Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22314A03110 November 20222BProbabilistic Risk Assessment
Job Performance Measure
ML22217A0843 August 2022NRC Operator Licensing Examination Approval 05000390/2022301 and 05000391/2022301
ML22007A1567 January 2022Notification of Licensed Operator Initial Examination 05000390/2022301 and 05000391/2022301
WBL-21-023, Preparation and Scheduling of Operator Licensing Examination20 April 2021Preparation and Scheduling of Operator Licensing Examination
IR 05000390/202030119 January 2021Reissue - Watts Bar Nuclear Plant - NRC Operator License Examination Report 05000390/2020301 and 05000391/2020301Job Performance Measure
ML21019A39311 January 20211 GFE Annual Letter for Fy 2021Generic Fundamentals Examination
COVID-19
ML20300A58926 October 2020File 2B - Normal Release - Exam Administrative ItemsProbabilistic Risk Assessment
Job Performance Measure
ML20300A58526 October 2020Wb 2020301 File 2A-3 Exam Administrative Items - Delayed ReleaseShutdown Margin
Severe Accident Management Guideline
ML20300A58426 October 2020Wb 2020301 Exam Final Items - Delayed Release - File 2A-2Boric Acid
Shutdown Margin
Job Performance Measure
Power change
ML20276A2052 October 2020SRO ExamSevere Accident Management Guideline
ML20276A1512 October 2020RO ExamBoric Acid
Post Accident Monitoring
WBL-20-008, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations10 March 2020Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations
ML20043F07023 January 2020301, 2B, Exam Administrative Items (Normal Release)
ML19256B03213 September 2019Wb 2019-301, Post Exam Comments (Normal Release)
L-19-031, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations15 May 2019Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations
ML19116A13926 April 2019301 ADAMS-2A Draft Exam MaterialUnanalyzed Condition
Boric Acid
Post Accident Monitoring
Missed surveillance
Earthquake
ML19116A14426 April 2019301 ADAMS-2C Exam QA Material
ML19100A25110 April 2019March 6, 2019, NRC Generic Fundamentals Examination Results for Watts Bar Nuclear PlantGeneric Fundamentals Examination
ML19099A3029 April 2019Confirmation of Requested Initial Operator License Examination for Watts Bar Nuclear Plant, Units 1 and 2
ML19029B11229 January 2019Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2018-02 - Revised Preparation and Scheduling of Operator Licensing Examinations
ML19018A22518 January 2019Notification of Licensed Operator Initial Examination 05000390/2019301, 05000391/2019301
IR 05000390/20183018 November 2018NRC Operator License Examination Report 05000390/2018301 and 05000391/2018301
ML18298A16325 October 2018301 Post Exam Comments
ML18122A1412 May 2018Nuclear Regulatory Commission (Nrg) Regulatory Issue Summary (RIS) 2018-02 - Preparation and Scheduling of Operator Licensing Examinations
ML18044A98913 February 2018Notification of Licensed Operator Initial Examination 05000390/2018301, 05000391/2018301
ML17191B34610 July 2017Exam Final Items - Delay Release 2 YrsSafe Shutdown
Boric Acid
Shutdown Margin
Job Performance Measure
Power change
ML17191B42410 July 2017Exam Administrative Items - Delay Release 2 YrsBoric Acid
Shutdown Margin
Internal Flooding
Job Performance Measure
ML17165A47714 June 2017302 Draft Administrative DocumentsBoric Acid
Shutdown Margin
Large early release frequency
ML17165A49114 June 2017302 Final Administrative DocumentsBoric Acid
Shutdown Margin
Ultimate heat sink
Stroke time
Job Performance Measure
Power change
ML17165A49514 June 2017302 Final Administrative JPMsSafe Shutdown
Boric Acid
Met Tower
Job Performance Measure
Large early release frequency
ML17165A51514 June 2017302 General Correspondence Redacted
ML17165A53714 June 2017302 Draft RO Written ExamShutdown Margin
Ultimate heat sink
Stroke time
Post Accident Monitoring
Power change
ML17165A49414 June 2017302 Final Simulator and in Plant JPMsBoric Acid
Shutdown Margin
Post Accident Monitoring
Job Performance Measure
Power change
ML17165A49314 June 2017302 Final Simulator ScenariosSafe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Post Accident Monitoring
Offsite Circuit
Power change
ML17165A48514 June 2017302 Draft Simulator and in Plant JPMsBoric Acid
Shutdown Margin
Post Accident Monitoring
Job Performance Measure
Power change
ML17165A48714 June 2017302 Draft Administrative JPMsSafe Shutdown
Boric Acid
Met Tower
Job Performance Measure
Large early release frequency
Power change
ML17165A48314 June 2017302 Draft Simulator ScenariosSafe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Post Accident Monitoring
Power change
ML17165A54114 June 2017302 Draft SRO Written ExamSafe Shutdown
Met Tower
Condition Adverse to Quality
Severe Accident Management Guideline
Fire Protection Program
Power change
ML17032A27927 January 2017Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017Generic Fundamentals Examination
ML16257A72113 September 2016Initial Exam 2016-301 Final SRO Written Exam - Delay Release 2 YearsSafe Shutdown
Unanalyzed Condition
Time of Discovery
Reactor Vessel Water Level
Ultimate heat sink
Post Accident Monitoring
Contraband
Fatality
ML16257A72313 September 2016Initial Exam 2016-301 Post Exam Comments
ML16257A71413 September 2016Initial Exam 2016-301 Final RO Written Exam - Delay Release 2 YearsBoric Acid
Shutdown Margin
High Radiation Area
Locked High Radiation Area
Fuel cladding
ML16200A12015 July 2016Operator Licensing Written Examination Approval 05000390/2016301 and 05000391/2016301
ML16054A27719 February 2016Notification of Licensed Operator Initial Examination 05000390/2016301, 05000391/2016301
ML15259A28216 September 2015301 Draft Administrative DocumentsBoric Acid
Shutdown Margin
ML15259A29016 September 2015301 Draft RO Written Exam
ML15259A29216 September 2015301 Draft SRO Written ExamSafe Shutdown
Boric Acid
Time of Discovery
Shutdown Margin
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Safe Shutdown Earthquake
Post Accident Monitoring
Met Tower
Temporary Modification
Process Control Program
Earthquake
Offsite Circuit
Fire Protection Program
Power change
Overexposure
Failure to Scram
ML15259A29516 September 2015301 Draft Simulator ScenariosSafe Shutdown
Boric Acid
Shutdown Margin
Post Accident Monitoring
Power change
ML15259A29616 September 2015301 Draft Simulator and In-Plant JPMsBoric Acid
Job Performance Measure
Power change
ML15259A39616 September 2015301 Draft Administrative JPMsHigh winds
Shutdown Margin
Met Tower
Job Performance Measure
Earthquake