| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION | | {{#Wiki_filter:UNITED STATES |
| REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 | | NUCLEAR REGULATORY COMMISSION |
| July 15, 2016 Tennessee Valley Authority
| | REGION II |
| ATTN: Mr. Virgil L. Perry | | 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 |
| Training Director
| | ATLANTA, GEORGIA 30303-1257 |
| Watts Bar Nuclear Plant | | July 15, 2016 |
| P. O. Box 2000 | | Tennessee Valley Authority |
| Spring City, TN 37381 | | ATTN: Mr. Virgil L. Perry |
|
| | Training Director |
| SUBJECT: WATTS BAR NUCLEAR POWER PLANT - OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL 05000390/2016301 AND 05000391/2016301 | | Watts Bar Nuclear Plant |
| Dear Mr. Perry:
| | P. O. Box 2000 |
|
| | Spring City, TN 37381 |
| The purpose of this letter is to confirm the final arrangements for the upcoming operator | | SUBJECT: WATTS BAR NUCLEAR POWER PLANT - OPERATOR LICENSING WRITTEN |
| licensing written examination at Watts Bar Nuclear Power Plant. | | EXAMINATION APPROVAL 05000390/2016301 AND 05000391/2016301 |
| | Dear Mr. Perry: |
| | The purpose of this letter is to confirm the final arrangements for the upcoming operator |
| | licensing written examination at Watts Bar Nuclear Power Plant. |
| | The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator |
| | license applications submitted in connection with this examination and separately provided a list |
| | of approved applicants to your office. The NRC staff will administer the operating tests to |
| | individuals, as applicable, during the week of July 18, 2016. Note that any examination waivers |
| | and application denials have been addressed in separate correspondence. |
| | The NRC has approved the subject written examination and hereby authorizes you to |
| | administer the written examination in accordance with Revision 10, of NUREG-1021, Operator |
| | Licensing Examination Standards for Power Reactors, during the week of July 25, 2016. |
| | This examination has undergone extensive review by my staff and representatives responsible |
| | for operator training at your facility. Based on this review, I have concluded that the |
| | examination meets the guidelines of NUREG-1021 for content, operational, and discrimination |
| | validity. By administering this examination, you also agree that it meets NUREG-1021 |
| | guidelines, and is appropriate for measuring the qualifications of licensed operators at your |
| | facility. If you determine that this examination is not appropriate for licensing operators at your |
| | facility, do not administer the examination and contact me at (404) 997-4551. |
| | Please contact the Chief Examiner, David Lanyi, at (404) 997-4487 if you have any questions or |
| | identify any errors or changes in license level (RO or SRO) or type of examination (partial or |
| | complete written examination and/or operating test) specified for each applicant on the list of |
| | approved applicants. |
| | Sincerely, |
| | /RA/ |
| | Gerald J. McCoy, Chief |
| | Operations Branch 1 |
| | Division of Reactor Safety |
| | Docket Nos.: 50-390, 50-391 |
| | License No.: NPF-90, NPF-96 |
|
| |
|
|
| | July 15, 2016 |
| The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to your office. The NRC staff will administer the operating tests to individuals, as applicable, during the week of July 18, 2016. Note that any examination waivers
| | Tennessee Valley Authority |
| and application denials have been addressed in separate correspondence.
| | ATTN: Mr. Virgil L. Perry |
| | | Training Director |
| The NRC has approved the subject written examination and hereby authorizes you to administer the written examination in accordance with Revision 10, of NUREG-1021, "Operator
| | Watts Bar Nuclear Plant |
| Licensing Examination Standards for Power Reactors," during the week of July 25, 2016.
