tower in Section 7.3. Changed "Federal Radiological Emergency Response Plan" to "National Response Framework" on Figure 9.1.
Revised paragraph 5 of Section 12.1.2, Communications Tests, to indicate the monthly NRC communications test is with the Headquarters Operations Officer rather than the NRC Region I Office.
Replaced the AP 3125 EAL Chart with the revised EAL charts in Appendix A. Replaced AP 3505, Emergency Preparedness Exercises and Drills, with fleet procedures EN-EP-306, Drills and Exercises, and EN-EP-307, Threat Based Drills, in Appendix G. Corrected siren numbers on the Siren List in Appendix H. Added the siren drawing for the Bernardston sirens in Appendix H.
03/30/10      48      Revised Figure 4.1 to add the Vernon Substation.
10/21/10      49      Revised Table 8.4: Added STA (1) to Plant Operations & Assessment of Operational Aspects functional area section. This change is being instituted to clarify specific coverage detail. Deleted the verbiage that specifies who the fire brigade consists of (FSS, 3 AO, and 1 Security) from the Fire Fighting functional area section. Added an (*) with comment that "Position staffed in accordance with Technical Requirements Manual and administrative procedures". The change is being instituted to be consistent with the TRM and to simplify upkeep of the Emergency Plan document.
Emergency Plan Revision 54 Revision Summary Page iv of ix Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Page iv of ix Entergy Vermont Yankee DATE REVISION DESCRIPTION 02/06/08 44 Implementation of the Independent Spent Fuel Storage Installation (ISFSI). Include ISFSI Emergency Action Level (EAL) for Notification of Unusual Event. Include definitions for ISFSI and Confinement Boundary. Update sections, tables and figures for title changes due to fleet alignment. Facility activation procedures incorporated into facility operation procedures.08/21/08 45 Implementation of the fleet standard Emergency Response Organization (ERO). Joint Information Center relocation. 03/12/09 46 Reference to Federal Radiological Emergency Response Plan (FRERP) changed to National Response Framework (NRF). Editorial changes. Rearrange OSC and EOF layouts. Annual Update of Letters of Agreement - no content change. Additional sirens added to Appendix H. Add FVY reference numbers to letters cited in Table 8.4 Note 1. 12/15/09 47 Revised Section 5.0 to indicate that the revised Emergency Action Levels are based on NUMARC/NESP-007 (NEI 99-01), "Methodology for Development of Emergency Action Levels", Rev. 5, dated February 2008. Revised 6.2.3, Meteorological Capability, to reflect the as-built elevations for the temperature instruments. Deleted reference to the UHF radio antennas being mounted on the primary meteorological tower in Section 7.3. Changed "Federal Radiological Emergency Response Plan" to "National Response Framework" on Figure 9.1. Revised paragraph 5 of Section 12.1.2, Communications Tests, to indicate the monthly NRC communications test is with the Headquarters Operations Officer rather than the NRC Region I Office.
Replaced the AP 3125 EAL Chart with the revised EAL charts in Appendix A. Replaced AP 3505, Emergency Preparedness Exercises and Drills, with fleet procedures EN-EP-306, Drills and Exercises, and EN-EP-307, Threat Based Drills, in Appendix G. Corrected siren numbers on the Siren List in Appendix H. Added the siren drawing for the Bernardston sirens in Appendix H.03/30/10 48 Revised Figure 4.1 to add the Vernon Substation. 10/21/10 49 Revised Table 8.4:  Added STA (1) to Plant Operations & Assessment of Operational Aspects functional area section. This change is being instituted to clarify specific coverage detail. Deleted the verbiage that specifies who the fire brigade consists of (FSS, 3 AO, and 1 Security) from the Fire Fighting functional area section. Added an (*) with comment that "Position staffed in accordance with Technical Requirements Manual and administrative procedures". The change is being instituted to be consistent with the TRM and to simplify upkeep of the Emergency Plan document.
REVISION  
REVISION  


==SUMMARY==
==SUMMARY==
(Continued)
(Continued)
Emergency Plan Revision 54 Revision Summary  
DATE      REVISION    DESCRIPTION 04/28/11      50      Updated figure 6.4 to reflect changes in the EOF facility arrangement.
Updated section 6.2.6, 10.1.3, 10.3, Appendix B and Appendix D to reflect current capabilities for outside analytical assistance and laboratory facilities support. Updated letters of agreement for: State of Massachusetts, State of New Hampshire, State of Vermont, Vernon Fire Department, Brattleboro Fire Department, and Institute of Nuclear Power Operations. Updated memorandum of understanding for State of Massachusetts Alert & Notification System, State of New Hampshire Alert & Notification System, and State of Vermont Alert & Notification System.
Emergency Plan Revision 54 Revision Summary Page v of ix Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Page v of ix Entergy Vermont Yankee DATE REVISION DESCRIPTION 04/28/11 50 Updated figure 6.4 to reflect changes in the EOF facility arrangement. Updated section 6.2.6, 10.1.3, 10.3, Appendix B and Appendix D to reflect current capabilities for outside analytical assistance and laboratory facilities support. Updated letters of agreement for: State of Massachusetts, State of New Hampshire, State of Vermont, Vernon Fire Department, Brattleboro Fire Department, and Institute of Nuclear Power Operations. Updated memorandum of understanding for State of Massachusetts Alert & Notification System, State of New Hampshire Alert & Notification System, and State of Vermont Alert & Notification System.
REVISION  
REVISION  


==SUMMARY==
==SUMMARY==
(Continued)
(Continued)
Emergency Plan Revision 54 Revision Summary
Section 3.2: Actions in an Emergency, Step 7 5/24/12      51      Step 7 was revised from Use the plant pager system to notify appropriate personnel to use the emergency notification system to notify appropriate personnel Section 6.1.3: Emergency Operations Facility/Recovery Center Added a statement to address ERO Augmentation at Alternate Facilities Section 8.4.1, Local Service An editorial change was made to this section to add Baystate to the name of Franklin Medical Center Table 8.4, Minimum Staffing Requirements for the ENVY ERO Table 8.4 has been updated to replace Security with the Fire Brigade for the functional area of Rescue Operations & First Aid, Changed Rad Waste Operator from ACRO to CRO Section 9.1 Emergency Condition Recognition and Classification Added a statement to address Emergency Declaration Timeliness Section 9.2.4 General Emergency Response, Step 1 This section was updated to refer to the Corporate Emergency Center located in Jackson MS for the EOF Manager to contact in a General Emergency for fleet support.
 
Figure 9.1, Notification Plan Figure 9.1 notification plan has been updated to align with the implementation of Everbridge and OP 3540, (Control Room Actions During an Emergency) and show operations as the initiator of the notifications Section 10.4.4, Use of Onsite Protective Equipment and Supplies Editorial change to correct Iodine to Iodide.
Page vi of ix Entergy Vermont Yankee 5/24/12 51 Section 3.2: Actions in an Emergency, Step 7 Step 7 was revised from "Use the plant pager system to notify appropriate personnel-" to "use the emergency notification system to notify appropriate personnel-"  Section 6.1.3: Emergency Operations Facility/Recovery Center Added a statement to address ERO Augmentation at Alternate Facilities Section 8.4.1, Local Service An editorial change was made to this section to add Baystate to the name of Franklin Medical Center Table 8.4, Minimum Staffing Requirements for the ENVY ERO Table 8.4 has been updated to replace Security with the Fire Brigade for the functional area of "Rescue Operations & First Aid", Changed Rad Waste Operator from ACRO to CRO Section 9.1 Emergency Condition Recognition and Classification Added a statement to address Emergency Declaration Timeliness Section 9.2.4 General Emergency Response, Step 1 This section was updated to refer to the Corporate Emergency Center located in Jackson MS for the EOF Manager to contact in a General Emergency for fleet support. Figure 9.1, Notification Plan Figure 9.1 notification plan has been updated to align with the implementation of Everbridge and OP 3540, (Control Room Actions During an Emergency) and show operations as the initiator of the notifications Section 10.4.4, Use of Onsite Protective Equipment and Supplies Editorial change to correct Iodine to Iodide. Section 10.6, Protective Actions for Onsite Personnel Added a statement for Protective Actions for Onsite Personnel Section 12.1.2, Communication Tests Section 12.1.2 has been updated to align with the Everbridge implementation at Vermont Yankee and revise the wording for the weekly communication test. Appendix E - Letters of Agreement Updated the following letters (18 is newly added) o Letter 4, Baystate Franklin Medical Center o Letter 5, National Weather Service (NOAA) o Letter 6, Brattleboro Memorial Hospital o Letter 7, Rescue Inc Ambulance Service o Letter 10, Institute of Nuclear Power Operations o Letter 11, Town of Vernon  
Section 10.6, Protective Actions for Onsite Personnel Added a statement for Protective Actions for Onsite Personnel Section 12.1.2, Communication Tests Section 12.1.2 has been updated to align with the Everbridge implementation at Vermont Yankee and revise the wording for the weekly communication test.
 
Appendix E - Letters of Agreement Updated the following letters (18 is newly added) o Letter 4, Baystate Franklin Medical Center o Letter 5, National Weather Service (NOAA) o Letter 6, Brattleboro Memorial Hospital o Letter 7, Rescue Inc Ambulance Service o Letter 10, Institute of Nuclear Power Operations o Letter 11, Town of Vernon o Letter 12, DOE o Letter 13, DOE-REAC/TS o Letter 14, Vermont Yankee Nuclear Power Corporation o Letter 18, Landmark College Appendix G - Index of Emergency Plan Implementing Procedures and Support Plans o Emergency Plan Implementing Procedures o Support Plans o Corporate Support Procedures Emergency Plan Revision 54 Revision Summary Page vi of ix Entergy Vermont Yankee Redacted Version of Document - Publicly Available
o Letter 12, DOE o Letter 13, DOE-REAC/TS o Letter 14, Vermont Yankee Nuclear Power Corporation o Letter 18, Landmark College Appendix G - Index of Emergency Plan Implementing Procedures and Support Plans o Emergency Plan Implementing Procedures  
 
o Support Plans o Corporate Support Procedures  


REVISION  
REVISION  
Line 93: Line 88:
==SUMMARY==
==SUMMARY==
(Continued)
(Continued)
Emergency Plan Revision 54 Revision Summary
Section 7.9 Emergency Response Data System Removed 12/20/12      52          wording regarding activation within one hour of an alert and replaced it with a statement for maintaining a continuous connection Section 8.1 Normal Plant Organization Updated the on shift staffing to include one (1) FSS, five (5) AOs, and one (1) Utility employee per the Vermont Yankee Nuclear Power Station On-Shift Staffing Analysis Section 8.2.3 Shift Manager Updated the last sentence of the paragraph to state The immediate responsibilities of the Shift Manager include performing or delegating performance of the following.
 
Table 8.4 Minimum Staffing Requirements for the ENVY ERO Replaced SCRO with CRS in the Table and on note 4. Title change only.
Page vii of ix Entergy Vermont Yankee 12/20/12 52 Section 7.9 "Emergency Response Data System" Removed wording regarding activation within one hour of an alert and replaced it with a statement for maintaining a continuous connection Section 8.1 "Normal Plant Organization" Updated the on shift staffing to include one (1) FSS, five (5) AOs, and one (1) Utility employee per the Vermont Yankee Nuclear Power Station On-Shift  
Updated AOs from 3 to 5 Added 1 FSS Added FSS to offsite dose assessment Note 1: Added a reference to the Vermont Yankee Nuclear Power Station On-Shift Staffing Analysis for composition of the 5 person fire brigade Note 4: Added FSS for performing initial dose assessment Appendix A Emergency Classification System and Emergency Action Levels - Added a cross reference to AP 3125, Emergency Plan Classification and Action Level Scheme for EAL Charts and removed the image of the EAL Chart Appendix G Index of Emergency Plan Implementing Procedures and Support Plans II. Support Plans - Added Vermont Yankee Nuclear Power Station On-Shift Staffing Analysis Corporate Support Plans: Added procedure EN-EP-302 Severe Weather Response effective 11/5/12 Emergency Plan Revision 54 Revision Summary Page vii of ix Entergy Vermont Yankee Redacted Version of Document - Publicly Available
 
Staffing Analysis Section 8.2.3 "Shift Manager" Updated the last sentence of the paragraph to state "The immediate responsibilities of the Shift Manager include performing or delegating performance of the  
 
following.Table 8.4 "Minimum Staffing Requirements for the ENVY EROReplaced SCRO with CRS in the Table and on note 4. Title change only. Updated AOs from 3 to 5 Added 1 FSS Added FSS to offsite dose assessment Note 1: Added a reference to the Vermont Yankee Nuclear Power Station On-Shift Staffing Analysis for composition of the 5 person fire brigade Note 4: Added FSS for performing initial dose assessment Appendix A "Emergency Classification System and Emergency Action Levels" - Added a cross reference to AP 3125, "Emergency Plan Classification and Action Level Scheme" for EAL Charts and removed the image of the EAL Chart Appendix G "Index of Emergency Plan Implementing Procedures and Support PlansII. Support Plans - Added Vermont Yankee Nuclear Power Station On-Shift Staffing Analysis   Corporate Support Plans: Added procedure EN-EP-302 "Severe Weather Response" effective 11/5/12


REVISION  
REVISION  
Line 105: Line 96:
==SUMMARY==
==SUMMARY==
(Continued)
(Continued)
Emergency Plan Revision 54 Revision Summary  
Section 8.1, Normal Plant Organization 9/17/13      53 Updated AOs from 5 to 6 Deleted Utility person Table 8.4, Minimum Staffing Requirements for the ENVY ERO Plant Operations & Assessment of Operational Aspects -
Updated AOs from 5 to 6 Fire Fighting - Added the total number (5); Added ** to reference the note May be provided by shift personnel assigned other functions and added reference to note 1 regarding the Fire Brigade being staffed IAW TRM, Staffing Analysis and AP 0894.
Figure 8.1 - Corrected the number on on shift AOs and added the Field Support Supervisor (FSS)
Appendix E, Letters of Agreement Updated INPO letter for 2012 DOE - REAC/TS - Updated letter dated June 6, 2013. The letter content remains unchanged.
Deleted letter 14 Vermont Yankee Nuclear Power Corporation no longer valid as of 12/31/12 Appendix G, Index of Emergency Plan Implementing Procedures and Support Plans Added Fleet Administrative Procedure references Updated procedure references in accordance with the procedure upgrade project numbering scheme Emergency Plan Revision 54 Revision Summary Page viii of ix Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Page viii of ix Entergy Vermont Yankee 9/17/13 53 Section 8.1, Normal Plant Organization  Updated AOs from 5 to 6  Deleted Utility person Table 8.4, Minimum Staffing Requirements for the ENVY ERO  Plant Operations & Assessment of Operational Aspects -
REVISION  
Updated AOs from 5 to 6  Fire Fighting - Added the total number (5); Added ** to reference the note "May be provided by shift personnel assigned other functions" and added reference to note 1 regarding the Fire Brigade being staffed IAW TRM, Staffing Analysis and AP 0894. Figure 8.1 - Corrected the number on on shift AOs and added the Field Support Supervisor (FSS)  Appendix E, Letters of Agreement  Updated INPO letter for 2012  DOE - REAC/TS - Updated letter dated June 6, 2013. The letter content remains unchanged. Deleted letter 14 "Vermont Yankee Nuclear Power Corporation" no longer valid as of 12/31/12 Appendix G, Index of Emergency Plan Implementing Procedures and Support Plans  Added Fleet Administrative Procedure references  Updated procedure references in accordance with the procedure upgrade project numbering scheme REVISION  


==SUMMARY==
==SUMMARY==
(Continued)
(Continued)
Emergency Plan Revision 54 Revision Summary Page ix of ix Entergy Vermont Yankee 12/19/13 54 Index  Added 7.1 InForm Notification System 3.2, Actions in an Emergency Changed Nuclear Alert System to Emergency Notification System in step 5 for notifying the three states 6.2.6, Facilities and Equipment for Offsite Monitoring   Removed the reference to the James A. Fitzpatrick environmental laboratory 7.1, InForm Notification System Added a description for the InForm Notification System 7.2, Nuclear Alert System Changed the words "Is used" to "can be" used to describe the Nuclear Alert System Figure 7.1, Plant to State Notification Channels Added a line for Inform Figure 7.2, Coordination Channels with States Added a line for Inform Section 8.1, Normal Plant Organization Removed the Field Support Supervisor from the Normal Plant Organization Table 8.4, Minimum Staffing Requirements for the ENVY ERO Notification/Communication: changed Chem Tech to AO Radiological Accident Assessment - Deleted Field Support Supervisor (FSS) and added Chem Tech. Note 4 - Deleted FSS and added Chem Tech Figure 8.1, Normal On-Shift Emergency Organization Revised to match shift staffing in section 8.1 and remove the Field Support Supervisor (FSS) Figure 9.1, Notification Plan Changed NAS to Inform/NAS Appendix E, Letters of Agreement Letters of Agreement have been removed from this document and will be maintained in the Emergency Plan Department files. A summary of the agreements has also been added. Appendix F, Evacuation Time Estimates An evacuation time estimate summary has been removed from this document and the entire document is maintained separately and referenced in this appendix. Appendix G, Index of Emergency Plan Implementing Procedures and Support Plans Updated procedure numbers to match the procedure upgrade project numbering   Added the Evacuation Time Estimate to Support Plans
Index 12/19/13     54 Added 7.1 InForm Notification System 3.2, Actions in an Emergency Changed Nuclear Alert System to Emergency Notification System in step 5 for notifying the three states 6.2.6, Facilities and Equipment for Offsite Monitoring Removed the reference to the James A. Fitzpatrick environmental laboratory 7.1, InForm Notification System Added a description for the InForm Notification System 7.2, Nuclear Alert System Changed the words Is used to can be used to describe the Nuclear Alert System Figure 7.1, Plant to State Notification Channels Added a line for Inform Figure 7.2, Coordination Channels with States Added a line for Inform Section 8.1, Normal Plant Organization Removed the Field Support Supervisor from the Normal Plant Organization Table 8.4, Minimum Staffing Requirements for the ENVY ERO Notification/Communication: changed Chem Tech to AO Radiological Accident Assessment - Deleted Field Support Supervisor (FSS) and added Chem Tech.
Note 4 - Deleted FSS and added Chem Tech Figure 8.1, Normal On-Shift Emergency Organization Revised to match shift staffing in section 8.1 and remove the Field Support Supervisor (FSS)
Figure 9.1, Notification Plan Changed NAS to Inform/NAS Appendix E, Letters of Agreement Letters of Agreement have been removed from this document and will be maintained in the Emergency Plan Department files. A summary of the agreements has also been added.
Appendix F, Evacuation Time Estimates An evacuation time estimate summary has been removed from this document and the entire document is maintained separately and referenced in this appendix.
Appendix G, Index of Emergency Plan Implementing Procedures and Support Plans Updated procedure numbers to match the procedure upgrade project numbering Added the Evacuation Time Estimate to Support Plans Emergency Plan Revision 54 Revision Summary Page ix of ix Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Emergency Plan Revision 54
TABLE OF CONTENTS


Table of Contents
==1.0  INTRODUCTION==
 
........................................................................................................1 2.0  DEFINITIONS .............................................................................................................2 3.0  
Page i of vii Entergy Vermont Yankee TABLE OF CONTENTS 1.0INTRODUC TION ........................................................................................................
12.0DEFINIT IONS .............................................................................................................
23.0


==SUMMARY==
==SUMMARY==
OF EMER GENCY PL AN ........................................................................
OF EMERGENCY PLAN ........................................................................6 3.1. Objectives ........................................................................................................6 3.2. Actions In An Emergency.................................................................................7 3.3. Emergency Response Facilities .......................................................................7 3.4. Mobilization ......................................................................................................8 3.5. State Government Notification and Response .................................................8 3.6. Federal Government Notification and Response .............................................9 3.7. Technical Support ............................................................................................9 4.0  THE AREA ............................................................................................................... 10 4.1. The Site ......................................................................................................... 10 4.2. Area Characteristics, Land Use and Demography ......................................... 10 4.3. Emergency Planning Zones ........................................................................... 11 5.0  EMERGENCY CLASSIFICATION SYSTEM ............................................................ 24 5.1. Notification of Unusual Event ......................................................................... 24 5.1.1.       Unusual Event (Terminated) .......................................................... 25 5.2. Alert ............................................................................................................... 25 5.3. Site Area Emergency ..................................................................................... 25 5.4. General Emergency ....................................................................................... 26 5.5. Emergency Classification System Review by State Authorities ..................... 26 6.0  EMERGENCY RESPONSE FACILITIES AND EQUIPMENT .................................. 27 6.1. Emergency Response Facilities ..................................................................... 27 6.1.1.       Technical Support Center .............................................................. 27 6.1.2.       The Operations Support Center ..................................................... 28 6.1.3.       Emergency Operations Facility/Recovery Center .......................... 29 6.1.4.       Deleted .......................................................................................... 30 6.1.5.       Joint Information Center ................................................................ 30 6.1.6.       Coordination of Radiological Data ................................................. 30 6.2. Assessment Capability................................................................................... 31 6.2.1.       Process Monitors ........................................................................... 31 6.2.2.       Radiological Monitors .................................................................... 31 6.2.3.       Meteorological Capability ............................................................... 32 6.2.4.       Fire Detection Devices ................................................................... 33 6.2.5.       Post-Accident Sampling ................................................................. 33 6.2.6.       Facilities and Equipment for Offsite Monitoring.............................. 33 7.0  COMMUNICATIONS ................................................................................................ 39 7.1. InForm Notification System ............................................................................ 39 Emergency Plan Revision 54 Table of Contents Page i of vii Entergy Vermont Yankee Redacted Version of Document - Publicly Available
63.1.Objectiv es ........................................................................................................
63.2.Actions In An Emergency  
.................................................................................
73.3.Emergency Response Faciliti es .......................................................................
73.4.Mobilizat ion ......................................................................................................
83.5.State Government Noti fication and Response .................................................
83.6.Federal Government Noti fication and Response .............................................
93.7.Technical Support ............................................................................................
94.0THE AREA ............................................................................................................... 104.1.The Site ......................................................................................................... 104.2.Area Characteristics, Land Use and Dem ography ......................................... 104.3.Emergency Planni ng Zones ........................................................................... 115.0EMERGENCY CLASSIFI CATION SYSTEM ............................................................ 245.1.Notification of Unusual Event ......................................................................... 245.1.1.Unusual Event (Terminated) .......................................................... 255.2.Alert ............................................................................................................... 255.3.Site Area Em ergency ..................................................................................... 255.4.General Em ergency ....................................................................................... 265.5.Emergency Classification System Revi ew by State Authorities ..................... 266.0EMERGENCY RESPONSE FACI LITIES AND EQUIPMENT .................................. 276.1.Emergency Response Faciliti es ..................................................................... 276.1.1.Technical Support Center .............................................................. 276.1.2.The Operations Su pport Center ..................................................... 286.1.3.Emergency Operations Facilit y/Recovery Center .......................... 296.1.4.Deleted .......................................................................................... 306.1.5.Joint Informati on Center ................................................................ 306.1.6.Coordination of R adiological Data ................................................. 306.2.Assessment Capability  
................................................................................... 316.2.1.Process Monitors ........................................................................... 316.2.2.Radiological Monitors .................................................................... 316.2.3.Meteorological Capability ............................................................... 326.2.4.Fire Detecti on Devices ................................................................... 336.2.5.Post-Accident Sampling ................................................................. 336.2.6.Facilities and Equipment for Offsite Monitoring  
.............................. 337.0COMMUNICATIONS ................................................................................................ 397.1.InForm Notificati on System ............................................................................ 39 TABLE OF CONTENTS (Continued)
Emergency Plan Revision 54  


Table of Contents  
TABLE OF CONTENTS (Continued) 7.2. Nuclear Alert System ..................................................................................... 39 7.3. Utility Microwave and Radio Systems ............................................................ 40 7.4. Mobile UHF Radio System............................................................................. 40 7.5. Plant Intercom System ................................................................................... 40 7.6. NRC Telephone System ................................................................................ 40 7.7. Commercial Telephone System ..................................................................... 41 7.8. Emergency Power Supply for Communications ............................................. 41 7.9. Facsimile Transmission ................................................................................. 41 7.10. Emergency Response Data System .............................................................. 42 8.0  ORGANIZATION ...................................................................................................... 46 8.1. Normal Plant Organization ............................................................................. 46 8.2. Emergency Response Organization .............................................................. 46 8.2.1.      Emergency Director ....................................................................... 48 8.2.2.      Emergency Plant Manager ............................................................ 49 8.2.3.      Shift Manager ................................................................................ 50 8.2.4.      EOF Manager ................................................................................ 51 8.2.5.      Operations Support Center Manager ............................................. 52 8.2.6.      Radiological Assessment Coordinator ........................................... 53 8.2.7.      Administration and Logistics Coordinator ...................................... 54 8.2.8.      Security Coordinator ...................................................................... 54 8.2.9.      Company Spokesperson ............................................................... 55 8.2.10. Decision Maker .............................................................................. 55 8.2.11. Engineering Support Group ........................................................... 55 8.3. Recovery Organization .................................................................................. 56 8.4. Extensions of Vermont Yankee Emergency Organization ............................. 57 8.4.1.      Local Service ................................................................................. 57 8.4.2.      Federal Government Support ........................................................ 57 8.4.3.      Additional Support ......................................................................... 58 8.5. Coordination with State Government Authorities ........................................... 58 9.0  EMERGENCY RESPONSE...................................................................................... 70 9.1. Emergency Condition Recognition and Classification .................................... 70 9.2. Activation of the Emergency Organization ..................................................... 70 9.2.1.      Notification of Unusual Event Response ........................................ 71 9.2.2.      Alert Response .............................................................................. 72 9.2.3.      Site Area Emergency Response .................................................... 73 9.2.4.      General Emergency Response ...................................................... 74 9.3. Emergency De-Escalation and Termination Criteria ...................................... 74 10.0  RADIOLOGICAL ASSESSMENT AND PROTECTIVE MEASURES ...................... 79 10.1. Radiological Assessment ............................................................................... 79 10.1.1. Initial Offsite Radiological Dose Projection Capability.................... 79 10.1.2. Variable Trajectory Atmospheric Dispersion/Dose Projection Capability ....................................................................................... 79 Emergency Plan Revision 54 Table of Contents Page ii of vii Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Page ii of vii Entergy Vermont Yankee 7.2.Nuclear Alert System ..................................................................................... 397.3.Utility Microwave and Radio Systems ............................................................ 407.4.Mobile UHF Radio System
TABLE OF CONTENTS (Continued) 10.1.3. Evaluation of Offsite Air Samples .................................................. 80 10.2. Protective Action Recommendation Criteria .................................................. 81 10.3. Radiological Exposure Control ....................................................................... 81 10.4. Protective Measures ...................................................................................... 82 10.4.1. Site Personnel Accountability ........................................................ 82 10.4.2. Site Egress Control Methods ......................................................... 83 10.4.3. Decontamination Capability ........................................................... 83 10.4.4. Use of Onsite Protective Equipment and Supplies ........................ 83 10.4.5. Fire Protection Equipment ............................................................. 83 10.5. Aid to Affected Personnel .............................................................................. 84 10.5.1. Medical Treatment ......................................................................... 84 10.5.2. Medical Transportation .................................................................. 84 10.6. Protective Actions for Onsite Personnel......................................................... 84 11.0  EMERGENCY NOTIFICATION AND PUBLIC INFORMATION ............................... 92 11.1. Emergency Notification .................................................................................. 92 11.2. Public Notification .......................................................................................... 92 11.3. Public Information .......................................................................................... 93 12.0  MAINTAINING EMERGENCY PREPAREDNESS ................................................... 95 12.1. Drills and Exercises ....................................................................................... 95 12.1.1. Radiation Emergency Drills and Exercises .................................... 95 12.1.2. Communication Tests .................................................................... 95 12.1.3. Fire Drills........................................................................................ 96 12.1.4. Medical Drills ................................................................................. 96 12.1.5. Radiological Monitoring Drills......................................................... 96 12.1.6. Health Physics Drills ...................................................................... 96 12.1.7. Security Drills ................................................................................. 97 12.1.8. Scenarios ....................................................................................... 97 12.1.9. Evaluation of Exercises ................................................................. 98 12.1.10. Emergency Plan Audit ................................................................... 98 12.2. Training .......................................................................................................... 99 12.3. Review and Updating of Plan and Procedures .............................................. 99 12.4. Maintenance and Inventory of Emergency Equipment and Supplies ........... 100 12.5. Responsibility for the Planning Effort ........................................................... 100 Emergency Plan Revision 54 Table of Contents Page iii of vii Entergy Vermont Yankee Redacted Version of Document - Publicly Available
............................................................................. 407.5.Plant Intercom System ................................................................................... 407.6.NRC Telephone System ................................................................................ 407.7.Commercial Teleph one System ..................................................................... 417.8.Emergency Power Supply fo r Communications ............................................. 417.9.Facsimile Transmission ................................................................................. 417.10.Emergency Response Data System .............................................................. 428.0ORGANIZATION ...................................................................................................... 468.1.Normal Plant Or ganization ............................................................................. 468.2.Emergency Response Organization .............................................................. 468.2.1.Emergency Director ....................................................................... 488.2.2.Emergency Plant Manager ............................................................ 498.2.3.Shift M anager ................................................................................ 508.2.4.EOF Manager ................................................................................ 518.2.5.Operations Support Center Manager ............................................. 528.2.6.Radiological Assessm ent Coordinator ........................................... 538.2.7.Administration and Logist ics Coordinator ...................................... 548.2.8.Security Coordinator ...................................................................... 548.2.9.Company Spok esperson ............................................................... 558.2.10.Decision Maker .............................................................................. 558.2.11.Engineering S upport Group ........................................................... 558.3.Recovery Organization .................................................................................. 568.4.Extensions of Vermont Yank ee Emergency Organization ............................. 578.4.1.Local Service ................................................................................. 578.4.2.Federal Governm ent Support ........................................................ 578.4.3.Additional Support ......................................................................... 588.5.Coordination with State Government Authorities ........................................... 589.0EMERGENCY RE SPONSE...................................................................................... 709.1.Emergency Condition Recognit ion and Classification .................................... 709.2.Activation of the Emergency Organization ..................................................... 709.2.1.Notification of Unus ual Event Response ........................................ 719.2.2.Alert Response .............................................................................. 729.2.3.Site Area Emergen cy Response .................................................... 739.2.4.General Emergen cy Response ...................................................... 749.3.Emergency De-Escalation and Te rmination Criteria ...................................... 7410.0RADIOLOGICAL ASSESSMENT AND PR OTECTIVE MEASURES ...................... 7910.1.Radiological Assessment ............................................................................... 7910.1.1.Initial Offsite Radiological Dose Projection Capability
.................... 7910.1.2.Variable Trajectory Atmospher ic Dispersion/Dose Projection Capability ....................................................................................... 79 TABLE OF CONTENTS (Continued)
Emergency Plan Revision 54


Table of Contents  
TABLE OF CONTENTS (Continued)
APPENDICES                                                                        Page APPENDIX A        Emergency Classification System and Emergency Action Levels      101 APPENDIX B        Emergency Equipment                                              102 APPENDIX C        Initial Offsite Dose Rate Estimation                            105 APPENDIX D        Environmental Laboratory Analytical and Dosimetry Services      107 APPENDIX E        Letters of Agreement                                            109 APPENDIX F        Evacuation Time Estimates                                        111 APPENDIX G        Index of Emergency Plan Implementing Procedures and Support Plans                                                    112 APPENDIX H        Public Notification System                                      115 Emergency Plan Revision 54 Table of Contents Page iv of vii Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Page iii of vii Entergy Vermont Yankee 10.1.3.Evaluation of Offsite Air Samples .................................................. 8010.2.Protective Action Reco mmendation Criteria .................................................. 8110.3.Radiological Expos ure Cont rol ....................................................................... 8110.4.Protective M easures ...................................................................................... 8210.4.1.Site Personnel A ccountability ........................................................ 8210.4.2.Site Egress Cont rol Methods ......................................................... 8310.4.3.Decontamination Capability ........................................................... 8310.4.4.Use of Onsite Protective Equipment and Supplies ........................ 8310.4.5.Fire Protection Equipment ............................................................. 8310.5.Aid to Affect ed Personnel .............................................................................. 8410.5.1.Medical Treatment ......................................................................... 8410.5.2.Medical Transportation .................................................................. 8410.6.Protective Actions for Onsite Personnel
TABLE OF CONTENTS (Continued)
......................................................... 8411.0EMERGENCY NOTIFICATION AND PUBLIC INFORMATION ............................... 9211.1.Emergency Notification .................................................................................. 9211.2.Public Notification .......................................................................................... 9211.3.Public Information .......................................................................................... 9312.0MAINTAINING EMERGENCY PREPAREDNESS ................................................... 9512.1.Drills and Exercises ....................................................................................... 9512.1.1.Radiation Emergency Dr ills and Exercises .................................... 9512.1.2.Communication Tests .................................................................... 9512.1.3.Fire Dr ills........................................................................................ 9612.1.4.Medical Drills ................................................................................. 9612.1.5.Radiological Monitoring Drills
LIST OF TABLES Table 4.1         Table of Land Use Table 4.2         2000 Population Distribution Within the 50-Mile EPZ of Vermont Yankee Table 4.3         Vermont Yankee "Plume Exposure" Emergency Planning Zone (10 Mile) Considerations Table 7.1         Vermont Yankee Emergency Communications Matrix Table 8.1         (Deleted)
......................................................... 9612.1.6.Health Physi cs Drills ...................................................................... 9612.1.7.Security Drills ................................................................................. 9712.1.8.Scenarios ....................................................................................... 9712.1.9.Evaluation of Exercises ................................................................. 9812.1.10.Emergency Plan Audit ................................................................... 9812.2.Training .......................................................................................................... 9912.3.Review and Updating of Plan and Procedures .............................................. 9912.4.Maintenance and Inventory of Emergen cy Equipment and Supplies ........... 10012.5.Responsibility for the Planning Effort ........................................................... 100 TABLE OF CONTENTS (Continued)
Table 8.2         (Deleted)
Emergency Plan Revision 54
Table 8.3         A Summary of Offsite Coordination Table 8.4         Minimum Staffing Requirements for the ENVY ERO Table 9.1         Vermont Yankee Emergency Response Table 10.1.1     EPA Protective Action Guidelines Table 10.1.2     Recommended Derived Intervention Level (DIL) or Criterion for Each Radionuclide Group Table 10.2       Emergency Dose Limits Table 10.3       Emergency Center Habitability and Protective Action Criteria Emergency Plan Revision 54 Table of Contents Page v of vii Entergy Vermont Yankee Redacted Version of Document - Publicly Available
 
Table of Contents
 
Page iv of vii Entergy Vermont Yankee APPENDICES Page APPENDIX A Emergency Classification System and Emergency Action Levels 101
 
APPENDIX B Emergency Equipment 102 APPENDIX C Initial Offsite Dose Rate Estimation 105 APPENDIX D Environmental Laboratory Analytical and Dosimetry Services 107
 
APPENDIX E Letters of Agreement 109 APPENDIX F Evacuation Time Estimates 111 APPENDIX G Index of Emergency Plan Im plementing Procedures and Support Plans 112 APPENDIX H Public Notification System 115 TABLE OF CONTENTS (Continued)
Emergency Plan Revision 54
 
Table of Contents
 
Page v of vii Entergy Vermont Yankee LIST OF TABLES
 
Table 4.1 Table of Land Use  
 
Table 4.2 2000 Population Distribution Within the 50-Mile EPZ of Vermont Yankee Table 4.3 Vermont Yankee "Plume Exposur e" Emergency Planning Zone (10 Mile) Considerations  
 
Table 7.1 Vermont Yankee Emergency Communications Matrix  
 
Table 8.1 (Deleted)
Table 8.2 (Deleted)  
 
Table 8.3 A Summary of Offsite Coordination Table 8.4 Minimum Staffing Requirements for the ENVY ERO  
 
Table 9.1 Vermont Yankee Emergency Response  
 
Table 10.1.1 EPA Protective Action Guidelines Table 10.1.2 Recommended Derived Intervention Lev el (DIL) or Criterion for Each Radionuclide Group  
 
Table 10.2 Emergency Dose Limits  
 
Table 10.3 Emergency Center Habitability an d Protective Action Criteria  


TABLE OF CONTENTS (Continued)
TABLE OF CONTENTS (Continued)
Emergency Plan Revision 54
LIST OF FIGURES Figure 4.1       Vermont Yankee Site Figure 4.2       Population Center and Special Interest Areas Within the 50 Mile EPZ Figure 4.3       2000 Population Distribution Within 0-5 Miles of Vermont Yankee Figure 4.4       2000 Population Distribution Within 0-10 Miles of Vermont Yankee Figure 4.5       2000 Population Distribution Within 10-50 Miles of Vermont Yankee Figure 4.6       Sector Nomenclature for Vermont Yankee Plume Exposure EPZ Figure 4.7       Vermont Yankee Plume Exposure Emergency Planning Zone Figure 4.8       Vermont Yankee 50 Mile Ingestion Pathway Emergency Planning Zone Figure 6.1       Location of State and Company Emergency Operating Centers Around Vermont Yankee Figure 6.2       Technical Support Center Layout Figure 6.3       Operations Support Center Layout Figure 6.4       Emergency Operations Facility/Recovery Center Layout Figure 7.1       Plant to State Notification Channels Figure 7.2       Coordination Channels with States Figure 8.1       Normal On-Shift Emergency Organization Figure 8.2       Vermont Yankee Emergency Management Organization Figure 8.3       Technical Support Center Emergency Organization Figure 8.4       Operations Support Center Emergency Organization Figure 8.5       Emergency Operations Facility Organization Figure 8.6       (Deleted)
 
Figure 8.7       Joint Information Center Organization Emergency Plan Revision 54 Table of Contents Page vi of vii Entergy Vermont Yankee Redacted Version of Document - Publicly Available
Table of Contents
 
Page vi of vii Entergy Vermont Yankee LIST OF FIGURES
 
Figure 4.1 Vermont Yankee Site  
 
Figure 4.2 Population Center and Special Intere st Areas Within the 50 Mile EPZ  
 
Figure 4.3 2000 Population Distribution Within 0-5 Miles of Vermont Yankee  
 
Figure 4.4 2000 Population Distribution Within 0-10 Miles of Vermont Yankee  
 
Figure 4.5 2000 Population Distribution Within 10-50 Miles of Vermont Yankee  
 
Figure 4.6 Sector Nomenclature for Vermont Yankee Plume Exposure EPZ  
 
Figure 4.7 Vermont Yankee Plume Expos ure Emergency Planning Zone  
 
Figure 4.8 Vermont Yankee 50 Mile Ingestion Pathway Emergency Planning Zone  
 
Figure 6.1 Location of State and Company Em ergency Operating Centers Around Vermont Yankee  
 
Figure 6.2 Technical Support Center Layout  
 
Figure 6.3 Operations Support Center Layout  
 
Figure 6.4 Emergency Operations Facilit y/Recovery Center Layout  
 
Figure 7.1 Plant to State Notification Channels  
 
Figure 7.2 Coordination Channels with States  
 
Figure 8.1 Normal On-Shift Emergency Organization  
 
Figure 8.2 Vermont Yankee Emergency Management Organization  
 
Figure 8.3 Technical Support Center Emergency Organization  
 
Figure 8.4 Operations Support Center Emergency Organization  
 
Figure 8.5 Emergency Operations Facility Organization Figure 8.6 (Deleted)  
 
Figure 8.7 Joint Information Center Organization


TABLE OF CONTENTS (Continued)
TABLE OF CONTENTS (Continued)
Emergency Plan Revision 54
LIST OF FIGURES (Continued)
 
Figure 9.1       Notification Plan Figure 10.1       Vermont Yankee Emergency Dose Rate Nomogram Figure 10.2       Field Sample Thyroid Dose Nomogram Figure 10.3       Medical Facilities within 50 Miles of Vermont Yankee Capable Of Handling Emergency Medical Cases Emergency Plan Revision 54 Table of Contents Page vii of vii Entergy Vermont Yankee Redacted Version of Document - Publicly Available
Table of Contents
 
Page vii of vii Entergy Vermont Yankee LIST OF FIGURES (Continued)
Figure 9.1 Notification Plan  
 
Figure 10.1 Vermont Yankee Emergency Dose Rate Nomogram  
 
Figure 10.2 Field Sample Thyroid Dose Nomogram  
 
Figure 10.3 Medical Facilities within 50 Mile s of Vermont Yankee Capable Of Handling Emergency Medical Cases  
 
Emergency Plan Revision 54  
 
Page 1 of 125 Entergy Vermont Yankee
 
==1.0 INTRODUCTION==
 
In the event of an emergency at the Vermont Y ankee Nuclear Power Station, officials from Vermont Yankee, local towns, the states of Vermont, New Hampshire and Massachusetts, as well as federal assistance resources, are mobilized to assess conditions and protect the health and safety of the public. This docum ent outlines the emergency response actions that are taken by Vermont Y ankee and the manner in which this response interfaces with offsite response actions.
 
This Emergency Plan is only a part of the over all response to an emergency at Vermont Yankee. Each community within about a 10-m ile radius of the plant and the states (Massachusetts, New Hampshire, and Vermont) have developed emergency response
 
plans to be implemented if the need arises. In addition, federal agencies have specified their nuclear power plant emergency res ponse roles and capabilities in the National Response Framework (January 2008).
 
The objective of this document is to outli ne the overall response of the Company to an emergency at the site. If an abnormal situation develops, automatic initiation of plant safety systems takes place and plant operators take corrective action according to specific emergency operating procedures. The purpose of these emergency operating procedures
 
is to describe corrective actions necessary to restore normal plant safety margins. The emergency operating procedures also lead to the activation of the Emergency Plan in accordance with a prescribed set of emergency implementing procedures. The Emergency
 
Plan summarizes Vermont Yankee's emergency implementing procedures and thereby the overall response to an emergency at the site.
 
Emergency Plan Revision 54
 
Page 2 of 125 Entergy Vermont Yankee 2.0 DEFINITIONS Alert - Events are in process or have occurred which involve an actual or potential substantial degradation of t he level of safety of the plant or a security event that involves probable life threatening risk to site personnel or damage to site equipment because of HOSTILE ACTION. Any releases are expected to be limited to small fractions of the EPA Protective Action Guideline exposure levels.
 
Assessment Actions - Those actions which are take to effectively define the emergency situation necessary for decisions on specific emergency measures.
 
Code Red - A Security related contingency requi ring the activation of the Security Response Team. This contingency shall, as a minimum cause a Notification of Unusual Event to be announced.
 
Committed Dose Equivalent (CDE) - The dose equivalent to organs or tissues of reference (e.g., thyroid) that will be received fr om an intake of radioac tive material by an individual during the 50 year period following the intake.
 
Confinement Boundary - The barrier(s) between areas containing radioactive substances and the environment.
 
Corrective Actions
- Those emergency measures taken to ameliorate or terminate an emergency situation.
 
Emergency Action Levels
- Specific instrument readings, system or event observation and/or radiological levels which initiate ev ent classification, not ification procedures, protective actions, and/or mobilization of t he emergency response organization. These are specific threshold readings or observations indicating system failures or abnormalities.
 
Emergency Assistance Personnel
- Vermont Yankee personnel who are assigned a role in the Emergency Response Organization.
 
Emergency Classification
- Emergencies are classified into four categories, NOTIFICATION OF UNUSUAL EVENT, ALERT, SITE AREA EMERGENCY and GENERAL EMERGENCY.
 
Emergency Implementing Procedure - Specific action taken by the plant staff to activate and implement this Emergency Plan.
 
Emergency Operations Centers
- Areas designated by the state/local representatives as Emergency Plan assembly areas fo r their respective staffs.
 
Emergency Operating Procedures
- The outline of specific corrective actions to be taken by plant operators in response to abnormal operating conditions.
 
Emergency Plan Revision 54
 
Page 3 of 125 Entergy Vermont Yankee Emergency Operations Facility
- A center established to coordinate the deployment of emergency response personnel, to evaluate offsite accident conditions and to maintain communications with offsite authorities.
 
Emergency Planning Zone - The areas for which planning is recommended to assure that prompt and effective actions can be taken to protect the public in the event of an
 
accident. The two zones are the 10-mile r adius plume exposure pathway zone and the 50-mile radius ingestion pathway zone.
 
Emergency Response Organization - Organization compris ed of Emergency Assistance Personnel who would respond and assist in a classified emergency situation.
 
Engineering Support Group
- An engineering group estab lished to provide emergency support for plant assessment and recovery operations.
 
Gai-Tronics - An intra-site station operation and public address system which consists of speakers and microphones located in areas vital to the operation of the station. The system has four channels which prov ide separate and independent page and intercommunication capabilities.
 
General Emergency
- Events are in process or have occurred which involve actual or imminent substantial core degradation or melt ing with potential for loss of containment
 
integrity or HOSTILE ACTION that results in an actual loss of physical control of the facility. Releases can be reasonably expected to exceed EPA Protective Action Guideline
 
exposure levels offs ite for more than the immediate site area.
 
Hostile Action
- An act toward an NPP or its pers onnel that includes the use of violent force to destroy equipment, takes hostages, and/or intimidates the licensee to achieve an end. This includes attack by air, land, or water using guns, explosives, projectiles, vehicles, or other devices used to deliver destructive force. Other acts that sati sfy the overall intent may be included. HOSTILE ACTION should not be construed to include acts of civil
 
disobedience or felonious acts that are not part of a concerted attack on the NPP.
Non-terrorism-based EALs should be used to addre ss such activities, (e.g., violent acts between individuals in t he owner controlled area).
 
Hostile Force
- One or more individuals who ar e engaged in a determined assault overtly or by stealth and deception, equipped with suitable weapons capable of k illing, maiming, or causing destruction.
 
Independent Spent Fuel Storage Installation (ISFSI)
- A complex that is designed and constructed for the interim st orage of spent nuclear fuel and other radioactive materials associated with spent fuel storage.
 
Ingestion Exposure Pathway - The pathway in which individuals receive a radiation dose due to internal deposition of radioactive materials from ingestion of contaminated water, foods, or milk.
 
Emergency Plan Revision 54
 
Page 4 of 125 Entergy Vermont Yankee Joint Information Center
- A center dedicated to the news media for the purpose of disseminating and coordinating information conc erning accident conditions. Activities conducted within this center will be the responsibility of the Company Spokesperson.
Notification of Unusual Event
- Events are in process or have occurred which indicate a potential degradation of the level of safety of the plant or i ndicate a security th reat to facility protection has been initiated. No releases of radioactive material requiring offsite response or monitoring are expected unless further degradation of safety systems occurs.
 
Operations Support Center - An emergency center established for available skilled emergency personnel (i.e., additional operations and support personnel). The Operations Support Center Manager directs activities within this center.
 
Plume Exposure Pathway
- The pathway in which individuals receive a radiation dose due to:  a) whole body external exposure due to gamma radiat ion from the plume and from deposited material; and b) inhalation exposure from the passing radioactive plume.
 
Projected Dose
- This is the amount of radiation dose estimated at the onset of any accidental radiological release.
It includes all the radiation dose the individual would receive for the duration of t he release assuming that no protective measures were undertaken.
 
Protective Action
- Those emergency measures taken to effectively mitigate the consequences of an accident by minimizing the radiological exposure that would likely occur if such actions were not undertaken.
Protective Action Guides - Projected radiological dose val ues to the public which warrant protective actions following an uncontrolled rel ease of radioactive mate rials. Protective actions would be warranted provided the reduction in the individual dose is not offset by
 
excessive risks to individual safety in implementing such actions.
 
Recovery Actions
- Those actions taken after the emergency has been controlled in order to restore safe plant conditions.
 
Recovery Center - An area established within the Emergency Operations facility for the purpose of planning recovery actions. The Emer gency Director directs the activities of this center.
 
Severe Accident Management
- Process that management uses to evaluate and respond to an accident that has deteriorated to a condition where the EOPs are exited and the Severe Accident Guidelines are used.
 
Site - That property within the fenced boundary of Vermont Yankee which is owned by the Company.
 
Site Area Emergency
- Events are in process or have o ccurred which involve an actual or likely major failures of plant functions neede d for protection of t he public or HOSTILE Emergency Plan Revision 54


Page 5 of 125 Entergy Vermont Yankee ACTION that results in intentional damage or ma licious acts; (1) toward site personnel or equipment that could lead to the likely failure of or; (2) that prevent effective access to equipment needed for the protection of the public. Any releases are not expected to result in exposure levels which exceed EPA Protective Action Guideline exposure levels beyond the site boundary.  
==1.0    INTRODUCTION==


Technical Support Center
In the event of an emergency at the Vermont Yankee Nuclear Power Station, officials from Vermont Yankee, local towns, the states of Vermont, New Hampshire and Massachusetts, as well as federal assistance resources, are mobilized to assess conditions and protect the health and safety of the public. This document outlines the emergency response actions that are taken by Vermont Yankee and the manner in which this response interfaces with offsite response actions.
- An in-plant center established in close proximity to the Control Room that has the capability to acquire plant parameters for post-accident evaluation by technical and recovery assistance personnel. The Emergency Plant
This Emergency Plan is only a part of the overall response to an emergency at Vermont Yankee. Each community within about a 10-mile radius of the plant and the states (Massachusetts, New Hampshire, and Vermont) have developed emergency response plans to be implemented if the need arises. In addition, federal agencies have specified their nuclear power plant emergency response roles and capabilities in the National Response Framework (January 2008).
The objective of this document is to outline the overall response of the Company to an emergency at the site. If an abnormal situation develops, automatic initiation of plant safety systems takes place and plant operators take corrective action according to specific emergency operating procedures. The purpose of these emergency operating procedures is to describe corrective actions necessary to restore normal plant safety margins. The emergency operating procedures also lead to the activation of the Emergency Plan in accordance with a prescribed set of emergency implementing procedures. The Emergency Plan summarizes Vermont Yankee's emergency implementing procedures and thereby the overall response to an emergency at the site.
Emergency Plan Revision 54 Page 1 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Manager directs activities within this center.  
2.0    DEFINITIONS Alert - Events are in process or have occurred which involve an actual or potential substantial degradation of the level of safety of the plant or a security event that involves probable life threatening risk to site personnel or damage to site equipment because of HOSTILE ACTION. Any releases are expected to be limited to small fractions of the EPA Protective Action Guideline exposure levels.
Assessment Actions - Those actions which are take to effectively define the emergency situation necessary for decisions on specific emergency measures.
Code Red - A Security related contingency requiring the activation of the Security Response Team. This contingency shall, as a minimum cause a Notification of Unusual Event to be announced.
Committed Dose Equivalent (CDE) - The dose equivalent to organs or tissues of reference (e.g., thyroid) that will be received from an intake of radioactive material by an individual during the 50 year period following the intake.
Confinement Boundary - The barrier(s) between areas containing radioactive substances and the environment.
Corrective Actions - Those emergency measures taken to ameliorate or terminate an emergency situation.
Emergency Action Levels - Specific instrument readings, system or event observation and/or radiological levels which initiate event classification, notification procedures, protective actions, and/or mobilization of the emergency response organization. These are specific threshold readings or observations indicating system failures or abnormalities.
Emergency Assistance Personnel - Vermont Yankee personnel who are assigned a role in the Emergency Response Organization.
Emergency Classification - Emergencies are classified into four categories, NOTIFICATION OF UNUSUAL EVENT, ALERT, SITE AREA EMERGENCY and GENERAL EMERGENCY.
Emergency Implementing Procedure - Specific action taken by the plant staff to activate and implement this Emergency Plan.
Emergency Operations Centers - Areas designated by the state/local representatives as Emergency Plan assembly areas for their respective staffs.
Emergency Operating Procedures - The outline of specific corrective actions to be taken by plant operators in response to abnormal operating conditions.
Emergency Plan Revision 54 Page 2 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Total Effective Dose Equivalent (TEDE)
Emergency Operations Facility - A center established to coordinate the deployment of emergency response personnel, to evaluate offsite accident conditions and to maintain communications with offsite authorities.
- The sum of the deep dose equivalent from external sources and the committed effective dose equivalent from internal exposures.  
Emergency Planning Zone - The areas for which planning is recommended to assure that prompt and effective actions can be taken to protect the public in the event of an accident. The two zones are the 10-mile radius plume exposure pathway zone and the 50-mile radius ingestion pathway zone.
Emergency Response Organization - Organization comprised of Emergency Assistance Personnel who would respond and assist in a classified emergency situation.
Engineering Support Group - An engineering group established to provide emergency support for plant assessment and recovery operations.
Gai-Tronics - An intra-site station operation and public address system which consists of speakers and microphones located in areas vital to the operation of the station. The system has four channels which provide separate and independent page and intercommunication capabilities.
General Emergency - Events are in process or have occurred which involve actual or imminent substantial core degradation or melting with potential for loss of containment integrity or HOSTILE ACTION that results in an actual loss of physical control of the facility.
Releases can be reasonably expected to exceed EPA Protective Action Guideline exposure levels offsite for more than the immediate site area.
Hostile Action - An act toward an NPP or its personnel that includes the use of violent force to destroy equipment, takes hostages, and/or intimidates the licensee to achieve an end. This includes attack by air, land, or water using guns, explosives, projectiles, vehicles, or other devices used to deliver destructive force. Other acts that satisfy the overall intent may be included. HOSTILE ACTION should not be construed to include acts of civil disobedience or felonious acts that are not part of a concerted attack on the NPP.
Non-terrorism-based EALs should be used to address such activities, (e.g., violent acts between individuals in the owner controlled area).
Hostile Force - One or more individuals who are engaged in a determined assault overtly or by stealth and deception, equipped with suitable weapons capable of killing, maiming, or causing destruction.
Independent Spent Fuel Storage Installation (ISFSI) - A complex that is designed and constructed for the interim storage of spent nuclear fuel and other radioactive materials associated with spent fuel storage.
Ingestion Exposure Pathway - The pathway in which individuals receive a radiation dose due to internal deposition of radioactive materials from ingestion of contaminated water, foods, or milk.
Emergency Plan Revision 54 Page 3 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Unusual Event (Terminated) - A condition that warrants a Notification of Unusual Event declaration, but was immediately rectified, su ch that the condition no longer existed by the time of declaration. The event or condition did not affect personnel onsite or the public offsite, or result in radioactive releases requiring offsite monitoring.
Joint Information Center - A center dedicated to the news media for the purpose of disseminating and coordinating information concerning accident conditions. Activities conducted within this center will be the responsibility of the Company Spokesperson.
Notification of Unusual Event - Events are in process or have occurred which indicate a potential degradation of the level of safety of the plant or indicate a security threat to facility protection has been initiated. No releases of radioactive material requiring offsite response or monitoring are expected unless further degradation of safety systems occurs.
Operations Support Center - An emergency center established for available skilled emergency personnel (i.e., additional operations and support personnel). The Operations Support Center Manager directs activities within this center.
Plume Exposure Pathway - The pathway in which individuals receive a radiation dose due to: a) whole body external exposure due to gamma radiation from the plume and from deposited material; and b) inhalation exposure from the passing radioactive plume.
Projected Dose - This is the amount of radiation dose estimated at the onset of any accidental radiological release. It includes all the radiation dose the individual would receive for the duration of the release assuming that no protective measures were undertaken.
Protective Action - Those emergency measures taken to effectively mitigate the consequences of an accident by minimizing the radiological exposure that would likely occur if such actions were not undertaken.
Protective Action Guides - Projected radiological dose values to the public which warrant protective actions following an uncontrolled release of radioactive materials. Protective actions would be warranted provided the reduction in the individual dose is not offset by excessive risks to individual safety in implementing such actions.
Recovery Actions - Those actions taken after the emergency has been controlled in order to restore safe plant conditions.
Recovery Center - An area established within the Emergency Operations facility for the purpose of planning recovery actions. The Emergency Director directs the activities of this center.
Severe Accident Management - Process that management uses to evaluate and respond to an accident that has deteriorated to a condition where the EOPs are exited and the Severe Accident Guidelines are used.
Site - That property within the fenced boundary of Vermont Yankee which is owned by the Company.
Site Area Emergency - Events are in process or have occurred which involve an actual or likely major failures of plant functions needed for protection of the public or HOSTILE Emergency Plan Revision 54 Page 4 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Emergency Plan Revision 54  
ACTION that results in intentional damage or malicious acts; (1) toward site personnel or equipment that could lead to the likely failure of or; (2) that prevent effective access to equipment needed for the protection of the public. Any releases are not expected to result in exposure levels which exceed EPA Protective Action Guideline exposure levels beyond the site boundary.
Technical Support Center - An in-plant center established in close proximity to the Control Room that has the capability to acquire plant parameters for post-accident evaluation by technical and recovery assistance personnel. The Emergency Plant Manager directs activities within this center.
Total Effective Dose Equivalent (TEDE) - The sum of the deep dose equivalent from external sources and the committed effective dose equivalent from internal exposures.
Unusual Event (Terminated) - A condition that warrants a Notification of Unusual Event declaration, but was immediately rectified, such that the condition no longer existed by the time of declaration. The event or condition did not affect personnel onsite or the public offsite, or result in radioactive releases requiring offsite monitoring.
Emergency Plan Revision 54 Page 5 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Page 6 of 125 Entergy Vermont Yankee 3.0  
3.0  


==SUMMARY==
==SUMMARY==
OF EMERGENCY PLAN 3.1. Objectives Safety systems at Vermont Yankee are desi gned to prevent and/or mitigate accidental radioactive releases. Accordingl y, the probability for a release of radioactivity resulting in a public hazard is very small. As a precaut ionary measure, however, this Emergency Plan specifies response actions if the safety systems are degraded or fail.  
OF EMERGENCY PLAN 3.1. Objectives Safety systems at Vermont Yankee are designed to prevent and/or mitigate accidental radioactive releases. Accordingly, the probability for a release of radioactivity resulting in a public hazard is very small. As a precautionary measure, however, this Emergency Plan specifies response actions if the safety systems are degraded or fail.
 
The purpose of this Emergency Plan is to classify emergencies according to severity, to assign responsibilities, and to clearly outline the most effective actions to safeguard the public and plant personnel in the unlikely event of an incident at Vermont Yankee. Detailed emergency procedures at Vermont Yankee are followed by plant personnel to notify and activate the onsite and offsite emergency organizations. These procedures are summarized in this Emergency Plan.
The purpose of this Emergency Plan is to classify emergencies according to severity, to assign responsibilities, and to clearly outline t he most effective actions to safeguard the public and plant personnel in the unlikely event of an incident at Vermont Yankee. Detailed emergency procedures at Vermont Yankee are followed by plant personnel to notify and  
 
activate the onsite and offsite emergency organizations. These procedures are summarized in this Emergency Plan.  
 
The basic objectives of this plan are:
The basic objectives of this plan are:
: 1) To establish a system for identification and classification of the emergency condition and initiation of response actions;
: 1)     To establish a system for identification and classification of the emergency condition and initiation of response actions;
: 2) To establish an organization for the directio n of activity within the plant to limit the consequences of the incident;
: 2)     To establish an organization for the direction of activity within the plant to limit the consequences of the incident;
: 3) To establish an organization for control of onsite and offsite surveillance activities to assess the extent and significance of any uncontrolled release of radioactive material;
: 3)     To establish an organization for control of onsite and offsite surveillance activities to assess the extent and significance of any uncontrolled release of radioactive material;
: 4) To identify facilities, equipment and supplies available for emergency use;
: 4)     To identify facilities, equipment and supplies available for emergency use;
: 5) To establish an engineering support or ganization to aid the plant personnel in limiting the consequences of and recovery from an event;
: 5)     To establish an engineering support organization to aid the plant personnel in limiting the consequences of and recovery from an event;
: 6) To establish the basic elements of an emergency recovery program;
: 6)     To establish the basic elements of an emergency recovery program;
: 7) To specify a system for coordination with federal, state, and local authorities and agencies for offsite emergency response;
: 7)     To specify a system for coordination with federal, state, and local authorities and agencies for offsite emergency response;
: 8) To develop a communications network between the plant and offsite authorities to provide prompt notificati on of emergency situations;
: 8)     To develop a communications network between the plant and offsite authorities to provide prompt notification of emergency situations;
: 9) To develop a training and Emergency Plan exercise program to assure constant effectiveness of the plan; and
: 9)     To develop a training and Emergency Plan exercise program to assure constant effectiveness of the plan; and
: 10) To keep the public informed in a timely manner to preclude misinformation and bolster confidence in the emergency response.  
: 10)   To keep the public informed in a timely manner to preclude misinformation and bolster confidence in the emergency response.
 
Emergency Plan Revision 54 Page 6 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
Emergency Plan Revision 54  


Page 7 of 125 Entergy Vermont Yankee Emergencies at nuclear power plants are classified into the following four major categories (as set forth in Section 5.0): Notification of Unusual Event, Al ert, Site Area Emergency, and General Emergency. Depending on the emergency classification, different levels of plant and offsite response are required. Activation of emergency facilities takes place in accordance with the classificati on of emergency response.
Emergencies at nuclear power plants are classified into the following four major categories (as set forth in Section 5.0): Notification of Unusual Event, Alert, Site Area Emergency, and General Emergency. Depending on the emergency classification, different levels of plant and offsite response are required. Activation of emergency facilities takes place in accordance with the classification of emergency response.
3.2. Actions In An Emergency If an emergency condition develops, the Shift Manager, or the senior licensed individual in the Control Room, assumes the responsibilities for initiating emergency actions to limit the consequences of the incident and to bring the plant into a stable condition. The individual must:
3.2. Actions In An Emergency If an emergency condition develops, the Shift Manager, or the senior licensed individual in the Control Room, assumes the responsibilities for initiating emergency actions to limit the consequences of the incident and to bring the plant into a stable condition. The individual must:
: 1) Recognize the emergency condition by observation of Emergency Action Levels;
: 1)     Recognize the emergency condition by observation of Emergency Action Levels;
: 2) Classify the accident in accordance with the emergency classification system;
: 2)     Classify the accident in accordance with the emergency classification system;
: 3) Initiate emergency operating procedure(s) applicable to the event;
: 3)     Initiate emergency operating procedure(s) applicable to the event;
: 4) Activate the plant emergency alarm system;
: 4)     Activate the plant emergency alarm system;
: 5) Notify state authorities in Vermont, New Hampshire and Massachusetts using the Emergency Notification System;
: 5)     Notify state authorities in Vermont, New Hampshire and Massachusetts using the Emergency Notification System;
: 6) Notify the NRC using the Emergency Notification System;
: 6)     Notify the NRC using the Emergency Notification System;
: 7) Use the emergency notification system to notify appropriate personnel as set forth in Figure 9.1 and Table 9.1;
: 7)     Use the emergency notification system to notify appropriate personnel as set forth in Figure 9.1 and Table 9.1;
: 8) Depending on the emergency classification, initiate the procedures which activate the Technical Support Center, the Emergency Operations Facility/Recovery Center, the Operations Support Center, and the Joint Information Center; and
: 8)     Depending on the emergency classification, initiate the procedures which activate the Technical Support Center, the Emergency Operations Facility/Recovery Center, the Operations Support Center, and the Joint Information Center; and
: 9) Direct and coordinate all emergency response efforts until overall responsibility is assumed by the Emergency Director.
: 9)     Direct and coordinate all emergency response efforts until overall responsibility is assumed by the Emergency Director.
3.3. Emergency Response Facilities The emergency response facilities, which are utilized by the emergency response organization, are described in Section 6.0.
3.3. Emergency Response Facilities The emergency response facilities, which are utilized by the emergency response organization, are described in Section 6.0. Depending on the emergency classification, different facilities are activated and utilized. Key site and offsite personnel are quickly dispatched to these facilities to perform accident assessments, implement corrective actions, analyze accident data, and provide public information support.
Depending on the emergency classification, different facilities are activated and utilized. Key site and offsite personnel are quickly  
Emergency Plan Revision 54 Page 7 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
 
dispatched to these facilities to perform accident assessments, implement corrective actions, analyze accident data, and provide public information support.  
 
Emergency Plan Revision 54  


Page 8 of 125 Entergy Vermont Yankee 3.4. Mobilization The mobilization scheme is based on the emergency notification system shown in Figure 9.1. Table 9.1 identifies the personnel notified. The notification system utilizes the plant public address system (Gai-Tronics), dedicated telephone lines, and radio pager devices (beepers) to notify and mobilize personnel. Key Vermont Yankee and support personnel carry pagers to expedite the mobiliza tion process during off-hours. Depending upon the emergency classification, different leve ls of mobilization ar e implemented. The mobilization scheme ensures that specific technical disciplines identified by Table B-1 of NUREG-0654 can be augmented within appropriate time frames. Table 8.4 outlines the minimum staffing requirements for the Emergency Response Organization at Vermont Yankee. Table 9.1 summarizes the response to the four classes of emergencies described in Section 5.0.  
3.4. Mobilization The mobilization scheme is based on the emergency notification system shown in Figure 9.1. Table 9.1 identifies the personnel notified. The notification system utilizes the plant public address system (Gai-Tronics), dedicated telephone lines, and radio pager devices (beepers) to notify and mobilize personnel. Key Vermont Yankee and support personnel carry pagers to expedite the mobilization process during off-hours. Depending upon the emergency classification, different levels of mobilization are implemented. The mobilization scheme ensures that specific technical disciplines identified by Table B-1 of NUREG-0654 can be augmented within appropriate time frames. Table 8.4 outlines the minimum staffing requirements for the Emergency Response Organization at Vermont Yankee. Table 9.1 summarizes the response to the four classes of emergencies described in Section 5.0.
3.5. State Government Notification and Response Vermont Yankee's Emergency Plan interfaces with the state emergency response plans of Vermont, New Hampshire and Massachusetts. Local town governments, in coordination with the emergency management agencies of these states, have plans, which if the need arises, contain instructions to carry out specific protective measures dependent upon various emergency conditions.
Vermont Yankee is responsible for conveying specific accident information, radiological assessment information, and protective action recommendations to the State of Vermont, State of New Hampshire, and Commonwealth of Massachusetts. It is the responsibility of each respective state Department of Public Health to evaluate this information and make appropriate recommendation regarding public protective actions in accordance with their plans and procedures.
A cooperative arrangement exists among the Vermont, New Hampshire and Massachusetts State authorities and Vermont Yankee Nuclear Power Station concerning radiological emergency preparedness. Vermont Yankee's emergency classification system and notification messages are reviewed and approved by these states in accordance with the terms specified in the Letter of Agreement found in Appendix E. Each state is committed to dispatching representatives to the plant's Emergency Operations Facility/Recovery Center when conditions warrant. Vermont Yankee's Joint Information Center provides the opportunity for joint utility, state and federal press briefings to be held.
Emergency Plan Revision 54 Page 8 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


3.5. State Government Notification and Response Vermont Yankee's Emergency Plan interfaces with the state emergency response plans of Vermont, New Hampshire and Massachusetts.
3.6. Federal Government Notification and Response As soon as an event is classified into one of the four categories of emergencies, notification to the NRC is made using the Emergency Notification System. Once notified of an emergency, the NRC evaluates the situation and determines the appropriate NRC response. Depending on the severity of the accident and the emergency classification declared, the NRC activates their incident response operations in accordance with the NRC Incident Response Plan. The NRC notifies the Federal Emergency Management Agency (FEMA) and other appropriate federal agencies to activate the federal emergency response organization in accordance with the National Response Framework (NRF). The NRF makes available the resources and capabilities of federal agencies to support plant, state and local governments. Principal participants are the NRC, FEMA, Department of Energy (DOE), and Environmental Protection Agency (EPA).
Local town governments, in coordination with the emergency management agencies of these states, have plans, which if the need arises, contain instructions to carry out specific protective measures dependent upon various emergency conditions.  
3.7. Technical Support Technical and manpower support are provided to the Vermont Yankee plant through support plans listed in Appendix G. Support beyond this level is arranged through the Institute of Nuclear Power Operations (INPO).
Emergency Plan Revision 54 Page 9 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Vermont Yankee is responsible for conveying specific accident information, radiological assessment information, and protective action recommendations to the State of Vermont, State of New Hampshire, and Commonwealth of Massachusetts. It is the responsibility of each respective state Department of Public Health to evaluate this information and make appropriate recommendation regarding public protective actions in accordance with their plans and procedures.  
4.0    THE AREA 4.1. The Site Vermont Yankee Nuclear Power Station is located on the west bank of the Connecticut River immediately upstream of the Vernon Hydrostation, in the town of Vernon, Vermont.
The Vermont Yankee Nuclear Power Station is a boiling water reactor having a thermal rated power of 1912 MWt. The station, shown in Figure 4.1, is located on about 125 acres in Windham County, and is owned by Entergy, with the exception of a narrow strip of land between the Connecticut River and the Vermont Yankee property for which it has perpetual rights and easements from the owner, New England Power Company.
4.2. Area Characteristics, Land Use and Demography The site, also shown in Figure 4.1, is bounded by the Connecticut River (Vernon Pond) on the east, by farm and pasture land mixed with wooded areas on the north and south, and by the town of Vernon on the west. Warwick and Northfield State Forests (approximately 8 miles southwest of the site), Green Mountain National Forest (approximately 18 miles southwest of the site) and the Pisgah Mountain Range (northeast of the site) limit the population density and land use within a 50-mile radius of the site. Most of the land around the site is undeveloped. Table 4.1 characterizes the land use within 25 miles of the plant.
The developed land is used for agricultural, dairying, and for residential areas within small villages. The primary agricultural crop is silage corn, which is stored for year-round feed for milk cows.
The nearest house is 1,300 feet from the Reactor Building and is one of several west of the site. The Vernon Elementary School (approximate enrollment of 250 pupils) is about 1,500 feet from the Reactor Building. The nearest hospital, Brattleboro Memorial, is approximately five (5) miles north-northwest from the site. The nearest dairy farm is approximately 1/2-mile northwest of the site. Additional dairy farms are located within a 5-mile radius of the plant. The largest sports facility in the vicinity is the Hinsdale Raceway, located approximately three (3) miles from the site. For racing events, the average attendance is approximately 4,000. A nursing home is located 2 miles south of the plant.
These areas have been noted since they have required special planning consideration by offsite authorities in the event of a radiological emergency at Vermont Yankee.
Figure 4.2 shows an overall perspective of the area within 50 miles of Vermont Yankee.
The average population density within a 10-mile radius of Vermont Yankee for 2000 was estimated to be 126 people per square mile. Figures 4.3, 4.4, and 4.5 provide the 2000 population distribution within a 5-, 10-, and 50-mile radius of the Vermont Yankee Nuclear Power Station. Table 4.2 summarizes these data.
Emergency Plan Revision 54 Page 10 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


A cooperative arrangement exists am ong the Vermont, New Hampshire and Massachusetts State authorities and Vermont Yankee Nuclear Power Station concerning radiological emergency preparedness. Vermont Yankee's emergency classification system
4.3. Emergency Planning Zones The NRC/EPA Task Force Report on Emergency Planning, "Planning Basis for the Development of State and Local Government Radiological Emergency Response Plans in Support of Light-Water Nuclear Power Plants" (NUREG-0396) established the size of planning zones for which predetermined emergency actions should be prepared. These planning zones were selected based upon the knowledge of the potential consequences, timing and release characteristics of a spectrum of accidents (including core melt scenarios), regardless of the low probability of occurrence. As a result, an Emergency Planning Zone concept was developed, both for short-term plume exposure and for the longer-term ingestion exposure pathways.
Emergency Planning Zones (EPZs) are defined as the areas for which planning is needed to assure that prompt and effective actions can be taken to protect the public in the event of an accident. The size of the Emergency Planning Zones represents the extent of detailed planning which should be performed to assure an adequate response. Dependent upon the severity of the accident, protective actions are generally limited to only portions of the designated EPZs, but as the need arises, actions are undertaken for the entire zones.
As a means of defining selected areas within the planning zones, Vermont Yankee divides the planning zones into sectors of 22 1/2 degrees centered on the 16 standard compass directions (see Figure 4.6). Each sector is identified by a letter ("I" and "O" are not used) and/or the standard compass direction. Distance from the plant is defined in terms of miles radially outward from the plant.
Vermont Yankee, for the purpose of radiological protection, is responsible for exercising direct control over the emergency activities within the exclusion area shown in Figure 4.1.
Means of controlling access on the river is the responsibility of the State of New Hampshire.
In accordance with the recommended planning bases, Vermont Yankee has expanded its previous planning considerations by defining two Emergency Planning Zones. The plume exposure EPZ, shown in Figure 4.7, is an area designated by the jurisdictional boundaries of those communities which are within a radial distance of 10 miles from the plant site. The size of the zone is based on the following considerations: 1) projected doses estimated for most accidents would not exceed the EPA Protective Action Guides outside the zone; 2) detailed planning within this area would provide a substantial base for expansion of response efforts in the event that it is necessary; 3) planning within this area recognizes all jurisdictional restraints imposed by the zone designation. Table 4.3 lists the local communities that are affected by this designation, the wind direction which would potentially affect these communities if a release occurs, and the sector/distance identification representing each of these communities. As specified in the state plans, communities within the plume exposure EPZ are alerted if a major accident at Vermont Yankee occurs. Communities within this zone have their own local radiological response plans.
Emergency Plan Revision 54 Page 11 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


and notification messages are reviewed and appr oved by these states in accordance with the terms specified in the Letter of Agreem ent found in Appendix E. Each state is committed to dispatching representatives to the plant's Emergency Operations Facility/Recovery Center when conditions wa rrant. Vermont Yankee's Joint Information Center provides the opportunity for joint utility, state and federal press briefings to be held.  
The ingestion exposure pathway Emergency Planning Zone, shown in Figure 4.8, is an area within a 50-mile radius from the plant site. The size of the zone is based on the fact that the downwind range within which significant contamination could occur would generally be limited to this distance because of wind shifts and travel periods. In addition, projected doses from contamination outside this zone would not exceed the Department of Health and Human Services' ingestion pathway Protective Action guides. Four states (Vermont, New Hampshire, Massachusetts, and New York) are responsible for coordinating and implementing protective actions within this area. Precautionary measures relative to livestock feeds, milk products, garden produce, and potable water supplies are implemented in this area to the extent dictated by the release conditions.
Emergency Plan Revision 54 Page 12 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Emergency Plan Revision 54  
TABLE 4.1 TABLE OF LAND USE (Square Miles)
Distance from Site Land Use                                0-10 Miles    10-25 Miles    1-25 Miles Residential                                30.2          79.2            109.4 Commercial and Industrial                    1.3            7.7            9.0 Agricultural                                25.9          143.8          169.7 Road                                        6.0          21.6            27.6 Public                                      7.2            78.3            85.5 Undeveloped                                243.4        1318.4          1561.8 TOTAL                                      314.0        1649.0          1963.0 Emergency Plan Revision 54 Page 13 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Page 9 of 125 Entergy Vermont Yankee 3.6. Federal Government Notification and Response As soon as an event is classified into one of the four categories of em ergencies, notification to the NRC is made using the Emergency Notification System. Once notified of an emergency, the NRC evaluates the situation and determines the appropriate NRC
TABLE 4.2 2000 POPULATION DISTRIBUTION WITHIN THE 50-MILE EPZ OF VERMONT YANKEE POPULATION TOTALS BY ZONE Ring                                    Cumulative Miles              Population              Miles                Population 0-1                  489                  0-1                    489 1-2                  2496                  0-2                    2985 2-3                  1937                  0-3                    4922 3-4                  1556                  0-4                    6478 4-5                  3441                  0-5                    9919 5-10                23954                0-10                  33873 10-20                111005                0-20                  144878 20-30                133847                0-30                  278725 30-40                337525                0-40                  616250 40-50                851123                0-50                  1467373 POPULATION TOTALS BY SECTOR Total Population                            Total Population Sector              0-50 Miles              Sector              0-50 Miles A  (N)                  46204              J  (S)                    458553 B  (NNE)                36424              K  (SSW)                  120057 C  (NE)                45230              L  (SW)                  32609 D  (ENE)                50939              M  (WSW)                  78287 E  (E)                  92389              N  (W)                    44288 F  (ESE)              188701              P  (WNW)                  31855 G  (SE)                141941              Q  (NW)                    17512 H  (SSE)                60442              R  (NNW)                  21912 Emergency Plan Revision 54 Page 14 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


response. Depending on the se verity of the accident and the emergency classification declared, the NRC activates their incident response operations in accordance with the NRC Incident Response Plan. The NRC notifies the Federal Emergency Management Agency (FEMA) and other appropriate federal agencies to activate the federal emergency response organization in accordance with the Nationa l Response Framework (NRF). The NRF makes available the resources and capabilities of federal agencies to support plant, state and local governments. Principal participants are the NRC, FEMA, Department of Energy (DOE), and Environmental Protection Agency (EPA).  
TABLE 4.3 VERMONT YANKEE "PLUME EXPOSURE" EMERGENCY PLANNING ZONE (10 MILE) CONSIDERATIONS COMMUNITIES              APPROPRIATE SECTOR            AFFECTED BY WINDS INVOLVED                  IDENTIFICATION*              BLOWING FROM
: 1. Brattleboro, VT        P (7-10), R and Q (4-10)                    ESE - S
: 2. Dummerston, VT          R and A (8-10)                            SE - SSW
: 3. Guilford, VT            L (3-5), M, N and P (2-9), Q (3-6)        NNE - SSE
: 4. Halifax, VT            M (9-10), N and P (8-10)                  ENE - SE
: 5. Vernon, VT              F (0-2), G and H (0-4), J (0-3), K and L (0-4), M, N, and P (0-3), Q and R (0-4)                          ALL DIRECTIONS
: 1. Chesterfield, NH        A and B (5-10), C (6-10)                  SSE - WSW
: 2. Hinsdale, NH            R, A, and B (0-6), C (0-4), D and E (0-3), F (1-4), G (2-5)            ALL DIRECTIONS
: 3. Richmond, NH            D, E, and F (9-10)                      WSW - WNW
: 4. Swanzey, NH            C (8-10), D (9-10)                        SSW - W
: 5. Winchester, NH          R (6-8), A and B (5-10), C (6-10)          S - NW
: 1. Bernardston, MA        J (3-9), K (3-10), L (3-8)               NNW - ENE
: 2. Colrain, MA            L and M (9-10)                             NNE - E
: 3. Gill, MA                H and J (7-10)                            NNW - NNE
: 4. Leyden, MA              K (7-10), L and M (5-10)                    N-E
: 5. Northfield, MA          G (4-10), H (3-10), J (3-7)              WNW - NNE
: 6. Warwick, MA            F and G (6-10)                             W - NNW
: 7. Greenfield, MA          J and K (8-10)                             N - NE
*Numbers in parentheses represent approximate miles from plant.
Emergency Plan Revision 54 Page 15 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


3.7. Technical Support Technical and manpower support are provided to the Vermont Yankee plant through support plans listed in Appendix G. Support beyond this level is arranged through the Institute of Nuclear Po wer Operations (INPO).
Figure 4.1 Vermont Yankee Site Emergency Plan Revision 54 Page 16 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Emergency Plan Revision 54  
Figure 4.2 Population Center and Special Interest Areas Within the 50 Mile EPZ Emergency Plan Revision 54 Page 17 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Page 10 of 125 Entergy Vermont Yankee 4.0 THE AREA 4.1. The Site Vermont Yankee Nuclear Power Station is located on the west bank of the Connecticut River immediately upstream of the Vernon Hydrostation, in t he town of Vernon, Vermont.
Figure 4.3 2000 Population Distribution Within 0 - 5 Miles of Vermont Yankee Emergency Plan Revision 54 Page 18 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
The Vermont Yankee Nuclear Power Station is a boiling water reactor having a thermal


rated power of 1912 MWt. The station, show n in Figure 4.1, is located on about 125 acres in Windham County, and is owned by Entergy, with the exception of a narrow strip of land between the Connecticut River and the Vermont Y ankee property for which it has perpetual rights and easements from the ow ner, New England Power Company.
Figure 4.4 2000 Population Distribution Within 0 - 10 Miles of Vermont Yankee Emergency Plan Revision 54 Page 19 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
4.2. Area Characteristics, Land Use and Demography The site, also shown in Figure 4.1, is bounded by the Connecticut River (Vernon Pond) on the east, by farm and pasture land mixed wi th wooded areas on the north and south, and by the town of Vernon on the we st. Warwick and Northfield St ate Forests (approximately 8 miles southwest of the site), Green Mountain National Forest (approximately 18 miles southwest of the site) and the Pisgah Mountain Range (northea st of the site) limit the population density and land use within a 50-mile radius of the site. Most of the land around the site is undeveloped. Table 4.1 characterizes the land use within 25 miles of the plant. 


The developed land is used for agricultural, dai rying, and for resident ial areas within small villages. The primary agricultural crop is sil age corn, which is stored for year-round feed for milk cows.
Figure 4.5 2000 Population Distribution Within 10 - 50 Miles of Vermont Yankee Emergency Plan Revision 54 Page 20 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


The nearest house is 1,300 feet from the Reactor Building and is one of several west of the site. The Vernon Elementary School (approxim ate enrollment of 250 pupils) is about 1,500 feet from the Reactor Buil ding. The nearest hospital, Brattleboro Memorial, is approximately five (5) miles nor th-northwest from the site. The nearest dairy farm is approximately 1/2-mile northwest of the site. Additional dai ry farms are located within a 5-mile radius of the plant. The largest sports facility in the vicinity is the Hinsdale Raceway, located approximately three (3) miles from the site. For racing events, the average attendance is approximately 4,000. A nursing home is located 2 miles s outh of the plant.
NOTE:      Each sector is 221/2° and is designated by either a letter ("i" and "O" not used) or a standard compass direction identification.
These areas have been noted since they have required special planning consideration by offsite authorities in the event of a radiological emergency at Vermont Yankee.
Figure 4.6 Sector Nomenclature for Vermont Yankee Plume Exposure EPZ Emergency Plan Revision 54 Page 21 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Figure 4.2 shows an overall perspective of t he area within 50 miles of Vermont Yankee.
Figure 4.7 Vermont Yankee Plume Exposure Emergency Planning Zone Only those portions of the communities that are within a 10-mile radius have been covered by the Public Notification System. All communities within this EPZ Boundary designation have developed an emergency plan.
The average population density within a 10-mile radius of Vermont Yankee for 2000 was estimated to be 126 people per square mile. Fi gures 4.3, 4.4, and 4.5 provide the 2000 population distribution within a 5-, 10-, and 50-mile radius of the Vermont Yankee Nuclear Power Station. Table 4.2 summarizes these data.
Emergency Plan Revision 54 Page 22 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Emergency Plan Revision 54  
Figure 4.8 Vermont Yankee 50 Mile Ingestion Pathway Emergency Planning Zone Emergency Plan Revision 54 Page 23 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Page 11 of 125 Entergy Vermont Yankee 4.3. Emergency Planning Zones The NRC/EPA Task Force Report on Emergency Planning, "Planning Basis for the Development of State and Local Government Radiological Emergency Response Plans in Support of Light-Water Nuclear Power Plants" (NUREG-0396) established the size of planning zones for which predetermined emer gency actions should be prepared. These planning zones were selected based upon the knowledge of the potential consequences, timing and release characteristics of a spec trum of accidents (including core melt scenarios), regardless of the low probability of occurrence.
5.0    EMERGENCY CLASSIFICATION SYSTEM The wide spectrum of component or system failures, or other occurrences that could potentially reduce plant safety margins, needs to be categorized. For this reason, a classification system has been defined which categorizes incidents according to severity into the following four classes: Notification of Unusual Event, Alert, Site Area Emergency, and General Emergency.
As a result, an Emergency Planning Zone concept was developed, both fo r short-term plume ex posure and for the longer-term ingestion exposure pathways.
The incidents leading to each of the four emergency classifications are further identified by certain measurable and observable indicators of plant conditions called Emergency Action Levels (EALs) listed in Appendix A. Emergency Action Levels defined in Appendix A aid the operator in recognizing the potential of an incident immediately and assure that the first step in the emergency response is carried out. The classification of the event may change as the conditions change.
The VY EALs and EAL bases were derived from example initiating conditions in NUMARC/NESP-007 (NEI 99-01), "Methodology for Development of Emergency Action Levels", Rev. 5, dated February 2008. The EALs and bases have been modified in accordance with Letter USNRC to VYNPS, "Vermont Yankee Nuclear Power Station -
Safety Evaluation for Emergency Action Levels (TAC No. MD9157)", dated June 16, 2009.
5.1. Notification of Unusual Event EVENTS ARE IN PROCESS OR HAVE OCCURRED WHICH INDICATE A POTENTIAL DEGRADATION OF THE LEVEL OF SAFETY OF THE PLANT OR INDICATE A SECURITY THREAT TO FACILITY PROTECTION HAS BEEN INITIATED. NO RELEASES OF RADIOACTIVE MATERIAL REQUIRING OFFSITE RESPONSE OR MONITORING ARE EXPECTED UNLESS FURTHER DEGRADATION OF SAFETY SYSTEMS OCCURS.
Notification of Unusual Event conditions do not cause serious damage to the plant and may not require a change in operational status. The purpose of the Notification of Unusual Event declaration is to: 1) ensure that the first step in any response later found to be necessary has been carried out; 2) bring the operating staff to a state of readiness; and 3) ensure that appropriate offsite notifications have been made in the event that additional support is required.
See Appendix A for a complete list of Emergency Action Levels corresponding to a Notification of Unusual Event.
Emergency Plan Revision 54 Page 24 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Emergency Planning Zones (EPZs) are defined as the areas for which planning is needed
5.1.1. Unusual Event (Terminated)
If a condition that warrants a Notification of Unusual Event declaration has occurred, and was immediately rectified such that the condition no longer existed by the time of declaration, this Notification of Unusual Event classification is referred to as an Unusual Event (Terminated).
The event or condition did not affect personnel onsite or the public offsite, or result in radioactive releases requiring offsite monitoring.
5.2. Alert EVENTS ARE IN PROCESS OR HAVE OCCURRED WHICH INVOLVE AN ACTUAL OR POTENTIAL SUBSTANTIAL DEGRADATION OF THE LEVEL OF SAFETY OF THE PLANT OR A SECURITY EVENT THAT INVOLVES PROBABLE LIFE THREATENING RISK TO SITE PERSONNEL OR DAMAGE TO SITE EQUIPMENT BECAUSE OF HOSTILE ACTION. ANY RELEASES ARE EXPECTED TO BE LIMITED TO SMALL FRACTIONS OF THE EPA PROTECTIVE ACTION GUIDELINE EXPOSURE LEVELS.
Plant response and offsite notifications associated with this event classification assure that sufficient emergency response personnel, both onsite and offsite, are mobilized and respond to event conditions. Actual releases of radioactivity which exceed Technical Specification limits may be involved, thus radiation monitoring and dose projection may be an integral portion of the emergency response required. Plant emergency response facilities are activated at this classification.
See Appendix A for a complete list of Emergency Action Levels corresponding to an Alert.
5.3. Site Area Emergency EVENTS ARE IN PROCESS OR HAVE OCCURRED WHICH INVOLVE AN ACTUAL OR LIKELY MAJOR FAILURES OF PLANT FUNCTIONS NEEDED FOR PROTECTION OF THE PUBLIC OR HOSTILE ACTION THAT RESULTS IN INTENTIONAL DAMAGE OR MALICIOUS ACTS; (1)
TOWARD SITE PERSONNEL OR EQUIPMENT THAT COULD LEAD TO THE LIKELY FAILURE OF OR; (2) THAT PREVENT EFFECTIVE ACCESS TO EQUIPMENT NEEDED FOR THE PROTECTION OF THE PUBLIC. ANY RELEASES ARE NOT EXPECTED TO RESULT IN EXPOSURE LEVELS WHICH EXCEED EPA PROTECTIVE ACTION GUIDELINE EXPOSURE LEVELS BEYOND THE SITE BOUNDARY.
Emergency Plan Revision 54 Page 25 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


to assure that prompt and effective actions can be taken to protect the public in the event of an accident. The size of the Emergency Planning Zones represents the extent of detailed planning which should be performed to a ssure an adequate response. Dependent upon the severity of the accident, protective actions are generally limited to only portions of the designated EPZs, but as the need arises, ac tions are undertaken for the entire zones.  
The events included in this category represent a potential for offsite releases which could impact the public to the extent that protective actions may be necessary. The purpose of the Site Area Emergency declaration is to: 1) ensure that all plant emergency response elements are mobilized; 2) ensure that monitoring teams have been dispatched, if needed;
: 3) ensure that in-plant protective measures have been taken; 4) provide for direct interface with offsite governmental response organizations; and 5) provide updates for the public through offsite officials.
See Appendix A for a complete list of Emergency Action Levels corresponding to Site Area Emergency.
5.4. General Emergency EVENTS ARE IN PROCESS OR HAVE OCCURRED WHICH INVOLVE ACTUAL OR IMMINENT SUBSTANTIAL CORE DEGRADATION OR MELTING WITH POTENTIAL FOR LOSS OF CONTAINMENT INTEGRITY OR HOSTILE ACTION THAT RESULTS IN AN ACTUAL LOSS OF PHYSICAL CONTROL OF THE FACILITY. RELEASES CAN BE REASONABLY EXPECTED TO EXCEED EPA PROTECTIVE ACTION GUIDELINE EXPOSURE LEVELS OFFSITE FOR MORE THAN THE IMMEDIATE SITE AREA.
The purpose of the General Emergency declaration is to: 1) ensure that appropriate offsite officials are adequately advised as to the extent of plant degradation; 2) provide consultation with offsite authorities in establishing appropriate protective actions for the public; 3) provide updates for the public through offsite authorities; and 4) ensure that all emergency response organizations and resources are being applied to accident mitigation.
See Appendix A for a complete list of Emergency Action Levels corresponding to a General Emergency.
5.5. Emergency Classification System Review by State Authorities The emergency classification system specified above, as well as the EALs presented in Appendix A, is reviewed with the state authorities of Vermont, New Hampshire, and Massachusetts.
Emergency Plan Revision 54 Page 26 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


As a means of defining selected areas within the planning zones, Vermont Yankee divides the planning zones into sectors of 22 1/2 degrees centered on the 16 standard compass directions (see Figure 4.6). Each sector is identified by a letter ("I" and "O" are not used) and/or the standard compass direction. Distance from the pl ant is defined in terms of miles radially outward from the plant.  
6.0    EMERGENCY RESPONSE FACILITIES AND EQUIPMENT Following the declaration of an emergency, the activities of the emergency response organization are coordinated in a number of emergency response facilities. Figure 4.1 shows the relative locations of Vermont Yankee's onsite emergency response facilities.
Figure 6.1 represents the locations of the offsite support organizations' Emergency Operations Centers relative to Vermont Yankee. Descriptions of Vermont Yankee facilities and assessment capabilities are presented below.
6.1. Emergency Response Facilities The emergency response organization is activated, in part or wholly, dependent upon the operating crew's recognition of Emergency Action Levels (EALs) which represent a particular emergency condition. Facility activation may be modified or suspended if the safety of personnel may be jeopardized by a security event or other event hazardous to personnel. Classification and subsequent declaration of the appropriate emergency condition by the Shift Manager transforms the Control Room complex into an emergency control center. Initially, the Control Room crew coordinates all phases of emergency response and corrective action required to restore the plant to a safe condition. The Control Room staff's attention focuses on regaining plant control as emergency response personnel report and are delegated emergency functions. The following describe each emergency response facility location.
6.1.1. Technical Support Center A Technical Support Center (TSC) has been established to direct post-accident evaluation and assist in recovery operations of the plant. The TSC is located on the second floor of the Administration Building in close proximity to the Control Room and is radiologically habitable to the same degree as the Control Room for postulated accident conditions. This center is established under the supervision of the Emergency Plant Manager and staffed by members of the TSC organization shown in Figure 8.3. A portion of the TSC, as shown in Figure 6.2, is assigned for NRC Incident Response Team members who may be dispatched to the plant. The TSC has the capability to monitor various plant parameters needed to evaluate accident conditions by accessing the plant process computer and using the diagnostic capability that its staff offers. The TSC staff can access more computer capabilities through the support plans listed in Appendix G.
Emergency Plan Revision 54 Page 27 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Vermont Yankee, for the purpose of radiological protection, is responsible for exercising direct control over the emergen cy activities within the exclusio n area shown in Figure 4.1. Means of controlling access on the river is the responsibility of the State of New Hampshire.  
Upon activation, the TSC provides the main communication link between the plant, the Control Room, the NRC and the Emergency Operations Facility/Recovery Center. Details of this communications capability are described in Section 7.0. The plant print files are located within the TSC boundary, and contain pending and as-built system and equipment drawings, system flow diagrams, isometrics, cable/wiring diagrams, equipment outline drawings, UFSAR, Emergency Plan and plant procedures.
The TSC is activated by the Emergency Plant Manager when a plant condition exists which requires ongoing technical evaluation (i.e., Alert, Site Area or General Emergency conditions). The TSC may be activated by the Emergency Plant Manager under a Notification of Unusual Event if conditions warrant such an action. The TSC has the capability to assess radiological conditions. This assessment capability consists of monitoring for direct radiation and airborne particulates, and sampling and analysis for airborne radioiodine. Appendix B lists emergency equipment found in the TSC.
If staffing of the TSC is not possible due to a security event or other hazardous conditions, ERO personnel will be notified to report to an alternate location.
The TSC is deactivated by the Emergency Director or the Emergency Plant Manager, depending on the emergency class, when the plant conditions have stabilized such that continuous technical assessment is no longer required.
6.1.2. The Operations Support Center The Operations Support Center (OSC), which is located on the first floor of the Administration Building, provides a general assembly area for Chemistry, Radiation Protection, Maintenance, Operations, and I&C Personnel (see Figure 6.3). It is staffed with sufficient in-plant personnel required to effect protective and corrective actions in support of the emergency situation. An Operations Support Center Manager directs the activities of this center. In-plant phone extensions and a page/intercom system provide communication capability at the OSC. Emergency equipment listed in Appendix B has been provided with additional back-up capability provided at the Radiation Protection control point. If conditions warrant evacuation of this center, the Emergency Operations Facility/Recovery Center assumes OSC functions. The OSC remains active and staffed until terminated by the Emergency Plant Manager.
If staffing of the OSC is not possible due to a security event or other hazardous conditions, ERO personnel will be notified to report to an alternate location.
Emergency Plan Revision 54 Page 28 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


In accordance with the recommended planning bases, Vermont Yankee has expanded its previous planning considerations by defini ng two Emergency Planning Zones. The plume exposure EPZ, shown in Figure 4.7, is an area designated by the jurisdictional boundaries of those communities which are within a radial distance of 10 miles from the plant site. The size of the zone is based on the following considerations:  1) projected doses estimated for most accidents would not exceed the EPA Protective Action Guides outside the zone; 2)
6.1.3. Emergency Operations Facility/Recovery Center The Emergency Operations Facility/Recovery Center (EOF/RC) is located at the Vermont Yankee Training Center on Old Ferry Road in Brattleboro, Vermont, approximately 8.75 miles from the plant site (See Figure 6.1). The EOF has a radiation protection factor of 5 and a ventilation system equipped with HEPA filters which can be isolated. The Commission has approved this as the primary facility with no backup up EOF necessary.
(NVY 84-44, February 27, 1984) The EOF, with communication capabilities for contacting the Control Room and plant Security, is available to serve as a staging area for augmented emergency response staff if the site is under threat of or experiencing hostile action. The overall responsibility for the functions performed in the EOF/RC belongs to the Emergency Director.
The Emergency Director acts as the principal spokesperson for Vermont Yankee concerning all issues where an interface with offsite government authorities is required.
The Radiological Assessment Coordinator is responsible for continuous evaluation of all licensee activities related to an emergency having, or potentially having, environmental radiological consequences. The EOF/RC has sufficient space and design to accommodate the emergency response organization and responding representatives from government and industry who are responsible for limiting offsite consequences (see Figure 6.4). The EOF/RC provides information needed by federal, state, and local authorities for implementation of their offsite Emergency Plans, and a centralized meeting location for key representatives from the agencies.
The EOF/RC maintains extensive communications capability with all emergency response facilities. Section 7.0 details the extent of this capability. Site access and control, dose assessment, sample analysis, decontamination, and recovery planning activities are directed from various locations within the EOF/RC. The EOF/RC serves as the primary evacuation, re-assembly, and off-duty augmentation personnel assembly point. Public information statements concerning the plant emergency status are transmitted from the EOF/RC to the Joint Information Center for release to the public.
The following copies of emergency planning documents are available in the EOF/RC:
Site Emergency Plan and Implementing Procedures Area Maps State and Local Emergency Plans UFSAR Emergency equipment and supplies are maintained at the EOF/RC, including equipment necessary to assess radiological habitability. This consists of monitoring for direct radiation and sampling and analysis for airborne radioparticulates and radioiodine. For a list of EOF/RC emergency equipment, see Appendix B.
Emergency Plan Revision 54 Page 29 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


detailed planning within this area would provide a subst antial base for expansion of response efforts in the event that it is necessary; 3) planning within this area recognizes all jurisdictional restraints imposed by the z one designation. Table 4.3 lists the local
6.1.4. Deleted 6.1.5. Joint Information Center The Joint Information Center (JIC) provides a centralized location for conducting joint state, federal and Vermont Yankee emergency news briefings in a manner to avoid hampering ongoing emergency response proceedings. It is expected that state and federal public information personnel will operate from the JIC.
 
The initial designated location of the JIC is the Vermont Yankee Office Building located in Brattleboro, Vermont. If accident conditions (plume trajectory) jeopardize the habitability of this facility, the alternate JIC at Landmark College in Putney, Vermont would be utilized.
communities that are affected by this des ignation, the wind direction which would potentially affect these communities if a release occurs, and the sector/distance identification representing each of these communities. As s pecified in the state plans, communities within the plume exposure EPZ ar e alerted if a major accident at Vermont Yankee occurs. Communities within this zone have their own local radiological response plans.
At the JIC, the Company Spokesperson coordinates the generation and issuance of press releases concerning plant emergency conditions to the media. Prior to their release to the media, the Emergency Director approves releases.
 
The JIC will be activated upon an emergency classification of an Alert or higher except as noted below.
Emergency Plan Revision 54
Activation of the JIC is optional prior to an Alert and is dependent on the escalation of the event and/or public interest. Prior to the activation of the JIC, the Manager of Communications or designee would be coordinating press releases from his/her routine operations location.
 
6.1.6. Coordination of Radiological Data Centralized coordination of the offsite radiological assessment effort with all organizations interested in and/or performing assessments is of importance to ensure that the data and its interpretation are reviewed by all parties. The number and type of organizations performing this effort vary with time and following accident declaration and offsite notification. Initially, plant emergency response personnel are the only organization performing this function and they are directed from, and their results evaluated, at the EOF/RC. State authorities join the EOF/RC monitoring and assessment activities. Federal response agencies would augment plant and state radiological assessment efforts upon their arrival.
Page 12 of 125 Entergy Vermont Yankee The ingestion exposure pathway Emergency Planning Zone, shown in Figure 4.8, is an area within a 50-mile radius from the plant site. The size of the zone is based on the fact that the downwind range within which significant contaminati on could occur would generally be limited to this distance because of wind shifts and travel periods. In addition, projected doses from contamination outside this zone would not exceed the Department of Health and Human Services' ingestion pathway Protecti ve Action guides. Four states (Vermont, New Hampshire, Massachusetts, and New York) are responsible for coordinating and
Plant and state monitoring efforts are coordinated at the EOF/RC. All samples are screened for activity levels in the field. Positive results require additional analysis at the EOF/RC. Analysis is completed in two phases. Initially, the sample is evaluated for radioiodine concentration levels using gamma energy analyses instrumentation. Having completed this analysis, total isotopic determination of activity levels is conducted using a HPGe or equivalent system. The EOF/RC sampling capability is greatly enhanced by coordinating sample transfer and analysis with the Environmental Laboratory.
 
Emergency Plan Revision 54 Page 30 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
implementing protective actions within this area. Precautionary measures relative to livestock feeds, milk products, garden produce, and potable water supplies are implemented in this area to the extent dictated by the release conditions.
 
Emergency Plan Revision 54
 
Page 13 of 125 Entergy Vermont Yankee TABLE 4.1 TABLE OF LAND USE (Square Miles)
Distance from Site
 
Land Use 0-10 Miles 10-25 Miles 1-25 Miles Residential 30.2 79.2 109.4 Commercial and Industrial 1.3 7.7 9.0 Agricultural 25.9 143.8 169.7 Road 6.0 21.6 27.6 Public 7.2 78.3 85.5 Undeveloped 243.4 1318.4 1561.8 TOTAL 314.0 1649.0 1963.0 Emergency Plan Revision 54
 
Page 14 of 125 Entergy Vermont Yankee TABLE 4.2 2000 POPULATION DISTRIBUTION WITHIN THE 50-MILE EPZ OF VERMONT YANKEE
 
POPULATION TOTALS BY ZONE Ring Miles Population Cumulative Miles Population 0-1 489 0-1 489 1-2 2496 0-2 2985
 
2-3 1937 0-3 4922 3-4 1556 0-4 6478 4-5 3441 0-5 9919 5-10 23954 0-10 33873 10-20 111005 0-20 144878 20-30 133847 0-30 278725 30-40 337525 0-40 616250 40-50 851123 0-50 1467373 POPULATION TOTALS BY SECTOR Total Population Total Population Sector 0-50 Miles Sector 0-50 Miles A (N) 46204 J (S) 458553 B (NNE) 36424 K (SSW) 120057 C (NE) 45230 L (SW) 32609 D (ENE) 50939 M (WSW) 78287 E (E) 92389 N (W) 44288 F (ESE) 188701 P (WNW) 31855 G (SE) 141941 Q (NW) 17512 H (SSE) 60442 R (NNW) 21912 Emergency Plan Revision 54
 
Page 15 of 125 Entergy Vermont Yankee TABLE 4.3 VERMONT YANKEE "PLUME EXPOSURE" EMERGENCY PLANNING ZONE (10 MILE) CONSIDERATIONS
 
COMMUNITIES INVOLVED APPROPRIATE SECTOR IDENTIFICATION* AFFECTED BY WINDS BLOWING FROM 1. Brattleboro, VT P (7-10), R and Q (4-10)
ESE - S 2. Dummerston, VT R and A (8-10) SE - SSW 3. Guilford, VT L (3-5), M, N and P (2-9), Q (3-6) NNE - SSE 4. Halifax, VT M (9-10), N and P (8-10)
ENE - SE 5. Vernon, VT F (0-2), G and H (0-4), J (0-3), K
 
and L (0-4), M, N, and P (0-3), Q
 
and R (0-4)
ALL DIRECTIONS 1. Chesterfield, NH A and B (5-10), C (6-10)
SSE - WSW 2. Hinsdale, NH R, A, and B (0-6), C (0-4), D and E (0-3), F (1-4), G (2-5)
ALL DIRECTIONS 3. Richmond, NH D, E, and F (9-10)
WSW - WNW 4. Swanzey, NH C (8-10), D (9-10)
SSW - W 5. Winchester, NH R (6-8), A and B (5-10), C (6-10) S - NW 1. Bernardston, MA J (3-9), K (3-10), L (3-8)
NNW - ENE 2. Colrain, MA L and M (9-10)
NNE - E 3. Gill, MA H and J (7-10)
NNW - NNE 4. Leyden, MA K (7-10), L and M (5-10)
N - E 5. Northfield, MA G (4-10), H (3-10), J (3-7)
WNW - NNE 6. Warwick, MA F and G (6-10)
W - NNW 7. Greenfield, MA J and K (8-10)
N - NE  *Numbers in parentheses represent approximate miles from plant.
 
Emergency Plan Revision 54
 
Page 16 of 125 Entergy Vermont Yankee
 
Figure 4.1 Vermont Yankee Site
 
Emergency Plan Revision 54
 
Page 17 of 125 Entergy Vermont Yankee Figure 4.2 Population Center and Special Interest Areas Within the 50 Mile EPZ Emergency Plan Revision 54
 
Page 18 of 125 Entergy Vermont Yankee Figure 4.3 2000 Population Distribution Within 0 - 5 Miles of Vermont Yankee Emergency Plan Revision 54
 
Page 19 of 125 Entergy Vermont Yankee Figure 4.4 2000 Population Distribution Within 0 - 10 Miles of Vermont Yankee Emergency Plan Revision 54
 
Page 20 of 125 Entergy Vermont Yankee Figure 4.5 2000 Population Distribution Within 10 - 50 Miles of Vermont Yankee Emergency Plan Revision 54
 
Page 21 of 125 Entergy Vermont Yankee
 
NOTE: Each sector is 221/2° and is designated by either a letter ("i" and "O" not used) or a standard compass dire ction identification.
Figure 4.6 Sector Nomenclature for Vermont Yankee Plume Exposure EPZ Emergency Plan Revision 54
 
Page 22 of 125 Entergy Vermont Yankee Figure 4.7 Vermont Yankee Plume Exposure Emergency Planning Zone Only those portions of the communities that are within a 10-mile radius have been covered by the Public Notification System. All comm unities within this EPZ Boundary designation have developed an emergency plan.
Emergency Plan Revision 54
 
Page 23 of 125 Entergy Vermont Yankee Figure 4.8 Vermont Yankee 50 Mile Ingestion Pathway Emergency Planning Zone Emergency Plan Revision 54
 
Page 24 of 125 Entergy Vermont Yankee 5.0 EMERGENCY CLASSIFICATION SYSTEM The wide spectrum of component or system fa ilures, or other occurrences that could
 
potentially reduce plant safety margins, needs to be categorized. For this reason, a classification system has been defined which ca tegorizes incidents according to severity into the following four classes: Notification of Unusual Event, Alert, Site Area Emergency, and General Emergency.
 
The incidents leading to each of the four emergency classifications are further identified by certain measurable and observa ble indicators of plant conditions called Emergency Action Levels (EALs) listed in Appendix A. Emer gency Action Levels defined in Appendix A aid the operator in recognizing the pot ential of an incident immediately and assure that the first step in the emergency response is carried out.
The classification of the event may change as the conditions change.
 
The VY EALs and EAL bases were derived fr om example initiating conditions in NUMARC/NESP-007 (NEI 99-01), "Methodology for Development of Emergency Action Levels", Rev. 5, dated February 2008.
The EALs and bases have been modified in accordance with Letter USNRC to VYNPS, "Vermont Yankee Nuclear Power Station -
Safety Evaluation for Emergency Action Level s (TAC No. MD9157)", dated June 16, 2009.
5.1. Notification of Unusual Event EVENTS ARE IN PROCESS OR HAVE OCCURRED WHICH INDICATE A POTENTIAL DEGRADATION OF THE LE VEL OF SAFETY OF THE PLANT OR INDICATE A SECURITY THREAT TO FACILITY PROTECTION HAS BEEN INITIATED. NO RELEASES OF RADIOACTIVE MATERIAL REQUIRING OFFSITE RESPONSE OR MONITORING ARE EXPECTED UNLESS FURTHER DEGRADATION OF SAFETY SYSTEMS OCCURS.
 
Notification of Unusual Event conditions do not cause serious damage to the plant and may
 
not require a change in operational status. The purpose of the Notification of Unusual Event declaration is to: 1) ensure that the first step in any response later found to be necessary has been carried out; 2) bring the operat ing staff to a state of readiness; and 3) ensure that appropriate offsite notifications have been made in the event that additional support is required.
 
See Appendix A for a complete list of Emergency Action Levels corresponding to a Notification of Unusual Event.
 
Emergency Plan Revision 54
 
Page 25 of 125 Entergy Vermont Yankee 5.1.1. Unusual Event (Terminated) If a condition that warrants a Notification of Unusual Event declaration has occurred, and was immediately rectified such that the c ondition no longer existed by the time of declaration, this Notification of Unusual Even t classification is refe rred to as an Unusual Event (Terminated).
 
The event or condition did not affect personnel onsite or the public offsite, or result in radioactive releases requi ring offsite monitoring.
 
5.2. Alert EVENTS ARE IN PROCESS OR HAVE OCCURRED WHICH INVOLVE AN ACTUAL OR POTENTIAL SUBSTANTIA L DEGRADATION OF THE LEVEL OF SAFETY OF THE PLANT OR A SECURITY EVENT THAT INVOLVES
 
PROBABLE LIFE THREATENING RISK TO SITE PERSONNEL OR DAMAGE TO SITE EQUIPMENT BECA USE OF HOSTILE ACTION. ANY RELEASES ARE EXPECTED TO BE LI MITED TO SMALL FRACTIONS OF THE EPA PROTECTIVE ACTION GU IDELINE EXPOSURE LEVELS.
 
Plant response and offsite notifications associat ed with this event classification assure that sufficient emergency response personnel, both onsite and offsite, are mobilized and
 
respond to event conditions. Actual releases of radioactivity wh ich exceed Technical Specification limits may be involv ed, thus radiation monitoring and dose projection may be an integral portion of the emergency response required. Plant emergency response facilities are activated at this classification.
 
See Appendix A for a complete list of Emergency Action Level s corresponding to an Alert.
5.3. Site Area Emergency EVENTS ARE IN PROCESS OR HAVE OCCURRED WHICH INVOLVE AN ACTUAL OR LIKELY MAJOR FAILURES OF PLANT FUNCTIONS
 
NEEDED FOR PROTECTION OF TH E PUBLIC OR HOSTILE ACTION THAT RESULTS IN INTENTIONAL DAMAGE OR MALICIOUS ACTS; (1)
TOWARD SITE PERSONNEL OR EQUIPMENT THAT COULD LEAD TO THE LIKELY FAILURE OF OR; (2)
THAT PREVENT EFFECTIVE ACCESS TO EQUIPMENT NEEDED FOR THE PROTECTION OF THE PUBLIC. ANY RELEASES ARE NOT EXPECTED TO RESULT IN EXPOSURE LEVELS WHICH EXCEED EPA PROTECTIVE ACTION GUIDELINE EXPOSURE LEVELS BEYOND THE SITE BOUNDARY.
 
Emergency Plan Revision 54
 
Page 26 of 125 Entergy Vermont Yankee The events included in this category represent a potential for offsite releases which could impact the public to the extent that protective actions may be necessary. The purpose of the Site Area Emergency declaration is to: 1) ensure that all plant emergency response elements are mobilized; 2) ensure that monitoring teams have been dispatched, if needed; 3) ensure that in-plant protec tive measures have been taken; 4) provide for direct interface with offsite governmental response organizations; and 5) provide updates for the public through offsite officials.
 
See Appendix A for a complete list of Emergency Action Lev els corresponding to Site Area Emergency.
 
5.4. General Emergency EVENTS ARE IN PROCESS OR HAVE OCCURRED WHICH INVOLVE ACTUAL OR IMMINENT SUBSTANTIAL CORE DEGRADATION OR
 
MELTING WITH POTENTIAL FOR LO SS OF CONTAINMENT INTEGRITY OR HOSTILE ACTION THAT RESULTS IN AN ACTUAL LOSS OF PHYSICAL CONTROL OF THE FACILITY. RELEASES CAN BE
 
REASONABLY EXPECTED TO EXC EED EPA PROTECTIVE ACTION GUIDELINE EXPOSURE LEVELS O FFSITE FOR MORE THAN THE IMMEDIATE SITE AREA.
 
The purpose of the General Emer gency declaration is to: 1) ensure that appropriate offsite officials are adequately advised as to the ext ent of plant degra dation; 2) provide consultation with offsite authorities in establishing appropriate protective actions for the public; 3) provide updates for the public through offsite authorit ies; and 4) ensure that all emergency response organizations and resources are being applied to accident mitigation.
 
See Appendix A for a complete list of Emergency Action Lev els corresponding to a General Emergency.
 
5.5. Emergency Classification System Review by State Authorities The emergency classification system specified above, as well as the EALs presented in Appendix A, is reviewed with the state authorities of Vermont, New Hampshire, and Massachusetts.
 
Emergency Plan Revision 54
 
Page 27 of 125 Entergy Vermont Yankee 6.0 EMERGENCY RESPONSE FACILITIES AND EQUIPMENT Following the declaration of an emergency, the activities of the emergency response organization are coordinated in a number of emergency response facilities. Figure 4.1 shows the relative locations of Vermont Y ankee's onsite emergency response facilities.
Figure 6.1 represents the lo cations of the offsite s upport organizations' Emergency Operations Centers relative to Vermont Yank ee. Descriptions of Vermont Yankee facilities and assessment capabilities are presented below.
 
6.1. Emergency Response Facilities The emergency response organization is activat ed, in part or wholly, dependent upon the operating crew's recognition of Emergency Action Levels (EALs) which represent a particular emergency condition.
Facility activation may be modified or suspended if the safety of personnel may be jeopardized by a security event or other event hazardous to personnel. Classification and subsequent decl aration of the appropriate emergency condition by the Shift Manager transforms the Control Room complex into an emergency control center. Initially, t he Control Room crew coordi nates all phases of emergency response and corrective action required to rest ore the plant to a safe condition. The Control Room staff's attention focuses on regaining plant control as emergency response personnel report and are delegated emergency functions. The following describe each emergency response facility location.
 
6.1.1. Technical Support Center A Technical Support Center (TSC) has been established to direct post-accident evaluation and assist in recovery operations of the plant.
The TSC is located on the second floor of the Administration Building in close proximity to the Control Room and is radiologically habitable to the same degree as the Control Room for postulated accident conditions. This center is established under the supervision of the Emergen cy Plant Manager and staffed by members of the TSC organization shown in Figur e 8.3. A portion of t he TSC, as shown in Figure 6.2, is assigned for NRC Incident Response Team members who may be dispatched to the plant. The TSC has the c apability to monitor various plant parameters needed to evaluate accident conditions by acce ssing the plant process computer and using the diagnostic capability that its staff offers. The TSC st aff can access more computer capabilities through the support plans listed in Appendix G.
 
Emergency Plan Revision 54
 
Page 28 of 125 Entergy Vermont Yankee Upon activation, the TSC provides the main communication link between the plant, the Control Room, the NRC and the Emergency Operations Facility/
Recovery Center. Details of this communications capability are described in Section 7.0. The plant print files are located within the TSC boundary, and contai n pending and as-built system and equipment drawings, system flow diagram s, isometrics, cable/wiring diagrams, equipment outline drawings, UFSAR, Emergency Plan and plant procedures.
 
The TSC is activated by the Emergency Plant Manager when a plant condition exists which requires ongoing technical evaluation (i.e
., Alert, Site Area or General Emergency conditions). The TSC may be activated by the Emergency Plant Manager under a Notification of Unusual Event if conditions warrant such an action. The TSC has the capability to assess radiological conditions. This assessment capability consists of monitoring for direct radiat ion and airborne particulates, and sampling and analysis for airborne radioiodine. Appen dix B lists emergency equi pment found in the TSC.
 
If staffing of the TSC is not possible due to a security event or other hazardous conditions, ERO personnel will be notified to report to an alternate location.
 
The TSC is deactivated by the Emergency Director or the Em ergency Plant Manager, depending on the emergency class, when the plant conditions have stabilized such that continuous technical assessm ent is no longer required.
6.1.2. The Operations Support Center The Operations Support Cent er (OSC), which is locate d on the first floor of the Administration Building, provides a general assembly area for Chemistry, Radiation Protection, Maintenance, Operations, and I&C Personnel (see Figure 6.3). It is staffed with sufficient in-plant personnel required to effect protective and corrective actions in support of the emergency situation. An Operations Support Center Manager directs the activities of this center. In-plant phone extensions and a page/intercom system provide communication capability at the OSC. Emer gency equipment listed in Appendix B has been provided with additional back-up capability provided at the Radiation Protection control point. If conditions warrant evacuation of this center, the Emergency Operations Facility/Recovery Center assumes OSC functions. The OSC rema ins active and staffed until terminated by the Emergency Plant Manager.
 
If staffing of the OSC is not possible due to a security event or other hazardous conditions, ERO personnel will be notified to report to an alternate location.
 
Emergency Plan Revision 54
 
Page 29 of 125 Entergy Vermont Yankee 6.1.3. Emergency Operations Facility/Recovery Center The Emergency Operations Facility/Recovery Center (EOF/RC) is located at the Vermont Yankee Training Center on Old Ferry Road in Brattleboro, Vermont, approximately 8.75 miles from the plant site (See Figure 6.1). The EOF has a r adiation protecti on factor of 5 and a ventilation system equippe d with HEPA filters which can be isolated. The Commission has approved this as the primary facility with no backup up EOF necessary.  (NVY 84-44, February 27, 1984)
The EOF, with communication capabilities for contacting the Control Room and plant Security, is avail able to serve as a staging area for augmented emergency response staff if the site is under threat of or experiencing hostile action. The overall responsibility for the functions per formed in the EOF/RC bel ongs to the Emergency Director.
 
The Emergency Director acts as the prin cipal spokesperson for Vermont Yankee
 
concerning all issues where an interface with offsite government authorities is required. The Radiological Assessment Coordinator is responsible for continuous evaluation of all licensee activities related to an emergency having, or potentially having, environmental
 
radiological consequences. The EOF/RC has sufficient space and design to accommodate the emergency response organization and respond ing representatives from government and industry who are responsible for limiting offsite consequences (see Figure 6.4). The EOF/RC provides information needed by f ederal, state, and lo cal authorities for implementation of their offsite Emergency Plans , and a centralized meeting location for key representatives fr om the agencies.
 
The EOF/RC maintains extensive communications capability with all emergency response facilities. Section 7.0 details the extent of this capability.
Site access and control, dose assessment, sample analysis, decontaminati on, and recovery planning activities are directed from various locations within the EOF/RC. The EOF/RC serves as the primary evacuation, re-assembly, and off-duty augmentation personnel assembly point. Public information statements concerning the plant emergency status are transmitted from the EOF/RC to the Joint Information C enter for release to the public.
 
The following copies of emergency planning documents are availabl e in the EOF/RC:
Site Emergency Plan and Implementing Procedures  Area Maps  State and Local Emergency Plans  UFSAR  Emergency equipment and supplies are maintained at the EOF/RC, including equipment necessary to assess radiological habitability. This consists of monitoring for direct radiation and sampling and analysis for airborne radioparticulates and radioiodine. For a list of
 
EOF/RC emergency equipment, see Appendix B.
 
Emergency Plan Revision 54
 
Page 30 of 125 Entergy Vermont Yankee 6.1.4. Deleted 6.1.5. Joint Information Center The Joint Information Center (JIC) provides a centralized location for conducting joint state, federal and Vermont Yankee emergency news br iefings in a manner to avoid hampering ongoing emergency response proceedings. It is expected that state and federal public information personnel will operate from the JIC.
The initial designated location of the JIC is th e Vermont Yankee Office Building located in Brattleboro, Vermont. If accident conditions (p lume trajectory) jeopardize the habitability of this facility, the alternate JIC at Landmark College in Putney, Vermont would be utilized.  
 
At the JIC, the Company Spokesperson coordinates the generat ion and issuance of press releases concerning plant emergency conditions to the media. Prior to their release to the media, the Emergency Direc tor approves releases.  
 
The JIC will be activated upon an emergency classi fication of an Alert or higher except as noted below.  
 
Activation of the JIC is optional prior to an Alert and is dependent on the escalation of the event and/or public interest. Prior to the activation of the JI C, the Manager of Communications or designee would be coordinat ing press releases from his/her routine operations location.  
 
6.1.6. Coordination of Radiological Data Centralized coordination of the offsite radiological assessment effort with all organizations interested in and/or performing assessments is of importance to ensure that the data and its interpretation are reviewed by all par ties. The number and type of organizations performing this effort vary with time and following accident declaration and offsite notification. Initially, plant emergency response personnel are the only organization performing this function and they are directed from, and their results evaluated, at the EOF/RC. State aut horities join the EOF/RC monitoring and assessment activities. Federal response agencies would augment plant and state radiological assessment efforts upon their arrival.  
 
Plant and state monitoring efforts are coordinated at the EOF/RC. All samples are screened for activity levels in the field. Posi tive results require add itional analysis at the EOF/RC. Analysis is completed in two phases. Initially, the sample is evaluated for  
 
radioiodine concentration levels using gamma energy analyses instrumentation. Having completed this analysis, total isotopic determination of activity levels is conducted using a HPG e or equivalent system. T he EOF/RC sampling capability is greatly enhanced by coordinating sample transfer and analysis with the Environm ental Laboratory.  
 
Emergency Plan Revision 54  
 
Page 31 of 125 Entergy Vermont Yankee When federal resources respond, a more suitable location than the EOF/RC may be needed. As stated by the Depar tment of Energy (DOE), the agency charged with the lead of the federal offsite monitoring resources, this effort would be established at some location in the general vicinity of the plant site that was adequate for the equipment and manpower deployed. Arrangements will be made for such a location with DOE and the states when it is required. Wherever this function is located, the basic objective is to assure monitoring efforts from all organizations are coordinated.
 
6.2. Assessment Capability The activation of the Emergency Plan and the continued assessment of accident conditions require extensive monitoring and assessment capabilities. The essential monitoring systems needed for recognition of abnormal events by the plant operator s are incorporated in the Emergency Action Levels specified in Appendix A. This section briefly describes monitoring systems as well as other assessment capabilities.
 
6.2.1. Process Monitors Plant process monitors capability includes in dications provided from various monitors located throughout the plant systems. Parameters monitored include pressure, temperature, flow, and equipment operating status. Vermont Yankee has also augmented these monitoring systems with the instrument ation to detect inadequate core cooling.
The manner in which process monitors are used for accident recognition and classification is given in the detailed Emergency Action Level listings in Appendix A.
 
6.2.2. Radiological Monitors A number of radiation monitors and m onitoring systems are provided on process and effluent liquid and gaseous lines that serve dire ctly or indirectly as discharge route for radioactive materials. These monitors, which include Control Room readout and alarm functions, exist in order that appropriate acti on can be initiated to limit fuel damage and/or contain radioactive material.


When federal resources respond, a more suitable location than the EOF/RC may be needed. As stated by the Department of Energy (DOE), the agency charged with the lead of the federal offsite monitoring resources, this effort would be established at some location in the general vicinity of the plant site that was adequate for the equipment and manpower deployed. Arrangements will be made for such a location with DOE and the states when it is required. Wherever this function is located, the basic objective is to assure monitoring efforts from all organizations are coordinated.
6.2. Assessment Capability The activation of the Emergency Plan and the continued assessment of accident conditions require extensive monitoring and assessment capabilities. The essential monitoring systems needed for recognition of abnormal events by the plant operators are incorporated in the Emergency Action Levels specified in Appendix A. This section briefly describes monitoring systems as well as other assessment capabilities.
6.2.1. Process Monitors Plant process monitors capability includes indications provided from various monitors located throughout the plant systems. Parameters monitored include pressure, temperature, flow, and equipment operating status. Vermont Yankee has also augmented these monitoring systems with the instrumentation to detect inadequate core cooling.
The manner in which process monitors are used for accident recognition and classification is given in the detailed Emergency Action Level listings in Appendix A.
6.2.2. Radiological Monitors A number of radiation monitors and monitoring systems are provided on process and effluent liquid and gaseous lines that serve directly or indirectly as discharge route for radioactive materials. These monitors, which include Control Room readout and alarm functions, exist in order that appropriate action can be initiated to limit fuel damage and/or contain radioactive material.
These monitors include:
These monitors include:
: 1. Main steam line radi ation monitoring system, 2. Air ejector off-gas radiation monitoring system, 3. Process and liquid effluent radiation monitors,
: 1. Main steam line radiation monitoring system,
: 4. Containment atmosphere radiation monitoring system, 5. Reactor Building ventilation radiation monitoring system, and 6. Plant stack radiat ion monitoring system.  
: 2. Air ejector off-gas radiation monitoring system,
 
: 3. Process and liquid effluent radiation monitors,
Specific details on these monitoring systems such as location, type, etc., are contained in the plant Updated Final Safety Analysis Report (UFSAR).  
: 4. Containment atmosphere radiation monitoring system,
 
: 5. Reactor Building ventilation radiation monitoring system, and
Emergency Plan Revision 54  
: 6. Plant stack radiation monitoring system.
 
