{{#Wiki_filter:LICENSEE:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 17, 2015 LICENSEE:       Tennessee Valley Authority FACILITY:       Watts Bar Nuclear Plant, Units 1 and 2
FACILITY:  


==SUBJECT:==
==SUBJECT:==
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 17, 2015 Tennessee Valley Authority Watts Bar Nuclear Plant, Units 1 and 2


==SUMMARY==
==SUMMARY==
OF AUGUST 26, 2015, MEETING WITH THE TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT DUAL UNIT FIRE PROTECTION REPORT AUDIT CLOSURE On August 26, 2015, a Category 1 public meeting with the Tennessee Valley Authority (TVA, the licensee) was held at the U.S. Nuclear Regulatory Commission (NRC) Headquarters, One White Flint North, 11555 Rockville Pike, Rockville Maryland, to discuss the review of the dual unit fire protection report (FPR) review for the Watts Bar Nuclear Plant (WBN), Units 1 and 2. A list of attendees is enclosed.
OF AUGUST 26, 2015, MEETING WITH THE TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT DUAL UNIT FIRE PROTECTION REPORT AUDIT CLOSURE On August 26, 2015, a Category 1 public meeting with the Tennessee Valley Authority (TVA, the licensee) was held at the U.S. Nuclear Regulatory Commission (NRC) Headquarters, One White Flint North, 11555 Rockville Pike, Rockville Maryland, to discuss the review of the dual unit fire protection report (FPR) review for the Watts Bar Nuclear Plant (WBN), Units 1 and 2. A list of attendees is enclosed.
By letter dated June 24, 2015, TVA submitted the As-Constructed FPR for both units at WBN (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15175A508).
By letter dated June 24, 2015, TVA submitted the As-Constructed FPR for both units at WBN (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15175A508). To facilitate the NRC staff's review, the audit process was used to resolve questions about the FPR and corresponding license conditions. During the audit process, changes to the submitted FPR were made. The purpose of the August 26, 2015, public meeting was for TVA to present the change pages to the FPR that will be submitted as a supplement to the June 24, 2015, submittal.
To facilitate the NRC staff's review, the audit process was used to resolve questions about the FPR and corresponding license conditions.
During the meeting, TVA went over each of the proposed changes to the FPR, referencing a handout that contained "change bars" in the margin to indicate edits made to the FPR. It was noted by the licensee that Part V of the handout did not contain change bars but was changed in its entirety. TVA's presentation is available in ADAMS at Accession No. ML15244B383. The FPR handout is available in ADAMS at Accession No. ML15244B377. In addition to the proposed changes, TVA committed to a number of validations to the FPR, which have been captured in Enclosure 2.
During the audit process, changes to the submitted FPR were made. The purpose of the August 26, 2015, public meeting was for TVA to present the change pages to the FPR that will be submitted as a supplement to the June 24, 2015, submittal.
For WBN, Unit 1, TVA submitted an amendment to the license to incorporate two corresponding license conditions relevant to the dual unit FPR and fire protection panel requirements. TVA noted that a supplement for the Unit 1 amendment will be submitted to clarify the numbering scheme for the license conditions.
During the meeting, TVA went over each of the proposed changes to the FPR, referencing a handout that contained "change bars" in the margin to indicate edits made to the FPR. It was noted by the licensee that Part V of the handout did not contain change bars but was changed in its entirety.
At the conclusion of the meeting, TVA indicated that it would submit a revised FPR to the NRC staff for review by the end of the week. The review schedule is contingent on TVA providing a timely and thorough final FPR. The staff's review of the FPR will be documented in the final supplement to the safety evaluation report, which would be issued concurrently with the facility operating license for WBN, Unit 2, should one be issued.
TV A's presentation is available in ADAMS at Accession No. ML15244B383.
The FPR handout is available in ADAMS at Accession No. ML15244B377.
In addition to the proposed changes, TVA committed to a number of validations to the FPR, which have been captured in Enclosure
: 2. For WBN, Unit 1, TVA submitted an amendment to the license to incorporate two corresponding license conditions relevant to the dual unit FPR and fire protection panel requirements.
TVA noted that a supplement for the Unit 1 amendment will be submitted to clarify the numbering scheme for the license conditions.
At the conclusion of the meeting, TVA indicated that it would submit a revised FPR to the NRC staff for review by the end of the week. The review schedule is contingent on TVA providing a timely and thorough final FPR. The staff's review of the FPR will be documented in the final supplement to the safety evaluation report, which would be issued concurrently with the facility operating license for WBN, Unit 2, should one be issued. Members of the public were not in attendance.
Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.
Docket Nos. 50-390 and 50-391


==Enclosures:==
Members of the public were not in attendance. Public Meeting Feedback forms were not received.
: 1. List of Attendees Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
: 2. Table Validations for TVA Fire Protection Report dated June 24, 2015 cc w/enclosures:
Distribution via Listserv LIST OF ATTENDEES AUGUST 26. 2015. MEETING WITH THE TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT DUAL UNIT FIRE PROTECTION REPORT AUDIT CLOSURE NAME TITLE ORGANIZATION U.S. Nuclear Regulatory Commission James Trapp Acting Deputy Director (NRC)/Office of Nuclear Reactor Regulation (NRR)/Division of Operating Reactor Licensing (DORL) Samson Lee Deputy Director NRC/NRR/Division of Risk Assessment (DRA) Joseph Giitter Director NRC/NRR/DRA Alex Klein Branch Chief NRC/NRR/DRA/AFPB (Fire Protection Branch) Daniel Frumkin Senior Fire Protection NRC/NRR/DRA/AFPB Engineer Charles Moulton Fire Protection Engineer NRC/NRR/DRA/AFPB Angela Wu Fire Protection Engineer NRC/NRR/DRA/AFPB David Jones Senior Fire Protection Region II/Division of Reactor Inspector Safety/Engineering Branch 2 Justin Poole Senior Project Manager NRR/DORL/Watts Bar Special Projects Branch (LPWB) Enclosure 1  NAME TITLE ORGANIZATION Jeanne Dion Project Manager NRR/DORL/LPWB Joseph Shea Vice President Nuclear Tennessee Valley Authority (TVA) Licensing Paul Simmons VP Nuclear WBN Unit 2 TVA Jim Polickoski WBN Fire Protection TVA Martin Bryan WBN Licensing TVA William Crouch* Engineering TVA Charles Brush* Engineering Engineering Planning and Management, Inc. (TVA Contractor)
John Pangle* Engineering TVA *participated by telephone Discussion Item Page Environmental V-7 Factors MCR V-12 Abandonment Actions Evaluations Fire Detection X-53 Monitoring Panel Design Code and Standards Watts Bar, Unit 2 -Fire Protection Report Public Meeting \Nednesday,August26,2015 9:00 A.M. -12:00 P.M. Validations for TVA Fire Protection Report dated June 24, 2015 Section Initial Language Change "The 100 12ercent time margin or Delete: Section 12erformance time 12lus uncertainty
* "100 percent" 2.1.2.2, allowances from paragraph
* "or performance time Part b. 2.1.2.1.A and 2.1.2.1.B above plus uncertainty" ensures adequate time to reach the control location and perform the action." "In the event the AF\N system does Insert: Section not automatically actuate, actions 2.3 are performed in the 12lant within 1 O * "demonstrated to be minutes to ensure the system is completed" running and injecting to the steam generators." "For additional information refer to TV A will look into the correct Code Unit 1 License Condition 2.1 and letter for the license Section Unit 2 License Condition
: 2. C(9) condition 1213 which state .. " Final Language "The time margin allowances from paragraph 2.1.2.1.A and 2.1.2.1.B above ensures adequate time to reach the control location and perform the action." "In the event the AF\N system does not automatically actuate, actions are performed in the 12lant demonstrated to be com12leted within 10 minutes to ensure the system is running and injecting to the steam generators." TBD Enclosure 2  Discussion Item Page Section Initial Language Change Final Language "For additional information refer to TVA will look into the correct TBD Fire Detection X-55 Code Unit 1 License Condition 2.1 and letter for the license Monitoring Panel Section Unit 2 License Condition 2.C(9) condition Design Code and 2023 which state .. " Standards "The Fire Hazards Analysis shows Delete entire sentence No sentence RB Hatch Room 11-100 ----that these rooms which are not Surveillance accessible during normal Qlant Frequency and oQerations have such limited fire Comp Actions hazards that no alternate comQensato[Y actions are reguired nor are Qractical and there is no reduction in nuclear safety or the first safe shutdown caQability of the Qlant." Other Items Discussion Page Section Comments Item The language should already read: Defining 111-6 Section "spurious" vs. 3.2 "The SI function's design basis includes events in which the RCS pressure boundary is ruptured." "inadvertent" SI Confirmed in the meeting (Bill on the phone) that Reference 4.2.17 is the 65 Calculation.
Reference V-13 Section 4.2.17 2.3.2  Members of the public were not in attendance.
Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.
Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.
IRA! Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-390 and 50-391  
Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-390 and 50-391


