| {{#Wiki_filter:b.l With one pump and/or one water supply inoperable, restore the inoperable equipment to operable status within seven (7)days or prepare and submit a Report to the Commission pursuant to Specification 6.9.2.b.b.2 With one water supply below the minimum specified limit for one day connect the spool piece to make the screen wash pump available for fire water supply.*c.With no Fire Protection Water System operable: l.Establish a backup fire protection water system within twenty-four (24)hours, and 2.Submit a Report in accordance with Specification 6.9.2.a.3.FIRE HOSE STATIONS a.Fire hose stations in the vicinity of safety related equipment shal l be operable at all times when the safety related equipment in their area of protection is required to be operable;or within one hour of finding an inoperable hose station, an equivalent capacity tire nose shal I be run from an equivalent water source to tne inoperable 1 ocati on.3.PENETRATION FIRE BARRIERS a.Al I electrical penetration fire barriers protecting safety related equipment shall be functional when safety related equipment in the area is required to be operable;or within one (1)hour of the bar rier being tound not intact;a fire watch patrol shall inspect at least once per hour, as operational conditions permit, until the affected penetration fire barrier is restored.8202i80i32 8202ii'PDR ADOCK 05000250'PDR!*This specitication becomes effective upon completion of the necessary modifications. | | {{#Wiki_filter:b.l With one pump and/or one water supply inoperable, restore the inoperable equipment to operable status within seven (7) days or prepare and submit a Report to the Commission pursuant to Specification 6.9.2.b. |
| These modifications to be completed no later than December 1980.3.14-2 2/11/82 I~v ks gl 1>f | | b.2 With one water supply below the minimum specified limit for one day connect the spool piece to make the screen wash pump available for fire water supply.* |
| ~t~~A.Hose Stations)Unit 3)TABLE 3.14-2 FIRE HOSE STATIONS 1.?.3.4~5.6.7.8.EL 18'L 18'L 18'-EL 30'L 30'L 42'L 42'L 42'ast of 4160 V SWGR room on column West of 3A Condensate pump on pedestal Passageway South of SG Feed Pump Room East of 480 V load center on column South end of mezzanine deck NW end of turbine deck North of 6A HPFW Heater NW Corner of entrance to el vator B.Hose Stations (Unit 4g l.2.3.4~5.6.7.8.EL 18'L 18'L 30'L 30'L 42'L 42'L 42'L 42'ast of 4160 V SWGR room on column Passageway South of SG Feed'Pump Room East of 480 V load center at stairway South end of mezzanine deck West end of turbine deck East side of turbine deck and north of 6A FW" Heater East side of turbine deck and east of 6B FW Heater Southwest Corner of turbine deck C.Hose Stations (Auxiliary Bui l din~)1.2.3.4, 5.EL 18'L 18'L 18'L 50'L 50'ast-Hest passageway at west end East-West passageway at east end North-South passageway outside of Unit 3 Chg.Pump Rm.Roof of Unit 3 New Fuel Storage Area Roof of Unit 4 New Fuel Storage Area 3.14-4 2/11/82 | | : c. With no Fire Protection Water System operable: |
| ~, Ci~~<<a, c.Verify that each pump starts sequentially to maintain the Fire Protection Water system pressure>125 psig.7.System flow test equivalent with Chapter 5, Section 11 of the Fire Protecti'on Handbook.14th Edition, published by the National Fire'rotection Association. | | : l. Establish a backup fire protection water system within twenty-four (24) hours, and |
| 3 Years 3.FIRE HOSE STATIONS a.Hose stations in the vicinity of safety related equipment shal I be demonstrated operable by: TEST 1.Visual inspection of hose station equipment 2., Visual inspection of hose, re-racking.
