{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONSTPJ!!.TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)'CCESSION NBR:9204150162 DOC.DATE: 92/04/08 NOTARIZED:
{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONSTPJ!!.TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO'OCKETlx FACXL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILXATION MECREDY,R.C.
'CCESSION NBR:9204150162             DOC.DATE: 92/04/08       NOTARIZED: NO         'OCKET    lx FACXL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester                 G   05000244 AUTH. NAME           AUTHOR AFFILXATION MECREDY,R.C.         Rochester Gas       & Electric   Corp.
Rochester Gas&Electric Corp.RECXP.NAME RECXPXENT AFFXLXATXON JOHNSON,A.R.
RECXP.NAME           RECXPXENT AFFXLXATXON JOHNSON,A.R.             Project Directorate I-3
Project Directorate I-3 D


==SUBJECT:==
==SUBJECT:==
Revised EOPs,including Rev 5 to AP-IA.l,Rev 6 to AP-IA.1,Rev Rev 4 to AP-RHR.2,Rev 3 to ES-0.2,Rev 2 to ES-0.3,Rev 3 to FR-P.2 6 Rev 6 to FR-I.3.W/920408 ltr.S DIsTRIBUTIQN coDE: A045D coPIEs REcEIvED:LTR J ENcL t SIzE: l++TITLE: OR Submittal:
Revised EOPs,including Rev 5 to AP-IA.l,Rev 6 to AP-IA.1,Rev Rev 4 to AP-RHR.2,Rev 3 to ES-0.2,Rev 2 to ES-0.3,Rev 3 to                           D FR-P.2 6 Rev 6 to FR-I.3.W/920408 ltr.
Emergency Preparedness Pla s, Implement'g Procedures, C NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
DIsTRIBUTIQN coDE: A045D coPIEs REcEIvED:LTR               J   ENcL t   SIzE:   l+ +           S TITLE: OR Submittal: Emergency Preparedness Pla s, Implement'g Procedures,                   C NOTES:License Exp date       in accordance with 10CFR2,2.109(9/19/72).             05000244 A RECIPIENT               COPIES            RECIPIENT        COPIES                D ID CODE/NAME           LTTR ENCL        ID CODE/NAME      LTTR ENCL PD1-3 PD                   1      1    JOHNSON,A              1    1                D INTERNAL: AEOD/DOA/IRB                 1     1     NRR/DRE~P~RB9     D     1    1 NUDOCS-ABSTRACT            1      1    RE   NLK~     0&     1   1 EXTERNAL: NRC PDR                      1     1     N  IC                  1   1 R
05000244 A RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL: AEOD/DOA/IRB NUDOCS-ABSTRACT EXTERNAL: NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME JOHNSON,A NRR/DRE~P~RB9 D RE-NLK~0&N IC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D D R D NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL 8 D D e rzzzzpi zzsxiziw'riigj jin I SxrZiiZ zzudl8 l~~zezu ROCHESTER GAS AND ELECTRIC CORPORATION ROBERT C MECREDY Vice President Clnne Nudeer Production o 89 EAST AVENUE, ROCHESTER N.Y.14649-0001 TELEPHONE AstErtcooEPte 546.2700 April 8, 1992 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Mr.Allen Johnson Project Directorate I-3 Washington, D.C.20555  
D NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR               8   ENCL     8
 
rzzzzpi     zzsxiziw e
          'riigj jin I SxrZiiZ zzudl8     l~~zezu ROCHESTER GAS AND ELECTRIC CORPORATION                     o   89 EAST AVENUE, ROCHESTER N.Y. 14649-0001 ROBERT C MECREDY                                                                              TELEPHONE Vice President                                                                          AstErtcooEPte 546.2700 Clnne Nudeer Production April 8, 1992 U.S. Nuclear Regulatory Commission Document Control Desk Attn:                         Mr. Allen Johnson Project Directorate I-3 Washington,                   D.C. 20555


==Subject:==
==Subject:==
Emergency Operating Procedures R.E.Ginna Nuclear Power Plant Docket No.50-244 Gentlemen:
Emergency Operating Procedures R. E. Ginna Nuclear Power Plant Docket No. 50-244 Gentlemen:
As requested, enclosed are Ginna Station Emergency Operating Procedures.
As requested, enclosed are Ginna Station Emergency Operating Procedures.
Very truly yours, Robert C.Mecredy Enclosures c: Mr.Lee Bettenhausen, USNRC, Region 1 Resident Inspector, Ginna Station I r3.QOV u emergency.
Very truly yours, Robert C. Mecredy Enclosures c:             Mr. Lee Bettenhausen, USNRC, Region             1 Resident Inspector, Ginna Station I r3.QOV u emergency. pro p4 9204150162 920408 PDR       ADOCK 05000244 PDR
pro p4 9204150162 920408 PDR ADOCK 05000244 PDR AP-IA.1 Loss of Instrument Air, Rev.5 (was not attached to previous mailing)AP-IA.1 Loss of Instrument Air, Rev.6 AP-RHR.2 Loss of RHR While Operating at RCS Reduced Inventory Conditions, Rev.4 Att EOP/AP Attachments, Normal RHR Cooling, Rev.0 Abnormal Procedures Index 3/28/92 Functional Restoration Guidelines Procedure Index 3/28/92 Critical Safety Function Status Trees Index 3/28/92 Equipment Sub-Procedures Index 3/28/92 Emergency Contingency Actions Procedures Index 3/28/92 Emergency Procedures Index 3/28/92 EOP/AP Attachment Index 3/28/92 Emergency Plan Implementing Procedures 3/28/92, ATT EOP/AP Attachments, RHR Sample, Rev.0 ES-0.2 Natural Circulation Cooldown, Rev.3 ES-0.3 Natural Circulation Cooldown with Steam Void in Vessel, Rev.2 FR-P.2 Response to Anticipated Pressurized Thermal Shock Condition, Rev.3 FR-I-3.Response to Voids in Reactor Vessel, Rev.6 EOP:, AP-IA.1 TITLE: LOSS OF INSTRUMENT AIR REV'PAGE 1 of 2 ATTACHMENT A CNMT IA LOSS AND FAILURE MODE 1)P&ID 433013-1887 o Letdown AOV-427 (FO)o Excess Letdown AOV-310 (FC)o RCP Seal Return AOV-270B (FO)o RCP Thermal Barrier CCW AOV-754B (FO)2)P&ID 833013-1888 o Letdown Orifices AOV-200A, 200B, 202 (FC)o Charging AOV-294, 392A (FC)o Aux.Spray AOV-296 (FC)o PRZR Spray PCV-431A, 431B (FC)0 PRZR PORV PCV 430 g'43 1C (FC)o RCP Thermal Barrier CCW AOV-754A (FO)o Charging AOV-392B (FC)o RCP Seal Return AOV-386 (FC)o PRZR Sample Valves AOV-951;953 (FC)AUX BLDG IA LOADS AND FAILURE MODE 1)P&ID 533013-1889 o Letdown Valve LCV-112A (Fail to VCT)2)P&ID f33013-1890 o Letdown Valve AOV-371 (FC)o Charging Line Valve HCV-142 (FO)o RHR Flow Valves HCV-624, 625 (FO)o RHR Hx Bypass Flow Valve FCV-626 (FC)3)P&ID 833013-1891 o VCT Makeup Valves AOV-llOB, 110C, ill (FC)o Charging Pump Suction AOV-112B (FC)AOV-112C (FO)o Charging Pump Speed Control Fails to Minimum o NaOH Tank Outlet Valves AOV-836A, 836B (FO)o Letdown Valve TCV-145 (Fail to VCT)o Letdown Valve PCV-135 (FO)4)P&ID f33013-1892 o VCT Makeup Valve AOV-110A (FO)  
 
't EOP: AP-IA.1 TITLE: LOSS OF INSTRUMENT AIR REV 5 PAGE 2 of 2 ATTACHMENT IA CONCERNS (Cont'd)TURBINE BLDG IA LOADS AND FAILURE MODE 1)P&ID N33013-1894 o Heater Drain Pump Recirc Vlv 3365 (FO)HDT pumps trip if recirc vly full open 1 minute o Condensate Trim Valves 9508D, 9508G (FC)o Condensate Makeup Vlv 4316 (FC)o Steam Dump Valves 3349, 3351, 3353, 3355 (FC)o H2 Cooler Inlet Vlv 4230 (FO).o Condensate Makeup Valve 4315 (FC)2)P&ID N33013-1895 o Reheater 2nd Pass Level Control Valves to g5 Heater 3333A, 3333B~3334Ag 3334B (FC)o MFW Regulating Valves and Bypass Valves 4269, 4270, 4271, 4272 (FC)3)P&ID$33013-1896 o Condensate Bypass Valve 3959 (FO)o Reheater 2nd Pass Hi Level Dump Vlvs to Condenser 3336A, 3336BI 3338AI 3338B (FO)o Steam Dump Valves 3350, 3352, 3354, 3356 (FC)o H2 Cooler Bypass Valve 4229 (FO)INTERMEDIATE BLDG IA LOADS AND FAILURE MODE 1)P&ID N33013-1893 o S/G Blowdown Vlvs 5737, 5738 (FC)IA COMPRESSORS FILTERS AND AIR DRYERS 1)P&ID N33013-1900, Sheets 1&2 AUX BLDG SW E-3 ES-1.1 ES-1.2 ES-1.3 ECA-0.1 ECA-2.1 ECA-3.1 ECA-3.2 ECA-3.3 FR-H.1 FR-I.3 COND TO S G FR-H.1.~CI CVI" E-0 ECA-O.O'R-Z.1 CNMT RECIRC FANS E-0 E-1 E-3 ES-1.1 ECA-1.1 ECA-2.1 ECA-3.1 FR-P.1'C LOADS D G STOP ECA-O.O FAULTED S G E-2 ECA-O.O ECA-2.1 FR-S.1 E-0 E-1 E-3 ES-1'ES-1.2 ES-1.3 ECA-2.1 ECA-3.1 ECA-3.2 ECA-3.3 GEN DEGAS ECA-O.O INTACT S G PRESS LETDOWN E-2 ES-0.1 ES-0.2 S 1'I'(I N2 PORVS E-3 ES-1'ECA-0.1 ECA-1.1 ECA-2.1 ECA-3.1 ECA-3.2 ECA-3.3 FR-C.1 FR-H-1 FR-P.1 FR-P.2 FR-I'NC E-3 ES-0.1 ES-F 1 ES-1.2 ECA-2.1 ECA-3.1 ECA-3.2 NONVITAL ECA-O.O RCS ISOLATION ECA-O.O RHR COOL ES-0.2 ES-0.3 ES-1.2 ES-3.1 ES-3.2 ES-3'ECA-1.1 ECA-2.1 ECA-3.1 ECA-3.2 ECA-3.3 FR-H.1 RUPTURED S G E-3 ECA-O.O ECA-3.1 ECA-3.'2 ECA-3.3 RHR NPSH ES-1.3 NORMAL RHR COOLING AP-RHR.2 RHR SAMPLE RHR SYSTEM ES-1.3 ECA-1.1 ES-0.2 ES-0.3 SAFW FR-H.1.SD-1.E-0 E-1 E-3 ES-0.1 ES-1.1 ES-1'ES-1.3 ECA-0.1 ECA-1.1 ECA-2.1 ECA-3.1 ECA-3.2 ECA-3.3 FR-H.1 FR-I.1 FR-I'FR-P.1 SI FLUSH E-3 ES-1.1 ECA-1.1 ECA-2.1 ECA-3.3 FR-P.1 SI UV E-0 E-1 ES-1.1 ES-1'ECA-2.1 ECA-3.1 VENT TIME FR-I.3 SEAL COOLING SD-2 E-3 ES-1.1 ES-1.2 ECA-0.1 ECA-0.2 ECA-2.1 ECA-3.1 ECA-3.2 ECA-3.3 SFP-RWST ECA-1'ECA-3.2 E-3 ES-0.1 ES-F 1 ES-1.2 ES-1.3 ECA-0.1 ECA-2.1 ECA-3.1 ECA-3'ECA-3.3 RCP START E-3 ES-0'ES-0'ES-0'ES-1'ES-1'ECA-1.1 ECA-2.1 ECA-3'ECA-3.2 ECA-3.3 FR-C.1 FR-C.2 FR-P.1 FR-1".3 EOP: AP-IA.1 TITLE!LOSS OF INSTRUMENT AIR REV: 5 PAGE 1 of 11 RO HESTER GAS AND ELECTRIC CORP TION GINNA STATION C TROLLED COPY NUMBER TECHNICAL R IEW PORC REVIE DA E P T SUP INTENDENT EFF CTIV DA CATEGORY 1.0 REVIEWED BY:
AP-IA.1 Loss of Instrument Air, Rev. 5 (was not attached to previous mailing)
r-./p'.p lt C, 1 EOP: 4 AP-.XA.1 TITLE: LOSS OF INSTRUMENT AIR REV: 5 PAGE 2 of 11 A.pURpOSE-This procedure provides the instructions necessary in the event of a loss of instrument air.B.ENTRY CONDITIONS/SYMPTOMS l.ENTRY CONDITIONS
AP-IA.1 Loss of Instrument Air, Rev. 6 AP-RHR.2 Loss of RHR While Operating at RCS Reduced Inventory Conditions, Rev. 4 Att EOP/AP Attachments, Normal RHR Cooling, Rev. 0 Abnormal Procedures Index 3/28/92 Functional Restoration Guidelines Procedure Index 3/28/92 Critical Safety Function Status Trees Index 3/28/92 Equipment Sub-Procedures Index 3/28/92 Emergency Contingency Actions Procedures Index 3/28/92 Emergency Procedures Index 3/28/92 EOP/AP Attachment Index 3/28/92 Emergency Plan Implementing Procedures 3/28/92, ATT EOP/AP Attachments, RHR Sample, Rev. 0 ES-0.2 Natural Circulation Cooldown, Rev. 3 ES-0.3 Natural Circulation Cooldown with Steam Void in Vessel, Rev. 2 FR-P.2 Response to Anticipated Pressurized Thermal Shock Condition, Rev. 3 FR-I-3.Response to Voids in Reactor Vessel, Rev. 6
-This procedure is entered from: a.E-Q, REACTOR TRXP OR SAFETY INJECTION, or b.E-1, LOSS OF REACTOR OR SECONDARY COOLANT, or c.ES-1.1, SI TERMINATION, or d~ECA 2 1 g UNCONTROLLED DEPRESSURI ZATION OF BOTH STEAM GENERATORS, or e.E-3, STEAM GENERATOR TUBE RUPTURE, or f ECA 3 1 g SGTR W I TH LOSS OF REACTOR COOLANT SUBCOOLED RECOVERY DESIRED, or g.FR-I.1, RESPONSE TO HIGH PRESSURIZER LEVEL, or h.FR-I.3, RESPONSE TO VOIDS IN REACTOR VESSEL HEAD, or i.FR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK, or j FR P 1 g RESPONSE TO IMMINENT'RESSURI ZED THERMAL SHOCK CONDITION.
 
2.SYMPTOMS-The symptoms of LOSS OF INSTRUMENT AIR are;a.Annunciator H-8, INSTRUMENT AIR LO PRESS, 100 psi, lit, or b.Annunciator H-16, INSTRUMENT AIR LO PRESS, lit.  
EOP:,         TITLE:                                        REV' AP-IA.1                 LOSS OF INSTRUMENT AIR PAGE 1 of 2 ATTACHMENT A CNMT IA LOSS AND FAILURE MODE
,])V ll'  
: 1) P&ID 433013-1887 o Letdown AOV-427 (FO) o Excess Letdown AOV-310 (FC) o RCP Seal Return AOV-270B (FO) o RCP Thermal Barrier CCW AOV-754B (FO)
~~~~~P RQ I T~~~~~T~I T~~I~~~~I~~~~I~T~T~~~)~~~~~~~I~~~~~~T I~~)~~~'I'~~0 I~~I~~~~~o~o~~t~I~~~~~'~~~~I J I 0 EOP: AP-,IA.1 TITLE: LOSS OF INSTRUMENT AIR REV: 5 PAGE 4 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED*****************************************CAUTION o OBSERVE D/G LOADING LIMITS OP 2300 KW POR 1/2 HOUR, 2250 KW FOR 2 HOURS, AND 1950 KW FOR CONTINUOUS SERVICE.o WHEN IA PRESSURE IS LOW, MFW REGULATING VALVES SHOULD BE MONITORED FOR PROPER OPERATION.
: 2) P&ID 833013-1888 o   Letdown   Orifices AOV-200A, 200B, 202 (FC) o   Charging   AOV-294, 392A (FC) o   Aux. Spray   AOV-296 (FC) o   PRZR Spray PCV-431A, 431B (FC) 0   PRZR PORV PCV 430 g '43 1C (FC) o   RCP Thermal Barrier CCW AOV-754A (FO) o   Charging AOV-392B (FC) o   RCP Seal Return AOV-386 (FC) o   PRZR Sample Valves AOV-951; 953 (FC)
I 2 Verify Power To Bus 13 And Bus 15: o Bus 13-APPROXIMATELY 480 VOLTS o Bus 15-APPROXIMATELY 480 VOLTS IP IA pressure is low due to a loss of power to Bus 13 OR bus 15, THEN: a.Crosstie bus 13 to 14, OR crosstie bus 15 to 16 as required.b.Start IA compressors as necessary (75 kw each).c.IP offsite power is lost, THEN go to AP-ELEC.1,LOSS OF tl2A OR 12B TRANSFORMER.
AUX BLDG IA   LOADS AND FAILURE MODE
3 Check IA Compressors:
: 1) P&ID 533013-1889 o Letdown Valve LCV-112A       (Fail to VCT)
o At least 2 compressors
: 2) P&ID f33013-1890 o Letdown Valve AOV-371 (FC) o Charging Line Valve HCV-142 (FO) o RHR Flow Valves HCV-624, 625 (FO) o RHR Hx Bypass Flow Valve FCV-626 (FC)
-RUNNING AND IA PRESSURE STABLE OR=INCREASING Perform the following:
P&ID 833013-1891 3) o VCT Makeup Valves AOV-llOB, 110C,       ill (FC) o Charging Pump Suction AOV-112B (FC) AOV-112C (FO) o Charging Pump Speed Control Fails to Minimum o NaOH Tank Outlet Valves AOV-836A, 836B (FO) o Letdown Valve TCV-145 (Fail to VCT) o Letdown Valve PCV-135 (FO)
a.Start additional IA compressors.
: 4) P&ID f33013-1892 o   VCT Makeup   Valve AOV-110A   (FO)
b.Service air compressor running OR start service air compressor.