Specific details on these monitoring systems such as location, type, etc., are contained in the plant Updated Final Safety Analysis Report (UFSAR).
Page 32 of 125 Entergy Vermont Yankee In addition to installed monitoring system s, Vermont Yankee has augmented onsite radiological assessment capability to include high-range containment and stack radiation monitoring; improved in-plant iodine detection capability; and arrangements for containment atmosphere and reactor water samples.
Emergency Plan Revision 54 Page 31 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
6.2.3. Meteorological Capability Vermont Yankee maintains a 300-foot primar y meteorological tower from which the following parameters are measured:
Wind speed at the 35 and 297 foot levels,  Wind direction at the 35 and 297 foot levels,  Ambient temperature at the 33 foot level, and Vertical temperature difference bet ween the 33 and 198-foot levels and the 33 and 295 foot levels.


In addition to installed monitoring systems, Vermont Yankee has augmented onsite radiological assessment capability to include high-range containment and stack radiation monitoring; improved in-plant iodine detection capability; and arrangements for containment atmosphere and reactor water samples.
6.2.3. Meteorological Capability Vermont Yankee maintains a 300-foot primary meteorological tower from which the following parameters are measured:
Wind speed at the 35 and 297 foot levels, Wind direction at the 35 and 297 foot levels, Ambient temperature at the 33 foot level, and Vertical temperature difference between the 33 and 198-foot levels and the 33 and 295 foot levels.
In addition, precipitation and barometric pressure are measured on the ground.
In addition, precipitation and barometric pressure are measured on the ground.
Fifteen-minute averages of the meteorological data are automat ically displayed in the Control Room and the EOF/RC.
Fifteen-minute averages of the meteorological data are automatically displayed in the Control Room and the EOF/RC. These meteorological data are used to calculate offsite dispersion parameters on a real-time basis at the EOF/RC during accident conditions.
These meteorological data ar e used to calculate offsite dispersion parameters on a real-time basis at the EOF/RC during accident conditions.
Vermont Yankee also maintains onsite a 140 foot back-up meteorological tower from which the following parameters are measured:
Vermont Yankee also maintains onsite a 140 foot back-up meteorological tower from which  
Wind speed at the 100 foot level, Wind direction at the 100 foot level, and Vertical temperature difference between the 33 - and 135-foot levels.
 
This tower serves as a back-up to the primary tower should it fail. The meteorological data from the back-up tower are displayed on video graphic recorders located in the Control Room.
the following paramet ers are measured:
In addition, Vermont Yankee has the capability to access additional meteorological information through offsite support services. This information can be forwarded to VY dose assessment personnel upon request.
Wind speed at the 100 foot level,   Wind direction at the 100 foot level, and Vertical temperature difference between the 33 - and 135-foot levels.  
Emergency Plan Revision 54 Page 32 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
 
This tower serves as a back-up to the primary tower should it fail. The meteorological data from the back-up tower are displayed on vide o graphic recorders located in the Control Room.  
 
In addition, Vermont Yankee has the capabi lity to access additional meteorological information through offsite support services.
This information can be forwarded to VY dose assessment personnel upon request.  
 
Emergency Plan Revision 54  
 
Page 33 of 125 Entergy Vermont Yankee 6.2.4. Fire Detection Devices Vermont Yankee has an extensive fire detection network which utilizes a combination of smoke detectors, thermal detectors, infrared detectors, ultraviolet detectors, and "rate of rise" detectors, as well as fire system status al arms as a means of providing plant operators with complete fire status information. This system is described in the Vermont Yankee Fire Protection and Appendix R Program.


6.2.4. Fire Detection Devices Vermont Yankee has an extensive fire detection network which utilizes a combination of smoke detectors, thermal detectors, infrared detectors, ultraviolet detectors, and "rate of rise" detectors, as well as fire system status alarms as a means of providing plant operators with complete fire status information. This system is described in the Vermont Yankee Fire Protection and Appendix R Program.
These detection systems, in addition to providing alarm indications in the Control Room, activate automatic fire suppression systems in certain vital areas within the plant.
These detection systems, in addition to providing alarm indications in the Control Room, activate automatic fire suppression systems in certain vital areas within the plant.
Supplementing these systems are dry chemical and CO 2 extinguishers, standpipe systems, and a continuously available fire brigade.  
Supplementing these systems are dry chemical and CO2 extinguishers, standpipe systems, and a continuously available fire brigade.
 
6.2.5. Post-Accident Sampling Post-accident sampling capability provides for emergency sample collection of containment atmosphere, plant stack halogen and particulate components, and primary coolant.
6.2.5. Post-Accident Sampling Post-accident sampling capability provides for emergency sample collection of containment atmosphere, plant stack halogen and particu late components, and primary coolant.
Management implements radiological precautions to limit whole body exposure to 5 rem/individual for sampling and analyses conducted using these systems.
Management implements radiological precauti ons to limit whole body exposure to 5 rem/individual for sampling and analyses conducted using these systems.
6.2.6. Facilities and Equipment for Offsite Monitoring States Emergency Management and/or the system load dispatcher provides reports concerning natural occurrences or severe weather conditions that may affect the plant area. Offsite fire departments of Vernon and Brattleboro notify the plant of any fire which might have an impact on the plant. Local Law Enforcement Agencies notify Plant Security of any situation in the area which might have an impact on the plant.
6.2.6. Facilities and Equipment for Offsite Monitoring States Emergency Management and/
In addition to offsite monitoring equipment at the EOF/RC, Vermont Yankee maintains an offsite environmental monitoring program. Radiological environmental monitoring stations for the site and surrounding area monitor the environment under normal and accident conditions. Radiological environmental monitoring stations have been established in accordance with Technical Specification (Technical Requirements Manual) requirements.
or the system load dispat cher provides reports concerning natural occurrences or severe w eather conditions that may affect the plant area. Offsite fire departments of Vernon and Brattl eboro notify the plant of any fire which might have an impact on the plant. Local Law Enforcement Agencies notify Plant Security of any situation in the area whic h might have an impact on the plant.
In addition to the analytical capabilities of the EOF, Vermont Yankee has access to outside analytical assistance and laboratory facilities from other non-affected Entergy nuclear sites, State and Federal agencies and other utilities through INPO. This support may include but is not limited to the following:
In addition to offsite monitoring equipment at the EOF/RC, Vermont Yankee maintains an offsite environmental monitoring program. Radiological environ mental monitoring stations for the site and surrounding area monitor the environment under normal and accident conditions. Radiological environmental m onitoring stations have been established in accordance with Technical Specification (T echnical Requirements Manual) requirements.
Massachusetts Department of Public Health (MDPH) through the implementation of the Nuclear Incident Advisory Team (NIAT) Handbook has laboratory analysis capability at the State Contracted laboratories and those laboratories listed in the New England Interstate Radiation Assistance Plan.
In addition to the analytical capabilities of the EOF, Vermont Yankee has access to outside analytical assistance and laboratory facilities fr om other non-affected En tergy nuclear sites, State and Federal agencies and other utilities through INPO. This support may include but is not limited to the following:
Emergency Plan Revision 54 Page 33 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
 
Massachusetts Department of Public Health (MDPH) through the implementation of the Nuclear Incident Advisory Team (NIAT) Han dbook has laboratory analysis capability at the State Contracted laboratories and those laboratories listed in the New England Interstate Radiation Assistance Plan.  
 
Emergency Plan Revision 54  
 
Page 34 of 125 Entergy Vermont Yankee Other environmental monitoring and analysis support can be requested and arranged through INPO. The INPO Emergency Resources Manual includes the information necessary to locate and request specialized equipment and technical assistance in the area of offsite radiological monitoring. INPO member utilities and suppliers agree to provide assistance as outlined in the IN PO Emergency Resources Manual. The above facilities have the capability to perform laboratory analyses of various environmental samples (e.g., terrestrial, marine and air). It is also estimated that the analytical assistance and laborat ory support will be able to res pond within four (4) to eight (8) hours from initial notification.
 
Additional offsite monitori ng equipment and capability can be provided by federal agencies in accordance with the Federal Radiological Emergency Response Plan. As discussed in Section 6.1.6, this additional capability is integrated into existing efforts.
 
Emergency Plan Revision 54
 
Page 35 of 125 Entergy Vermont Yankee Figure 6.1 Location of State and Company Emergency Operating Centers around Vermont Yankee
 
Emergency Plan Revision 54
 
Page 38 of 125 Entergy Vermont Yankee
 
Emergency Plan Revision 54


Page 39 of 125 Entergy Vermont Yankee 7.0 COMMUNICATIONS The plant staff has available various means of communication systems for effective
Other environmental monitoring and analysis support can be requested and arranged through INPO. The INPO Emergency Resources Manual includes the information necessary to locate and request specialized equipment and technical assistance in the area of offsite radiological monitoring. INPO member utilities and suppliers agree to provide assistance as outlined in the INPO Emergency Resources Manual.
The above facilities have the capability to perform laboratory analyses of various environmental samples (e.g., terrestrial, marine and air). It is also estimated that the analytical assistance and laboratory support will be able to respond within four (4) to eight (8) hours from initial notification.
Additional offsite monitoring equipment and capability can be provided by federal agencies in accordance with the Federal Radiological Emergency Response Plan. As discussed in Section 6.1.6, this additional capability is integrated into existing efforts.
Emergency Plan Revision 54 Page 34 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


communications and coordination with offsit e and onsite response organizations and/or teams.
Figure 6.1 Location of State and Company Emergency Operating Centers around Vermont Yankee Emergency Plan Revision 54 Page 35 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


A summary of the communicati on systems is defined in the co mmunication matrix provided in Table 7.1 and outlined below.
Redacted Version of Document - Publicly Available Redacted Version of Document - Publicly Available Sensitive Unclassified Non-Safeguards Information Redacted Emergency Plan Revision 54 Page 38 of 125 Entergy Vermont Yankee Sensitive Unclassified Non-Safeguards Information Redacted Redacted Version of Document - Publicly Available


7.1. InForm Notification System The InForm Notification System is located in the Control Room and the Emergency Operations Facility. InForm consists of source and destination computers that take advantage of the internet to send Emergency Noti fication Forms to the States of Vermont, New Hampshire and Massachusetts during a declared emergency.
7.0    COMMUNICATIONS The plant staff has available various means of communication systems for effective communications and coordination with offsite and onsite response organizations and/or teams.
This system is staffed on a 24-hour basis on both ends - the Control Room and the State Police dispatching points. The activation of t he public notification system starts with this 24-hour State Police link. InForm performs self checks every 10 seconds.
A summary of the communication systems is defined in the communication matrix provided in Table 7.1 and outlined below.
7.1. InForm Notification System The InForm Notification System is located in the Control Room and the Emergency Operations Facility. InForm consists of source and destination computers that take advantage of the internet to send Emergency Notification Forms to the States of Vermont, New Hampshire and Massachusetts during a declared emergency.
This system is staffed on a 24-hour basis on both ends - the Control Room and the State Police dispatching points. The activation of the public notification system starts with this 24-hour State Police link. InForm performs self checks every 10 seconds.
Backup to the InForm Notification System is the Nuclear Alert System.
Backup to the InForm Notification System is the Nuclear Alert System.
7.2. Nuclear Alert System The Nuclear Alert System (NAS), originating in the Control R oom, is a system of dedicated phone circuits independent of the normal land line phone system. The NAS can be used to notify the State Police of Vermont, Massachuse tts, and New Hampshire of any emergency. This system is a secure (dedicated) communications arrangement and is installed for the primary purpose of initial notification of the States, via State Police, by the plant operators.
7.2. Nuclear Alert System The Nuclear Alert System (NAS), originating in the Control Room, is a system of dedicated phone circuits independent of the normal land line phone system. The NAS can be used to notify the State Police of Vermont, Massachusetts, and New Hampshire of any emergency.
This system is staffed on a 24-hour basis on both ends - the Control Room and the State Police dispatching points.
This system is a secure (dedicated) communications arrangement and is installed for the primary purpose of initial notification of the States, via State Police, by the plant operators.
The activation of the public notification system starts with this 24-hour State police link. NAS is tested mo nthly between the plant and the State Police agencies.  
This system is staffed on a 24-hour basis on both ends - the Control Room and the State Police dispatching points. The activation of the public notification system starts with this 24-hour State police link. NAS is tested monthly between the plant and the State Police agencies.
 
The Nuclear Alert System also links the Control Room, the Emergency Operating Centers and Incident Field Offices of Massachusetts, New Hampshire, and Vermont, and the Emergency Operations Facility/Recovery Center (EOF/RC). This communication system incorporates all the principal emergency response centers into a single dedicated network.
The Nuclear Alert System also links the C ontrol Room, the Emergen cy Operating Centers and Incident Field Offices of Massachuse tts, New Hampshire, and Vermont, and the  
The Nuclear Alert System network is shown in Figure 7.1 (Control Room Link) and in Figure 7.2 (EOF/RC Link).
 
Backup to the NAS phone system is the commercial phone system.
Emergency Operations Facility/Recovery Cent er (EOF/RC). This communication system incorporates all the principal emergency response centers into a single dedicated network.
Emergency Plan Revision 54 Page 39 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
 
The Nuclear Alert System network is shown in Figure 7.1 (Control Room Link) and in Figure 7.2 (EOF/RC Link).  
 
Backup to the NAS phone system is the commercial phone system.  
 
Emergency Plan Revision 54  
 
Page 40 of 125 Entergy Vermont Yankee 7.3. Utility Microwave and Radio Systems The Utility Microwave and Radio Systems are located in the Control Room. The Utility Microwave is a line-of-sight dedicated system used to notify system lo ad dispatchers of emergency conditions at the plant. The te lephone has buttons marked for each load dispatcher. By pushing one of the buttons on the telephone, it rings automatically at the selected location. In the event that communi cations fail with the NRC due to loss of the commercial telephone system, the load dispatchers are advised that Vermont Yankee will use the Utility Microwave System to provide updates of plant conditions to NRC Region I.
The Utility Radio Net is used as an alternate means of notifying load dispatchers. Load dispatchers have 24-hour manning capability at their organizations. The systems are tested once a week with both organizations.
 
7.4. Mobile UHF Radio System The Mobile UHF Radio System is utilized as a primary means of communications for offsite monitoring teams and security personnel; it is the alternate means of communications between the EOF/RC, the Contro l Room, TSC, and onsite res ponse teams. The System consists of 100-watt UHF repeaters with hi gh gain antennas. These repeaters are activated by any of the six base radio stations located in the Control Room, Secondary Alarm System (SAS), TSC, Security Gate 1 and CAS, and the EOF/RC. Also, the portable units activate the repeater.
In the event the repeater fails, a "talk around" feature allows continued communications between portable units. This system is tested daily through operational use of the system.
 
Security also has the capability to contact via radio the Windham C ounty Sheriff Dispatcher and any Vermont State Police Patrol Vehicle(s) located in close proximity to the plant.
7.5. Plant Intercom System The Intercom System (Gai-Tronics) is located in many areas throughout the plant, including the Control Room, Technical Support Center, Operations Support Center and Security Gates 1 and 2. This system consists of four channels and is utiliz ed as a paging system during normal operations. During emergency sit uations, the system is used as the primary means for: (1) notifying plant per sonnel of the emergency, (2) coordinating the activities of onsite response teams with the Technical S upport Center; (3) coordinating activities between Control Room and the Te chnical Support Center; (4) calling for any missing or unaccounted for personnel that may be in t he plant; and (5) communicating between the plant emergency response facilities. This system is in continuous daily use.
7.6. NRC Telephone System The NRC has utilized the Federal Telecommunications System (FTS) telephone network for its emergency telecommunications system. The FTS system provides a separate (public cannot access) government tel ephone network which avoid potential public telephone blockage which may occur in the event of a major emergency.
 
Emergency Plan Revision 54
 
Page 41 of 125 Entergy Vermont Yankee The Emergency Notification System (ENS) utilizes an FTS line which exists between the NRC Operations Office in Rockville, Maryland and the Control Room, with extensions in the Communications Room and the NRC Room (NRC Resident Inspector's Office) of the Technical Support Center. This line is tested daily by the NRC and has a 24-hour manning capability at both organizations.
 
The Emergency Notification System (ENS) also utilizes a separate FTS line between the NRC Operations Office in Rockv ille, Maryland and the EOF/RC.
 
The Health Physics Network (HPN) which utilizes separate FTS lines from the TSC and
 
EOF/RC, allows Vermont Yankee to transmi t health physics and environmental information to the NRC through the Operations Center in Rockville, Maryland in a radiological event.
7.7. Commercial Telephone System The commercial telephone system is used as a primary and al ternate means of communications for notification and coordination. For conditions involving telephone company equipment blockage in the local ar ea, alternate external telephone line arrangements have been made avai lable to the plant.
7.8. Emergency Power Supply for Communications Currently there are several telephone and other emergency communication channels (Gai-Tronics, radio network, and microwave) lo cated within the plant that are connected to an emergency or redundant power supply. All emergency co mmunications (including all phones) located within the plant are connected to an emergency or redundant supply.


There are power fail phones located in the EO F/RC, TSC, and Control Room, which will automatically activate if power is lost to the inte rnal telephone system.
7.3. Utility Microwave and Radio Systems The Utility Microwave and Radio Systems are located in the Control Room. The Utility Microwave is a line-of-sight dedicated system used to notify system load dispatchers of emergency conditions at the plant. The telephone has buttons marked for each load dispatcher. By pushing one of the buttons on the telephone, it rings automatically at the selected location. In the event that communications fail with the NRC due to loss of the commercial telephone system, the load dispatchers are advised that Vermont Yankee will use the Utility Microwave System to provide updates of plant conditions to NRC Region I.
7.9. Facsimile Transmission High speed, quality facsimile equipment is loca ted at the Technical Support Center (TSC), Operations Support Center (OSC), Emer gency Operations/Recovery Center, Joint Information Center (JIC), and each respective state's Emergency Operat ion Center (EOC).
The Utility Radio Net is used as an alternate means of notifying load dispatchers. Load dispatchers have 24-hour manning capability at their organizations. The systems are tested once a week with both organizations.
This is used to transmit pertinent data and information concerning the emergency among these facilities.  
7.4. Mobile UHF Radio System The Mobile UHF Radio System is utilized as a primary means of communications for offsite monitoring teams and security personnel; it is the alternate means of communications between the EOF/RC, the Control Room, TSC, and onsite response teams. The System consists of 100-watt UHF repeaters with high gain antennas. These repeaters are activated by any of the six base radio stations located in the Control Room, Secondary Alarm System (SAS), TSC, Security Gate 1 and CAS, and the EOF/RC. Also, the portable units activate the repeater. In the event the repeater fails, a "talk around" feature allows continued communications between portable units. This system is tested daily through operational use of the system.
Security also has the capability to contact via radio the Windham County Sheriff Dispatcher and any Vermont State Police Patrol Vehicle(s) located in close proximity to the plant.
7.5. Plant Intercom System The Intercom System (Gai-Tronics) is located in many areas throughout the plant, including the Control Room, Technical Support Center, Operations Support Center and Security Gates 1 and 2. This system consists of four channels and is utilized as a paging system during normal operations. During emergency situations, the system is used as the primary means for: (1) notifying plant personnel of the emergency, (2) coordinating the activities of onsite response teams with the Technical Support Center; (3) coordinating activities between Control Room and the Technical Support Center; (4) calling for any missing or unaccounted for personnel that may be in the plant; and (5) communicating between the plant emergency response facilities. This system is in continuous daily use.
7.6. NRC Telephone System The NRC has utilized the Federal Telecommunications System (FTS) telephone network for its emergency telecommunications system. The FTS system provides a separate (public cannot access) government telephone network which avoid potential public telephone blockage which may occur in the event of a major emergency.
Emergency Plan Revision 54 Page 40 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Emergency Plan Revision 54  
The Emergency Notification System (ENS) utilizes an FTS line which exists between the NRC Operations Office in Rockville, Maryland and the Control Room, with extensions in the Communications Room and the NRC Room (NRC Resident Inspector's Office) of the Technical Support Center. This line is tested daily by the NRC and has a 24-hour manning capability at both organizations.
The Emergency Notification System (ENS) also utilizes a separate FTS line between the NRC Operations Office in Rockville, Maryland and the EOF/RC.
The Health Physics Network (HPN) which utilizes separate FTS lines from the TSC and EOF/RC, allows Vermont Yankee to transmit health physics and environmental information to the NRC through the Operations Center in Rockville, Maryland in a radiological event.
7.7. Commercial Telephone System The commercial telephone system is used as a primary and alternate means of communications for notification and coordination. For conditions involving telephone company equipment blockage in the local area, alternate external telephone line arrangements have been made available to the plant.
7.8. Emergency Power Supply for Communications Currently there are several telephone and other emergency communication channels (Gai-Tronics, radio network, and microwave) located within the plant that are connected to an emergency or redundant power supply. All emergency communications (including all phones) located within the plant are connected to an emergency or redundant supply.
There are power fail phones located in the EOF/RC, TSC, and Control Room, which will automatically activate if power is lost to the internal telephone system.
7.9. Facsimile Transmission High speed, quality facsimile equipment is located at the Technical Support Center (TSC),
Operations Support Center (OSC), Emergency Operations/Recovery Center, Joint Information Center (JIC), and each respective state's Emergency Operation Center (EOC).
This is used to transmit pertinent data and information concerning the emergency among these facilities.
Emergency Plan Revision 54 Page 41 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Page 42 of 125 Entergy Vermont Yankee 7.10. Emergency Response Data System The Emergency Response Data System (ERDS) is a direct real-time electronic transmission of the following types of parameters to the NRC to assist them in monitoring the status of an emergency:
7.10. Emergency Response Data System The Emergency Response Data System (ERDS) is a direct real-time electronic transmission of the following types of parameters to the NRC to assist them in monitoring the status of an emergency:
Core and coolant system data, Containment building data, Radioactivity release data, and Site meteorological data.
Core and coolant system data, Containment building data, Radioactivity release data, and Site meteorological data.
Vermont Yankee maintains a continuous ERDS connection with the NRC Operations Center.  
Vermont Yankee maintains a continuous ERDS connection with the NRC Operations Center.
Emergency Plan Revision 54 Page 42 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Emergency Plan Revision 54  
TABLE 7.1 VERMONT YANKEE EMERGENCY COMMUNICATIONS MATRIX CALLING FROM CALLING TO                      CR        TSC      OSC        EOF      JIC Technical Support Center (TSC)            1, 4, 5, 7    -        -          -      -
Operations Support Center (OSC)              1,7        1,7      -          -      -
Emergency Operations Facility (EOF)        1, 2, 4  1, 4, 10    1          -      -
Joint Information Center (JIC)                1        1,10      1        1,10      -
Offsite and Site Boundary Monitors            1, 4      1, 4      1        1, 4      1 Nuclear Regulatory Commission                1, 5    1, 5, 6      1        1, 5, 6    1 State Police (VT, NH, MA)                    1,2        1        1        1, 2      1 State EOCs (VT, NH, MA)                    1, 2, 9      1        1      1, 2, 9, 10  1 Vermont Yankee Plant Security              1, 4, 7    1, 4, 7    1, 7      1, 4, 7    1 Vermont Yankee Emergency Response Personnel                            1, 8      1, 8      1, 8      1, 8    1, 8 KEY 1    Commercial Telephone System 2    Nuclear Alert System 3    Utility Microwave 4    Mobile UHF Radio System 5    Emergency Notification System 6    Health Physics Network 7    Gai-Tronics 8    Personnel Pager System 9    Southwest Fire Radio 10    Facsimile Transmission Emergency Plan Revision 54 Page 43 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Page 43 of 125 Entergy Vermont Yankee TABLE 7.1 VERMONT YANKEE EMERGENCY COMMUNICATIONS MATRIX CALLING FROM CALLING TO CR TSC OSC EOF JIC Technical Support Center (TSC) 1, 4, 5, 7 - - - - Operations Support Center (OSC) 1,7 1,7 - - -
Figure 7.1 Plant to State Notification Channels Emergency Plan Revision 54 Page 44 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
Emergency Operations Facility (EOF) 1, 2, 4 1, 4, 10 1 - - Joint Information Center (JIC) 1 1,10 1 1,10 -
Offsite and Site Boundary Monitors 1, 4 1, 4 1 1, 4 1 Nuclear Regulatory Commission 1, 5 1, 5, 6 1 1, 5, 6 1 State Police (VT, NH, MA) 1,2 1 1 1, 2 1 State EOCs (VT, NH, MA) 1, 2, 9 1 1 1, 2, 9, 10 1 Vermont Yankee Plant Security 1, 4, 7 1, 4, 7 1, 7 1, 4, 7 1 Vermont Yankee Emergency Response Personnel 1, 8 1, 8 1, 8 1, 8 1, 8 KEY  1 Commercial Telephone System 2 Nuclear Alert System 3 Utility Microwave 4 Mobile UHF Radio System 5 Emergency Notification System 6 Health Physics Network


7 Gai-Tronics 8 Personnel Pager System 9 Southwest Fire Radio 10 Facsimile Transmission
Figure 7.2 Coordination Channels with States Emergency Plan Revision 54 Page 45 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Emergency Plan Revision 54  
8.0      ORGANIZATION This section describes how the normal plant and engineering support organization transform into an emergency response organization to effectively deal with any incident at Vermont Yankee.
8.1. Normal Plant Organization Vermont Yankee's normal operation and management organization consist of the onsite facility organization supported by the engineering and management organizations located offsite. The relationship and content of these onsite and offsite organizations are specified in the plant Technical Specifications, Technical Requirements Manual or Entergy Quality Assurance Manual.
During normal operations, the minimum staff on duty at the plant during all shifts consists of one (1) Shift Manager, one (1) Control Room Supervisor, two (2) Control Room Operators, six (6) Auxiliary Operators, one (1) Shift Technical Advisor, one (1) Radiation Protection Technician, one (1) Chemistry Technician and security personnel as indicated in Figure 8.1. The responsibility for determining the status of the plant in an emergency is assigned to the Shift Manager or, in his absence from the Control Room, to the Control Room Supervisor who has the authority and responsibility to immediately initiate any emergency actions, including emergency classification and notification. Additional personnel are available on an on-call basis to respond to plant emergencies. Corrective action and repair, as outlined in Table 8.4, is performed by Operations staff on-shift until supplemented by additional ERO staff.
8.2. Emergency Response Organization The Vermont Yankee emergency response organization is activated in part or in whole, depending upon the condition classification determined by the normal plant operations crew in the Control Room. Vermont Yankee's emergency response organization is divided into onsite and offsite elements. The Vermont Yankee Emergency Management Organization is shown in Figure 8.2. Staffing for the onsite emergency response facilities is shown in Figure 8.3 (Technical Support Center) and Figure 8.4 (Operations Support Center).
Staffing for the off-site emergency response facilities is shown in Figure 8.5 (Emergency Operations Facility/Recovery Center). All or portions of these organizations are activated depending upon the emergency classification.
Elements of the emergency response plan are activated subsequent to an emergency declaration by the Shift Manager; designated company personnel are notified and will report to designated locations. The emergency response action of the personnel already present are performed on a priority basis depending on the emergency conditions and the immediate need which those conditions dictate as determined by the onshift operations crew. The specific priorities facing the emergency response forces in the various locations cannot be pre-established. They would be specific to the nature of the emergency and variable with time as it proceeds.
Emergency Plan Revision 54 Page 46 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Page 44 of 125 Entergy Vermont Yankee Figure 7.1 Plant to State Notification Channels Emergency Plan Revision 54
Plans and procedures have been put into place to ensure the timely activation of emergency response facilities. Although the response time will vary due to factors such as weather and traffic conditions, a goal of sixty (60) minutes for activation has been established for onsite emergency facilities including the EOF.
 
For this reason, the coordinators and managers in the emergency response facilities are charged with the responsibility of determining the priority of response functions when initially activated and assembled, and ensuring that the needed functions be performed on the basis of the priority determination. This process of prioritizing needs and addressing them accordingly is specified in the Emergency Plan's implementing procedures.
Page 45 of 125 Entergy Vermont Yankee Figure 7.2 Coordination Channels with States Emergency Plan Revision 54
In emergency situations, the Shift Manager, Emergency Plant Manager, or OSC Manager can authorize actions, without following the complete work order process, if these actions prevent the following:
 
Loss of important equipment, Personnel injury, or Plant trip.
Page 46 of 125 Entergy Vermont Yankee 8.0 ORGANIZATION This section describes how the normal plant and engineering support organization
The Emergency Plant Manager and OSC Manager are responsible for updating the Shift Manager when plant systems will be taken out and returned to service.
 
The titles of positions in the Vermont Yankee Emergency Management Organization are shown in Figure 8.2.
transform into an emergency response organization to effectively deal with any incident at Vermont Yankee.
Emergency Plan Revision 54 Page 47 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
 
8.1. Normal Plant Organization Vermont Yankee's normal operation and management organization consist of the onsite facility organization supported by the engineering and management organizations located offsite. The relationship and co ntent of these onsite and offsit e organizations are specified in the plant Technical Specifications, Technical Requirements Manual or Entergy Quality Assurance Manual.
 
During normal operations, the minimum staff on duty at the plant during all shifts consists of
 
one (1) Shift Manager, one (1) Control Room Supervisor, two (2) Control Room Operators, six  (6) Auxiliary Operators, one (1) Shift Technical Adviso r, one (1) Radiation Protection Technician, one (1) Chemistry Technician an d security personnel as indicated in Figure 8.1. The responsibility for determining the status of the plant in an emergency is assigned to the Shift Manager or, in his absen ce from the Control Room, to the Control Room Supervisor who has the authority and re sponsibility to immediately initiate any emergency actions, including emergency classi fication and notification. Additional personnel are available on an on-call basis to respond to plant emergencies. Corrective action and repair, as outlined in Table 8.4, is performed by Operations staff on-shift until supplemented by additional ERO staff.
 
8.2. Emergency Res ponse Organization The Vermont Yankee emergency response organizati on is activated in part or in whole, depending upon the condition classi fication determined by the nor mal plant operations crew in the Control Room. Vermont Yankee's emergency response organization is divided into onsite and offsite elements. The Vermont Yankee Emergency Management Organization is shown in Figure 8.2. Staffing for the ons ite emergency response facilities is shown in Figure 8.3 (Technical Support Center) and Figur e 8.4 (Operations Support Center).
Staffing for the off-site emergency response facilities is shown in Figure 8.5 (Emergency Operations Facility/Recovery Center). All or portions of these organizations are activated depending upon the emergency classification.
 
Elements of the emergency response plan ar e activated subsequent to an emergency declaration by the Shift Manager; designa ted company personnel are notified and will report to designated locations. The emergency response action of the personnel already present are performed on a priority basis depending on the emergency conditions and the immediate need which those conditions dictate as determined by the onshift operations
 
crew. The specific priorities facing the emer gency response forces in the various locations cannot be pre-established. They would be s pecific to the nature of the emergency and variable with time as it proceeds.
 
Emergency Plan Revision 54
 
Page 47 of 125 Entergy Vermont Yankee Plans and procedures have been put into pl ace to ensure the timely activation of emergency response facilities. Although the res ponse time will vary due to factors such as weather and traffic conditions, a goal of sixty (60) minutes for activation has been established for onsite emergency facilities including the EOF.
For this reason, the coordinators and manager s in the emergency response facilities are charged with the responsibility of determining the priority of response functions when initially activated and assembled, and ensuri ng that the needed functions be performed on the basis of the priority determination. This process of prioritizing needs and addressing  
 
them accordingly is specified in the Emergency Plan's implem enting procedures.  
 
In emergency situations, t he Shift Manager, Emergency Plant Manager, or OSC Manager can authorize actions, without foll owing the complete work order process, if these actions prevent the following:  
 
Loss of important equipment, Personnel injury, or Plant trip.
The Emergency Plant Manager and OSC Manager ar e responsible for updating the Shift Manager when plant systems will be taken out and returned to service.  
 
The titles of positions in the Vermont Yankee Emergency Management Organization are  
 
shown in Figure 8.2.  
 
Emergency Plan Revision 54  
 
Page 48 of 125 Entergy Vermont Yankee 8.2.1. Emergency Director The Emergency Director is a manager of Vermont Yankee who has the requisite authority, management ability, technical knowledge, and staff to manage the site emergency and
 
recovery organization. The Emergency Director is responsible for the di rection of the total emergency response and has the company authority to accomplish this responsibility.


8.2.1. Emergency Director The Emergency Director is a manager of Vermont Yankee who has the requisite authority, management ability, technical knowledge, and staff to manage the site emergency and recovery organization. The Emergency Director is responsible for the direction of the total emergency response and has the company authority to accomplish this responsibility.
The Emergency Director's principal responsibilities are to:
The Emergency Director's principal responsibilities are to:
: 1. Assume overall responsibility, fr om the Shift Manager for the response actions necessary for control of the accident and protection of emergency personnel and the public;
: 1. Assume overall responsibility, from the Shift Manager for the response actions necessary for control of the accident and protection of emergency personnel and the public;
: 2. Assume responsibility from the Shift Manager for offsite St ates' notification; (non-delegable)
: 2. Assume responsibility from the Shift Manager for offsite States' notification; (non-delegable)
: 3. Assume responsibility, from the Shift Manager for authorization of escalation, and de-escalation of the emergency;
: 3. Assume responsibility, from the Shift Manager for authorization of escalation, and de-escalation of the emergency;
: 4. Assume responsibility, from t he Shift Manager for authorization and transmittal of offsite protective action recommendations; (non-delegable)
: 4. Assume responsibility, from the Shift Manager for authorization and transmittal of offsite protective action recommendations; (non-delegable)
: 5. Manage all emergency elements required to restore the plant to a safe condition;
: 5. Manage all emergency elements required to restore the plant to a safe condition;
: 6. Coordinate accident information and assume the role of utility liaison with offsite governmental authorities;
: 6. Coordinate accident information and assume the role of utility liaison with offsite governmental authorities;
: 7. Request and direct the use of outside s upport for recovery operations (e.g., equipment, manpower, services);
: 7. Request and direct the use of outside support for recovery operations (e.g.,
equipment, manpower, services);
: 8. Resolve issues concerning operating license requirements with NRC representatives;
: 8. Resolve issues concerning operating license requirements with NRC representatives;
: 9. Approve public information releases; and
: 9. Approve public information releases; and
: 10. Perform or direct the emergency response organization manpower planning effort to assure the availa bility of sufficient staff to implement all necessary functions, should the emergency response efforts be over a prolonged period.  
: 10. Perform or direct the emergency response organization manpower planning effort to assure the availability of sufficient staff to implement all necessary functions, should the emergency response efforts be over a prolonged period.
The Emergency Director or designated alternate is notified of all emergency conditions occurring at the plant. For Alert, Site Area Emergency and General Emergency conditions, the Emergency Director reports to the EOF/RC and directs the activities of the emergency response organizations throughout the emergency condition and until the recovery activities have been terminated.
Emergency Plan Revision 54 Page 48 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


The Emergency Director or designated alternate is notified of all emergency conditions
8.2.2. Emergency Plant Manager The Emergency Plant Manager has direct responsibility for the conduct of operations at the plant. During an emergency situation, the Emergency Plant Manager is responsible for the overall supervision and coordination of the onsite emergency response activities and directs the activities of the Technical Support Center until the accident is terminated. The Emergency Plant Manager's primary responsibilities are to:
 
occurring at the plant. For Al ert, Site Area Emergency and G eneral Emergency conditions, the Emergency Director reports to the EOF/RC and directs the activities of the emergency response organizations throughout the emergency condition and until the recovery
 
activities have been terminated.
 
Emergency Plan Revision 54
 
Page 49 of 125 Entergy Vermont Yankee 8.2.2. Emergency Plant Manager The Emergency Plant Manager has direct responsib ility for the conduct of operations at the plant. During an emergency situation, the Emer gency Plant Manager is responsible for the overall supervision and coordination of the onsite emergency response activities and directs the activities of the Technical Support Center until the accident is terminated. The Emergency Plant Manager's primary responsibilities are to:
: 1. Direct the onsite activities required to restore the plant to a safe condition;
: 1. Direct the onsite activities required to restore the plant to a safe condition;
: 2. Provide technical accident assessment and support to termina te the accident;
: 2. Provide technical accident assessment and support to terminate the accident;
: 3. Analyze instrument and contro l problems, design and coordinate the installation of short-term modifications, and define emergency operation procedures during the modification period;
: 3. Analyze instrument and control problems, design and coordinate the installation of short-term modifications, and define emergency operation procedures during the modification period;
: 4. Analyze problems in the area of system operations, determine emergency procedures related to syst em operations and establish shift operations support, if applicable;
: 4. Analyze problems in the area of system operations, determine emergency procedures related to system operations and establish shift operations support, if applicable;
: 5. Develop guidance for plant shift operati ons concerning plant protection of the reactor core;
: 5. Develop guidance for plant shift operations concerning plant protection of the reactor core;
: 6. Oversee the accumulation, retention, retrieval and transmission of vital plant parameters required to analyze the accident progression and subsequent termination;
: 6. Oversee the accumulation, retention, retrieval and transmission of vital plant parameters required to analyze the accident progression and subsequent termination;
: 7. Provide assistance to the Shift Manager or Emergency Director on the escalation and de-escalation of the em ergency classification as conditions  
: 7. Provide assistance to the Shift Manager or Emergency Director on the escalation and de-escalation of the emergency classification as conditions warrant;
 
: 8. Initially direct the activities of onsite and offsite teams until EOF becomes operational.
warrant; 8. Initially direct the activities of onsite and offsite teams until EOF becomes operational.  
A qualified manager assumes the role of Emergency Plant Manager under all emergency conditions. To assist the Emergency Plant Manager, the TSC is staffed by representatives from the following departments as depicted in Figure 8.3:
 
Operations Maintenance Reactor Engineering Engineering Chemistry (in the OSC)
A qualified manager assumes the role of Emergency Plant Manager under all emergency conditions. To assist the Emergency Plant M anager, the TSC is staffed by representatives from the following departments as depicted in Figure 8.3:
Radiation Protection Security (stationed at the off site command post)
Operations Maintenance Reactor Engineering Engineering Chemistry (in the OSC) Radiation Protection Security (stationed at the off site command post)  
Emergency Plan Revision 54 Page 49 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Emergency Plan Revision 54
8.2.3. Shift Manager The Shift Manager is the Duty Shift Manager. The alternate is the Control Room Supervisor of the assigned operating crew in the Control Room at the time of the emergency. The Shift Manager is responsible for initiating emergency actions to limit the consequences of the event and bring it under control. The immediate responsibilities of the Shift Manager include performing or delegating performance of the following:
 
Page 50 of 125 Entergy Vermont Yankee 8.2.3. Shift Manager The Shift Manager is the Duty Shift Manager. The alternate is the Control Room Supervisor of the assigned operating crew in the Control Room at the time of the emergency. The Shift Manager is responsible for initiating emergency actions to limit the consequences of the event and bri ng it under control.
The immediate res ponsibilities of the Shift Manager include performing or del egating performance of the following:
: 1. Recognition of emergency conditions by observation of characteristic emergency action levels (EALs);
: 1. Recognition of emergency conditions by observation of characteristic emergency action levels (EALs);
: 2. Classifications of accident conditi ons in accordance with the emergency classification system;
: 2. Classifications of accident conditions in accordance with the emergency classification system;
: 3. Implementation of emer gency operating procedures applicable to the event condition;
: 3. Implementation of emergency operating procedures applicable to the event condition;
: 4. Initiation of the appropriate em ergency plan implementing procedure;
: 4. Initiation of the appropriate emergency plan implementing procedure;
: 5. Prompt notification of Vermont, New Hampshire and Massachusetts State Police indicating the event classification;
: 5. Prompt notification of Vermont, New Hampshire and Massachusetts State Police indicating the event classification;
: 6. Notification of the NRC indicating the event classification;
: 6. Notification of the NRC indicating the event classification;
Line 886: Line 512:
: 1. Notification of appropriate plant and company management personnel of the emergency conditions;
: 1. Notification of appropriate plant and company management personnel of the emergency conditions;
: 2. Direction and coordination of all initial emergency response efforts until the support elements of the emergency response organization are activated; and
: 2. Direction and coordination of all initial emergency response efforts until the support elements of the emergency response organization are activated; and
: 3. Limiting the consequences of the accident and restoring the plant to a safe condition.  
: 3. Limiting the consequences of the accident and restoring the plant to a safe condition.
 
As part of the plant notification system, the Shift Manager has selected plant management and department head personnel notified using a radio paging/telephone system. This is the mechanism for mobilizing plant support personnel and activating the remainder of the onsite emergency response organization.
As part of the plant notification system, the Shift Manager has selected plant management and department head personnel notifi ed using a radio paging/telephone system. This is the mechanism for mobilizing plant support personnel and activating the remainder of the onsite emergency response organization.  
Emergency Plan Revision 54 Page 50 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
 
Emergency Plan Revision 54  
 
Page 51 of 125 Entergy Vermont Yankee 8.2.4. EOF Manager The EOF Manager is a designated staff me mber of Vermont Yankee management specifically trained to be responsible for t he facility Emergency Plan with respect to operation of the EOF/RC. The EOF Manager's primary responsibilities are to:
: 1. Establish the Emergency Operat ions Facility when required;
: 2. Assess Emergency Operations Facility habitability via the Radiological Assessment Coordinator;
: 3. Prepare the Emergency Operations Facility for the arriva l of offsite authorities and other support personnel.
A designated Vermont Yankee management staf f member assumes the role of the Emergency Operations Facility Manager at an Alert or higher emergency classification. The EOF Manager is responsible for reporting to the Emergency Director.


Emergency Plan Revision 54  
8.2.4. EOF Manager The EOF Manager is a designated staff member of Vermont Yankee management specifically trained to be responsible for the facility Emergency Plan with respect to operation of the EOF/RC. The EOF Manager's primary responsibilities are to:
: 1.      Establish the Emergency Operations Facility when required;
: 2.      Assess Emergency Operations Facility habitability via the Radiological Assessment Coordinator;
: 3.      Prepare the Emergency Operations Facility for the arrival of offsite authorities and other support personnel.
A designated Vermont Yankee management staff member assumes the role of the Emergency Operations Facility Manager at an Alert or higher emergency classification.
The EOF Manager is responsible for reporting to the Emergency Director.
Emergency Plan Revision 54 Page 51 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Page 52 of 125 Entergy Vermont Yankee 8.2.5. Operations Support Center Manager A member of the plant staff is assigned to coordinate the f unctions of the Operations Support Center. The responsibil ities of the Operations S upport Center Manager include:
8.2.5. Operations Support Center Manager A member of the plant staff is assigned to coordinate the functions of the Operations Support Center. The responsibilities of the Operations Support Center Manager include:
: 1. Provide system valve alignment and equipment operation support to the Shift Manager; 2. Assist in coordinating recovery ef forts as requested by the Emergency Plant Manager; 3. Provide Radiation Protection and Chemistry support for the in-plant emergency radiation protection and sampling activities;
: 1. Provide system valve alignment and equipment operation support to the Shift Manager;
: 2. Assist in coordinating recovery efforts as requested by the Emergency Plant Manager;
: 3. Provide Radiation Protection and Chemistry support for the in-plant emergency radiation protection and sampling activities;
: 4. Assign available personnel to the following emergency team function as necessary:
: 4. Assign available personnel to the following emergency team function as necessary:
: a. Site Boundary Survey Monitoring Team
: a. Site Boundary Survey Monitoring Team
Line 907: Line 533:
: c. Repair and Corrective Action/Rescue Team
: c. Repair and Corrective Action/Rescue Team
: 5. Brief OSC teams on in-plant radiation protection controls.
: 5. Brief OSC teams on in-plant radiation protection controls.
The OSC Manager directs the OSC and maintains th is facility until the termination of the event. The OSC Manager establishes a base of operations in the OSC, but may find it necessary to go to the TSC from time to time.  
The OSC Manager directs the OSC and maintains this facility until the termination of the event. The OSC Manager establishes a base of operations in the OSC, but may find it necessary to go to the TSC from time to time.
 
Emergency Plan Revision 54 Page 52 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
Emergency Plan Revision 54  
 
Page 53 of 125 Entergy Vermont Yankee 8.2.6. Radiological A ssessment Coordinator During emergency conditions, the Radiological Assessment Coordinator is responsible for the development of plans and procedures to assess and control radiological exposure in support of and consistent with the emergency response and recovery organization objectives. The primary em ergency responsibilities of the Radiological Assessment Coordinator include:
: 1. Assess the onsite and offsite radiological conditions associated with any accidental releases.
: 2. Evaluate offsite doses based on radiatio n monitoring performed by monitoring personnel;
: 3. Provide support to the TSC to ensure onsite protective action recommendations (i.e., decontamination proc edures, protective clothing, etc.) are being considered and carried out;
: 4. Continuously update t he Emergency Director concerning dose assessment results and recommend offsite radiol ogical protective actions to the Emergency Director;
: 5. Recommend administrative limits for radiological exposure control of emergency workers in keeping with those specified in Table 10.2 and maintain the necessary records; and
: 6. Review plans and schedules of tasks with appropriate managers and coordinator of the recovery organization concentrating on radiation protection procedures.
: 7. Establish the coordination of radiol ogical analysis of offsite samples;
: 8. Receive and document all sample results;
: 9. Coordinate the assessment activi ties and resolve any discrepancies with offsite response and assistance organizations.
 
The immediate priority of the Radiological Assessment Coordinator and staff is radiological analysis of air samples taken by offsite monitoring teams. For the long-term, additional duties include the analysis of cont amination levels in area veget ables, fruits, milk, or water, and soil samples. To accomplish this long-te rm requirement, the Radiological Assessment Coordinator works closely with the services provided by support organizations (e.g., Environmental Lab).


Emergency Plan Revision 54  
8.2.6. Radiological Assessment Coordinator During emergency conditions, the Radiological Assessment Coordinator is responsible for the development of plans and procedures to assess and control radiological exposure in support of and consistent with the emergency response and recovery organization objectives. The primary emergency responsibilities of the Radiological Assessment Coordinator include:
: 1.      Assess the onsite and offsite radiological conditions associated with any accidental releases.
: 2.      Evaluate offsite doses based on radiation monitoring performed by monitoring personnel;
: 3.      Provide support to the TSC to ensure onsite protective action recommendations (i.e., decontamination procedures, protective clothing, etc.)
are being considered and carried out;
: 4.      Continuously update the Emergency Director concerning dose assessment results and recommend offsite radiological protective actions to the Emergency Director;
: 5.      Recommend administrative limits for radiological exposure control of emergency workers in keeping with those specified in Table 10.2 and maintain the necessary records; and
: 6.      Review plans and schedules of tasks with appropriate managers and coordinator of the recovery organization concentrating on radiation protection procedures.
: 7.      Establish the coordination of radiological analysis of offsite samples;
: 8.      Receive and document all sample results;
: 9.      Coordinate the assessment activities and resolve any discrepancies with offsite response and assistance organizations.
The immediate priority of the Radiological Assessment Coordinator and staff is radiological analysis of air samples taken by offsite monitoring teams. For the long-term, additional duties include the analysis of contamination levels in area vegetables, fruits, milk, or water, and soil samples. To accomplish this long-term requirement, the Radiological Assessment Coordinator works closely with the services provided by support organizations (e.g.,
Environmental Lab).
Emergency Plan Revision 54 Page 53 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Page 54 of 125 Entergy Vermont Yankee 8.2.7. Administration a nd Logistics Coordinator The Administration and Logistics Coordinator is authorized to provide administrative, logistic and communication services for the emergency organization at the site. Specifically, the responsibilit ies of the Administration and Logi stics Coordinator include:
8.2.7. Administration and Logistics Coordinator The Administration and Logistics Coordinator is authorized to provide administrative, logistic and communication services for the emergency organization at the site.
Specifically, the responsibilities of the Administration and Logistics Coordinator include:
: 1. Function as an aid to the Emergency Director;
: 1. Function as an aid to the Emergency Director;
: 2. Acquire the resources required by all site emergency management disciplines;
: 2. Acquire the resources required by all site emergency management disciplines;
: 3. Assist in arranging for near-s ite accommodations (i.e., housing, transportation, etc.) of incoming emergency response personnel;
: 3. Assist in arranging for near-site accommodations (i.e., housing, transportation, etc.) of incoming emergency response personnel;
: 4. Assist in arranging for food and potable water for personnel at all emergency response centers;
: 4. Assist in arranging for food and potable water for personnel at all emergency response centers;
: 5. Maintain adequate contractual co mmunication services for the site emergency organization; and
: 5. Maintain adequate contractual communication services for the site emergency organization; and
: 6. Initially be responsible for proc urement using est ablished emergency procurement procedures.
: 6. Initially be responsible for procurement using established emergency procurement procedures.
NOTE: Subsequently, normal Purchasing Depar tment operations and procedures are used as directed by the Emergency Director.  
NOTE:         Subsequently, normal Purchasing Department operations and procedures are used as directed by the Emergency Director.
 
The Administration and Logistics Coordinator establishes operations at the EOF/RC and assists the Emergency Director, as requested.
The Administration and Logistics Coordinator establishes operations at the EOF/RC and assists the Emergency Dir ector, as requested.
8.2.8. Security Coordinator The Security Coordinator directs the security personnel in maintaining required security in support of the emergency operations. The functional responsibilities of the Security Coordinator include:
8.2.8. Security Coordinator The Security Coordinator directs the security personnel in maintaining required security in support of the emergency operations. The func tional responsibilities of the Security Coordinator include:
: 1. Establish security around the plant site and/or any other areas identified by the Shift Manager;
: 1. Establish security around the plant site and/or any other areas identified by the Shift Manager;
: 2. Call for required offsite police support, if necessary;
: 2. Call for required offsite police support, if necessary;
: 3. Manage site evacuation;
: 3. Manage site evacuation;
: 4. Provide initial accountability of personnel in the protected area; and
: 4. Provide initial accountability of personnel in the protected area; and
: 5. Maintain overall plant security in accordance with the Plant Security Plan.  
: 5. Maintain overall plant security in accordance with the Plant Security Plan.
 
The Security Coordinator interfaces with the Emergency Plant Manager for in-plant security actions. The Security Coordinator is stationed at the off-site command post.
The Security Coordinator interfaces with the Emergency Plant Manager for in-plant security actions. The Security Coordinator is stationed at the off-site command post.
Emergency Plan Revision 54  
Emergency Plan Revision 54 Page 54 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
 
Page 55 of 125 Entergy Vermont Yankee 8.2.9. Company Spokesperson The Company Spokesperson is authorized to provide the public with information concerning the emergency.
The emergency responsibilities of the Company Spokesperson include:  1. Establish a Joint Information Center when necessary;
: 2. Coordinate information at the Joint Information Center wit h counterparts from local, state and federal agencies and with other companies involved with the emergency; and
: 3. Present terminology concerning acci dent conditions in an easily understood and informative manner to the press.
 
During an emergency, the Company Spokespers on reports to the Em ergency Director. The Manager of Communications or a designated alternate fills the position of the Company Spokesperson.
 
8.2.10. Decision Maker During implementation of Severe Accident Management (SAM), the senior licensed individual in the TSC will assume the role of Decision Maker as defined in the SAM Guideline.
 
8.2.11. Engineering Support Group The Engineering Support Group is an engineering group estab lished to provide emergency support for plant assessment and recovery operat ions. This group is activated for an Alert, Site Area and General Emergency. The suppor t group includes personnel from the various onsite engineering groups. In addition, the engineering support group may access offsite engineering resources through the support programs listed in Appendix G. This group resides in the Technical Support Center, and communicates with offsite technical support personnel. This group has access to the tec hnical expertise to provide a variety of emergency functions, such as engineering a nalyses and plant system assessment in support of recovery efforts.
 
Emergency Plan Revision 54  
 
Page 56 of 125 Entergy Vermont Yankee 8.3. Recovery Organization The emergency measures presented in this plan are actions designated to mitigate the consequences of the accident in a manner that affords the maximum protection to the public. Planning for the recovery mode of operations involves the development of general principles and an organizational capability that can be adapted to any emergency situation. The emergency response organization described in Section 8.1 and 8.2 provides the foundation for such a recovery organization.
 
The Emergency Director directs the recovery or ganization. As indicated in Figures 8.1 through 8.5, the organization relie s on more than plant staff and/or resources to restore the plant to normal conditions. The expertise provided through the support plans is available to
 
aid with the necessary corrective actions requi red to control and/or restore normal plant status. Various State and Federal support groups augment the recovery organization. The following is a brief summary of the recovery organization's responsibilities:
: 1. Maintain comprehensive radiological surveillance of the plant to assure continuous control and re cognition of problems;
: 2. Control access to the area and exposures to workers;
: 3. Decontaminate affect ed areas and/or equipment;
: 4. Conduct clean-up and restoration activities;
: 5. Isolate and repair damaged systems;
: 6. Document all proceedings of the accident and review the effectiveness of the emergency organization in reducing pub lic hazard and/or plant damage;
: 7. Provide offsite authoritie s with status report as to the operations capabilities of the plant;
: 8. Provide assistance to recovery actions undertaken by state/local authorities, if requested; and
: 9. Provide the public with information on the status of the recovery efforts (i.e., via press, TV/radio, etc.).
 
When plant conditions allow a transition from the emergency phase to the recovery phase, the Emergency Director conducts a plant em ergency management meeting to discuss the recovery organization. The actions taken by this organization concerning termination of the emergency proceeds in accordance with a recovery plan developed specifically for the accident conditions.
 
Emergency Plan Revision 54
 
Page 57 of 125 Entergy Vermont Yankee 8.4. Extensions of Vermont Yankee Emergency Organization 8.4.1. Local Service Arrangements have been made for the extension of the emergency organization capability for handling emergencies to provide for:
: 1. Transportation of injured pers onnel using an ambulance service;
: 2. Treatment of radioactively contaminated and injured personnel at a local support hospital (Brattleboro Memorial and Baystate Franklin Medical Center) and other regional medical facilities as s pecified in the local support hospital plans; and
: 3. Fire support services by the Ve rnon and Brattleboro Fire Departments and the Tri-State and Southwestern Fire Mutual Aid Networks.
: 4. Law enforcement support services prov ided by local, county, state, and federal law enforcement authorities as appropriate and response capabilities are documented in the letters of agr eement maintained by Security.
 
Evidence of agreements with participating local services is found in Appendix E, Vermont Yankee Fire Protection, Appendix R Program, and the Annual Law Enfo rcement Letters of Agreement (Safeguards Informati on) maintained by Security.
8.4.2. Federal Government Support Resources of federal agencies appropriate to an emergency condition are made available in accordance with the National Response Framework. This plan and the resources behind it are activated through the plant notification of the NRC.
Many resources are made available, as deemed necessary by the emergency condition, including a major effort under the leadership of the Department of Energy applied to the area of offsite radiological impact assessment. This effort can involve manpower and equipment for extensive plume measurement, including aerial monitoring a nd tracking, and sampling and analysis of ingestion pathway media.


Emergency Plan Revision 54  
8.2.9.        Company Spokesperson The Company Spokesperson is authorized to provide the public with information concerning the emergency. The emergency responsibilities of the Company Spokesperson include:
: 1.      Establish a Joint Information Center when necessary;
: 2.      Coordinate information at the Joint Information Center with counterparts from local, state and federal agencies and with other companies involved with the emergency; and
: 3.      Present terminology concerning accident conditions in an easily understood and informative manner to the press.
During an emergency, the Company Spokesperson reports to the Emergency Director.
The Manager of Communications or a designated alternate fills the position of the Company Spokesperson.
8.2.10.        Decision Maker During implementation of Severe Accident Management (SAM), the senior licensed individual in the TSC will assume the role of Decision Maker as defined in the SAM Guideline.
8.2.11.        Engineering Support Group The Engineering Support Group is an engineering group established to provide emergency support for plant assessment and recovery operations. This group is activated for an Alert, Site Area and General Emergency. The support group includes personnel from the various onsite engineering groups. In addition, the engineering support group may access offsite engineering resources through the support programs listed in Appendix G. This group resides in the Technical Support Center, and communicates with offsite technical support personnel. This group has access to the technical expertise to provide a variety of emergency functions, such as engineering analyses and plant system assessment in support of recovery efforts.
Emergency Plan Revision 54 Page 55 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Page 58 of 125 Entergy Vermont Yankee 8.4.3. Additional Support Dependent upon the emergency condition and response needs, the Vermont Yankee emergency organization can be augmented by m anpower and equipment support from the remainder of the Entergy Nuclear organization.
8.3. Recovery Organization The emergency measures presented in this plan are actions designated to mitigate the consequences of the accident in a manner that affords the maximum protection to the public. Planning for the recovery mode of operations involves the development of general principles and an organizational capability that can be adapted to any emergency situation.
This support capability is outlined in the Corporate Support procedure as referenced in Appendix G.  
The emergency response organization described in Section 8.1 and 8.2 provides the foundation for such a recovery organization.
The Emergency Director directs the recovery organization. As indicated in Figures 8.1 through 8.5, the organization relies on more than plant staff and/or resources to restore the plant to normal conditions. The expertise provided through the support plans is available to aid with the necessary corrective actions required to control and/or restore normal plant status. Various State and Federal support groups augment the recovery organization. The following is a brief summary of the recovery organization's responsibilities:
: 1.     Maintain comprehensive radiological surveillance of the plant to assure continuous control and recognition of problems;
: 2.      Control access to the area and exposures to workers;
: 3.      Decontaminate affected areas and/or equipment;
: 4.      Conduct clean-up and restoration activities;
: 5.      Isolate and repair damaged systems;
: 6.      Document all proceedings of the accident and review the effectiveness of the emergency organization in reducing public hazard and/or plant damage;
: 7.      Provide offsite authorities with status report as to the operations capabilities of the plant;
: 8.      Provide assistance to recovery actions undertaken by state/local authorities, if requested; and
: 9.      Provide the public with information on the status of the recovery efforts (i.e.,
via press, TV/radio, etc.).
When plant conditions allow a transition from the emergency phase to the recovery phase, the Emergency Director conducts a plant emergency management meeting to discuss the recovery organization. The actions taken by this organization concerning termination of the emergency proceeds in accordance with a recovery plan developed specifically for the accident conditions.
Emergency Plan Revision 54 Page 56 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Should response support beyond this level be required, additional support from other
8.4. Extensions of Vermont Yankee Emergency Organization 8.4.1. Local Service Arrangements have been made for the extension of the emergency organization capability for handling emergencies to provide for:
: 1. Transportation of injured personnel using an ambulance service;
: 2. Treatment of radioactively contaminated and injured personnel at a local support hospital (Brattleboro Memorial and Baystate Franklin Medical Center) and other regional medical facilities as specified in the local support hospital plans; and
: 3. Fire support services by the Vernon and Brattleboro Fire Departments and the Tri-State and Southwestern Fire Mutual Aid Networks.
: 4. Law enforcement support services provided by local, county, state, and federal law enforcement authorities as appropriate and response capabilities are documented in the letters of agreement maintained by Security.
Evidence of agreements with participating local services is found in Appendix E, Vermont Yankee Fire Protection, Appendix R Program, and the Annual Law Enforcement Letters of Agreement (Safeguards Information) maintained by Security.
8.4.2. Federal Government Support Resources of federal agencies appropriate to an emergency condition are made available in accordance with the National Response Framework. This plan and the resources behind it are activated through the plant notification of the NRC. Many resources are made available, as deemed necessary by the emergency condition, including a major effort under the leadership of the Department of Energy applied to the area of offsite radiological impact assessment. This effort can involve manpower and equipment for extensive plume measurement, including aerial monitoring and tracking, and sampling and analysis of ingestion pathway media.
Emergency Plan Revision 54 Page 57 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


nuclear industry organizations can be reques ted through interface wit h the Institute of Nuclear Power Operations (INPO). Informational notificat ions are provided to this organization whenever emergency conditions e scalate to an Alert or greater emergency condition. The decision to request additional i ndustry support is a responsibility of the Emergency Director. All industry support organizations repor ting to the site are assigned by emergency management, located in the EOF/
8.4.3. Additional Support Dependent upon the emergency condition and response needs, the Vermont Yankee emergency organization can be augmented by manpower and equipment support from the remainder of the Entergy Nuclear organization. This support capability is outlined in the Corporate Support procedure as referenced in Appendix G.
RC, who specifies their authorities, responsibilities and any limits on their actions. All responding parties are required to adhere to existing plant procedures while completing their assignments.
Should response support beyond this level be required, additional support from other nuclear industry organizations can be requested through interface with the Institute of Nuclear Power Operations (INPO). Informational notifications are provided to this organization whenever emergency conditions escalate to an Alert or greater emergency condition. The decision to request additional industry support is a responsibility of the Emergency Director. All industry support organizations reporting to the site are assigned by emergency management, located in the EOF/RC, who specifies their authorities, responsibilities and any limits on their actions. All responding parties are required to adhere to existing plant procedures while completing their assignments.
8.5. Coordination with St ate Government Authorities Because of the location of the Vermont Yankee Plant, the planning and/or action responsibilities at the state level involves coordination of three states; Vermont, New Hampshire, and Massachusetts. Section 7.0 describes the extensive communications network between Vermont Yankee and these stat es as a means of promptly notifying appropriate authorities under a ccident conditions. Table 8.3 provides a summary of emergency plan areas and the associated pl ant, state and local responsibilities.
8.5. Coordination with State Government Authorities Because of the location of the Vermont Yankee Plant, the planning and/or action responsibilities at the state level involves coordination of three states; Vermont, New Hampshire, and Massachusetts. Section 7.0 describes the extensive communications network between Vermont Yankee and these states as a means of promptly notifying appropriate authorities under accident conditions. Table 8.3 provides a summary of emergency plan areas and the associated plant, state and local responsibilities.
The Shift Manager initiates the coordination effort by notifying Vermont, New Hampshire and Massachusetts State Police, providing t hem with an established message format that describes the accident status. Based on the emergency class, the State emergency response personnel are alerted and/or mobilized. To ensure effective coordination of offsite emergency response actions, representati ves of each state are a ssigned to report to the EOF/RC for first-hand emergency informati on and assessment. They are provided space in the EOF/RC as shown in Figure 6.4. The Emergency Director or designee issues periodic accident reports to the responding State Repres entative. Each state representative is responsible for transferring the content of these stat us reports to their respective State Emergency Operating Center (E OC). If additional te chnical expertise is required by state authorities at the stat e Emergency Operating Centers (EOCs), the Emergency Director can authorize dispatching of technical support staff to assist them in  
The Shift Manager initiates the coordination effort by notifying Vermont, New Hampshire and Massachusetts State Police, providing them with an established message format that describes the accident status. Based on the emergency class, the State emergency response personnel are alerted and/or mobilized. To ensure effective coordination of offsite emergency response actions, representatives of each state are assigned to report to the EOF/RC for first-hand emergency information and assessment. They are provided space in the EOF/RC as shown in Figure 6.4. The Emergency Director or designee issues periodic accident reports to the responding State Representative. Each state representative is responsible for transferring the content of these status reports to their respective State Emergency Operating Center (EOC). If additional technical expertise is required by state authorities at the state Emergency Operating Centers (EOCs), the Emergency Director can authorize dispatching of technical support staff to assist them in comprehension of any emergency communications.
Based upon the accident assessment, protective measures are recommended and implemented by each state according to actions and decisions prescribed by each state's Emergency Plan. The Vermont Health Department will notify the New York State Department of Public Health concerning all ingestion pathway considerations. Additional state support can be called upon from any or all other New England states through the agreement specified in the New England Compact on Radiological Health Protection.
Emergency Plan Revision 54 Page 58 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


comprehension of any emergency communications.
TABLE 8.3 (Page 1 of 3)
 
Based upon the accident assessment, protective measures are recommended and implemented by each state according to actions and decisions prescribed by each state's Emergency Plan. The Vermont Health Department will notify t he New York State Department of Public Health concerning all ingestion pathway considerations. Additional
 
state support can be called upon from any or all other New England states through the agreement specified in the Ne w England Compact on Radiological Health Protection.
 
