Category:Letter
MONTHYEARIR 05000390/20250102024-11-0404 November 2024 Notification of an NRC (FPTI) (NRC Inspection Report 05000390/2025010 0500039/ 2025010) (RFI) CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20243012024-10-17017 October 2024 Operator Licensing Examination Approval 05000390/2024301 and 05000391/2024301 ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24261C0062024-10-0404 October 2024 Correction to Amendment No. 134 to Facility Operating License No. NPF-90 and Amendment No. 38 to Facility Operating License No. NPF-96 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter 05000391/LER-2024-003, Inoperability of Both Trains of Unit 2 Low Head Safety Injection2024-07-11011 July 2024 Inoperability of Both Trains of Unit 2 Low Head Safety Injection ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000391/LER-2024-002, Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO2024-05-0606 May 2024 Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report 05000391/LER-2024-001, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-03-27027 March 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) 2024-09-05
[Table view] Category:License-Operator
MONTHYEARML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) ML22314A0312022-11-10010 November 2022 2B ML22217A0842022-08-0303 August 2022 NRC Operator Licensing Examination Approval 05000390/2022301 and 05000391/2022301 ML22007A1562022-01-0707 January 2022 Notification of Licensed Operator Initial Examination 05000390/2022301 and 05000391/2022301 WBL-21-023, Preparation and Scheduling of Operator Licensing Examination2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examination ML21111A3522021-04-16016 April 2021 March 2021 GFE IR 05000390/20203012021-01-19019 January 2021 Reissue - Watts Bar Nuclear Plant - NRC Operator License Examination Report 05000390/2020301 and 05000391/2020301 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20300A5842020-10-26026 October 2020 Wb 2020301 Exam Final Items - Delayed Release - File 2A-2 ML20300A5852020-10-26026 October 2020 Wb 2020301 File 2A-3 Exam Administrative Items - Delayed Release ML20300A5892020-10-26026 October 2020 File 2B - Normal Release - Exam Administrative Items ML20276A1512020-10-0202 October 2020 RO Exam ML20276A2052020-10-0202 October 2020 SRO Exam WBL-20-008, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations2020-03-10010 March 2020 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations ML20043F0702020-01-23023 January 2020 301, 2B, Exam Administrative Items (Normal Release) ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19256B0322019-09-13013 September 2019 Wb 2019-301, Post Exam Comments (Normal Release) L-19-031, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations ML19116A1442019-04-26026 April 2019 301 ADAMS-2C Exam QA Material ML19116A1392019-04-26026 April 2019 301 ADAMS-2A Draft Exam Material ML19100A2512019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Watts Bar Nuclear Plant ML19099A3022019-04-0909 April 2019 Confirmation of Requested Initial Operator License Examination for Watts Bar Nuclear Plant, Units 1 and 2 ML19045A3712019-02-12012 February 2019 March 2019 GFE Cover Letter Rii ML19029B1122019-01-29029 January 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2018-02 - Revised Preparation and Scheduling of Operator Licensing Examinations ML19018A2252019-01-18018 January 2019 Notification of Licensed Operator Initial Examination 05000390/2019301, 05000391/2019301 ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 IR 05000390/20183012018-11-0808 November 2018 NRC Operator License Examination Report 05000390/2018301 and 05000391/2018301 ML18298A1632018-10-25025 October 2018 301 Post Exam Comments ML18122A1412018-05-0202 May 2018 Nuclear Regulatory Commission (Nrg) Regulatory Issue Summary (RIS) 2018-02 - Preparation and Scheduling of Operator Licensing Examinations ML18044A9892018-02-13013 February 2018 Notification of Licensed Operator Initial Examination 05000390/2018301, 