==Enclosures:==
==Enclosures:==
: 1. List of Attendees
: 1. List of Attendees
: 2. Table Validations for TVA Fire Protection Report dated June 24, 2015 cc w/enclosures:
: 2. Table Validations for TVA Fire Protection Report dated June 24, 2015 cc w/enclosures: Distribution via Listserv
Distribution via Listserv DISTRIBUTION:
 
PUBLIC LPWB R/F RidsRgn2MailCenter Resource RidsACRS_MailCTR Resource RidsRgn2MailCenter Resource DFrumkin, NRR RidsNrrPMWattsBar2 Resource RidsNrrPMWattsBar1 Resource RidsNrrDorllp_WB Resource RidsNrrLABClayton Resource TWertz, NRR CMoulton, NRR RidsNrrDra Resource RidsNrrDorl Resource AWu, NRR CRosales-Cooper, OEDO RidsNrrDraAfpb Resource DJones, RGN-11 ADAMS Accession No.: ML152448388 (Package)
LIST OF ATTENDEES AUGUST 26. 2015. MEETING WITH THE TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT DUAL UNIT FIRE PROTECTION REPORT AUDIT CLOSURE NAME                    TITLE                    ORGANIZATION U.S. Nuclear Regulatory Commission (NRC)/Office of Nuclear Reactor James Trapp        Acting Deputy Director Regulation (NRR)/Division of Operating Reactor Licensing (DORL)
Meeting Summary ML152448371 Meetinq Notice ML 1 21 4 d ML 152 B d ML152448383 5 5A4 8 Han outs 44 377 an OFFICE DORL/LPWBPM DORL/LPWB/LA DRNAFPB DORL/LPWB/BC JDion BClayton NAME (LRonewicz for) AKlein JQuichocho DATE 9/1/15 9/1/15 9/14/15 9/17/15 OFFICE DORL/LPWB/PM NAME JPoole DATE 9/17/15 OFFICIAL RECORD COPY}}
NRC/NRR/Division of Risk Samson Lee          Deputy Director Assessment (DRA)
Joseph Giitter      Director                  NRC/NRR/DRA NRC/NRR/DRA/AFPB (Fire Alex Klein          Branch Chief Protection Branch)
Senior Fire Protection Daniel Frumkin                                  NRC/NRR/DRA/AFPB Engineer Charles Moulton      Fire Protection Engineer  NRC/NRR/DRA/AFPB Angela Wu            Fire Protection Engineer  NRC/NRR/DRA/AFPB Senior Fire Protection    Region II/Division of Reactor David Jones Inspector                  Safety/Engineering Branch 2 NRR/DORL/Watts Bar Special Justin Poole        Senior Project Manager Projects Branch (LPWB)
Enclosure 1
 
NAME                      TITLE                  ORGANIZATION Jeanne Dion            Project Manager        NRR/DORL/LPWB Vice President Nuclear Joseph Shea                                    Tennessee Valley Authority (TVA)
Licensing Paul Simmons            VP Nuclear WBN Unit 2  TVA Jim Polickoski          WBN Fire Protection    TVA Martin Bryan            WBN Licensing          TVA William Crouch*        Engineering            TVA Engineering Planning and Charles Brush*          Engineering Management, Inc. (TVA Contractor)
John Pangle*            Engineering            TVA
*participated by telephone
 
Watts Bar, Unit 2 - Fire Protection Report Public Meeting
                                            \Nednesday,August26,2015 9:00 A.M. - 12:00 P.M.
Validations for TVA Fire Protection Report dated June 24, 2015 Discussion Item  Page  Section            Initial Language                          Change                  Final Language "The 100 12ercent time margin or        Delete:                        "The time margin Environmental    V-7  Section    12erformance time 12lus uncertainty        *    "100 percent"        allowances from paragraph Factors          2.1.2.2,   allowances from paragraph                  *    "or performance time  2.1.2.1.A and 2.1.2.1.B Part b. 2.1.2.1.A and 2.1.2.1.B above                    plus uncertainty"    above ensures adequate ensures adequate time to reach the                                    time to reach the control control location and perform the                                      location and perform the action."                                                              action."
                                  "In the event the AF\N system does      Insert:                        "In the event the AF\N MCR        V-12  Section    not automatically actuate, actions                                    system does not Abandonment            2.3      are performed in the 12lant within 1O      *    "demonstrated to be  automatically actuate, Actions                      minutes to ensure the system is                  completed"            actions are performed in the Evaluations                    running and injecting to the steam                                    12lant demonstrated to be generators."                                                          com12leted within 10 minutes to ensure the system is running and injecting to the steam generators."
                                  "For additional information refer to    TVA will look into the correct TBD Fire Detection  X-53  Code    Unit 1 License Condition 2.1 and        letter for the license Monitoring Panel        Section  Unit 2 License Condition 2. C(9)        condition Design Code and          1213    which state .. "
Standards Enclosure 2
 