| | P. O. Box 2000 |
| | | Spring City, TN 37381 |
|
| | SUBJECT: WATTS BAR NUCLEAR POWER PLANT - OPERATOR LICENSING WRITTEN |
| This examination has undergone extensive review by my staff and representatives responsible for operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination
| | EXAMINATION APPROVAL 05000390/2016301 AND 05000391/2016301 |
| validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operators at your
| | Dear Mr. Perry: |
| facility. If you determine that this examination is not appropriate for licensing operators at your
| | The purpose of this letter is to confirm the final arrangements for the upcoming operator |
| facility, do not administer the examination and contact me at (404) 997-4551.
| | licensing written examination at Watts Bar Nuclear Power Plant. |
| Please contact the Chief Examiner, David Lanyi, at (404) 997-4487 if you have any questions or identify any errors or changes in license level (RO or SRO) or type of examination (partial or
| | The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator |
| complete written examination and/or operating test) specified for each applicant on the list of
| | license applications submitted in connection with this examination and separately provided a list |
| approved applicants.
| | of approved applicants to your office. The NRC staff will administer the operating tests to |
| Sincerely,
| | individuals, as applicable, during the week of July 18, 2016. Note that any examination waivers |
| /RA/
| | and application denials have been addressed in separate correspondence. |
| | | The NRC has approved the subject written examination and hereby authorizes you to |
| Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety
| | administer the written examination in accordance with Revision 10, of NUREG-1021, Operator |
| | | Licensing Examination Standards for Power Reactors, during the week of July 25, 2016. |
|
| | This examination has undergone extensive review by my staff and representatives responsible |
| Docket Nos.: 50-390, 50-391
| | for operator training at your facility. Based on this review, I have concluded that the |
| License No.: NPF-90, NPF-96
| | examination meets the guidelines of NUREG-1021 for content, operational, and discrimination |
| July 15, 2016
| | validity. By administering this examination, you also agree that it meets NUREG-1021 |
| Tennessee Valley Authority
| | guidelines, and is appropriate for measuring the qualifications of licensed operators at your |
| ATTN: Mr. Virgil L. Perry | | facility. If you determine that this examination is not appropriate for licensing operators at your |
| Training Director
| | facility, do not administer the examination and contact me at (404) 997-4551. |
| Watts Bar Nuclear Plant P. O. Box 2000 | | Please contact the Chief Examiner, David Lanyi, at (404) 997-4487 if you have any questions or |
| Spring City, TN 37381 | | identify any errors or changes in license level (RO or SRO) or type of examination (partial or |
| | | complete written examination and/or operating test) specified for each applicant on the list of |
|
| | approved applicants. |
| SUBJECT: WATTS BAR NUCLEAR POWER PLANT - OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL 05000390/2016301 AND 05000391/2016301 | | Sincerely, |
| Dear Mr. Perry:
| | /RA/ |
| | | Gerald J. McCoy, Chief |
|
| | Operations Branch 1 |
| The purpose of this letter is to confirm the final arrangements for the upcoming operator | | Division of Reactor Safety |
| licensing written examination at Watts Bar Nuclear Power Plant. | | Docket Nos.: 50-390, 50-391 |
| The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator
| | License No.: NPF-90, NPF-96 |
| license applications submitted in connection with this examination and separately provided a list | | X PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE X NON-SENSITIVE |
| of approved applicants to your office. The NRC staff will administer the operating tests to individuals, as applicable, during the week of July 18, 2016. Note that any examination waivers | | ADAMS: Yes ACCESSION NUMBER: ML16200A120 X SUNSI REVIEW COMPLETE |
| and application denials have been addressed in separate correspondence. | | OFFICE RII:DRS RII:DRS RII:DRS |
| The NRC has approved the subject written examination and hereby authorizes you to