05000391/2018301 ML17191B4242017-07-10010 July 2017 Exam Administrative Items - Delay Release 2 Yrs ML17191B3462017-07-10010 July 2017 Exam Final Items - Delay Release 2 Yrs ML17165A4912017-06-14014 June 2017 302 Final Administrative Documents ML17165A4952017-06-14014 June 2017 302 Final Administrative JPMs ML17165A5152017-06-14014 June 2017 302 General Correspondence Redacted ML17165A5372017-06-14014 June 2017 302 Draft RO Written Exam ML17165A4942017-06-14014 June 2017 302 Final Simulator and in Plant JPMs ML17165A4932017-06-14014 June 2017 302 Final Simulator Scenarios ML17165A4852017-06-14014 June 2017 302 Draft Simulator and in Plant JPMs ML17165A4872017-06-14014 June 2017 302 Draft Administrative JPMs ML17165A4832017-06-14014 June 2017 302 Draft Simulator Scenarios ML17165A5412017-06-14014 June 2017 302 Draft SRO Written Exam ML17165A4772017-06-14014 June 2017 302 Draft Administrative Documents ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16257A7232016-09-13013 September 2016 Initial Exam 2016-301 Post Exam Comments ML16257A7142016-09-13013 September 2016 Initial Exam 2016-301 Final RO Written Exam - Delay Release 2 Years ML16257A7212016-09-13013 September 2016 Initial Exam 2016-301 Final SRO Written Exam - Delay Release 2 Years ML16200A1202016-07-15015 July 2016 Operator Licensing Written Examination Approval 05000390/2016301 and 05000391/2016301 ML16197A0392016-07-15015 July 2016 NRC Regulatory Issue Summary 2016-09 - Preparation and Scheduling of Operator Licensing Examinations ML16054A2772016-02-19019 February 2016 Notification of Licensed Operator Initial Examination 05000390/2016301, 05000391/2016301 2024-03-19
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) ML22314A0312022-11-10010 November 2022 2B ML22217A0842022-08-0303 August 2022 NRC Operator Licensing Examination Approval 05000390/2022301 and 05000391/2022301 ML22007A1562022-01-0707 January 2022 Notification of Licensed Operator Initial Examination 05000390/2022301 and 05000391/2022301 WBL-21-023, Preparation and Scheduling of Operator Licensing Examination2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examination IR 05000390/20203012021-01-19019 January 2021 Reissue - Watts Bar Nuclear Plant - NRC Operator License Examination Report 05000390/2020301 and 05000391/2020301 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20300A5892020-10-26026 October 2020 File 2B - Normal Release - Exam Administrative Items ML20300A5852020-10-26026 October 2020 Wb 2020301 File 2A-3 Exam Administrative Items - Delayed Release ML20300A5842020-10-26026 October 2020 Wb 2020301 Exam Final Items - Delayed Release - File 2A-2 ML20276A2052020-10-0202 October 2020 SRO Exam ML20276A1512020-10-0202 October 2020 RO Exam WBL-20-008, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations2020-03-10010 March 2020 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations ML20043F0702020-01-23023 January 2020 301, 2B, Exam Administrative Items (Normal Release) ML19256B0322019-09-13013 September 2019 Wb 2019-301, Post Exam Comments (Normal Release) L-19-031, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations ML19116A1392019-04-26026 April 2019 301 ADAMS-2A Draft Exam Material ML19116A1442019-04-26026 April 2019 301 ADAMS-2C Exam QA Material ML19100A2512019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Watts Bar Nuclear Plant ML19099A3022019-04-0909 April 2019 Confirmation of Requested Initial Operator License Examination for Watts Bar Nuclear Plant, Units 1 and 2 ML19029B1122019-01-29029 January 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2018-02 - Revised Preparation and Scheduling of Operator Licensing Examinations ML19018A2252019-01-18018 January 2019 Notification of Licensed Operator Initial Examination 05000390/2019301, 05000391/2019301 IR 05000390/20183012018-11-0808 November 2018 NRC Operator License Examination Report 05000390/2018301 and 05000391/2018301 ML18298A1632018-10-25025 October 2018 301 Post Exam Comments ML18122A1412018-05-0202 May 2018 Nuclear Regulatory Commission (Nrg) Regulatory Issue Summary (RIS) 2018-02 - Preparation and Scheduling of Operator Licensing Examinations ML18044A9892018-02-13013 February 2018 Notification of Licensed Operator Initial Examination 05000390/2018301, 05000391/2018301 ML17191B3462017-07-10010 July 2017 Exam Final Items - Delay Release 2 Yrs ML17191B4242017-07-10010 July 2017 Exam Administrative Items - Delay Release 2 Yrs ML17165A4912017-06-14014 June 2017 302 Final Administrative Documents ML17165A4952017-06-14014 June 2017 302 Final Administrative JPMs ML17165A5152017-06-14014 June 2017 302 General Correspondence Redacted ML17165A5372017-06-14014 June 2017 302 Draft RO Written Exam ML17165A4942017-06-14014 June 2017 302 Final Simulator and in Plant JPMs ML17165A4932017-06-14014 June 2017 302 Final Simulator Scenarios ML17165A4852017-06-14014 June 2017 302 Draft Simulator and in Plant JPMs ML17165A4872017-06-14014 June 2017 302 Draft Administrative JPMs ML17165A4832017-06-14014 June 2017 302 Draft Simulator Scenarios ML17165A5412017-06-14014 June 2017 302 Draft SRO Written Exam ML17165A4772017-06-14014 June 2017 302 Draft Administrative Documents ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16257A7232016-09-13013 September 2016 Initial Exam 2016-301 Post Exam Comments ML16257A7142016-09-13013 September 2016 Initial Exam 2016-301 Final RO Written Exam - Delay Release 2 Years ML16257A7212016-09-13013 September 2016 Initial Exam 2016-301 Final SRO Written Exam - Delay Release 2 Years ML16200A1202016-07-15015 July 2016 Operator Licensing Written Examination Approval 05000390/2016301 and 05000391/2016301 ML16054A2772016-02-19019 February 2016 Notification of Licensed Operator Initial Examination 05000390/2016301, 05000391/2016301 ML15259A2822015-09-16016 September 2015 301 Draft Administrative Documents ML15259A2902015-09-16016 September 2015 301 Draft RO Written Exam ML15259A2922015-09-16016 September 2015 301 Draft SRO Written Exam ML15259A2952015-09-16016 September 2015 301 Draft Simulator Scenarios ML15259A2962015-09-16016 September 2015 301 Draft Simulator and In-Plant JPMs 2024-03-19
[Table view] |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 May 2,2018 10 cFR 50.4 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Units 1 and 2 Facility Operating License No. NPF-90 and NPF-96 NRC Docket Nos. 50-390 and 50-391
Subject:
Nuclear Regulatory Commission (NRG) Regulatory lssue Summary (RlS) 20{8 Preparation and Scheduling of Operator Licensing Examinations
Reference:
NRC RIS 2018-02, "Preparation and Scheduling of Operator Licensing Examinations," dated March 26, 2018 Regulatory lssue Summary (RlS) 2018-02 requested information regarding Watts Bar Nuclear Plant's (WBN's) projected operator licensing examination schedules and the estimated number of applicants. The enclosure to this letter addresses the NRC's request and provides an estimate of the examination requirements for WBN on NRC Form 536.
There are no new regulatory commitments in this letter. Should you have any questions regarding this submittal, please contact Leon Neat, lnterim Operations Training Manager at $23) 365-1256 or Kim Hulvey, Site Licensing Manager at (423) 365-7720.
Respectfully, 4
Paul Simmons Site Vice President Watts Bar Nuclear Plant
U.S. Nuclear Regulatory Commission Page 2 May 2,2018
Enclosure:
NRC Form 536 - Operator Licensing Examination Data cc (Enclosure):
NRC Project Manager - Watts Bar Nuclear Plant NRC RegionalAdministrator - Region l!
NRC Senior Resident lnspector
Enclosure NRC Form 536 Operator Licensing Examination Data Tennessee Valley Authority Watts Bar Nuclear Plant, Units { and 2 NRC Docket Nos. 50-390 and S0-3gi
U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY oMB: No. gt50-013i ExptRES: i130t2o20 Estimated burden per response to comply wiilr this voluntary information collection request. t hour.
This OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations.
Send comments regarding burden estimate to the lnformation Services Branch (T-2 F43), U.S.
EXAMINATION DATA Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, Nuclear and to the Desk Officer, Office of lnformation and Regulatory Affairs, NEOB-I0202, (315G013-i1, Oftce of Management and Budget, Washington, DC 20503. lf a means used to impose an information collection does not display a cunently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Watts Bar Units l and 2 lt A. PROPOSED EXAMINATION PREPARATIONffi PROPOSED NUMBER a"ro, cY 2021 cY 2022 cY 2023 ESTIMATED NUMBER OF LICENSEE.PREPARED I 0 I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC.PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER cY 2020 cY 2022 cY 2023
""r*,
NUMBER OF REACTOR OPERATORS 7 6 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT l2 6 NUMBER OF SENIOR REACTOR OPERATORS. UPGRADE 0 3 NUMBER OF SENIOR REACTOR OPERATORS. LIMTTED 0 0 PROPOSED DATES August 2020, Sept 2020 August2022, Sept 2022 PRIMARY DATE 08/ t0t2020 08/08/2022 ALTERNATE DATE 09114t202A 09112t2022 NRC FORM 536 (11-2017)
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 May 2,2018 10 cFR 50.4 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Units 1 and 2 Facility Operating License No. NPF-90 and NPF-96 NRC Docket Nos. 50-390 and 50-391
Subject:
Nuclear Regulatory Commission (NRG) Regulatory lssue Summary (RlS) 20{8 Preparation and Scheduling of Operator Licensing Examinations
Reference:
NRC RIS 2018-02, "Preparation and Scheduling of Operator Licensing Examinations," dated March 26, 2018 Regulatory lssue Summary (RlS) 2018-02 requested information regarding Watts Bar Nuclear Plant's (WBN's) projected operator licensing examination schedules and the estimated number of applicants. The enclosure to this letter addresses the NRC's request and provides an estimate of the examination requirements for WBN on NRC Form 536.
There are no new regulatory commitments in this letter. Should you have any questions regarding this submittal, please contact Leon Neat, lnterim Operations Training Manager at $23) 365-1256 or Kim Hulvey, Site Licensing Manager at (423) 365-7720.
Respectfully, 4
Paul Simmons Site Vice President Watts Bar Nuclear Plant
U.S. Nuclear Regulatory Commission Page 2 May 2,2018
Enclosure:
NRC Form 536 - Operator Licensing Examination Data cc (Enclosure):
NRC Project Manager - Watts Bar Nuclear Plant NRC RegionalAdministrator - Region l!
NRC Senior Resident lnspector
Enclosure NRC Form 536 Operator Licensing Examination Data Tennessee Valley Authority Watts Bar Nuclear Plant, Units { and 2 NRC Docket Nos. 50-390 and S0-3gi
U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY oMB: No. gt50-013i ExptRES: i130t2o20 Estimated burden per response to comply wiilr this voluntary information collection request. t hour.
This OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations.
Send comments regarding burden estimate to the lnformation Services Branch (T-2 F43), U.S.
EXAMINATION DATA Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, Nuclear and to the Desk Officer, Office of lnformation and Regulatory Affairs, NEOB-I0202, (315G013-i1, Oftce of Management and Budget, Washington, DC 20503. lf a means used to impose an information collection does not display a cunently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Watts Bar Units l and 2 lt A. PROPOSED EXAMINATION PREPARATIONffi PROPOSED NUMBER a"ro, cY 2021 cY 2022 cY 2023 ESTIMATED NUMBER OF LICENSEE.PREPARED I 0 I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC.PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER cY 2020 cY 2022 cY 2023
""r*,
NUMBER OF REACTOR OPERATORS 7 6 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT l2 6 NUMBER OF SENIOR REACTOR OPERATORS. UPGRADE 0 3 NUMBER OF SENIOR REACTOR OPERATORS. LIMTTED 0 0 PROPOSED DATES August 2020, Sept 2020 August2022, Sept 2022 PRIMARY DATE 08/ t0t2020 08/08/2022 ALTERNATE DATE 09114t202A 09112t2022 NRC FORM 536 (11-2017)