| | : 2. Submit a Report in accordance with Specification 6.9.2.a. |
| and replacement of degraded gaskets in couplings. | | : 3. FIRE HOSE STATIONS |
| 3.Partially open each hose station valve to verify valve operability and no flow blockage.4.Hose hydrostatic test at a pressure of 150 psi or 50 psi above system pressure, whichever i s greater.INTERVAL Monthly Anually 3 Years 3 Years 4.PENETRATION FIRE BARRIERS a.Electrical penetration fire barriers protecting safety related areas shall be verified to be functional (intact)by a visual inspection: | | : a. Fire hose stations in the vicinity of safety related equipment shal l be operable at all times when the safety related equipment in their area of protection is required to be operable; or within one hour of finding an inoperable hose station, an equivalent capacity tire nose shal be run from an equivalent water source to tne inoperable I |
| 1.At least once per 18 months, and 2.Prior to declaring a penetration fire barrier functional following repai'rs or maintenance. | | 1 ocati on. |
| 4.15-2 2/11/82 i~((i)1I~tl)}} | | : 3. PENETRATION FIRE BARRIERS |
| | : a. Al I electrical penetration fire barriers protecting safety related equipment shall be functional when safety related equipment in the area is required to be operable; or within one (1) hour of the bar rier being tound not intact; a fire watch patrol shall inspect at least once per hour, as operational conditions permit, until the affected penetration fire barrier is restored. |
| | 8202i80i32 8202ii |
| | 'PDR ADOCK |
| | ' |
| | 05000250 PDR ! |
| | *This specitication becomes effective upon completion of the necessary modifications. These modifications to be completed no later than December 1980. |
| | 3.14-2 2/11/82 |
| | |
| | I gl |
| | ~ v ks |
| | > f 1 |
| | |
| | ~t ~ ~ |
| | TABLE 3.14-2 FIRE HOSE STATIONS A. Hose Stations )Unit 3) |
| | : 1. EL 18'L of 4160 V SWGR room on column |
| | ?. West of 3A Condensate pump on pedestal |
| | : 3. 18'- |
| | 18'L Passageway South of SG Feed Pump Room 4~ |
| | 5. |
| | EL 42'ast 30'L 30'L East of 480 V load center on column South end of mezzanine deck |
| | : 6. 42'L NW end of turbine deck |
| | : 7. 42'L North of 6A HPFW Heater |
| | : 8. NW Corner of entrance to el vator B. Hose Stations (Unit 4g |
| | : l. EL 18'L of 4160 V SWGR room on column |
| | : 2. 18'L Passageway South of SG Feed 'Pump Room |
| | : 3. East of 480 V load center at stairway 42'ast 30'L 4~ 30'L South end of mezzanine deck |
| | : 5. 42'L West end of turbine deck |
| | : 6. 42'L East side of turbine deck and north of 6A FW" Heater |
| | : 7. 42'L East side of turbine deck and east of 6B FW Heater |
| | : 8. Southwest Corner of turbine deck C. Hose Stations (Auxiliary Bui l din~) |
| | : 1. EL passageway at west end 50'ast-Hest 18'L |
| | : 2. 18'L East-West passageway at east end |
| | : 3. 18'L North-South passageway outside of Unit 3 Chg. Pump Rm. |
| | 4, 50'L Roof of Unit 3 New Fuel Storage Area |
| | : 5. Roof of Unit 4 New Fuel Storage Area 3.14-4 2/11/82 |
| | |
| | ~, Ci ~ ~ |
| | <<a, |
| | : c. Verify that each pump starts sequentially to maintain the Fire Protection Water system pressure > 125 psig. |
| | : 7. System flow test equivalent with 3 Years Chapter 5, Section 11 of the Fire Protecti'on Handbook. 14th Edition, published by the National Fire |
| | 'rotection Association. |