| | SIGNATURE JHK MBATES/for GJMCCOY |
| administer the written examination in accordance with Revision 10, of NUREG-1021, "Operator | | NAME JKIRBY DLANYI GMCCOY |
| Licensing Examination Standards for Power Reactors," during the week of July 25, 2016. | | DATE 7/14/2016 7/15/2016 7/15/2016 |
| | | E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO |
| This examination has undergone extensive review by my staff and representatives responsible for operator training at your facility. Based on this review, I have concluded that the
| |
| examination meets the guidelines of NUREG-1021 for content, operational, and discrimination | |
| validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operators at your | |
| facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (404) 997-4551. | |
|
| |
| Please contact the Chief Examiner, David Lanyi, at (404) 997-4487 if you have any questions or identify any errors or changes in license level (RO or SRO) or type of examination (partial or | |
| complete written examination and/or operating test) specified for each applicant on the list of approved applicants. | |
| Sincerely, /RA/ Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety
| |
|
| |
| Docket Nos.: 50-390, 50-391 | |
| License No.: NPF-90, NPF-96 | |
| X PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE X NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER: ML16200A120 X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE JHK MBATES/for GJMCCOY NAME JKIRBY DLANYI GMCCOY DATE 7/14/2016 7/15/2016 7/15/2016 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO
| |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML24008A2462024-01-18018 January 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000390/20234412023-12-21021 December 2023 Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) IR 05000390/20234042023-12-14014 December 2023 Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control IR 05000390/20230102023-11-30030 November 2023 RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20230032023-11-13013 November 2023 Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation ML23312A1432023-11-0808 November 2023 Submittal of Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 5 CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23251A2002023-09-11011 September 2023 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Units 1 and 2 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds IR 05000390/20230022023-08-16016 August 2023 Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002 ML23220A1582023-08-0909 August 2023 Integrated Inspection Report 05000390/2023002 and 05000391/2023002 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills IR 05000390/20230112023-07-24024 July 2023 Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011 CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out IR 05000390/20234032023-05-30030 May 2023 Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403 ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20220032023-05-0909 May 2023 Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) IR 05000390/20230012023-05-0404 May 2023 Integrated Inspection Report 05000390/2023001 and 05000391/2023001 CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23073A2762023-04-0303 April 2023 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (Letter) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report 2024-01-09
[Table view] Category:License-Operator
MONTHYEARML22314A0312022-11-10010 November 2022 2B ML22217A0842022-08-0303 August 2022 NRC Operator Licensing Examination Approval 05000390/2022301 and 05000391/2022301 ML22007A1562022-01-0707 January 2022 Notification of Licensed Operator Initial Examination 05000390/2022301 and 05000391/2022301 WBL-21-023, Preparation and Scheduling of Operator Licensing Examination2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examination ML21111A3522021-04-16016 April 2021 March 2021 GFE IR 05000390/20203012021-01-19019 January 2021 Reissue - Watts Bar Nuclear Plant - NRC Operator License Examination Report 05000390/2020301 and 05000391/2020301 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20300A5892020-10-26026 October 2020 File 2B - Normal Release - Exam Administrative Items ML20300A5842020-10-26026 October 2020 Wb 2020301 Exam Final Items - Delayed Release - File 2A-2 