 
c.Automatic service air to IA crosstie (AOV-5251) open OR locally open manual crosstie, V-5365 (located in the Turbine Bldg.basement).
't EOP:             TITLE:                                              REV  5 AP-IA.1                     LOSS OF INSTRUMENT   AIR PAGE 2 of 2 ATTACHMENT     IA   CONCERNS (Cont'd)
d.Crosstie breathing air compressor and available portable air compressors (Per T-2P EMERGENCY BACKUP TO INSTRUMENT AIR SYSTEM FROM PORTABLE AIR COMPRESSORS).  
TURBINE BLDG       IA LOADS AND FAILURE MODE P&ID N33013-1894 1) o Heater Drain     Pump Recirc Vlv 3365   (FO) HDT pumps trip if recirc vly full open     1 minute o Condensate     Trim Valves 9508D, 9508G (FC) o Condensate     Makeup Vlv 4316 (FC) o Steam Dump Valves 3349, 3351, 3353, 3355 (FC) o H2 Cooler Inlet Vlv 4230 (FO)
        . o Condensate Makeup Valve 4315 (FC)
: 2)   P&ID N33013-1895 o Reheater 2nd Pass Level Control Valves to g5 Heater 3333A, 3333B~ 3334Ag 3334B (FC) o MFW Regulating Valves and Bypass Valves 4269, 4270, 4271, 4272 (FC)
: 3)   P&ID $ 33013-1896 o Condensate Bypass Valve 3959 (FO) o Reheater 2nd Pass Hi Level Dump Vlvs to Condenser         3336A, 3336BI 3338AI 3338B (FO) o Steam Dump Valves 3350, 3352, 3354, 3356 (FC) o H2 Cooler Bypass Valve 4229 (FO)
INTERMEDIATE BLDG       IA LOADS AND FAILURE MODE
: 1)   P&ID N33013-1893 o S/G Blowdown     Vlvs 5737, 5738   (FC)
IA   COMPRESSORS     FILTERS   AND AIR DRYERS
: 1)   P&ID N33013-1900,     Sheets 1 & 2
 
AUX BLDG SW . ~CI  CVI" E-3           E-0 ES-1.1        ECA-O.O'R-Z.1 ES-1.2 ES-1.3 ECA-0.1 ECA-2.1 ECA-3.1       CNMT RECIRC FANS ECA-3.2 ECA-3.3       E-0 FR-H.1        E-1 FR-I.3       E-3 ES-1.1 ECA-1.1 ECA-2.1 COND TO S G  ECA-3.1 FR-P.1 FR-H.1
'C   LOADS     D G STOP ECA-O.O       E-0 E-1 E-3 FAULTED S G  ES-1 '
ES-1.2 E-2          ES-1.3 ECA-O.O      ECA-2.1 ECA-2.1       ECA-3.1 FR-S.1        ECA-3.2 ECA-3.3 GEN DEGAS ECA-O.O       INTACT       S G PRESS E-2 LETDOWN ES-0.1 ES-0.2
 
S 1
'I'( I
 
N2 PORVS           RCS  ISOLATION E-3               ECA-O.O ES-1 '
ECA-0.1 ECA-1.1           RHR COOL ECA-2.1 ECA-3.1           ES-0.2 ECA-3.2           ES-0.3 ECA-3.3           ES-1.2 FR-C.1            ES-3.1 FR-H-1             ES-3.2 FR-P.1             ES-3 '
FR-P.2             ECA-1.1 FR-I'             ECA-2.1 ECA-3.1 ECA-3.2 ECA-3.3 NC                FR-H.1 E-3 ES-0.1            RUPTURED S G ES-F 1 ES-1.2             E-3 ECA-2.1           ECA-O.O ECA-3.1           ECA-3.1 ECA-3.2            ECA-3.'2 ECA-3.3 NONVITAL          RHR NPSH ECA-O.O           ES-1.3 NORMAL RHR COOLING AP-RHR.2           RHR SAMPLE ES-0.2 RHR SYSTEM         ES-0.3 ES-1.3 ECA-1.1
 
SAFW        SI  FLUSH FR-H.1       E-3 ES-1. 1 ECA-1. 1
  . SD-1         ECA-2.1 ECA-3.3
.
E-0         FR-P.1 E-1 E-3 ES-0.1       SI  UV ES-1.1 ES-1 '      E-0 ES-1.3       E-1 ECA-0.1     ES-1.1 ECA-1.1     ES-1 '
ECA-2.1     ECA-2.1 ECA-3.1     ECA-3.1 ECA-3.2 ECA-3.3 FR-H.1       VENT TIME FR-I.1 FR-I'        FR-I.3 FR-P.1 SEAL COOLING SD-2 E-3          E-3 ES-1.1      ES-0.1 ES-1.2       ES-F 1 ECA-0.1      ES-1.2 ECA-0.2     ES-1.3 ECA-2.1     ECA-0.1 ECA-3.1      ECA-2.1 ECA-3.2     ECA-3.1 ECA-3.3      ECA-3 '
ECA-3.3 SFP-RWST    RCP START ECA-1 '      E-3 ECA-3.2      ES-0 '
ES-0 '
ES-0 '
ES-1 '
ES-1 '
ECA-1.1 ECA-2.1 ECA-3 '
ECA-3.2 ECA-3.3 FR-C.1 FR-C.2 FR-P.1 FR -1". 3
 
EOP:         TITLE!                                      REV: 5 AP-IA.1               LOSS OF INSTRUMENT AIR PAGE 1 of 11 RO HESTER GAS AND ELECTRIC CORP TION GINNA STATION C TROLLED COPY NUMBER TECHNICAL R IEW PORC REVIE   DA E P   T SUP INTENDENT EFF CTIV DA CATEGORY 1.0 REVIEWED BY:
 
r-
      . /p'.p lt C,
1
 
EOP:         TITLE:                                              REV: 5 4
AP-.XA.1                 LOSS OF INSTRUMENT AIR PAGE 2   of 11 A. pURpOSE This   procedure provides the instructions necessary in the event of a loss of instrument air.
B. ENTRY CONDITIONS/SYMPTOMS
: l. ENTRY CONDITIONS This   procedure is entered from:
: a. E-Q, REACTOR TRXP   OR SAFETY INJECTION, or
: b. E-1, LOSS OF REACTOR OR SECONDARY COOLANT,     or
: c. ES-1.1, SI TERMINATION, or d ~ ECA 2 1 g UNCONTROLLED DEPRESSURI ZATION OF BOTH STEAM GENERATORS, or
: e. E-3, STEAM GENERATOR TUBE RUPTURE,   or f                     I ECA 3 1 g SGTR W TH LOSS OF REACTOR COOLANT SUBCOOLED RECOVERY DESIRED, or
: g. FR-I.1, RESPONSE TO HIGH PRESSURIZER   LEVEL, or
: h. FR-I.3, RESPONSE TO VOIDS IN REACTOR VESSEL HEAD,     or
: i. FR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT   SINK, or j   FR P 1 g RESPONSE TO IMMINENT'RESSURI ZED THERMAL SHOCK CONDITION.
: 2. SYMPTOMS The   symptoms of LOSS OF INSTRUMENT   AIR are;
: a. Annunciator H-8,   INSTRUMENT AIR LO PRESS,   100 psi, lit, or
: b. Annunciator H-16,   INSTRUMENT AIR LO PRESS,   lit.
 
      ,])
V ll'
 
                                                    ~                                     P
~ ~                                     ~                                       ~
I                         ~
I RQ
                              ~   ~     ~ T ~                         T           ~           ~
I       T  ~
                                      ~
                ~
I   ~                   T ~
                                                  ~
                                                      ~
                                                        )  ~ ~   ~
                                                                          ~
                                                                              ~           ~     ~
~
  ~ ~ ~ ~ ~
I ~         T  ~                              ~ ~ ~   ~ ~   T I ~     ~
                                                                                                )
                        ~       ~   ~
                                                                                    'I '             ~     ~
0                                                     I   ~         ~   I     ~           ~
                                                                                                          ~   ~     ~
o ~       o         ~           ~       t   ~   I
                                                                                            ~                     ~
                                                                      ~             ~         ~
                                                                                                    '
                                                                                    ~   ~ ~                 ~
I
 
I J
0
 
EOP:             TITLE:                                                          REV: 5 AP-,IA. 1                   LOSS OF INSTRUMENT     AIR PAGE 4   of 11 STEP       ACTION/EXPECTED RESPONSE             RESPONSE NOT OBTAINED
  *****************************************
CAUTION o   OBSERVE D/G LOADING LIMITS OP 2300 KW POR   1/2 HOUR,   2250 KW FOR 2 HOURS, AND 1950 KW FOR CONTINUOUS SERVICE.
o WHEN IA PRESSURE   IS LOW, MFW REGULATING VALVES SHOULD BE MONITORED FOR PROPER OPERATION.
I 2 Verify   Power To Bus 13 And             IP IA pressure is low due to a loss Bus 15:                                    of power to Bus 13 OR bus 15, THEN:
o  Bus 13  -  APPROXIMATELY 480 VOLTS    a. Crosstie bus     13 to 14, OR crosstie   bus 15 to 16 as o  Bus 15  -  APPROXIMATELY 480 VOLTS        required.
: b. Start IA compressors as necessary (75 kw each).
: c. IP offsite     power is lost, THEN go to AP-ELEC.1,LOSS     OF tl2A OR 12B TRANSFORMER.