Emergency Plan Revision 54
 
Page 59 of 125 Entergy Vermont Yankee TABLE 8.3 (Page 1 of 3)
A  
A  


==SUMMARY==
==SUMMARY==
OF OFFSITE COORDINATION EMERGENCY PLAN FUNCTION PLANT RESPONSIBILITYSTATE RESPONSIBILITYLOCAL RESPONSIBILITY Protective Action Decision Making The Shift Manager issues the initial  
OF OFFSITE COORDINATION EMERGENCY PLAN FUNCTION         PLANT RESPONSIBILITY                      STATE RESPONSIBILITY                LOCAL RESPONSIBILITY Protective Action Decision The Shift Manager issues the initial   State Police receive the initial        The State Directors of Making                    protective action recommendation.      notification whereupon they activate    Emergency Management the State fan-out notification process. Agencies will notify either the local emergency management directors or the selectmen of the recommended action and advise.
After the Emergency Director (ED)      In the State of Vermont, the Director assumes overall responsibility, the    of the Vermont Emergency ED will issue protective action        Management Agency and the Director recommendations to the appropriate      of the Division of Occupational Health State authorities (non-delegable).      and Radiological Health and Safety would activate.
In the Commonwealth of Massachusetts, the Director of the Massachusetts Emergency Management Agency and the Director of the Radiation Control Branch of the Massachusetts Department of Public health would activate.
In the State of New Hampshire, the Director of the New Hampshire Office of Emergency Management and the Division of Public Health Services would activate.
Emergency Plan Revision 54 Page 59 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


protective action recommendation. State Police receive the initial notification whereupon they activate
TABLE 8.3 (Continued)
 
(Page 2 of 3)
the State fan-out notification process.
The State Directors of Emergency Management Agencies will notify either the local emergency management directors or the selectmen of the recommended action and
 
advise. After the Emergency Director (ED) assumes overall responsibility, the ED will issue protective action recommendations to the appropriate State authorities (non-delegable). In the State of Vermont, the Director of the Vermont Emergency Management Agency and the Director of the Division of Occupational Health and Radiological Health and Safety
 
would activate.
In the Commonwealth of Massachusetts, the Director of the
 
Massachusetts Emergency Management Agency and the Director of the Radiation Control Branch of the Massachusetts Department of Public health would activate.
In the State of New Hampshire, the Director of the New Hampshire Office of Emergency Management and the Division of Public Health Services
 
would activate.
 
Emergency Plan Revision 54
 
Page 60 of 125 Entergy Vermont Yankee TABLE 8.3 (Continued) (Page 2 of 3)
A  
A  


==SUMMARY==
==SUMMARY==
OF OFFSITE COORDINATION EMERGENCY PLAN FUNCTION PLANT RESPONSIBILITYSTATE RESPONSIBILITYLOCAL RESPONSIBILITY Protective Action Decision Making (continued) Each State Health representative would call or report to the plant for the  
OF OFFSITE COORDINATION EMERGENCY PLAN FUNCTION               PLANT RESPONSIBILITY                    STATE RESPONSIBILITY                  LOCAL RESPONSIBILITY Protective Action Decision                                               Each State Health representative Making (continued)                                                       would call or report to the plant for the follow-up protective action recommendation issued by the Emergency Director.
 
follow-up protective action recommendation issued by the Emergency Director.
Each State Health representative will review all factors and issue a final recommendation to the Directors of State Emergency management Agencies, who, in turn, will initiate response actions to implement this recommendation.
Each State Health representative will review all factors and issue a final recommendation to the Directors of State Emergency management Agencies, who, in turn, will initiate response actions to implement this recommendation.
A coordination between the States will decide the time to implement the proposed actions, including activating the public alert and instructional methods (e.g., siren activation/NOA  
A coordination between the States will decide the time to implement the proposed actions, including activating the public alert and instructional methods (e.g., siren activation/NOA message, etc.)
 
Coordination of Radiological Data The Radiological Assessment           Each State Health representative at        Local communities rely on Coordinator is responsible for         the EOF/RC will request monitoring        State capability for radiological compiling offsite monitoring results   updates from the EOF Manager.              evaluation.
message, etc.)
and for ensuring an effective deployment of monitoring personnel     In the State of Vermont, the Director of as well as coordinating information   the Division of Occupational &
Coordination of Radiological Data The Radiological Assessment Coordinator is responsible for compiling offsite monitoring results and for ensuring an effective deployment of monitoring personnel  
transfer.                             Radiological Health & Safety will command this function at the State EOC.
 
Emergency Plan Revision 54 Page 60 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
as well as coordinating information transfer.
Each State Health representative at the EOF/RC will request monitoring updates from the EOF Manager.  


In the State of Vermont, the Director of
TABLE 8.3 (Continued)
 
(Page 3 of 3)
the Division of Occupational &
Radiological Health & Safety will command this function at the State EOC. Local communities rely on State capability for radiological evaluation.
Emergency Plan Revision 54
 
Page 61 of 125 Entergy Vermont Yankee TABLE 8.3 (Continued) (Page 3 of 3)
A  
A  


==SUMMARY==
==SUMMARY==
OF OFFSITE COORDINATION EMERGENCY PLAN FUNCTION PLANT RESPONSIBILITYSTATE RESPONSIBILITYLOCAL RESPONSIBILITY Coordination of Radiological Data (continued) The Emergency Directo r will advise the State response personnel of results. In the Commonwealth of Massachusetts, the Director of the Radiation Control Branch of the Massachusetts Department of Public Health will command this function at the State EOC. In the State of New Hampshire, the Director of the Division of Public Health Services will command this function at the State EOC.
OF OFFSITE COORDINATION EMERGENCY PLAN FUNCTION                 PLANT RESPONSIBILITY                    STATE RESPONSIBILITY                LOCAL RESPONSIBILITY Coordination of Radiological Data The Emergency Director will advise     In the Commonwealth of (continued)                      the State response personnel of         Massachusetts, the Director of the results.                                Radiation Control Branch of the Massachusetts Department of Public Health will command this function at the State EOC.
Plant Access Control The Security Coordinator coordinates plant site security and offsite law enforcement support as
In the State of New Hampshire, the Director of the Division of Public Health Services will command this function at the State EOC.
 
Plant Access Control             The Security Coordinator               State Police would respond as            Local police would assist as coordinates plant site security and     directed by the Directors of the         directed by the State Police.
necessar y.State Police would respond as directed by the Directors of the Emergency Management Agencies. Local police would assist as directed by the State Police. Evacuation Process Shift Manager will sound evacuation alarm under Site Area or General  
offsite law enforcement support as      Emergency Management Agencies.
 
necessary.
Emer g encies.State Emergency management Agencies will coordinate the activation of the Public Notification S ystem. OSC Manager will direct personnel to monitor all plant evacuees.
Evacuation Process               Shift Manager will sound evacuation     State Emergency management alarm under Site Area or General       Agencies will coordinate the activation Emergencies.                            of the Public Notification System.
Health and Human Services or Red Cross representative will coordinate the establishment of Reception Centers. Public Information Release The Emergency Director issues final approval prior to release.State press personnel report to the Joint Information Center.Media inquiries are referred to the Joint Information Center. The Public Information Liaison at the EOF/RC relays accident status reports to the Joint Information  
OSC Manager will direct personnel       Health and Human Services or Red to monitor all plant evacuees.         Cross representative will coordinate the establishment of Reception Centers.
 
Public Information Release       The Emergency Director issues final State press personnel report to the         Media inquiries are referred to approval prior to release.              Joint Information Center.                the Joint Information Center.
Center.State press personnel coordinate releases with the Company Spokesperson.
The Public Information Liaison at       State press personnel coordinate the EOF/RC relays accident status       releases with the Company reports to the Joint Information       Spokesperson.
The Company Spokesperson releases the information to the  
Center.
 
The Company Spokesperson releases the information to the media.
media.
Emergency Plan Revision 54 Page 61 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
Emergency Plan Revision 54  
 
Page 62 of 125 Entergy Vermont Yankee Table 8.4 (Page 1 of 2) MINIMUM STAFFING REQUIREMENTS FOR THE ENVY ERO FUNCTIONAL AREA MAJOR TASKS ENVY POSITION TITLE 1 RESPONSE TIME Plant Operations &  Assessment of Operational Aspects  Shift Manager (1) On Shift CRS (1) On Shift CRO (2) On Shift AO (6) On Shift STA (1) On Shift Emergency Direction
 
& Control (Emergency Coordinator)***  Shift Manager (1**) On Shift Notification /
Communication**** Notify Licensee, State
 
local and federal personnel & maintain communication STA/ AO STA/Offsite Comm/ENS Comm/Chem.Tech
 
(1) 3 STA/Offsite Comm/ENS Comm/Chem.Tech
 
(2) 3 On Shift 30 min.
60 min. Radiological Accident Assessment and Support of Operational Accident Assessment Emergency Operations Facility (EOF) Director Offsite Dose assessment EOF Emergency Director (1) 60 min. Shift Mgr/CRS/STA/Chem Tech RP Staff (1) 4 On Shift 30 min. Off site surveys Field monitoring teams (2) Field monitoring teams (2) 30 min.
60 min. Onsite (out of plant) Shift RP tech (1) Field monitoring teams (1) 3  Field monitoring teams (1)
On Shift 30 min.
60 min. In plant surveys Shift RP Tech (1)  RP staff (1)
RP staff (1)
On Shift 30 min. 60 min. Chemistry / Radiochemistry Shift Chem. Tech (1)  Chem staff (1)
On Shift 60 min. Plant System Engineering  Shift Technical Advisor STA (1) On Shift Core/Thermal hydraulics TSC RE (1) 3 30 min. Electrical TSC Manager / TSC Engineering staff (1) 60 min. Mechanical TSC Manager / TSC Engineering staff (1) 60 min. Repair & Corrective
 
Actions Mechanical Maintenance Shift AO (1**) On Shift Mechanical Maintenance Maintenance (1) 60 min. Rad Waste operator AO/CRO (1) 60 min. Electrical Maintenance /
Instrumentation & Control Technician Shift AO (1**) Maintenance (1)
Maintenance (1)
On Shift 30 min.
60 min. Instrumentation & Control Technician Maintenance (1) 30 min.


Emergency Plan Revision 54  
Table 8.4 (Page 1 of 2)
MINIMUM STAFFING REQUIREMENTS FOR THE ENVY ERO FUNCTIONAL            MAJOR TASKS                ENVY POSITION TITLE1                      RESPONSE AREA                                                                                        TIME Plant Operations &                                Shift Manager (1)                        On Shift Assessment of                                      CRS (1)                                  On Shift Operational Aspects                                CRO (2)                                  On Shift AO (6)                                    On Shift STA (1)                                  On Shift Emergency Direction                                Shift Manager (1**)                      On Shift
& Control (Emergency Coordinator)***
Notification /        Notify Licensee, State      STA/ AO                                  On Shift Communication****      local and federal          STA/Offsite Comm/ENS Comm/Chem.Tech      30 min.
personnel & maintain        (1) 3                                    60 min.
communication              STA/Offsite Comm/ENS Comm/Chem.Tech (2) 3 Radiological          Emergency Operations        EOF Emergency Director (1)                60 min.
Accident              Facility (EOF) Director    Shift Mgr/CRS/STA/Chem Tech              On Shift Assessment and        Offsite Dose assessment    RP Staff (1)4                            30 min.
Support of Operational Accident  Off site surveys            Field monitoring teams (2)                30 min.
Assessment Field monitoring teams (2)                60 min.
Onsite (out of plant)      Shift RP tech (1)                        On Shift Field monitoring teams (1) 3              30 min.
Field monitoring teams (1)                60 min.
In plant surveys            Shift RP Tech (1)                        On Shift RP staff (1)                              30 min.
RP staff (1)                              60 min.
Chemistry /                Shift Chem. Tech (1)                      On Shift Radiochemistry              Chem staff (1)                            60 min.
Plant System          Shift Technical Advisor    STA (1)                                  On Shift Engineering            Core/Thermal hydraulics    TSC RE (1) 3                              30 min.
Electrical                  TSC Manager / TSC Engineering staff (1)  60 min.
Mechanical                  TSC Manager / TSC Engineering staff (1)  60 min.
Repair & Corrective    Mechanical Maintenance      Shift AO (1**)                            On Shift Actions                Mechanical Maintenance      Maintenance (1)                          60 min.
Rad Waste operator          AO/CRO (1)                                60 min.
Electrical Maintenance /    Shift AO (1**)                            On Shift Instrumentation & Control  Maintenance (1)                          30 min.
Technician                  Maintenance (1)                          60 min.
Instrumentation & Control  Maintenance (1)                          30 min.
Technician Emergency Plan Revision 54 Page 62 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Page 63 of 125 Entergy Vermont Yankee Table 8.4 (Continued) (Page 2 of 2) MINIMUM STAFFING REQUIREMENTS FOR THE ENVY ERO FUNCTIONAL AREA MAJOR TASKS ENVY POSITION TITLE 1 RESPONSE TIME Protective Actions (In Plant) Radiation protection, access control, HP coverage for repair, corrective actions, search  
Table 8.4 (Continued)
& rescue, first aid & firefighting, personnel monitorin g, dosimetr y Shift AO  (2**)
(Page 2 of 2)
2  RP (2)  RP (2) On Shift 30 min 60 min Fire Fighting Fire brigade* (5**)
MINIMUM STAFFING REQUIREMENTS FOR THE ENVY ERO FUNCTIONAL               MAJOR TASKS                   ENVY POSITION TITLE1                        RESPONSE AREA                                                                                                TIME Protective Actions       Radiation protection,        Shift AO (2**) 2                            On Shift (In Plant)               access control, HP           RP (2)                                      30 min coverage for repair,         RP (2)                                      60 min corrective actions, search
1 Local support Local support On Shift  30 min.
                          & rescue, first aid &
60 min.Rescue Operations & First Aid  Fire brigade (2**)Local support Local support On Shift 30 min.
firefighting, personnel monitoring, dosimetry Fire Fighting                                           Fire brigade* (5**) 1                       On Shift Local support                               30 min.
60 min.Site Access Control & Personnel A ccountabilit y Security, communications, personnel accountabilit ySecurity Force On Shift NOTE: Response times are from NOTIFICATION of the event and are based on optimum travel conditions.
Local support                                60 min.
* Position staffed in accordance with Technical Requirements Manual and Administrative procedures. ** May be provided by shift personnel assigned other functions  
Rescue Operations                                       Fire brigade (2**)                           On Shift
*** Overall direction of facility response to be assumed by EOF director when all centers are fully staffed. Direction of minute to minute facility operations remains with senior manager in technical support center or control room. **** May be performed by engineering aide to Shift Manager (STA for ENVY) NOTES 1. AP 0894 specifies minimum shift staffing requirements. FB requires 5 persons per TRM and the Vermont Yankee Nuclear Power Station On-Shift Staffing Analysis. The staffing analysis is maintained as a controlled document and is effective 30 days after OSRC approval. STA and Chemistry Tech must be available within 10 minutes to the Control Room. VY letter to NRC dated 4/14/1981 (FVY 81-65) establishing position. VY letter to NRC 6/22/1982 (FVY 82-75) Supplement -NUREG 0737 Item III.A.1.2 on training of on-shift staff to support VY position for staffing. VY letter to NRC 4/14/1981 (FVY 81-65) TMI Action Plan Item III.A.1.2, goal for augmentation of staff. VY letter to NRC 6/15/82 (FVY 82-70) Results of Augmentation drills to support use of goals. Titles of ENVY ERO positions are shown. 2. All AOs use digital dosimeters with features for dose rate and total dose monitoring. AOs are trained to self-monitor in an emergency. 3. ENVY has designated pager holders who staff positions required to meet minimum staffing to activate TSC, OSC and EOF (see E Plan Figures 8.3 through 8.5). There are a minimum of 4 persons per position (4 teams who rotate duty). However, all persons on teams are expected to respond. In addition, all other ERO personnel not on pagers are notified by the emergency call-in notification system and are expected to respond.
& First Aid                                            Local support                               30 min.
Local support                                60 min.
Site Access Control       Security,                    Security Force                              On Shift
& Personnel               communications, Accountability            personnel accountability NOTE: Response times are from NOTIFICATION of the event and are based on optimum travel conditions.
* Position staffed in accordance with Technical Requirements Manual and Administrative procedures.
**       May be provided by shift personnel assigned other functions
***     Overall direction of facility response to be assumed by EOF director when all centers are fully staffed.
Direction of minute to minute facility operations remains with senior manager in technical support center or control room.
****     May be performed by engineering aide to Shift Manager (STA for ENVY)
NOTES
: 1. AP 0894 specifies minimum shift staffing requirements. FB requires 5 persons per TRM and the Vermont Yankee Nuclear Power Station On-Shift Staffing Analysis. The staffing analysis is maintained as a controlled document and is effective 30 days after OSRC approval. STA and Chemistry Tech must be available within 10 minutes to the Control Room. VY letter to NRC dated 4/14/1981 (FVY 81-65) establishing position. VY letter to NRC 6/22/1982 (FVY 82-75)
Supplement -NUREG 0737 Item III.A.1.2 on training of on-shift staff to support VY position for staffing. VY letter to NRC 4/14/1981 (FVY 81-65) TMI Action Plan Item III.A.1.2, goal for augmentation of staff. VY letter to NRC 6/15/82 (FVY 82-70) Results of Augmentation drills to support use of goals. Titles of ENVY ERO positions are shown.
: 2. All AOs use digital dosimeters with features for dose rate and total dose monitoring. AOs are trained to self-monitor in an emergency.
: 3. ENVY has designated pager holders who staff positions required to meet minimum staffing to activate TSC, OSC and EOF (see E Plan Figures 8.3 through 8.5). There are a minimum of 4 persons per position (4 teams who rotate duty). However, all persons on teams are expected to respond. In addition, all other ERO personnel not on pagers are notified by the emergency call-in notification system and are expected to respond.
: 4. The on-shift Shift Manager, CRS, STA, and Chem Tech have the capability to do initial dose assessment and PAR. The TSC and EOF radiation assessment staff relieves them of this function.
: 4. The on-shift Shift Manager, CRS, STA, and Chem Tech have the capability to do initial dose assessment and PAR. The TSC and EOF radiation assessment staff relieves them of this function.
Emergency Plan Revision 54  
Emergency Plan Revision 54 Page 63 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
 
Page 64 of 125 Entergy Vermont Yankee Figure 8.1 Normal On-shift Emergency Organization
.
Emergency Plan Revision 54
 
Page 65 of 125 Entergy Vermont Yankee Figure 8.2 VY Emergency Management Organization Emergency Plan Revision 54
 
Page 66 of 125 Entergy Vermont Yankee Figure 8.3 Technical Support Center Emergency Organization Emergency Plan Revision 54
 
Page 67 of 125 Entergy Vermont Yankee Figure 8.4 Operations Support Center Emergency Organization Emergency Plan Revision 54
 
Page 68 of 125 Entergy Vermont Yankee Figure 8.5 Emergency Operations Facility Organization Emergency Plan Revision 54
 
Page 69 of 125 Entergy Vermont Yankee Figure 8.7 Joint Information Center Organization
 
Emergency Plan Revision 54
 
Page 70 of 125 Entergy Vermont Yankee 9.0 EMERGENCY RESPONSE 9.1. Emergency Condition Recognition and Classification Vermont Yankee maintains the capability to a ssess, classify, and declare an emergency condition within 15 minutes afte r the availability of indicati ons to plant operators that an emergency action level has been exceeded and promptly declares the emergency condition as soon as possible following identification of the appropriate emergency classification level. 
 
Section 5.0 presents the emergency classification system used for categorizing the wide spectrum of possible emergency conditions into one of four emergency classes. The


process of condition recognition, immediate response to correct the condition, event classification, and initiation of the appropriate emergency impl ementing procedures are all critical responsibilities of the Shift Manager and the operations crew. This has been recognized in the design of both the em ergency operating and emergency implementing procedures. The step between condition recogniti on and classification is handled as a procedural transition from the emergency operating procedure app licable to the event, to a specific emergency implementing procedure.
Figure 8.1 Normal On-shift Emergency Organization.
Emergency Plan Revision 54 Page 64 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


The specific transition procedure contains the listing of conditions that represents each of  
Figure 8.2 VY Emergency Management Organization Emergency Plan Revision 54 Page 65 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


the four emergency categories and the detailed Emergency Action Levels (EALs) that allow
Figure 8.3 Technical Support Center Emergency Organization Emergency Plan Revision 54 Page 66 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


the Shift Manager to determine the emergency classification. Once the emergency is classified, the applicable emergen cy implementing procedure is init iated. This is the trigger for the activation of the plant emergency re sponse organization and the notification of offsite authorities for the activation of their emergency response. The activation of the plant emergency response organization brings to the assistance of the operations shift personnel all the various support elements described in this plan. How specific support elements are implemented, are detailed in the emergency implementing procedures. See Appendix G for a listing of these procedures.
Figure 8.4 Operations Support Center Emergency Organization Emergency Plan Revision 54 Page 67 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


9.2. Activation of the Emergency Organization The Shift Manager activates the emergency organization if plant conditions reach predetermined Emergency Action Levels (Appendix A). Depending upon the specific action levels attained, the Shift Manager declares one of the following: Noti fication of Unusual Event, Alert, Site Area Emer gency, or Gener al Emergency.
Figure 8.5 Emergency Operations Facility Organization Emergency Plan Revision 54 Page 68 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Emergency Plan Revision 54  
Figure 8.7 Joint Information Center Organization Emergency Plan Revision 54 Page 69 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Page 71 of 125 Entergy Vermont Yankee 9.2.1. Notification of Unusual Event Response Appendix A defines the conditions that require the declaration of a Notification of Unusual Event. Emergencies defined within this classi fication demand the mobilization of specific emergency response members and the initiation of precautionar y and/or corrective actions which mitigate the consequences of the event.
9.0      EMERGENCY RESPONSE 9.1. Emergency Condition Recognition and Classification Vermont Yankee maintains the capability to assess, classify, and declare an emergency condition within 15 minutes after the availability of indications to plant operators that an emergency action level has been exceeded and promptly declares the emergency condition as soon as possible following identification of the appropriate emergency classification level.
A Notification of Unusual Event does not activate the entire emergency response organi zation, but may require augmentation of on-shift resources to deal wit h the event. Offsite emergency organizations are notified for informational purposes, and aid from offsite fi re, medical, and security organizations may be required depending on the nature of the event.  
Section 5.0 presents the emergency classification system used for categorizing the wide spectrum of possible emergency conditions into one of four emergency classes. The process of condition recognition, immediate response to correct the condition, event classification, and initiation of the appropriate emergency implementing procedures are all critical responsibilities of the Shift Manager and the operations crew. This has been recognized in the design of both the emergency operating and emergency implementing procedures. The step between condition recognition and classification is handled as a procedural transition from the emergency operating procedure applicable to the event, to a specific emergency implementing procedure.
The specific transition procedure contains the listing of conditions that represents each of the four emergency categories and the detailed Emergency Action Levels (EALs) that allow the Shift Manager to determine the emergency classification. Once the emergency is classified, the applicable emergency implementing procedure is initiated. This is the trigger for the activation of the plant emergency response organization and the notification of offsite authorities for the activation of their emergency response. The activation of the plant emergency response organization brings to the assistance of the operations shift personnel all the various support elements described in this plan. How specific support elements are implemented, are detailed in the emergency implementing procedures. See Appendix G for a listing of these procedures.
9.2. Activation of the Emergency Organization The Shift Manager activates the emergency organization if plant conditions reach predetermined Emergency Action Levels (Appendix A). Depending upon the specific action levels attained, the Shift Manager declares one of the following: Notification of Unusual Event, Alert, Site Area Emergency, or General Emergency.
Emergency Plan Revision 54 Page 70 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


The response required as a result of this dec laration of a Notification of Unusual Event varies according to the specified event, but a general summary of actions taken is  
9.2.1. Notification of Unusual Event Response Appendix A defines the conditions that require the declaration of a Notification of Unusual Event. Emergencies defined within this classification demand the mobilization of specific emergency response members and the initiation of precautionary and/or corrective actions which mitigate the consequences of the event. A Notification of Unusual Event does not activate the entire emergency response organization, but may require augmentation of on-shift resources to deal with the event. Offsite emergency organizations are notified for informational purposes, and aid from offsite fire, medical, and security organizations may be required depending on the nature of the event.
 
The response required as a result of this declaration of a Notification of Unusual Event varies according to the specified event, but a general summary of actions taken is described below:
described below:
: 1. The emergency condition is recognized and classified by the Shift Manager who instructs Control Room personnel to announce over the plant page system the emergency classification;
: 1. The emergency condition is recognized and classified by the Shift Manager who instructs Control Room personnel to announce over the plant page system the emergency classification;
: 2. The on-duty operations shift and se lected plant personnel respond as directed by the Shift Manager;
: 2. The on-duty operations shift and selected plant personnel respond as directed by the Shift Manager;
: 3. The Shift Technical Advisor reports to the Control Room and provides technical support as necessary;
: 3. The Shift Technical Advisor reports to the Control Room and provides technical support as necessary;
: 4. Appropriate plant staff are directed to assume various emergency functions;
: 4. Appropriate plant staff are directed to assume various emergency functions;
Line 1,156: Line 732:
: 9. Additional personnel report to the plant as requested by the SM;
: 9. Additional personnel report to the plant as requested by the SM;
: 10. The Shift Manager directs the activities of emergency response personnel until overall responsibility is assumed by the Emergency Director;
: 10. The Shift Manager directs the activities of emergency response personnel until overall responsibility is assumed by the Emergency Director;
: 11. If necessary, appropriate emergency medical, fire department, or law enforcement agencies are notif ied and requested to respond;
: 11. If necessary, appropriate emergency medical, fire department, or law enforcement agencies are notified and requested to respond;
: 12. The TSC may be activated at the discr etion of the Emergency Plant Manager; Emergency Plan Revision 54  
: 12. The TSC may be activated at the discretion of the Emergency Plant Manager; Emergency Plan Revision 54 Page 71 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
 
: 13. The public information representative is notified and handles public information associated with the event; and
Page 72 of 125 Entergy Vermont Yankee
: 14. The Shift Manager terminates the Notification of Unusual Event status and closes out the event with a verbal summary to offsite authorities or escalates to higher level emergency classification.
: 13. The public information representat ive is notified and handles public information associated with the event; and
9.2.1.1.       Unusual Event (Terminated) Response If a condition that warrants a Notification of Unusual Event declaration has occurred, and was immediately rectified such that the condition no longer existed by the time of declaration, this Notification of Unusual Event classification is referred to as an Unusual Event (Terminated).
: 14. The Shift Manager terminates the Noti fication of Unusual Event status and closes out the event with a verbal summa ry to offsite authorities or escalates to higher level emergency classification.
The event or condition did not affect personnel onsite or the public offsite, or result in radioactive releases requiring offsite monitoring.
9.2.1.1. Unusual Event (Terminated) Response If a condition that warrants a Notification of Unusual Event declaration has occurred, and was immediately rectified such that the c ondition no longer existed by the time of declaration, this Notification of Unusual Even t classification is refe rred to as an Unusual Event (Terminated).  
The response to this declaration of an Unusual Event (Terminated) is not as comprehensive as that for a Notification of Unusual Event. All the same notifications for a Notification of Unusual Event are made, and emergency response personnel reporting to the plant are based on specific requests of the SM.
 
The event or condition did not affect personnel onsite or the public offsite, or result in radioactive releases requi ring offsite monitoring.  
 
The response to this declaration of an Unusual Event (Terminated) is not as comprehensive as that for a Notification of Unusual Event. All the sa me notifications for a Notification of Unusual Ev ent are made, and emergency response personnel reporting to the plant are based on specific requests of the SM.  
 
9.2.2. Alert Response An Alert requires actions to: 1) assure that sufficient emergency response personnel are mobilized to respond to the accident conditions at the site; and 2) that offsite emergency organizations are readily available to respond to the situation. Prompt notification is made to state officials and follow-up information is provided as needed to offsite emergency organizations. Unassigned personnel are evacuated from the site. In an Alert, the steps listed in the Notification of Unusual Event Response section (except for the termination process) and the following are performed:
9.2.2. Alert Response An Alert requires actions to: 1) assure that sufficient emergency response personnel are mobilized to respond to the accident conditions at the site; and 2) that offsite emergency organizations are readily available to respond to the situation. Prompt notification is made to state officials and follow-up information is provided as needed to offsite emergency organizations. Unassigned personnel are evacuated from the site. In an Alert, the steps listed in the Notification of Unusual Event Response section (except for the termination process) and the following are performed:
: 1. The Alert emergency notification and response, as shown in Figure 9.1 and described in Table 9.1 are implemented;
: 1.     The Alert emergency notification and response, as shown in Figure 9.1 and described in Table 9.1 are implemented;
: 2. The Technical Support Center, Oper ations Support Center, the Emergency Operations Facility/Recovery Center, and the Joint Information Center are activated by personnel as shown in Table 9.1;
: 2.     The Technical Support Center, Operations Support Center, the Emergency Operations Facility/Recovery Center, and the Joint Information Center are activated by personnel as shown in Table 9.1;
: 3. If sufficient personnel are not available onsite, off-duty per sonnel are called in as specified in the emer gency implementing procedures;
: 3.     If sufficient personnel are not available onsite, off-duty personnel are called in as specified in the emergency implementing procedures;
: 4. The Emergency Plant Manager reports to the Technical Support Center and directs in-plant emergency operations;
: 4.     The Emergency Plant Manager reports to the Technical Support Center and directs in-plant emergency operations;
: 5. The EOF Manager establishes operations in the EOF/RC; Emergency Plan Revision 54  
: 5.     The EOF Manager establishes operations in the EOF/RC; Emergency Plan Revision 54 Page 72 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
 
: 6. The Vermont, Massachusetts, and New Hampshire state emergency response personnel, having been notified through the state fan-out process, respond in accordance with their respective Radiological Emergency Response Plans;
Page 73 of 125 Entergy Vermont Yankee
: 7. The Emergency Director reports to the EOF/RC and assumes total responsibility for overall emergency response actions and recovery;
: 6. The Vermont, Massachusetts, an d New Hampshire state emergency response personnel, having been notified th rough the state fa n-out process, respond in accordance with their respective Radiological Emergency Response Plans;
: 8. The Joint Information Center is established and timely public information is presented through coordination between the Emergency Director and offsite authorities;
: 7. The Emergency Director reports to the EOF/RC and assumes total responsibility for overall emergency response actions and recovery; 8. The Joint Information Center is est ablished and timely public information is presented through coordination between the Emergency Director and offsite authorities;
: 9. Offsite authorities are provided periodic meteorological assessments and, if releases are occurring, projected dose estimates. (Note: If radiological releases are occurring, monitoring teams are dispatched.); and
: 9. Offsite authorities are provided periodi c meteorological assessments and, if releases are occurring, projected dose estimates. (Note:
: 10. The Emergency Director reaches agreement with offsite authorities concerning de-escalation or termination of the event, and closes out the event by verbal summary to offsite authorities. If an event is a reportable occurrence, a written summary is issued to these authorities in an appropriate time frame through distribution by the Emergency Plan Manager.
If radiological releases are occurring, monitori ng teams are dispatched.); and
: 10. The Emergency Director reaches agreement with offsite authorities concerning de-escalation or termination of the event, and closes out the event by verbal summary to offsite authori ties. If an event is a reportable occurrence, a written summary is issued to these authorities in an appropriate time frame through distribution by the Emergency Plan Manager.
9.2.3. Site Area Emergency Response In a Site Area Emergency, the steps listed in the Alert Response section and the following are performed:
9.2.3. Site Area Emergency Response In a Site Area Emergency, the steps listed in the Alert Response section and the following are performed:
: 1. All Vermont Yankee emergency response personnel are notified and report as described in Table 9.1;
: 1. All Vermont Yankee emergency response personnel are notified and report as described in Table 9.1;
: 2. The Engineering Suppor t Group works in concert with the TSC to resolve engineering support and assist in coordinating equipment resources;
: 2. The Engineering Support Group works in concert with the TSC to resolve engineering support and assist in coordinating equipment resources;
: 3. State emergency response personnel are dispatched to the EOF/RC as state/local emergency response organi zations become fully mobilized;
: 3. State emergency response personnel are dispatched to the EOF/RC as state/local emergency response organizations become fully mobilized;
: 4. Plant conditions are continually assessed and protective action recommendations to offsite authoriti es are made on the basis of this assessment and/or actual or projec ted offsite radiological impacts;
: 4. Plant conditions are continually assessed and protective action recommendations to offsite authorities are made on the basis of this assessment and/or actual or projected offsite radiological impacts;
: 5. Termination actions are initiated in t he same manner as that identified for an Alert. A closeout, de-escalation to reco very phase, or escalation of the emergency classification is made in c oordination with offsite authorities.  
: 5. Termination actions are initiated in the same manner as that identified for an Alert. A closeout, de-escalation to recovery phase, or escalation of the emergency classification is made in coordination with offsite authorities.
 
Emergency Plan Revision 54 Page 73 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
Emergency Plan Revision 54  


Page 74 of 125 Entergy Vermont Yankee 9.2.4. General Emergency Response All Emergency Centers are acti vated and all available resour ces are called upon in the event of a General Emergency.
9.2.4. General Emergency Response All Emergency Centers are activated and all available resources are called upon in the event of a General Emergency. The plant promptly notifies offsite authorities and initiates all emergency response organization capabilities.
The plant promptly notifies offsite authorities and initiates all emergency response organization capabilities.  
Offsite authorities fully activate their emergency response and implement appropriate protective measures based on meteorological information, actual or projected radiological dose conditions and/or conditions. The Emergency Director and the entire emergency response organization assemble plant status parameters and continually advise offsite authorities of the type of public protective action most appropriate to the situation based on plant conditions and offsite dose projections. This includes whether to shelter or evacuate the affected towns within the plume exposure emergency planning zone. In a General Emergency, the steps listed in the Site Area Emergency Response section and the following are performed:
 
: 1. The Emergency Director may request that the EOF Manager mobilize other personnel in support of Vermont Yankee through activation of the Corporate Emergency Center;
Offsite authorities fully activate their em ergency response and implement appropriate protective measures based on meteorological in formation, actual or projected radiological dose conditions and/or conditions. The Em ergency Director and the entire emergency response organization assemble plant status parameters and continually advise offsite authorities of the type of public protective action most appropriate to the situation based on plant conditions and offsite dose projections. Th is includes whether to shelter or evacuate the affected towns within the plume exposur e emergency planning z one. In a General Emergency, the steps listed in the Site Area Emergency Response section and the following are performed:
: 1. The Emergency Director may request t hat the EOF Manager mobilize other personnel in support of Vermont Yankee through activation of the Corporate Emergency Center;
: 2. Other nuclear industry resources are alerted and requested to render appropriate assistance;
: 2. Other nuclear industry resources are alerted and requested to render appropriate assistance;
: 3. The full resources of the National Response Framework are activated; and
: 3. The full resources of the National Response Framework are activated; and
: 4. Dissemination of information and inst ructions associated with protective actions to the public is the principal focus of all response organizations. The plant fully participates in these ef forts by providing detailed emergency condition information.
: 4. Dissemination of information and instructions associated with protective actions to the public is the principal focus of all response organizations. The plant fully participates in these efforts by providing detailed emergency condition information.
9.3. Emergency De-Escalation and Termination Criteria Classification of an accident condition requires that the plant operation staff recognize that pre-established EALs associated with an emergency condition, as defined in Appendix A, have been reached or exceeded.  
9.3. Emergency De-Escalation and Termination Criteria Classification of an accident condition requires that the plant operation staff recognize that pre-established EALs associated with an emergency condition, as defined in Appendix A, have been reached or exceeded.
De-escalation criteria require (1) an extensive review of plant parameters and/or offsite radiological conditions in conjunction with the pre-established EALs; (2) review of plant and offsite conditions with offsite authorities; and (3) concurrence by offsite authorities as to the appropriate time frame required to implement de-escalation.
Emergency Plan Revision 54 Page 74 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


De-escalation criteria require (1) an extensive review of plant parameters and/or offsite radiological conditions in conj unction with the pre-established EALs; (2) review of plant and offsite conditions with offsite authorities; and (3) concurrence by offsite authorities as to the appropriate time frame required to implement de-escalation.
De-escalation from a Notification of Unusual Event to a recovery phase requires satisfying the following criteria:
 
: 1. Criticality controls are in effect;
Emergency Plan Revision 54
 
Page 75 of 125 Entergy Vermont Yankee De-escalation from a Notificati on of Unusual Event to a recovery phase requires satisfying the following criteria:
: 1. Criticality contro ls are in effect;
: 2. The core is being adequately cooled;
: 2. The core is being adequately cooled;
: 3. The fission product release has been controlled;
: 3. The fission product release has been controlled;
: 4. Control has been established over c ontainment pressure and temperature;
: 4. Control has been established over containment pressure and temperature;
: 5. An adequate heat transfer path to an ultimate heat sink has been established;
: 5. An adequate heat transfer path to an ultimate heat sink has been established;
: 6. Reactor coolant system pressure is under control; and/or
: 6. Reactor coolant system pressure is under control; and/or
: 7. Notification of Unusual Event conditions have been reviewed, are under control, and are not expect ed to deteriorate further.  
: 7. Notification of Unusual Event conditions have been reviewed, are under control, and are not expected to deteriorate further.
De-escalation from emergency classes greater than the Notification of Unusual Event level to a recovery phase requires satisfying all the criteria stated in Items 1 through 6 above and that the States of Vermont and New Hampshire, and the Commonwealth of Massachusetts reach agreement with the Emergency Director or designee that there is no longer a need for either consideration of further public protective action or surveillance related to public protective action.
When plant conditions allow de-escalation in the emergency class to a recovery phase, the Emergency Director directs the emergency response organization to perform certain response actions prior to implementing any change. These actions include:
: 1. Notification of all plant emergency management personnel of the pending change;
: 2. Notification of offsite authorities of the pending change;
: 3. Notification of corporate support services of the pending change;
: 4. Coordination of media releases concerning the transition; and
: 5. Announcement of the transition over the plant page system.
Emergency Plan Revision 54 Page 75 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


De-escalation from emergency classes greater t han the Notification of Unusual Event level to a recovery phase requires satisfying all the criteria stated in Items 1 through 6 above and
TABLE 9.1 (Page 1 of 2)
VERMONT YANKEE EMERGENCY RESPONSE EMERGENCY CENTER        NOTIFICATION OF UNUSUAL EVENT                ALERT OR SITE AREA OR GENERAL EMERGENCY Technical Support Center  Activation at the discretion of the       Emergency Plant Manager Emergency Plant Manager TSC Manager Maintenance Coordinator (Electrical/Mechanical/I&C)
Radiological Coordinator Reactor Engineer Engineering Coordinator (Project, System, Design)
Operations Coordinator Engineering Support Group Operations Support Center Not activated                              OSC Manager Radiation Protection Staff Chemistry Staff Spare Licensed Operators Spare Auxiliary Operators Control Instrument Specialists Plant Mechanics Emergency Plan Revision 54 Page 76 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


that the States of Vermont and New Hampsh ire, and the Commonwealth of Massachusetts reach agreement with the Emergen cy Director or designee that there is no longer a need for either consideration of furt her public protective action or surveillance related to public protective action.
TABLE 9.1 (Continued)
(Page 2 of 2)
VERMONT YANKEE EMERGENCY RESPONSE NOTIFICATION OF UNUSUAL                  ALERT OR SITE AREA OR GENERAL EMERGENCY CENTER                          EVENT                                  EMERGENCY Emergency Operations          Activation at the discretion of the Facility/Recovery Center      Emergency Plant Manager              Emergency Director Offsite Communicator Technical Advisor EOF Manager Administration and Logistics Coordinator Radiological Assessment Coordinator Personnel & Equipment Monitor
                                                                    *Site/Offsite Monitoring Teams Public Information Liaison Joint Information Center      Not Activated                        Company Spokesperson VY Public Information Staff Nuclear Public Information Representatives Joint Information Center Staff
              *Deployed from OSC and report to Radiological Assessment Coordinator Emergency Plan Revision 54 Page 77 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


When plant conditions allow de-escalation in t he emergency class to a recovery phase, the Emergency Director directs the emergency response organization to perform certain response actions prior to implementing any change. These actions include:
Redacted Version of Document - Publicly Available 10.0    RADIOLOGICAL ASSESSMENT AND PROTECTIVE MEASURES 10.1. Radiological Assessment 10.1.1.        Initial Offsite Radiological Dose Projection Capability Vermont Yankee has developed a method to quickly determine the projected offsite radiological conditions at various distances downwind of the plant site. During the initial stages of an emergency, the Shift Manager or designated individual is responsible to perform the initial evaluation of offsite radiological conditions. The initial evaluation of offsite radiological conditions is accomplished by utilizing the Offsite Dose Projection System (ODPS).
: 1. Notification of all plant emer gency management personnel of the pending change;  2. Notification of offsite authorities of the pending change;
The ODPS utilizes a straight line Gaussian plume dispersion model programmed on the plant process computer. The program allows the user the option to select one of two release pathways (elevated or ground) and to utilize site-specific radiological and meteorological information to estimate the Total Effective Dose Equivalent and adult thyroid Committed Dose Equivalent (elevated release only) at a distance of 0.35 miles to 10 miles from the plant site.
: 3. Notification of corporate s upport services of the pending change;
10.1.2.       Variable Trajectory Atmospheric Dispersion/Dose Projection Capability Once the EOF/RC is activated, Vermont Yankee utilizes a plume tracking/dose projection system, which is capable of providing near real time offsite dose estimated for actual meteorological and radiological accident conditions. The system assumes a Gaussian, variable trajectory, plume segment transport model designed to handle the site-specific atmospheric dispersion characteristics associated with the Vermont Yankee Nuclear Power Station site. Both continuous and intermittent releases for either ground or stack release points can be evaluated. The effects of release height, building wake entrainment, momentum plume rise, precipitation and terrain height can be assessed in the evaluation.
: 4. Coordination of media releas es concerning the transition; and
Plume trajectories are based on onsite meteorological tower information and topography of the Connecticut River Valley.
: 5. Announcement of the transit ion over the plant page system.
The model combines complex plume transport algorithms with the same dose assessment algorithms used by the model described in Section 10.1.1. The model is programmed on a personal computer. The program is designed to graphically display the calculated plume characteristics on a 10-mile Vermont Yankee EPZ site map while providing transcripts of all dispersion and dose calculations.
Emergency Plan Revision 54 Page 79 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Emergency Plan Revision 54
Additionally, the Offsite Dose Nomogram can be used to determine an activity release rate (Ci/sec) and a projected offsite whole body plume centerline dose rate (mR/hr) at 1/3 of a mile from the stack. These determinations are made by using Figure 10.1 with the following additional information:
 
: 1. Time after reactor shutdown;
Page 76 of 125 Entergy Vermont Yankee TABLE 9.1 (Page 1 of 2) VERMONT YANKEE EMER GENCY RESPONSE EMERGENCY CENTER NOTIFICATION OF UNUSUAL EVENT ALERT OR SITE AREA OR GENERAL EMERGENCY Technical Support Center Activa tion at the discretion of the Emergency Plant Manager Emergency Plant Manager  TSC Manager Maintenance Coordinator (Electrical/Mechanical/I&C)  Radiological Coordinator Reactor Engineer Engineering Coordinator (Project, System, Design)  Operations Coordinator Engineering Support Group
: 2. The plant stack high range monitor response;
 
: 3. The plant stack flow rate at the time of the accident; and
Operations Support Center Not activated OSC Manager  Radiation Protection Staff Chemistry Staff Spare Licensed Operators Spare Auxiliary Operators Control Instrument Specialists Plant Mechanics
: 4. Wind speed.
 
The assumptions incorporated in and the use of the nomograms contained in Figure 10.1 is discussed in Appendix C.
Emergency Plan Revision 54
10.1.3.       Evaluation of Offsite Air Samples Vermont Yankee monitoring teams, after determining the location of the plume centerline (i.e., maximum radiation level) in the field, take air samples at various intervals downwind from the plant. These samples are analyzed for gross beta/gamma activity in the field and, if elevated levels are observed, they are returned to the Emergency Operations Facility where they are analyzed to determine radionuclide concentrations. These field results can be projected to other distances of interest.
 
Particular attention is given to observed iodine concentrations. Air samples are analyzed in a multi-step process. The first step involves field analysis of the sample which measures the gross radioactivity collected in the silver zeolite cartridge and filter paper using a pancake GM detector. If the silver zeolite sample analysis shows a net count rate greater than the background count rate, the sample is immediately delivered to the EOF/RC for analysis with greater sensitivity and accuracy (for I-131 specifically).
Page 77 of 125 Entergy Vermont Yankee TABLE 9.1 (Continued) (Page 2 of 2) VERMONT YANKEE EMER GENCY RESPONSE EMERGENCY CENTER NOTIFICATION OF UNUSUAL EVENT ALERT OR SITE AREA OR GENERAL EMERGENCY Emergency Operations
The projected thyroid dose is determined from the measured I-131 concentration by multiplying the estimate of the duration of exposure by the dose conversion factor for an adult member of the public. A nomogram has been developed specifically for this thyroid dose projection on the basis of airborne radioiodine measurements. It is shown in Figure 10.2.
 
In addition to the measurement and evaluation of offsite direct dose rates and air samples for radioiodine, the offsite radiological impact assessment includes the identification of principal radionuclides potentially released from the accident and significant exposure pathways.
Facility/Recovery Center Activation at the discretion of the Emergency Plant Manager Emergency Director  Offsite Communicator Technical Advisor EOF Manager Administration and Logistics Coordinator
This is accomplished through an emergency sampling program in which environmental samples of media (water, air, soil, etc., as appropriate) are collected and subjected to detailed radionuclide analysis. The necessary analysis can be performed as described in section 6.2.6.
 
Emergency Plan Revision 54 Page 80 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
Radiological Assessment Coordinator Personnel & Equipment Monitor 
  *Site/Offsite Monitoring Teams Public Information Liaison
 
Joint Information Center Not Activated Company Spokesperson VY Public Information Staff Nuclear Public Information Representatives Joint Information Center Staff
*Deployed from OSC and report to Radiological Assessment Coordinator
 
Emergency Plan Revision 54
 
Page 79 of 125 Entergy Vermont Yankee 10.0 RADIOLOGICAL ASSESSMENT AND PROTECTIVE MEASURES 10.1. Radiological Assessment 10.1.1. Initial Offsite Radiological Dose Projection Capability Vermont Yankee has developed a method to quickly determine the projected offsite radiological conditions at various distances downwind of the plant site. During the initial stages of an emergency, the Shift Manager or designated individual is responsible to perform the initial evaluation of offsite radiological conditions. The initial evaluation of offsite radiological conditions is accomplish ed by utilizing the Offsite Dose Projection System (ODPS).
 
The ODPS utilizes a straight line Gaussian plume dispersion model programmed on the
 
plant process computer. The program allows the user the option to select one of two release pathways (elevated or ground) and to utilize site-specific radiological and meteorological information to estimate the To tal Effective Dose Equivalent and adult thyroid Committed Dose Equivalent (elevated release only) at a distance of 0.35 miles to 10 miles from the plant site.
 
10.1.2. Variable Trajectory Atmospheric Dispersion/Dose Projection Capability Once the EOF/RC is activated, Vermont Yankee utilizes a plume tracking/dose projection system, which is capable of providing near real time offsite dose estimated for actual meteorological and radiological accident conditions. The system assumes a Gaussian, variable trajectory, plume segment transpor t model designed to handle the site-specific atmospheric dispersion characteristics asso ciated with the Vermont Yankee Nuclear Power Station site. Both continuous and intermittent releases for either ground or stack release points can be evaluated. The effects of release height, building wake entrainment, momentum plume rise, precipitation and terrain height can be assessed in the evaluation.
Plume trajectories are based on onsite meteorological tower information and topography of the Connecticut River Valley.
 
The model combines complex plume transport algorithms with the same dose assessment algorithms used by the model described in Section 10.1.1. The model is programmed on a personal computer. The program is designed to graphically display the calculated plume characteristics on a 10-mile Vermont Yankee EPZ site map while providing transcripts of all dispersion and dose calculations.
 
Emergency Plan Revision 54
 
Page 80 of 125 Entergy Vermont Yankee Additionally, the Offsite Dose Nomogram can be used to determine an activity release rate
( Ci/sec) and a projected offsite whole body plume centerline dose rate (mR/hr) at 1/3 of a mile from the stack. T hese determinations are made by using Figure 10.1 with the following additional information:
: 1. Time after reactor shutdown; 2. The plant stack high range monitor response; 3. The plant stack flow rate at the time of the accident; and 4. Wind speed.
The assumptions incorporated in and the use of the nomograms contai ned in Figure 10.1 is discussed in Appendix C.  
 
10.1.3. Evaluation of Offsite Air Samples Vermont Yankee monitoring teams, after determi ning the location of the plume centerline (i.e., maximum radiation level) in the field, take air samples at various intervals downwind from the plant. These samples are analyzed for gross beta/gamma activity in the field and, if elevated levels are observed, they are returned to the Emergency Operations Facility where they are analyzed to determine radionucli de concentrations. These field results can be projected to other distances of interest.
Particular attention is given to observed iodi ne concentrations. Air samples are analyzed in a multi-step process. The first step involves field analysis of the sample which measures the gross radioactivity collected in the silv er zeolite cartridge and filter paper using a pancake GM detector. If the silver zeolite sample analysis shows a net count rate greater than the background count rate, the sample is immediately delivered to the EOF/RC for analysis with greater sensitivity and accuracy (for I-131 specifically).
The projected thyroid dose is determined from the measured I-131 concentration by multiplying the estimate of the duration of exposure by the dose conversion factor for an adult member of the public. A nomogram has been developed specifically for this thyroid dose projection on the basis of airborne radi oiodine measurements.
It is shown in Figure 10.2.  
 
In addition to the measurement and evaluation of offsite direct dose rates and air samples for radioiodine, the offsite radiological impact assessment includes the identification of principal radionuclides potentia lly released from the accident and significant exposure pathways.
This is accomplished through an emergency sampling program in which environmental samples of media (water, air, soil, etc., as appropriate) are collected and subjected to detailed radionuclide analysis. The necessary analysis can be performed as described in section 6.2.6.
 
Emergency Plan Revision 54  
 
Page 81 of 125 Entergy Vermont Yankee 10.2. Protective Action Recommendation Criteria In the event a General Emergency has been declared, Vermont Yankee immediately recommends protective actions to state authori ties based on plant conditions which include the status of core and contai nment conditions. At a mini mum, the Shift Manager or Emergency Director, who is in charge of the emergency response activities, recommends that the general public be advised to seek shelter for the towns of Hinsdale, New Hampshire and Vernon, Vermont; and the town s located five miles downwind in the affected sectors.
 
If plant conditions indicate a severe reactor accident exists involvin g actual or projected substantial core damage, Vermont Yankee reco mmends to the appropriate state officials evacuation of the towns of Hinsdale, New Hampshire and Vernon, Vermont; and all towns located five miles downwind in the affected sectors.
 
With an emergency condition producing a radi ological release or an inplant (i.e., containment) source term that could be subsequently released, one of the priorities of the responding emergency personnel is to implement the sampling and analysis of releases and/or source terms to identify if there is a radioiodine component. This sampling capability


includes containment atmosphere, gas spaces in other plant systems, and the plant stack. Radioiodine identified at any of these point s is quantified and evaluated in terms of actual or potential offsite impact.  
10.2. Protective Action Recommendation Criteria In the event a General Emergency has been declared, Vermont Yankee immediately recommends protective actions to state authorities based on plant conditions which include the status of core and containment conditions. At a minimum, the Shift Manager or Emergency Director, who is in charge of the emergency response activities, recommends that the general public be advised to seek shelter for the towns of Hinsdale, New Hampshire and Vernon, Vermont; and the towns located five miles downwind in the affected sectors.
 
If plant conditions indicate a severe reactor accident exists involving actual or projected substantial core damage, Vermont Yankee recommends to the appropriate state officials evacuation of the towns of Hinsdale, New Hampshire and Vernon, Vermont; and all towns located five miles downwind in the affected sectors.
Once actual source term, onsite and/or offs ite field monitoring determinations have been made, the Vermont Yankee Emergency Director or designee provides projected offsite  
With an emergency condition producing a radiological release or an inplant (i.e.,
 
containment) source term that could be subsequently released, one of the priorities of the responding emergency personnel is to implement the sampling and analysis of releases and/or source terms to identify if there is a radioiodine component. This sampling capability includes containment atmosphere, gas spaces in other plant systems, and the plant stack.
Total Effective Dose Equivalents (TEDEs) and thyroid Committed Dose Equivalents (CDEs) at various distances from the plant to the Departments of Public Health of Vermont, New Hampshire and Massachusetts. Based upon these results, the Emergency Director recommends protective actions in accordanc e with the criteria set forth in the EPA Protective Action Guides, Table 10.1.1. For environmental samples collected and analyzed by Vermont Yankee, the results of these samples are coordinated with the appropriate state agencies, and the state agencies implem ent the appropriate ingestion pathway protective actions in accordance with the FDA/HHS document Accidental Radioactive Contamination of Human Food and Animal Feeds, issued 8/13/98. Table 10.1.2 lists the Recommended Derived Intervention Level (DIL) for each radionuclide group.
Radioiodine identified at any of these points is quantified and evaluated in terms of actual or potential offsite impact.
Once actual source term, onsite and/or offsite field monitoring determinations have been made, the Vermont Yankee Emergency Director or designee provides projected offsite Total Effective Dose Equivalents (TEDEs) and thyroid Committed Dose Equivalents (CDEs) at various distances from the plant to the Departments of Public Health of Vermont, New Hampshire and Massachusetts. Based upon these results, the Emergency Director recommends protective actions in accordance with the criteria set forth in the EPA Protective Action Guides, Table 10.1.1. For environmental samples collected and analyzed by Vermont Yankee, the results of these samples are coordinated with the appropriate state agencies, and the state agencies implement the appropriate ingestion pathway protective actions in accordance with the FDA/HHS document Accidental Radioactive Contamination of Human Food and Animal Feeds, issued 8/13/98. Table 10.1.2 lists the Recommended Derived Intervention Level (DIL) for each radionuclide group.
10.3. Radiological Exposure Control During a plant emergency, abnormally high levels of radiation and/or radioactivity may be encountered. These levels may range from slightly above those experienced during normal plant operation to life-endangering levels of several hundred rem in a short period of time.
10.3. Radiological Exposure Control During a plant emergency, abnormally high levels of radiation and/or radioactivity may be encountered. These levels may range from slightly above those experienced during normal plant operation to life-endangering levels of several hundred rem in a short period of time.
Under all emergency situations, immediate acti ons are required to regain control of the emergency or for life-saving purposes; steps should be taken to minimize personnel exposure from external and/or in ternal sources of radiation.  
Under all emergency situations, immediate actions are required to regain control of the emergency or for life-saving purposes; steps should be taken to minimize personnel exposure from external and/or internal sources of radiation.
 
Emergency Plan Revision 54 Page 81 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
Emergency Plan Revision 54  
 
Page 82 of 125 Entergy Vermont Yankee Table 10.2 specifies the guide lines on emergency dose limi ts for personnel providing emergency response duties which is consistent with the Environmental Protection Agency Emergency Worker Dose Limit Guides (EPA 400-R-92-001). The Shift Manager initially has the responsibility to aut horize emergency dose commitments until relieved by the Emergency Plant Manager. This authorization is c oordinated with the a ssistance of the Radiological Coordinator or Shift Chemistry and Radiation Protection Technicians as needed. Exposure to individuals providing emergency functions will be consistent with the limits specified in Table 10.2 with every attempt made to keep exposures ALARA.
The Radiological Coordinator is responsible for developing emergency radiological protection programs for plant staff support per sonnel. Emergency kits in each emergency center are provided with self-reading dosimeters (both high and low range). Each member reporting to the site will be provided a DLR badge.
Dose records will be maintained at each center based upon the results of the self-reading dosimeters. This information is cross-referenced with the DLR badge data, as soon as they can be processed at the Emergency Operations Facility/Recovery Center. The capability exis ts for the emergency


processing of DLRs on a 24-hour per day basis, if necessary, through a General Services Agreement with Landauer Inc. Emergency workers are instru cted to read self indicating dosimeters frequently, and DLRs may be processed with increased periodicity.
Table 10.2 specifies the guidelines on emergency dose limits for personnel providing emergency response duties which is consistent with the Environmental Protection Agency Emergency Worker Dose Limit Guides (EPA 400-R-92-001). The Shift Manager initially has the responsibility to authorize emergency dose commitments until relieved by the Emergency Plant Manager. This authorization is coordinated with the assistance of the Radiological Coordinator or Shift Chemistry and Radiation Protection Technicians as needed. Exposure to individuals providing emergency functions will be consistent with the limits specified in Table 10.2 with every attempt made to keep exposures ALARA.
10.4. Protective Measures 10.4.1. Site Personnel Accountability The goal of the personnel accountability proc ess is to account for personnel within 30 minutes of the emergency declaration of an Alert or higher. Accountability for a Notification of Unusual Event is at the discretion of the Emergency Plant Manager. Plant procedures require Security personnel at the gate to mainta in a list of personnel ent ering or leaving the site during a site evacuation. Emergency Response Facility Managers are responsible for accounting for their sta ff as they report to their facility. Each facility maintains an organizational sign-in method which enhances th is reporting process. All reports are provided to the Emergency Plant Manager in the Technical S upport Center, who initiates search and rescue actions for any missing pers onnel. Plant security provides assistance for this accountability effort and aids in the control of personnel during extended emergency operations.  
The Radiological Coordinator is responsible for developing emergency radiological protection programs for plant staff support personnel. Emergency kits in each emergency center are provided with self-reading dosimeters (both high and low range). Each member reporting to the site will be provided a DLR badge. Dose records will be maintained at each center based upon the results of the self-reading dosimeters. This information is cross-referenced with the DLR badge data, as soon as they can be processed at the Emergency Operations Facility/Recovery Center. The capability exists for the emergency processing of DLRs on a 24-hour per day basis, if necessary, through a General Services Agreement with Landauer Inc. Emergency workers are instructed to read self indicating dosimeters frequently, and DLRs may be processed with increased periodicity.
10.4. Protective Measures 10.4.1.       Site Personnel Accountability The goal of the personnel accountability process is to account for personnel within 30 minutes of the emergency declaration of an Alert or higher. Accountability for a Notification of Unusual Event is at the discretion of the Emergency Plant Manager. Plant procedures require Security personnel at the gate to maintain a list of personnel entering or leaving the site during a site evacuation. Emergency Response Facility Managers are responsible for accounting for their staff as they report to their facility. Each facility maintains an organizational sign-in method which enhances this reporting process. All reports are provided to the Emergency Plant Manager in the Technical Support Center, who initiates search and rescue actions for any missing personnel. Plant security provides assistance for this accountability effort and aids in the control of personnel during extended emergency operations.
Accountability may be modified or suspended if the safety of personnel may be jeopardized by a Security event or other event hazardous to personnel.
Emergency Plan Revision 54 Page 82 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Accountability may be modified or suspended if the safety of personnel may be jeopardized by a Security event or other event hazardous to personnel.
10.4.2.       Site Egress Control Methods All visitors and contractors are evacuated from the plant under the Alert, Site Area or General Emergency conditions. At the Site Area or General Emergency all visitors and contractors are directed to report to the EOF/RC for monitoring. Emergency personnel assigned to the EOF/RC and other unassigned plant personnel, report immediately to the EOF/RC, and are monitored upon arrival at the facility. If a Code Red Security event has been declared, evacuation and accountability may put personnel at risk. In these security situations, evacuation and accountability may be suspended until directed by Security.
 