ML20300A5852020-10-26026 October 2020 Wb 2020301 File 2A-3 Exam Administrative Items - Delayed Release ML20276A2052020-10-0202 October 2020 SRO Exam ML20276A1512020-10-0202 October 2020 RO Exam WBL-20-008, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations2020-03-10010 March 2020 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations ML20043F0702020-01-23023 January 2020 301, 2B, Exam Administrative Items (Normal Release) ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19256B0322019-09-13013 September 2019 Wb 2019-301, Post Exam Comments (Normal Release) L-19-031, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations ML19116A1442019-04-26026 April 2019 301 ADAMS-2C Exam QA Material ML19116A1392019-04-26026 April 2019 301 ADAMS-2A Draft Exam Material ML19100A2512019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Watts Bar Nuclear Plant ML19099A3022019-04-0909 April 2019 Confirmation of Requested Initial Operator License Examination for Watts Bar Nuclear Plant, Units 1 and 2 ML19045A3712019-02-12012 February 2019 March 2019 GFE Cover Letter Rii ML19029B1122019-01-29029 January 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2018-02 - Revised Preparation and Scheduling of Operator Licensing Examinations ML19018A2252019-01-18018 January 2019 Notification of Licensed Operator Initial Examination 05000390/2019301, 05000391/2019301 ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 IR 05000390/20183012018-11-0808 November 2018 NRC Operator License Examination Report 05000390/2018301 and 05000391/2018301 ML18298A1632018-10-25025 October 2018 301 Post Exam Comments ML18122A1412018-05-0202 May 2018 Nuclear Regulatory Commission (Nrg) Regulatory Issue Summary (RIS) 2018-02 - Preparation and Scheduling of Operator Licensing Examinations ML18044A9892018-02-13013 February 2018 Notification of Licensed Operator Initial Examination 05000390/2018301, 05000391/2018301 ML17191B4242017-07-10010 July 2017 Exam Administrative Items - Delay Release 2 Yrs ML17191B3462017-07-10010 July 2017 Exam Final Items - Delay Release 2 Yrs ML17165A4912017-06-14014 June 2017 302 Final Administrative Documents ML17165A4952017-06-14014 June 2017 302 Final Administrative JPMs ML17165A5152017-06-14014 June 2017 302 General Correspondence Redacted ML17165A5372017-06-14014 June 2017 302 Draft RO Written Exam ML17165A4942017-06-14014 June 2017 302 Final Simulator and in Plant JPMs ML17165A4932017-06-14014 June 2017 302 Final Simulator Scenarios ML17165A4852017-06-14014 June 2017 302 Draft Simulator and in Plant JPMs ML17165A4872017-06-14014 June 2017 302 Draft Administrative JPMs ML17165A4832017-06-14014 June 2017 302 Draft Simulator Scenarios ML17165A5412017-06-14014 June 2017 302 Draft SRO Written Exam ML17165A4772017-06-14014 June 2017 302 Draft Administrative Documents ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16257A7232016-09-13013 September 2016 Initial Exam 2016-301 Post Exam Comments ML16257A7142016-09-13013 September 2016 Initial Exam 2016-301 Final RO Written Exam - Delay Release 2 Years ML16257A7212016-09-13013 September 2016 Initial Exam 2016-301 Final SRO Written Exam - Delay Release 2 Years ML16200A1202016-07-15015 July 2016 Operator Licensing Written Examination Approval 05000390/2016301 and 05000391/2016301 ML16197A0392016-07-15015 July 2016 NRC Regulatory Issue Summary 2016-09 - Preparation and Scheduling of Operator Licensing Examinations ML16054A2772016-02-19019 February 2016 Notification of Licensed Operator Initial Examination 05000390/2016301, 05000391/2016301 ML15259A2822015-09-16016 September 2015 301 Draft Administrative Documents 2022-08-03
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML22314A0312022-11-10010 November 2022 2B ML22217A0842022-08-0303 August 2022 NRC Operator Licensing Examination Approval 05000390/2022301 and 05000391/2022301 ML22007A1562022-01-0707 January 2022 Notification of Licensed Operator Initial Examination 05000390/2022301 and 05000391/2022301 WBL-21-023, Preparation and Scheduling of Operator Licensing Examination2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examination IR 05000390/20203012021-01-19019 January 2021 Reissue - Watts Bar Nuclear Plant - NRC Operator License Examination Report 05000390/2020301 and 05000391/2020301 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20300A5892020-10-26026 October 2020 