| | : 3. FIRE HOSE STATIONS |
| | : a. Hose stations in the vicinity of safety related equipment shal I be demonstrated operable by: |
| | TEST INTERVAL |
| | : 1. Visual inspection of hose Monthly station equipment 2., Visual inspection of hose, Anually re-racking. and replacement of degraded gaskets in couplings. |
| | : 3. Partially open each hose 3 Years station valve to verify valve operability and no flow blockage. |
| | : 4. Hose hydrostatic test at a 3 Years pressure of 150 psi or 50 psi above system pressure, whichever i s greater. |
| | : 4. PENETRATION FIRE BARRIERS |
| | : a. Electrical penetration fire barriers protecting safety related areas shall be verified to be functional (intact) by a visual inspection: |
| | : 1. At least once per 18 months, and |
| | : 2. Prior to declaring a penetration fire barrier functional following repai'rs or maintenance. |
| | 4.15-2 2/11/82 |
| | |
| | ( i) 1I ~ |
| | i |
| | ~ ( |
| | tl)}} |
Proposed Tech Spec Pages 3.14-2,3.14-4 & 4.15-2 Re Operability Requirements of Fire Hose Stations in Vicinity of safety-related EquipmentML17341A886 |
Person / Time |
---|
Site: |
Turkey Point |
---|
Issue date: |
02/11/1982 |
---|
From: |
FLORIDA POWER & LIGHT CO. |
---|
To: |
|
---|
Shared Package |
---|
ML17341A885 |
List: |
---|
References |
---|
NUDOCS 8202180132 |
Download: ML17341A886 (5) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML17355A3921999-07-27027 July 1999 Proposed Tech Specs 3.8.1.1,3.4.3 & 3.5.2,extending AOT for Inoperable EDG from 72 Hours to 7 Days on one-time Basis ML17355A3041999-04-26026 April 1999 Proposed Tech Specs Deleting Obsolete Part of License Condition 3.L & Incorporating Administrative Changes to TS Index,Ts 3/4.1.2.5 & TS 3/4.7.6 ML17355A2491999-03-0808 March 1999 Proposed Tech Specs Section 6.0,deleting Certain Requirements That Are Adequately Controlled by Existing Regulations,Other than 10CFR50.36 & TS ML17355A2411999-02-24024 February 1999 Proposed Tech Specs Page 3/4 7-15,removing Restrictions on Location at Which Temp of UHS May Be Monitored ML17354B1641998-10-27027 October 1998 Proposed Tech Specs Pages Re Amends to Licenses DPR-31 & DPR-41,to Incorporate Specific Staff Qualifications for Multi-Discipline Supervisor Position Into TS ML17354A8381998-03-12012 March 1998 Proposed Tech Specs Deleting License Conditions 3.I,3.K,3.H & 4 & Incorporating Recent Organization Change in TS 6.5.1.2 & 6.5.3.1.a ML17354A7801998-02-0202 February 1998 Proposed Tech Specs Re Diesel Fuel Storage Sys ML17354A7621998-01-0909 January 1998 Proposed Tech Specs Sections 5.3.1 & 6.9.1.7,,allowing Implementation of Zirlo Fuel Rod Cladding ML17354A7321997-12-0404 December 1997 Proposed Tech Specs Section 6.9.1.7, COLR, Clarifying References 4 & 6 by Adding Best Estimate LOCA to COLR & Documenting re-analysis Performed as Result of Revs to Large Break LOCA Methodology ML17354A6161997-08-27027 August 1997 Proposed Tech Specs Page 6.2,allowing Use of 12 Hour Shifts for Nominal 40 (36 to 48) Hour Week ML17354A4771997-04-24024 April 1997 Proposed Tech Specs Page 6-22 Re Large Break Loss of Coolant re-analysis ML17354A4221997-02-24024 February 1997 Proposed Tech Specs 6.9.1.7 Re COLR & Large Break Loss of Coolant Accident re-analysis ML17354A3741996-12-17017 December 1996 Proposed Tech Specs,Modifying TSs to Change SR for TS 4.4.10 Re Reactor