3 Check IA Compressors:                      Perform the following:
o   At least 2 compressors - RUNNING       a. Start additional IA compressors.
AND IA PRESSURE STABLE OR  =
INCREASING                            b. Service     air compressor running OR start service air       compressor.
: c. Automatic service       air to IA crosstie   (AOV-5251) open OR locally   open manual crosstie, V-5365 (located     in the Turbine Bldg. basement).
: d. Crosstie breathing air compressor and available portable air compressors (Per T-2P EMERGENCY BACKUP TO INSTRUMENT AIR SYSTEM FROM PORTABLE AIR COMPRESSORS).
 
>
>
EOP: AP-IA.1.C T1TLE: LOSS OF INSTRUMENT AIR REV 5 PAGE 5 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 4 Check IA System Major Components Locally: a.IA dryers: o Dryers-NOT BLOWING AIR o Dryers-AUTO TRANSFER OCCURRING PROPERLY a.IF IA dryer is blowing air OR IF dryer transfer is NOT occurring, THEN isolate the faulty dryer: 1)A IA dryer isolation:
EOP:             T1TLE:
o Open bypass V-5276.o Close inlet V-5277.o Close outlet V-5275 b.XA dryer prefilters and after filters D/P-LESS THAN 10 PSID c.Running IA compressors-OPERATING PROPERLY o Open circuit breaker fl in misc.120V power DIST PNL (East of secondary sample sink).2)B IA dryer isolation:
REV  5 AP-IA.1                     LOSS OF INSTRUMENT   AIR
o Open bypass V-8230.o Close inlet V-8228.o Close outlet V-8229.o Open circuit breaker$6 in LTG PNL TB2 (Turbine Bldg.basement east end).b.IF any filter D/P is excessive greater than 10 psid, THEN bypass the affected filter.c.IF any IA compressor malfunctioning, THEN perform the following:
  .C PAGE 5   of   11 STEP       ACTION/EXPECTED RESPONSE         RESPONSE   NOT OBTAINED 4 Check IA System Major Components Locally:
1)Remove faulty IA compressor from IA header if necessary.
: a. IA dryers:                         a. IF IA dryer    is blowing air   OR IF dryer transfer is   NOT occurring, o  Dryers -  NOT BLOWING AIR          THEN isolate the faulty dryer:
fs i~
o  Dryers -  AUTO TRANSFER            1) A IA   dryer isolation:
EOP: AP-IA.1 TITLE: LOSS OF INSTRUMENT AIR REV 5 PAGE 6 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED*****************************************CAUTION AN EVALUATION OF THE CONSEQUENCES SHOULD BE PERFORMED BEFORE A LEAKING SECTION OF THE IA SYSTEM IS ISOLATED.REFER TO ATTACHMENT A FOR MAJOR EQUIPMENT APPECTED IN EACH SPECIFIC AREA.5 Check For Instrument Air Leakage In The Turbine And Intermediate (clean side)Buildings:
OCCURRING PROPERLY o Open bypass   V-5276.
o Turbine Building-NO LEAKAGE DETECTED o Intermediate Building (clean side)-NO LEAKAGE DETECTED IF the IA leak is found in the turbine or intermediate buildings, THEN perform the following:
o Close inlet V-5277.
a.Isolate the leak (Refer to Figure 1 and Attachment A).-b.Go to Step 16 6 Establish Conditions To Isolate Instrument Air To The CNMT a.Isolate letdown as follows: 1)Close'AOV-427-AOV-427 CLOSED 2)Close AOV-200A, AOV-200B, and AOV-202-AOVs 200A, 200B, 202 CLOSED a.Verify letdown isolation valve AOV-371 closed.b.Check that charging thru HCV-142-NOT REQIURED BY AN EOP c.Isolate charging line flow thru HCV-142 as follows: o Close HCV-142-HCV-142 CLOSED b.IF charging flow thru HCV-142 reqiured by an EOP, THEN go to Step 7.c.IP HCV-142 can NOT be closed manually, THEN dispatch an AO to close V-286 locally (located in Charging Pump Room).
o Close outlet V-5275 o Open circuit breaker   fl misc. 120V power DIST PNL in (East of secondary sample sink).
I g J o EOP: AP-IA.1 LOSS OF INSTRUMENT AIR REV: 5 PAGE 7 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: When IA is isolated to CNMT, PRZR spray valves will not function.PRZR heaters should be manually controlled.
: 2) B IA dryer isolation:
7 Close AOV-5392-TO ISOLATE IA TO CNMT 8 Check IA Pressure-a.Pressure-STABLE OR INCREASING b.Go to Step 13 a.IP IA pressure continues to decrease, THEN open IA to CNMT (AOV-5392)
o   Open bypass   V-8230.
AND go to Step 9.NOTE: When IA is isolated to the Aux Bldg, makeup to the VCT and from the RWST is disabled, AND charging pumps will go to minimum speed, AND HCV-142 fails open.9 Locally Close V-7350 (AUX BLDG By SFP On West Wall)TO ISOLATE IA TO AUX BLDG l'
o   Close inlet V-8228.
P-.EOP: AP-.IA.l TITLE: LOSS OF INSTRUMENT AIR REV 5 PAGE 8 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 10 Check IA Pressure-STABLE OR INCREASING IF IA leak is NOT in Aux Bldg, THEN: a.Restore letdown as follows: 1)Open IA to Aux Bldg V-7350.2)Ensure V-5392, IA to CNMT is open.XF NOT go to Step'12.3)Ensure AOV-371 and AOV-427 open.4)Place PCV-135 and TCV-130 in manual at 25X open.5)Open desired orifice isolation valve.6)Adjust PCV-135 and TCV-130 as necessary.
o   Close outlet V-8229.
7)Restore PCV-135 and TCV-130 to auto at 250 psig and 80'F to 120'F.b.Continue investigation.
o   Open circuit breaker $ 6 in LTG PNL TB2   (Turbine Bldg.
c.Go to Step 14.
basement east end).
l~
: b. XA dryer prefilters  and after    b. IF any   filter D/P   is excessive filters  D/P - LESS THAN 10 PSID      greater than 10 psid, THEN bypass the affected filter.
EOP: AP-IA.1 TITLE: LOSS OF INSTRUMENT AIR REV 5 PAGE 9 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED*****************************************CAUTION IF CHARGING PUMP SUCTION IS SWAPPED TO THE RWST, A LOAD REDUCTION MAY BE REQUIRED TO MAINTAIN TAVG AT TREF.*****************************************11 Check VCT Level-GREATER THAN 204 IF VCT level is low and IA has NOT been restored, THEN perform, the following:
: c. Running IA compressors-            c. IF any IA compressor OPERATING PROPERLY                      malfunctioning,   THEN perform the following:
a.Stop charging pump A and place in PULL STOP.b.Dispatch AO to locally open manual charging pump suction from RWST (V-358 located in charging pump room).c.WHEN V-358 open, THEN direct AO to close V-268 to isolate charging pumps B and C from VCT (V-268 located.in charging pump room).IF normal VCT makeup or normal or excess letdown can NOT be restored, THEN, plant shutdown will be required, (Refer to 0-2.1, NORMAL SHUTDOWN TO HOT SHUTDOWN).
: 1) Remove   faulty IA compressor from IA header   if necessary.
12 Verify CCW Is Being Supplied To The RCPs: o Annunciator Alarm A-7-EXTINGUISHED o Annunciator Alarm A-15-EXTINGUISHED Perform the following:
fs
a.Restore CCW to the RCPs.b.IF CCW can NOT be restored to RCPs, THEN go to Step 13.
 
I'8~
i~
c, EOP: AP-IA.1 TITLE: LOSS OF INSTRUMENT AIR REV 5 PAGE 10 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED*****************************************CAUTION MONITOR RCP SEAL INDICATIONS WHEN CHARGING PUMP IS NOT RUNNING.*****************************************13 Start And Stop Charging Pump(s)As Necessary-TO CONTROL PRZR LEVEL 14 Throttle Charging Flow Locally If Necessary, Using V-286 (Located In Charging Pump Room)-TO MAINTAIN RCP SEAL INJECTION FLOW WHEN CHARGING PUMP(S)ARE RUNNING 15 Isolate IA Leak: a.Investigate
EOP:           TITLE:                                                        REV  5 AP-IA.1                     LOSS OF INSTRUMENT       AIR PAGE 6   of 11 STEP     ACTION/EXPECTED RESPONSE               RESPONSE   NOT OBTAINED
-LEAKING SECTION TO BE ISOLATED S b.Isolate-LEAK AS CLOSE TO SOURCE AS POSSIBLE IF IA leak can NOT be isolated with plant at power AND IA pressure is less than 60 psig, THEN perform the following:
  *****************************************
o Trip the reactor.o Go to E-O, REACTOR TRIP or SAFETY INJECTION.
CAUTION AN EVALUATION OF THE CONSEQUENCES SHOULD BE PERFORMED BEFORE A LEAKING SECTION OF THE IA SYSTEM IS ISOLATED. REFER TO ATTACHMENT A FOR MAJOR EQUIPMENT APPECTED IN EACH SPECIFIC AREA.
