ML17264A516: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:~~l~gISR261 J OCHESTER GAS Ec ELECTRIC C ORATION To<DOCUMENT CONTROL DESK US NRC ATT t ALLEN JOHNSON PROJECT DOCTORATE 1-1 WASHINGTON DC 20555 DOCUMENT CONTROL I Document Transmittal ggjgqP~~Transmittal:
{{#Wiki_filter:J
960507 N 059 Date: 05/23/1996 Holder: 1217 LISTED BELOW ARE NEW OR REVISED CONTROLLED DOCUMENTS.
        ~ ~l
REVIEW THE ATTACHED INSTRUCTION LETTER (IF APPLICABLE), AND UPDATE YOUR CONTROLLED DOCUMENT IN~'CCORDANCE WITH QA-603.I" Doc Id TRM Doc Title Rev Rev Date Qty TECHNICAL REQUIREMENTS MANUAL FOR 002 05/24/1996 1 GINNA STATION 3 I aaaaaaaaaaaaaaaaaaaaxaaaaaaaaaaaaaxaaaaaxxaxaaaaaaaaaaaaxaaaxaaaaaaaaaaaaa Receipt Acknowledgement and Action Taken: Signature Return to: Date Attention Document Control-49/3 Rochester Gas 6 Electric Corporation 89 East Avenue Rochester, New York 14649'~A qb053i0084 qb0522 PDR ADOCK 05000244 F PDH  
~   gISR261                             OCHESTER GAS Ec ELECTRIC C   ORATION DOCUMENT CONTROL I
,~~~.,~'ochester Gas and Electric Corpdration Inter-Office Correspondence May 22, 1996  
Document  Transmittal To <   DOCUMENT CONTROL DESK Transmittal:
ggjgqP~
960507 Date: 05/23/1996
                                                                                                  ~
N 059 US NRC                                                          Holder: 1217 ATT t ALLEN JOHNSON PROJECT DOCTORATE 1-1 WASHINGTON          DC 20555 LISTED BELOW ARE       NEW OR REVISED CONTROLLED DOCUMENTS.     REVIEW THE ATTACHED INSTRUCTION LETTER (IF APPLICABLE), AND UPDATE YOUR CONTROLLED DOCUMENT IN
~ 'CCORDANCE WITH QA-603.
I"   Doc   Id                   Doc Title                             Rev     Rev Date   Qty TRM                        TECHNICAL REQUIREMENTS MANUAL FOR       002   05/24/1996     1 GINNA STATION 3     I aaaaaaaaaaaaaaaaaaaaxaaaaaaaaaaaaaxaaaaaxxaxaaaaaaaaaaaaxaaaxaaaaaaaaaaaaa Receipt Acknowledgement and Action Taken:
Signature                                                         Date Return to:       Attention Document Control - 49/3 Rochester Gas 6 Electric Corporation 89 East Avenue Rochester, New York     14649 qb053i0084 qb0522 PDR   ADOCK 05000244 F                 PDH
  '~
A
 
,
  ~ ~
                          ~                   .,                   ~
Gas and Electric Corpdration         'ochester Inter-Office Correspondence May 22, 1996


