ML17265A820: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Indiana Michigan Power Company Ccokraciear pen Ore Cook prrir lhkymhv4arc6 ara aaa aaor INOlhhM NlCHEOiAN-PONEN May 24, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Operating License DPR-58 Docket No.50-315 Document Control Manager: ln accordance with the criteria established by 10 CFR 50.73 entitled Licensee Event This su le LER 315/98%37%1,"Ice Condenser Bypass Leakage Exceeds D''i cee s esign asis Limit." pp cmental report represents an extensive revision to the original LER and replaces that report in its entirety.The following new commitments were identified in this submittal~The Divider Banier Seal ice condenser bypass will be corrected''to Mode 4.via a esignc ange prior Sincerely, Vice President-Nuclear Engineering llrb Attachment J.E.Dyer, Region Ill R.P.Powers P.A.Barrett D.F.Kunsemiller R.Whale D.Hahn Records Center, INPO NRC Resident Inspector 9906030252 990524 PDR ADOCK 050003l5 S PDR a r~}}
{{#Wiki_filter:Indiana Michigan Power Company Ccokraciear pen Ore Cook prrir lhkymhv4arc6 ara aaa aaor INOlhhM NlCHEOiAN-PONEN May 24, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Operating License DPR-58 Docket No. 50-315 Document Control Manager:
ln accordance with the criteria established by 10 CFR 50.73 entitled Licensee Event LER 315/98%37%1, "Ice Condenser Bypass Leakage Exceeds
                                                                              '       'i cee s Design asis Limit."
This su pp lecmental report represents an extensive revision to the original LER and replaces that report in its entirety.
The following new commitments were identified in this submittal
                                                                        '      '
    ~   The Divider Banier Seal ice condenser bypass will be corrected via a esignc ange prior to Mode 4.
Sincerely, Vice President- Nuclear Engineering llrb Attachment J. E.       Dyer, Region Ill R. P.       Powers P. A.       Barrett D. F.       Kunsemiller R.           Whale D.           Hahn Records Center, INPO NRC Resident Inspector 9906030252 990524 PDR   ADOCK       050003l5 S                           PDR a
r~}}

Revision as of 16:43, 29 October 2019

Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal
ML17265A820
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/24/1999
From: Rencheck M
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17265A821 List:
References
NUDOCS 9906030252
Download: ML17265A820 (1)


Text

Indiana Michigan Power Company Ccokraciear pen Ore Cook prrir lhkymhv4arc6 ara aaa aaor INOlhhM NlCHEOiAN-PONEN May 24, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Operating License DPR-58 Docket No. 50-315 Document Control Manager:

ln accordance with the criteria established by 10 CFR 50.73 entitled Licensee Event LER 315/98%37%1, "Ice Condenser Bypass Leakage Exceeds

' 'i cee s Design asis Limit."

This su pp lecmental report represents an extensive revision to the original LER and replaces that report in its entirety.

The following new commitments were identified in this submittal

' '

~ The Divider Banier Seal ice condenser bypass will be corrected via a esignc ange prior to Mode 4.

Sincerely, Vice President- Nuclear Engineering llrb Attachment J. E. Dyer, Region Ill R. P. Powers P. A. Barrett D. F. Kunsemiller R. Whale D. Hahn Records Center, INPO NRC Resident Inspector 9906030252 990524 PDR ADOCK 050003l5 S PDR a

r~