File 2B - Normal Release - Exam Administrative Items ML20300A5852020-10-26026 October 2020 Wb 2020301 File 2A-3 Exam Administrative Items - Delayed Release ML20300A5842020-10-26026 October 2020 Wb 2020301 Exam Final Items - Delayed Release - File 2A-2 ML20276A2052020-10-0202 October 2020 SRO Exam ML20276A1512020-10-0202 October 2020 RO Exam WBL-20-008, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations2020-03-10010 March 2020 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations ML20043F0702020-01-23023 January 2020 301, 2B, Exam Administrative Items (Normal Release) ML19256B0322019-09-13013 September 2019 Wb 2019-301, Post Exam Comments (Normal Release) L-19-031, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations ML19116A1392019-04-26026 April 2019 301 ADAMS-2A Draft Exam Material ML19116A1442019-04-26026 April 2019 301 ADAMS-2C Exam QA Material ML19100A2512019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Watts Bar Nuclear Plant ML19099A3022019-04-0909 April 2019 Confirmation of Requested Initial Operator License Examination for Watts Bar Nuclear Plant, Units 1 and 2 ML19029B1122019-01-29029 January 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2018-02 - Revised Preparation and Scheduling of Operator Licensing Examinations ML19018A2252019-01-18018 January 2019 Notification of Licensed Operator Initial Examination 05000390/2019301, 05000391/2019301 IR 05000390/20183012018-11-0808 November 2018 NRC Operator License Examination Report 05000390/2018301 and 05000391/2018301 ML18298A1632018-10-25025 October 2018 301 Post Exam Comments ML18122A1412018-05-0202 May 2018 Nuclear Regulatory Commission (Nrg) Regulatory Issue Summary (RIS) 2018-02 - Preparation and Scheduling of Operator Licensing Examinations ML18044A9892018-02-13013 February 2018 Notification of Licensed Operator Initial Examination 05000390/2018301, 05000391/2018301 ML17191B3462017-07-10010 July 2017 Exam Final Items - Delay Release 2 Yrs ML17191B4242017-07-10010 July 2017 Exam Administrative Items - Delay Release 2 Yrs ML17165A4772017-06-14014 June 2017 302 Draft Administrative Documents ML17165A4912017-06-14014 June 2017 302 Final Administrative Documents ML17165A4952017-06-14014 June 2017 302 Final Administrative JPMs ML17165A5152017-06-14014 June 2017 302 General Correspondence Redacted ML17165A5372017-06-14014 June 2017 302 Draft RO Written Exam ML17165A4942017-06-14014 June 2017 302 Final Simulator and in Plant JPMs ML17165A4932017-06-14014 June 2017 302 Final Simulator Scenarios ML17165A4852017-06-14014 June 2017 302 Draft Simulator and in Plant JPMs ML17165A4872017-06-14014 June 2017 302 Draft Administrative JPMs ML17165A4832017-06-14014 June 2017 302 Draft Simulator Scenarios ML17165A5412017-06-14014 June 2017 302 Draft SRO Written Exam ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16257A7212016-09-13013 September 2016 Initial Exam 2016-301 Final SRO Written Exam - Delay Release 2 Years ML16257A7232016-09-13013 September 2016 Initial Exam 2016-301 Post Exam Comments ML16257A7142016-09-13013 September 2016 Initial Exam 2016-301 Final RO Written Exam - Delay Release 2 Years ML16200A1202016-07-15015 July 2016 Operator Licensing Written Examination Approval 05000390/2016301 and 05000391/2016301 ML16054A2772016-02-19019 February 2016 Notification of Licensed Operator Initial Examination 05000390/2016301, 05000391/2016301 ML15259A2822015-09-16016 September 2015 301 Draft Administrative Documents ML15259A2902015-09-16016 September 2015 301 Draft RO Written Exam ML15259A2922015-09-16016 September 2015 301 Draft SRO Written Exam ML15259A2952015-09-16016 September 2015 301 Draft Simulator Scenarios ML15259A2962015-09-16016 September 2015 301 Draft Simulator and In-Plant JPMs ML15259A3962015-09-16016 September 2015 301 Draft Administrative JPMs 2022-08-03
[Table view] |
See also: IR 05000390/2016301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
July 15, 2016
Tennessee Valley Authority
ATTN: Mr. Virgil L. Perry
Training Director
Watts Bar Nuclear Plant
P. O. Box 2000
Spring City, TN 37381
SUBJECT: WATTS BAR NUCLEAR POWER PLANT - OPERATOR LICENSING WRITTEN
EXAMINATION APPROVAL 05000390/2016301 AND 05000391/2016301
Dear Mr. Perry:
The purpose of this letter is to confirm the final arrangements for the upcoming operator
licensing written examination at Watts Bar Nuclear Power Plant.