==SUBJECT:==
==SUBJECT:==
Issuance of Revision 2 to Technical Requirements Manual (TRM)TO: Distribution Attached is Revision 2 to the TRM.These changes are made to provide consistency between the TRM, ITS, and COLR Table 1 with respect to RWST boron concentration requirements.
Issuance   of Revision 2 to Technical Requirements Manual (TRM)
Revision 2 to the TRM is considered effective on May 24, 1996.Please update yow copy of the TRM according to the list below.III LEP-i LEP-i B 3.1-3 B 3.1-7 B 3.1-3 B 3.1-7 Any questions should be directed to Mark Flaherty (x8512)or Peter Bamford (x3 832).George J.Wrobel Manager, Nuclear Safety&Licensing MD&855  
TO: Distribution Attached is Revision 2 to the TRM. These changes are made to provide consistency between the TRM, ITS, and COLR Table 1 with respect to RWST boron concentration requirements. Revision 2 to the TRM is considered effective on May 24, 1996.
.r s c List of Effective Pages (TRH)P ge Rev.Page Rev.Page Rev.Page TOC Sectio 1.0 TRH 1.0-1 Section 2.0 TRM 2.0-1 Section 3.0 TRH 3.0-1 Section 3.1 TRH 3.1-1 TRH 3.1-2 TRH 3.1-3 TRH 3.1-4 TRH 3.1-5 ,TRH 3.1-6 TRM 3.1-7 Section 3.2 TRH 3.2-1 Section 3.3 TRN 3.3-1 TRM 3.3-2 TRM 3.3-3 TRN 3.3-4 TRH 3.3-5 TRH 3:3-6 TRN 3.3-7 TRN 3.3-8 TRH 3.3-9 TRM 3.3-0 TRN 3.3 ll TRH 3.-12 TRH 3.3-13 TRH.3-14 1 0 Section TRH 3.4-1 TRH 3.4-2 TRH 3.4-3 TRH 3.4-4 TRH 3.4-5 TRM 3.4-6 TRN 3.4-7 Section RH 3.5-1 Section TRM 6-1 Sects n TRH 3.7-1 TRH 3.7-2 TRH 3.7-3 TRH 3.7-4 TRH 3.7-5 TRH 3.7-6 TRH 3.7-7 TRM 3.7-8 TRM 3.7y TRH 3'-10 TRH 3.7-11 TRg 3.7-12 KH 3.7-13 RH 3.7-14 TRH 3.7-15 TRN 3.7-16 TRN 3.7-17 TRN 3.7-18 TRH 3.7-19 TRH 3.7-20 TRH 3.7-21 TRH 3.7-22 TRH 3.7-23 TRH 3.7-24 3.4 3.5 3.6 3.7 Section 3.8 TRH 3.8-1 Section 3.9 TRH 3.9-1 TRH 3.9-2 TRH 3.9-3 TRH 3.9-4 0 0 0~nna Station TRH LEP-i Revision 1 0 I Boron Injection Syst-HO()ES I, 2i 3, and 4 TR 3.I.I SURVE I LLANCC RE(U I REHENT S SURVEILLANCE FREQUENCY TSR 3.1.1.1-NOTE---Only required to be performed when complying with TR 3.1.1.a.Verify RWST boron concentration is z 2000 ppm.7 days TSR 3.1.1.2-NOTE-Only req-ired to be performed when complying with TR 3.).I.b.Verify boric acid storage tank level is within limit.24 hours TSR 3.1.1.3-NOTE--Only required to be performed when complying with TR 3.1.1.b.Verify boric acid storage tank boron concentration is within limit.Twice p'r week TSR 3.1.1.4 Perform CHANNEL CALIBRATION of Volume Control Tank level indication.
Please update   yow copy of the TRM according to the list below.
18 months (continued)
III             LEP-i                         LEP-i B 3.1-3                       B 3.1-3 B 3.1-7                      B 3.1-7 Any questions should be directed to Mark Flaherty (x8512) or Peter Bamford (x3 832).
Ginna Station TRH IRH 3.1-3 Revision 0 C
George J. Wrobel Manager, Nuclear Safety & Licensing MD&855
Boron njection System-HODE 5 TR 3.1.2 ACTIONS continued CONDITION REQUIRED ACTIONS COHPLET ION TIHE B---------NOTE--------
 
Only applicable to TR 3.1.2.a.RCS boron concentration not within limit.B.l OR B.2 Initiate action to borate RCS to within limit.Initiate action to verify one boron injection subsystem is OPERABLE.Immediately Immedi ately SURVEILLANCE REQUIREHENTS SURVEILLANCE FREQUENCY TSR 3.1.2.1 NOTE-Only required to be performed when complying with TR 3.1.2.b.Verify boron injection subsystem suction source boron concentration is z 2000 ppm.Twice per week TSR 3.1.2.2 NOTE-Only required to be performed when complying with TR 3.1.2.a.Verify RCS boron concentration is within the limit specified in the COLR for LCO 3.9.1.72 hours Ginna Station TRH TRH 3.1-7 Revision 1}}
.r s c List of Effective   Pages (TRH)
P ge       Rev.     Page       Rev.     Page         Rev. Page TOC             Section 3.4          Section 3.8 TRH 3.4-1           TRH 3.8-1 TRH 3.4-2 Sectio    1.0    TRH 3.4-3               Section 3.9 TRH 3.4-4 TRH  1.0-1            TRH 3.4-5           TRH 3.9-1       0 TRM 3.4-6            TRH 3.9-2       0 Section 2.0      TRN 3.4-7            TRH 3.9-3       0~
TRH 3.9-4 TRM  2.0-1                Section 3.5 Section 3.0       RH  3.5-1 TRH   3.0-1                Section 3.6 Section 3.1      TRM    6-1 TRH 3.1-1               Sects  n 3.7 TRH   3.1-2 TRH   3.1-3           TRH 3.7-1 TRH   3.1-4           TRH  3.7-2 TRH  3.1-5            TRH 3.7-3
,TRH 3. 1-6          TRH 3.7-4 TRM  3.1-7           TRH 3.7-5 TRH 3.7-6 Section 3.2      TRH 3.7-7 TRM 3.7-8 TRH  3.2-1            TRM 3.7y TRH 3'-10 Section 3.3      TRH 3.7-11 TRg 3.7-12 TRN  3.3-1          1  KH 3.7-13 TRM  3.3-2          0  RH 3.7-14 TRM  3.3-3            TRH 3.7-15 TRN 3.3-4            TRN  3. 7-16 TRH  3.3-5            TRN 3.7-17 TRH  3:3-6            TRN 3.7-18 TRN  3.3-7           TRH 3.7-19 TRN  3.3-8            TRH 3.7-20 TRH 3.3-9            TRH 3.7-21 TRM  3.3- 0          TRH  3.7-22 TRN  3.3   ll        TRH 3.7-23 TRH 3. -12          TRH 3.7-24 TRH 3.3-13 TRH   .3-14 nna Station   TRH                     LEP-i                         Revision 1
 
0 I Boron Injection Syst     - HO()ES   I, 2i 3, and 4 TR 3.I.I SURVE I LLANCC RE(U I REHENT S SURVEILLANCE                                     FREQUENCY TSR   3.1.1.1                         -NOTE---
Only required to be performed       when complying with TR 3 . 1. 1. a.
Verify   RWST boron concentration     is z 2000       7  days ppm.
TSR   3.1.1.2                           -NOTE-Only req-ired to be performed       when complying with TR 3.). I.b.
Verify boric acid storage tank level is               24  hours within limit.
TSR   3.1.1.3                           -NOTE--
Only required to be performed when complying with TR 3.1.1.b.
Verify boric acid storage tank boron                   Twice    p'r  week concentration is within limit.
TSR 3.1.1.4     Perform   CHANNEL CALIBRATION   of Volume             18  months Control Tank   level   indication.
(continued)
Ginna   Station TRH                     IRH 3.1-3                                 Revision   0
 
C Boron   njection System-HODE 5 TR 3.1.2 ACTIONS     continued CONDITION                     REQUIRED ACTIONS             COHPLET ION TIHE B   ---------NOTE--------       B.l      Initiate action to          Immediately Only applicable to   TR             borate  RCS to within 3.1.2.a.                             limit.
OR RCS boron concentration not           B.2     Initiate action to         Immedi ately within limit.                       verify one boron injection subsystem is OPERABLE.
SURVEILLANCE REQUIREHENTS SURVEILLANCE                                 FREQUENCY TSR   3.1.2.1                         NOTE-Only required to be performed when complying with TR 3. 1.2.b.
Verify boron injection subsystem suction             Twice per week source boron concentration is z 2000 ppm.
TSR   3.1.2.2                         NOTE-Only required to be performed when complying with TR 3. 1.2.a.
Verify RCS boron concentration   is within       72 hours the limit specified in   the COLR for LCO 3.9.1.
Ginna Station   TRH                   TRH 3.1-7                             Revision 1}}

Revision as of 18:06, 29 October 2019

Rev 2 to Technical Requirements Manual (TRM)
ML17264A516
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/22/1996
From: Wrobel G
ROCHESTER GAS & ELECTRIC CORP.
To:
References
PROC-960522, NUDOCS 9605310084
Download: ML17264A516 (8)


Text

J

~ ~l

~ gISR261 OCHESTER GAS Ec ELECTRIC C ORATION DOCUMENT CONTROL I

Document Transmittal To < DOCUMENT CONTROL DESK Transmittal:

ggjgqP~

960507 Date: 05/23/1996

~

N 059 US NRC Holder: 1217 ATT t ALLEN JOHNSON PROJECT DOCTORATE 1-1 WASHINGTON DC 20555 LISTED BELOW ARE NEW OR REVISED CONTROLLED DOCUMENTS. REVIEW THE ATTACHED INSTRUCTION LETTER (IF APPLICABLE), AND UPDATE YOUR CONTROLLED DOCUMENT IN

~ 'CCORDANCE WITH QA-603.

I" Doc Id Doc Title Rev Rev Date Qty TRM TECHNICAL REQUIREMENTS MANUAL FOR 002 05/24/1996 1 GINNA STATION 3 I aaaaaaaaaaaaaaaaaaaaxaaaaaaaaaaaaaxaaaaaxxaxaaaaaaaaaaaaxaaaxaaaaaaaaaaaaa Receipt Acknowledgement and Action Taken:

Signature Date Return to: Attention Document Control - 49/3 Rochester Gas 6 Electric Corporation 89 East Avenue Rochester, New York 14649 qb053i0084 qb0522 PDR ADOCK 05000244 F PDH

'~

A

,

~ ~

~ ., ~

Gas and Electric Corpdration 'ochester Inter-Office Correspondence May 22, 1996

SUBJECT:

Issuance of Revision 2 to Technical Requirements Manual (TRM)

TO: Distribution Attached is Revision 2 to the TRM. These changes are made to provide consistency between the TRM, ITS, and COLR Table 1 with respect to RWST boron concentration requirements. Revision 2 to the TRM is considered effective on May 24, 1996.