Coolant Pump Flywheel Insp ML17354A3521996-11-22022 November 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Sources & 3/4.8.1 Re AC Sources Operating Limiting Condition for Operation ML17354A2871996-10-0303 October 1996 Proposed Tech Specs Revising TS to Allow Deferral for One Cycle of Reactor Coolant Pump Flywheel Ultrasonic Exams Required by Reg Guide 1.14 ML17353A7991996-07-17017 July 1996 Proposed Tech Specs,Revising TSs to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Intervals Determined by performance-based Criteria ML17353A7111996-05-28028 May 1996 Proposed Tech Specs Section 6.0, Administrative Controls. ML18008A0451996-05-10010 May 1996 Proposed Tech Specs Re Various Administrative Improvements ML17353A6781996-05-0909 May 1996 Proposed Tech Specs Re SBLOCA re-analysis ML17353A6521996-04-23023 April 1996 Proposed Tech Specs Re Accumulator Water Level & Pressure Channnel,Per NRC GL 93-05 ML17353A6581996-04-19019 April 1996 Proposed Tech Specs,Revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl & Incorporating Administrative Clarifications & Corrections ML17353A6171996-03-21021 March 1996 Proposed Tech Specs,Revising TS Such That Requirements for Radiological Effluent Controls Relocated to Offsite Dose Calculation Manual or Process Control Program ML17353A6091996-03-20020 March 1996 Proposed TS 3/4.5.1,reflecting Removal of SRs & Operability Requirements for ECCS SI Accumulators That Concern Water Level & Pressure Channels ML17353A6001996-03-0505 March 1996 Proposed TS Sections 4.4.3.3 & 4.5.2,reducing Frequency of Surveillances & Insps in Accordance W/Gl 93-05,Items 6.6 & 7.5 ML17353A5031995-12-18018 December 1995 Proposed Tech Specs,Increasing Allowed Rated Thermal Power from 2,200 Mwt to 2,300 Mwt ML17353A4541995-11-22022 November 1995 Proposed Tech Specs Re Administrative Controls & Reviews ML17353A4511995-11-22022 November 1995 Proposed Tech Specs Pages 3/4 8-2 & 3/4 8-3 Re Edgs,Per GLs 93-05 & 94-01 ML17353A3971995-10-0404 October 1995 Proposed Tech Specs,Modifying TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/Esfas,Tables 4.3-1 & 4.3-2 SR for Rps/Nis/Esfas & Bases 3/4.3.1 & 3/4.3.2 for Rps/Nis/Esfas Instrumentations ML17353A3831995-09-28028 September 1995 Proposed Tech Specs,Implementing Revised Thermal Design Procedure & SG Water Level low-low Setpoint ML17353A3531995-09-11011 September 1995 Proposed Tech Specs Re Edgs,Change to Testing Requirements, Per GLs 93-05 & 94-01 ML17353A2831995-07-26026 July 1995 Proposed Tech Specs 4.1.3.1.2,4.6.5.1,4.4.6.2.2,4.10.1.2 & Table 4.3-3 to Reduce Frequency of Testing,Per GL 93-05 ML17353A2801995-07-26026 July 1995 Proposed Tech Specs,Modifying TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/Esfas Instrumentation,Tables 4.3-1 & 4.3-2 SRs for Rps/Nis/Esfas Instrumentation & Bases 3/4.3.1 & 3/4.3.2 for Rps/Nis/Esfas Instrumentation ML17353A2761995-07-26026 July 1995 Proposed Tech Specs,Adding to Approved COLR Analysis Methodology Used for SBLOCA Analysis in Anticipation of Thermal Uprate to 2,300 Mwt for Both Units & Increasing Current Margin to Calculated PCT ML17353A2731995-07-26026 July 1995 Proposed Tech Specs,Revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl,Incorporating Administrative Clarifications & Corrections & Correcting Typos ML17353A2701995-07-26026 July 1995 Proposed Tech Specs Re Rod Misalignment Requirement