IF IA leak occurred while performing any EOP AND can NOT be isolated, THEN , return to procedure and step in effect.16 Complete-RESTORATION OF UNAFFECTED PORTIONS OF THE IA SYSTEM TO SERVICE f I~~  
5 Check For Instrument Air                   IF the IA leak is found in the Leakage In The Turbine And                 turbine or intermediate buildings, Intermediate (clean side)                 THEN  perform the following:
>>EOP: AP-IA.1 TITLE: LOSS OF INSTRUMENT AIR REV 5 PAGE 11 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 17 Verify-THAT PLANT OPERATION CAN CONTINUE NOTE: Refer to 0-9.3, NRC XMMEDIATE NOTIFICATION, for reporting requirements.
Buildings:
18 Complete-MAINTENANCE AND HIGHER SUPERVISION NOTIFICATION 19 Establish Further Guidance: o Return to-PROCEDURE AND STEP IN EFFECT-OR-o Return to-NORMAL PLANT OPERATION-END-  
: a. Isolate the leak (Refer to o Turbine Building -   NO LEAKAGE             Figure 1 and Attachment A).-
DETECTED
: b. Go  to Step  16 o Intermediate Building (clean side) - NO LEAKAGE DETECTED 6  Establish Conditions To Isolate Instrument Air To        The CNMT
: a. Isolate letdown  as  follows:          a. Verify letdown isolation valve AOV-371 closed.
: 1) Close 'AOV-427 - AOV-427 CLOSED
: 2) Close AOV-200A, AOV-200B, and AOV-202 - AOVs 200A, 200B, 202 CLOSED
: b. Check that charging thru HCV-142       b. IF charging flow thru HCV-142
          - NOT REQIURED BY AN EOP                   reqiured by an  EOP, THEN go  to Step 7.
: c. Isolate charging line flow thru       c. IP HCV-142 can NOT be closed HCV-142 as  follows:                       manually, THEN dispatch an AO to close V-286 locally (located in o Close HCV-142 - HCV-142   CLOSED       Charging Pump Room).
 
I g
J
 
EOP:                                                                      REV: 5 AP-IA. 1                    LOSS OF INSTRUMENT    AIR of 11 o                                                                            PAGE 7 STEP      ACTION/EXPECTED RESPONSE            RESPONSE  NOT OBTAINED NOTE:    When IA is isolated to CNMT, PRZR spray valves  will not function.
PRZR heaters should be manually controlled.
7  Close AOV-5392      TO ISOLATE IA TO CNMT 8  Check IA  Pressure
: a. Pressure  - STABLE OR INCREASING    a. IP IA pressure continues to decrease, THEN open IA to CNMT (AOV-5392) AND go to Step 9.
: b. Go to Step  13 NOTE:    When IA is isolated to the Aux Bldg, makeup  to the VCT and from the RWST is disabled, AND charging pumps will go to minimum speed, AND HCV-142 fails  open.
9 Locally Close V-7350        (AUX BLDG By SFP On West Wall)
TO ISOLATE IA TO AUX BLDG
 
l
'
 
EOP:            TITLE:                                                  REV  5 P
AP-.IA.l                 LOSS OF INSTRUMENT  AIR of  11
-.                                                                           PAGE 8 STEP     ACTION/EXPECTED RESPONSE         RESPONSE   NOT OBTAINED 10   Check IA Pressure     STABLE OR   IF IA leak is   NOT in Aux Bldg, THEN:
INCREASING
: a. Restore letdown as follows:
: 1) Open IA to Aux Bldg V-7350.
: 2) Ensure V-5392, IA to CNMT is open. XF NOT go to Step'12.
: 3) Ensure AOV-371 and AOV-427 open.
: 4) Place PCV-135 and TCV-130 in manual at     25X open.
: 5) Open desired   orifice isolation valve.
: 6) Adjust PCV-135 and TCV-130 as necessary.
: 7) Restore PCV-135 and TCV-130 to auto at 250 psig and 80'F to 120'F.
: b. Continue investigation.
: c. Go to Step 14.
 
l
~
 
EOP:           TITLE:                                                        REV    5 AP-IA.1                   LOSS OF INSTRUMENT     AIR PAGE 9   of 11 STEP       ACTION/EXPECTED RESPONSE           RESPONSE   NOT OBTAINED
  *****************************************
CAUTION IF CHARGING PUMP SUCTION IS SWAPPED TO THE RWST, A LOAD REDUCTION MAY BE REQUIRED TO MAINTAIN TAVG AT TREF.
  *****************************************
11   Check VCT Level     GREATER           IF VCT level is low     and IA has   NOT THAN 204                                been   restored,   THEN   perform, the following:
: a. Stop charging     pump A and   place in PULL STOP.
: b. Dispatch   AO to locally   open manual charging pump       suction from RWST   (V-358 located in charging   pump   room).
: c. WHEN V-358 open, THEN direct       AO to close V-268 to isolate charging pumps B and C from VCT (V-268 located. in charging pump room).
IF normal   VCT makeup or normal or excess letdown can NOT be restored, THEN, plant shutdown will be required, (Refer to 0-2.1,       NORMAL SHUTDOWN TO HOT SHUTDOWN).
12   Verify CCW   Is Being Supplied       Perform the following:
To The   RCPs:
: a. Restore   CCW to the   RCPs.
o  Annunciator Alarm  A            EXTINGUISHED                        b. IF   CCW can NOT be restored to RCPs,   THEN go   to Step 13.
o  Annunciator Alarm  A            EXTINGUISHED
 
I
  '8~
 
EOP:           TITLE:                                                    REV  5 AP-IA. 1                   LOSS OF INSTRUMENT     AIR PAGE 10   of 11 c,
STEP     ACTION/EXPECTED RESPONSE             RESPONSE NOT OBTAINED
      *****************************************
CAUTION MONITOR RCP SEAL INDICATIONS WHEN CHARGING PUMP   IS NOT RUNNING.
    *****************************************
13   Start   And Stop Charging Pump(s) As Necessary TO CONTROL PRZR LEVEL 14   Throttle Charging Flow Locally If Necessary, Using V-286 (Located In Charging Pump Room)     TO MAINTAIN RCP SEAL INJECTION FLOW WHEN CHARGING PUMP(S) ARE RUNNING 15   Isolate IA Leak:                         IF IA leak can NOT be isolated with plant at power AND IA pressure is
: a. Investigate - LEAKING SECTION  TO    less than 60 psig, THEN perform the BE ISOLATED                          following:
S
: b. Isolate -  LEAK AS CLOSE TO          o   Trip the reactor.
SOURCE AS POSSIBLE o   Go to E-O, REACTOR TRIP or SAFETY INJECTION.
IF IA leak occurred while performing any EOP AND can NOT   be isolated, THEN , return to procedure and step in effect.
16   Complete     RESTORATION OF UNAFFECTED PORTIONS OF THE       IA SYSTEM TO SERVICE
 
f I
~ ~
 
EOP:           TITLE:                                                    REV  5 AP-IA.1                     LOSS OF INSTRUMENT     AIR PAGE 11 of 11
>>
STEP       ACTION/EXPECTED RESPONSE             RESPONSE NOT OBTAINED 17   Verify   THAT PLANT OPERATION CAN CONTINUE NOTE: Refer to 0-9.3,     NRC XMMEDIATE NOTIFICATION, for reporting requirements.
18   Complete MAINTENANCE AND HIGHER SUPERVISION NOTIFICATION 19 Establish Further Guidance:
o Return to -     PROCEDURE AND STEP IN EFFECT
                        -OR-o Return to -     NORMAL PLANT OPERATION
                                              -END-
 
'
'
Qi=EOP: AP-IA.1 TITLE: LOSS OF INSTRUMENT AIR REV: 5 PAGE 1 of 1 ATTACHMENT A CNMT IA LOSS AND FAILURE MODE 1)P&ID 533013-1887 o Letdown AOV-427 (FO)o Excess Letdown AOV-310 (FC)o RCP Seal Return AOV-270B (FO)o RCP Thermal Barrier CCW AOV-754B (FO)2)P&ID 433013-1888 o Letdown Orifices AOV-200A, 200B, 202 (FC)o Charging AOV-294, 392A (FC)o Aux.Spray AOV-296 (FC)o PRZR Spray PCV-431A, 431B (FC)o PRZR PORV PCV-430, 431C (FC)o RCP Thermal Barrier CCW AOV-754A (FO)o Charging AOV-392B (FC)o RCP Seal Return AOV-386'(FC)o PRZR Sample Valves AOV-951, 953 (FC)AUX BLDG IA LOADS AND FAILURE MODE 1)P&ID N33013-1889 o Letdown Valve LCV-112A (Fail to VCT)2)P&ID N33013-1890 o Letdown Valve AOV-371 (FC)o Charging Line Valve HCV-142 (FO)o RHR Flow Valves HCV-624, 625 (FO)o RHR Hx Bypass Flow Valve FCV-626 (FC)3)P&ID N33013-1891 o VCT Makeup Valves AOV-110B, 110C, ill (FC)o Charging Pump Suction AOV-112B (FC)AOV-112C (FO)o Charging Pump Speed Control Fails to Minimum o NaOH Tank Outlet Valves AOV-836A, 836B (FO)o Letdown Valve TCV-145 (Fail to VCT)o Letdown Valve PCV-135 (FO)4)P&ID N33013-1892 o VCT Makeup Valve AOV-110A (FO)  
EOP:           TITLE:                                        REV: 5 AP-IA.1                 LOSS OF INSTRUMENT   AIR PAGE 1 of 1 Qi=
.~
ATTACHMENT A CNMT IA LOSS AND FAILURE MODE
AP-IA.1'ITLE:
: 1) P&ID 533013-1887 o   Letdown AOV-427 (FO) o   Excess Letdown AOV-310 (FC) o   RCP Seal Return AOV-270B (FO) o   RCP Thermal Barrier CCW AOV-754B (FO)
LOSS OF INSTRUMENT AIR REV 5 PAGE 1 of 1 FIGURE 1 FRQh SERVICE AIR CNAT TO ORYERS V I.="=)COLUAN 8 l2 PEN 3I8 AQV.5392~V-539r INT BLDG VALL SERV I CE ht4)AUX BLCGS TllREI V.53 IS BLDG V 53IB V 53 I 4 V 53 I 5 AVT (CDLUAN E 4)Pt 2I63 F R 0 h V 53ll V 95350 AKIVE AVT RESIN HYPER)V 53I3 V 53I2 P I.62 ABOVE A INST AIR DRYER V.6962 SCREEN K)USE J.~}}
: 2) P&ID 433013-1888 o   Letdown   Orifices AOV-200A, 200B, 202 (FC) o   Charging   AOV-294, 392A (FC) o   Aux. Spray   AOV-296 (FC) o   PRZR Spray PCV-431A, 431B (FC) o   PRZR PORV PCV-430, 431C (FC) o   RCP Thermal Barrier CCW AOV-754A (FO) o   Charging AOV-392B (FC) o   RCP Seal Return AOV-386 '(FC) o   PRZR Sample Valves AOV-951, 953 (FC)
AUX BLDG IA   LOADS AND FAILURE MODE
: 1) P&ID N33013-1889 o   Letdown Valve LCV-112A     (Fail to VCT)
: 2) P&ID N33013-1890 o   Letdown Valve AOV-371 (FC) o   Charging Line Valve HCV-142     (FO) o   RHR Flow Valves HCV-624, 625 (FO) o   RHR Hx Bypass Flow Valve FCV-626 (FC)
: 3) P&ID N33013-1891 o
o VCT Makeup Valves AOV-110B, 110C,     ill (FC)
Charging Pump Suction AOV-112B (FC) AOV-112C (FO) o   Charging Pump Speed Control Fails to Minimum o   NaOH Tank Outlet Valves AOV-836A, 836B (FO) o   Letdown Valve TCV-145 (Fail to VCT) o   Letdown Valve PCV-135 (FO)
: 4) P&ID N33013-1892 o   VCT Makeup   Valve AOV-110A   (FO)
 
.
  ~
 
AP-IA.1'ITLE:                                                                             REV        5 LOSS OF INSTRUMENT                   AIR PAGE 1         of 1 FIGURE 1 FRQh SERVICE AIR                   CNAT PEN  3I8 AQV.5392 I.="=)           ~
V-539r SERV I CE ht4)
TO                  COLUAN 8 l2                                                  AUX BLCGS INT BLDG VALL ORYERS V
TllREI     V.53 IS BLDG V 53 I 4     V 53 I 5 Pt 2I63 V 53IB AVT       (CDLUAN E 4)
V 95350 F
R 0               V 53ll                   AKIVE AVT RESIN HYPER) h V 53I3 V 53I2 P I. 62 ABOVE A INST AIR DRYER V.6962 SCREEN K)USE
 
J
.
  ~}}

Revision as of 09:47, 29 October 2019

Revised Eops,Including Rev 5 to AP-IA.1,Rev 6 to AP-IA.1,Rev 4 to AP-RHR.2,Rev 3 to ES-0.2,Rev 2 to ES-0.3,Rev 3 to FR-P.2 & Rev 6 to FR-I.3.W/920408 Ltr
ML17309A480
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/08/1992
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
PROC-920408, NUDOCS 9204150162
Download: ML17309A480 (36)


Text

ACCELERATED DISTRIBUTION DEMONSTPJ!!.TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

'CCESSION NBR:9204150162 DOC.DATE: 92/04/08 NOTARIZED: NO 'OCKET lx FACXL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILXATION MECREDY,R.C. Rochester Gas & Electric Corp.

RECXP.NAME RECXPXENT AFFXLXATXON JOHNSON,A.R. Project Directorate I-3

SUBJECT:

Revised EOPs,including Rev 5 to AP-IA.l,Rev 6 to AP-IA.1,Rev Rev 4 to AP-RHR.2,Rev 3 to ES-0.2,Rev 2 to ES-0.3,Rev 3 to D FR-P.2 6 Rev 6 to FR-I.3.W/920408 ltr.

DIsTRIBUTIQN coDE: A045D coPIEs REcEIvED:LTR J ENcL t SIzE: l+ + S TITLE: OR Submittal: Emergency Preparedness Pla s, Implement'g Procedures, C NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 A RECIPIENT COPIES RECIPIENT COPIES D ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 PD 1 1 JOHNSON,A 1 1 D INTERNAL: AEOD/DOA/IRB 1 1 NRR/DRE~P~RB9 D 1 1 NUDOCS-ABSTRACT 1 1 RE NLK~ 0& 1 1 EXTERNAL: NRC PDR 1 1 N IC 1 1 R

D D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL 8

rzzzzpi zzsxiziw e

'riigj jin I SxrZiiZ zzudl8 l~~zezu ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER N.Y. 14649-0001 ROBERT C MECREDY TELEPHONE Vice President AstErtcooEPte 546.2700 Clnne Nudeer Production April 8, 1992 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Mr. Allen Johnson Project Directorate I-3 Washington, D.C. 20555

Subject:

Emergency Operating Procedures R. E. Ginna Nuclear Power Plant Docket No. 50-244 Gentlemen:

As requested, enclosed are Ginna Station Emergency Operating Procedures.

Very truly yours, Robert C. Mecredy Enclosures c: Mr. Lee Bettenhausen, USNRC, Region 1 Resident Inspector, Ginna Station I r3.QOV u emergency. pro p4 9204150162 920408 PDR ADOCK 05000244 PDR

AP-IA.1 Loss of Instrument Air, Rev. 5 (was not attached to previous mailing)

AP-IA.1 Loss of Instrument Air, Rev. 6 AP-RHR.2 Loss of RHR While Operating at RCS Reduced Inventory Conditions, Rev. 4 Att EOP/AP Attachments, Normal RHR Cooling, Rev. 0 Abnormal Procedures Index 3/28/92 Functional Restoration Guidelines Procedure Index 3/28/92 Critical Safety Function Status Trees Index 3/28/92 Equipment Sub-Procedures Index 3/28/92 Emergency Contingency Actions Procedures Index 3/28/92 Emergency Procedures Index 3/28/92 EOP/AP Attachment Index 3/28/92 Emergency Plan Implementing Procedures 3/28/92, ATT EOP/AP Attachments, RHR Sample, Rev. 0 ES-0.2 Natural Circulation Cooldown, Rev. 3 ES-0.3 Natural Circulation Cooldown with Steam Void in Vessel, Rev. 2 FR-P.2 Response to Anticipated Pressurized Thermal Shock Condition, Rev. 3 FR-I-3.Response to Voids in Reactor Vessel, Rev. 6

EOP:, TITLE: REV' AP-IA.1 LOSS OF INSTRUMENT AIR PAGE 1 of 2 ATTACHMENT A CNMT IA LOSS AND FAILURE MODE