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator
license applications submitted in connection with this examination and separately provided a list
of approved applicants to your office. The NRC staff will administer the operating tests to
individuals, as applicable, during the week of July 18, 2016. Note that any examination waivers
and application denials have been addressed in separate correspondence.
The NRC has approved the subject written examination and hereby authorizes you to
administer the written examination in accordance with Revision 10, of NUREG-1021, Operator
Licensing Examination Standards for Power Reactors, during the week of July 25, 2016.
This examination has undergone extensive review by my staff and representatives responsible
for operator training at your facility. Based on this review, I have concluded that the
examination meets the guidelines of NUREG-1021 for content, operational, and discrimination
validity. By administering this examination, you also agree that it meets NUREG-1021
guidelines, and is appropriate for measuring the qualifications of licensed operators at your
facility. If you determine that this examination is not appropriate for licensing operators at your
facility, do not administer the examination and contact me at (404) 997-4551.
Please contact the Chief Examiner, David Lanyi, at (404) 997-4487 if you have any questions or
identify any errors or changes in license level (RO or SRO) or type of examination (partial or
complete written examination and/or operating test) specified for each applicant on the list of
approved applicants.
Sincerely,
/RA/
Gerald J. McCoy, Chief
Operations Branch 1
Division of Reactor Safety
Docket Nos.: 50-390, 50-391
License No.: NPF-90, NPF-96
July 15, 2016
Tennessee Valley Authority
ATTN: Mr. Virgil L. Perry
Training Director
Watts Bar Nuclear Plant
P. O. Box 2000
Spring City, TN 37381
SUBJECT: WATTS BAR NUCLEAR POWER PLANT - OPERATOR LICENSING WRITTEN
EXAMINATION APPROVAL 05000390/2016301 AND 05000391/2016301
Dear Mr. Perry:
The purpose of this letter is to confirm the final arrangements for the upcoming operator
licensing written examination at Watts Bar Nuclear Power Plant.
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator
license applications submitted in connection with this examination and separately provided a list
of approved applicants to your office. The NRC staff will administer the operating tests to
individuals, as applicable, during the week of July 18, 2016. Note that any examination waivers
and application denials have been addressed in separate correspondence.
The NRC has approved the subject written examination and hereby authorizes you to
administer the written examination in accordance with Revision 10, of NUREG-1021, Operator
Licensing Examination Standards for Power Reactors, during the week of July 25, 2016.
This examination has undergone extensive review by my staff and representatives responsible
for operator training at your facility. Based on this review, I have concluded that the
examination meets the guidelines of NUREG-1021 for content, operational, and discrimination
validity. By administering this examination, you also agree that it meets NUREG-1021
guidelines, and is appropriate for measuring the qualifications of licensed operators at your
facility. If you determine that this examination is not appropriate for licensing operators at your
facility, do not administer the examination and contact me at (404) 997-4551.
Please contact the Chief Examiner, David Lanyi, at (404) 997-4487 if you have any questions or
identify any errors or changes in license level (RO or SRO) or type of examination (partial or
complete written examination and/or operating test) specified for each applicant on the list of
approved applicants.
Sincerely,
/RA/
Gerald J. McCoy, Chief
Operations Branch 1
Division of Reactor Safety
Docket Nos.: 50-390, 50-391
License No.: NPF-90, NPF-96
X PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE X NON-SENSITIVE
ADAMS: Yes ACCESSION NUMBER: ML16200A120 X SUNSI REVIEW COMPLETE
OFFICE RII:DRS RII:DRS RII:DRS
SIGNATURE JHK MBATES/for GJMCCOY
NAME JKIRBY DLANYI GMCCOY
DATE 7/14/2016 7/15/2016 7/15/2016
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO