Issue date | Title | Topic | |
---|---|---|---|
ML22314A031 | 10 November 2022 | 2B | Probabilistic Risk Assessment Job Performance Measure |
ML22217A084 | 3 August 2022 | NRC Operator Licensing Examination Approval 05000390/2022301 and 05000391/2022301 | |
ML22007A156 | 7 January 2022 | Notification of Licensed Operator Initial Examination 05000390/2022301 and 05000391/2022301 | |
WBL-21-023, Preparation and Scheduling of Operator Licensing Examination | 20 April 2021 | Preparation and Scheduling of Operator Licensing Examination | |
IR 05000390/2020301 | 19 January 2021 | Reissue - Watts Bar Nuclear Plant - NRC Operator License Examination Report 05000390/2020301 and 05000391/2020301 | Job Performance Measure |
ML21019A393 | 11 January 2021 | 1 GFE Annual Letter for Fy 2021 | Generic Fundamentals Examination COVID-19 |
ML20300A589 | 26 October 2020 | File 2B - Normal Release - Exam Administrative Items | Probabilistic Risk Assessment Job Performance Measure |
ML20300A585 | 26 October 2020 | Wb 2020301 File 2A-3 Exam Administrative Items - Delayed Release | Shutdown Margin Severe Accident Management Guideline |
ML20300A584 | 26 October 2020 | Wb 2020301 Exam Final Items - Delayed Release - File 2A-2 | Boric Acid Shutdown Margin Job Performance Measure Power change |
ML20276A205 | 2 October 2020 | SRO Exam | Severe Accident Management Guideline |
ML20276A151 | 2 October 2020 | RO Exam | Boric Acid Post Accident Monitoring |
WBL-20-008, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations | 10 March 2020 | Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations | |
ML20043F070 | 23 January 2020 | 301, 2B, Exam Administrative Items (Normal Release) | |
ML19256B032 | 13 September 2019 | Wb 2019-301, Post Exam Comments (Normal Release) | |
L-19-031, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations | 15 May 2019 | Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations | |
ML19116A139 | 26 April 2019 | 301 ADAMS-2A Draft Exam Material | Unanalyzed Condition Boric Acid Post Accident Monitoring Missed surveillance Earthquake |
ML19116A144 | 26 April 2019 | 301 ADAMS-2C Exam QA Material | |
ML19100A251 | 10 April 2019 | March 6, 2019, NRC Generic Fundamentals Examination Results for Watts Bar Nuclear Plant | Generic Fundamentals Examination |
ML19099A302 | 9 April 2019 | Confirmation of Requested Initial Operator License Examination for Watts Bar Nuclear Plant, Units 1 and 2 | |
ML19029B112 | 29 January 2019 | Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2018-02 - Revised Preparation and Scheduling of Operator Licensing Examinations | |
ML19018A225 | 18 January 2019 | Notification of Licensed Operator Initial Examination 05000390/2019301, 05000391/2019301 | |
IR 05000390/2018301 | 8 November 2018 | NRC Operator License Examination Report 05000390/2018301 and 05000391/2018301 | |
ML18298A163 | 25 October 2018 | 301 Post Exam Comments | |
ML18122A141 | 2 May 2018 | Nuclear Regulatory Commission (Nrg) Regulatory Issue Summary (RIS) 2018-02 - Preparation and Scheduling of Operator Licensing Examinations | |
ML18044A989 | 13 February 2018 | Notification of Licensed Operator Initial Examination 05000390/2018301, 05000391/2018301 | |
ML17191B346 | 10 July 2017 | Exam Final Items - Delay Release 2 Yrs | Safe Shutdown Boric Acid Shutdown Margin Job Performance Measure Power change |
ML17191B424 | 10 July 2017 | Exam Administrative Items - Delay Release 2 Yrs | Boric Acid Shutdown Margin Internal Flooding Job Performance Measure |
ML17165A477 | 14 June 2017 | 302 Draft Administrative Documents | Boric Acid Shutdown Margin Large early release frequency |
ML17165A491 | 14 June 2017 | 302 Final Administrative Documents | Boric Acid Shutdown Margin Ultimate heat sink Stroke time Job Performance Measure Power change |
ML17165A495 | 14 June 2017 | 302 Final Administrative JPMs | Safe Shutdown Boric Acid Met Tower Job Performance Measure Large early release frequency |
ML17165A515 | 14 June 2017 | 302 General Correspondence Redacted | |
ML17165A537 | 14 June 2017 | 302 Draft RO Written Exam | Shutdown Margin Ultimate heat sink Stroke time Post Accident Monitoring Power change |
ML17165A494 | 14 June 2017 | 302 Final Simulator and in Plant JPMs | Boric Acid Shutdown Margin Post Accident Monitoring Job Performance Measure Power change |
ML17165A493 | 14 June 2017 | 302 Final Simulator Scenarios | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Reactor Vessel Water Level Post Accident Monitoring Offsite Circuit Power change |
ML17165A485 | 14 June 2017 | 302 Draft Simulator and in Plant JPMs | Boric Acid Shutdown Margin Post Accident Monitoring Job Performance Measure Power change |
ML17165A487 | 14 June 2017 | 302 Draft Administrative JPMs | Safe Shutdown Boric Acid Met Tower Job Performance Measure Large early release frequency Power change |
ML17165A483 | 14 June 2017 | 302 Draft Simulator Scenarios | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Reactor Vessel Water Level Post Accident Monitoring Power change |
ML17165A541 | 14 June 2017 | 302 Draft SRO Written Exam | Safe Shutdown Met Tower Condition Adverse to Quality Severe Accident Management Guideline Fire Protection Program Power change |
ML17032A279 | 27 January 2017 | Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 | Generic Fundamentals Examination |
ML16257A721 | 13 September 2016 | Initial Exam 2016-301 Final SRO Written Exam - Delay Release 2 Years | Safe Shutdown Unanalyzed Condition Time of Discovery Reactor Vessel Water Level Ultimate heat sink Post Accident Monitoring Contraband Fatality |
ML16257A723 | 13 September 2016 | Initial Exam 2016-301 Post Exam Comments | |
ML16257A714 | 13 September 2016 | Initial Exam 2016-301 Final RO Written Exam - Delay Release 2 Years | Boric Acid Shutdown Margin High Radiation Area Locked High Radiation Area Fuel cladding |
ML16200A120 | 15 July 2016 | Operator Licensing Written Examination Approval 05000390/2016301 and 05000391/2016301 | |
ML16054A277 | 19 February 2016 | Notification of Licensed Operator Initial Examination 05000390/2016301, 05000391/2016301 | |
ML15259A282 | 16 September 2015 | 301 Draft Administrative Documents | Boric Acid Shutdown Margin |
ML15259A290 | 16 September 2015 | 301 Draft RO Written Exam | |
ML15259A292 | 16 September 2015 | 301 Draft SRO Written Exam | Safe Shutdown Boric Acid Time of Discovery Shutdown Margin Ultimate heat sink Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Safe Shutdown Earthquake Post Accident Monitoring Met Tower Temporary Modification Process Control Program Earthquake Offsite Circuit Fire Protection Program Power change Overexposure Failure to Scram |
ML15259A295 | 16 September 2015 | 301 Draft Simulator Scenarios | Safe Shutdown Boric Acid Shutdown Margin Post Accident Monitoring Power change |
ML15259A296 | 16 September 2015 | 301 Draft Simulator and In-Plant JPMs | Boric Acid Job Performance Measure Power change |
ML15259A396 | 16 September 2015 | 301 Draft Administrative JPMs | High winds Shutdown Margin Met Tower Job Performance Measure Earthquake |