Plant evacuees are advised of area evacuation routes prior to being released. Appendix F provides evacuation time estimates for the plume exposure EPZ, and also details the major evacuation routes that could be used in the area. Access to the plant is not allowed unless personnel are specifically authorized.
Emergency Plan Revision 54
10.4.3.       Decontamination Capability The in-plant decontamination facility is located in the Operations Support Center. Waste generated through the use of this system is collected and processed by the plant liquid radwaste system. Survey instrumentation for personnel "frisking" and sensitive body burden monitoring equipment are available in various plant locations.
 
Decontamination at the EOF/RC is provided by using washcloths, which are disposed of by placing them in a 55-gallon drum. If conditions warrant alternative means, the EOF/RC has emergency decontamination capability (decontamination shower with the waste draining in to a holding tank). After accident conditions have been terminated, the holding tank is sampled to ascertain whether abnormal radiological levels exist. Depending upon the activity present and the isotopic determination, plans will be developed to remove the waste for disposal. Contaminated personnel not required for EOF activation will be directed to State Reception Centers.
Page 83 of 125 Entergy Vermont Yankee 10.4.2. Site Egress Control Methods All visitors and contractors are evacuated fr om the plant under the Alert, Site Area or General Emergency conditions. At the Site Area or General Emergency all visitors and contractors are directed to report to t he EOF/RC for monitoring. Emergency personnel assigned to the EOF/RC and other unassigned pl ant personnel, report immediately to the EOF/RC, and are monitored upon arrival at the facility. If a Code Red Security event has been declared, evacuation and accountability may put personnel at risk. In these security situations, evacuation and accountability may be suspended until directed by Security.  
10.4.4.       Use of Onsite Protective Equipment and Supplies The plant supplies of personnel radiation protection equipment and gear are utilized to support the emergency response effort. Equipment such as respiratory protection gear, all types of protective clothing, and a supply of potassium Iodide is assigned to emergency response organization members in accordance with established plant radiation protection criteria. Radiation guideline action levels for a range of plant radiological conditions are shown in Table 10.3.
 
10.4.5.       Fire Protection Equipment The plant maintains sufficient respiratory equipment (i.e., Scott Air Pacs and spare air cylinders), to support emergency response personnel in the event of a fire. Additionally, Vermont Yankee maintains a letter of agreement with the Brattleboro Fire Department for recharging Scott Air Pac cylinders during an emergency.
Plant evacuees are advised of area evacuation r outes prior to being released. Appendix F provides evacuation time estimates for the plume exposure EPZ, and also details the major evacuation routes that could be used in the area. Access to the plant is not allowed unless personnel are specif ically authorized.
Emergency Plan Revision 54 Page 83 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
10.4.3. Decontamination Capability The in-plant decontamination facility is locat ed in the Operations Su pport Center. Waste generated through the use of this system is collected and proc essed by the plant liquid radwaste system. Survey instrumentation for personnel "frisking" and sensitive body burden monitoring equipment are availa ble in various plant locations.
Decontamination at the EOF/RC is provided by using washcloths, which are disposed of by placing them in a 55-gallon drum. If conditions warrant alte rnative means, the EOF/RC has emergency decontamination capabili ty (decontamination shower with the waste draining in to a holding tank). After accident conditi ons have been terminated, the holding tank is sampled to ascertain whether abnormal radiological levels exist. Depending upon the activity present and the isotopic determination, plans will be developed to remove the waste for disposal. Contaminated personnel not requi red for EOF activation will be directed to State Reception Centers.  
 
10.4.4. Use of Onsite Prot ective Equipment and Supplies The plant supplies of personnel radiation protection equipment and gear are utilized to support the emergency response effort. Equipment such as respiratory protection gear, all types of protective clothing, and a supply of potassium Iodide is assigned to emergency response organization members in accordance with established plant radiation protection  
 
criteria. Radiation guideline action levels for a range of plant radiological conditions are shown in Table 10.3.  
 
10.4.5. Fire Protection Equipment The plant maintains sufficient respiratory equipment (i.e., Scott Air Pacs and spare air cylinders), to support emergency response personnel in the event of a fire. Additionally, Vermont Yankee maintains a letter of agreement with the Brattleboro Fire Department for recharging Scott Air Pac cylinders during an emergency.  
 
Emergency Plan Revision 54  
 
Page 84 of 125 Entergy Vermont Yankee 10.5. Aid to Affected Personnel 10.5.1. Medical Treatment In-plant medical supplies are provided in the Operations Suppor t Center. Medical Response Team members are trained in accordance with station procedures.


10.5. Aid to Affected Personnel 10.5.1.      Medical Treatment In-plant medical supplies are provided in the Operations Support Center. Medical Response Team members are trained in accordance with station procedures.
Arrangements exist with the hospitals indicated in Section 8.4.1. Both hospitals participate in medical emergency drills. Figure 10.3 shows hospitals within the ingestion exposure EPZ of Vermont Yankee, which have the capability to handle radiation emergencies.
Arrangements exist with the hospitals indicated in Section 8.4.1. Both hospitals participate in medical emergency drills. Figure 10.3 shows hospitals within the ingestion exposure EPZ of Vermont Yankee, which have the capability to handle radiation emergencies.
10.5.2. Medical Transportation Arrangements exist with Rescue, Inc., to prov ide 24-hour ambulance service for emergency transportation of plant personnel for offsite treat ment. The ambulance service is capable of radio communications with the hospital while en route with a patient. Normal telecommunication channels are used in notifying the ambulance service dispatch center.
10.5.2.       Medical Transportation Arrangements exist with Rescue, Inc., to provide 24-hour ambulance service for emergency transportation of plant personnel for offsite treatment. The ambulance service is capable of radio communications with the hospital while en route with a patient. Normal telecommunication channels are used in notifying the ambulance service dispatch center.
Rescue, Inc. personnel are prov ided with specific training by Vermont Yankee on the health physics considerations associated with radioa ctively contaminated personnel and site access control measures.  
Rescue, Inc. personnel are provided with specific training by Vermont Yankee on the health physics considerations associated with radioactively contaminated personnel and site access control measures.
 
10.6. Protective Actions for Onsite Personnel A range of protective actions to protect onsite personnel during hostile action is provided to ensure the continued ability to safely shut down the reactor and perform the functions of the emergency plan.
10.6. Protective Actions for Onsite Personnel A range of protective actions to protect onsite personnel during hostile ac tion is provided to ensure the continued ability to safely shut down the reactor and perform the functions of the emergency plan.  
Emergency Plan Revision 54 Page 84 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
 
Emergency Plan Revision 54  
 
Page 85 of 125 Entergy Vermont Yankee TABLE 10.1.1 EPA PROTECTIVE ACTION GUIDELINES Total Effective Dose Equivalent (TEDE)
Committed Dose Equivalent (CDE) to the Thyroid  Protective Action
>1 rem  >5 rem  EVACUATION (Sheltering may be preferred
 
protective action if the following
 
are present:
 
Severe weather,  Competing disasters,  Local physical factors which impede evacuation LOCAL/STATE OFFSITE


OFFICIALS WILL DETERMINE  
TABLE 10.1.1 EPA PROTECTIVE ACTION GUIDELINES Total Effective Dose        Committed Dose                  Protective Action Equivalent (TEDE)      Equivalent (CDE) to the Thyroid
        >1 rem                    >5 rem                      EVACUATION (Sheltering may be preferred protective action if the following are present:
Severe weather, Competing disasters, Local physical factors which impede evacuation LOCAL/STATE OFFSITE OFFICIALS WILL DETERMINE THE SIGNIFICANCE OF THESE FACTORS TO THE PAR SUBSEQUENT TO THE ISSUANCE OF THE PAR BY VY.)
Emergency Plan Revision 54 Page 85 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


THE SIGNIFICANCE OF THESE
TABLE 10.1.2 RECOMMENDED DERIVED INTERVENTION LEVEL (DIL)
OR CRITERION FOR EACH RADIONUCLIDE GROUP(a)(b)
All Components Of The Diet Radionuclide Group                    (Bg/kg)                      (pCi/kg)
Sr-90                                      160                          4300 I-131                                      170                          4600 Cs-134 + Cs-137                            1200                        32,000 Pu-238 + Pu-239 + Am-241                    2                            54 Ru-103 + Ru-106I                        C3 + C6 <1                  C3 + C6 <1 6800 450                  180,000 12,000 Notes:
(a)
The DIL for each radionuclide group (except for Ru-103 + Ru-106) is applied independently. Each DIL applies to the sum of the concentrations of the radionuclides in the group at the time of measurement.
(b)
Applicable to foods as prepared for consumption. For dried or concentrated products such as powdered milk or concentrated juices, adjust by a factor appropriate to reconstitution, and assume the reconstitution water is not contaminated. For spices, which are consumed in very small quantities, use a dilution factor of 10.
(c)
Due to the large difference in DILs for Ru-103 and Ru-106, the individual concentrations of Ru-103 and Ru-106 are divided by their respective DILs and then summed. The sum must be less than one. C3 and C6 are the concentrations, at the time of measurement, for Ru-103 and Ru-106, respectively.
(from Accidental Radioactive Contamination of Human Food and Animal Feeds:
Recommendations for State and Local Agencies, Table 2, 8/13/98)
Emergency Plan Revision 54 Page 86 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


FACTORS TO THE PAR
TABLE 10.2 EMERGENCY DOSE LIMITS(a)
(refer to Notes 1 and 2)
Dose Limit (refer to Note 3)                Work Activity                      Condition Maintain ALARA and to extent 5 Rem Total Effective Dose All              practicable limit emergency Equivalent (TEDE) workers to these limits 10 Rem TEDE                          Protecting Valuable Property    Lower dose not practicable Lifesaving or Protection of 25 Rem TEDE                                                          Lower dose not practicable Large Population Only on a voluntary basis to Lifesaving or Protection of 75 Rem TEDE                                                          persons fully aware of the Large Population risks involved NOTES:
: 1.      For emergency dose limits the following considerations should be made:
: a.      Declared pregnant women will not be allowed to participate.
: b.      The use of volunteers for exposures during emergency actions is desirable. Older workers with low lifetime accumulated effective dose should be given priority.
: c.      The individual(s) awareness of biological consequences that such as exposure can have, including the risks associated with exposure of a developing embryo/fetus for female workers.
: d.      All practical protective measures to limit such an exposure.
: e.      Concurrence of individual(s) involved (i.e., voluntary risk acceptance).
: f.      The probability of success should be balanced against the expected exposure limit.
: g.      The individual's familiarity with the task and speed that the individual can conduct the task.
: 2.      After the emergency has been concluded, doses received by emergency workers are required to be accounted for in accordance with 10CFR Part 20 occupational dose limits.
: 3.      Emergency dose limits for the lens of the eye and for any organ (including skin and extremities) are three and ten times the listed values, respectively.
a EPA 400-R-92-001, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents, Revised 1991 Emergency Plan Revision 54 Page 87 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


SUBSEQUENT TO THE
TABLE 10.3 EMERGENCY CENTER HABITABILITY AND PROTECTIVE ACTION CRITERIA
 
: 1. A background dose rate of 50 mRem/hr will increase the frequency of radiation monitoring in the center and require an immediate evaluation of the accumulated TEDE at the affected center.
ISSUANCE OF THE PAR BY VY.)
 
Emergency Plan Revision 54
 
Page 86 of 125 Entergy Vermont Yankee TABLE 10.1.2 RECOMMENDED DERIVED INTERVENTION LEVEL (DIL) OR CRITERION FOR EACH RADIONUCLIDE GROUP(a)(b)  All Components Of The Diet Radionuclide Group (Bg/kg) (pCi/kg) Sr-90 160 4300 I-131 170 4600 Cs-134 + Cs-137 1200 32,000 Pu-238 + Pu-239 + Am-241 2 54 Ru-103 + Ru-106 I        C 3    +    C 6    <1 6800    450 C 3    +    C 6    <1 180,000    12,000 
 
Notes:
(a) The DIL for each radionuclide group (e xcept for Ru-103 + Ru-106) is applied independently.
Each DIL applies to the sum of the concentrations of the radionuclides in the group at the time of measurement.
(b) Applicable to foods as prepared for c onsumption. For dried or concentrated products such as powdered milk or conc entrated juices, adjust by a factor appropriate to reconstitution, and assume the reconstitution water is not contaminated. For spices, which are consumed in very small quantities, use a
 
dilution factor of 10.
(c) Due to the large difference in DILs for Ru-103 and Ru-106, the individual concentrations of Ru-103 and Ru-106 are divide d by their respective DILs and then summed. The sum must be le ss than one. C3 and C6 are the concentrations, at the
 
time of measurement, for Ru-103 and Ru-106, respectively.
 
(from Accidental Radioactive Contaminat ion of Human Food and Animal Feeds:
Recommendations for State and Local Agencies, Table 2, 8/13/98)
 
Emergency Plan Revision 54
 
Page 87 of 125 Entergy Vermont Yankee TABLE 10.2 EMERGENCY DOSE LIMITS (a) (refer to Notes 1 and 2)
Dose Limit (refer to Note 3)
Work Activity Condition 5 Rem Total Effective Dose Equivalent (TEDE)
All Maintain ALARA and to extent practicable limit emergency workers to these limits 10 Rem TEDE Protecting Valuable Property Lower dose not practicable 25 Rem TEDE Lifesaving or Protection of
 
Large Population Lower dose not practicable 75 Rem TEDE Lifesaving or Protection of
 
Large Population Only on a voluntary basis to persons fully aware of the risks involved
 
NOTES:
: 1. For emergency dose limits the following considerations should be made:
: a. Declared pregnant women will not be allowed to participate.
: b. The use of volunteers for exposures during emergency actions is desirable. Older workers with low lifetime accumulated effective dose should be given priority.
: c. The individual(s) awareness of biological consequences that such as exposure can have, including the risks associated with exposure of a developing embryo/fetus for female workers.
: d. All practical protective measures to limit such an exposure.
: e. Concurrence of individual(s) involved (i.e., voluntary risk acceptance).
: f. The probability of success should be balanced against the expected exposure limit.
: g. The individual's familiarity with the task and speed that the individual can conduct the task.
: 2. After the emergency has been concluded, doses received by emergency workers are required to be accounted for in accordance with 10CFR Part 20 occupational dose limits.
: 3. Emergency dose limits for the lens of the eye and for any organ (including skin and extremities) are three and ten times the listed values, respectively.
a EPA 400-R-92-001, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents, Revised 1991 Emergency Plan Revision 54
 
Page 88 of 125 Entergy Vermont Yankee TABLE 10.3 EMERGENCY CENTER HABITABILITY AND PROTECTIVE ACTION CRITERIA
: 1. A background dose rate of 50 mRem/h r will increase the frequency of radiation monitoring in the center and require an immediate evaluation of the accumulated  
 
TEDE at the affected center.
: 2. A reading of 1 Rem on the high-range or alarming dosimeter will initiate planning for possible evacuation to the alternate center.
: 2. A reading of 1 Rem on the high-range or alarming dosimeter will initiate planning for possible evacuation to the alternate center.
a) If the TSC has to be evacuated, 1) The Emergency Plant Manager and immediate staff deemed necessary to deal with the emergency should relocate to the Control Room and continue their respective roles in the Emergency Response  
a)     If the TSC has to be evacuated,
 
: 1)     The Emergency Plant Manager and immediate staff deemed necessary to deal with the emergency should relocate to the Control Room and continue their respective roles in the Emergency Response Organization.
Organization.
: 2)     Remaining TSC staff should relocate to the EOF/RC in support of their respective disciplines or be otherwise reassigned by the Administration and Logistics Coordinator.
: 2) Remaining TSC staff should relocate to the EOF/RC in support of their respective disciplines or be other wise reassigned by the Administration and Logistics Coordinator.
b)     If the OSC has to be evacuated, the TSC will determine an alternate area for relocation.
b) If the OSC has to be evacuated, the TS C will determine an alternate area for relocation.
: 3. A reading of 4 Rem on the high-range or alarming dosimeter will initiate evaluation of the need for a phased evacuation.
: 3. A reading of 4 Rem on the high-range or alarming dosimeter will initiate evaluation of the need for a phased evacuation.
: 4. If center personnel have been or may be exposed to elevated radioiodine air concentrations in excess of 500 millirem/hr (4.0 x 10
: 4. If center personnel have been or may be exposed to elevated radioiodine air concentrations in excess of 500 millirem/hr (4.0 x 10-6 microcuries/cc), evaluate the need for administration of KI for center staff and relief shift personnel.
-6 microcuries/cc), evaluate the need for administration of KI for cent er staff and relief shift personnel.  
Emergency Plan Revision 54 Page 88 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
 
Emergency Plan Revision 54  
 
Page 89 of 125 Entergy Vermont Yankee Figure 10.1 Vermont Yankee Emergency Dose Rate Nomogram Emergency Plan Revision 54
 
Page 90 of 125 Entergy Vermont Yankee Figure 10.2 Field Sample Thyroid Dose Nomogram
 
Emergency Plan Revision 54


Page 91 of 125 Entergy Vermont Yankee Figure 10.3 Medical Facilities within 50 Miles of Vermont Yankee Capable of Handling Emergency Medical Cases
Figure 10.1 Vermont Yankee Emergency Dose Rate Nomogram Emergency Plan Revision 54 Page 89 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Emergency Plan Revision 54  
Figure 10.2 Field Sample Thyroid Dose Nomogram Emergency Plan Revision 54 Page 90 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Page 92 of 125 Entergy Vermont Yankee 11.0 EMERGENCY NOTIFICATION AND PUBLIC INFORMATION 11.1. Emergency Notification The Shift Manager is responsible for the notific ation of the State Police of Vermont, New Hampshire, and Massachusetts. Notificati on is made within 15 minutes of emergency classification and is the initial link to offsite au thorities for the activati on of offsite emergency response plans, which includes emergency public notification if the emergency conditions warrant.
Figure 10.3 Medical Facilities within 50 Miles of Vermont Yankee Capable of Handling Emergency Medical Cases Emergency Plan Revision 54 Page 91 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
The format and contents of the initial message between the plant and State Police dispatchers are specified in notification procedures and have been established with the review and agreement of those state authorities responsible for state plans.


11.0    EMERGENCY NOTIFICATION AND PUBLIC INFORMATION 11.1. Emergency Notification The Shift Manager is responsible for the notification of the State Police of Vermont, New Hampshire, and Massachusetts. Notification is made within 15 minutes of emergency classification and is the initial link to offsite authorities for the activation of offsite emergency response plans, which includes emergency public notification if the emergency conditions warrant.
The format and contents of the initial message between the plant and State Police dispatchers are specified in notification procedures and have been established with the review and agreement of those state authorities responsible for state plans.
As soon as contacted via the notification procedure, the Department of Public Health of Vermont, Massachusetts and New Hampshire may call Vermont Yankee and request the following information:
As soon as contacted via the notification procedure, the Department of Public Health of Vermont, Massachusetts and New Hampshire may call Vermont Yankee and request the following information:
: 1. Date, time and class of the emergency;
: 1. Date, time and class of the emergency;
: 2. Type and quantity of release, height of release, and estimated duration/impact times;
: 2. Type and quantity of release, height of release, and estimated duration/impact times;
: 3. Prevailing weather conditions (wind velocity, direction, temperature, atmospheric stability, form of precipitation, if any);
: 3. Prevailing weather conditions (wind velocity, direction, temperature, atmospheric stability, form of precipitation, if any);
: 4. Actual or projected dose rates at .35 miles from the site, and projected dose rates at various dist ances from the plant;
: 4. Actual or projected dose rates at .35 miles from the site, and projected dose rates at various distances from the plant;
: 5. Emergency response actions underway; and
: 5. Emergency response actions underway; and
: 6. Recommended protective actions.  
: 6. Recommended protective actions.
 
These follow-up reports are provided on an as-needed basis until such time that the emergency condition has been terminated in agreement with the States of Vermont and New Hampshire, Commonwealth of Massachusetts, and Vermont Yankee plant management.
These follow-up reports are provided on an as-needed basis until such time that the emergency condition has been terminated in agreem ent with the States of Vermont and New Hampshire, Commonwealth of Massachusetts, and Vermont Yankee plant management.  
11.2. Public Notification The prompt public notification methods in the Vermont Yankee area utilize, radio, television, sirens and weather alert receivers, police and fire department mobile loudhailers and sirens, and door-to-door notification should that be required. Details of this system are provided in Appendix H.
 
Emergency Plan Revision 54 Page 92 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
11.2. Public Notification The prompt public notification methods in the Vermont Yankee area utilize, radio, television, sirens and weather alert receivers, police and fire department mobile loudhailers and sirens, and door-to-door notification should that be required. Details of this system are provided in Appendix H.  
 
Emergency Plan Revision 54  
 
Page 93 of 125 Entergy Vermont Yankee 11.3. Public Information Any emergency generates a continuous and intens ive demand for up-to-date information. This is best accomplished if each organization involved is aware of what the others are saying. Consequently, Vermont Yankee has pl anned for the establishment of a Joint Information Center for the purpose of providing coordinated press releases during an accident.
 
For a Notification of Unusual Event, the M anager of Communications is notified of the incident by telephone or paging system. The Manager of Communications, or designated alternate, is responsible for writing any offici al statements or press releases concerning the incident. Prior to release, statements ar e approved by an officer of the company or designee. Information is rel eased directly to the press pool and the "Status Phones" are updated with this information.
In addition, the Manager of Co mmunications notifies the appropriate departmental st aff and the corporate public affairs office.
 
For an Alert, Site Area Emergency and a General emergency, the Joint Information Center is activated and fully staffed.
 
The Public Information Liaison and required st aff report to the EOF/RC for coordinating the accident information between the plant and t he Joint Information Center. The Joint Information Center is staffed and provides im mediate accessibility to information files and resources for the Company Spokesperson (Manager of Communications, or designated alternate) and/or the Joint Information Center staff.
 
Regular press conferences are held at the Jo int Information Center, directed by the Company Spokesperson in conjunction with appropriate state and federal organizations. Vermont Yankee can provide 24-hour coverage at the Joint Information Center to ensure timely updates and answers to questions from visiting media representatives.
 
As part of Vermont Yankee's full disclosure policy, Vermont Yankee has initiated a public inquiry phone for media and public use. Norm ally, a prerecorded message provides, on a daily basis, routine operating information, changes in plant operation, and other items of interest. During an emergency, the phone is used to relay and provide up-to-date status reports regarding the situation.


Joint Information Center personnel monitor local radio and television for erroneous information concerning accident conditions. When misinformation is recognized, corrective action is taken.  
11.3. Public Information Any emergency generates a continuous and intensive demand for up-to-date information.
This is best accomplished if each organization involved is aware of what the others are saying. Consequently, Vermont Yankee has planned for the establishment of a Joint Information Center for the purpose of providing coordinated press releases during an accident.
For a Notification of Unusual Event, the Manager of Communications is notified of the incident by telephone or paging system. The Manager of Communications, or designated alternate, is responsible for writing any official statements or press releases concerning the incident. Prior to release, statements are approved by an officer of the company or designee. Information is released directly to the press pool and the "Status Phones" are updated with this information. In addition, the Manager of Communications notifies the appropriate departmental staff and the corporate public affairs office.
For an Alert, Site Area Emergency and a General emergency, the Joint Information Center is activated and fully staffed.
The Public Information Liaison and required staff report to the EOF/RC for coordinating the accident information between the plant and the Joint Information Center. The Joint Information Center is staffed and provides immediate accessibility to information files and resources for the Company Spokesperson (Manager of Communications, or designated alternate) and/or the Joint Information Center staff.
Regular press conferences are held at the Joint Information Center, directed by the Company Spokesperson in conjunction with appropriate state and federal organizations.
Vermont Yankee can provide 24-hour coverage at the Joint Information Center to ensure timely updates and answers to questions from visiting media representatives.
As part of Vermont Yankee's full disclosure policy, Vermont Yankee has initiated a public inquiry phone for media and public use. Normally, a prerecorded message provides, on a daily basis, routine operating information, changes in plant operation, and other items of interest. During an emergency, the phone is used to relay and provide up-to-date status reports regarding the situation.
Joint Information Center personnel monitor local radio and television for erroneous information concerning accident conditions. When misinformation is recognized, corrective action is taken.
Emergency Plan Revision 54 Page 93 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Emergency Plan Revision 54
Communication is provided between the Joint Information Center and the EOF/RC and for state and federal agency use. Public information documentation covering the following areas of concern is available:
 
: 1. Educational information on radiation;
Page 94 of 125 Entergy Vermont Yankee Communication is provided between the Joint Information Center and the EOF/RC and for state and federal agency use. Public informa tion documentation covering the following areas of concern is available:
: 2. Educational information on the Vermont Yankee Nuclear Power Plant;
: 1. Educational info rmation on radiation;
: 2. Educational information on the Ve rmont Yankee Nuclear Power Plant;
: 3. The emergency classification system and notification process; and
: 3. The emergency classification system and notification process; and
: 4. Planned protective actions to be im plemented by state and local authorities.  
: 4. Planned protective actions to be implemented by state and local authorities.
Vermont Yankee assists the States of Vermont and New Hampshire and the Commonwealth of Massachusetts, to develop and ensure for dissemination on a yearly basis, brochures, calendars, and posters which provide the public with emergency planning arrangements.
The Vermont Yankee Communications Department conducts annual information programs to acquaint the news media with information concerning radiation, emergency public information procedures, the emergency classification system and a general review of plant characteristics. Local and state media are invited and encouraged to attend.
Emergency Plan Revision 54 Page 94 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Vermont Yankee assists the States of Vermont and New Hampshire and the Commonwealth of Massachusetts , to develop and ensure for dissemination on a yearly basis, brochures, calendars, and posters whic h provide the public with emergency planning arrangements.  
12.0    MAINTAINING EMERGENCY PREPAREDNESS 12.1. Drills and Exercises An exercise tests the execution of the overall plant emergency preparedness and the integration of this preparedness with offsite authorities. A drill is a supervised instruction period aimed at testing, developing and maintaining skills in a particular response function.
Emergency exercises and drills are conducted to test and evaluate the adequacy of emergency facilities, equipment, procedures, communication channels, actions of emergency response personnel, and coordination between offsite agencies and the facility.
A summary of exercises and drills and associated elements is outlined below.
12.1.1.        Radiation Emergency Drills and Exercises A full participation exercise shall be conducted every two years. At least one drill involving a combination of some of the principal functional areas of emergency response shall be conducted in the interval between biennial exercises. State and offsite agencies may participate in drills.
12.1.2.        Communication Tests To ensure that emergency communications between the facility and offsite emergency response organizations are operable, communications tests are conducted as outlined below. Items 2) and 3) below can be performed as part of an Emergency plan drill or exercise.
: 1.      Communication channels with state governments within the plume exposure pathway are tested monthly;
: 2.      Communications with state Emergency Operations Center (EOCs) are conducted annually;
: 3.      Communications with assessment teams are conducted annually;
: 4.      Communications among states within the ingestion pathway are tested monthly; and
: 5.      Communications with the NRC Headquarters Operations Officer from the Control Room, TSC and EOF are tested monthly.
Emergency Plan Revision 54 Page 95 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


The Vermont Yankee Communications Depart ment conducts annual information programs to acquaint the news media with information concerning radiation, emergency public information procedures, the emergency classification system and a general review of plant characteristics. Local and state media are invit ed and encouraged to attend.
To ensure the reliability of the plant's call-in procedure, the following test/drill is performed as follows:
 
Weekly functional test of the emergency notification system to test system performance, and Quarterly off-hours, unannounced communications drill, utilizing both the pager system and commercial telephone, to estimate emergency personnel response times.
Emergency Plan Revision 54
12.1.3.         Fire Drills To test and evaluate the response and training of the plant's fire brigade, a number of fire drills are conducted annually.
 
To demonstrate the coordination between the plant's fire brigade and the Vernon Fire Department, the fire department is annually offered the opportunity to participate in an onsite fire drill.
Page 95 of 125 Entergy Vermont Yankee 12.0 MAINTAINING EMERGENCY PREPAREDNESS 12.1. Drills and Exercises An exercise tests the execution of the overall plant emer gency preparedness and the integration of this preparedness with offsite authorities. A drill is a supervised instruction period aimed at testing, developing and maintain ing skills in a particular response function.
12.1.4.         Medical Drills To evaluate the training of the facility's medical response team and offsite medical response (ambulance and hospital), a medical drill is conducted annually with a simulated contaminated injured individual. This drill can be performed as part of an Emergency Plan drill or exercise.
Emergency exercises and drills are conducted to test and evaluate the adequacy of emergency facilities, equipment, procedures, communication channels, actions of emergency response personnel, and c oordination between offsite agencies and the facility.
12.1.5.         Radiological Monitoring Drills Plant environs and radiological monitoring drills (onsite and offsite) are conducted annually.
 
These drills include collection and analysis of airborne sample media, communications, record keeping, and interface with offsite monitoring efforts. This drill can be performed as part of an Emergency Plan drill or exercise. Radiological monitoring drills will include interface with State offsite monitoring efforts during the biennial exercise.
A summary of exercises and drills and associated elements is outlined below.
12.1.6.         Health Physics Drills Health Physics drills are conducted semi-annually involving response to, and analysis of, simulated elevated in-plant airborne and liquid samples and direct radiation measurements in the environment. A drill can be performed as part of an Emergency Plan drill or exercise.
 
Emergency Plan Revision 54 Page 96 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
12.1.1. Radiation Emergency Drills and Exercises A full participation exercise shall be conducted every two years. At least one drill involving a combination of some of t he principal functional areas of emergency response shall be conducted in the interval between biennial ex ercises. State and offsite agencies may participate in drills.
 
12.1.2. Communication Tests To ensure that emergency communications between the facility and offsite emergency response organizations are operable, communica tions tests are conducted as outlined below. Items 2) and 3) below can be performed as part of an Emergency plan drill or exercise.
: 1. Communication channels with state governments within the plume exposure pathway are tested monthly;
: 2. Communications with state Emergen cy Operations Center (EOCs) are conducted annually;
: 3. Communications with assessm ent teams are conducted annually;
: 4. Communications among states within the ingestion pathway are tested monthly; and
: 5. Communications with the NRC Headquarte rs Operations Officer from the Control Room, TSC and EO F are tested monthly.
 
Emergency Plan Revision 54
 
Page 96 of 125 Entergy Vermont Yankee To ensure the reliability of the plant's call-in procedure, the following test/drill is performed as follows:
Weekly functional test of the emer gency notification system to test system performance, and Quarterly off-hours, unannounced communications drill, utilizing both the pager system and commercial telephone, to estimate emergency personnel response times.
12.1.3. Fire Drills To test and evaluate the response and training of the plant's fire brigade , a number of fire drills are conducted annually.  
 
To demonstrate the coordinati on between the plant's fire brigade and the Vernon Fire Department, the fire department is annually offered the opportunity to participate in an onsite fire drill.  
 
12.1.4. Medical Drills To evaluate the training of the facility's medical response team and offsite medical response (ambulance and hospital), a medical drill is conducted annually with a simulated contaminated injured individual. This drill can be performed as part of an Emergency Plan drill or exercise.
12.1.5. Radiological Monitoring Drills Plant environs and radiological monitoring drills (onsite and offsite) are conducted annually. These drills include collection and analysis of airborne sample media, communications, record keeping, and interface with offsite monitoring efforts. This drill can be performed as part of an Emergency Plan drill or exercise. Radiological monitoring drills will include interface with State offsite monitoring efforts during the biennial exercise.
12.1.6. Health Physics Drills Health Physics drills are conducted semi-annually involving response to, and analysis of, simulated elevated in-plant airborne and liquid samples and direct radiation measurements in the environment. A drill can be performed as part of an Emergency Plan drill or exercise.  
 
Emergency Plan Revision 54  
 
Page 97 of 125 Entergy Vermont Yankee 12.1.7. Security Drills The purpose of the Hostile Acti on-based drill is to maintain key skills, specifically the site-specific team skills necessary to mitigate security-based events. Hostile Action-based scenarios will be included in the drill and exerci se program for exercise selection on a six-year frequency. Full implementation should include engagem ent of Offsite responders and FEMA. Scenarios should address EP response actions early in the event that include aspects such as initial classification, notif ication, PARs if appropriate, and protective measures on site. Various scenarios should be developed to address response to different threat modes, various initiators or response capabilities.
 
12.1.8. Scenarios An Exercise/Drill Coordinator is responsible for an emergency plan drill or exercise. The Exercise/Drill Coordinator's responsibilities include developing the exercise/drill scenario, the accident time sequence, and the selection and training of the Controllers required to evaluate the effectiveness of the Verm ont Yankee Emergency Preparedness Program.
 
A scenario is prepared by the Scenario Development Group for each exercise/drill to be conducted. The scenario varies year to year and is approved by Vermont Yankee
 
Management. Within a six-year per iod, the scenario content is varied to test all the major elements of the Emergency Plan Program. For full participati on exercises, the scenario simulates an emergency condition and sequence that calls for the mobilization of the offsite authorities; requires the recommendation of offsite protective actions; and allows for the evaluation of offsite plans and integration with the plant response.


12.1.7.        Security Drills The purpose of the Hostile Action-based drill is to maintain key skills, specifically the site-specific team skills necessary to mitigate security-based events. Hostile Action-based scenarios will be included in the drill and exercise program for exercise selection on a six-year frequency. Full implementation should include engagement of Offsite responders and FEMA. Scenarios should address EP response actions early in the event that include aspects such as initial classification, notification, PARs if appropriate, and protective measures on site. Various scenarios should be developed to address response to different threat modes, various initiators or response capabilities.
12.1.8.        Scenarios An Exercise/Drill Coordinator is responsible for an emergency plan drill or exercise. The Exercise/Drill Coordinator's responsibilities include developing the exercise/drill scenario, the accident time sequence, and the selection and training of the Controllers required to evaluate the effectiveness of the Vermont Yankee Emergency Preparedness Program.
A scenario is prepared by the Scenario Development Group for each exercise/drill to be conducted. The scenario varies year to year and is approved by Vermont Yankee Management. Within a six-year period, the scenario content is varied to test all the major elements of the Emergency Plan Program. For full participation exercises, the scenario simulates an emergency condition and sequence that calls for the mobilization of the offsite authorities; requires the recommendation of offsite protective actions; and allows for the evaluation of offsite plans and integration with the plant response.
The contents of the scenario include, but are not limited to, the following:
The contents of the scenario include, but are not limited to, the following:
: 1. Basic objective(s);
: 1. Basic objective(s);
: 2. Date, time period, place and participating organizations;
: 2. Date, time period, place and participating organizations;
: 3. Simulation lists;
: 3. Simulation lists;
: 4. Time schedule of real and si mulated initiating events;
: 4. Time schedule of real and simulated initiating events;
: 5. A narrative summary describing the c onduct of the exercise to include such items as simulated casualties, search and rescue of personnel, deployment of  
: 5. A narrative summary describing the conduct of the exercise to include such items as simulated casualties, search and rescue of personnel, deployment of radiological monitoring teams, and public information affairs; and
 
: 6. List of Controllers.
radiological monitoring teams, and public information affairs; and
The scenarios are designed to allow free play in exercising the decision-making process associated with such emergency response actions as exposure control, emergency classification and de-escalation, protective action recommendation, and the emergency manpower augmentation process.
: 6. List of Controllers.  
Emergency Plan Revision 54 Page 97 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
 
The scenarios are designed to allow free play in exercising the decision-making process associated with such emergency response ac tions as exposure control, emergency classification and de-escalation, protective action recommendation, and the emergency manpower augmentation process.  
 
Emergency Plan Revision 54  
 
Page 98 of 125 Entergy Vermont Yankee Security based scenarios to test and evaluate security response capabilities will be conducted in accordance with security drills and exercise procedures and may be conducted during emergency plan drills or exercises.
 
Starting times and pre-notification for exercises are coordinated with and agreed upon by all participating organizations. The scenar io package is submitted to the NRC in accordance with current regulatory guidance.
 
12.1.9. Evaluation of Exercises To evaluate the performance of participating facility personnel and the adequacy of emergency facilities, equipment and procedures during an exercise, the Exercise Coordinator obtains qualified controllers which includes resources outside the facility to evaluate and critique the exercise.
 
When feasible, personnel designated as c ontrollers are assigned to an Emergency Plan area germane to their area of expertise. C ontrollers are provided general instruction concerning their specific observation function.
Each controller is requested to observe the implementation of the emergency plan element assigned to hi m or her, and then to record and report observed inadequacies.
 
A critique is conducted at the conclusion of the exercise with facility personnel as designated by the General Mana ger or a designated representativ
: e. After the critique, the controllers submit a written evaluation to the Exercise Coordinator in which the exercise performance is evaluated against the objective
: s. All comments and/or recommendations are documented. Controllers from State Emergency Management and Health Department agencies are encouraged to join the observation and critique process.
Weaknesses and/or deficiencies identified in an exercise critique are processed in accordance with the site corrective actions program.
 
12.1.10. Emergency Plan Audit The Vermont Yankee Emergency Plan is independently audited as par t of the Vermont Yankee In-plant Audit Program. The audit is conducted as part of the Entergy Quality Assurance Program in accordance with 10C FR50.54(t). All aspects of emergency preparedness, including exercise documentation, capabilities, procedures, and interfaces with state and local gove rnments are audited.
 
Emergency Plan Revision 54
 
Page 99 of 125 Entergy Vermont Yankee 12.2. Training All non-essential plant personnel receive annual instruction, in accordance with "Emergency Plan Training," concerning their expected response action during an emergency. Those members of the pl ant staff who have been assigned (per the Emergency Assistance Personnel List) to t he emergency response organization receive annual training which includes, but is not limited to, the following:
: 1. Familiarize individua ls with Emergency Plan and implementing procedures, especially where emergency response tasks are not part of their normal duties;  2. Define an individual's responsibilities associated with their designated function;
: 3. Familiarize individuals in emergency exposure control measures and guidelines, particularly those associated with an individual's designated emergency functions; and
: 4. Provide sufficient technical insi ght to maintain emergency functions.
A portion of this training is provided by personnel's participation in unrehearsed drills or emergency exercises. During these drills and exercises, controllers check the performance of the personnel assigned, and provide critiques which coul d be incorporated in future training. Specific details of the training given on an annual basis are described in "Emergency Plan Training," and in the Emer gency Plan Training Program Description.
12.3. Review and Updating of Plan and Procedures The Emergency Plan is reviewed at least annually and the associated implementing procedures are reviewed at least biennially. All recommendations for changes to the Emergency Plan or associated implementing procedures are reviewed in accordance with 10CFR50.54(q). The Emergency Plan is submitted to Vermont Yankee's On-Site Safety Review Committee for approval. Written agreements with outside support organizations and government agencies are evaluated annually to determine if these agreements are still
 
valid. If agreements are not valid, then they are renewed and updated. This agreement review is documented. Revisions to t he Emergency Plan are made in accordance with current regulations and guidelines. Changes to the Plan are forwarded to organization and individuals with a responsibility for implementation of the Plan. Telephone number listings associated with the emergency notifica tion process are updated quarterly.
 
Emergency Plan Revision 54


Page 100 of 125 Entergy Vermont Yankee 12.4. Maintenance and Inventory of Emergency Equipment and Supplies The emergency equipment maintained in the C ontrol Room, Operations Support Center, Technical Support Center, and the Emergency Operations Facility are listed in a checklist in Emergency Equipment Readiness Check, that is used to check readiness.
Security based scenarios to test and evaluate security response capabilities will be conducted in accordance with security drills and exercise procedures and may be conducted during emergency plan drills or exercises.
Weekly, the Operations Department conducts a test of certain emer gency communications equipment. At least quarterly in accordance with the emergency equipment inventory procedure, and subsequent to each usage, R adiation Protection D epartment, Chemistry Department, and other designated VY personnel are assigned to inventory and maintain the emergency kits and/or equipment. Rotation of survey instruments normally used in the plant with instruments in the Emergency Kits assures that emergency equipment is calibrated and fully operable. There are suff icient reserve instruments and equipment to replace those that are remov ed from emergency kits for ca libration purposes. Appendix B contains a list of emergency equipment by location.
Starting times and pre-notification for exercises are coordinated with and agreed upon by all participating organizations. The scenario package is submitted to the NRC in accordance with current regulatory guidance.
12.1.9.        Evaluation of Exercises To evaluate the performance of participating facility personnel and the adequacy of emergency facilities, equipment and procedures during an exercise, the Exercise Coordinator obtains qualified controllers which includes resources outside the facility to evaluate and critique the exercise.
When feasible, personnel designated as controllers are assigned to an Emergency Plan area germane to their area of expertise. Controllers are provided general instruction concerning their specific observation function. Each controller is requested to observe the implementation of the emergency plan element assigned to him or her, and then to record and report observed inadequacies.
A critique is conducted at the conclusion of the exercise with facility personnel as designated by the General Manager or a designated representative. After the critique, the controllers submit a written evaluation to the Exercise Coordinator in which the exercise performance is evaluated against the objectives. All comments and/or recommendations are documented. Controllers from State Emergency Management and Health Department agencies are encouraged to join the observation and critique process.
Weaknesses and/or deficiencies identified in an exercise critique are processed in accordance with the site corrective actions program.
12.1.10.       Emergency Plan Audit The Vermont Yankee Emergency Plan is independently audited as part of the Vermont Yankee In-plant Audit Program. The audit is conducted as part of the Entergy Quality Assurance Program in accordance with 10CFR50.54(t). All aspects of emergency preparedness, including exercise documentation, capabilities, procedures, and interfaces with state and local governments are audited.
Emergency Plan Revision 54 Page 98 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


12.5. Responsibility for the Planning Effort The Senior Site Executive has overall resp onsibility for implement ation of the Emergency Plan at Vermont Yankee. The Emergency Planning Manager is responsible for emergency planning and the interface with local and st ate governments. T he Emergency Planning Manager reports offsite to the Director, Emergency Programs.
12.2. Training All non-essential plant personnel receive annual instruction, in accordance with "Emergency Plan Training," concerning their expected response action during an emergency. Those members of the plant staff who have been assigned (per the Emergency Assistance Personnel List) to the emergency response organization receive annual training which includes, but is not limited to, the following:
The duties of the Emergency Planning Manager in clude, but are not limited to, the following:
: 1.     Familiarize individuals with Emergency Plan and implementing procedures, especially where emergency response tasks are not part of their normal duties;
: 1. Revise and update the Emergency Plan;
: 2.     Define an individual's responsibilities associated with their designated function;
: 2. Maintain the Emergency Plan implement ing procedures so that they are updated and current with the Emergency Plan;
: 3.     Familiarize individuals in emergency exposure control measures and guidelines, particularly those associated with an individual's designated emergency functions; and
: 3. Schedule and ensure the conduct of emergency equipment inventories and calibration;
: 4.     Provide sufficient technical insight to maintain emergency functions.
: 4. Represent the plant in state and local Emergency plan interfaces;
A portion of this training is provided by personnel's participation in unrehearsed drills or emergency exercises. During these drills and exercises, controllers check the performance of the personnel assigned, and provide critiques which could be incorporated in future training. Specific details of the training given on an annual basis are described in "Emergency Plan Training," and in the Emergency Plan Training Program Description.
: 5. Represent the plant in NRC emergency planning appraisals and audits;
12.3. Review and Updating of Plan and Procedures The Emergency Plan is reviewed at least annually and the associated implementing procedures are reviewed at least biennially. All recommendations for changes to the Emergency Plan or associated implementing procedures are reviewed in accordance with 10CFR50.54(q). The Emergency Plan is submitted to Vermont Yankee's On-Site Safety Review Committee for approval. Written agreements with outside support organizations and government agencies are evaluated annually to determine if these agreements are still valid. If agreements are not valid, then they are renewed and updated. This agreement review is documented. Revisions to the Emergency Plan are made in accordance with current regulations and guidelines. Changes to the Plan are forwarded to organization and individuals with a responsibility for implementation of the Plan. Telephone number listings associated with the emergency notification process are updated quarterly.
: 6. Interface with the Exercise Coor dinator in prepari ng and coordinating Emergency Plan drills and exercise; and
Emergency Plan Revision 54 Page 99 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
: 7. Maintain drill and exercise documentation and coordinate implementation of corrective actions deemed necessary following drills and exercises.  


Emergency Plan Revision 54  
12.4. Maintenance and Inventory of Emergency Equipment and Supplies The emergency equipment maintained in the Control Room, Operations Support Center, Technical Support Center, and the Emergency Operations Facility are listed in a checklist in Emergency Equipment Readiness Check, that is used to check readiness.
Weekly, the Operations Department conducts a test of certain emergency communications equipment. At least quarterly in accordance with the emergency equipment inventory procedure, and subsequent to each usage, Radiation Protection Department, Chemistry Department, and other designated VY personnel are assigned to inventory and maintain the emergency kits and/or equipment. Rotation of survey instruments normally used in the plant with instruments in the Emergency Kits assures that emergency equipment is calibrated and fully operable. There are sufficient reserve instruments and equipment to replace those that are removed from emergency kits for calibration purposes. Appendix B contains a list of emergency equipment by location.
12.5. Responsibility for the Planning Effort The Senior Site Executive has overall responsibility for implementation of the Emergency Plan at Vermont Yankee. The Emergency Planning Manager is responsible for emergency planning and the interface with local and state governments. The Emergency Planning Manager reports offsite to the Director, Emergency Programs. The duties of the Emergency Planning Manager include, but are not limited to, the following:
: 1.      Revise and update the Emergency Plan;
: 2.      Maintain the Emergency Plan implementing procedures so that they are updated and current with the Emergency Plan;
: 3.      Schedule and ensure the conduct of emergency equipment inventories and calibration;
: 4.      Represent the plant in state and local Emergency plan interfaces;
: 5.      Represent the plant in NRC emergency planning appraisals and audits;
: 6.      Interface with the Exercise Coordinator in preparing and coordinating Emergency Plan drills and exercise; and
: 7.      Maintain drill and exercise documentation and coordinate implementation of corrective actions deemed necessary following drills and exercises.
Emergency Plan Revision 54 Page 100 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Page 101 of 125 Entergy Vermont Yankee APPENDIX A EMERGENCY CLASSIFICATION SYSTEM AND EMERGENCY ACTION LEVELS
APPENDIX A EMERGENCY CLASSIFICATION SYSTEM AND EMERGENCY ACTION LEVELS
[NOTE: Reference AP 3125, Emergency Plan Classi fication and Action Level Scheme for the most current revision of the EAL Charts.]  
[NOTE: Reference AP 3125, Emergency Plan Classification and Action Level Scheme for the most current revision of the EAL Charts.]
Emergency Plan Revision 54 Page 101 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Emergency Plan Revision 54  
APPENDIX B EMERGENCY EQUIPMENT This Appendix contains a list of emergency equipment by location. Backup equipment is available at the Radiation Protection control point and associated areas located in the OSC.
In addition, all the resources referenced in 6.2.6 and 10.3 are at the disposal of Vermont Yankee in an emergency.
Emergency Plan Revision 54 Page 102 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Page 102 of 125 Entergy Vermont Yankee APPENDIX B EMERGENCY EQUIPMENT This Appendix contains a list of emergency equipment by location. Backup equipment is available at the Radiation Prot ection control point and associated areas located in the OSC.
Sensitive Unclassified Non-Safeguards Information Redacted Emergency Plan Revision 54 Page 103 of 125 Entergy Vermont Yankee Sensitive Unclassified Non-Safeguards Information Redacted Redacted Version of Document - Publicly Available
In addition, all the resources referenced in 6.
2.6 and 10.3 are at the disposal of Vermont Yankee in an emergency.


Emergency Plan Revision 54  
Sensitive Unclassified Non-Safeguards Information Redacted Emergency Plan Revision 54 Page 104 of 125 Entergy Vermont Yankee Sensitive Unclassified Non-Safeguards Information Redacted Redacted Version of Document - Publicly Available


Page 103 of 125 Entergy Vermont Yankee Emergency Plan Revision 54  
APPENDIX C INITIAL OFFSITE DOSE RATE ESTIMATION Emergency Plan Revision 54 Page 105 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
 
Page 104 of 125 Entergy Vermont Yankee Emergency Plan Revision 54
 
Page 105 of 125 Entergy Vermont Yankee APPENDIX C INITIAL OFFSITE DOSE RATE ESTIMATION


APPENDIX C (Continued)
APPENDIX C (Continued)
Emergency Plan Revision 54
Vermont Yankee has developed a method to quickly determine the release rate and the projected offsite dose rate at 1/3 mile from the site that could be associated with an accident condition that exceeds the range of the normal plant stack Radiation Monitoring System. This determination is made by using Figure 10.1 with the following input variables:
 
: 1.     Time after reactor shutdown;
Page 106 of 125 Entergy Vermont Yankee Vermont Yankee has developed a method to quickly determine the release rate and the projected offsite dose rate at 1/3 mile from t he site that could be associated with an accident condition that exceeds the range of the normal plant stack Radiation Monitoring System. This determination is made by using Figure 10.1 wit h the following input variables:
: 2.     The plant stack high-range monitor response;
: 1. Time after reactor shutdown;
: 3.     The plant stack flow rate at the time of the accident; and
: 2. The plant stack high-range monitor response;
: 4.     Wind speed The plant stack high range monitor consists of a Victoreen ion chamber located at the base of the stack (el. 264') and shielded by 1/2" of aluminum. A release rate function, J, has been determined at this location for a fuel melt mixture of fission product noble gases, as a function of time after reactor shutdown. This function, J, converts the monitor response to total activity concentration in the stack.
: 3. The plant stack flow rate at the time of the accident; and 4. Wind speed The plant stack high range monitor consists of a Victoreen ion chamber located at the base of the stack (el. 264')
The activity release rate is determined from the nomogram, Figure 10.1, with the definition of the necessary input parameters. The projected offsite plume centerline dose rate at 1/3 mile from the stack can be determined from the nomogram once the following parameters are available: the response of the plant stack high range monitor, the plant stack flow rate, and the wind speed. The Offsite Dose Rate Function must be entered from the "time after shutdown" axis in order to obtain this result. The Offsite Dose Rate Conversion Function is the ratio of Parameter J to Parameter f at any time, t, where Parameter f is the effective dose conversion factor for the fission product noble gas mixture at time, t. Atmospheric stability is not required due to the fact that the gamma dose diffusion factor does not vary significantly at 1/3 mile for a stack release. The value chosen for the nomogram is conservative for all atmospheric stability classes.
and shielded by 1/2" of aluminum. A release rate function, J, has been determined at this location for a fuel melt mixture of fission product noble gases, as a function of time after reactor shutdown. This func tion, J, converts the monitor response to total activity concentration in the stack.  
The dose rate determined by the nomogram provides a conservative estimate of Total Effective Dose Equivalent (TEDE) for a stack release dominated by noble gases.
 
The activity release rate is determined from the nomogram, Fi gure 10.1, with the definition of the necessary i nput parameters. T he projected offsite plume centerline dose rate at 1/3 mile from the stack can be determined from the nomogram once the following  
 
parameters are available: t he response of the plant stack high range monitor, the plant stack flow rate, and the wind speed. The Offsite Dose Rate Function must be entered from the "time after shutdown" axis in order to obtain this result. The Offsite Dose Rate Conversion Function is the ratio of Parameter J to Parameter f at any time, t, where Parameter f is the e ffective dose conversion factor for the fission product noble gas mixture at time, t. Atmospheric st ability is not required due to th e fact that the gamma dose diffusion factor does not vary significantly at 1/3 mile for a stack release. The value chosen for the nomogram is conservative for all atmospheric stability classes.
The dose rate determined by the nomogram pr ovides a conservative estimate of Total Effective Dose Equivalent (TEDE) fo r a stack release dominated by noble gases.
Since the iodine to noble gas ratio for a stack release are both relatively low, the thyroid dose does not contribute significantly to the TEDE under these conditions.
Since the iodine to noble gas ratio for a stack release are both relatively low, the thyroid dose does not contribute significantly to the TEDE under these conditions.
In order to qualitatively define plume width, a transparent overlay has been prepared for a Vermont area base map. The transparency consists of three angles [one each for unstable (Pasquill A, B, C st ability classes), neutral (Pasquill D stability), and stable (Pasquill E, F, G stability) condi tions] drawn from the plant out to a distance of ten miles.
In order to qualitatively define plume width, a transparent overlay has been prepared for a Vermont area base map. The transparency consists of three angles [one each for unstable (Pasquill A, B, C stability classes), neutral (Pasquill D stability), and stable (Pasquill E, F, G stability) conditions] drawn from the plant out to a distance of ten miles.
Included within each angle are areas lateral to the plume centerline having radionuclide concentrations of at least 5% of the plume centerline value. Centering the stability-dependent angles over the appropriate downwind direction on the site area base map qualitatively defines the pl ume width. Using the appropr iate sector/zone designation appropriate to the plume width, Vermont Yankee can provide the state authorities with an affected area.  
Included within each angle are areas lateral to the plume centerline having radionuclide concentrations of at least 5% of the plume centerline value. Centering the stability-dependent angles over the appropriate downwind direction on the site area base map qualitatively defines the plume width. Using the appropriate sector/zone designation appropriate to the plume width, Vermont Yankee can provide the state authorities with an affected area.
 
Emergency Plan Revision 54 Page 106 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
Emergency Plan Revision 54  


Page 107 of 125 Entergy Vermont Yankee APPENDIX D ENVIRONMENTAL LABORATORY ANALYTICAL AND DOSIMETRY SERVICES  
APPENDIX D ENVIRONMENTAL LABORATORY ANALYTICAL AND DOSIMETRY SERVICES Emergency Plan Revision 54 Page 107 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


APPENDIX D (Continued)
APPENDIX D (Continued)
Emergency Plan Revision 54
General In the event of a radiological emergency at Vermont Yankee, Laboratory services (as described in 6.2.6) are available, on a 24-hour emergency call basis, to perform gamma isotopic analyses on samples taken by the plant's emergency monitoring teams. Portable gamma spectroscopy equipment can be deployed to the plant site to determine the presence and level of contamination in samples of various media in the event of an accidental release of radioactive material. In addition Entergy maintains a General Services Agreement with Landauer Inc. for 24 hour emergency personnel Dosimetry processing.
 
Portable Emergency Analysis Equipment Portable analysis equipment including a shielded HPGe detector based gamma spectroscopy system complete with computerized spectral analysis capability may be deployed to assist in an emergency response. A report of plant-related nuclide concentrations, standard deviation, and Minimum Detectable Concentration (MDC) is forwarded to assessment personnel.
Page 108 of 125 Entergy Vermont Yankee General In the event of a radiological emergency at Vermont Yankee, Laboratory services (as described in 6.2.6) are available, on a 24-hour emergency call basis, to perform gamma isotopic analyses on samples taken by the plant
Following a request from Vermont Yankee for assistance in assessing an emergency condition, laboratory personnel will be dispatched to a designated location within approximately four (4) to eight (8) hours. Upon arrival, laboratory personnel will determine the presence and level of contamination in samples of various media (air cartridges, air filters, vegetation, water) collected by Plant Field Sampling Teams.
's emergency monitoring teams. Portable gamma spectroscopy equipment can be deploy ed to the plant site to determine the presence and level of contami nation in samples of various media in the event of an accidental release of radioactive material. In addition Entergy maintains a General Services Agreement with Landauer Inc. for 24 hour em ergency personnel Dosimetry processing.  
Emergency DLR Services The capability exists for the emergency processing of DLRs on a 24-hour per day basis, if necessary, through a General Services Agreement with Landauer Inc. Emergency workers are instructed to read self indicating dosimeters frequently, and DLRs may be processed with increased periodicity.
 
Portable Body Burden Service A WBC System is comprised of a portable shielded HPGe detector, interfaced to a PC-based ADCI/MCA and IBM compatible portable computer may be acquired from the other industry facilities. The analytical methodology provides a whole body scan and identifies activity content of the lung, GI, and thyroid.
Portable Emergency Analysis Equipment Portable analysis equipment including a shielded HPGe detector based gamma spectroscopy system complete with computerized spectral analysis capability may be deployed to assist in an emergency respons
A result report is generated for those plant-related nuclides found to be present at the 99%
: e. A report of plant-related nuclide concentrations, standard deviation, and Minimu m Detectable Concentration (MDC) is forwarded to assessment personnel.  
confidence level.
 
Emergency Plan Revision 54 Page 108 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
Following a request from Vermont Yankee for assistance in assessing an emergency condition, laboratory personnel will be dispatched to a designated location within approximately four (4) to eight (8) hours. Upon arrival, l aboratory personnel will determine the presence and level of contam ination in samples of various media (air cartridges, air filters, vegetation, water) collect ed by Plant Field Sampling Teams.  
 
Emergency DLR Services  
 
The capability exists for the emergency processi ng of DLRs on a 24-hour per day basis, if necessary, through a General Services Agreem ent with Landauer Inc.
Emergency workers are instructed to read self indicating dos imeters frequently, and DLRs may be processed with increased periodicity.  
 
Portable Body Burden Service A WBC System is comprised of a portable shielded HPGe detector, interfaced to a PC-based ADCI/MCA and IBM com patible portable computer may be acquired from the other industry facilities. The analytical methodology provides a whole body scan and identifies activity content of the lung, GI, and thyroid.  
 
A result report is generated for those plant-rela ted nuclides found to be present at the 99% confidence level.  


Emergency Plan Revision 54
APPENDIX E LETTERS OF AGREEMENT Letters of agreement in effect between Vermont Yankee and the offsite authorities and organizations, which under earlier revisions resided in this appendix, have been removed.
 