Discussion Item  Page  Section              Initial Language                        Change                  Final Language "For additional information refer to  TVA will look into the correct  TBD Fire Detection  X-55    Code    Unit 1 License Condition 2.1 and      letter for the license Monitoring Panel        Section  Unit 2 License Condition 2.C(9)        condition Design Code and          2023    which state .. "
Standards "The Fire Hazards Analysis shows      Delete entire sentence          No sentence RB Hatch Room    11-100    ----  that these rooms which are not Surveillance                    accessible during normal Qlant Frequency and                    oQerations have such limited fire Comp Actions                    hazards that no alternate comQensato[Y actions are reguired nor are Qractical and there is no reduction in nuclear safety or the first safe shutdown caQability of the Qlant."
Other Items Discussion    Page  Section                                              Comments Item The language should already read:
Defining      111-6 Section "spurious" vs.          3.2    "The SI function's design basis includes events in which the RCS pressure boundary is ruptured."
"inadvertent" SI Confirmed in the meeting (Bill on the phone) that Reference 4.2.17 is the 65 Calculation.
Reference    V-13  Section 4.2.17              2.3.2
 
ML152448388 (Package) Meeting Summary ML152448371 Meetinq Notice ML15215A448  Han d outs ML15244B377 an d ML152448383 OFFICE       DORL/LPWBPM         DORL/LPWB/LA       DRNAFPB           DORL/LPWB/BC JDion                 BClayton NAME                               (LRonewicz for)     AKlein           JQuichocho DATE         9/1/15               9/1/15             9/14/15           9/17/15 OFFICE       DORL/LPWB/PM NAME         JPoole DATE         9/17/15}}

Latest revision as of 07:04, 31 October 2019

8/26/2015, Summary of Public Meeting Regarding Watts Bar Nuclear Plant Dual Unit Fire Protection Report Audit Closure
ML15244B371
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 09/17/2015
From: Justin Poole
Watts Bar Special Projects Branch
To:
Dion J, NRR/DORL/LPL2-2, 415-1349
Shared Package
ML15244B388 List:
References
Download: ML15244B371 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 17, 2015 LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF AUGUST 26, 2015, MEETING WITH THE TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT DUAL UNIT FIRE PROTECTION REPORT AUDIT CLOSURE On August 26, 2015, a Category 1 public meeting with the Tennessee Valley Authority (TVA, the licensee) was held at the U.S. Nuclear Regulatory Commission (NRC) Headquarters, One White Flint North, 11555 Rockville Pike, Rockville Maryland, to discuss the review of the dual unit fire protection report (FPR) review for the Watts Bar Nuclear Plant (WBN), Units 1 and 2. A list of attendees is enclosed.

By letter dated June 24, 2015, TVA submitted the As-Constructed FPR for both units at WBN (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15175A508). To facilitate the NRC staff's review, the audit process was used to resolve questions about the FPR and corresponding license conditions. During the audit process, changes to the submitted FPR were made. The purpose of the August 26, 2015, public meeting was for TVA to present the change pages to the FPR that will be submitted as a supplement to the June 24, 2015, submittal.

During the meeting, TVA went over each of the proposed changes to the FPR, referencing a handout that contained "change bars" in the margin to indicate edits made to the FPR. It was noted by the licensee that Part V of the handout did not contain change bars but was changed in its entirety. TVA's presentation is available in ADAMS at Accession No. ML15244B383. The FPR handout is available in ADAMS at Accession No. ML15244B377. In addition to the proposed changes, TVA committed to a number of validations to the FPR, which have been captured in Enclosure 2.

For WBN, Unit 1, TVA submitted an amendment to the license to incorporate two corresponding license conditions relevant to the dual unit FPR and fire protection panel requirements. TVA noted that a supplement for the Unit 1 amendment will be submitted to clarify the numbering scheme for the license conditions.

At the conclusion of the meeting, TVA indicated that it would submit a revised FPR to the NRC staff for review by the end of the week. The review schedule is contingent on TVA providing a timely and thorough final FPR. The staff's review of the FPR will be documented in the final supplement to the safety evaluation report, which would be issued concurrently with the facility operating license for WBN, Unit 2, should one be issued.

Members of the public were not in attendance. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.

Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-390 and 50-391

Enclosures:

1. List of Attendees
2. Table Validations for TVA Fire Protection Report dated June 24, 2015 cc w/enclosures: Distribution via Listserv

LIST OF ATTENDEES AUGUST 26. 2015. MEETING WITH THE TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT DUAL UNIT FIRE PROTECTION REPORT AUDIT CLOSURE NAME TITLE ORGANIZATION U.S. Nuclear Regulatory Commission (NRC)/Office of Nuclear Reactor James Trapp Acting Deputy Director Regulation (NRR)/Division of Operating Reactor Licensing (DORL)

NRC/NRR/Division of Risk Samson Lee Deputy Director Assessment (DRA)

Joseph Giitter Director NRC/NRR/DRA NRC/NRR/DRA/AFPB (Fire Alex Klein Branch Chief Protection Branch)

Senior Fire Protection Daniel Frumkin NRC/NRR/DRA/AFPB Engineer Charles Moulton Fire Protection Engineer NRC/NRR/DRA/AFPB Angela Wu Fire Protection Engineer NRC/NRR/DRA/AFPB Senior Fire Protection Region II/Division of Reactor David Jones Inspector Safety/Engineering Branch 2 NRR/DORL/Watts Bar Special Justin Poole Senior Project Manager Projects Branch (LPWB)

Enclosure 1

NAME TITLE ORGANIZATION Jeanne Dion Project Manager NRR/DORL/LPWB Vice President Nuclear Joseph Shea Tennessee Valley Authority (TVA)

Licensing Paul Simmons VP Nuclear WBN Unit 2 TVA Jim Polickoski WBN Fire Protection TVA Martin Bryan WBN Licensing TVA William Crouch* Engineering TVA Engineering Planning and Charles Brush* Engineering Management, Inc. (TVA Contractor)

John Pangle* Engineering TVA

  • participated by telephone

Watts Bar, Unit 2 - Fire Protection Report Public Meeting

\Nednesday,August26,2015 9:00 A.M. - 12:00 P.M.

Validations for TVA Fire Protection Report dated June 24, 2015 Discussion Item Page Section Initial Language Change Final Language "The 100 12ercent time margin or Delete: "The time margin Environmental V-7 Section 12erformance time 12lus uncertainty * "100 percent" allowances from paragraph Factors 2.1.2.2, allowances from paragraph * "or performance time 2.1.2.1.A and 2.1.2.1.B Part b. 2.1.2.1.A and 2.1.2.1.B above plus uncertainty" above ensures adequate ensures adequate time to reach the time to reach the control control location and perform the location and perform the action." action."

"In the event the AF\N system does Insert: "In the event the AF\N MCR V-12 Section not automatically actuate, actions system does not Abandonment 2.3 are performed in the 12lant within 1O * "demonstrated to be automatically actuate, Actions minutes to ensure the system is completed" actions are performed in the Evaluations running and injecting to the steam 12lant demonstrated to be generators." com12leted within 10 minutes to ensure the system is running and injecting to the steam generators."

"For additional information refer to TVA will look into the correct TBD Fire Detection X-53 Code Unit 1 License Condition 2.1 and letter for the license Monitoring Panel Section Unit 2 License Condition 2. C(9) condition Design Code and 1213 which state .. "

Standards Enclosure 2

Discussion Item Page Section Initial Language Change Final Language "For additional information refer to TVA will look into the correct TBD Fire Detection X-55 Code Unit 1 License Condition 2.1 and letter for the license Monitoring Panel Section Unit 2 License Condition 2.C(9) condition Design Code and 2023 which state .. "

Standards "The Fire Hazards Analysis shows Delete entire sentence No sentence RB Hatch Room 11-100 ---- that these rooms which are not Surveillance accessible during normal Qlant Frequency and oQerations have such limited fire Comp Actions hazards that no alternate comQensato[Y actions are reguired nor are Qractical and there is no reduction in nuclear safety or the first safe shutdown caQability of the Qlant."

Other Items Discussion Page Section Comments Item The language should already read:

Defining 111-6 Section "spurious" vs. 3.2 "The SI function's design basis includes events in which the RCS pressure boundary is ruptured."

"inadvertent" SI Confirmed in the meeting (Bill on the phone) that Reference 4.2.17 is the 65 Calculation.

Reference V-13 Section 4.2.17 2.3.2

ML152448388 (Package) Meeting Summary ML152448371 Meetinq Notice ML15215A448 Han d outs ML15244B377 an d ML152448383 OFFICE DORL/LPWBPM DORL/LPWB/LA DRNAFPB DORL/LPWB/BC JDion BClayton NAME (LRonewicz for) AKlein JQuichocho DATE 9/1/15 9/1/15 9/14/15 9/17/15 OFFICE DORL/LPWB/PM NAME JPoole DATE 9/17/15