for Movable Control Assemblies ML17353A2671995-07-26026 July 1995 Proposed Tech Specs for Nuclear Instrumentation Sys Adjustments Based on Calorimetric Measurements at Reduced Power Levels ML17353A2401995-06-19019 June 1995 Proposed Tech Specs Re TS SR 4.8.1.1.2.g.7 ML17352B1841995-05-23023 May 1995 Proposed Tech Specs Re Use of Changed Setpoint Presentation Format for RPS & ESFAS Instrumentation ML20083R1291995-05-0505 May 1995 Proposed Tech Specs Re Implementation of Revised Thermal Design Procedure & SG Water Level low-low Setpoint ML17352B0881995-03-30030 March 1995 Proposed Tech Specs SR 4.8.1.1.2.g.7,allowing Separation of 5-minute hot-start Test from 24-h EDG Test Run,Deleting Associated Footnote & Adding New TS SR 4.8.1.1.2.g.14 & Associated Footnote for Performance of Subj 5-minute Test ML17352B0041995-01-17017 January 1995 Proposed Tech Specs 6.9.1.7, COLR, Including Ref to Topical Rept NF-TR-95-01 Re Implementation of FPL Nuclear Physics Methodology for Calculations of COLR Parameters ML17352A8341994-10-20020 October 1994 Proposed TS 3/4.7.1.1 & Associated Bases,Addressing Max Allowable Reactor Thermal Power Operation W/Inoperable MSSVs ML17352A8281994-10-20020 October 1994 Proposed Tech Specs 4.8.1.1.2e & 4.8.1.1.2f,addressing EDG Fuel Oil Testing & TS 3.8.1.1,addressing Required Action in Event Diesel Fuel Oil Does Not Meet Diesel Fuel Oil Testing Program Limits ML17352A8311994-10-20020 October 1994 Proposed Tech Specs 3/4.4.9.1,reflecting Removal of Schedule for Withdrawal of Rv Matl Specimens ML17352A8381994-10-20020 October 1994 Proposed Tech Specs,Allowing Containment Personnel Airlock Doors to Be Opened During Core Alterations & Movement of Irradiated Fuel in Containment,Provided Certain Conditions Met ML17352A7321994-07-19019 July 1994 Proposed TS 3/4.7.1 & Associated Bases Addressing Operation at Reduced Power Levels W/Inoperable Main Steam Safety Valves ML17352A7291994-07-19019 July 1994 Proposed Tech Specs 4.8.1.1.2e & 4.8.2.2.2f Re EDG Fuel Oil Testing Program ML17352A7241994-07-19019 July 1994 Proposed Tech Specs Adding Rod Bank Insertion Limits & K(Z) Curves to COLR ML17352A5471994-04-19019 April 1994 Proposed TS 4.0.5a Re ISI & Testing Programs ML17352A5441994-04-19019 April 1994 Proposed Tech Specs Changing Containment Spray Sys Surveillance Requirements 1999-07-27
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17355A3921999-07-27027 July 1999 Proposed Tech Specs 3.8.1.1,3.4.3 & 3.5.2,extending AOT for Inoperable EDG from 72 Hours to 7 Days on one-time Basis ML17355A3581999-06-28028 June 1999 Cycle 18 Startup Rept. with 990628 Ltr ML17355A3041999-04-26026 April 1999 Proposed Tech Specs Deleting Obsolete Part of License Condition 3.L & Incorporating Administrative Changes to TS Index,Ts 3/4.1.2.5 & TS 3/4.7.6 ML17355A2491999-03-0808 March 1999 Proposed Tech Specs Section 6.0,deleting Certain Requirements That Are Adequately Controlled by Existing Regulations,Other than 10CFR50.36 & TS ML17355A2411999-02-24024 February 1999 Proposed Tech Specs Page 3/4 7-15,removing Restrictions on Location at Which Temp of UHS May Be Monitored ML17355A2011999-01-25025 January 1999 Cycle 17 Startup Rept. with 990125 Ltr ML17354B1641998-10-27027 October 1998 Proposed Tech Specs Pages Re Amends to Licenses DPR-31 & DPR-41,to Incorporate Specific Staff Qualifications for Multi-Discipline Supervisor