These documents are now maintained in the Emergency Planning Department files.
Page 109 of 125 Entergy Vermont Yankee APPENDIX E LETTERS OF AGREEMENT Letters of agreement in effect between Ve rmont Yankee and the offsite authorities and organizations, which under earlier revisions re sided in this appendix, have been removed. These documents are now maintained in t he Emergency Planning Department files.
Entergy Operations, Inc. maintains agreements and/or contracts with the following organizations in support of Vermont Yankee Emergency Response.
Entergy Operations, Inc. maintains agreements and/or contracts with the following organizations in support of Vermont Yankee Emergency Response.
Letters of Agreement have been ascertained with o ffsite groups to provide on-site aid in the event of an emergency situation, including those resulting from hostile actions at Vermont Yankee. Ambulance Service: Twenty-four (24) hour ambulance service is provided by Rescue Inc. Mutual aid backup from other ambulance se rvices provides for additional emergency medical services, ambulances and EMS personnel. Onsite procedures contain instructions that cover the call for assistance and the handl ing of the ambulance service personnel.
Letters of Agreement have been ascertained with offsite groups to provide on-site aid in the event of an emergency situation, including those resulting from hostile actions at Vermont Yankee.
Ambulance Service: Twenty-four (24) hour ambulance service is provided by Rescue Inc.
Mutual aid backup from other ambulance services provides for additional emergency medical services, ambulances and EMS personnel. Onsite procedures contain instructions that cover the call for assistance and the handling of the ambulance service personnel.
Radio communication exists between the ambulance and local hospitals.
Radio communication exists between the ambulance and local hospitals.
Medical: Onsite procedures contain instruct ions, which cover the request for medical assistance and handling of patients.
Medical: Onsite procedures contain instructions, which cover the request for medical assistance and handling of patients.
Hospitals: Brattleboro Memori al Hospital and Baystate Franklin Medical Center have agreed to accept patients from Vermont Yankee who have been injured, contaminated or irradiated.
Hospitals: Brattleboro Memorial Hospital and Baystate Franklin Medical Center have agreed to accept patients from Vermont Yankee who have been injured, contaminated or irradiated.
Fire: Offsite firefighting support is pr ovided by the Vernon and Brattleboro Fire Departments, as resources permit, with mutual aid backup from other fire departments.
Fire: Offsite firefighting support is provided by the Vernon and Brattleboro Fire Departments, as resources permit, with mutual aid backup from other fire departments.
Law Enforcement: When notified that assistance is needed, Security will notify the Lead Local Law Enforcement Agency (LLEA). The handl ing of security matters, including those involving hostile action for Vermont Yankee is covered in the Vermont Yankee Security Plan and are classified as safeguards information.
Law Enforcement: When notified that assistance is needed, Security will notify the Lead Local Law Enforcement Agency (LLEA). The handling of security matters, including those involving hostile action for Vermont Yankee is covered in the Vermont Yankee Security Plan and are classified as safeguards information.
Emergency Plan Revision 54 Page 109 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


APPENDIX E (Continued)
APPENDIX E (Continued)
Emergency Plan Revision 54
Letters of Agreement
 
Page 110 of 125 Entergy Vermont Yankee Letters of Agreement
: 1. State of Massachusetts
: 1. State of Massachusetts
: 2. State of New Hampshire
: 2. State of New Hampshire
: 3. State of Vermont
: 3. State of Vermont
: 4. Baystate Franklin Medical Center
: 4. Baystate Franklin Medical Center
: 5. National Weather Service (NOAA)
: 5. National Weather Service (NOAA) 6     Brattleboro Memorial Hospital
 
6 Brattleboro Memorial Hospital
: 7. Rescue, Inc. Ambulance Service
: 7. Rescue, Inc. Ambulance Service
: 8. Vernon Fire Department
: 8. Vernon Fire Department
Line 1,639: Line 1,065:
: 15. State of Massachusetts Alert & Notification System
: 15. State of Massachusetts Alert & Notification System
: 16. State of New Hampshire Alert & Notification System
: 16. State of New Hampshire Alert & Notification System
: 17. State of Vermont Aler t & Notification System
: 17. State of Vermont Alert & Notification System
: 18. Landmark College
: 18. Landmark College
: 19. Law Enforcement  
: 19. Law Enforcement *
*
* All letters of agreement from Local Law Enforcement Authorities as required by the Physical Security Plan are classified as Safeguards Information and as such are maintained by Security.
* All letters of agreement from Local Law Enforcement Authorities as required by the Physical Security Plan are classified as Safeguards Information and as such are maintained by Security.
Emergency Plan Revision 54  
Emergency Plan Revision 54 Page 110 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Page 111 of 125 Entergy Vermont Yankee APPENDIX F EVACUATION TIME ESTIMATES
APPENDIX F EVACUATION TIME ESTIMATES The Evacuation Time Estimate for Vermont Yankee Nuclear Power Station is maintained as a separate document. The Evacuation Time Estimate is provided to offsite agencies when it is updated.
Emergency Plan Revision 54 Page 111 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


The Evacuation Time Estimate for Vermont Yankee Nuclear Power Station is maintained as a separate document. The Evacuation Time Estimate is provided to offsite agencies when it is updated. 
APPENDIX G INDEX OF EMERGENCY PLAN IMPLEMENTING PROCEDURES AND SUPPORT PLANS Emergency Plan Revision 54 Page 112 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Emergency Plan Revision 54  
APPENDIX G (Continued)
 
I. EMERGENCY PLAN IMPLEMENTING PROCEDURES AP 3125            Emergency Plan Classification and Action Level Scheme EPOP-COMM-3504 Emergency Communications EPOP-EQUIP-3506 Emergency Equipment Readiness Check OP 3507            Emergency Radiation Exposure Control OP 3508            Onsite Medical Emergency Procedure OP 3509            Environmental Sample Collection during an Emergency OP 3510            Offsite and Site Boundary Monitoring EPOP-PAR-3511      Offsite Protective Action Recommendations OP 3513            Evaluation of Offsite Radiological Conditions AP 3532            Emergency Preparedness Organization OP 3533            Post Accident Sampling of Reactor Coolant OP 3534            Post Accident Sampling of Plant Stack Gaseous Releases OP 3535            Post Accident Sampling and Analysis of Primary Containment OP 3536            In-plant Air Sample Analysis with Abnormal Conditions EPOP-CR-3540      Control Room Actions During an Emergency EPOP-TSC-3542      Operation of the Technical Support Center EPOP-OSC-3544      Operation of the Operations Support Center EPOP-EOF-3546      Operation of the Emergency Operations Facility/Recovery Center OP 3547            Security Actions During an Emergency OP 3548            Emergency Termination and Recovery AP 3549            Offsite Emergency Preparedness Support EPOP-JIC-3550      Activation and Operation of the Joint Information Center EPOP-3551          Operation of the Joint Information Center When the Alternate Joint Information Center is Activated EPOP-3552          Activation and Operation of the Alternate Joint Information Center AP 3553            Administration and Maintenance of the Alert and Notification System AP 3554            Emergency Plan Teams AP 3712            Emergency Plan Training AP-10049          Equipment Important to Emergency Response EPAP-INFORM-10076        InForm Notification System Emergency Plan Revision 54 Page 113 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
Page 112 of 125 Entergy Vermont Yankee APPENDIX G INDEX OF EMERGENCY PLAN IMPLEMENTING PROCEDURES AND SUPPORT PLANS


APPENDIX G (Continued)
APPENDIX G (Continued)
Emergency Plan Revision 54
II. SUPPORT PLANS*
 
The Vermont Yankee Severe Accident Management Program (PP 7019)
Page 113 of 125 Entergy Vermont Yankee I. EMERGENCY PLAN IMPLEMENTING PROCEDURES AP 3125 Emergency Plan Classification and Action Level Scheme EPOP-COMM-3504 Emergency Communications EPOP-EQUIP-3506 Emergency Equipment Readiness Check OP 3507 Emergency Radiation Exposure Control OP 3508 Onsite Medical Emergency Procedure OP 3509 Environmental Sample Collection during an Emergency OP 3510 Offsite and Site Boundary Monitoring EPOP-PAR-3511 Offsite Protecti ve Action Recommendations OP 3513 Evaluation of Offsite Radiological Conditions AP 3532 Emergency Prepar edness Organization OP 3533 Post Accident Sampling of Reactor Coolant OP 3534 Post Accident Sampling of Plant Stack Gaseous Releases OP 3535 Post Accident Sampling and Analysis of Primary Containment OP 3536 In-plant Air Sample Analysis with Abnormal Conditions EPOP-CR-3540 Control Room Actions During an Emergency EPOP-TSC-3542 Operation of t he Technical Support Center
 
EPOP-OSC-3544 Operati on of the Operations Support Center EPOP-EOF-3546 Operation of the Emergency Operations Facility/Recovery Center OP 3547 Security Actions During an Emergency OP 3548 Emergency Termination and Recovery AP 3549 Offsite Emergen cy Preparedness Support EPOP-JIC-3550 Activation and Operation of the Joint Information Center EPOP-3551 Operation of t he Joint Information Center When the Alternate Joint Information Center is Activated EPOP-3552 Activation and Operation of the Alternate Joint Information Center AP 3553 Administration and Maintenance of the Alert and Notification System AP 3554 Emergency Plan Teams AP 3712 Emergency Plan Training AP-10049 Equipment Important to Emergency Response EPAP-INFORM-10076 InForm Notification System APPENDIX G (Continued)
Emergency Plan Revision 54
 
Page 114 of 125 Entergy Vermont Yankee II. SUPPORT PLANS* The Vermont Yankee Severe Acci dent Management Program (PP 7019)
The Vermont Yankee Security Plan Vermont Yankee Fire Protection and Safe Shutdown (SEP-FP-VTY-003)
The Vermont Yankee Security Plan Vermont Yankee Fire Protection and Safe Shutdown (SEP-FP-VTY-003)
The State of Vermont Radiological Emergency Response Plan The State of New Hampshire Radiological Emergency Response Plan  
The State of Vermont Radiological Emergency Response Plan The State of New Hampshire Radiological Emergency Response Plan The Commonwealth of Massachusetts Radiological Emergency Response Plan for Fixed-Site Nuclear Facilities NRC Incident Response Plan (NUREG-0728)
 
National Response Framework (January 2008)
The Commonwealth of Massachusetts Radiological Emergency Response Plan for Fixed-Site Nuclear Facilities NRC Incident Response Plan (NUREG-0728)
Procedure for Admission and Management of Radioactively Contaminated Patients at Brattleboro Memorial Hospital Vermont Yankee Nuclear Power Station On-Shift Staffing Analysis Evacuation Time Estimate Corporate Support Procedures EN-FAP-EP-009, Use of KI for the Emergency Response Organization EN-FAP-EP-010, Severe Weather Response EN-FAP-EP-012, Severe Weather Recovery EN-EP-202, Equipment Important to Emergency Preparedness EN-EP-301, Emergency Planning Assessment of Offsite Emergency Response Capability Following a Natural Disaster EN-EP-305, Emergency Planning 10CFR50.54(q) Review Program EN-EP-306, Drills and Exercises EN-EP-307, Hostile Action Based Drills & Exercises EN-EP-308, Emergency Planning Critiques EN-EP-309, Fatigue Management for Hurricane Response Activities EN-EP-310, Emergency Response Organization Notification System EN-EP-311, Emergency Response Data System (ERDS) Activation via the Virtual Private Network (VPN)
National Response Fram ework (January 2008) Procedure for Admission and Management of Radioactively Contaminated Patients at Brattleboro Memorial Hospital Vermont Yankee Nuclear Power Station On-Shift Staffing Analysis Evacuation Time Estimate Corporate Support Procedures EN-FAP-EP-009, Use of KI for the Emergency Response Organization EN-FAP-EP-010, Severe Weather Response EN-FAP-EP-012, Severe Weather Recovery EN-EP-202, Equipment Important to Emergency Preparedness EN-EP-301, Emergency Planning Assessment of Offsite Emergency Response Capability Following a Natural Disaster EN-EP-305, Emergency Planning 10CFR50.54(q) Review Program EN-EP-306, Drills and Exercises EN-EP-307, Hostile Action Based Drills & Exercises  
EN-EP-401, Public Use of Emergency Preparedness Owner Controlled Area EN-EP-601, Corporate Emergency Center Operations EN-EP-606, Pandemic Flu Response EN-EP-801, Emergency Response Organization
 
EN-EP-308, Emergency Planning Critiques EN-EP-309, Fatigue Management for Hurricane Response Activities EN-EP-310, Emergency Response Organization Notification System EN-EP-311, Emergency Response Data Syst em (ERDS) Activation via the Virtual Private Network (VPN) EN-EP-401, Public Use of Emergen cy Preparedness Owner Controlled Area EN-EP-601, Corporate Emergency Center Operations EN-EP-606, Pandemic Flu Response EN-EP-801, Emergency Response Organization
* This list does not reference any of the emergency plan arrangements specified in Appendices D and E of this plan.
* This list does not reference any of the emergency plan arrangements specified in Appendices D and E of this plan.
Emergency Plan Revision 54 Page 114 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Emergency Plan Revision 54  
APPENDIX H PUBLIC NOTIFICATION SYSTEM Emergency Plan Revision 54 Page 115 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
 
Page 115 of 125 Entergy Vermont Yankee APPENDIX H PUBLIC NOTIFICATION SYSTEM


APPENDIX H (Continued)
APPENDIX H (Continued)
Emergency Plan Revision 54
Vermont Yankee has completed the installation of the equipment necessary to meet the requirements outlined in NUREG-0654 for alerting the public within the Vermont Yankee EPZ. The equipment consists of 37 sirens and NWS Tone-Alert receivers. The attached town maps indicate the location of each siren.
 
When an emergency condition exists which requires the Public Notification System to be activated, the emergency Management Agencies of Massachusetts, New Hampshire, and Vermont coordinate the activation of the Public Notification System (sirens, mobile PA systems, weather alert receivers, emergency broadcasting stations, etc.). After the coordination, the respective states notify local response organizations to activate the system to alert the affected population. Coordination of the three states is very important prior to activation due to the overlap of the radio stations and sound devices outside a state into the other affected states. The responsibility for activating the prompt Public Notification System rests with the State and Local Governments.
Page 116 of 125 Entergy Vermont Yankee Vermont Yankee has completed the installation of the equipment necessary to meet the requirements outlined in NUREG-0654 for alerting the public within the Vermont  
In the event of an emergency situation, which requires rapid implementation of alerting the public, the respective state agencies (State Police and/or Emergency Management) immediately notify the Emergency Alert System (EAS) stations to provide advisory information to the public. Simultaneously, the states include the activation of the Public Notification System in their initial message to the local response organizations.
 
Yankee EPZ. The equipment consists of 37 si rens and NWS Tone-Alert receivers. The attached town maps indicate the location of each siren.  
 
When an emergency condition exists which requires the Public Notification System to be activated, the emergency Management A gencies of Massachusetts, New Hampshire, and Vermont coordinate the activation of the Public Notification System (sirens, mobile PA  
 
systems, weather alert receiv ers, emergency broadcasting stations, etc.). After the coordination, the respective states notify local response organizations to activate the system to alert the affected population. Coordination of the three states is very important prior to activation due to the overlap of the radio stations and sound devices outside a state into the other affected states.
The responsibility for activating the prompt Public Notification System rests with the Stat e and Local Governments.
In the event of an emergency situation, which requires rapid implementation of alerting the public, the respective state agencies (State Police and/or Emergency Management) immediately notify the Emergency Alert System (E AS) stations to provide advisory information to the public. Simultaneously , the states include the activation of the Public Notification System in their initial me ssage to the local response organizations.
Coordination is not conducted during a fast breaking event.
Coordination is not conducted during a fast breaking event.
Emergency response organizations have a 24-hour capability of alerting and providing instructions to the public.  
Emergency response organizations have a 24-hour capability of alerting and providing instructions to the public.
 
Each state has made provisions for issuing emergency instructions to the public.
Each state has made provisions for issui ng emergency instructions to the public.
Descriptions of the information to be immediately issued and updates of the information are outlined in the respective State Emergency Response Plans.
Descriptions of the information to be immediately issued and upda tes of the information are outlined in the respective State Emergency Response Plans.  
Emergency Plan Revision 54 Page 116 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


APPENDIX H (Continued)
APPENDIX H (Continued)
Emergency Plan Revision 54  
Siren List Map #  Siren Name                          Siren Location 1        VV1      Vermont Yankee, Vernon, VT 2        VV2      Fire Station, Vernon, VT 3        VV3      Recreation Center, Vernon, VT 4        BV1      Municipal Center, Brattleboro, VT 5        BV2      Town Garage, Brattleboro, VT 6        BV3      West Fire Station, Brattleboro, VT 7        BV4      Putney Road, Brattleboro, VT 8        BV5      Williams Street, Brattleboro, VT 9        BV6      State Police, Route 9, Brattleboro, VT 10        HN1      Fire Station, Hinsdale, NH 11        HN2      Town Well, Hinsdale, NH 12        WN1      Swanzey Town Line, Route 10, Winchester, NH 13        WN2      Fiddle Hill Road, Winchester, NH 14        WN3      Fire Station, Winchester, NH 15        WN4      Town Well, Route 10, Winchester, NH 16        NM1      Route 10 North, Northfield, MA 17        NM2      Fire Station, Northfield, MA 18        NM3      Lucky Clapp Road, Northfield, MA 19        DM1      Town Garage, Bernardston, MA 20        CM1      Griswoldville, Colrain, MA 21        CM2      Aunt Sophies Peak, Colrain, MA 22        DM2      Hucklehill Road, Bernardston, MA 23        CM3      Greenfield and Leyden Roads, Colrain, MA 24        CN1      Fire Station Cupola, Chesterfield, NH 25        CN2      West Chesterfield Fire Station, Chesterfield, NH 26        CN3      Spofford Fire Station, Chesterfield, NH 27        CN4      Highway Garage, Chesterfield, NH 28        DV1      Highway Garage, Dummerston, VT 29        DV2      West Dummerston Fire Station, Dummerston, VT 30        DM3      Fire Station, Bernardston, MA 31        GM1      Northfield Mt, Hermon School, Gill , MA 32        LM1      Municipal Center, Leyden, MA 33        GV1      Front of School Corner, Guilford, VT 34        GV2      Stage Road, Guilford, VT 35        GV3      Sportsmans Club on Cremery Road, Guilford, VT 36        HN3      Filter Plant, Route 63, Hinsdale, NH 37        RN1      Whipple Hill Road, Richmond, NH Emergency Plan Revision 54 Page 117 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available


Page 117 of 125 Entergy Vermont Yankee Siren List Map # Siren Name Siren Location    1 VV1 Vermont Yankee, Vernon, VT 2 VV2 Fire Station, Vernon, VT 3 VV3 Recreation C enter, Vernon, VT 4 BV1 Municipal Cent er, Brattleboro, VT 5 BV2 Town Garage, Brattleboro, VT 6 BV3 West Fire Stat ion, Brattleboro, VT 7 BV4 Putney Road, Brattleboro, VT 8 BV5 Williams Street, Brattleboro, VT 9 BV6 State Police, Rout e 9, Brattleboro, VT 10 HN1 Fire Station, Hinsdale, NH 11 HN2 Town Well, Hinsdale, NH 12 WN1 Swanzey Town Line, Route 10, Winchester, NH 13 WN2 Fiddle Hill Road, Winchester, NH 14 WN3 Fire Station, Winchester, NH 15 WN4 Town Well, Route 10, Winchester, NH 16 NM1 Route 10 North, Northfield, MA 17 NM2 Fire Station, Northfield, MA 18 NM3 Lucky Clapp Road, Northfield, MA 19 DM1 Town Garage, Bernardston, MA 20 CM1 Griswoldville, Colrain, MA 21 CM2 Aunt Sophie's Peak, Colrain, MA 22 DM2 Hucklehill Road, Bernardston, MA 23 CM3 Greenfield and Leyden Roads, Colrain, MA 24 CN1 Fire Station Cupola, Chesterfield, NH 25 CN2 West Chesterfield Fire Station, Chesterfield, NH 26 CN3 Spofford Fire Station, Chesterfield, NH 27 CN4 Highway Garage, Chesterfield, NH 28 DV1 Highway Garage, Dummerston, VT 29 DV2 West Dummerston Fire Station, Dummerston, VT 30 DM3 Fire Station, Bernardston, MA 31 GM1 Northfield Mt, Hermon School, Gill , MA 32 LM1 Municipal Center, Leyden, MA 33 GV1 Front of School Corner, Guilford, VT 34 GV2 Stage Road, Guilford, VT 35 GV3 Sportsman's Club on Cr emery Road, Guilford, VT 36 HN3 Filter Plant, R oute 63, Hinsdale, NH 37 RN1 Whipple Hill Road, Richmond, NH
Redacted Version of Document - Publicly Available Redacted Version of Document - Publicly Available Redacted Version of Document - Publicly Available Redacted Version of Document - Publicly Available Redacted Version of Document - Publicly Available APPENDIX H (Continued)
 
Emergency Plan Revision 54 Page 123 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
APPENDIX H (Continued)
Emergency Plan Revision 54  


Page 123 of 125 Entergy Vermont Yankee}}
Redacted Version of Document - Publicly Available Redacted Version of Document - Publicly Available}}

Latest revision as of 19:47, 31 October 2019

Attachment B - VY E-Plan (Rev 54) (Redacted)
ML14308A569
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 12/19/2013
From: Mckenney M
Entergy Nuclear Operations
To:
Atomic Safety and Licensing Board Panel, NRC/SECY
SECY RAS
References
50-271-LA, ASLBP 15-934-01-LA-BD01, RAS 26866
Download: ML14308A569 (142)


Text

Redacted Version of Document - Publicly Available EMERGENCY PLAN ENTERGY VERMONT YANKEE VERNON, VERMONT REVISION 54 Effective Date 12/19/13 Redacted Version of Document - Publicly Available

ENTERGY VERMONT YANKEE EMERGENCY PLAN REVISION

SUMMARY

DATE REVISION DESCRIPTION 04/28/04 39 Replaced Framatome ANS services and the DE&S Mutual Assistance Agreement with the Corporate Service Center from White Plains.

Updated information about the NAS to the new NAS system that was installed. Added Mechanical Maintenance to the Repair & Corrective Actions section for the 60 min. response in Table 8-4. Removed the EOFC Asst. and Communications positions. Removed requirement for drills to include a PASS sample.

03/15/05 40 Removed references to satellite phones. Revised Figures 7.1 and 7.2.

Updated Evacuation Time Estimate (Appendix F) based on study conducted in 2004. Updated Table 4.2 and Figures 4.3, 4.4 and 4.5 based on 2000 census data per UFSAR Rev. 19. Updated Section 4.2 for latest population figures per UFSAR Rev. 19. Joint News Center activation changed from SAE to Alert. Removed references to "typically filled by" titles and "designated alternates" due to change to four teams. Deleted Table 8.1. Changed alternate Joint News Center location from Marlborough, MA to Landmark College. Revised Figure 6.3 for new OSC Communication Center location. Revised Figure 6.4 for new EOF/RC Center Layout. Section 8.2.1 SRM responsibilities revised. Section 8.2.2 TSC Coordinator responsibilities revised. Security Coordinator position reports to off site command center instead of the TSC. Revised Figure 8.3.

Removed requirement for TS Coordinator to appoint an OSC Coordinator due to four team assignments. Revised Section 9.0 to require activation of the Joint News Center at the Alert. Revised Table 9.1. Updated Appendix E with recent letters of agreement from DOE/REAC and INPO. Deleted letters of agreement with Duke Engineering & Services for old alternate joint news center and Yankee Rowe for lab sample analysis and decontamination services. Updated Appendix G with new procedures AP 3549 and OP 3550. Removed reference to JNC Guidelines which were replaced by OP 3550.

Changed OP 3505 to AP 3505 and OP 3712 to AP 3712. Deleted Section 8.2.7 Radiological Coordinator. Section 8.2.6 revised Rad Assistant responsibilities. Revised Table 8.4 to remove reference to Radiological Coordinator. Revised Figure 8.2 to delete Radiological Coordinator. Revised Figure 8.5 to delete Radiological Coordinator and communicators. Replaced with Radio Operator and RP staff.

Revised Figure 8.7 to reflect changes due to four team rotation.

Emergency Plan Revision 54 Revision Summary Page i of ix Entergy Vermont Yankee Redacted Version of Document - Publicly Available

REVISION

SUMMARY

(Continued)

DATE REVISION DESCRIPTION 01/18/06 41 Incorporated changes per NRC Bulletin 2005-02 (ECL definition changes, Security drills, Hostile Action definitions). Changed "Unusual Event" to "Notification of Unusual Event" to conform to industry standards. Changed title - Director of Public Affairs to Manager of Communications. Changed reference from Plant Operations Review Committee to On-Site Safety Review Committee. Letters of agreement reviewed annually in conjunction with annual review of the E-Plan. Updated respiratory protection locations per RP changes.

Updated letters of agreement for States, DOE-REAC/TS and Vernon Fire Department. Added letters of agreement for States regarding Alert & Notification System (ANS). Added OP 3548 and OP 3551 to list of Implementing Procedures in Appendix G. Updated Appendix H for the implementation of the new siren system.

06/22/06 42 Corrected Hostile Force definition - "overtly" had been omitted from the last revision (WT-VTY-2006-00000 CA#00463). Revised thermal rated power per License Amendment #229, issued March 2, 2006 (CR-VTYLO-2006-0004 CA#23). Removed reference to gross electrical output. Per Regulatory Information Summary 2003-18, Supplement 2, issued December 12, 2005, removed the requirement for states to concur with changes to the Emergency Action Levels.

Changed TLD (thermoluminescent device) references to DLR (dosimeter of legal record) per Radiation Protection change. Replaced the annual INPO letter of agreement with the latest version. Updated the general letters of agreement with Vermont and New Hampshire.

Added memorandum of understanding for Alert & Notification System with Vermont and New Hampshire. Added new procedure, OP 3552, Activation and Operation of the Alternate Joint News Center.

Emergency Plan Revision 54 Revision Summary Page ii of ix Entergy Vermont Yankee Redacted Version of Document - Publicly Available

REVISION

SUMMARY

(Continued)

DATE REVISION DESCRIPTION 10/10/07 43 Changed TLD (thermoluminescent device) references to DLR (dosimeter of legal record) per Radiation Protection change. Replaced the annual INPO letter with the latest version. Updated the general letters of agreement with Franklin Medical Center, Brattleboro Memorial Hospital, Rescue, Inc. Ambulance Service, Vernon Fire Department, Brattleboro Fire Department, Vermont Yankee Nuclear Power Corporation. Appendix G - added new procedures, AP 3553, Administration and Maintenance of the Alert and Notification System, and AP 3554, Emergency Plan Teams; deleted references to procedures OP 3524, OP 3525 and OP 3531 which were incorporated into other procedures; added EN-EP-605, Corporate Incident Response Team. Changed Joint News Center to Joint Information Center throughout. Changed Figure 6.1 to reflect new location of Massachusetts Region III EOC. Revised Figure 6.3 to remove reference to the medical office and update Control Point personnel contamination monitor label. Changed reference from Vermont Operational Quality Assurance Manual to Entergy Quality Assurance Manual. Removed references to the Duty On Call Officer. Removed requirement for Plant Certification for the TSC Coordinator. Changed references to "corporatelevel" to reflect Entergy organization.

Revised EOF Coordinator and Radiological Assistant responsibilities to reflect organizational changes. Changed "onsite assistance teams" to "repair and corrective action teams." Revised Figure 8.5 to indicate that the EOF Coordinator is not needed for activation of the EOF.

Removed references that required the TSC Coordinator to respond at the Notification of Unusual Event level and revised the responsibility to direct and coordinate all emergency response efforts. Revised Table 9.1 to reflect changes in the emergency response organization structure. Removed respiratory protection from the equipment inventory for the EOF. Revised "Emergency Broadcast Stations" to "Emergency Alert System stations." Removed reference to the Engineering Support Group as a separate entity. The Engineering Support Group is part of the TSC. Fire Brigade Leader changed from Shift Technical Advisor to Field Support Supervisor on Table 8.4.

Removed specific number of federal agencies available. Revised the reference to the TSC capacity. Revised the OSC Coordinator location to direct the OSC. Removed "designee" to the SRM responsibility to approve press releases. Removed switchboard from the EOF.

Removed NID Assistant from the JIC. Revised Table 9.1 to reflect ERO structure. Added the use of State Reception Center for decontamination efforts.

Emergency Plan Revision 54 Revision Summary Page iii of ix Entergy Vermont Yankee Redacted Version of Document - Publicly Available

REVISION

SUMMARY

(Continued)

DATE REVISION DESCRIPTION 02/06/08 44 Implementation of the Independent Spent Fuel Storage Installation (ISFSI). Include ISFSI Emergency Action Level (EAL) for Notification of Unusual Event. Include definitions for ISFSI and Confinement Boundary. Update sections, tables and figures for title changes due to fleet alignment. Facility activation procedures incorporated into facility operation procedures.

08/21/08 45 Implementation of the fleet standard Emergency Response Organization (ERO). Joint Information Center relocation.

03/12/09 46 Reference to Federal Radiological Emergency Response Plan (FRERP) changed to National Response Framework (NRF). Editorial changes. Rearrange OSC and EOF layouts. Annual Update of Letters of Agreement - no content change. Additional sirens added to Appendix H. Add FVY reference numbers to letters cited in Table 8.4 Note 1.

12/15/09 47 Revised Section 5.0 to indicate that the revised Emergency Action Levels are based on NUMARC/NESP-007 (NEI 99-01), "Methodology for Development of Emergency Action Levels", Rev. 5, dated February 2008. Revised 6.2.3, Meteorological Capability, to reflect the as-built elevations for the temperature instruments. Deleted reference to the UHF radio antennas being mounted on the primary meteorological tower in Section 7.3. Changed "Federal Radiological Emergency Response Plan" to "National Response Framework" on Figure 9.1.

Revised paragraph 5 of Section 12.1.2, Communications Tests, to indicate the monthly NRC communications test is with the Headquarters Operations Officer rather than the NRC Region I Office.

Replaced the AP 3125 EAL Chart with the revised EAL charts in Appendix A. Replaced AP 3505, Emergency Preparedness Exercises and Drills, with fleet procedures EN-EP-306, Drills and Exercises, and EN-EP-307, Threat Based Drills, in Appendix G. Corrected siren numbers on the Siren List in Appendix H. Added the siren drawing for the Bernardston sirens in Appendix H.

03/30/10 48 Revised Figure 4.1 to add the Vernon Substation.

10/21/10 49 Revised Table 8.4: Added STA (1) to Plant Operations & Assessment of Operational Aspects functional area section. This change is being instituted to clarify specific coverage detail. Deleted the verbiage that specifies who the fire brigade consists of (FSS, 3 AO, and 1 Security) from the Fire Fighting functional area section. Added an (*) with comment that "Position staffed in accordance with Technical Requirements Manual and administrative procedures". The change is being instituted to be consistent with the TRM and to simplify upkeep of the Emergency Plan document.

Emergency Plan Revision 54 Revision Summary Page iv of ix Entergy Vermont Yankee Redacted Version of Document - Publicly Available

REVISION

SUMMARY

(Continued)

DATE REVISION DESCRIPTION 04/28/11 50 Updated figure 6.4 to reflect changes in the EOF facility arrangement.

Updated section 6.2.6, 10.1.3, 10.3, Appendix B and Appendix D to reflect current capabilities for outside analytical assistance and laboratory facilities support. Updated letters of agreement for: State of Massachusetts, State of New Hampshire, State of Vermont, Vernon Fire Department, Brattleboro Fire Department, and Institute of Nuclear Power Operations. Updated memorandum of understanding for State of Massachusetts Alert & Notification System, State of New Hampshire Alert & Notification System, and State of Vermont Alert & Notification System.

Emergency Plan Revision 54 Revision Summary Page v of ix Entergy Vermont Yankee Redacted Version of Document - Publicly Available

REVISION

SUMMARY

(Continued)

Section 3.2: Actions in an Emergency, Step 7 5/24/12 51 Step 7 was revised from Use the plant pager system to notify appropriate personnel to use the emergency notification system to notify appropriate personnel Section 6.1.3: Emergency Operations Facility/Recovery Center Added a statement to address ERO Augmentation at Alternate Facilities Section 8.4.1, Local Service An editorial change was made to this section to add Baystate to the name of Franklin Medical Center Table 8.4, Minimum Staffing Requirements for the ENVY ERO Table 8.4 has been updated to replace Security with the Fire Brigade for the functional area of Rescue Operations & First Aid, Changed Rad Waste Operator from ACRO to CRO Section 9.1 Emergency Condition Recognition and Classification Added a statement to address Emergency Declaration Timeliness Section 9.2.4 General Emergency Response, Step 1 This section was updated to refer to the Corporate Emergency Center located in Jackson MS for the EOF Manager to contact in a General Emergency for fleet support.

Figure 9.1, Notification Plan Figure 9.1 notification plan has been updated to align with the implementation of Everbridge and OP 3540, (Control Room Actions During an Emergency) and show operations as the initiator of the notifications Section 10.4.4, Use of Onsite Protective Equipment and Supplies Editorial change to correct Iodine to Iodide.

Section 10.6, Protective Actions for Onsite Personnel Added a statement for Protective Actions for Onsite Personnel Section 12.1.2, Communication Tests Section 12.1.2 has been updated to align with the Everbridge implementation at Vermont Yankee and revise the wording for the weekly communication test.

Appendix E - Letters of Agreement Updated the following letters (18 is newly added) o Letter 4, Baystate Franklin Medical Center o Letter 5, National Weather Service (NOAA) o Letter 6, Brattleboro Memorial Hospital o Letter 7, Rescue Inc Ambulance Service o Letter 10, Institute of Nuclear Power Operations o Letter 11, Town of Vernon o Letter 12, DOE o Letter 13, DOE-REAC/TS o Letter 14, Vermont Yankee Nuclear Power Corporation o Letter 18, Landmark College Appendix G - Index of Emergency Plan Implementing Procedures and Support Plans o Emergency Plan Implementing Procedures o Support Plans o Corporate Support Procedures Emergency Plan Revision 54 Revision Summary Page vi of ix Entergy Vermont Yankee Redacted Version of Document - Publicly Available

REVISION

SUMMARY

(Continued)

Section 7.9 Emergency Response Data System Removed 12/20/12 52 wording regarding activation within one hour of an alert and replaced it with a statement for maintaining a continuous connection Section 8.1 Normal Plant Organization Updated the on shift staffing to include one (1) FSS, five (5) AOs, and one (1) Utility employee per the Vermont Yankee Nuclear Power Station On-Shift Staffing Analysis Section 8.2.3 Shift Manager Updated the last sentence of the paragraph to state The immediate responsibilities of the Shift Manager include performing or delegating performance of the following.

Table 8.4 Minimum Staffing Requirements for the ENVY ERO Replaced SCRO with CRS in the Table and on note 4. Title change only.

Updated AOs from 3 to 5 Added 1 FSS Added FSS to offsite dose assessment Note 1: Added a reference to the Vermont Yankee Nuclear Power Station On-Shift Staffing Analysis for composition of the 5 person fire brigade Note 4: Added FSS for performing initial dose assessment Appendix A Emergency Classification System and Emergency Action Levels - Added a cross reference to AP 3125, Emergency Plan Classification and Action Level Scheme for EAL Charts and removed the image of the EAL Chart Appendix G Index of Emergency Plan Implementing Procedures and Support Plans II. Support Plans - Added Vermont Yankee Nuclear Power Station On-Shift Staffing Analysis Corporate Support Plans: Added procedure EN-EP-302 Severe Weather Response effective 11/5/12 Emergency Plan Revision 54 Revision Summary Page vii of ix Entergy Vermont Yankee Redacted Version of Document - Publicly Available

REVISION

SUMMARY

(Continued)

Section 8.1, Normal Plant Organization 9/17/13 53 Updated AOs from 5 to 6 Deleted Utility person Table 8.4, Minimum Staffing Requirements for the ENVY ERO Plant Operations & Assessment of Operational Aspects -

Updated AOs from 5 to 6 Fire Fighting - Added the total number (5); Added ** to reference the note May be provided by shift personnel assigned other functions and added reference to note 1 regarding the Fire Brigade being staffed IAW TRM, Staffing Analysis and AP 0894.

Figure 8.1 - Corrected the number on on shift AOs and added the Field Support Supervisor (FSS)

Appendix E, Letters of Agreement Updated INPO letter for 2012 DOE - REAC/TS - Updated letter dated June 6, 2013. The letter content remains unchanged.

Deleted letter 14 Vermont Yankee Nuclear Power Corporation no longer valid as of 12/31/12 Appendix G, Index of Emergency Plan Implementing Procedures and Support Plans Added Fleet Administrative Procedure references Updated procedure references in accordance with the procedure upgrade project numbering scheme Emergency Plan Revision 54 Revision Summary Page viii of ix Entergy Vermont Yankee Redacted Version of Document - Publicly Available

REVISION

SUMMARY

(Continued)

Index 12/19/13 54 Added 7.1 InForm Notification System 3.2, Actions in an Emergency Changed Nuclear Alert System to Emergency Notification System in step 5 for notifying the three states 6.2.6, Facilities and Equipment for Offsite Monitoring Removed the reference to the James A. Fitzpatrick environmental laboratory 7.1, InForm Notification System Added a description for the InForm Notification System 7.2, Nuclear Alert System Changed the words Is used to can be used to describe the Nuclear Alert System Figure 7.1, Plant to State Notification Channels Added a line for Inform Figure 7.2, Coordination Channels with States Added a line for Inform Section 8.1, Normal Plant Organization Removed the Field Support Supervisor from the Normal Plant Organization Table 8.4, Minimum Staffing Requirements for the ENVY ERO Notification/Communication: changed Chem Tech to AO Radiological Accident Assessment - Deleted Field Support Supervisor (FSS) and added Chem Tech.

Note 4 - Deleted FSS and added Chem Tech Figure 8.1, Normal On-Shift Emergency Organization Revised to match shift staffing in section 8.1 and remove the Field Support Supervisor (FSS)

Figure 9.1, Notification Plan Changed NAS to Inform/NAS Appendix E, Letters of Agreement Letters of Agreement have been removed from this document and will be maintained in the Emergency Plan Department files. A summary of the agreements has also been added.

Appendix F, Evacuation Time Estimates An evacuation time estimate summary has been removed from this document and the entire document is maintained separately and referenced in this appendix.

Appendix G, Index of Emergency Plan Implementing Procedures and Support Plans Updated procedure numbers to match the procedure upgrade project numbering Added the Evacuation Time Estimate to Support Plans Emergency Plan Revision 54 Revision Summary Page ix of ix Entergy Vermont Yankee Redacted Version of Document - Publicly Available

TABLE OF CONTENTS

1.0 INTRODUCTION

........................................................................................................1 2.0 DEFINITIONS .............................................................................................................2 3.0

SUMMARY

OF EMERGENCY PLAN ........................................................................6 3.1. Objectives ........................................................................................................6 3.2. Actions In An Emergency.................................................................................7 3.3. Emergency Response Facilities .......................................................................7 3.4. Mobilization ......................................................................................................8 3.5. State Government Notification and Response .................................................8 3.6. Federal Government Notification and Response .............................................9 3.7. Technical Support ............................................................................................9 4.0 THE AREA ............................................................................................................... 10 4.1. The Site ......................................................................................................... 10 4.2. Area Characteristics, Land Use and Demography ......................................... 10 4.3. Emergency Planning Zones ........................................................................... 11 5.0 EMERGENCY CLASSIFICATION SYSTEM ............................................................ 24 5.1. Notification of Unusual Event ......................................................................... 24 5.1.1. Unusual Event (Terminated) .......................................................... 25 5.2. Alert ............................................................................................................... 25 5.3. Site Area Emergency ..................................................................................... 25 5.4. General Emergency ....................................................................................... 26 5.5. Emergency Classification System Review by State Authorities ..................... 26 6.0 EMERGENCY RESPONSE FACILITIES AND EQUIPMENT .................................. 27 6.1. Emergency Response Facilities ..................................................................... 27 6.1.1. Technical Support Center .............................................................. 27 6.1.2. The Operations Support Center ..................................................... 28 6.1.3. Emergency Operations Facility/Recovery Center .......................... 29 6.1.4. Deleted .......................................................................................... 30 6.1.5. Joint Information Center ................................................................ 30 6.1.6. Coordination of Radiological Data ................................................. 30 6.2. Assessment Capability................................................................................... 31 6.2.1. Process Monitors ........................................................................... 31 6.2.2. Radiological Monitors .................................................................... 31 6.2.3. Meteorological Capability ............................................................... 32 6.2.4. Fire Detection Devices ................................................................... 33 6.2.5. Post-Accident Sampling ................................................................. 33 6.2.6. Facilities and Equipment for Offsite Monitoring.............................. 33 7.0 COMMUNICATIONS ................................................................................................ 39 7.1. InForm Notification System ............................................................................ 39 Emergency Plan Revision 54 Table of Contents Page i of vii Entergy Vermont Yankee Redacted Version of Document - Publicly Available

TABLE OF CONTENTS (Continued) 7.2. Nuclear Alert System ..................................................................................... 39 7.3. Utility Microwave and Radio Systems ............................................................ 40 7.4. Mobile UHF Radio System............................................................................. 40 7.5. Plant Intercom System ................................................................................... 40 7.6. NRC Telephone System ................................................................................ 40 7.7. Commercial Telephone System ..................................................................... 41 7.8. Emergency Power Supply for Communications ............................................. 41 7.9. Facsimile Transmission ................................................................................. 41 7.10. Emergency Response Data System .............................................................. 42 8.0 ORGANIZATION ...................................................................................................... 46 8.1. Normal Plant Organization ............................................................................. 46 8.2. Emergency Response Organization .............................................................. 46 8.2.1. Emergency Director ....................................................................... 48 8.2.2. Emergency Plant Manager ............................................................ 49 8.2.3. Shift Manager ................................................................................ 50 8.2.4. EOF Manager ................................................................................ 51 8.2.5. Operations Support Center Manager ............................................. 52 8.2.6. Radiological Assessment Coordinator ........................................... 53 8.2.7. Administration and Logistics Coordinator ...................................... 54 8.2.8. Security Coordinator ...................................................................... 54 8.2.9. Company Spokesperson ............................................................... 55 8.2.10. Decision Maker .............................................................................. 55 8.2.11. Engineering Support Group ........................................................... 55 8.3. Recovery Organization .................................................................................. 56 8.4. Extensions of Vermont Yankee Emergency Organization ............................. 57 8.4.1. Local Service ................................................................................. 57 8.4.2. Federal Government Support ........................................................ 57 8.4.3. Additional Support ......................................................................... 58 8.5. Coordination with State Government Authorities ........................................... 58 9.0 EMERGENCY RESPONSE...................................................................................... 70 9.1. Emergency Condition Recognition and Classification .................................... 70 9.2. Activation of the Emergency Organization ..................................................... 70 9.2.1. Notification of Unusual Event Response ........................................ 71 9.2.2. Alert Response .............................................................................. 72 9.2.3. Site Area Emergency Response .................................................... 73 9.2.4. General Emergency Response ...................................................... 74 9.3. Emergency De-Escalation and Termination Criteria ...................................... 74 10.0 RADIOLOGICAL ASSESSMENT AND PROTECTIVE MEASURES ...................... 79 10.1. Radiological Assessment ............................................................................... 79 10.1.1. Initial Offsite Radiological Dose Projection Capability.................... 79 10.1.2. Variable Trajectory Atmospheric Dispersion/Dose Projection Capability ....................................................................................... 79 Emergency Plan Revision 54 Table of Contents Page ii of vii Entergy Vermont Yankee Redacted Version of Document - Publicly Available

TABLE OF CONTENTS (Continued) 10.1.3. Evaluation of Offsite Air Samples .................................................. 80 10.2. Protective Action Recommendation Criteria .................................................. 81 10.3. Radiological Exposure Control ....................................................................... 81 10.4. Protective Measures ...................................................................................... 82 10.4.1. Site Personnel Accountability ........................................................ 82 10.4.2. Site Egress Control Methods ......................................................... 83 10.4.3. Decontamination Capability ........................................................... 83 10.4.4. Use of Onsite Protective Equipment and Supplies ........................ 83 10.4.5. Fire Protection Equipment ............................................................. 83 10.5. Aid to Affected Personnel .............................................................................. 84 10.5.1. Medical Treatment ......................................................................... 84 10.5.2. Medical Transportation .................................................................. 84 10.6. Protective Actions for Onsite Personnel......................................................... 84 11.0 EMERGENCY NOTIFICATION AND PUBLIC INFORMATION ............................... 92 11.1. Emergency Notification .................................................................................. 92 11.2. Public Notification .......................................................................................... 92 11.3. Public Information .......................................................................................... 93 12.0 MAINTAINING EMERGENCY PREPAREDNESS ................................................... 95 12.1. Drills and Exercises ....................................................................................... 95 12.1.1. Radiation Emergency Drills and Exercises .................................... 95 12.1.2. Communication Tests .................................................................... 95 12.1.3. Fire Drills........................................................................................ 96 12.1.4. Medical Drills ................................................................................. 96 12.1.5. Radiological Monitoring Drills......................................................... 96 12.1.6. Health Physics Drills ...................................................................... 96 12.1.7. Security Drills ................................................................................. 97 12.1.8. Scenarios ....................................................................................... 97 12.1.9. Evaluation of Exercises ................................................................. 98 12.1.10. Emergency Plan Audit ................................................................... 98 12.2. Training .......................................................................................................... 99 12.3. Review and Updating of Plan and Procedures .............................................. 99 12.4. Maintenance and Inventory of Emergency Equipment and Supplies ........... 100 12.5. Responsibility for the Planning Effort ........................................................... 100 Emergency Plan Revision 54 Table of Contents Page iii of vii Entergy Vermont Yankee Redacted Version of Document - Publicly Available

TABLE OF CONTENTS (Continued)

APPENDICES Page APPENDIX A Emergency Classification System and Emergency Action Levels 101 APPENDIX B Emergency Equipment 102 APPENDIX C Initial Offsite Dose Rate Estimation 105 APPENDIX D Environmental Laboratory Analytical and Dosimetry Services 107 APPENDIX E Letters of Agreement 109 APPENDIX F Evacuation Time Estimates 111 APPENDIX G Index of Emergency Plan Implementing Procedures and Support Plans 112 APPENDIX H Public Notification System 115 Emergency Plan Revision 54 Table of Contents Page iv of vii Entergy Vermont Yankee Redacted Version of Document - Publicly Available

TABLE OF CONTENTS (Continued)

LIST OF TABLES Table 4.1 Table of Land Use Table 4.2 2000 Population Distribution Within the 50-Mile EPZ of Vermont Yankee Table 4.3 Vermont Yankee "Plume Exposure" Emergency Planning Zone (10 Mile) Considerations Table 7.1 Vermont Yankee Emergency Communications Matrix Table 8.1 (Deleted)

Table 8.2 (Deleted)

Table 8.3 A Summary of Offsite Coordination Table 8.4 Minimum Staffing Requirements for the ENVY ERO Table 9.1 Vermont Yankee Emergency Response Table 10.1.1 EPA Protective Action Guidelines Table 10.1.2 Recommended Derived Intervention Level (DIL) or Criterion for Each Radionuclide Group Table 10.2 Emergency Dose Limits Table 10.3 Emergency Center Habitability and Protective Action Criteria Emergency Plan Revision 54 Table of Contents Page v of vii Entergy Vermont Yankee Redacted Version of Document - Publicly Available

TABLE OF CONTENTS (Continued)

LIST OF FIGURES Figure 4.1 Vermont Yankee Site Figure 4.2 Population Center and Special Interest Areas Within the 50 Mile EPZ Figure 4.3 2000 Population Distribution Within 0-5 Miles of Vermont Yankee Figure 4.4 2000 Population Distribution Within 0-10 Miles of Vermont Yankee Figure 4.5 2000 Population Distribution Within 10-50 Miles of Vermont Yankee Figure 4.6 Sector Nomenclature for Vermont Yankee Plume Exposure EPZ Figure 4.7 Vermont Yankee Plume Exposure Emergency Planning Zone Figure 4.8 Vermont Yankee 50 Mile Ingestion Pathway Emergency Planning Zone Figure 6.1 Location of State and Company Emergency Operating Centers Around Vermont Yankee Figure 6.2 Technical Support Center Layout Figure 6.3 Operations Support Center Layout Figure 6.4 Emergency Operations Facility/Recovery Center Layout Figure 7.1 Plant to State Notification Channels Figure 7.2 Coordination Channels with States Figure 8.1 Normal On-Shift Emergency Organization Figure 8.2 Vermont Yankee Emergency Management Organization Figure 8.3 Technical Support Center Emergency Organization Figure 8.4 Operations Support Center Emergency Organization Figure 8.5 Emergency Operations Facility Organization Figure 8.6 (Deleted)

Figure 8.7 Joint Information Center Organization Emergency Plan Revision 54 Table of Contents Page vi of vii Entergy Vermont Yankee Redacted Version of Document - Publicly Available

TABLE OF CONTENTS (Continued)

LIST OF FIGURES (Continued)

Figure 9.1 Notification Plan Figure 10.1 Vermont Yankee Emergency Dose Rate Nomogram Figure 10.2 Field Sample Thyroid Dose Nomogram Figure 10.3 Medical Facilities within 50 Miles of Vermont Yankee Capable Of Handling Emergency Medical Cases Emergency Plan Revision 54 Table of Contents Page vii of vii Entergy Vermont Yankee Redacted Version of Document - Publicly Available

1.0 INTRODUCTION

In the event of an emergency at the Vermont Yankee Nuclear Power Station, officials from Vermont Yankee, local towns, the states of Vermont, New Hampshire and Massachusetts, as well as federal assistance resources, are mobilized to assess conditions and protect the health and safety of the public. This document outlines the emergency response actions that are taken by Vermont Yankee and the manner in which this response interfaces with offsite response actions.

This Emergency Plan is only a part of the overall response to an emergency at Vermont Yankee. Each community within about a 10-mile radius of the plant and the states (Massachusetts, New Hampshire, and Vermont) have developed emergency response plans to be implemented if the need arises. In addition, federal agencies have specified their nuclear power plant emergency response roles and capabilities in the National Response Framework (January 2008).

The objective of this document is to outline the overall response of the Company to an emergency at the site. If an abnormal situation develops, automatic initiation of plant safety systems takes place and plant operators take corrective action according to specific emergency operating procedures. The purpose of these emergency operating procedures is to describe corrective actions necessary to restore normal plant safety margins. The emergency operating procedures also lead to the activation of the Emergency Plan in accordance with a prescribed set of emergency implementing procedures. The Emergency Plan summarizes Vermont Yankee's emergency implementing procedures and thereby the overall response to an emergency at the site.

Emergency Plan Revision 54 Page 1 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

2.0 DEFINITIONS Alert - Events are in process or have occurred which involve an actual or potential substantial degradation of the level of safety of the plant or a security event that involves probable life threatening risk to site personnel or damage to site equipment because of HOSTILE ACTION. Any releases are expected to be limited to small fractions of the EPA Protective Action Guideline exposure levels.

Assessment Actions - Those actions which are take to effectively define the emergency situation necessary for decisions on specific emergency measures.

Code Red - A Security related contingency requiring the activation of the Security Response Team. This contingency shall, as a minimum cause a Notification of Unusual Event to be announced.

Committed Dose Equivalent (CDE) - The dose equivalent to organs or tissues of reference (e.g., thyroid) that will be received from an intake of radioactive material by an individual during the 50 year period following the intake.

Confinement Boundary - The barrier(s) between areas containing radioactive substances and the environment.

Corrective Actions - Those emergency measures taken to ameliorate or terminate an emergency situation.

Emergency Action Levels - Specific instrument readings, system or event observation and/or radiological levels which initiate event classification, notification procedures, protective actions, and/or mobilization of the emergency response organization. These are specific threshold readings or observations indicating system failures or abnormalities.

Emergency Assistance Personnel - Vermont Yankee personnel who are assigned a role in the Emergency Response Organization.

Emergency Classification - Emergencies are classified into four categories, NOTIFICATION OF UNUSUAL EVENT, ALERT, SITE AREA EMERGENCY and GENERAL EMERGENCY.

Emergency Implementing Procedure - Specific action taken by the plant staff to activate and implement this Emergency Plan.

Emergency Operations Centers - Areas designated by the state/local representatives as Emergency Plan assembly areas for their respective staffs.

Emergency Operating Procedures - The outline of specific corrective actions to be taken by plant operators in response to abnormal operating conditions.

Emergency Plan Revision 54 Page 2 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Emergency Operations Facility - A center established to coordinate the deployment of emergency response personnel, to evaluate offsite accident conditions and to maintain communications with offsite authorities.

Emergency Planning Zone - The areas for which planning is recommended to assure that prompt and effective actions can be taken to protect the public in the event of an accident. The two zones are the 10-mile radius plume exposure pathway zone and the 50-mile radius ingestion pathway zone.

Emergency Response Organization - Organization comprised of Emergency Assistance Personnel who would respond and assist in a classified emergency situation.

Engineering Support Group - An engineering group established to provide emergency support for plant assessment and recovery operations.

Gai-Tronics - An intra-site station operation and public address system which consists of speakers and microphones located in areas vital to the operation of the station. The system has four channels which provide separate and independent page and intercommunication capabilities.

General Emergency - Events are in process or have occurred which involve actual or imminent substantial core degradation or melting with potential for loss of containment integrity or HOSTILE ACTION that results in an actual loss of physical control of the facility.

Releases can be reasonably expected to exceed EPA Protective Action Guideline exposure levels offsite for more than the immediate site area.

Hostile Action - An act toward an NPP or its personnel that includes the use of violent force to destroy equipment, takes hostages, and/or intimidates the licensee to achieve an end. This includes attack by air, land, or water using guns, explosives, projectiles, vehicles, or other devices used to deliver destructive force. Other acts that satisfy the overall intent may be included. HOSTILE ACTION should not be construed to include acts of civil disobedience or felonious acts that are not part of a concerted attack on the NPP.

Non-terrorism-based EALs should be used to address such activities, (e.g., violent acts between individuals in the owner controlled area).

Hostile Force - One or more individuals who are engaged in a determined assault overtly or by stealth and deception, equipped with suitable weapons capable of killing, maiming, or causing destruction.

Independent Spent Fuel Storage Installation (ISFSI) - A complex that is designed and constructed for the interim storage of spent nuclear fuel and other radioactive materials associated with spent fuel storage.

Ingestion Exposure Pathway - The pathway in which individuals receive a radiation dose due to internal deposition of radioactive materials from ingestion of contaminated water, foods, or milk.

Emergency Plan Revision 54 Page 3 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Joint Information Center - A center dedicated to the news media for the purpose of disseminating and coordinating information concerning accident conditions. Activities conducted within this center will be the responsibility of the Company Spokesperson.

Notification of Unusual Event - Events are in process or have occurred which indicate a potential degradation of the level of safety of the plant or indicate a security threat to facility protection has been initiated. No releases of radioactive material requiring offsite response or monitoring are expected unless further degradation of safety systems occurs.

Operations Support Center - An emergency center established for available skilled emergency personnel (i.e., additional operations and support personnel). The Operations Support Center Manager directs activities within this center.

Plume Exposure Pathway - The pathway in which individuals receive a radiation dose due to: a) whole body external exposure due to gamma radiation from the plume and from deposited material; and b) inhalation exposure from the passing radioactive plume.

Projected Dose - This is the amount of radiation dose estimated at the onset of any accidental radiological release. It includes all the radiation dose the individual would receive for the duration of the release assuming that no protective measures were undertaken.

Protective Action - Those emergency measures taken to effectively mitigate the consequences of an accident by minimizing the radiological exposure that would likely occur if such actions were not undertaken.

Protective Action Guides - Projected radiological dose values to the public which warrant protective actions following an uncontrolled release of radioactive materials. Protective actions would be warranted provided the reduction in the individual dose is not offset by excessive risks to individual safety in implementing such actions.

Recovery Actions - Those actions taken after the emergency has been controlled in order to restore safe plant conditions.

Recovery Center - An area established within the Emergency Operations facility for the purpose of planning recovery actions. The Emergency Director directs the activities of this center.

Severe Accident Management - Process that management uses to evaluate and respond to an accident that has deteriorated to a condition where the EOPs are exited and the Severe Accident Guidelines are used.

Site - That property within the fenced boundary of Vermont Yankee which is owned by the Company.

Site Area Emergency - Events are in process or have occurred which involve an actual or likely major failures of plant functions needed for protection of the public or HOSTILE Emergency Plan Revision 54 Page 4 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

ACTION that results in intentional damage or malicious acts; (1) toward site personnel or equipment that could lead to the likely failure of or; (2) that prevent effective access to equipment needed for the protection of the public. Any releases are not expected to result in exposure levels which exceed EPA Protective Action Guideline exposure levels beyond the site boundary.

Technical Support Center - An in-plant center established in close proximity to the Control Room that has the capability to acquire plant parameters for post-accident evaluation by technical and recovery assistance personnel. The Emergency Plant Manager directs activities within this center.

Total Effective Dose Equivalent (TEDE) - The sum of the deep dose equivalent from external sources and the committed effective dose equivalent from internal exposures.

Unusual Event (Terminated) - A condition that warrants a Notification of Unusual Event declaration, but was immediately rectified, such that the condition no longer existed by the time of declaration. The event or condition did not affect personnel onsite or the public offsite, or result in radioactive releases requiring offsite monitoring.

Emergency Plan Revision 54 Page 5 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

3.0

SUMMARY

OF EMERGENCY PLAN 3.1. Objectives Safety systems at Vermont Yankee are designed to prevent and/or mitigate accidental radioactive releases. Accordingly, the probability for a release of radioactivity resulting in a public hazard is very small. As a precautionary measure, however, this Emergency Plan specifies response actions if the safety systems are degraded or fail.

The purpose of this Emergency Plan is to classify emergencies according to severity, to assign responsibilities, and to clearly outline the most effective actions to safeguard the public and plant personnel in the unlikely event of an incident at Vermont Yankee. Detailed emergency procedures at Vermont Yankee are followed by plant personnel to notify and activate the onsite and offsite emergency organizations. These procedures are summarized in this Emergency Plan.

The basic objectives of this plan are:

1) To establish a system for identification and classification of the emergency condition and initiation of response actions;
2) To establish an organization for the direction of activity within the plant to limit the consequences of the incident;
3) To establish an organization for control of onsite and offsite surveillance activities to assess the extent and significance of any uncontrolled release of radioactive material;
4) To identify facilities, equipment and supplies available for emergency use;
5) To establish an engineering support organization to aid the plant personnel in limiting the consequences of and recovery from an event;
6) To establish the basic elements of an emergency recovery program;
7) To specify a system for coordination with federal, state, and local authorities and agencies for offsite emergency response;
8) To develop a communications network between the plant and offsite authorities to provide prompt notification of emergency situations;
9) To develop a training and Emergency Plan exercise program to assure constant effectiveness of the plan; and
10) To keep the public informed in a timely manner to preclude misinformation and bolster confidence in the emergency response.

Emergency Plan Revision 54 Page 6 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Emergencies at nuclear power plants are classified into the following four major categories (as set forth in Section 5.0): Notification of Unusual Event, Alert, Site Area Emergency, and General Emergency. Depending on the emergency classification, different levels of plant and offsite response are required. Activation of emergency facilities takes place in accordance with the classification of emergency response.

3.2. Actions In An Emergency If an emergency condition develops, the Shift Manager, or the senior licensed individual in the Control Room, assumes the responsibilities for initiating emergency actions to limit the consequences of the incident and to bring the plant into a stable condition. The individual must:

1) Recognize the emergency condition by observation of Emergency Action Levels;
2) Classify the accident in accordance with the emergency classification system;
3) Initiate emergency operating procedure(s) applicable to the event;
4) Activate the plant emergency alarm system;
5) Notify state authorities in Vermont, New Hampshire and Massachusetts using the Emergency Notification System;
6) Notify the NRC using the Emergency Notification System;
7) Use the emergency notification system to notify appropriate personnel as set forth in Figure 9.1 and Table 9.1;
8) Depending on the emergency classification, initiate the procedures which activate the Technical Support Center, the Emergency Operations Facility/Recovery Center, the Operations Support Center, and the Joint Information Center; and
9) Direct and coordinate all emergency response efforts until overall responsibility is assumed by the Emergency Director.

3.3. Emergency Response Facilities The emergency response facilities, which are utilized by the emergency response organization, are described in Section 6.0. Depending on the emergency classification, different facilities are activated and utilized. Key site and offsite personnel are quickly dispatched to these facilities to perform accident assessments, implement corrective actions, analyze accident data, and provide public information support.

Emergency Plan Revision 54 Page 7 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

3.4. Mobilization The mobilization scheme is based on the emergency notification system shown in Figure 9.1. Table 9.1 identifies the personnel notified. The notification system utilizes the plant public address system (Gai-Tronics), dedicated telephone lines, and radio pager devices (beepers) to notify and mobilize personnel. Key Vermont Yankee and support personnel carry pagers to expedite the mobilization process during off-hours. Depending upon the emergency classification, different levels of mobilization are implemented. The mobilization scheme ensures that specific technical disciplines identified by Table B-1 of NUREG-0654 can be augmented within appropriate time frames. Table 8.4 outlines the minimum staffing requirements for the Emergency Response Organization at Vermont Yankee. Table 9.1 summarizes the response to the four classes of emergencies described in Section 5.0.

3.5. State Government Notification and Response Vermont Yankee's Emergency Plan interfaces with the state emergency response plans of Vermont, New Hampshire and Massachusetts. Local town governments, in coordination with the emergency management agencies of these states, have plans, which if the need arises, contain instructions to carry out specific protective measures dependent upon various emergency conditions.

Vermont Yankee is responsible for conveying specific accident information, radiological assessment information, and protective action recommendations to the State of Vermont, State of New Hampshire, and Commonwealth of Massachusetts. It is the responsibility of each respective state Department of Public Health to evaluate this information and make appropriate recommendation regarding public protective actions in accordance with their plans and procedures.

A cooperative arrangement exists among the Vermont, New Hampshire and Massachusetts State authorities and Vermont Yankee Nuclear Power Station concerning radiological emergency preparedness. Vermont Yankee's emergency classification system and notification messages are reviewed and approved by these states in accordance with the terms specified in the Letter of Agreement found in Appendix E. Each state is committed to dispatching representatives to the plant's Emergency Operations Facility/Recovery Center when conditions warrant. Vermont Yankee's Joint Information Center provides the opportunity for joint utility, state and federal press briefings to be held.

Emergency Plan Revision 54 Page 8 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

3.6. Federal Government Notification and Response As soon as an event is classified into one of the four categories of emergencies, notification to the NRC is made using the Emergency Notification System. Once notified of an emergency, the NRC evaluates the situation and determines the appropriate NRC response. Depending on the severity of the accident and the emergency classification declared, the NRC activates their incident response operations in accordance with the NRC Incident Response Plan. The NRC notifies the Federal Emergency Management Agency (FEMA) and other appropriate federal agencies to activate the federal emergency response organization in accordance with the National Response Framework (NRF). The NRF makes available the resources and capabilities of federal agencies to support plant, state and local governments. Principal participants are the NRC, FEMA, Department of Energy (DOE), and Environmental Protection Agency (EPA).

3.7. Technical Support Technical and manpower support are provided to the Vermont Yankee plant through support plans listed in Appendix G. Support beyond this level is arranged through the Institute of Nuclear Power Operations (INPO).

Emergency Plan Revision 54 Page 9 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

4.0 THE AREA 4.1. The Site Vermont Yankee Nuclear Power Station is located on the west bank of the Connecticut River immediately upstream of the Vernon Hydrostation, in the town of Vernon, Vermont.

The Vermont Yankee Nuclear Power Station is a boiling water reactor having a thermal rated power of 1912 MWt. The station, shown in Figure 4.1, is located on about 125 acres in Windham County, and is owned by Entergy, with the exception of a narrow strip of land between the Connecticut River and the Vermont Yankee property for which it has perpetual rights and easements from the owner, New England Power Company.