1) P&ID 433013-1887 o Letdown AOV-427 (FO) o Excess Letdown AOV-310 (FC) o RCP Seal Return AOV-270B (FO) o RCP Thermal Barrier CCW AOV-754B (FO)
2) P&ID 833013-1888 o Letdown Orifices AOV-200A, 200B, 202 (FC) o Charging AOV-294, 392A (FC) o Aux. Spray AOV-296 (FC) o PRZR Spray PCV-431A, 431B (FC) 0 PRZR PORV PCV 430 g '43 1C (FC) o RCP Thermal Barrier CCW AOV-754A (FO) o Charging AOV-392B (FC) o RCP Seal Return AOV-386 (FC) o PRZR Sample Valves AOV-951; 953 (FC)

AUX BLDG IA LOADS AND FAILURE MODE

1) P&ID 533013-1889 o Letdown Valve LCV-112A (Fail to VCT)
2) P&ID f33013-1890 o Letdown Valve AOV-371 (FC) o Charging Line Valve HCV-142 (FO) o RHR Flow Valves HCV-624, 625 (FO) o RHR Hx Bypass Flow Valve FCV-626 (FC)

P&ID 833013-1891 3) o VCT Makeup Valves AOV-llOB, 110C, ill (FC) o Charging Pump Suction AOV-112B (FC) AOV-112C (FO) o Charging Pump Speed Control Fails to Minimum o NaOH Tank Outlet Valves AOV-836A, 836B (FO) o Letdown Valve TCV-145 (Fail to VCT) o Letdown Valve PCV-135 (FO)

4) P&ID f33013-1892 o VCT Makeup Valve AOV-110A (FO)

't EOP: TITLE: REV 5 AP-IA.1 LOSS OF INSTRUMENT AIR PAGE 2 of 2 ATTACHMENT IA CONCERNS (Cont'd)

TURBINE BLDG IA LOADS AND FAILURE MODE P&ID N33013-1894 1) o Heater Drain Pump Recirc Vlv 3365 (FO) HDT pumps trip if recirc vly full open 1 minute o Condensate Trim Valves 9508D, 9508G (FC) o Condensate Makeup Vlv 4316 (FC) o Steam Dump Valves 3349, 3351, 3353, 3355 (FC) o H2 Cooler Inlet Vlv 4230 (FO)

. o Condensate Makeup Valve 4315 (FC)

2) P&ID N33013-1895 o Reheater 2nd Pass Level Control Valves to g5 Heater 3333A, 3333B~ 3334Ag 3334B (FC) o MFW Regulating Valves and Bypass Valves 4269, 4270, 4271, 4272 (FC)
3) P&ID $ 33013-1896 o Condensate Bypass Valve 3959 (FO) o Reheater 2nd Pass Hi Level Dump Vlvs to Condenser 3336A, 3336BI 3338AI 3338B (FO) o Steam Dump Valves 3350, 3352, 3354, 3356 (FC) o H2 Cooler Bypass Valve 4229 (FO)

INTERMEDIATE BLDG IA LOADS AND FAILURE MODE

1) P&ID N33013-1893 o S/G Blowdown Vlvs 5737, 5738 (FC)

IA COMPRESSORS FILTERS AND AIR DRYERS

1) P&ID N33013-1900, Sheets 1 & 2

AUX BLDG SW . ~CI CVI" E-3 E-0 ES-1.1 ECA-O.O'R-Z.1 ES-1.2 ES-1.3 ECA-0.1 ECA-2.1 ECA-3.1 CNMT RECIRC FANS ECA-3.2 ECA-3.3 E-0 FR-H.1 E-1 FR-I.3 E-3 ES-1.1 ECA-1.1 ECA-2.1 COND TO S G ECA-3.1 FR-P.1 FR-H.1

'C LOADS D G STOP ECA-O.O E-0 E-1 E-3 FAULTED S G ES-1 '

ES-1.2 E-2 ES-1.3 ECA-O.O ECA-2.1 ECA-2.1 ECA-3.1 FR-S.1 ECA-3.2 ECA-3.3 GEN DEGAS ECA-O.O INTACT S G PRESS E-2 LETDOWN ES-0.1 ES-0.2

S 1

'I'( I

N2 PORVS RCS ISOLATION E-3 ECA-O.O ES-1 '

ECA-0.1 ECA-1.1 RHR COOL ECA-2.1 ECA-3.1 ES-0.2 ECA-3.2 ES-0.3 ECA-3.3 ES-1.2 FR-C.1 ES-3.1 FR-H-1 ES-3.2 FR-P.1 ES-3 '

FR-P.2 ECA-1.1 FR-I' ECA-2.1 ECA-3.1 ECA-3.2 ECA-3.3 NC FR-H.1 E-3 ES-0.1 RUPTURED S G ES-F 1 ES-1.2 E-3 ECA-2.1 ECA-O.O ECA-3.1 ECA-3.1 ECA-3.2 ECA-3.'2 ECA-3.3 NONVITAL RHR NPSH ECA-O.O ES-1.3 NORMAL RHR COOLING AP-RHR.2 RHR SAMPLE ES-0.2 RHR SYSTEM ES-0.3 ES-1.3 ECA-1.1

SAFW SI FLUSH FR-H.1 E-3 ES-1. 1 ECA-1. 1

. SD-1 ECA-2.1 ECA-3.3

.

E-0 FR-P.1 E-1 E-3 ES-0.1 SI UV ES-1.1 ES-1 ' E-0 ES-1.3 E-1 ECA-0.1 ES-1.1 ECA-1.1 ES-1 '

ECA-2.1 ECA-2.1 ECA-3.1 ECA-3.1 ECA-3.2 ECA-3.3 FR-H.1 VENT TIME FR-I.1 FR-I' FR-I.3 FR-P.1 SEAL COOLING SD-2 E-3 E-3 ES-1.1 ES-0.1 ES-1.2 ES-F 1 ECA-0.1 ES-1.2 ECA-0.2 ES-1.3 ECA-2.1 ECA-0.1 ECA-3.1 ECA-2.1 ECA-3.2 ECA-3.1 ECA-3.3 ECA-3 '

ECA-3.3 SFP-RWST RCP START ECA-1 ' E-3 ECA-3.2 ES-0 '

ES-0 '

ES-0 '

ES-1 '

ES-1 '

ECA-1.1 ECA-2.1 ECA-3 '

ECA-3.2 ECA-3.3 FR-C.1 FR-C.2 FR-P.1 FR -1". 3

EOP: TITLE! REV: 5 AP-IA.1 LOSS OF INSTRUMENT AIR PAGE 1 of 11 RO HESTER GAS AND ELECTRIC CORP TION GINNA STATION C TROLLED COPY NUMBER TECHNICAL R IEW PORC REVIE DA E P T SUP INTENDENT EFF CTIV DA CATEGORY 1.0 REVIEWED BY:

r-

. /p'.p lt C,

1

EOP: TITLE: REV: 5 4

AP-.XA.1 LOSS OF INSTRUMENT AIR PAGE 2 of 11 A. pURpOSE This procedure provides the instructions necessary in the event of a loss of instrument air.

B. ENTRY CONDITIONS/SYMPTOMS

l. ENTRY CONDITIONS This procedure is entered from:
a. E-Q, REACTOR TRXP OR SAFETY INJECTION, or
b. E-1, LOSS OF REACTOR OR SECONDARY COOLANT, or
c. ES-1.1, SI TERMINATION, or d ~ ECA 2 1 g UNCONTROLLED DEPRESSURI ZATION OF BOTH STEAM GENERATORS, or
e. E-3, STEAM GENERATOR TUBE RUPTURE, or f I ECA 3 1 g SGTR W TH LOSS OF REACTOR COOLANT SUBCOOLED RECOVERY DESIRED, or
g. FR-I.1, RESPONSE TO HIGH PRESSURIZER LEVEL, or
h. FR-I.3, RESPONSE TO VOIDS IN REACTOR VESSEL HEAD, or
i. FR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK, or j FR P 1 g RESPONSE TO IMMINENT'RESSURI ZED THERMAL SHOCK CONDITION.
2. SYMPTOMS The symptoms of LOSS OF INSTRUMENT AIR are;
a. Annunciator H-8, INSTRUMENT AIR LO PRESS, 100 psi, lit, or
b. Annunciator H-16, INSTRUMENT AIR LO PRESS, lit.

,])

V ll'

~ P

~ ~ ~ ~

I ~

I RQ

~ ~ ~ T ~ T ~ ~

I T ~

~

~

I ~ T ~

~

~

) ~ ~ ~

~

~ ~ ~

I ~

~ ~ ~ ~ ~

I ~ T ~ ~ ~ ~ ~ ~ T I ~ ~

)

~ ~ ~

'I ' ~ ~

0 I ~ ~ I ~ ~

~ ~ ~

o ~ o ~ ~ t ~ I

~ ~

~ ~ ~

'

~ ~ ~ ~

I

I J

0

EOP: TITLE: REV: 5 AP-,IA. 1 LOSS OF INSTRUMENT AIR PAGE 4 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

CAUTION o OBSERVE D/G LOADING LIMITS OP 2300 KW POR 1/2 HOUR, 2250 KW FOR 2 HOURS, AND 1950 KW FOR CONTINUOUS SERVICE.

o WHEN IA PRESSURE IS LOW, MFW REGULATING VALVES SHOULD BE MONITORED FOR PROPER OPERATION.

I 2 Verify Power To Bus 13 And IP IA pressure is low due to a loss Bus 15: of power to Bus 13 OR bus 15, THEN:

o Bus 13 - APPROXIMATELY 480 VOLTS a. Crosstie bus 13 to 14, OR crosstie bus 15 to 16 as o Bus 15 - APPROXIMATELY 480 VOLTS required.

b. Start IA compressors as necessary (75 kw each).
c. IP offsite power is lost, THEN go to AP-ELEC.1,LOSS OF tl2A OR 12B TRANSFORMER.

3 Check IA Compressors: Perform the following:

o At least 2 compressors - RUNNING a. Start additional IA compressors.

AND IA PRESSURE STABLE OR =

INCREASING b. Service air compressor running OR start service air compressor.

c. Automatic service air to IA crosstie (AOV-5251) open OR locally open manual crosstie, V-5365 (located in the Turbine Bldg. basement).
d. Crosstie breathing air compressor and available portable air compressors (Per T-2P EMERGENCY BACKUP TO INSTRUMENT AIR SYSTEM FROM PORTABLE AIR COMPRESSORS).

>

EOP: T1TLE:

REV 5 AP-IA.1 LOSS OF INSTRUMENT AIR

.C PAGE 5 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 4 Check IA System Major Components Locally:

a. IA dryers: a. IF IA dryer is blowing air OR IF dryer transfer is NOT occurring, o Dryers - NOT BLOWING AIR THEN isolate the faulty dryer:

o Dryers - AUTO TRANSFER 1) A IA dryer isolation:

OCCURRING PROPERLY o Open bypass V-5276.

o Close inlet V-5277.

o Close outlet V-5275 o Open circuit breaker fl misc. 120V power DIST PNL in (East of secondary sample sink).

2) B IA dryer isolation:

o Open bypass V-8230.

o Close inlet V-8228.

o Close outlet V-8229.

o Open circuit breaker $ 6 in LTG PNL TB2 (Turbine Bldg.

basement east end).

b. XA dryer prefilters and after b. IF any filter D/P is excessive filters D/P - LESS THAN 10 PSID greater than 10 psid, THEN bypass the affected filter.
c. Running IA compressors- c. IF any IA compressor OPERATING PROPERLY malfunctioning, THEN perform the following:
1) Remove faulty IA compressor from IA header if necessary.

fs

i~

EOP: TITLE: REV 5 AP-IA.1 LOSS OF INSTRUMENT AIR PAGE 6 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

CAUTION AN EVALUATION OF THE CONSEQUENCES SHOULD BE PERFORMED BEFORE A LEAKING SECTION OF THE IA SYSTEM IS ISOLATED. REFER TO ATTACHMENT A FOR MAJOR EQUIPMENT APPECTED IN EACH SPECIFIC AREA.

5 Check For Instrument Air IF the IA leak is found in the Leakage In The Turbine And turbine or intermediate buildings, Intermediate (clean side) THEN perform the following:

Buildings:

a. Isolate the leak (Refer to o Turbine Building - NO LEAKAGE Figure 1 and Attachment A).-

DETECTED

b. Go to Step 16 o Intermediate Building (clean side) - NO LEAKAGE DETECTED 6 Establish Conditions To Isolate Instrument Air To The CNMT
a. Isolate letdown as follows: a. Verify letdown isolation valve AOV-371 closed.
1) Close 'AOV-427 - AOV-427 CLOSED
2) Close AOV-200A, AOV-200B, and AOV-202 - AOVs 200A, 200B, 202 CLOSED
b. Check that charging thru HCV-142 b. IF charging flow thru HCV-142

- NOT REQIURED BY AN EOP reqiured by an EOP, THEN go to Step 7.

c. Isolate charging line flow thru c. IP HCV-142 can NOT be closed HCV-142 as follows: manually, THEN dispatch an AO to close V-286 locally (located in o Close HCV-142 - HCV-142 CLOSED Charging Pump Room).

I g

J

EOP: REV: 5 AP-IA. 1 LOSS OF INSTRUMENT AIR of 11 o PAGE 7 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: When IA is isolated to CNMT, PRZR spray valves will not function.

PRZR heaters should be manually controlled.

7 Close AOV-5392 TO ISOLATE IA TO CNMT 8 Check IA Pressure

a. Pressure - STABLE OR INCREASING a. IP IA pressure continues to decrease, THEN open IA to CNMT (AOV-5392) AND go to Step 9.
b. Go to Step 13 NOTE: When IA is isolated to the Aux Bldg, makeup to the VCT and from the RWST is disabled, AND charging pumps will go to minimum speed, AND HCV-142 fails open.

9 Locally Close V-7350 (AUX BLDG By SFP On West Wall)

TO ISOLATE IA TO AUX BLDG

l

'

EOP: TITLE: REV 5 P

AP-.IA.l LOSS OF INSTRUMENT AIR of 11

-. PAGE 8 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 10 Check IA Pressure STABLE OR IF IA leak is NOT in Aux Bldg, THEN:

INCREASING

a. Restore letdown as follows:
1) Open IA to Aux Bldg V-7350.
2) Ensure V-5392, IA to CNMT is open. XF NOT go to Step'12.
3) Ensure AOV-371 and AOV-427 open.
4) Place PCV-135 and TCV-130 in manual at 25X open.
5) Open desired orifice isolation valve.
6) Adjust PCV-135 and TCV-130 as necessary.
7) Restore PCV-135 and TCV-130 to auto at 250 psig and 80'F to 120'F.
b. Continue investigation.
c. Go to Step 14.

l

~

EOP: TITLE: REV 5 AP-IA.1 LOSS OF INSTRUMENT AIR PAGE 9 of 11 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

CAUTION IF CHARGING PUMP SUCTION IS SWAPPED TO THE RWST, A LOAD REDUCTION MAY BE REQUIRED TO MAINTAIN TAVG AT TREF.

11 Check VCT Level GREATER IF VCT level is low and IA has NOT THAN 204 been restored, THEN perform, the following:

a. Stop charging pump A and place in PULL STOP.
b. Dispatch AO to locally open manual charging pump suction from RWST (V-358 located in charging pump room).
c. WHEN V-358 open, THEN direct AO to close V-268 to isolate charging pumps B and C from VCT (V-268 located. in charging pump room).

IF normal VCT makeup or normal or excess letdown can NOT be restored, THEN, plant shutdown will be required, (Refer to 0-2.1, NORMAL SHUTDOWN TO HOT SHUTDOWN).

12 Verify CCW Is Being Supplied Perform the following:

To The RCPs:

a. Restore CCW to the RCPs.

o Annunciator Alarm A EXTINGUISHED b. IF CCW can NOT be restored to RCPs, THEN go to Step 13.

o Annunciator Alarm A EXTINGUISHED

I

'8~

EOP: TITLE: REV 5 AP-IA. 1 LOSS OF INSTRUMENT AIR PAGE 10 of 11 c,

STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

CAUTION MONITOR RCP SEAL INDICATIONS WHEN CHARGING PUMP IS NOT RUNNING.

13 Start And Stop Charging Pump(s) As Necessary TO CONTROL PRZR LEVEL 14 Throttle Charging Flow Locally If Necessary, Using V-286 (Located In Charging Pump Room) TO MAINTAIN RCP SEAL INJECTION FLOW WHEN CHARGING PUMP(S) ARE RUNNING 15 Isolate IA Leak: IF IA leak can NOT be isolated with plant at power AND IA pressure is

a. Investigate - LEAKING SECTION TO less than 60 psig, THEN perform the BE ISOLATED following:

S

b. Isolate - LEAK AS CLOSE TO o Trip the reactor.

SOURCE AS POSSIBLE o Go to E-O, REACTOR TRIP or SAFETY INJECTION.

IF IA leak occurred while performing any EOP AND can NOT be isolated, THEN , return to procedure and step in effect.

16 Complete RESTORATION OF UNAFFECTED PORTIONS OF THE IA SYSTEM TO SERVICE

f I

~ ~

EOP: TITLE: REV 5 AP-IA.1 LOSS OF INSTRUMENT AIR PAGE 11 of 11

>>

STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 17 Verify THAT PLANT OPERATION CAN CONTINUE NOTE: Refer to 0-9.3, NRC XMMEDIATE NOTIFICATION, for reporting requirements.

18 Complete MAINTENANCE AND HIGHER SUPERVISION NOTIFICATION 19 Establish Further Guidance:

o Return to - PROCEDURE AND STEP IN EFFECT

-OR-o Return to - NORMAL PLANT OPERATION

-END-

'

EOP: TITLE: REV: 5 AP-IA.1 LOSS OF INSTRUMENT AIR PAGE 1 of 1 Qi=

ATTACHMENT A CNMT IA LOSS AND FAILURE MODE

1) P&ID 533013-1887 o Letdown AOV-427 (FO) o Excess Letdown AOV-310 (FC) o RCP Seal Return AOV-270B (FO) o RCP Thermal Barrier CCW AOV-754B (FO)
2) P&ID 433013-1888 o Letdown Orifices AOV-200A, 200B, 202 (FC) o Charging AOV-294, 392A (FC) o Aux. Spray AOV-296 (FC) o PRZR Spray PCV-431A, 431B (FC) o PRZR PORV PCV-430, 431C (FC) o RCP Thermal Barrier CCW AOV-754A (FO) o Charging AOV-392B (FC) o RCP Seal Return AOV-386 '(FC) o PRZR Sample Valves AOV-951, 953 (FC)

AUX BLDG IA LOADS AND FAILURE MODE

1) P&ID N33013-1889 o Letdown Valve LCV-112A (Fail to VCT)
2) P&ID N33013-1890 o Letdown Valve AOV-371 (FC) o Charging Line Valve HCV-142 (FO) o RHR Flow Valves HCV-624, 625 (FO) o RHR Hx Bypass Flow Valve FCV-626 (FC)
3) P&ID N33013-1891 o

o VCT Makeup Valves AOV-110B, 110C, ill (FC)

Charging Pump Suction AOV-112B (FC) AOV-112C (FO) o Charging Pump Speed Control Fails to Minimum o NaOH Tank Outlet Valves AOV-836A, 836B (FO) o Letdown Valve TCV-145 (Fail to VCT) o Letdown Valve PCV-135 (FO)

4) P&ID N33013-1892 o VCT Makeup Valve AOV-110A (FO)

.

~

AP-IA.1'ITLE: REV 5 LOSS OF INSTRUMENT AIR PAGE 1 of 1 FIGURE 1 FRQh SERVICE AIR CNAT PEN 3I8 AQV.5392 I.="=) ~

V-539r SERV I CE ht4)

TO COLUAN 8 l2 AUX BLCGS INT BLDG VALL ORYERS V

TllREI V.53 IS BLDG V 53 I 4 V 53 I 5 Pt 2I63 V 53IB AVT (CDLUAN E 4)

V 95350 F

R 0 V 53ll AKIVE AVT RESIN HYPER) h V 53I3 V 53I2 P I. 62 ABOVE A INST AIR DRYER V.6962 SCREEN K)USE

J

.

~