{{#Wiki_filter:0 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
{{#Wiki_filter:0 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406
KING OF PRUSSIA, PA 19406-2713 MN-17-005 March 28, 2017 MEETING  
-2713 MN-17-005 March 28, 2017 MEETING  


==SUMMARY==
==SUMMARY==


LICENSEE: First Energy Nuclear Operating Company (FENOC)
LICENSEE:               First Energy Nuclear Operating Company (FENOC)
 
FACILITY:               Beaver Valley Power Station, Units 1 and 2
FACILITY: Beaver Valley Power Station, Units 1 and 2


==SUBJECT:==
==SUBJECT:==
Annual Assessment Meeting Summary On March 20, 2017
Annual Assessment Meeting Summary On March 20, 2017, from 5:00 p.m. to 6:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Shippingport Community and Municipal Building in Shippingport, PA. The NRC conducted the open house to discuss its assessment of the safety performance at Beaver Valley Power Station, Units 1 and 2, for 2016.
, from 5:00 p.m. to 6:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Shippingport Community and Municipal Building in Shippingport, PA. The NRC conducted the open house to discuss its assessment of the safety performance at Beaver Valley Power Station, Units 1 and 2, for 2016.
A notice of the open house was issued on March 7, 2017, and was posted on the NRCs external (public) Website. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML17061A207.
A notice of the open house was issued on March 7, 2017, and was posted on the NRC's external (public) Website. The meeting notice can be found in the NRC
ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html.
's Agencywide Documents Access and Management System (ADAMS) with Accession No. ML17061A207. ADAMS is accessible from the NRC's Website at http://www.nrc.gov/reading
The NRC displayed poster boards and was available to discuss its assessment of the safety performance of the Beaver Valley Power Station for the period of January 1 through December 31, 2016, as documented in our Annual Assessment Letter dated March 1, 2017 (ADAMS Accession No. ML17058A277). The NRC poster boards included background information on the Reactor Oversight Process (ROP) and plant-specific performance. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Beaver Valley Power Station can be found on the NRC's website at https://www.nrc.gov/reactors/operating/oversight.html.
-rm/adams.html. The NRC displayed poster boards and was available to discuss its assessment of the safety performance of the Beaver Valley Power Station for the period of January 1 through December 31, 2016, as documented in our Annual Assessment Letter dated March 1, 2017 (ADAMS Accession No. ML17058A277). The NRC poster boards included background information on the Reactor Oversight Process (ROP) and plant
Members of the public attended the open house and were offered the opportunity to question the NRC regarding Beaver Valleys performance and the role of the agency in ensuring safe plant operations.
-specific performance. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Beaver Valley Power Station can be found on the NRC's website at https://www.nrc.gov/reactors/operating/oversight.html
. Members of the public attended the open house and were offered the opportunity to question the NRC regarding Beaver Valley's performance and the role of the agency in ensuring safe plant operations.
______/RA________________
______/RA________________
Silas R. Kennedy, Chie f Projects Branch 6 Division of Reactor Projects
Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects


==Enclosure:==
==Enclosure:==
Attendance List (ADAMS No. ML17075A019)
Attendance List (ADAMS No. ML17075A019)