Please update yow copy of the TRM according to the list below.

III LEP-i LEP-i B 3.1-3 B 3.1-3 B 3.1-7 B 3.1-7 Any questions should be directed to Mark Flaherty (x8512) or Peter Bamford (x3 832).

George J. Wrobel Manager, Nuclear Safety & Licensing MD&855

.r s c List of Effective Pages (TRH)

P ge Rev. Page Rev. Page Rev. Page TOC Section 3.4 Section 3.8 TRH 3.4-1 TRH 3.8-1 TRH 3.4-2 Sectio 1.0 TRH 3.4-3 Section 3.9 TRH 3.4-4 TRH 1.0-1 TRH 3.4-5 TRH 3.9-1 0 TRM 3.4-6 TRH 3.9-2 0 Section 2.0 TRN 3.4-7 TRH 3.9-3 0~

TRH 3.9-4 TRM 2.0-1 Section 3.5 Section 3.0 RH 3.5-1 TRH 3.0-1 Section 3.6 Section 3.1 TRM 6-1 TRH 3.1-1 Sects n 3.7 TRH 3.1-2 TRH 3.1-3 TRH 3.7-1 TRH 3.1-4 TRH 3.7-2 TRH 3.1-5 TRH 3.7-3

,TRH 3. 1-6 TRH 3.7-4 TRM 3.1-7 TRH 3.7-5 TRH 3.7-6 Section 3.2 TRH 3.7-7 TRM 3.7-8 TRH 3.2-1 TRM 3.7y TRH 3'-10 Section 3.3 TRH 3.7-11 TRg 3.7-12 TRN 3.3-1 1 KH 3.7-13 TRM 3.3-2 0 RH 3.7-14 TRM 3.3-3 TRH 3.7-15 TRN 3.3-4 TRN 3. 7-16 TRH 3.3-5 TRN 3.7-17 TRH 3:3-6 TRN 3.7-18 TRN 3.3-7 TRH 3.7-19 TRN 3.3-8 TRH 3.7-20 TRH 3.3-9 TRH 3.7-21 TRM 3.3- 0 TRH 3.7-22 TRN 3.3 ll TRH 3.7-23 TRH 3. -12 TRH 3.7-24 TRH 3.3-13 TRH .3-14 nna Station TRH LEP-i Revision 1

0 I Boron Injection Syst - HO()ES I, 2i 3, and 4 TR 3.I.I SURVE I LLANCC RE(U I REHENT S SURVEILLANCE FREQUENCY TSR 3.1.1.1 -NOTE---

Only required to be performed when complying with TR 3 . 1. 1. a.

Verify RWST boron concentration is z 2000 7 days ppm.

TSR 3.1.1.2 -NOTE-Only req-ired to be performed when complying with TR 3.). I.b.

Verify boric acid storage tank level is 24 hours within limit.

TSR 3.1.1.3 -NOTE--

Only required to be performed when complying with TR 3.1.1.b.

Verify boric acid storage tank boron Twice p'r week concentration is within limit.

TSR 3.1.1.4 Perform CHANNEL CALIBRATION of Volume 18 months Control Tank level indication.

(continued)

Ginna Station TRH IRH 3.1-3 Revision 0

C Boron njection System-HODE 5 TR 3.1.2 ACTIONS continued CONDITION REQUIRED ACTIONS COHPLET ION TIHE B ---------NOTE-------- B.l Initiate action to Immediately Only applicable to TR borate RCS to within 3.1.2.a. limit.

OR RCS boron concentration not B.2 Initiate action to Immedi ately within limit. verify one boron injection subsystem is OPERABLE.

SURVEILLANCE REQUIREHENTS SURVEILLANCE FREQUENCY TSR 3.1.2.1 NOTE-Only required to be performed when complying with TR 3. 1.2.b.

Verify boron injection subsystem suction Twice per week source boron concentration is z 2000 ppm.

TSR 3.1.2.2 NOTE-Only required to be performed when complying with TR 3. 1.2.a.

Verify RCS boron concentration is within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> the limit specified in the COLR for LCO 3.9.1.

Ginna Station TRH TRH 3.1-7 Revision 1