Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal
Date released: 04/30/2018 Download: ML17265A821


LER 98-037-01:on 990422,determined That Ice Condenser Bypass Leakage Exceeds Design Basis Limit.Caused by Pressure Seal Required by Revised W Design Not Incorporated Into Aep Design.Numerous Matl Condition Walkdowns & Assessments Made
ML17265A823
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/24/1999
From: Berry L
INDIANA MICHIGAN POWER CO.
To:
References
Download: ML17265A823 (6)
Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal
ML17265A820
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/24/1999
From: Rencheck M
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML17265A820 (1)