ML18044A989

From kanterella
Jump to navigation Jump to search
Notification of Licensed Operator Initial Examination 05000390/2018301, 05000391/2018301
ML18044A989
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 02/13/2018
From: Gerald Mccoy
Division of Reactor Safety II
To: James Shea
Tennessee Valley Authority
References
50-390/OL-18-01, 50-391/OL-18-01
Download: ML18044A989 (4)


See also: IR 05000390/2018301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

February 13, 2018

Mr. Joseph W. Shea

Vice President, Nuclear Licensing

Tennessee Valley Authority

1101 Market Street, LP 3D-C

Chattanooga, TN 37402-2801

SUBJECT: WATTS BAR NUCLEAR PLANT UNITS 1 AND 2 - NOTIFICATION OF

LICENSED OPERATOR INITIAL EXAMINATION 05000390/2018301,

05000391/2018301

Dear Mr. Shea:

During a meeting on February 8, 2018, between Mr. Timothy Gabosch, Operations Training

Examination Lead, and Mr. Mark Bates, Senior Operations Engineer, arrangements were made

for the administration of licensing examinations at the Watts Bar Nuclear Plant. The on-site

preparatory week is scheduled for the week of August 6, 2018. The operating test is scheduled

to be administered during the weeks of September 4, 2018 and September 10, 2018. The

written examination is scheduled to be administered the week of September 17, 2018.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 11 of NUREG-1021, Operator

Licensing Examination Standards for Power Reactors. The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by April 6, 2018. Mr. Mark Bates provided a written examination outline to your staff on

November 3, 2017. The operating tests, written examination, and the supporting reference

materials identified in Attachment 3 to ES-201, will be due by June 21, 2018. Pursuant to Title

10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outline, examination, and test before

they are submitted to the NRC for review and approval. All materials shall be complete and

ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

J. Shea 2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the NRC takes

licensing action on all the applications and any adjudicatory actions on any hearing demands

are complete.

Appendix E of NUREG-1021, contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator waiver and/or excusal requests (Office of Management and

Budget (OMB) approval number 3150-0090) at least 60 days before the first examination date (if

possible). Contact Mr. Bates to determine the method for submission of the waiver or excusal

requests. Preliminary reactor operator and senior reactor operator license applications (OMB

approval number 3150-0090) and medical certifications (OMB approval number 3150-0024)

should be submitted at least 30 days before the first examination date. If the applications are

not received at least 30 days before the examination date, a postponement may be necessary.

Final signed applications certifying that all training has been completed and requesting any

waivers or excusals, as applicable, should be submitted at least 14 days before the first

examination date.

Although the guidelines for receiving waiver or excusal requests call for at least 30 days before

the first examination date (preliminary) and 14 days before the first examination date (final), the

requests should be submitted as early as possible in the process (see the 60-day guideline

above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.

Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form

398, Personal Qualifications StatementLicensee, or as directed by Mr. Bates when

contacting him to determine the method for submission). The NRC will document its final

decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398

submitted for the applicant. The NRC will not provide its decision until the final application is

submitted to the agency.

This letter contains information collection requirements that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved

by the Office of Management and Budget, approval number 3150-0018.

The burden to the public for these mandatory information collections is estimated to average

2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination, including the time for reviewing instructions, searching existing

data sources, gathering and maintaining the data needed, and completing and reviewing the

information collections. You may submit comments on any aspect of the information collections,

including suggestions for reducing the burden, to FOIA, Privacy and Information Collections

Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by

electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information

and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information, unless the document requesting or requiring the collection displays a currently

valid OMB control number.

J. Shea 3

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the agencys Rules of Practice, a copy of this letter will be available electronically for public

inspection through the Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html.

Thank you for your cooperation in this matter. Mr. Gabosch has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Bates at (404) 997-4612,

(mark.bates@nrc.gov), or me at (404) 997-4551, (Internet E-mail: gerald.mccoy@nrc.gov).

Sincerely,

/RA/

Gerald J. McCoy, Chief

Operations Branch 1

Division of Reactor Safety

Docket No. 50-390, 50-391

License No. NPF-90, NPF-96

cc: Distribution via Listserv

_______________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE MAB7 EMAIL GJM1

NAME BATES MCCOY

DATE 2/13/2018 2/13/ 2018

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO