| {{#Wiki_filter:January 10, 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington , DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Docket 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 NEXT era ENERGY S POINT BEACH NRC 2017-0002 10 CFR 50.54(f) NextEra Energy Point Beach , LLC, Notification of Modification Completion Referenc*es: | | {{#Wiki_filter:NEXTera ENERGY S POINT BEACH January 10, 2017 NRC 2017-0002 10 CFR 50.54(f) |
| * 1. NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 (ML12073A348)
| | U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington , DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Docket 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 NextEra Energy Point Beach , LLC, Notification of Modification Completion Referenc*es: * |
| : 2. NextEra Energy Point Beach, LLC's Expedited Seismic Evaluation Process Report (CEUS Sites), Response [to] NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from * | | : 1. NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 (ML12073A348) |
| * the Fukushima*Dai-ichi Accident, dated December 22 , 2014(ML14356A426) | | : 2. NextEra Energy Point Beach, LLC's Expedited Seismic Evaluation Process Report (CEUS Sites), Response [to] NRC Request for Information Pursuant to 10 CFR 50.54(f) |
| * 3. NextEra Energy Point Beach, LLC, Screening and High Confidence Low Probability of Failure (HCLPF) Results for Inaccessible and Late Addition Components, dated February 16, 2016(ML16047A163)
| | Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from |
| On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a 10 CFR 50.54(f) letter to all power reactor licensees and holders of construction permits in active or deferred status. Reference 1, Enclosure 1, requested each addressee located in the Central and Eastern United States (CEUS) to submit a Seismic Hazard Evaluation and Screening. | | * |
| NextEra Energy Point Beach, LLC (NextEra) submitted an Expedited Seismic Evaluation Process Report for Point Beach Units 1 and 2 (Reference 2). In Reference 2, NextEra indicated that inaccessible and late addition components would be screened for High Confidence Low Probability of Failure (HCLPF) by restart from the Unit 2 fall 2015 refueling outage. NextEra submitted the HCLPF results for the inaccessible and late addition components in Reference | | * the Fukushima*Dai-ichi Accident, dated December 22, 2014(ML14356A426) * |
| : 3. In Reference 2, NextEra also indicated that modifications would be completed to enhance the seismic capacity of the station. This letter provides written notification of completion of the following modifications that were stated in Reference 2: NextEra Energy Point Beach , LLC 6610 Nuclear Road, Two Rivers, WI 54241 Document Control Desk Page 2 1. Masonry wall 111-2/23, along the west side of the Control Room, was modified to provide additional support at mid-span of the wall. 2. Masonry wall 111-4N/23, along the west side of the Control Room, was modified to provide additional support at mid-span of the wall. 3. Shield installation was performed to protect targets. below the Work Control Center (WCC) block walls located on the 44 ft elevation of the Turbine Building. 4. Condensate Storage Tank (CST) anchorage modifications were completed.
| | : 3. NextEra Energy Point Beach, LLC, Screening and High Confidence Low Probability of Failure (HCLPF) Results for Inaccessible and Late Addition Components, dated February 16, 2016(ML16047A163) |
| In addition, subsequent to issuance of Reference 2, two additional block walls were identified as needing modification. | | On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a 10 CFR 50.54(f) letter to all power reactor licensees and holders of construction permits in active or deferred status. |
| Modifications have been completed to the two additional walls: 1. Masonry wall 113/23 , a supporting element for walls 111-3N/23 and 111-3S/23 , was modified to provide additional support at mid-span of the wall. 2. Masonry wall 114/23, a supporting element for walls 111-3S/23 and 111-4N/23 , was *modified to provide additional support at mid-span of the wall. -* This letter contains no new regulatory commitments. | | Reference 1, Enclosure 1, requested each addressee located in the Central and Eastern United States (CEUS) to submit a Seismic Hazard Evaluation and Screening. |
| This letter documents completion of commitments made in Reference | | NextEra Energy Point Beach, LLC (NextEra) submitted an Expedited Seismic Evaluation Process Report for Point Beach Units 1 and 2 (Reference 2). In Reference 2, NextEra indicated that inaccessible and late addition components would be screened for High Confidence Low Probability of Failure (HCLPF) by restart from the Unit 2 fall 2015 refueling outage. NextEra submitted the HCLPF results for the inaccessible and late addition components in Reference 3. |
| : 2. If you have any questions please contact Mr. Bryan Woyak, Licensing Manager , at (920) 755-7599.
| | In Reference 2, NextEra also indicated that modifications would be completed to enhance the seismic capacity of the station. This letter provides written notification of completion of the following modifications that were stated in Reference 2: |
| I declare under penalty of perjury that the foregoing is true and correct. Executed on January 10, 2017. Sincerely, NextEra Energy Point Beach, LLC obert Coffey Site Vice President cc: Director, Office of Nuclear Reactor Regulation Administrator, Region Ill, USNRC Resident Inspector, Po i nt Beach Nuclear Plant , USNRC Project Manager, Point Beach Nuclear Plant , USNRC}} | | NextEra Energy Point Beach , LLC 6610 Nuclear Road, Two Rivers, WI 54241 |
| | |
| | Document Control Desk Page 2 |
| | : 1. Masonry wall 111-2/23, along the west side of the Control Room, was modified to provide additional support at mid-span of the wall. |
| | : 2. Masonry wall 111-4N/23, along the west side of the Control Room, was modified to provide additional support at mid-span of the wall. |
| | : 3. Shield installation was performed to protect targets. below the Work Control Center (WCC) block walls located on the 44 ft elevation of the Turbine Building . |
| | : 4. Condensate Storage Tank (CST) anchorage modifications were completed. |
| | In addition, subsequent to issuance of Reference 2, two additional block walls were identified as needing modification. Modifications have been completed to the two additional walls: |
| | : 1. Masonry wall 113/23, a supporting element for walls 111-3N/23 and 111-3S/23, was modified to provide additional support at mid-span of the wall. |
| | : 2. Masonry wall 114/23, a supporting element for walls 111-3S/23 and 111-4N/23, was |
| | *modified to provide additional support at mid-span of the wall. - |
| | * This letter contains no new regulatory commitments. This letter documents completion of commitments made in Reference 2. |
| | If you have any questions please contact Mr. Bryan Woyak, Licensing Manager, at (920) 755-7599. |
| | I declare under penalty of perjury that the foregoing is true and correct. Executed on January 10, 2017. |
| | Sincerely, NextEra Energy Point Beach, LLC obert Coffey Site Vice President cc: Director, Office of Nuclear Reactor Regulation Administrator, Region Ill, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC Project Manager, Point Beach Nuclear Plant, USNRC}} |
|
---|
Category:Letter type:NRC
MONTHYEARNRC 2023-0013, Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-07-0707 July 2023 Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter NRC 2023-0005, Report of Changes to Emergency Plan2023-02-21021 February 2023 Report of Changes to Emergency Plan NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan2022-09-30030 September 2022 Sixth 10-Year Interval Inservice Testing (1ST) Program Plan NRC 2022-0025, License Amendment Request 295, Beacon Power Distribution Monitoring System2022-09-26026 September 2022 License Amendment Request 295, Beacon Power Distribution Monitoring System NRC 2022-0019, Report of Changes to Emergency Plan2022-07-13013 July 2022 Report of Changes to Emergency Plan NRC 2022-0022, Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2,2022-07-11011 July 2022 Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, NRC 2022-0015, Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report2022-04-27027 April 2022 Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report NRC 2022-0014, 2021 Annual Monitoring Report2022-04-14014 April 2022 2021 Annual Monitoring Report NRC 2021-0012, Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41)2022-04-0707 April 2022 Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41) NRC 2022-0003, License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process2022-03-25025 March 2022 License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process NRC 2022-0006, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2022-02-22022 February 2022 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections NRC 2022-0004, Report of Changes to Emergency Plan2022-02-0909 February 2022 Report of Changes to Emergency Plan NRC 2022-0005, Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2022-02-0101 February 2022 Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2022-0001, Report of Changes to Emergency Plan2022-01-11011 January 2022 Report of Changes to Emergency Plan NRC 2021-0046, Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40)2021-10-28028 October 2021 Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40) NRC 2021-0031, Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-0562021-07-15015 July 2021 Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-056 NRC 2021-0027, Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-0532021-06-30030 June 2021 Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-053 NRC 2021-0028, Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism2021-06-23023 June 2021 Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism NRC 2021-0021, 2020 Annual Monitoring Report2021-04-29029 April 2021 2020 Annual Monitoring Report NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations NRC-2021-0010, CFR 50.59 Evaluation and Commitment Change Summary Report2021-04-0202 April 2021 CFR 50.59 Evaluation and Commitment Change Summary Report NRC-2021-0011, Technical Specification Bases and Technical Requirement Manual Change Summary2021-04-0202 April 2021 Technical Specification Bases and Technical Requirement Manual Change Summary NRC 2021-0006, Report of Changes to Emergency Plan2021-03-18018 March 2021 Report of Changes to Emergency Plan NRC 2021-0005, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-022021-02-11011 February 2021 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-02 NRC 2021-0002, Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2021-01-21021 January 2021 Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report2021-01-21021 January 2021 Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report NRC 2021-0001, Report of Changes to Emergency Plan2021-01-13013 January 2021 Report of Changes to Emergency Plan NRC 2020-0044, Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise2020-12-0808 December 2020 Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise NRC 2020-0032, Application for Subsequent Renewed Facility Operating Licenses2020-11-16016 November 2020 Application for Subsequent