2
2


==SUBJECT:==
==SUBJECT:==
(Public Meeting Notice) FIRST ENERGY NUCLEAR OP ERATING COMPANY, BEAVER VALLEY POWER STATION, UNITS 1 AND 2 DATED MARCH 28, 2017   Distribution: (via e-mail) DDorman, RA DLew, DRA MScott, DRP DPelton, DRP RLorson, DRS JYerokun, DRS SHorvitz, DRP SKennedy, DRP SShaffer, DRP MHenrion, DRP JKrafty, DRP, SRI CBozlinski, DRP, ROAA JBowen, RI, OEDO RidsNrrPMBeaverValley Resource RidsNrrDorlLpl1
(Public Meeting Notice) FIRST ENERGY NUCLEAR OPERATING COMPANY, BEAVER VALLEY POWER STATION, UNITS 1 AND 2 DATED MARCH 28, 2017 Distribution: (via e-mail)
-2 Resource ROPreports Resource           DOCUMENT NAME: G:\DRP\BRANCH6\Communications
DDorman, RA DLew, DRA MScott, DRP DPelton, DRP RLorson, DRS JYerokun, DRS SHorvitz, DRP SKennedy, DRP SShaffer, DRP MHenrion, DRP JKrafty, DRP, SRI CBozlinski, DRP, ROAA JBowen, RI, OEDO RidsNrrPMBeaverValley Resource RidsNrrDorlLpl1-2 Resource ROPreports Resource DOCUMENT NAME: G:\DRP\BRANCH6\Communications\Public Meetings\Annual Assessment Meetings\2017\Beaver Valley\BV Annual Assessment Meeting Summary 2017.docx ADAMS PKG No. ML17075A019                                 Accession No. ML17082A184 Non-Sensitive                   Publicly Available SUNSI Review Sensitive                        Non-Publicly Available OFFICE     RI/DRP                 RI/DRP NAME       MHenrion/MH             SKennedy/SK DATE       03/28/17                03/28/17 OFFICIAL RECORD COPY}}
\Public Meetings
\Annual Assessment Meetings\2017\Beaver Valley
\BV Annual Assessment Meeting Summary 2017.docx ADAMS PKG No. ML17075A019   Accession No. ML17082A184 SUNSI Review Non-Sensitive Sensitive  Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP   NAME MHenrion/MH SKennedy/SK   DATE 03/28/1 7 03/28/1 7    OFFICIAL RECORD COPY}}

Latest revision as of 06:28, 30 October 2019

March 20, 2017, Summary of Annual Assessment Meeting with Beaver Valley, Units 1 and 2
ML17082A184
Person / Time
Site: Beaver Valley
Issue date: 03/28/2017
From: Silas Kennedy
NRC/RGN-I/DRP/PB6
To:
Kennedy S
Shared Package
ML17075A019 List:
References
MN-17-005
Download: ML17082A184 (3)


Text

0 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406-2713 MN-17-005 March 28, 2017 MEETING

SUMMARY

LICENSEE: First Energy Nuclear Operating Company (FENOC)

FACILITY: Beaver Valley Power Station, Units 1 and 2

SUBJECT:

Annual Assessment Meeting Summary On March 20, 2017, from 5:00 p.m. to 6:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Shippingport Community and Municipal Building in Shippingport, PA. The NRC conducted the open house to discuss its assessment of the safety performance at Beaver Valley Power Station, Units 1 and 2, for 2016.

A notice of the open house was issued on March 7, 2017, and was posted on the NRCs external (public) Website. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML17061A207.

ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html.

The NRC displayed poster boards and was available to discuss its assessment of the safety performance of the Beaver Valley Power Station for the period of January 1 through December 31, 2016, as documented in our Annual Assessment Letter dated March 1, 2017 (ADAMS Accession No. ML17058A277). The NRC poster boards included background information on the Reactor Oversight Process (ROP) and plant-specific performance. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Beaver Valley Power Station can be found on the NRC's website at https://www.nrc.gov/reactors/operating/oversight.html.

Members of the public attended the open house and were offered the opportunity to question the NRC regarding Beaver Valleys performance and the role of the agency in ensuring safe plant operations.

______/RA________________

Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

Attendance List (ADAMS No. ML17075A019)

2

SUBJECT:

(Public Meeting Notice) FIRST ENERGY NUCLEAR OPERATING COMPANY, BEAVER VALLEY POWER STATION, UNITS 1 AND 2 DATED MARCH 28, 2017 Distribution: (via e-mail)

DDorman, RA DLew, DRA MScott, DRP DPelton, DRP RLorson, DRS JYerokun, DRS SHorvitz, DRP SKennedy, DRP SShaffer, DRP MHenrion, DRP JKrafty, DRP, SRI CBozlinski, DRP, ROAA JBowen, RI, OEDO RidsNrrPMBeaverValley Resource RidsNrrDorlLpl1-2 Resource ROPreports Resource DOCUMENT NAME: G:\DRP\BRANCH6\Communications\Public Meetings\Annual Assessment Meetings\2017\Beaver Valley\BV Annual Assessment Meeting Summary 2017.docx ADAMS PKG No. ML17075A019 Accession No. ML17082A184 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME MHenrion/MH SKennedy/SK DATE 03/28/17 03/28/17 OFFICIAL RECORD COPY