Position Into TS ML20197C9661998-08-27027 August 1998 Rev 15 to Security Training & Qualification Plan ML17354A9471998-04-27027 April 1998 Rev 2 to Turkey Point Nuclear Plant Recovery Plan. ML17354A8381998-03-12012 March 1998 Proposed Tech Specs Deleting License Conditions 3.I,3.K,3.H & 4 & Incorporating Recent Organization Change in TS 6.5.1.2 & 6.5.3.1.a ML17354A7801998-02-0202 February 1998 Proposed Tech Specs Re Diesel Fuel Storage Sys ML17355A2711998-01-30030 January 1998 Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point Plant,Units 3 & 4. ML17354A7621998-01-0909 January 1998 Proposed Tech Specs Sections 5.3.1 & 6.9.1.7,,allowing Implementation of Zirlo Fuel Rod Cladding ML17354A7321997-12-0404 December 1997 Proposed Tech Specs Section 6.9.1.7, COLR, Clarifying References 4 & 6 by Adding Best Estimate LOCA to COLR & Documenting re-analysis Performed as Result of Revs to Large Break LOCA Methodology ML17354A6161997-08-27027 August 1997 Proposed Tech Specs Page 6.2,allowing Use of 12 Hour Shifts for Nominal 40 (36 to 48) Hour Week ML17354A4971997-05-0101 May 1997 Rev 1 to Turkey Point Nuclear Plant Recovery Plan. ML17354A4771997-04-24024 April 1997 Proposed Tech Specs Page 6-22 Re Large Break Loss of Coolant re-analysis ML17354A4221997-02-24024 February 1997 Proposed Tech Specs 6.9.1.7 Re COLR & Large Break Loss of Coolant Accident re-analysis ML17354A3741996-12-17017 December 1996 Proposed Tech Specs,Modifying TSs to Change SR for TS 4.4.10 Re Reactor Coolant Pump Flywheel Insp ML17354A3521996-11-22022 November 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Sources & 3/4.8.1 Re AC Sources Operating Limiting Condition for Operation ML17354A2871996-10-0303 October 1996 Proposed Tech Specs Revising TS to Allow Deferral for One Cycle of Reactor Coolant Pump Flywheel Ultrasonic Exams Required by Reg Guide 1.14 ML17353A7991996-07-17017 July 1996 Proposed Tech Specs,Revising TSs to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Intervals Determined by performance-based Criteria ML17353A7111996-05-28028 May 1996 Proposed Tech Specs Section 6.0, Administrative Controls. ML18008A0451996-05-10010 May 1996 Proposed Tech Specs Re Various Administrative Improvements ML17353A6781996-05-0909 May 1996 Proposed Tech Specs Re SBLOCA re-analysis ML17353A6521996-04-23023 April 1996 Proposed Tech Specs Re Accumulator Water Level & Pressure Channnel,Per NRC GL 93-05 ML17353A6581996-04-19019 April 1996 Proposed Tech Specs,Revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl & Incorporating Administrative Clarifications & Corrections ML17353A6171996-03-21021 March 1996 Proposed Tech Specs,Revising TS Such That Requirements for Radiological Effluent Controls Relocated to Offsite Dose Calculation Manual or Process Control Program ML17353A6091996-03-20020 March 1996 Proposed TS 3/4.5.1,reflecting Removal of SRs & Operability Requirements for ECCS SI Accumulators That Concern Water Level & Pressure Channels ML17353A6001996-03-0505 March 1996 Proposed TS Sections 4.4.3.3 & 4.5.2,reducing Frequency of Surveillances & Insps in Accordance W/Gl 93-05,Items 6.6 & 7.5 ML17353A5801996-02-29029 February 1996 Plant Procedures & Training Matl Provided for Preparation of Licensing Exams for Reactor Operator Group Xvi & Senior Reactor Operator Upgrade. ML17353A6191996-02-15015 February 1996 Offsite Dose Calculation Manual for