Renewed Facility Operating Licenses NRC 2020-0039, Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40)2020-11-0202 November 2020 Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40) NRC 2020-0031, NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-0812020-10-0505 October 2020 NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-081 NRC 2020-0029, Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-09-15015 September 2020 Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0024, Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements2020-08-17017 August 2020 Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements NRC 2020-0020, License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-08-13013 August 2020 License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0023, NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-08-12012 August 2020 NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations NRC 2020-0021, Response to NRC Inspection Report and Preliminary White Finding2020-08-12012 August 2020 Response to NRC Inspection Report and Preliminary White Finding NRC 2020-0018, Report of Changes to Emergency Plan2020-07-15015 July 2020 Report of Changes to Emergency Plan NRC-2020-0016, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-12012 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic NRC 2020-0012, Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2020-05-20020 May 2020 Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2020-0008, Report of Changes to Emergency Plan2020-04-0606 April 2020 Report of Changes to Emergency Plan NRC 2020-0007, Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38)2020-03-27027 March 2020 Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38) NRC 2020-0003, License Amendment Request 289: Tornado Missile Protection Licensing Basis2020-02-0606 February 2020 License Amendment Request 289: Tornado Missile Protection Licensing Basis NRC 2020-0001, Pressure Temperature Limits Report (PTLR)2020-01-0909 January 2020 Pressure Temperature Limits Report (PTLR) NRC 2019-0044, Report of Changes to Emergency Plan2019-11-0101 November 2019 Report of Changes to Emergency Plan NRC 2019-0036, Submittal of 2018 Update to Final Safety Analysis Report2019-10-18018 October 2019 Submittal of 2018 Update to Final Safety Analysis Report NRC 2019-0037, Technical Specification Bases Change Summary2019-10-18018 October 2019 Technical Specification Bases Change Summary NRC 2019-0034, Technical Requirements Manual Change Summary2019-10-18018 October 2019 Technical Requirements Manual Change Summary NRC 2019-0032, CFR 50.59 Evaluation and Commitment Change Summary Report2019-10-18018 October 2019 CFR 50.59 Evaluation and Commitment Change Summary Report NRC 2019-0042, NextEra Energy Point Beach, LLC, Relief Request 1-RR-13 and 2-RR-13, Response to Request for Additional Information2019-10-17017 October 2019 NextEra Energy Point Beach, LLC, Relief Request 1-RR-13 and 2-RR-13, Response to Request for Additional Information 2023-07-07
[Table view] |
Text
NEXTera ENERGY S POINT BEACH January 10, 2017 NRC 2017-0002 10 CFR 50.54(f)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington , DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Docket 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 NextEra Energy Point Beach , LLC, Notification of Modification Completion Referenc*es: *
- 1. NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 (ML12073A348)
- 2. NextEra Energy Point Beach, LLC's Expedited Seismic Evaluation Process Report (CEUS Sites), Response [to] NRC Request for Information Pursuant to 10 CFR 50.54(f)
Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from
- the Fukushima*Dai-ichi Accident, dated December 22, 2014(ML14356A426) *
- 3. NextEra Energy Point Beach, LLC, Screening and High Confidence Low Probability of Failure (HCLPF) Results for Inaccessible and Late Addition Components, dated February 16, 2016(ML16047A163)
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a 10 CFR 50.54(f) letter to all power reactor licensees and holders of construction permits in active or deferred status.
Reference 1, Enclosure 1, requested each addressee located in the Central and Eastern United States (CEUS) to submit a Seismic Hazard Evaluation and Screening.
NextEra Energy Point Beach, LLC (NextEra) submitted an Expedited Seismic Evaluation Process Report for Point Beach Units 1 and 2 (Reference 2). In Reference 2, NextEra indicated that inaccessible and late addition components would be screened for High Confidence Low Probability of Failure (HCLPF) by restart from the Unit 2 fall 2015 refueling outage. NextEra submitted the HCLPF results for the inaccessible and late addition components in Reference 3.
In Reference 2, NextEra also indicated that modifications would be completed to enhance the seismic capacity of the station. This letter provides written notification of completion of the following modifications that were stated in Reference 2:
NextEra Energy Point Beach , LLC 6610 Nuclear Road, Two Rivers, WI 54241
Document Control Desk Page 2
- 1. Masonry wall 111-2/23, along the west side of the Control Room, was modified to provide additional support at mid-span of the wall.
- 2. Masonry wall 111-4N/23, along the west side of the Control Room, was modified to provide additional support at mid-span of the wall.
- 3. Shield installation was performed to protect targets. below the Work Control Center (WCC) block walls located on the 44 ft elevation of the Turbine Building .
- 4. Condensate Storage Tank (CST) anchorage modifications were completed.
In addition, subsequent to issuance of Reference 2, two additional block walls were identified as needing modification. Modifications have been completed to the two additional walls:
- 1. Masonry wall 113/23, a supporting element for walls 111-3N/23 and 111-3S/23, was modified to provide additional support at mid-span of the wall.
- 2. Masonry wall 114/23, a supporting element for walls 111-3S/23 and 111-4N/23, was
- modified to provide additional support at mid-span of the wall. -
- This letter contains no new regulatory commitments. This letter documents completion of commitments made in Reference 2.
If you have any questions please contact Mr. Bryan Woyak, Licensing Manager, at (920) 755-7599.
I declare under penalty of perjury that the foregoing is true and correct. Executed on January 10, 2017.