4.2. Area Characteristics, Land Use and Demography The site, also shown in Figure 4.1, is bounded by the Connecticut River (Vernon Pond) on the east, by farm and pasture land mixed with wooded areas on the north and south, and by the town of Vernon on the west. Warwick and Northfield State Forests (approximately 8 miles southwest of the site), Green Mountain National Forest (approximately 18 miles southwest of the site) and the Pisgah Mountain Range (northeast of the site) limit the population density and land use within a 50-mile radius of the site. Most of the land around the site is undeveloped. Table 4.1 characterizes the land use within 25 miles of the plant.

The developed land is used for agricultural, dairying, and for residential areas within small villages. The primary agricultural crop is silage corn, which is stored for year-round feed for milk cows.

The nearest house is 1,300 feet from the Reactor Building and is one of several west of the site. The Vernon Elementary School (approximate enrollment of 250 pupils) is about 1,500 feet from the Reactor Building. The nearest hospital, Brattleboro Memorial, is approximately five (5) miles north-northwest from the site. The nearest dairy farm is approximately 1/2-mile northwest of the site. Additional dairy farms are located within a 5-mile radius of the plant. The largest sports facility in the vicinity is the Hinsdale Raceway, located approximately three (3) miles from the site. For racing events, the average attendance is approximately 4,000. A nursing home is located 2 miles south of the plant.

These areas have been noted since they have required special planning consideration by offsite authorities in the event of a radiological emergency at Vermont Yankee.

Figure 4.2 shows an overall perspective of the area within 50 miles of Vermont Yankee.

The average population density within a 10-mile radius of Vermont Yankee for 2000 was estimated to be 126 people per square mile. Figures 4.3, 4.4, and 4.5 provide the 2000 population distribution within a 5-, 10-, and 50-mile radius of the Vermont Yankee Nuclear Power Station. Table 4.2 summarizes these data.

Emergency Plan Revision 54 Page 10 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

4.3. Emergency Planning Zones The NRC/EPA Task Force Report on Emergency Planning, "Planning Basis for the Development of State and Local Government Radiological Emergency Response Plans in Support of Light-Water Nuclear Power Plants" (NUREG-0396) established the size of planning zones for which predetermined emergency actions should be prepared. These planning zones were selected based upon the knowledge of the potential consequences, timing and release characteristics of a spectrum of accidents (including core melt scenarios), regardless of the low probability of occurrence. As a result, an Emergency Planning Zone concept was developed, both for short-term plume exposure and for the longer-term ingestion exposure pathways.

Emergency Planning Zones (EPZs) are defined as the areas for which planning is needed to assure that prompt and effective actions can be taken to protect the public in the event of an accident. The size of the Emergency Planning Zones represents the extent of detailed planning which should be performed to assure an adequate response. Dependent upon the severity of the accident, protective actions are generally limited to only portions of the designated EPZs, but as the need arises, actions are undertaken for the entire zones.

As a means of defining selected areas within the planning zones, Vermont Yankee divides the planning zones into sectors of 22 1/2 degrees centered on the 16 standard compass directions (see Figure 4.6). Each sector is identified by a letter ("I" and "O" are not used) and/or the standard compass direction. Distance from the plant is defined in terms of miles radially outward from the plant.

Vermont Yankee, for the purpose of radiological protection, is responsible for exercising direct control over the emergency activities within the exclusion area shown in Figure 4.1.

Means of controlling access on the river is the responsibility of the State of New Hampshire.

In accordance with the recommended planning bases, Vermont Yankee has expanded its previous planning considerations by defining two Emergency Planning Zones. The plume exposure EPZ, shown in Figure 4.7, is an area designated by the jurisdictional boundaries of those communities which are within a radial distance of 10 miles from the plant site. The size of the zone is based on the following considerations: 1) projected doses estimated for most accidents would not exceed the EPA Protective Action Guides outside the zone; 2) detailed planning within this area would provide a substantial base for expansion of response efforts in the event that it is necessary; 3) planning within this area recognizes all jurisdictional restraints imposed by the zone designation. Table 4.3 lists the local communities that are affected by this designation, the wind direction which would potentially affect these communities if a release occurs, and the sector/distance identification representing each of these communities. As specified in the state plans, communities within the plume exposure EPZ are alerted if a major accident at Vermont Yankee occurs. Communities within this zone have their own local radiological response plans.

Emergency Plan Revision 54 Page 11 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

The ingestion exposure pathway Emergency Planning Zone, shown in Figure 4.8, is an area within a 50-mile radius from the plant site. The size of the zone is based on the fact that the downwind range within which significant contamination could occur would generally be limited to this distance because of wind shifts and travel periods. In addition, projected doses from contamination outside this zone would not exceed the Department of Health and Human Services' ingestion pathway Protective Action guides. Four states (Vermont, New Hampshire, Massachusetts, and New York) are responsible for coordinating and implementing protective actions within this area. Precautionary measures relative to livestock feeds, milk products, garden produce, and potable water supplies are implemented in this area to the extent dictated by the release conditions.

Emergency Plan Revision 54 Page 12 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

TABLE 4.1 TABLE OF LAND USE (Square Miles)

Distance from Site Land Use 0-10 Miles 10-25 Miles 1-25 Miles Residential 30.2 79.2 109.4 Commercial and Industrial 1.3 7.7 9.0 Agricultural 25.9 143.8 169.7 Road 6.0 21.6 27.6 Public 7.2 78.3 85.5 Undeveloped 243.4 1318.4 1561.8 TOTAL 314.0 1649.0 1963.0 Emergency Plan Revision 54 Page 13 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

TABLE 4.2 2000 POPULATION DISTRIBUTION WITHIN THE 50-MILE EPZ OF VERMONT YANKEE POPULATION TOTALS BY ZONE Ring Cumulative Miles Population Miles Population 0-1 489 0-1 489 1-2 2496 0-2 2985 2-3 1937 0-3 4922 3-4 1556 0-4 6478 4-5 3441 0-5 9919 5-10 23954 0-10 33873 10-20 111005 0-20 144878 20-30 133847 0-30 278725 30-40 337525 0-40 616250 40-50 851123 0-50 1467373 POPULATION TOTALS BY SECTOR Total Population Total Population Sector 0-50 Miles Sector 0-50 Miles A (N) 46204 J (S) 458553 B (NNE) 36424 K (SSW) 120057 C (NE) 45230 L (SW) 32609 D (ENE) 50939 M (WSW) 78287 E (E) 92389 N (W) 44288 F (ESE) 188701 P (WNW) 31855 G (SE) 141941 Q (NW) 17512 H (SSE) 60442 R (NNW) 21912 Emergency Plan Revision 54 Page 14 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

TABLE 4.3 VERMONT YANKEE "PLUME EXPOSURE" EMERGENCY PLANNING ZONE (10 MILE) CONSIDERATIONS COMMUNITIES APPROPRIATE SECTOR AFFECTED BY WINDS INVOLVED IDENTIFICATION* BLOWING FROM

1. Brattleboro, VT P (7-10), R and Q (4-10) ESE - S
2. Dummerston, VT R and A (8-10) SE - SSW
3. Guilford, VT L (3-5), M, N and P (2-9), Q (3-6) NNE - SSE
4. Halifax, VT M (9-10), N and P (8-10) ENE - SE
5. Vernon, VT F (0-2), G and H (0-4), J (0-3), K and L (0-4), M, N, and P (0-3), Q and R (0-4) ALL DIRECTIONS
1. Chesterfield, NH A and B (5-10), C (6-10) SSE - WSW
2. Hinsdale, NH R, A, and B (0-6), C (0-4), D and E (0-3), F (1-4), G (2-5) ALL DIRECTIONS
3. Richmond, NH D, E, and F (9-10) WSW - WNW
4. Swanzey, NH C (8-10), D (9-10) SSW - W
5. Winchester, NH R (6-8), A and B (5-10), C (6-10) S - NW
1. Bernardston, MA J (3-9), K (3-10), L (3-8) NNW - ENE
2. Colrain, MA L and M (9-10) NNE - E
3. Gill, MA H and J (7-10) NNW - NNE
4. Leyden, MA K (7-10), L and M (5-10) N-E
5. Northfield, MA G (4-10), H (3-10), J (3-7) WNW - NNE
6. Warwick, MA F and G (6-10) W - NNW
7. Greenfield, MA J and K (8-10) N - NE
  • Numbers in parentheses represent approximate miles from plant.

Emergency Plan Revision 54 Page 15 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Figure 4.1 Vermont Yankee Site Emergency Plan Revision 54 Page 16 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Figure 4.2 Population Center and Special Interest Areas Within the 50 Mile EPZ Emergency Plan Revision 54 Page 17 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Figure 4.3 2000 Population Distribution Within 0 - 5 Miles of Vermont Yankee Emergency Plan Revision 54 Page 18 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Figure 4.4 2000 Population Distribution Within 0 - 10 Miles of Vermont Yankee Emergency Plan Revision 54 Page 19 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Figure 4.5 2000 Population Distribution Within 10 - 50 Miles of Vermont Yankee Emergency Plan Revision 54 Page 20 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

NOTE: Each sector is 221/2° and is designated by either a letter ("i" and "O" not used) or a standard compass direction identification.

Figure 4.6 Sector Nomenclature for Vermont Yankee Plume Exposure EPZ Emergency Plan Revision 54 Page 21 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Figure 4.7 Vermont Yankee Plume Exposure Emergency Planning Zone Only those portions of the communities that are within a 10-mile radius have been covered by the Public Notification System. All communities within this EPZ Boundary designation have developed an emergency plan.

Emergency Plan Revision 54 Page 22 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Figure 4.8 Vermont Yankee 50 Mile Ingestion Pathway Emergency Planning Zone Emergency Plan Revision 54 Page 23 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

5.0 EMERGENCY CLASSIFICATION SYSTEM The wide spectrum of component or system failures, or other occurrences that could potentially reduce plant safety margins, needs to be categorized. For this reason, a classification system has been defined which categorizes incidents according to severity into the following four classes: Notification of Unusual Event, Alert, Site Area Emergency, and General Emergency.

The incidents leading to each of the four emergency classifications are further identified by certain measurable and observable indicators of plant conditions called Emergency Action Levels (EALs) listed in Appendix A. Emergency Action Levels defined in Appendix A aid the operator in recognizing the potential of an incident immediately and assure that the first step in the emergency response is carried out. The classification of the event may change as the conditions change.

The VY EALs and EAL bases were derived from example initiating conditions in NUMARC/NESP-007 (NEI 99-01), "Methodology for Development of Emergency Action Levels", Rev. 5, dated February 2008. The EALs and bases have been modified in accordance with Letter USNRC to VYNPS, "Vermont Yankee Nuclear Power Station -

Safety Evaluation for Emergency Action Levels (TAC No. MD9157)", dated June 16, 2009.

5.1. Notification of Unusual Event EVENTS ARE IN PROCESS OR HAVE OCCURRED WHICH INDICATE A POTENTIAL DEGRADATION OF THE LEVEL OF SAFETY OF THE PLANT OR INDICATE A SECURITY THREAT TO FACILITY PROTECTION HAS BEEN INITIATED. NO RELEASES OF RADIOACTIVE MATERIAL REQUIRING OFFSITE RESPONSE OR MONITORING ARE EXPECTED UNLESS FURTHER DEGRADATION OF SAFETY SYSTEMS OCCURS.

Notification of Unusual Event conditions do not cause serious damage to the plant and may not require a change in operational status. The purpose of the Notification of Unusual Event declaration is to: 1) ensure that the first step in any response later found to be necessary has been carried out; 2) bring the operating staff to a state of readiness; and 3) ensure that appropriate offsite notifications have been made in the event that additional support is required.

See Appendix A for a complete list of Emergency Action Levels corresponding to a Notification of Unusual Event.

Emergency Plan Revision 54 Page 24 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

5.1.1. Unusual Event (Terminated)

If a condition that warrants a Notification of Unusual Event declaration has occurred, and was immediately rectified such that the condition no longer existed by the time of declaration, this Notification of Unusual Event classification is referred to as an Unusual Event (Terminated).

The event or condition did not affect personnel onsite or the public offsite, or result in radioactive releases requiring offsite monitoring.

5.2. Alert EVENTS ARE IN PROCESS OR HAVE OCCURRED WHICH INVOLVE AN ACTUAL OR POTENTIAL SUBSTANTIAL DEGRADATION OF THE LEVEL OF SAFETY OF THE PLANT OR A SECURITY EVENT THAT INVOLVES PROBABLE LIFE THREATENING RISK TO SITE PERSONNEL OR DAMAGE TO SITE EQUIPMENT BECAUSE OF HOSTILE ACTION. ANY RELEASES ARE EXPECTED TO BE LIMITED TO SMALL FRACTIONS OF THE EPA PROTECTIVE ACTION GUIDELINE EXPOSURE LEVELS.

Plant response and offsite notifications associated with this event classification assure that sufficient emergency response personnel, both onsite and offsite, are mobilized and respond to event conditions. Actual releases of radioactivity which exceed Technical Specification limits may be involved, thus radiation monitoring and dose projection may be an integral portion of the emergency response required. Plant emergency response facilities are activated at this classification.

See Appendix A for a complete list of Emergency Action Levels corresponding to an Alert.

5.3. Site Area Emergency EVENTS ARE IN PROCESS OR HAVE OCCURRED WHICH INVOLVE AN ACTUAL OR LIKELY MAJOR FAILURES OF PLANT FUNCTIONS NEEDED FOR PROTECTION OF THE PUBLIC OR HOSTILE ACTION THAT RESULTS IN INTENTIONAL DAMAGE OR MALICIOUS ACTS; (1)

TOWARD SITE PERSONNEL OR EQUIPMENT THAT COULD LEAD TO THE LIKELY FAILURE OF OR; (2) THAT PREVENT EFFECTIVE ACCESS TO EQUIPMENT NEEDED FOR THE PROTECTION OF THE PUBLIC. ANY RELEASES ARE NOT EXPECTED TO RESULT IN EXPOSURE LEVELS WHICH EXCEED EPA PROTECTIVE ACTION GUIDELINE EXPOSURE LEVELS BEYOND THE SITE BOUNDARY.

Emergency Plan Revision 54 Page 25 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

The events included in this category represent a potential for offsite releases which could impact the public to the extent that protective actions may be necessary. The purpose of the Site Area Emergency declaration is to: 1) ensure that all plant emergency response elements are mobilized; 2) ensure that monitoring teams have been dispatched, if needed;

3) ensure that in-plant protective measures have been taken; 4) provide for direct interface with offsite governmental response organizations; and 5) provide updates for the public through offsite officials.

See Appendix A for a complete list of Emergency Action Levels corresponding to Site Area Emergency.

5.4. General Emergency EVENTS ARE IN PROCESS OR HAVE OCCURRED WHICH INVOLVE ACTUAL OR IMMINENT SUBSTANTIAL CORE DEGRADATION OR MELTING WITH POTENTIAL FOR LOSS OF CONTAINMENT INTEGRITY OR HOSTILE ACTION THAT RESULTS IN AN ACTUAL LOSS OF PHYSICAL CONTROL OF THE FACILITY. RELEASES CAN BE REASONABLY EXPECTED TO EXCEED EPA PROTECTIVE ACTION GUIDELINE EXPOSURE LEVELS OFFSITE FOR MORE THAN THE IMMEDIATE SITE AREA.

The purpose of the General Emergency declaration is to: 1) ensure that appropriate offsite officials are adequately advised as to the extent of plant degradation; 2) provide consultation with offsite authorities in establishing appropriate protective actions for the public; 3) provide updates for the public through offsite authorities; and 4) ensure that all emergency response organizations and resources are being applied to accident mitigation.

See Appendix A for a complete list of Emergency Action Levels corresponding to a General Emergency.

5.5. Emergency Classification System Review by State Authorities The emergency classification system specified above, as well as the EALs presented in Appendix A, is reviewed with the state authorities of Vermont, New Hampshire, and Massachusetts.

Emergency Plan Revision 54 Page 26 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

6.0 EMERGENCY RESPONSE FACILITIES AND EQUIPMENT Following the declaration of an emergency, the activities of the emergency response organization are coordinated in a number of emergency response facilities. Figure 4.1 shows the relative locations of Vermont Yankee's onsite emergency response facilities.

Figure 6.1 represents the locations of the offsite support organizations' Emergency Operations Centers relative to Vermont Yankee. Descriptions of Vermont Yankee facilities and assessment capabilities are presented below.

6.1. Emergency Response Facilities The emergency response organization is activated, in part or wholly, dependent upon the operating crew's recognition of Emergency Action Levels (EALs) which represent a particular emergency condition. Facility activation may be modified or suspended if the safety of personnel may be jeopardized by a security event or other event hazardous to personnel. Classification and subsequent declaration of the appropriate emergency condition by the Shift Manager transforms the Control Room complex into an emergency control center. Initially, the Control Room crew coordinates all phases of emergency response and corrective action required to restore the plant to a safe condition. The Control Room staff's attention focuses on regaining plant control as emergency response personnel report and are delegated emergency functions. The following describe each emergency response facility location.

6.1.1. Technical Support Center A Technical Support Center (TSC) has been established to direct post-accident evaluation and assist in recovery operations of the plant. The TSC is located on the second floor of the Administration Building in close proximity to the Control Room and is radiologically habitable to the same degree as the Control Room for postulated accident conditions. This center is established under the supervision of the Emergency Plant Manager and staffed by members of the TSC organization shown in Figure 8.3. A portion of the TSC, as shown in Figure 6.2, is assigned for NRC Incident Response Team members who may be dispatched to the plant. The TSC has the capability to monitor various plant parameters needed to evaluate accident conditions by accessing the plant process computer and using the diagnostic capability that its staff offers. The TSC staff can access more computer capabilities through the support plans listed in Appendix G.

Emergency Plan Revision 54 Page 27 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Upon activation, the TSC provides the main communication link between the plant, the Control Room, the NRC and the Emergency Operations Facility/Recovery Center. Details of this communications capability are described in Section 7.0. The plant print files are located within the TSC boundary, and contain pending and as-built system and equipment drawings, system flow diagrams, isometrics, cable/wiring diagrams, equipment outline drawings, UFSAR, Emergency Plan and plant procedures.

The TSC is activated by the Emergency Plant Manager when a plant condition exists which requires ongoing technical evaluation (i.e., Alert, Site Area or General Emergency conditions). The TSC may be activated by the Emergency Plant Manager under a Notification of Unusual Event if conditions warrant such an action. The TSC has the capability to assess radiological conditions. This assessment capability consists of monitoring for direct radiation and airborne particulates, and sampling and analysis for airborne radioiodine. Appendix B lists emergency equipment found in the TSC.

If staffing of the TSC is not possible due to a security event or other hazardous conditions, ERO personnel will be notified to report to an alternate location.

The TSC is deactivated by the Emergency Director or the Emergency Plant Manager, depending on the emergency class, when the plant conditions have stabilized such that continuous technical assessment is no longer required.

6.1.2. The Operations Support Center The Operations Support Center (OSC), which is located on the first floor of the Administration Building, provides a general assembly area for Chemistry, Radiation Protection, Maintenance, Operations, and I&C Personnel (see Figure 6.3). It is staffed with sufficient in-plant personnel required to effect protective and corrective actions in support of the emergency situation. An Operations Support Center Manager directs the activities of this center. In-plant phone extensions and a page/intercom system provide communication capability at the OSC. Emergency equipment listed in Appendix B has been provided with additional back-up capability provided at the Radiation Protection control point. If conditions warrant evacuation of this center, the Emergency Operations Facility/Recovery Center assumes OSC functions. The OSC remains active and staffed until terminated by the Emergency Plant Manager.

If staffing of the OSC is not possible due to a security event or other hazardous conditions, ERO personnel will be notified to report to an alternate location.

Emergency Plan Revision 54 Page 28 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

6.1.3. Emergency Operations Facility/Recovery Center The Emergency Operations Facility/Recovery Center (EOF/RC) is located at the Vermont Yankee Training Center on Old Ferry Road in Brattleboro, Vermont, approximately 8.75 miles from the plant site (See Figure 6.1). The EOF has a radiation protection factor of 5 and a ventilation system equipped with HEPA filters which can be isolated. The Commission has approved this as the primary facility with no backup up EOF necessary.

(NVY 84-44, February 27, 1984) The EOF, with communication capabilities for contacting the Control Room and plant Security, is available to serve as a staging area for augmented emergency response staff if the site is under threat of or experiencing hostile action. The overall responsibility for the functions performed in the EOF/RC belongs to the Emergency Director.

The Emergency Director acts as the principal spokesperson for Vermont Yankee concerning all issues where an interface with offsite government authorities is required.

The Radiological Assessment Coordinator is responsible for continuous evaluation of all licensee activities related to an emergency having, or potentially having, environmental radiological consequences. The EOF/RC has sufficient space and design to accommodate the emergency response organization and responding representatives from government and industry who are responsible for limiting offsite consequences (see Figure 6.4). The EOF/RC provides information needed by federal, state, and local authorities for implementation of their offsite Emergency Plans, and a centralized meeting location for key representatives from the agencies.

The EOF/RC maintains extensive communications capability with all emergency response facilities. Section 7.0 details the extent of this capability. Site access and control, dose assessment, sample analysis, decontamination, and recovery planning activities are directed from various locations within the EOF/RC. The EOF/RC serves as the primary evacuation, re-assembly, and off-duty augmentation personnel assembly point. Public information statements concerning the plant emergency status are transmitted from the EOF/RC to the Joint Information Center for release to the public.

The following copies of emergency planning documents are available in the EOF/RC:

Site Emergency Plan and Implementing Procedures Area Maps State and Local Emergency Plans UFSAR Emergency equipment and supplies are maintained at the EOF/RC, including equipment necessary to assess radiological habitability. This consists of monitoring for direct radiation and sampling and analysis for airborne radioparticulates and radioiodine. For a list of EOF/RC emergency equipment, see Appendix B.

Emergency Plan Revision 54 Page 29 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

6.1.4. Deleted 6.1.5. Joint Information Center The Joint Information Center (JIC) provides a centralized location for conducting joint state, federal and Vermont Yankee emergency news briefings in a manner to avoid hampering ongoing emergency response proceedings. It is expected that state and federal public information personnel will operate from the JIC.

The initial designated location of the JIC is the Vermont Yankee Office Building located in Brattleboro, Vermont. If accident conditions (plume trajectory) jeopardize the habitability of this facility, the alternate JIC at Landmark College in Putney, Vermont would be utilized.

At the JIC, the Company Spokesperson coordinates the generation and issuance of press releases concerning plant emergency conditions to the media. Prior to their release to the media, the Emergency Director approves releases.

The JIC will be activated upon an emergency classification of an Alert or higher except as noted below.

Activation of the JIC is optional prior to an Alert and is dependent on the escalation of the event and/or public interest. Prior to the activation of the JIC, the Manager of Communications or designee would be coordinating press releases from his/her routine operations location.

6.1.6. Coordination of Radiological Data Centralized coordination of the offsite radiological assessment effort with all organizations interested in and/or performing assessments is of importance to ensure that the data and its interpretation are reviewed by all parties. The number and type of organizations performing this effort vary with time and following accident declaration and offsite notification. Initially, plant emergency response personnel are the only organization performing this function and they are directed from, and their results evaluated, at the EOF/RC. State authorities join the EOF/RC monitoring and assessment activities. Federal response agencies would augment plant and state radiological assessment efforts upon their arrival.

Plant and state monitoring efforts are coordinated at the EOF/RC. All samples are screened for activity levels in the field. Positive results require additional analysis at the EOF/RC. Analysis is completed in two phases. Initially, the sample is evaluated for radioiodine concentration levels using gamma energy analyses instrumentation. Having completed this analysis, total isotopic determination of activity levels is conducted using a HPGe or equivalent system. The EOF/RC sampling capability is greatly enhanced by coordinating sample transfer and analysis with the Environmental Laboratory.

Emergency Plan Revision 54 Page 30 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

When federal resources respond, a more suitable location than the EOF/RC may be needed. As stated by the Department of Energy (DOE), the agency charged with the lead of the federal offsite monitoring resources, this effort would be established at some location in the general vicinity of the plant site that was adequate for the equipment and manpower deployed. Arrangements will be made for such a location with DOE and the states when it is required. Wherever this function is located, the basic objective is to assure monitoring efforts from all organizations are coordinated.

6.2. Assessment Capability The activation of the Emergency Plan and the continued assessment of accident conditions require extensive monitoring and assessment capabilities. The essential monitoring systems needed for recognition of abnormal events by the plant operators are incorporated in the Emergency Action Levels specified in Appendix A. This section briefly describes monitoring systems as well as other assessment capabilities.

6.2.1. Process Monitors Plant process monitors capability includes indications provided from various monitors located throughout the plant systems. Parameters monitored include pressure, temperature, flow, and equipment operating status. Vermont Yankee has also augmented these monitoring systems with the instrumentation to detect inadequate core cooling.

The manner in which process monitors are used for accident recognition and classification is given in the detailed Emergency Action Level listings in Appendix A.

6.2.2. Radiological Monitors A number of radiation monitors and monitoring systems are provided on process and effluent liquid and gaseous lines that serve directly or indirectly as discharge route for radioactive materials. These monitors, which include Control Room readout and alarm functions, exist in order that appropriate action can be initiated to limit fuel damage and/or contain radioactive material.

These monitors include:

1. Main steam line radiation monitoring system,
2. Air ejector off-gas radiation monitoring system,
3. Process and liquid effluent radiation monitors,
4. Containment atmosphere radiation monitoring system,
5. Reactor Building ventilation radiation monitoring system, and
6. Plant stack radiation monitoring system.

Specific details on these monitoring systems such as location, type, etc., are contained in the plant Updated Final Safety Analysis Report (UFSAR).

Emergency Plan Revision 54 Page 31 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

In addition to installed monitoring systems, Vermont Yankee has augmented onsite radiological assessment capability to include high-range containment and stack radiation monitoring; improved in-plant iodine detection capability; and arrangements for containment atmosphere and reactor water samples.

6.2.3. Meteorological Capability Vermont Yankee maintains a 300-foot primary meteorological tower from which the following parameters are measured:

Wind speed at the 35 and 297 foot levels, Wind direction at the 35 and 297 foot levels, Ambient temperature at the 33 foot level, and Vertical temperature difference between the 33 and 198-foot levels and the 33 and 295 foot levels.

In addition, precipitation and barometric pressure are measured on the ground.

Fifteen-minute averages of the meteorological data are automatically displayed in the Control Room and the EOF/RC. These meteorological data are used to calculate offsite dispersion parameters on a real-time basis at the EOF/RC during accident conditions.

Vermont Yankee also maintains onsite a 140 foot back-up meteorological tower from which the following parameters are measured:

Wind speed at the 100 foot level, Wind direction at the 100 foot level, and Vertical temperature difference between the 33 - and 135-foot levels.

This tower serves as a back-up to the primary tower should it fail. The meteorological data from the back-up tower are displayed on video graphic recorders located in the Control Room.

In addition, Vermont Yankee has the capability to access additional meteorological information through offsite support services. This information can be forwarded to VY dose assessment personnel upon request.

Emergency Plan Revision 54 Page 32 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

6.2.4. Fire Detection Devices Vermont Yankee has an extensive fire detection network which utilizes a combination of smoke detectors, thermal detectors, infrared detectors, ultraviolet detectors, and "rate of rise" detectors, as well as fire system status alarms as a means of providing plant operators with complete fire status information. This system is described in the Vermont Yankee Fire Protection and Appendix R Program.

These detection systems, in addition to providing alarm indications in the Control Room, activate automatic fire suppression systems in certain vital areas within the plant.

Supplementing these systems are dry chemical and CO2 extinguishers, standpipe systems, and a continuously available fire brigade.

6.2.5. Post-Accident Sampling Post-accident sampling capability provides for emergency sample collection of containment atmosphere, plant stack halogen and particulate components, and primary coolant.

Management implements radiological precautions to limit whole body exposure to 5 rem/individual for sampling and analyses conducted using these systems.

6.2.6. Facilities and Equipment for Offsite Monitoring States Emergency Management and/or the system load dispatcher provides reports concerning natural occurrences or severe weather conditions that may affect the plant area. Offsite fire departments of Vernon and Brattleboro notify the plant of any fire which might have an impact on the plant. Local Law Enforcement Agencies notify Plant Security of any situation in the area which might have an impact on the plant.

In addition to offsite monitoring equipment at the EOF/RC, Vermont Yankee maintains an offsite environmental monitoring program. Radiological environmental monitoring stations for the site and surrounding area monitor the environment under normal and accident conditions. Radiological environmental monitoring stations have been established in accordance with Technical Specification (Technical Requirements Manual) requirements.

In addition to the analytical capabilities of the EOF, Vermont Yankee has access to outside analytical assistance and laboratory facilities from other non-affected Entergy nuclear sites, State and Federal agencies and other utilities through INPO. This support may include but is not limited to the following:

Massachusetts Department of Public Health (MDPH) through the implementation of the Nuclear Incident Advisory Team (NIAT) Handbook has laboratory analysis capability at the State Contracted laboratories and those laboratories listed in the New England Interstate Radiation Assistance Plan.

Emergency Plan Revision 54 Page 33 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Other environmental monitoring and analysis support can be requested and arranged through INPO. The INPO Emergency Resources Manual includes the information necessary to locate and request specialized equipment and technical assistance in the area of offsite radiological monitoring. INPO member utilities and suppliers agree to provide assistance as outlined in the INPO Emergency Resources Manual.

The above facilities have the capability to perform laboratory analyses of various environmental samples (e.g., terrestrial, marine and air). It is also estimated that the analytical assistance and laboratory support will be able to respond within four (4) to eight (8) hours from initial notification.

Additional offsite monitoring equipment and capability can be provided by federal agencies in accordance with the Federal Radiological Emergency Response Plan. As discussed in Section 6.1.6, this additional capability is integrated into existing efforts.

Emergency Plan Revision 54 Page 34 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Figure 6.1 Location of State and Company Emergency Operating Centers around Vermont Yankee Emergency Plan Revision 54 Page 35 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Redacted Version of Document - Publicly Available Redacted Version of Document - Publicly Available Sensitive Unclassified Non-Safeguards Information Redacted Emergency Plan Revision 54 Page 38 of 125 Entergy Vermont Yankee Sensitive Unclassified Non-Safeguards Information Redacted Redacted Version of Document - Publicly Available

7.0 COMMUNICATIONS The plant staff has available various means of communication systems for effective communications and coordination with offsite and onsite response organizations and/or teams.

A summary of the communication systems is defined in the communication matrix provided in Table 7.1 and outlined below.

7.1. InForm Notification System The InForm Notification System is located in the Control Room and the Emergency Operations Facility. InForm consists of source and destination computers that take advantage of the internet to send Emergency Notification Forms to the States of Vermont, New Hampshire and Massachusetts during a declared emergency.

This system is staffed on a 24-hour basis on both ends - the Control Room and the State Police dispatching points. The activation of the public notification system starts with this 24-hour State Police link. InForm performs self checks every 10 seconds.

Backup to the InForm Notification System is the Nuclear Alert System.

7.2. Nuclear Alert System The Nuclear Alert System (NAS), originating in the Control Room, is a system of dedicated phone circuits independent of the normal land line phone system. The NAS can be used to notify the State Police of Vermont, Massachusetts, and New Hampshire of any emergency.

This system is a secure (dedicated) communications arrangement and is installed for the primary purpose of initial notification of the States, via State Police, by the plant operators.

This system is staffed on a 24-hour basis on both ends - the Control Room and the State Police dispatching points. The activation of the public notification system starts with this 24-hour State police link. NAS is tested monthly between the plant and the State Police agencies.

The Nuclear Alert System also links the Control Room, the Emergency Operating Centers and Incident Field Offices of Massachusetts, New Hampshire, and Vermont, and the Emergency Operations Facility/Recovery Center (EOF/RC). This communication system incorporates all the principal emergency response centers into a single dedicated network.

The Nuclear Alert System network is shown in Figure 7.1 (Control Room Link) and in Figure 7.2 (EOF/RC Link).

Backup to the NAS phone system is the commercial phone system.

Emergency Plan Revision 54 Page 39 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

7.3. Utility Microwave and Radio Systems The Utility Microwave and Radio Systems are located in the Control Room. The Utility Microwave is a line-of-sight dedicated system used to notify system load dispatchers of emergency conditions at the plant. The telephone has buttons marked for each load dispatcher. By pushing one of the buttons on the telephone, it rings automatically at the selected location. In the event that communications fail with the NRC due to loss of the commercial telephone system, the load dispatchers are advised that Vermont Yankee will use the Utility Microwave System to provide updates of plant conditions to NRC Region I.

The Utility Radio Net is used as an alternate means of notifying load dispatchers. Load dispatchers have 24-hour manning capability at their organizations. The systems are tested once a week with both organizations.

7.4. Mobile UHF Radio System The Mobile UHF Radio System is utilized as a primary means of communications for offsite monitoring teams and security personnel; it is the alternate means of communications between the EOF/RC, the Control Room, TSC, and onsite response teams. The System consists of 100-watt UHF repeaters with high gain antennas. These repeaters are activated by any of the six base radio stations located in the Control Room, Secondary Alarm System (SAS), TSC, Security Gate 1 and CAS, and the EOF/RC. Also, the portable units activate the repeater. In the event the repeater fails, a "talk around" feature allows continued communications between portable units. This system is tested daily through operational use of the system.

Security also has the capability to contact via radio the Windham County Sheriff Dispatcher and any Vermont State Police Patrol Vehicle(s) located in close proximity to the plant.

7.5. Plant Intercom System The Intercom System (Gai-Tronics) is located in many areas throughout the plant, including the Control Room, Technical Support Center, Operations Support Center and Security Gates 1 and 2. This system consists of four channels and is utilized as a paging system during normal operations. During emergency situations, the system is used as the primary means for: (1) notifying plant personnel of the emergency, (2) coordinating the activities of onsite response teams with the Technical Support Center; (3) coordinating activities between Control Room and the Technical Support Center; (4) calling for any missing or unaccounted for personnel that may be in the plant; and (5) communicating between the plant emergency response facilities. This system is in continuous daily use.

7.6. NRC Telephone System The NRC has utilized the Federal Telecommunications System (FTS) telephone network for its emergency telecommunications system. The FTS system provides a separate (public cannot access) government telephone network which avoid potential public telephone blockage which may occur in the event of a major emergency.

Emergency Plan Revision 54 Page 40 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

The Emergency Notification System (ENS) utilizes an FTS line which exists between the NRC Operations Office in Rockville, Maryland and the Control Room, with extensions in the Communications Room and the NRC Room (NRC Resident Inspector's Office) of the Technical Support Center. This line is tested daily by the NRC and has a 24-hour manning capability at both organizations.

The Emergency Notification System (ENS) also utilizes a separate FTS line between the NRC Operations Office in Rockville, Maryland and the EOF/RC.

The Health Physics Network (HPN) which utilizes separate FTS lines from the TSC and EOF/RC, allows Vermont Yankee to transmit health physics and environmental information to the NRC through the Operations Center in Rockville, Maryland in a radiological event.

7.7. Commercial Telephone System The commercial telephone system is used as a primary and alternate means of communications for notification and coordination. For conditions involving telephone company equipment blockage in the local area, alternate external telephone line arrangements have been made available to the plant.

7.8. Emergency Power Supply for Communications Currently there are several telephone and other emergency communication channels (Gai-Tronics, radio network, and microwave) located within the plant that are connected to an emergency or redundant power supply. All emergency communications (including all phones) located within the plant are connected to an emergency or redundant supply.

There are power fail phones located in the EOF/RC, TSC, and Control Room, which will automatically activate if power is lost to the internal telephone system.

7.9. Facsimile Transmission High speed, quality facsimile equipment is located at the Technical Support Center (TSC),

Operations Support Center (OSC), Emergency Operations/Recovery Center, Joint Information Center (JIC), and each respective state's Emergency Operation Center (EOC).

This is used to transmit pertinent data and information concerning the emergency among these facilities.

Emergency Plan Revision 54 Page 41 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

7.10. Emergency Response Data System The Emergency Response Data System (ERDS) is a direct real-time electronic transmission of the following types of parameters to the NRC to assist them in monitoring the status of an emergency:

Core and coolant system data, Containment building data, Radioactivity release data, and Site meteorological data.

Vermont Yankee maintains a continuous ERDS connection with the NRC Operations Center.

Emergency Plan Revision 54 Page 42 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

TABLE 7.1 VERMONT YANKEE EMERGENCY COMMUNICATIONS MATRIX CALLING FROM CALLING TO CR TSC OSC EOF JIC Technical Support Center (TSC) 1, 4, 5, 7 - - - -

Operations Support Center (OSC) 1,7 1,7 - - -

Emergency Operations Facility (EOF) 1, 2, 4 1, 4, 10 1 - -

Joint Information Center (JIC) 1 1,10 1 1,10 -

Offsite and Site Boundary Monitors 1, 4 1, 4 1 1, 4 1 Nuclear Regulatory Commission 1, 5 1, 5, 6 1 1, 5, 6 1 State Police (VT, NH, MA) 1,2 1 1 1, 2 1 State EOCs (VT, NH, MA) 1, 2, 9 1 1 1, 2, 9, 10 1 Vermont Yankee Plant Security 1, 4, 7 1, 4, 7 1, 7 1, 4, 7 1 Vermont Yankee Emergency Response Personnel 1, 8 1, 8 1, 8 1, 8 1, 8 KEY 1 Commercial Telephone System 2 Nuclear Alert System 3 Utility Microwave 4 Mobile UHF Radio System 5 Emergency Notification System 6 Health Physics Network 7 Gai-Tronics 8 Personnel Pager System 9 Southwest Fire Radio 10 Facsimile Transmission Emergency Plan Revision 54 Page 43 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Figure 7.1 Plant to State Notification Channels Emergency Plan Revision 54 Page 44 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Figure 7.2 Coordination Channels with States Emergency Plan Revision 54 Page 45 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

8.0 ORGANIZATION This section describes how the normal plant and engineering support organization transform into an emergency response organization to effectively deal with any incident at Vermont Yankee.

8.1. Normal Plant Organization Vermont Yankee's normal operation and management organization consist of the onsite facility organization supported by the engineering and management organizations located offsite. The relationship and content of these onsite and offsite organizations are specified in the plant Technical Specifications, Technical Requirements Manual or Entergy Quality Assurance Manual.

During normal operations, the minimum staff on duty at the plant during all shifts consists of one (1) Shift Manager, one (1) Control Room Supervisor, two (2) Control Room Operators, six (6) Auxiliary Operators, one (1) Shift Technical Advisor, one (1) Radiation Protection Technician, one (1) Chemistry Technician and security personnel as indicated in Figure 8.1. The responsibility for determining the status of the plant in an emergency is assigned to the Shift Manager or, in his absence from the Control Room, to the Control Room Supervisor who has the authority and responsibility to immediately initiate any emergency actions, including emergency classification and notification. Additional personnel are available on an on-call basis to respond to plant emergencies. Corrective action and repair, as outlined in Table 8.4, is performed by Operations staff on-shift until supplemented by additional ERO staff.

8.2. Emergency Response Organization The Vermont Yankee emergency response organization is activated in part or in whole, depending upon the condition classification determined by the normal plant operations crew in the Control Room. Vermont Yankee's emergency response organization is divided into onsite and offsite elements. The Vermont Yankee Emergency Management Organization is shown in Figure 8.2. Staffing for the onsite emergency response facilities is shown in Figure 8.3 (Technical Support Center) and Figure 8.4 (Operations Support Center).

Staffing for the off-site emergency response facilities is shown in Figure 8.5 (Emergency Operations Facility/Recovery Center). All or portions of these organizations are activated depending upon the emergency classification.

Elements of the emergency response plan are activated subsequent to an emergency declaration by the Shift Manager; designated company personnel are notified and will report to designated locations. The emergency response action of the personnel already present are performed on a priority basis depending on the emergency conditions and the immediate need which those conditions dictate as determined by the onshift operations crew. The specific priorities facing the emergency response forces in the various locations cannot be pre-established. They would be specific to the nature of the emergency and variable with time as it proceeds.

Emergency Plan Revision 54 Page 46 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Plans and procedures have been put into place to ensure the timely activation of emergency response facilities. Although the response time will vary due to factors such as weather and traffic conditions, a goal of sixty (60) minutes for activation has been established for onsite emergency facilities including the EOF.

For this reason, the coordinators and managers in the emergency response facilities are charged with the responsibility of determining the priority of response functions when initially activated and assembled, and ensuring that the needed functions be performed on the basis of the priority determination. This process of prioritizing needs and addressing them accordingly is specified in the Emergency Plan's implementing procedures.

In emergency situations, the Shift Manager, Emergency Plant Manager, or OSC Manager can authorize actions, without following the complete work order process, if these actions prevent the following:

Loss of important equipment, Personnel injury, or Plant trip.

The Emergency Plant Manager and OSC Manager are responsible for updating the Shift Manager when plant systems will be taken out and returned to service.

The titles of positions in the Vermont Yankee Emergency Management Organization are shown in Figure 8.2.

Emergency Plan Revision 54 Page 47 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

8.2.1. Emergency Director The Emergency Director is a manager of Vermont Yankee who has the requisite authority, management ability, technical knowledge, and staff to manage the site emergency and recovery organization. The Emergency Director is responsible for the direction of the total emergency response and has the company authority to accomplish this responsibility.

The Emergency Director's principal responsibilities are to:

1. Assume overall responsibility, from the Shift Manager for the response actions necessary for control of the accident and protection of emergency personnel and the public;
2. Assume responsibility from the Shift Manager for offsite States' notification; (non-delegable)
3. Assume responsibility, from the Shift Manager for authorization of escalation, and de-escalation of the emergency;
4. Assume responsibility, from the Shift Manager for authorization and transmittal of offsite protective action recommendations; (non-delegable)
5. Manage all emergency elements required to restore the plant to a safe condition;
6. Coordinate accident information and assume the role of utility liaison with offsite governmental authorities;
7. Request and direct the use of outside support for recovery operations (e.g.,

equipment, manpower, services);

8. Resolve issues concerning operating license requirements with NRC representatives;
9. Approve public information releases; and
10. Perform or direct the emergency response organization manpower planning effort to assure the availability of sufficient staff to implement all necessary functions, should the emergency response efforts be over a prolonged period.

The Emergency Director or designated alternate is notified of all emergency conditions occurring at the plant. For Alert, Site Area Emergency and General Emergency conditions, the Emergency Director reports to the EOF/RC and directs the activities of the emergency response organizations throughout the emergency condition and until the recovery activities have been terminated.

Emergency Plan Revision 54 Page 48 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

8.2.2. Emergency Plant Manager The Emergency Plant Manager has direct responsibility for the conduct of operations at the plant. During an emergency situation, the Emergency Plant Manager is responsible for the overall supervision and coordination of the onsite emergency response activities and directs the activities of the Technical Support Center until the accident is terminated. The Emergency Plant Manager's primary responsibilities are to:

1. Direct the onsite activities required to restore the plant to a safe condition;
2. Provide technical accident assessment and support to terminate the accident;
3. Analyze instrument and control problems, design and coordinate the installation of short-term modifications, and define emergency operation procedures during the modification period;
4. Analyze problems in the area of system operations, determine emergency procedures related to system operations and establish shift operations support, if applicable;
5. Develop guidance for plant shift operations concerning plant protection of the reactor core;
6. Oversee the accumulation, retention, retrieval and transmission of vital plant parameters required to analyze the accident progression and subsequent termination;
7. Provide assistance to the Shift Manager or Emergency Director on the escalation and de-escalation of the emergency classification as conditions warrant;
8. Initially direct the activities of onsite and offsite teams until EOF becomes operational.

A qualified manager assumes the role of Emergency Plant Manager under all emergency conditions. To assist the Emergency Plant Manager, the TSC is staffed by representatives from the following departments as depicted in Figure 8.3:

Operations Maintenance Reactor Engineering Engineering Chemistry (in the OSC)

Radiation Protection Security (stationed at the off site command post)

Emergency Plan Revision 54 Page 49 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

8.2.3. Shift Manager The Shift Manager is the Duty Shift Manager. The alternate is the Control Room Supervisor of the assigned operating crew in the Control Room at the time of the emergency. The Shift Manager is responsible for initiating emergency actions to limit the consequences of the event and bring it under control. The immediate responsibilities of the Shift Manager include performing or delegating performance of the following:

1. Recognition of emergency conditions by observation of characteristic emergency action levels (EALs);
2. Classifications of accident conditions in accordance with the emergency classification system;
3. Implementation of emergency operating procedures applicable to the event condition;
4. Initiation of the appropriate emergency plan implementing procedure;
5. Prompt notification of Vermont, New Hampshire and Massachusetts State Police indicating the event classification;
6. Notification of the NRC indicating the event classification;
7. Initial offsite dose assessment activities; and
8. Offsite protective action recommendation and initial transmittal to State officials.

Subsequent responsibilities undertaken by the Shift Manager include:

1. Notification of appropriate plant and company management personnel of the emergency conditions;
2. Direction and coordination of all initial emergency response efforts until the support elements of the emergency response organization are activated; and
3. Limiting the consequences of the accident and restoring the plant to a safe condition.

As part of the plant notification system, the Shift Manager has selected plant management and department head personnel notified using a radio paging/telephone system. This is the mechanism for mobilizing plant support personnel and activating the remainder of the onsite emergency response organization.

Emergency Plan Revision 54 Page 50 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

8.2.4. EOF Manager The EOF Manager is a designated staff member of Vermont Yankee management specifically trained to be responsible for the facility Emergency Plan with respect to operation of the EOF/RC. The EOF Manager's primary responsibilities are to:

1. Establish the Emergency Operations Facility when required;
2. Assess Emergency Operations Facility habitability via the Radiological Assessment Coordinator;
3. Prepare the Emergency Operations Facility for the arrival of offsite authorities and other support personnel.

A designated Vermont Yankee management staff member assumes the role of the Emergency Operations Facility Manager at an Alert or higher emergency classification.

The EOF Manager is responsible for reporting to the Emergency Director.

Emergency Plan Revision 54 Page 51 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

8.2.5. Operations Support Center Manager A member of the plant staff is assigned to coordinate the functions of the Operations Support Center. The responsibilities of the Operations Support Center Manager include:

1. Provide system valve alignment and equipment operation support to the Shift Manager;
2. Assist in coordinating recovery efforts as requested by the Emergency Plant Manager;
3. Provide Radiation Protection and Chemistry support for the in-plant emergency radiation protection and sampling activities;
4. Assign available personnel to the following emergency team function as necessary:
a. Site Boundary Survey Monitoring Team
b. Offsite Monitoring Teams
c. Repair and Corrective Action/Rescue Team
5. Brief OSC teams on in-plant radiation protection controls.

The OSC Manager directs the OSC and maintains this facility until the termination of the event. The OSC Manager establishes a base of operations in the OSC, but may find it necessary to go to the TSC from time to time.

Emergency Plan Revision 54 Page 52 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

8.2.6. Radiological Assessment Coordinator During emergency conditions, the Radiological Assessment Coordinator is responsible for the development of plans and procedures to assess and control radiological exposure in support of and consistent with the emergency response and recovery organization objectives. The primary emergency responsibilities of the Radiological Assessment Coordinator include:

1. Assess the onsite and offsite radiological conditions associated with any accidental releases.
2. Evaluate offsite doses based on radiation monitoring performed by monitoring personnel;
3. Provide support to the TSC to ensure onsite protective action recommendations (i.e., decontamination procedures, protective clothing, etc.)

are being considered and carried out;

4. Continuously update the Emergency Director concerning dose assessment results and recommend offsite radiological protective actions to the Emergency Director;
5. Recommend administrative limits for radiological exposure control of emergency workers in keeping with those specified in Table 10.2 and maintain the necessary records; and
6. Review plans and schedules of tasks with appropriate managers and coordinator of the recovery organization concentrating on radiation protection procedures.
7. Establish the coordination of radiological analysis of offsite samples;
8. Receive and document all sample results;
9. Coordinate the assessment activities and resolve any discrepancies with offsite response and assistance organizations.

The immediate priority of the Radiological Assessment Coordinator and staff is radiological analysis of air samples taken by offsite monitoring teams. For the long-term, additional duties include the analysis of contamination levels in area vegetables, fruits, milk, or water, and soil samples. To accomplish this long-term requirement, the Radiological Assessment Coordinator works closely with the services provided by support organizations (e.g.,

Environmental Lab).

Emergency Plan Revision 54 Page 53 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

8.2.7. Administration and Logistics Coordinator The Administration and Logistics Coordinator is authorized to provide administrative, logistic and communication services for the emergency organization at the site.

Specifically, the responsibilities of the Administration and Logistics Coordinator include:

1. Function as an aid to the Emergency Director;
2. Acquire the resources required by all site emergency management disciplines;
3. Assist in arranging for near-site accommodations (i.e., housing, transportation, etc.) of incoming emergency response personnel;
4. Assist in arranging for food and potable water for personnel at all emergency response centers;
5. Maintain adequate contractual communication services for the site emergency organization; and
6. Initially be responsible for procurement using established emergency procurement procedures.

NOTE: Subsequently, normal Purchasing Department operations and procedures are used as directed by the Emergency Director.

The Administration and Logistics Coordinator establishes operations at the EOF/RC and assists the Emergency Director, as requested.

8.2.8. Security Coordinator The Security Coordinator directs the security personnel in maintaining required security in support of the emergency operations. The functional responsibilities of the Security Coordinator include:

1. Establish security around the plant site and/or any other areas identified by the Shift Manager;
2. Call for required offsite police support, if necessary;
3. Manage site evacuation;
4. Provide initial accountability of personnel in the protected area; and
5. Maintain overall plant security in accordance with the Plant Security Plan.

The Security Coordinator interfaces with the Emergency Plant Manager for in-plant security actions. The Security Coordinator is stationed at the off-site command post.

Emergency Plan Revision 54 Page 54 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

8.2.9. Company Spokesperson The Company Spokesperson is authorized to provide the public with information concerning the emergency. The emergency responsibilities of the Company Spokesperson include:

1. Establish a Joint Information Center when necessary;
2. Coordinate information at the Joint Information Center with counterparts from local, state and federal agencies and with other companies involved with the emergency; and
3. Present terminology concerning accident conditions in an easily understood and informative manner to the press.

During an emergency, the Company Spokesperson reports to the Emergency Director.

The Manager of Communications or a designated alternate fills the position of the Company Spokesperson.

8.2.10. Decision Maker During implementation of Severe Accident Management (SAM), the senior licensed individual in the TSC will assume the role of Decision Maker as defined in the SAM Guideline.

8.2.11. Engineering Support Group The Engineering Support Group is an engineering group established to provide emergency support for plant assessment and recovery operations. This group is activated for an Alert, Site Area and General Emergency. The support group includes personnel from the various onsite engineering groups. In addition, the engineering support group may access offsite engineering resources through the support programs listed in Appendix G. This group resides in the Technical Support Center, and communicates with offsite technical support personnel. This group has access to the technical expertise to provide a variety of emergency functions, such as engineering analyses and plant system assessment in support of recovery efforts.

Emergency Plan Revision 54 Page 55 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

8.3. Recovery Organization The emergency measures presented in this plan are actions designated to mitigate the consequences of the accident in a manner that affords the maximum protection to the public. Planning for the recovery mode of operations involves the development of general principles and an organizational capability that can be adapted to any emergency situation.

The emergency response organization described in Section 8.1 and 8.2 provides the foundation for such a recovery organization.

The Emergency Director directs the recovery organization. As indicated in Figures 8.1 through 8.5, the organization relies on more than plant staff and/or resources to restore the plant to normal conditions. The expertise provided through the support plans is available to aid with the necessary corrective actions required to control and/or restore normal plant status. Various State and Federal support groups augment the recovery organization. The following is a brief summary of the recovery organization's responsibilities:

1. Maintain comprehensive radiological surveillance of the plant to assure continuous control and recognition of problems;
2. Control access to the area and exposures to workers;
3. Decontaminate affected areas and/or equipment;
4. Conduct clean-up and restoration activities;
5. Isolate and repair damaged systems;
6. Document all proceedings of the accident and review the effectiveness of the emergency organization in reducing public hazard and/or plant damage;
7. Provide offsite authorities with status report as to the operations capabilities of the plant;
8. Provide assistance to recovery actions undertaken by state/local authorities, if requested; and
9. Provide the public with information on the status of the recovery efforts (i.e.,

via press, TV/radio, etc.).

When plant conditions allow a transition from the emergency phase to the recovery phase, the Emergency Director conducts a plant emergency management meeting to discuss the recovery organization. The actions taken by this organization concerning termination of the emergency proceeds in accordance with a recovery plan developed specifically for the accident conditions.

Emergency Plan Revision 54 Page 56 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

8.4. Extensions of Vermont Yankee Emergency Organization 8.4.1. Local Service Arrangements have been made for the extension of the emergency organization capability for handling emergencies to provide for:

1. Transportation of injured personnel using an ambulance service;
2. Treatment of radioactively contaminated and injured personnel at a local support hospital (Brattleboro Memorial and Baystate Franklin Medical Center) and other regional medical facilities as specified in the local support hospital plans; and
3. Fire support services by the Vernon and Brattleboro Fire Departments and the Tri-State and Southwestern Fire Mutual Aid Networks.
4. Law enforcement support services provided by local, county, state, and federal law enforcement authorities as appropriate and response capabilities are documented in the letters of agreement maintained by Security.

Evidence of agreements with participating local services is found in Appendix E, Vermont Yankee Fire Protection, Appendix R Program, and the Annual Law Enforcement Letters of Agreement (Safeguards Information) maintained by Security.

8.4.2. Federal Government Support Resources of federal agencies appropriate to an emergency condition are made available in accordance with the National Response Framework. This plan and the resources behind it are activated through the plant notification of the NRC. Many resources are made available, as deemed necessary by the emergency condition, including a major effort under the leadership of the Department of Energy applied to the area of offsite radiological impact assessment. This effort can involve manpower and equipment for extensive plume measurement, including aerial monitoring and tracking, and sampling and analysis of ingestion pathway media.

Emergency Plan Revision 54 Page 57 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

8.4.3. Additional Support Dependent upon the emergency condition and response needs, the Vermont Yankee emergency organization can be augmented by manpower and equipment support from the remainder of the Entergy Nuclear organization. This support capability is outlined in the Corporate Support procedure as referenced in Appendix G.

Should response support beyond this level be required, additional support from other nuclear industry organizations can be requested through interface with the Institute of Nuclear Power Operations (INPO). Informational notifications are provided to this organization whenever emergency conditions escalate to an Alert or greater emergency condition. The decision to request additional industry support is a responsibility of the Emergency Director. All industry support organizations reporting to the site are assigned by emergency management, located in the EOF/RC, who specifies their authorities, responsibilities and any limits on their actions. All responding parties are required to adhere to existing plant procedures while completing their assignments.

8.5. Coordination with State Government Authorities Because of the location of the Vermont Yankee Plant, the planning and/or action responsibilities at the state level involves coordination of three states; Vermont, New Hampshire, and Massachusetts. Section 7.0 describes the extensive communications network between Vermont Yankee and these states as a means of promptly notifying appropriate authorities under accident conditions. Table 8.3 provides a summary of emergency plan areas and the associated plant, state and local responsibilities.

The Shift Manager initiates the coordination effort by notifying Vermont, New Hampshire and Massachusetts State Police, providing them with an established message format that describes the accident status. Based on the emergency class, the State emergency response personnel are alerted and/or mobilized. To ensure effective coordination of offsite emergency response actions, representatives of each state are assigned to report to the EOF/RC for first-hand emergency information and assessment. They are provided space in the EOF/RC as shown in Figure 6.4. The Emergency Director or designee issues periodic accident reports to the responding State Representative. Each state representative is responsible for transferring the content of these status reports to their respective State Emergency Operating Center (EOC). If additional technical expertise is required by state authorities at the state Emergency Operating Centers (EOCs), the Emergency Director can authorize dispatching of technical support staff to assist them in comprehension of any emergency communications.

Based upon the accident assessment, protective measures are recommended and implemented by each state according to actions and decisions prescribed by each state's Emergency Plan. The Vermont Health Department will notify the New York State Department of Public Health concerning all ingestion pathway considerations. Additional state support can be called upon from any or all other New England states through the agreement specified in the New England Compact on Radiological Health Protection.

Emergency Plan Revision 54 Page 58 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

TABLE 8.3 (Page 1 of 3)

A

SUMMARY

OF OFFSITE COORDINATION EMERGENCY PLAN FUNCTION PLANT RESPONSIBILITY STATE RESPONSIBILITY LOCAL RESPONSIBILITY Protective Action Decision The Shift Manager issues the initial State Police receive the initial The State Directors of Making protective action recommendation. notification whereupon they activate Emergency Management the State fan-out notification process. Agencies will notify either the local emergency management directors or the selectmen of the recommended action and advise.

After the Emergency Director (ED) In the State of Vermont, the Director assumes overall responsibility, the of the Vermont Emergency ED will issue protective action Management Agency and the Director recommendations to the appropriate of the Division of Occupational Health State authorities (non-delegable). and Radiological Health and Safety would activate.

In the Commonwealth of Massachusetts, the Director of the Massachusetts Emergency Management Agency and the Director of the Radiation Control Branch of the Massachusetts Department of Public health would activate.

In the State of New Hampshire, the Director of the New Hampshire Office of Emergency Management and the Division of Public Health Services would activate.

Emergency Plan Revision 54 Page 59 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

TABLE 8.3 (Continued)

(Page 2 of 3)

A

SUMMARY

OF OFFSITE COORDINATION EMERGENCY PLAN FUNCTION PLANT RESPONSIBILITY STATE RESPONSIBILITY LOCAL RESPONSIBILITY Protective Action Decision Each State Health representative Making (continued) would call or report to the plant for the follow-up protective action recommendation issued by the Emergency Director.

Each State Health representative will review all factors and issue a final recommendation to the Directors of State Emergency management Agencies, who, in turn, will initiate response actions to implement this recommendation.

A coordination between the States will decide the time to implement the proposed actions, including activating the public alert and instructional methods (e.g., siren activation/NOA message, etc.)

Coordination of Radiological Data The Radiological Assessment Each State Health representative at Local communities rely on Coordinator is responsible for the EOF/RC will request monitoring State capability for radiological compiling offsite monitoring results updates from the EOF Manager. evaluation.

and for ensuring an effective deployment of monitoring personnel In the State of Vermont, the Director of as well as coordinating information the Division of Occupational &

transfer. Radiological Health & Safety will command this function at the State EOC.

Emergency Plan Revision 54 Page 60 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

TABLE 8.3 (Continued)

(Page 3 of 3)

A

SUMMARY

OF OFFSITE COORDINATION EMERGENCY PLAN FUNCTION PLANT RESPONSIBILITY STATE RESPONSIBILITY LOCAL RESPONSIBILITY Coordination of Radiological Data The Emergency Director will advise In the Commonwealth of (continued) the State response personnel of Massachusetts, the Director of the results. Radiation Control Branch of the Massachusetts Department of Public Health will command this function at the State EOC.

In the State of New Hampshire, the Director of the Division of Public Health Services will command this function at the State EOC.

Plant Access Control The Security Coordinator State Police would respond as Local police would assist as coordinates plant site security and directed by the Directors of the directed by the State Police.

offsite law enforcement support as Emergency Management Agencies.

necessary.

Evacuation Process Shift Manager will sound evacuation State Emergency management alarm under Site Area or General Agencies will coordinate the activation Emergencies. of the Public Notification System.

OSC Manager will direct personnel Health and Human Services or Red to monitor all plant evacuees. Cross representative will coordinate the establishment of Reception Centers.

Public Information Release The Emergency Director issues final State press personnel report to the Media inquiries are referred to approval prior to release. Joint Information Center. the Joint Information Center.

The Public Information Liaison at State press personnel coordinate the EOF/RC relays accident status releases with the Company reports to the Joint Information Spokesperson.

Center.

The Company Spokesperson releases the information to the media.

Emergency Plan Revision 54 Page 61 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Table 8.4 (Page 1 of 2)

MINIMUM STAFFING REQUIREMENTS FOR THE ENVY ERO FUNCTIONAL MAJOR TASKS ENVY POSITION TITLE1 RESPONSE AREA TIME Plant Operations & Shift Manager (1) On Shift Assessment of CRS (1) On Shift Operational Aspects CRO (2) On Shift AO (6) On Shift STA (1) On Shift Emergency Direction Shift Manager (1**) On Shift

& Control (Emergency Coordinator)***

Notification / Notify Licensee, State STA/ AO On Shift Communication**** local and federal STA/Offsite Comm/ENS Comm/Chem.Tech 30 min.

personnel & maintain (1) 3 60 min.

communication STA/Offsite Comm/ENS Comm/Chem.Tech (2) 3 Radiological Emergency Operations EOF Emergency Director (1) 60 min.

Accident Facility (EOF) Director Shift Mgr/CRS/STA/Chem Tech On Shift Assessment and Offsite Dose assessment RP Staff (1)4 30 min.

Support of Operational Accident Off site surveys Field monitoring teams (2) 30 min.

Assessment Field monitoring teams (2) 60 min.

Onsite (out of plant) Shift RP tech (1) On Shift Field monitoring teams (1) 3 30 min.

Field monitoring teams (1) 60 min.

In plant surveys Shift RP Tech (1) On Shift RP staff (1) 30 min.

RP staff (1) 60 min.

Chemistry / Shift Chem. Tech (1) On Shift Radiochemistry Chem staff (1) 60 min.

Plant System Shift Technical Advisor STA (1) On Shift Engineering Core/Thermal hydraulics TSC RE (1) 3 30 min.