Gaseous & Liquid Effluents from Turkey Point Plant Units 3 & 4. ML17353A7631996-02-0808 February 1996 Conduct of Operations. ML17353A5031995-12-18018 December 1995 Proposed Tech Specs,Increasing Allowed Rated Thermal Power from 2,200 Mwt to 2,300 Mwt ML17353A4541995-11-22022 November 1995 Proposed Tech Specs Re Administrative Controls & Reviews ML17353A4511995-11-22022 November 1995 Proposed Tech Specs Pages 3/4 8-2 & 3/4 8-3 Re Edgs,Per GLs 93-05 & 94-01 ML17353A3971995-10-0404 October 1995 Proposed Tech Specs,Modifying TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/Esfas,Tables 4.3-1 & 4.3-2 SR for Rps/Nis/Esfas & Bases 3/4.3.1 & 3/4.3.2 for Rps/Nis/Esfas Instrumentations ML17353A3831995-09-28028 September 1995 Proposed Tech Specs,Implementing Revised Thermal Design Procedure & SG Water Level low-low Setpoint ML17353A3531995-09-11011 September 1995 Proposed Tech Specs Re Edgs,Change to Testing Requirements, Per GLs 93-05 & 94-01 ML17353A7641995-08-23023 August 1995 Emergency & Off-normal Operating Procedure Usage. ML17353A2831995-07-26026 July 1995 Proposed Tech Specs 4.1.3.1.2,4.6.5.1,4.4.6.2.2,4.10.1.2 & Table 4.3-3 to Reduce Frequency of Testing,Per GL 93-05 ML17353A2801995-07-26026 July 1995 Proposed Tech Specs,Modifying TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/Esfas Instrumentation,Tables 4.3-1 & 4.3-2 SRs for Rps/Nis/Esfas Instrumentation & Bases 3/4.3.1 & 3/4.3.2 for Rps/Nis/Esfas Instrumentation ML17353A2761995-07-26026 July 1995 Proposed Tech Specs,Adding to Approved COLR Analysis Methodology Used for SBLOCA Analysis in Anticipation of Thermal Uprate to 2,300 Mwt for Both Units & Increasing Current Margin to Calculated PCT ML17353A2731995-07-26026 July 1995 Proposed Tech Specs,Revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl,Incorporating Administrative Clarifications & Corrections & Correcting Typos ML17353A2701995-07-26026 July 1995 Proposed Tech Specs Re Rod Misalignment Requirement for Movable Control Assemblies ML17353A2671995-07-26026 July 1995 Proposed Tech Specs for Nuclear Instrumentation Sys Adjustments Based on Calorimetric Measurements at Reduced Power Levels ML17353A2401995-06-19019 June 1995 Proposed Tech Specs Re TS SR 4.8.1.1.2.g.7 ML17352B1841995-05-23023 May 1995 Proposed Tech Specs Re Use of Changed Setpoint Presentation Format for RPS & ESFAS Instrumentation ML20083R1291995-05-0505 May 1995 Proposed Tech Specs Re Implementation of Revised Thermal Design Procedure & SG Water Level low-low Setpoint ML17352B0881995-03-30030 March 1995 Proposed Tech Specs SR 4.8.1.1.2.g.7,allowing Separation of 5-minute hot-start Test from 24-h EDG Test Run,Deleting Associated Footnote & Adding New TS SR 4.8.1.1.2.g.14 & Associated Footnote for Performance of Subj 5-minute Test 1999-07-27
[Table view] |
Text
b.l With one pump and/or one water supply inoperable, restore the inoperable equipment to operable status within seven (7) days or prepare and submit a Report to the Commission pursuant to Specification 6.9.2.b.
b.2 With one water supply below the minimum specified limit for one day connect the spool piece to make the screen wash pump available for fire water supply.*
- c. With no Fire Protection Water System operable:
- l. Establish a backup fire protection water system within twenty-four (24) hours, and
- 2. Submit a Report in accordance with Specification 6.9.2.a.
- 3. FIRE HOSE STATIONS
- a. Fire hose stations in the vicinity of safety related equipment shal l be operable at all times when the safety related equipment in their area of protection is required to be operable; or within one hour of finding an inoperable hose station, an equivalent capacity tire nose shal be run from an equivalent water source to tne inoperable I
1 ocati on.
- 3. PENETRATION FIRE BARRIERS
- a. Al I electrical penetration fire barriers protecting safety related equipment shall be functional when safety related equipment in the area is required to be operable; or within one (1) hour of the bar rier being tound not intact; a fire watch patrol shall inspect at least once per hour, as operational conditions permit, until the affected penetration fire barrier is restored.
8202i80i32 8202ii
'PDR ADOCK
'
05000250 PDR !
- This specitication becomes effective upon completion of the necessary modifications. These modifications to be completed no later than December 1980.
3.14-2 2/11/82
I gl
~ v ks
> f 1
~t ~ ~
TABLE 3.14-2 FIRE HOSE STATIONS A. Hose Stations )Unit 3)
- 1. EL 18'L of 4160 V SWGR room on column
?. West of 3A Condensate pump on pedestal
- 3. 18'-
18'L Passageway South of SG Feed Pump Room 4~
5.
EL 42'ast 30'L 30'L East of 480 V load center on column South end of mezzanine deck
- 6. 42'L NW end of turbine deck
- 7. 42'L North of 6A HPFW Heater
- 8. NW Corner of entrance to el vator B. Hose Stations (Unit 4g
- l. EL 18'L of 4160 V SWGR room on column
- 2. 18'L Passageway South of SG Feed 'Pump Room
- 3. East of 480 V load center at stairway 42'ast 30'L 4~ 30'L South end of mezzanine deck
- 5. 42'L West end of turbine deck
- 6. 42'L East side of turbine deck and north of 6A FW" Heater
- 7. 42'L East side of turbine deck and east of 6B FW Heater
- 8. Southwest Corner of turbine deck C. Hose Stations (Auxiliary Bui l din~)
- 1. EL passageway at west end 50'ast-Hest 18'L
- 2. 18'L East-West passageway at east end
- 3. 18'L North-South passageway outside of Unit 3 Chg. Pump Rm.
4, 50'L Roof of Unit 3 New Fuel Storage Area
- 5. Roof of Unit 4 New Fuel Storage Area 3.14-4 2/11/82
~, Ci ~ ~
<<a,
- c. Verify that each pump starts sequentially to maintain the Fire Protection Water system pressure > 125 psig.
- 7. System flow test equivalent with 3 Years Chapter 5, Section 11 of the Fire Protecti'on Handbook. 14th Edition, published by the National Fire
'rotection Association.
- 3. FIRE HOSE STATIONS
- a. Hose stations in the vicinity of safety related equipment shal I be demonstrated operable by:
TEST INTERVAL
- 1. Visual inspection of hose Monthly station equipment 2., Visual inspection of hose, Anually re-racking. and replacement of degraded gaskets in couplings.
- 3. Partially open each hose 3 Years station valve to verify valve operability and no flow blockage.
- 4. Hose hydrostatic test at a 3 Years pressure of 150 psi or 50 psi above system pressure, whichever i s greater.
- 4. PENETRATION FIRE BARRIERS
- a. Electrical penetration fire barriers protecting safety related areas shall be verified to be functional (intact) by a visual inspection:
- 1. At least once per 18 months, and
- 2. Prior to declaring a penetration fire barrier functional following repai'rs or maintenance.
4.15-2 2/11/82
( i) 1I ~