Electrical TSC Manager / TSC Engineering staff (1) 60 min.

Mechanical TSC Manager / TSC Engineering staff (1) 60 min.

Repair & Corrective Mechanical Maintenance Shift AO (1**) On Shift Actions Mechanical Maintenance Maintenance (1) 60 min.

Rad Waste operator AO/CRO (1) 60 min.

Electrical Maintenance / Shift AO (1**) On Shift Instrumentation & Control Maintenance (1) 30 min.

Technician Maintenance (1) 60 min.

Instrumentation & Control Maintenance (1) 30 min.

Technician Emergency Plan Revision 54 Page 62 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Table 8.4 (Continued)

(Page 2 of 2)

MINIMUM STAFFING REQUIREMENTS FOR THE ENVY ERO FUNCTIONAL MAJOR TASKS ENVY POSITION TITLE1 RESPONSE AREA TIME Protective Actions Radiation protection, Shift AO (2**) 2 On Shift (In Plant) access control, HP RP (2) 30 min coverage for repair, RP (2) 60 min corrective actions, search

& rescue, first aid &

firefighting, personnel monitoring, dosimetry Fire Fighting Fire brigade* (5**) 1 On Shift Local support 30 min.

Local support 60 min.

Rescue Operations Fire brigade (2**) On Shift

& First Aid Local support 30 min.

Local support 60 min.

Site Access Control Security, Security Force On Shift

& Personnel communications, Accountability personnel accountability NOTE: Response times are from NOTIFICATION of the event and are based on optimum travel conditions.

  • Position staffed in accordance with Technical Requirements Manual and Administrative procedures.
    • May be provided by shift personnel assigned other functions
      • Overall direction of facility response to be assumed by EOF director when all centers are fully staffed.

Direction of minute to minute facility operations remains with senior manager in technical support center or control room.

        • May be performed by engineering aide to Shift Manager (STA for ENVY)

NOTES

1. AP 0894 specifies minimum shift staffing requirements. FB requires 5 persons per TRM and the Vermont Yankee Nuclear Power Station On-Shift Staffing Analysis. The staffing analysis is maintained as a controlled document and is effective 30 days after OSRC approval. STA and Chemistry Tech must be available within 10 minutes to the Control Room. VY letter to NRC dated 4/14/1981 (FVY 81-65) establishing position. VY letter to NRC 6/22/1982 (FVY 82-75)

Supplement -NUREG 0737 Item III.A.1.2 on training of on-shift staff to support VY position for staffing. VY letter to NRC 4/14/1981 (FVY 81-65) TMI Action Plan Item III.A.1.2, goal for augmentation of staff. VY letter to NRC 6/15/82 (FVY 82-70) Results of Augmentation drills to support use of goals. Titles of ENVY ERO positions are shown.

2. All AOs use digital dosimeters with features for dose rate and total dose monitoring. AOs are trained to self-monitor in an emergency.
3. ENVY has designated pager holders who staff positions required to meet minimum staffing to activate TSC, OSC and EOF (see E Plan Figures 8.3 through 8.5). There are a minimum of 4 persons per position (4 teams who rotate duty). However, all persons on teams are expected to respond. In addition, all other ERO personnel not on pagers are notified by the emergency call-in notification system and are expected to respond.
4. The on-shift Shift Manager, CRS, STA, and Chem Tech have the capability to do initial dose assessment and PAR. The TSC and EOF radiation assessment staff relieves them of this function.

Emergency Plan Revision 54 Page 63 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Figure 8.1 Normal On-shift Emergency Organization.

Emergency Plan Revision 54 Page 64 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Figure 8.2 VY Emergency Management Organization Emergency Plan Revision 54 Page 65 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Figure 8.3 Technical Support Center Emergency Organization Emergency Plan Revision 54 Page 66 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Figure 8.4 Operations Support Center Emergency Organization Emergency Plan Revision 54 Page 67 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Figure 8.5 Emergency Operations Facility Organization Emergency Plan Revision 54 Page 68 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Figure 8.7 Joint Information Center Organization Emergency Plan Revision 54 Page 69 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

9.0 EMERGENCY RESPONSE 9.1. Emergency Condition Recognition and Classification Vermont Yankee maintains the capability to assess, classify, and declare an emergency condition within 15 minutes after the availability of indications to plant operators that an emergency action level has been exceeded and promptly declares the emergency condition as soon as possible following identification of the appropriate emergency classification level.

Section 5.0 presents the emergency classification system used for categorizing the wide spectrum of possible emergency conditions into one of four emergency classes. The process of condition recognition, immediate response to correct the condition, event classification, and initiation of the appropriate emergency implementing procedures are all critical responsibilities of the Shift Manager and the operations crew. This has been recognized in the design of both the emergency operating and emergency implementing procedures. The step between condition recognition and classification is handled as a procedural transition from the emergency operating procedure applicable to the event, to a specific emergency implementing procedure.

The specific transition procedure contains the listing of conditions that represents each of the four emergency categories and the detailed Emergency Action Levels (EALs) that allow the Shift Manager to determine the emergency classification. Once the emergency is classified, the applicable emergency implementing procedure is initiated. This is the trigger for the activation of the plant emergency response organization and the notification of offsite authorities for the activation of their emergency response. The activation of the plant emergency response organization brings to the assistance of the operations shift personnel all the various support elements described in this plan. How specific support elements are implemented, are detailed in the emergency implementing procedures. See Appendix G for a listing of these procedures.

9.2. Activation of the Emergency Organization The Shift Manager activates the emergency organization if plant conditions reach predetermined Emergency Action Levels (Appendix A). Depending upon the specific action levels attained, the Shift Manager declares one of the following: Notification of Unusual Event, Alert, Site Area Emergency, or General Emergency.

Emergency Plan Revision 54 Page 70 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

9.2.1. Notification of Unusual Event Response Appendix A defines the conditions that require the declaration of a Notification of Unusual Event. Emergencies defined within this classification demand the mobilization of specific emergency response members and the initiation of precautionary and/or corrective actions which mitigate the consequences of the event. A Notification of Unusual Event does not activate the entire emergency response organization, but may require augmentation of on-shift resources to deal with the event. Offsite emergency organizations are notified for informational purposes, and aid from offsite fire, medical, and security organizations may be required depending on the nature of the event.

The response required as a result of this declaration of a Notification of Unusual Event varies according to the specified event, but a general summary of actions taken is described below:

1. The emergency condition is recognized and classified by the Shift Manager who instructs Control Room personnel to announce over the plant page system the emergency classification;
2. The on-duty operations shift and selected plant personnel respond as directed by the Shift Manager;
3. The Shift Technical Advisor reports to the Control Room and provides technical support as necessary;
4. Appropriate plant staff are directed to assume various emergency functions;
5. Control Room personnel notify the New Hampshire, Massachusetts and Vermont State Police. The State Police notify the appropriate state authorities;
6. The NRC is notified;
7. Other support is requested as necessary;
8. The Emergency Call-in Method is implemented as shown in the notification plan (Figure 9.1);
9. Additional personnel report to the plant as requested by the SM;
10. The Shift Manager directs the activities of emergency response personnel until overall responsibility is assumed by the Emergency Director;
11. If necessary, appropriate emergency medical, fire department, or law enforcement agencies are notified and requested to respond;
12. The TSC may be activated at the discretion of the Emergency Plant Manager; Emergency Plan Revision 54 Page 71 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
13. The public information representative is notified and handles public information associated with the event; and
14. The Shift Manager terminates the Notification of Unusual Event status and closes out the event with a verbal summary to offsite authorities or escalates to higher level emergency classification.

9.2.1.1. Unusual Event (Terminated) Response If a condition that warrants a Notification of Unusual Event declaration has occurred, and was immediately rectified such that the condition no longer existed by the time of declaration, this Notification of Unusual Event classification is referred to as an Unusual Event (Terminated).

The event or condition did not affect personnel onsite or the public offsite, or result in radioactive releases requiring offsite monitoring.

The response to this declaration of an Unusual Event (Terminated) is not as comprehensive as that for a Notification of Unusual Event. All the same notifications for a Notification of Unusual Event are made, and emergency response personnel reporting to the plant are based on specific requests of the SM.

9.2.2. Alert Response An Alert requires actions to: 1) assure that sufficient emergency response personnel are mobilized to respond to the accident conditions at the site; and 2) that offsite emergency organizations are readily available to respond to the situation. Prompt notification is made to state officials and follow-up information is provided as needed to offsite emergency organizations. Unassigned personnel are evacuated from the site. In an Alert, the steps listed in the Notification of Unusual Event Response section (except for the termination process) and the following are performed:

1. The Alert emergency notification and response, as shown in Figure 9.1 and described in Table 9.1 are implemented;
2. The Technical Support Center, Operations Support Center, the Emergency Operations Facility/Recovery Center, and the Joint Information Center are activated by personnel as shown in Table 9.1;
3. If sufficient personnel are not available onsite, off-duty personnel are called in as specified in the emergency implementing procedures;
4. The Emergency Plant Manager reports to the Technical Support Center and directs in-plant emergency operations;
5. The EOF Manager establishes operations in the EOF/RC; Emergency Plan Revision 54 Page 72 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available
6. The Vermont, Massachusetts, and New Hampshire state emergency response personnel, having been notified through the state fan-out process, respond in accordance with their respective Radiological Emergency Response Plans;
7. The Emergency Director reports to the EOF/RC and assumes total responsibility for overall emergency response actions and recovery;
8. The Joint Information Center is established and timely public information is presented through coordination between the Emergency Director and offsite authorities;
9. Offsite authorities are provided periodic meteorological assessments and, if releases are occurring, projected dose estimates. (Note: If radiological releases are occurring, monitoring teams are dispatched.); and
10. The Emergency Director reaches agreement with offsite authorities concerning de-escalation or termination of the event, and closes out the event by verbal summary to offsite authorities. If an event is a reportable occurrence, a written summary is issued to these authorities in an appropriate time frame through distribution by the Emergency Plan Manager.

9.2.3. Site Area Emergency Response In a Site Area Emergency, the steps listed in the Alert Response section and the following are performed:

1. All Vermont Yankee emergency response personnel are notified and report as described in Table 9.1;
2. The Engineering Support Group works in concert with the TSC to resolve engineering support and assist in coordinating equipment resources;
3. State emergency response personnel are dispatched to the EOF/RC as state/local emergency response organizations become fully mobilized;
4. Plant conditions are continually assessed and protective action recommendations to offsite authorities are made on the basis of this assessment and/or actual or projected offsite radiological impacts;
5. Termination actions are initiated in the same manner as that identified for an Alert. A closeout, de-escalation to recovery phase, or escalation of the emergency classification is made in coordination with offsite authorities.

Emergency Plan Revision 54 Page 73 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

9.2.4. General Emergency Response All Emergency Centers are activated and all available resources are called upon in the event of a General Emergency. The plant promptly notifies offsite authorities and initiates all emergency response organization capabilities.

Offsite authorities fully activate their emergency response and implement appropriate protective measures based on meteorological information, actual or projected radiological dose conditions and/or conditions. The Emergency Director and the entire emergency response organization assemble plant status parameters and continually advise offsite authorities of the type of public protective action most appropriate to the situation based on plant conditions and offsite dose projections. This includes whether to shelter or evacuate the affected towns within the plume exposure emergency planning zone. In a General Emergency, the steps listed in the Site Area Emergency Response section and the following are performed:

1. The Emergency Director may request that the EOF Manager mobilize other personnel in support of Vermont Yankee through activation of the Corporate Emergency Center;
2. Other nuclear industry resources are alerted and requested to render appropriate assistance;
3. The full resources of the National Response Framework are activated; and
4. Dissemination of information and instructions associated with protective actions to the public is the principal focus of all response organizations. The plant fully participates in these efforts by providing detailed emergency condition information.

9.3. Emergency De-Escalation and Termination Criteria Classification of an accident condition requires that the plant operation staff recognize that pre-established EALs associated with an emergency condition, as defined in Appendix A, have been reached or exceeded.

De-escalation criteria require (1) an extensive review of plant parameters and/or offsite radiological conditions in conjunction with the pre-established EALs; (2) review of plant and offsite conditions with offsite authorities; and (3) concurrence by offsite authorities as to the appropriate time frame required to implement de-escalation.

Emergency Plan Revision 54 Page 74 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

De-escalation from a Notification of Unusual Event to a recovery phase requires satisfying the following criteria:

1. Criticality controls are in effect;
2. The core is being adequately cooled;
3. The fission product release has been controlled;
4. Control has been established over containment pressure and temperature;
5. An adequate heat transfer path to an ultimate heat sink has been established;
6. Reactor coolant system pressure is under control; and/or
7. Notification of Unusual Event conditions have been reviewed, are under control, and are not expected to deteriorate further.

De-escalation from emergency classes greater than the Notification of Unusual Event level to a recovery phase requires satisfying all the criteria stated in Items 1 through 6 above and that the States of Vermont and New Hampshire, and the Commonwealth of Massachusetts reach agreement with the Emergency Director or designee that there is no longer a need for either consideration of further public protective action or surveillance related to public protective action.

When plant conditions allow de-escalation in the emergency class to a recovery phase, the Emergency Director directs the emergency response organization to perform certain response actions prior to implementing any change. These actions include:

1. Notification of all plant emergency management personnel of the pending change;
2. Notification of offsite authorities of the pending change;
3. Notification of corporate support services of the pending change;
4. Coordination of media releases concerning the transition; and
5. Announcement of the transition over the plant page system.

Emergency Plan Revision 54 Page 75 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

TABLE 9.1 (Page 1 of 2)

VERMONT YANKEE EMERGENCY RESPONSE EMERGENCY CENTER NOTIFICATION OF UNUSUAL EVENT ALERT OR SITE AREA OR GENERAL EMERGENCY Technical Support Center Activation at the discretion of the Emergency Plant Manager Emergency Plant Manager TSC Manager Maintenance Coordinator (Electrical/Mechanical/I&C)

Radiological Coordinator Reactor Engineer Engineering Coordinator (Project, System, Design)

Operations Coordinator Engineering Support Group Operations Support Center Not activated OSC Manager Radiation Protection Staff Chemistry Staff Spare Licensed Operators Spare Auxiliary Operators Control Instrument Specialists Plant Mechanics Emergency Plan Revision 54 Page 76 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

TABLE 9.1 (Continued)

(Page 2 of 2)

VERMONT YANKEE EMERGENCY RESPONSE NOTIFICATION OF UNUSUAL ALERT OR SITE AREA OR GENERAL EMERGENCY CENTER EVENT EMERGENCY Emergency Operations Activation at the discretion of the Facility/Recovery Center Emergency Plant Manager Emergency Director Offsite Communicator Technical Advisor EOF Manager Administration and Logistics Coordinator Radiological Assessment Coordinator Personnel & Equipment Monitor

  • Site/Offsite Monitoring Teams Public Information Liaison Joint Information Center Not Activated Company Spokesperson VY Public Information Staff Nuclear Public Information Representatives Joint Information Center Staff
  • Deployed from OSC and report to Radiological Assessment Coordinator Emergency Plan Revision 54 Page 77 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Redacted Version of Document - Publicly Available 10.0 RADIOLOGICAL ASSESSMENT AND PROTECTIVE MEASURES 10.1. Radiological Assessment 10.1.1. Initial Offsite Radiological Dose Projection Capability Vermont Yankee has developed a method to quickly determine the projected offsite radiological conditions at various distances downwind of the plant site. During the initial stages of an emergency, the Shift Manager or designated individual is responsible to perform the initial evaluation of offsite radiological conditions. The initial evaluation of offsite radiological conditions is accomplished by utilizing the Offsite Dose Projection System (ODPS).

The ODPS utilizes a straight line Gaussian plume dispersion model programmed on the plant process computer. The program allows the user the option to select one of two release pathways (elevated or ground) and to utilize site-specific radiological and meteorological information to estimate the Total Effective Dose Equivalent and adult thyroid Committed Dose Equivalent (elevated release only) at a distance of 0.35 miles to 10 miles from the plant site.

10.1.2. Variable Trajectory Atmospheric Dispersion/Dose Projection Capability Once the EOF/RC is activated, Vermont Yankee utilizes a plume tracking/dose projection system, which is capable of providing near real time offsite dose estimated for actual meteorological and radiological accident conditions. The system assumes a Gaussian, variable trajectory, plume segment transport model designed to handle the site-specific atmospheric dispersion characteristics associated with the Vermont Yankee Nuclear Power Station site. Both continuous and intermittent releases for either ground or stack release points can be evaluated. The effects of release height, building wake entrainment, momentum plume rise, precipitation and terrain height can be assessed in the evaluation.

Plume trajectories are based on onsite meteorological tower information and topography of the Connecticut River Valley.

The model combines complex plume transport algorithms with the same dose assessment algorithms used by the model described in Section 10.1.1. The model is programmed on a personal computer. The program is designed to graphically display the calculated plume characteristics on a 10-mile Vermont Yankee EPZ site map while providing transcripts of all dispersion and dose calculations.

Emergency Plan Revision 54 Page 79 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Additionally, the Offsite Dose Nomogram can be used to determine an activity release rate (Ci/sec) and a projected offsite whole body plume centerline dose rate (mR/hr) at 1/3 of a mile from the stack. These determinations are made by using Figure 10.1 with the following additional information:

1. Time after reactor shutdown;
2. The plant stack high range monitor response;
3. The plant stack flow rate at the time of the accident; and
4. Wind speed.

The assumptions incorporated in and the use of the nomograms contained in Figure 10.1 is discussed in Appendix C.

10.1.3. Evaluation of Offsite Air Samples Vermont Yankee monitoring teams, after determining the location of the plume centerline (i.e., maximum radiation level) in the field, take air samples at various intervals downwind from the plant. These samples are analyzed for gross beta/gamma activity in the field and, if elevated levels are observed, they are returned to the Emergency Operations Facility where they are analyzed to determine radionuclide concentrations. These field results can be projected to other distances of interest.

Particular attention is given to observed iodine concentrations. Air samples are analyzed in a multi-step process. The first step involves field analysis of the sample which measures the gross radioactivity collected in the silver zeolite cartridge and filter paper using a pancake GM detector. If the silver zeolite sample analysis shows a net count rate greater than the background count rate, the sample is immediately delivered to the EOF/RC for analysis with greater sensitivity and accuracy (for I-131 specifically).

The projected thyroid dose is determined from the measured I-131 concentration by multiplying the estimate of the duration of exposure by the dose conversion factor for an adult member of the public. A nomogram has been developed specifically for this thyroid dose projection on the basis of airborne radioiodine measurements. It is shown in Figure 10.2.

In addition to the measurement and evaluation of offsite direct dose rates and air samples for radioiodine, the offsite radiological impact assessment includes the identification of principal radionuclides potentially released from the accident and significant exposure pathways.

This is accomplished through an emergency sampling program in which environmental samples of media (water, air, soil, etc., as appropriate) are collected and subjected to detailed radionuclide analysis. The necessary analysis can be performed as described in section 6.2.6.

Emergency Plan Revision 54 Page 80 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

10.2. Protective Action Recommendation Criteria In the event a General Emergency has been declared, Vermont Yankee immediately recommends protective actions to state authorities based on plant conditions which include the status of core and containment conditions. At a minimum, the Shift Manager or Emergency Director, who is in charge of the emergency response activities, recommends that the general public be advised to seek shelter for the towns of Hinsdale, New Hampshire and Vernon, Vermont; and the towns located five miles downwind in the affected sectors.

If plant conditions indicate a severe reactor accident exists involving actual or projected substantial core damage, Vermont Yankee recommends to the appropriate state officials evacuation of the towns of Hinsdale, New Hampshire and Vernon, Vermont; and all towns located five miles downwind in the affected sectors.

With an emergency condition producing a radiological release or an inplant (i.e.,

containment) source term that could be subsequently released, one of the priorities of the responding emergency personnel is to implement the sampling and analysis of releases and/or source terms to identify if there is a radioiodine component. This sampling capability includes containment atmosphere, gas spaces in other plant systems, and the plant stack.

Radioiodine identified at any of these points is quantified and evaluated in terms of actual or potential offsite impact.

Once actual source term, onsite and/or offsite field monitoring determinations have been made, the Vermont Yankee Emergency Director or designee provides projected offsite Total Effective Dose Equivalents (TEDEs) and thyroid Committed Dose Equivalents (CDEs) at various distances from the plant to the Departments of Public Health of Vermont, New Hampshire and Massachusetts. Based upon these results, the Emergency Director recommends protective actions in accordance with the criteria set forth in the EPA Protective Action Guides, Table 10.1.1. For environmental samples collected and analyzed by Vermont Yankee, the results of these samples are coordinated with the appropriate state agencies, and the state agencies implement the appropriate ingestion pathway protective actions in accordance with the FDA/HHS document Accidental Radioactive Contamination of Human Food and Animal Feeds, issued 8/13/98. Table 10.1.2 lists the Recommended Derived Intervention Level (DIL) for each radionuclide group.

10.3. Radiological Exposure Control During a plant emergency, abnormally high levels of radiation and/or radioactivity may be encountered. These levels may range from slightly above those experienced during normal plant operation to life-endangering levels of several hundred rem in a short period of time.

Under all emergency situations, immediate actions are required to regain control of the emergency or for life-saving purposes; steps should be taken to minimize personnel exposure from external and/or internal sources of radiation.

Emergency Plan Revision 54 Page 81 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Table 10.2 specifies the guidelines on emergency dose limits for personnel providing emergency response duties which is consistent with the Environmental Protection Agency Emergency Worker Dose Limit Guides (EPA 400-R-92-001). The Shift Manager initially has the responsibility to authorize emergency dose commitments until relieved by the Emergency Plant Manager. This authorization is coordinated with the assistance of the Radiological Coordinator or Shift Chemistry and Radiation Protection Technicians as needed. Exposure to individuals providing emergency functions will be consistent with the limits specified in Table 10.2 with every attempt made to keep exposures ALARA.

The Radiological Coordinator is responsible for developing emergency radiological protection programs for plant staff support personnel. Emergency kits in each emergency center are provided with self-reading dosimeters (both high and low range). Each member reporting to the site will be provided a DLR badge. Dose records will be maintained at each center based upon the results of the self-reading dosimeters. This information is cross-referenced with the DLR badge data, as soon as they can be processed at the Emergency Operations Facility/Recovery Center. The capability exists for the emergency processing of DLRs on a 24-hour per day basis, if necessary, through a General Services Agreement with Landauer Inc. Emergency workers are instructed to read self indicating dosimeters frequently, and DLRs may be processed with increased periodicity.

10.4. Protective Measures 10.4.1. Site Personnel Accountability The goal of the personnel accountability process is to account for personnel within 30 minutes of the emergency declaration of an Alert or higher. Accountability for a Notification of Unusual Event is at the discretion of the Emergency Plant Manager. Plant procedures require Security personnel at the gate to maintain a list of personnel entering or leaving the site during a site evacuation. Emergency Response Facility Managers are responsible for accounting for their staff as they report to their facility. Each facility maintains an organizational sign-in method which enhances this reporting process. All reports are provided to the Emergency Plant Manager in the Technical Support Center, who initiates search and rescue actions for any missing personnel. Plant security provides assistance for this accountability effort and aids in the control of personnel during extended emergency operations.

Accountability may be modified or suspended if the safety of personnel may be jeopardized by a Security event or other event hazardous to personnel.

Emergency Plan Revision 54 Page 82 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

10.4.2. Site Egress Control Methods All visitors and contractors are evacuated from the plant under the Alert, Site Area or General Emergency conditions. At the Site Area or General Emergency all visitors and contractors are directed to report to the EOF/RC for monitoring. Emergency personnel assigned to the EOF/RC and other unassigned plant personnel, report immediately to the EOF/RC, and are monitored upon arrival at the facility. If a Code Red Security event has been declared, evacuation and accountability may put personnel at risk. In these security situations, evacuation and accountability may be suspended until directed by Security.

Plant evacuees are advised of area evacuation routes prior to being released. Appendix F provides evacuation time estimates for the plume exposure EPZ, and also details the major evacuation routes that could be used in the area. Access to the plant is not allowed unless personnel are specifically authorized.

10.4.3. Decontamination Capability The in-plant decontamination facility is located in the Operations Support Center. Waste generated through the use of this system is collected and processed by the plant liquid radwaste system. Survey instrumentation for personnel "frisking" and sensitive body burden monitoring equipment are available in various plant locations.

Decontamination at the EOF/RC is provided by using washcloths, which are disposed of by placing them in a 55-gallon drum. If conditions warrant alternative means, the EOF/RC has emergency decontamination capability (decontamination shower with the waste draining in to a holding tank). After accident conditions have been terminated, the holding tank is sampled to ascertain whether abnormal radiological levels exist. Depending upon the activity present and the isotopic determination, plans will be developed to remove the waste for disposal. Contaminated personnel not required for EOF activation will be directed to State Reception Centers.

10.4.4. Use of Onsite Protective Equipment and Supplies The plant supplies of personnel radiation protection equipment and gear are utilized to support the emergency response effort. Equipment such as respiratory protection gear, all types of protective clothing, and a supply of potassium Iodide is assigned to emergency response organization members in accordance with established plant radiation protection criteria. Radiation guideline action levels for a range of plant radiological conditions are shown in Table 10.3.

10.4.5. Fire Protection Equipment The plant maintains sufficient respiratory equipment (i.e., Scott Air Pacs and spare air cylinders), to support emergency response personnel in the event of a fire. Additionally, Vermont Yankee maintains a letter of agreement with the Brattleboro Fire Department for recharging Scott Air Pac cylinders during an emergency.

Emergency Plan Revision 54 Page 83 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

10.5. Aid to Affected Personnel 10.5.1. Medical Treatment In-plant medical supplies are provided in the Operations Support Center. Medical Response Team members are trained in accordance with station procedures.

Arrangements exist with the hospitals indicated in Section 8.4.1. Both hospitals participate in medical emergency drills. Figure 10.3 shows hospitals within the ingestion exposure EPZ of Vermont Yankee, which have the capability to handle radiation emergencies.

10.5.2. Medical Transportation Arrangements exist with Rescue, Inc., to provide 24-hour ambulance service for emergency transportation of plant personnel for offsite treatment. The ambulance service is capable of radio communications with the hospital while en route with a patient. Normal telecommunication channels are used in notifying the ambulance service dispatch center.

Rescue, Inc. personnel are provided with specific training by Vermont Yankee on the health physics considerations associated with radioactively contaminated personnel and site access control measures.

10.6. Protective Actions for Onsite Personnel A range of protective actions to protect onsite personnel during hostile action is provided to ensure the continued ability to safely shut down the reactor and perform the functions of the emergency plan.

Emergency Plan Revision 54 Page 84 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

TABLE 10.1.1 EPA PROTECTIVE ACTION GUIDELINES Total Effective Dose Committed Dose Protective Action Equivalent (TEDE) Equivalent (CDE) to the Thyroid

>1 rem >5 rem EVACUATION (Sheltering may be preferred protective action if the following are present:

Severe weather, Competing disasters, Local physical factors which impede evacuation LOCAL/STATE OFFSITE OFFICIALS WILL DETERMINE THE SIGNIFICANCE OF THESE FACTORS TO THE PAR SUBSEQUENT TO THE ISSUANCE OF THE PAR BY VY.)

Emergency Plan Revision 54 Page 85 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

TABLE 10.1.2 RECOMMENDED DERIVED INTERVENTION LEVEL (DIL)

OR CRITERION FOR EACH RADIONUCLIDE GROUP(a)(b)

All Components Of The Diet Radionuclide Group (Bg/kg) (pCi/kg)

Sr-90 160 4300 I-131 170 4600 Cs-134 + Cs-137 1200 32,000 Pu-238 + Pu-239 + Am-241 2 54 Ru-103 + Ru-106I C3 + C6 <1 C3 + C6 <1 6800 450 180,000 12,000 Notes:

(a)

The DIL for each radionuclide group (except for Ru-103 + Ru-106) is applied independently. Each DIL applies to the sum of the concentrations of the radionuclides in the group at the time of measurement.

(b)

Applicable to foods as prepared for consumption. For dried or concentrated products such as powdered milk or concentrated juices, adjust by a factor appropriate to reconstitution, and assume the reconstitution water is not contaminated. For spices, which are consumed in very small quantities, use a dilution factor of 10.

(c)

Due to the large difference in DILs for Ru-103 and Ru-106, the individual concentrations of Ru-103 and Ru-106 are divided by their respective DILs and then summed. The sum must be less than one. C3 and C6 are the concentrations, at the time of measurement, for Ru-103 and Ru-106, respectively.

(from Accidental Radioactive Contamination of Human Food and Animal Feeds:

Recommendations for State and Local Agencies, Table 2, 8/13/98)

Emergency Plan Revision 54 Page 86 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

TABLE 10.2 EMERGENCY DOSE LIMITS(a)

(refer to Notes 1 and 2)

Dose Limit (refer to Note 3) Work Activity Condition Maintain ALARA and to extent 5 Rem Total Effective Dose All practicable limit emergency Equivalent (TEDE) workers to these limits 10 Rem TEDE Protecting Valuable Property Lower dose not practicable Lifesaving or Protection of 25 Rem TEDE Lower dose not practicable Large Population Only on a voluntary basis to Lifesaving or Protection of 75 Rem TEDE persons fully aware of the Large Population risks involved NOTES:

1. For emergency dose limits the following considerations should be made:
a. Declared pregnant women will not be allowed to participate.
b. The use of volunteers for exposures during emergency actions is desirable. Older workers with low lifetime accumulated effective dose should be given priority.
c. The individual(s) awareness of biological consequences that such as exposure can have, including the risks associated with exposure of a developing embryo/fetus for female workers.
d. All practical protective measures to limit such an exposure.
e. Concurrence of individual(s) involved (i.e., voluntary risk acceptance).
f. The probability of success should be balanced against the expected exposure limit.
g. The individual's familiarity with the task and speed that the individual can conduct the task.
2. After the emergency has been concluded, doses received by emergency workers are required to be accounted for in accordance with 10CFR Part 20 occupational dose limits.
3. Emergency dose limits for the lens of the eye and for any organ (including skin and extremities) are three and ten times the listed values, respectively.

a EPA 400-R-92-001, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents, Revised 1991 Emergency Plan Revision 54 Page 87 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

TABLE 10.3 EMERGENCY CENTER HABITABILITY AND PROTECTIVE ACTION CRITERIA

1. A background dose rate of 50 mRem/hr will increase the frequency of radiation monitoring in the center and require an immediate evaluation of the accumulated TEDE at the affected center.
2. A reading of 1 Rem on the high-range or alarming dosimeter will initiate planning for possible evacuation to the alternate center.

a) If the TSC has to be evacuated,

1) The Emergency Plant Manager and immediate staff deemed necessary to deal with the emergency should relocate to the Control Room and continue their respective roles in the Emergency Response Organization.
2) Remaining TSC staff should relocate to the EOF/RC in support of their respective disciplines or be otherwise reassigned by the Administration and Logistics Coordinator.

b) If the OSC has to be evacuated, the TSC will determine an alternate area for relocation.

3. A reading of 4 Rem on the high-range or alarming dosimeter will initiate evaluation of the need for a phased evacuation.
4. If center personnel have been or may be exposed to elevated radioiodine air concentrations in excess of 500 millirem/hr (4.0 x 10-6 microcuries/cc), evaluate the need for administration of KI for center staff and relief shift personnel.

Emergency Plan Revision 54 Page 88 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Figure 10.1 Vermont Yankee Emergency Dose Rate Nomogram Emergency Plan Revision 54 Page 89 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Figure 10.2 Field Sample Thyroid Dose Nomogram Emergency Plan Revision 54 Page 90 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Figure 10.3 Medical Facilities within 50 Miles of Vermont Yankee Capable of Handling Emergency Medical Cases Emergency Plan Revision 54 Page 91 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

11.0 EMERGENCY NOTIFICATION AND PUBLIC INFORMATION 11.1. Emergency Notification The Shift Manager is responsible for the notification of the State Police of Vermont, New Hampshire, and Massachusetts. Notification is made within 15 minutes of emergency classification and is the initial link to offsite authorities for the activation of offsite emergency response plans, which includes emergency public notification if the emergency conditions warrant.

The format and contents of the initial message between the plant and State Police dispatchers are specified in notification procedures and have been established with the review and agreement of those state authorities responsible for state plans.

As soon as contacted via the notification procedure, the Department of Public Health of Vermont, Massachusetts and New Hampshire may call Vermont Yankee and request the following information:

1. Date, time and class of the emergency;
2. Type and quantity of release, height of release, and estimated duration/impact times;
3. Prevailing weather conditions (wind velocity, direction, temperature, atmospheric stability, form of precipitation, if any);
4. Actual or projected dose rates at .35 miles from the site, and projected dose rates at various distances from the plant;
5. Emergency response actions underway; and
6. Recommended protective actions.

These follow-up reports are provided on an as-needed basis until such time that the emergency condition has been terminated in agreement with the States of Vermont and New Hampshire, Commonwealth of Massachusetts, and Vermont Yankee plant management.

11.2. Public Notification The prompt public notification methods in the Vermont Yankee area utilize, radio, television, sirens and weather alert receivers, police and fire department mobile loudhailers and sirens, and door-to-door notification should that be required. Details of this system are provided in Appendix H.

Emergency Plan Revision 54 Page 92 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

11.3. Public Information Any emergency generates a continuous and intensive demand for up-to-date information.

This is best accomplished if each organization involved is aware of what the others are saying. Consequently, Vermont Yankee has planned for the establishment of a Joint Information Center for the purpose of providing coordinated press releases during an accident.

For a Notification of Unusual Event, the Manager of Communications is notified of the incident by telephone or paging system. The Manager of Communications, or designated alternate, is responsible for writing any official statements or press releases concerning the incident. Prior to release, statements are approved by an officer of the company or designee. Information is released directly to the press pool and the "Status Phones" are updated with this information. In addition, the Manager of Communications notifies the appropriate departmental staff and the corporate public affairs office.

For an Alert, Site Area Emergency and a General emergency, the Joint Information Center is activated and fully staffed.

The Public Information Liaison and required staff report to the EOF/RC for coordinating the accident information between the plant and the Joint Information Center. The Joint Information Center is staffed and provides immediate accessibility to information files and resources for the Company Spokesperson (Manager of Communications, or designated alternate) and/or the Joint Information Center staff.

Regular press conferences are held at the Joint Information Center, directed by the Company Spokesperson in conjunction with appropriate state and federal organizations.

Vermont Yankee can provide 24-hour coverage at the Joint Information Center to ensure timely updates and answers to questions from visiting media representatives.

As part of Vermont Yankee's full disclosure policy, Vermont Yankee has initiated a public inquiry phone for media and public use. Normally, a prerecorded message provides, on a daily basis, routine operating information, changes in plant operation, and other items of interest. During an emergency, the phone is used to relay and provide up-to-date status reports regarding the situation.

Joint Information Center personnel monitor local radio and television for erroneous information concerning accident conditions. When misinformation is recognized, corrective action is taken.

Emergency Plan Revision 54 Page 93 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Communication is provided between the Joint Information Center and the EOF/RC and for state and federal agency use. Public information documentation covering the following areas of concern is available:

1. Educational information on radiation;
2. Educational information on the Vermont Yankee Nuclear Power Plant;
3. The emergency classification system and notification process; and
4. Planned protective actions to be implemented by state and local authorities.

Vermont Yankee assists the States of Vermont and New Hampshire and the Commonwealth of Massachusetts, to develop and ensure for dissemination on a yearly basis, brochures, calendars, and posters which provide the public with emergency planning arrangements.

The Vermont Yankee Communications Department conducts annual information programs to acquaint the news media with information concerning radiation, emergency public information procedures, the emergency classification system and a general review of plant characteristics. Local and state media are invited and encouraged to attend.

Emergency Plan Revision 54 Page 94 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

12.0 MAINTAINING EMERGENCY PREPAREDNESS 12.1. Drills and Exercises An exercise tests the execution of the overall plant emergency preparedness and the integration of this preparedness with offsite authorities. A drill is a supervised instruction period aimed at testing, developing and maintaining skills in a particular response function.

Emergency exercises and drills are conducted to test and evaluate the adequacy of emergency facilities, equipment, procedures, communication channels, actions of emergency response personnel, and coordination between offsite agencies and the facility.

A summary of exercises and drills and associated elements is outlined below.

12.1.1. Radiation Emergency Drills and Exercises A full participation exercise shall be conducted every two years. At least one drill involving a combination of some of the principal functional areas of emergency response shall be conducted in the interval between biennial exercises. State and offsite agencies may participate in drills.

12.1.2. Communication Tests To ensure that emergency communications between the facility and offsite emergency response organizations are operable, communications tests are conducted as outlined below. Items 2) and 3) below can be performed as part of an Emergency plan drill or exercise.

1. Communication channels with state governments within the plume exposure pathway are tested monthly;
2. Communications with state Emergency Operations Center (EOCs) are conducted annually;
3. Communications with assessment teams are conducted annually;
4. Communications among states within the ingestion pathway are tested monthly; and
5. Communications with the NRC Headquarters Operations Officer from the Control Room, TSC and EOF are tested monthly.

Emergency Plan Revision 54 Page 95 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

To ensure the reliability of the plant's call-in procedure, the following test/drill is performed as follows:

Weekly functional test of the emergency notification system to test system performance, and Quarterly off-hours, unannounced communications drill, utilizing both the pager system and commercial telephone, to estimate emergency personnel response times.

12.1.3. Fire Drills To test and evaluate the response and training of the plant's fire brigade, a number of fire drills are conducted annually.

To demonstrate the coordination between the plant's fire brigade and the Vernon Fire Department, the fire department is annually offered the opportunity to participate in an onsite fire drill.

12.1.4. Medical Drills To evaluate the training of the facility's medical response team and offsite medical response (ambulance and hospital), a medical drill is conducted annually with a simulated contaminated injured individual. This drill can be performed as part of an Emergency Plan drill or exercise.

12.1.5. Radiological Monitoring Drills Plant environs and radiological monitoring drills (onsite and offsite) are conducted annually.

These drills include collection and analysis of airborne sample media, communications, record keeping, and interface with offsite monitoring efforts. This drill can be performed as part of an Emergency Plan drill or exercise. Radiological monitoring drills will include interface with State offsite monitoring efforts during the biennial exercise.

12.1.6. Health Physics Drills Health Physics drills are conducted semi-annually involving response to, and analysis of, simulated elevated in-plant airborne and liquid samples and direct radiation measurements in the environment. A drill can be performed as part of an Emergency Plan drill or exercise.

Emergency Plan Revision 54 Page 96 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

12.1.7. Security Drills The purpose of the Hostile Action-based drill is to maintain key skills, specifically the site-specific team skills necessary to mitigate security-based events. Hostile Action-based scenarios will be included in the drill and exercise program for exercise selection on a six-year frequency. Full implementation should include engagement of Offsite responders and FEMA. Scenarios should address EP response actions early in the event that include aspects such as initial classification, notification, PARs if appropriate, and protective measures on site. Various scenarios should be developed to address response to different threat modes, various initiators or response capabilities.

12.1.8. Scenarios An Exercise/Drill Coordinator is responsible for an emergency plan drill or exercise. The Exercise/Drill Coordinator's responsibilities include developing the exercise/drill scenario, the accident time sequence, and the selection and training of the Controllers required to evaluate the effectiveness of the Vermont Yankee Emergency Preparedness Program.

A scenario is prepared by the Scenario Development Group for each exercise/drill to be conducted. The scenario varies year to year and is approved by Vermont Yankee Management. Within a six-year period, the scenario content is varied to test all the major elements of the Emergency Plan Program. For full participation exercises, the scenario simulates an emergency condition and sequence that calls for the mobilization of the offsite authorities; requires the recommendation of offsite protective actions; and allows for the evaluation of offsite plans and integration with the plant response.

The contents of the scenario include, but are not limited to, the following:

1. Basic objective(s);
2. Date, time period, place and participating organizations;
3. Simulation lists;
4. Time schedule of real and simulated initiating events;
5. A narrative summary describing the conduct of the exercise to include such items as simulated casualties, search and rescue of personnel, deployment of radiological monitoring teams, and public information affairs; and
6. List of Controllers.

The scenarios are designed to allow free play in exercising the decision-making process associated with such emergency response actions as exposure control, emergency classification and de-escalation, protective action recommendation, and the emergency manpower augmentation process.

Emergency Plan Revision 54 Page 97 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Security based scenarios to test and evaluate security response capabilities will be conducted in accordance with security drills and exercise procedures and may be conducted during emergency plan drills or exercises.

Starting times and pre-notification for exercises are coordinated with and agreed upon by all participating organizations. The scenario package is submitted to the NRC in accordance with current regulatory guidance.

12.1.9. Evaluation of Exercises To evaluate the performance of participating facility personnel and the adequacy of emergency facilities, equipment and procedures during an exercise, the Exercise Coordinator obtains qualified controllers which includes resources outside the facility to evaluate and critique the exercise.

When feasible, personnel designated as controllers are assigned to an Emergency Plan area germane to their area of expertise. Controllers are provided general instruction concerning their specific observation function. Each controller is requested to observe the implementation of the emergency plan element assigned to him or her, and then to record and report observed inadequacies.

A critique is conducted at the conclusion of the exercise with facility personnel as designated by the General Manager or a designated representative. After the critique, the controllers submit a written evaluation to the Exercise Coordinator in which the exercise performance is evaluated against the objectives. All comments and/or recommendations are documented. Controllers from State Emergency Management and Health Department agencies are encouraged to join the observation and critique process.

Weaknesses and/or deficiencies identified in an exercise critique are processed in accordance with the site corrective actions program.

12.1.10. Emergency Plan Audit The Vermont Yankee Emergency Plan is independently audited as part of the Vermont Yankee In-plant Audit Program. The audit is conducted as part of the Entergy Quality Assurance Program in accordance with 10CFR50.54(t). All aspects of emergency preparedness, including exercise documentation, capabilities, procedures, and interfaces with state and local governments are audited.

Emergency Plan Revision 54 Page 98 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

12.2. Training All non-essential plant personnel receive annual instruction, in accordance with "Emergency Plan Training," concerning their expected response action during an emergency. Those members of the plant staff who have been assigned (per the Emergency Assistance Personnel List) to the emergency response organization receive annual training which includes, but is not limited to, the following:

1. Familiarize individuals with Emergency Plan and implementing procedures, especially where emergency response tasks are not part of their normal duties;
2. Define an individual's responsibilities associated with their designated function;
3. Familiarize individuals in emergency exposure control measures and guidelines, particularly those associated with an individual's designated emergency functions; and
4. Provide sufficient technical insight to maintain emergency functions.

A portion of this training is provided by personnel's participation in unrehearsed drills or emergency exercises. During these drills and exercises, controllers check the performance of the personnel assigned, and provide critiques which could be incorporated in future training. Specific details of the training given on an annual basis are described in "Emergency Plan Training," and in the Emergency Plan Training Program Description.

12.3. Review and Updating of Plan and Procedures The Emergency Plan is reviewed at least annually and the associated implementing procedures are reviewed at least biennially. All recommendations for changes to the Emergency Plan or associated implementing procedures are reviewed in accordance with 10CFR50.54(q). The Emergency Plan is submitted to Vermont Yankee's On-Site Safety Review Committee for approval. Written agreements with outside support organizations and government agencies are evaluated annually to determine if these agreements are still valid. If agreements are not valid, then they are renewed and updated. This agreement review is documented. Revisions to the Emergency Plan are made in accordance with current regulations and guidelines. Changes to the Plan are forwarded to organization and individuals with a responsibility for implementation of the Plan. Telephone number listings associated with the emergency notification process are updated quarterly.

Emergency Plan Revision 54 Page 99 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

12.4. Maintenance and Inventory of Emergency Equipment and Supplies The emergency equipment maintained in the Control Room, Operations Support Center, Technical Support Center, and the Emergency Operations Facility are listed in a checklist in Emergency Equipment Readiness Check, that is used to check readiness.

Weekly, the Operations Department conducts a test of certain emergency communications equipment. At least quarterly in accordance with the emergency equipment inventory procedure, and subsequent to each usage, Radiation Protection Department, Chemistry Department, and other designated VY personnel are assigned to inventory and maintain the emergency kits and/or equipment. Rotation of survey instruments normally used in the plant with instruments in the Emergency Kits assures that emergency equipment is calibrated and fully operable. There are sufficient reserve instruments and equipment to replace those that are removed from emergency kits for calibration purposes. Appendix B contains a list of emergency equipment by location.

12.5. Responsibility for the Planning Effort The Senior Site Executive has overall responsibility for implementation of the Emergency Plan at Vermont Yankee. The Emergency Planning Manager is responsible for emergency planning and the interface with local and state governments. The Emergency Planning Manager reports offsite to the Director, Emergency Programs. The duties of the Emergency Planning Manager include, but are not limited to, the following:

1. Revise and update the Emergency Plan;
2. Maintain the Emergency Plan implementing procedures so that they are updated and current with the Emergency Plan;
3. Schedule and ensure the conduct of emergency equipment inventories and calibration;
4. Represent the plant in state and local Emergency plan interfaces;
5. Represent the plant in NRC emergency planning appraisals and audits;
6. Interface with the Exercise Coordinator in preparing and coordinating Emergency Plan drills and exercise; and
7. Maintain drill and exercise documentation and coordinate implementation of corrective actions deemed necessary following drills and exercises.

Emergency Plan Revision 54 Page 100 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

APPENDIX A EMERGENCY CLASSIFICATION SYSTEM AND EMERGENCY ACTION LEVELS

[NOTE: Reference AP 3125, Emergency Plan Classification and Action Level Scheme for the most current revision of the EAL Charts.]

Emergency Plan Revision 54 Page 101 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

APPENDIX B EMERGENCY EQUIPMENT This Appendix contains a list of emergency equipment by location. Backup equipment is available at the Radiation Protection control point and associated areas located in the OSC.

In addition, all the resources referenced in 6.2.6 and 10.3 are at the disposal of Vermont Yankee in an emergency.

Emergency Plan Revision 54 Page 102 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Sensitive Unclassified Non-Safeguards Information Redacted Emergency Plan Revision 54 Page 103 of 125 Entergy Vermont Yankee Sensitive Unclassified Non-Safeguards Information Redacted Redacted Version of Document - Publicly Available

Sensitive Unclassified Non-Safeguards Information Redacted Emergency Plan Revision 54 Page 104 of 125 Entergy Vermont Yankee Sensitive Unclassified Non-Safeguards Information Redacted Redacted Version of Document - Publicly Available

APPENDIX C INITIAL OFFSITE DOSE RATE ESTIMATION Emergency Plan Revision 54 Page 105 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

APPENDIX C (Continued)

Vermont Yankee has developed a method to quickly determine the release rate and the projected offsite dose rate at 1/3 mile from the site that could be associated with an accident condition that exceeds the range of the normal plant stack Radiation Monitoring System. This determination is made by using Figure 10.1 with the following input variables:

1. Time after reactor shutdown;
2. The plant stack high-range monitor response;
3. The plant stack flow rate at the time of the accident; and
4. Wind speed The plant stack high range monitor consists of a Victoreen ion chamber located at the base of the stack (el. 264') and shielded by 1/2" of aluminum. A release rate function, J, has been determined at this location for a fuel melt mixture of fission product noble gases, as a function of time after reactor shutdown. This function, J, converts the monitor response to total activity concentration in the stack.

The activity release rate is determined from the nomogram, Figure 10.1, with the definition of the necessary input parameters. The projected offsite plume centerline dose rate at 1/3 mile from the stack can be determined from the nomogram once the following parameters are available: the response of the plant stack high range monitor, the plant stack flow rate, and the wind speed. The Offsite Dose Rate Function must be entered from the "time after shutdown" axis in order to obtain this result. The Offsite Dose Rate Conversion Function is the ratio of Parameter J to Parameter f at any time, t, where Parameter f is the effective dose conversion factor for the fission product noble gas mixture at time, t. Atmospheric stability is not required due to the fact that the gamma dose diffusion factor does not vary significantly at 1/3 mile for a stack release. The value chosen for the nomogram is conservative for all atmospheric stability classes.

The dose rate determined by the nomogram provides a conservative estimate of Total Effective Dose Equivalent (TEDE) for a stack release dominated by noble gases.

Since the iodine to noble gas ratio for a stack release are both relatively low, the thyroid dose does not contribute significantly to the TEDE under these conditions.

In order to qualitatively define plume width, a transparent overlay has been prepared for a Vermont area base map. The transparency consists of three angles [one each for unstable (Pasquill A, B, C stability classes), neutral (Pasquill D stability), and stable (Pasquill E, F, G stability) conditions] drawn from the plant out to a distance of ten miles.

Included within each angle are areas lateral to the plume centerline having radionuclide concentrations of at least 5% of the plume centerline value. Centering the stability-dependent angles over the appropriate downwind direction on the site area base map qualitatively defines the plume width. Using the appropriate sector/zone designation appropriate to the plume width, Vermont Yankee can provide the state authorities with an affected area.

Emergency Plan Revision 54 Page 106 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

APPENDIX D ENVIRONMENTAL LABORATORY ANALYTICAL AND DOSIMETRY SERVICES Emergency Plan Revision 54 Page 107 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

APPENDIX D (Continued)

General In the event of a radiological emergency at Vermont Yankee, Laboratory services (as described in 6.2.6) are available, on a 24-hour emergency call basis, to perform gamma isotopic analyses on samples taken by the plant's emergency monitoring teams. Portable gamma spectroscopy equipment can be deployed to the plant site to determine the presence and level of contamination in samples of various media in the event of an accidental release of radioactive material. In addition Entergy maintains a General Services Agreement with Landauer Inc. for 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> emergency personnel Dosimetry processing.

Portable Emergency Analysis Equipment Portable analysis equipment including a shielded HPGe detector based gamma spectroscopy system complete with computerized spectral analysis capability may be deployed to assist in an emergency response. A report of plant-related nuclide concentrations, standard deviation, and Minimum Detectable Concentration (MDC) is forwarded to assessment personnel.

Following a request from Vermont Yankee for assistance in assessing an emergency condition, laboratory personnel will be dispatched to a designated location within approximately four (4) to eight (8) hours. Upon arrival, laboratory personnel will determine the presence and level of contamination in samples of various media (air cartridges, air filters, vegetation, water) collected by Plant Field Sampling Teams.

Emergency DLR Services The capability exists for the emergency processing of DLRs on a 24-hour per day basis, if necessary, through a General Services Agreement with Landauer Inc. Emergency workers are instructed to read self indicating dosimeters frequently, and DLRs may be processed with increased periodicity.

Portable Body Burden Service A WBC System is comprised of a portable shielded HPGe detector, interfaced to a PC-based ADCI/MCA and IBM compatible portable computer may be acquired from the other industry facilities. The analytical methodology provides a whole body scan and identifies activity content of the lung, GI, and thyroid.

A result report is generated for those plant-related nuclides found to be present at the 99%

confidence level.

Emergency Plan Revision 54 Page 108 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

APPENDIX E LETTERS OF AGREEMENT Letters of agreement in effect between Vermont Yankee and the offsite authorities and organizations, which under earlier revisions resided in this appendix, have been removed.

These documents are now maintained in the Emergency Planning Department files.

Entergy Operations, Inc. maintains agreements and/or contracts with the following organizations in support of Vermont Yankee Emergency Response.

Letters of Agreement have been ascertained with offsite groups to provide on-site aid in the event of an emergency situation, including those resulting from hostile actions at Vermont Yankee.

Ambulance Service: Twenty-four (24) hour ambulance service is provided by Rescue Inc.

Mutual aid backup from other ambulance services provides for additional emergency medical services, ambulances and EMS personnel. Onsite procedures contain instructions that cover the call for assistance and the handling of the ambulance service personnel.

Radio communication exists between the ambulance and local hospitals.

Medical: Onsite procedures contain instructions, which cover the request for medical assistance and handling of patients.

Hospitals: Brattleboro Memorial Hospital and Baystate Franklin Medical Center have agreed to accept patients from Vermont Yankee who have been injured, contaminated or irradiated.

Fire: Offsite firefighting support is provided by the Vernon and Brattleboro Fire Departments, as resources permit, with mutual aid backup from other fire departments.

Law Enforcement: When notified that assistance is needed, Security will notify the Lead Local Law Enforcement Agency (LLEA). The handling of security matters, including those involving hostile action for Vermont Yankee is covered in the Vermont Yankee Security Plan and are classified as safeguards information.

Emergency Plan Revision 54 Page 109 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

APPENDIX E (Continued)

Letters of Agreement

1. State of Massachusetts
2. State of New Hampshire
3. State of Vermont
4. Baystate Franklin Medical Center
5. National Weather Service (NOAA) 6 Brattleboro Memorial Hospital
7. Rescue, Inc. Ambulance Service
8. Vernon Fire Department
9. Brattleboro Fire Department
10. Institute of Nuclear Power Operations
11. Town of Vernon
12. Department of Energy
13. DOE - REAC/TS
14. Deleted
15. State of Massachusetts Alert & Notification System
16. State of New Hampshire Alert & Notification System
17. State of Vermont Alert & Notification System
18. Landmark College
19. Law Enforcement *
  • All letters of agreement from Local Law Enforcement Authorities as required by the Physical Security Plan are classified as Safeguards Information and as such are maintained by Security.

Emergency Plan Revision 54 Page 110 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

APPENDIX F EVACUATION TIME ESTIMATES The Evacuation Time Estimate for Vermont Yankee Nuclear Power Station is maintained as a separate document. The Evacuation Time Estimate is provided to offsite agencies when it is updated.

Emergency Plan Revision 54 Page 111 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

APPENDIX G INDEX OF EMERGENCY PLAN IMPLEMENTING PROCEDURES AND SUPPORT PLANS Emergency Plan Revision 54 Page 112 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

APPENDIX G (Continued)

I. EMERGENCY PLAN IMPLEMENTING PROCEDURES AP 3125 Emergency Plan Classification and Action Level Scheme EPOP-COMM-3504 Emergency Communications EPOP-EQUIP-3506 Emergency Equipment Readiness Check OP 3507 Emergency Radiation Exposure Control OP 3508 Onsite Medical Emergency Procedure OP 3509 Environmental Sample Collection during an Emergency OP 3510 Offsite and Site Boundary Monitoring EPOP-PAR-3511 Offsite Protective Action Recommendations OP 3513 Evaluation of Offsite Radiological Conditions AP 3532 Emergency Preparedness Organization OP 3533 Post Accident Sampling of Reactor Coolant OP 3534 Post Accident Sampling of Plant Stack Gaseous Releases OP 3535 Post Accident Sampling and Analysis of Primary Containment OP 3536 In-plant Air Sample Analysis with Abnormal Conditions EPOP-CR-3540 Control Room Actions During an Emergency EPOP-TSC-3542 Operation of the Technical Support Center EPOP-OSC-3544 Operation of the Operations Support Center EPOP-EOF-3546 Operation of the Emergency Operations Facility/Recovery Center OP 3547 Security Actions During an Emergency OP 3548 Emergency Termination and Recovery AP 3549 Offsite Emergency Preparedness Support EPOP-JIC-3550 Activation and Operation of the Joint Information Center EPOP-3551 Operation of the Joint Information Center When the Alternate Joint Information Center is Activated EPOP-3552 Activation and Operation of the Alternate Joint Information Center AP 3553 Administration and Maintenance of the Alert and Notification System AP 3554 Emergency Plan Teams AP 3712 Emergency Plan Training AP-10049 Equipment Important to Emergency Response EPAP-INFORM-10076 InForm Notification System Emergency Plan Revision 54 Page 113 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

APPENDIX G (Continued)

II. SUPPORT PLANS*

The Vermont Yankee Severe Accident Management Program (PP 7019)

The Vermont Yankee Security Plan Vermont Yankee Fire Protection and Safe Shutdown (SEP-FP-VTY-003)

The State of Vermont Radiological Emergency Response Plan The State of New Hampshire Radiological Emergency Response Plan The Commonwealth of Massachusetts Radiological Emergency Response Plan for Fixed-Site Nuclear Facilities NRC Incident Response Plan (NUREG-0728)

National Response Framework (January 2008)

Procedure for Admission and Management of Radioactively Contaminated Patients at Brattleboro Memorial Hospital Vermont Yankee Nuclear Power Station On-Shift Staffing Analysis Evacuation Time Estimate Corporate Support Procedures EN-FAP-EP-009, Use of KI for the Emergency Response Organization EN-FAP-EP-010, Severe Weather Response EN-FAP-EP-012, Severe Weather Recovery EN-EP-202, Equipment Important to Emergency Preparedness EN-EP-301, Emergency Planning Assessment of Offsite Emergency Response Capability Following a Natural Disaster EN-EP-305, Emergency Planning 10CFR50.54(q) Review Program EN-EP-306, Drills and Exercises EN-EP-307, Hostile Action Based Drills & Exercises EN-EP-308, Emergency Planning Critiques EN-EP-309, Fatigue Management for Hurricane Response Activities EN-EP-310, Emergency Response Organization Notification System EN-EP-311, Emergency Response Data System (ERDS) Activation via the Virtual Private Network (VPN)

EN-EP-401, Public Use of Emergency Preparedness Owner Controlled Area EN-EP-601, Corporate Emergency Center Operations EN-EP-606, Pandemic Flu Response EN-EP-801, Emergency Response Organization

  • This list does not reference any of the emergency plan arrangements specified in Appendices D and E of this plan.

Emergency Plan Revision 54 Page 114 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

APPENDIX H PUBLIC NOTIFICATION SYSTEM Emergency Plan Revision 54 Page 115 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

APPENDIX H (Continued)

Vermont Yankee has completed the installation of the equipment necessary to meet the requirements outlined in NUREG-0654 for alerting the public within the Vermont Yankee EPZ. The equipment consists of 37 sirens and NWS Tone-Alert receivers. The attached town maps indicate the location of each siren.

When an emergency condition exists which requires the Public Notification System to be activated, the emergency Management Agencies of Massachusetts, New Hampshire, and Vermont coordinate the activation of the Public Notification System (sirens, mobile PA systems, weather alert receivers, emergency broadcasting stations, etc.). After the coordination, the respective states notify local response organizations to activate the system to alert the affected population. Coordination of the three states is very important prior to activation due to the overlap of the radio stations and sound devices outside a state into the other affected states. The responsibility for activating the prompt Public Notification System rests with the State and Local Governments.

In the event of an emergency situation, which requires rapid implementation of alerting the public, the respective state agencies (State Police and/or Emergency Management) immediately notify the Emergency Alert System (EAS) stations to provide advisory information to the public. Simultaneously, the states include the activation of the Public Notification System in their initial message to the local response organizations.

Coordination is not conducted during a fast breaking event.

Emergency response organizations have a 24-hour capability of alerting and providing instructions to the public.

Each state has made provisions for issuing emergency instructions to the public.

Descriptions of the information to be immediately issued and updates of the information are outlined in the respective State Emergency Response Plans.

Emergency Plan Revision 54 Page 116 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

APPENDIX H (Continued)

Siren List Map # Siren Name Siren Location 1 VV1 Vermont Yankee, Vernon, VT 2 VV2 Fire Station, Vernon, VT 3 VV3 Recreation Center, Vernon, VT 4 BV1 Municipal Center, Brattleboro, VT 5 BV2 Town Garage, Brattleboro, VT 6 BV3 West Fire Station, Brattleboro, VT 7 BV4 Putney Road, Brattleboro, VT 8 BV5 Williams Street, Brattleboro, VT 9 BV6 State Police, Route 9, Brattleboro, VT 10 HN1 Fire Station, Hinsdale, NH 11 HN2 Town Well, Hinsdale, NH 12 WN1 Swanzey Town Line, Route 10, Winchester, NH 13 WN2 Fiddle Hill Road, Winchester, NH 14 WN3 Fire Station, Winchester, NH 15 WN4 Town Well, Route 10, Winchester, NH 16 NM1 Route 10 North, Northfield, MA 17 NM2 Fire Station, Northfield, MA 18 NM3 Lucky Clapp Road, Northfield, MA 19 DM1 Town Garage, Bernardston, MA 20 CM1 Griswoldville, Colrain, MA 21 CM2 Aunt Sophies Peak, Colrain, MA 22 DM2 Hucklehill Road, Bernardston, MA 23 CM3 Greenfield and Leyden Roads, Colrain, MA 24 CN1 Fire Station Cupola, Chesterfield, NH 25 CN2 West Chesterfield Fire Station, Chesterfield, NH 26 CN3 Spofford Fire Station, Chesterfield, NH 27 CN4 Highway Garage, Chesterfield, NH 28 DV1 Highway Garage, Dummerston, VT 29 DV2 West Dummerston Fire Station, Dummerston, VT 30 DM3 Fire Station, Bernardston, MA 31 GM1 Northfield Mt, Hermon School, Gill , MA 32 LM1 Municipal Center, Leyden, MA 33 GV1 Front of School Corner, Guilford, VT 34 GV2 Stage Road, Guilford, VT 35 GV3 Sportsmans Club on Cremery Road, Guilford, VT 36 HN3 Filter Plant, Route 63, Hinsdale, NH 37 RN1 Whipple Hill Road, Richmond, NH Emergency Plan Revision 54 Page 117 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Redacted Version of Document - Publicly Available Redacted Version of Document - Publicly Available Redacted Version of Document - Publicly Available Redacted Version of Document - Publicly Available Redacted Version of Document - Publicly Available APPENDIX H (Continued)

Emergency Plan Revision 54 Page 123 of 125 Entergy Vermont Yankee Redacted Version of Document - Publicly Available

Redacted Version of Document - Publicly Available Redacted Version of Document - Publicly Available