b.l With one pump and/or one water supply inoperable, restore the inoperable equipment to operable status within seven (7) days or prepare and submit a Report to the Commission pursuant to Specification 6.9.2.b.
b.2 With one water supply below the minimum specified limit for one day connect the spool piece to make the screen wash pump available for fire water supply.*
c.
With no Fire Protection Water System operable:
l.
Establish a backup fire protection water system within twenty-four (24) hours, and 2.
Submit a Report in accordance with Specification 6.9.2.a.
3.
FIRE HOSE STATIONS a.
Fire hose stations in the vicinity of safety related equipment shal l
be operable at all times when the safety related equipment in their area of protection is required to be operable; or within one hour of finding an inoperable hose station, an equivalent capacity tire nose shal I
be run from an equivalent water source to tne inoperable 1 ocati on.
3.
Al I electrical penetration fire barriers protecting safety related equipment shall be functional when safety related equipment in the area is required to be operable; or within one (1) hour of the bar rier being tound not intact; a fire watch patrol shall inspect at least once per hour, as operational conditions permit, until the affected penetration fire barrier is restored.
8202i80i32 8202ii
- This specitication becomes effective upon completion of the necessary modifications.
These modifications to be completed no later than December 1980.
3.14-2 2/11/82
I
~
vks gl 1
> f
~t ~
~
A.
Hose Stations )Unit 3)
TABLE 3.14-2 FIRE HOSE STATIONS 1.
?.
3.
4 ~
5.
6.
7.
8.
EL 18'L 18'L18'-
EL 30'L 30'L 42'L 42'L 42'ast of 4160 V
SWGR room on column West of 3A Condensate pump on pedestal Passageway South of SG Feed Pump Room East of 480 V load center on column South end of mezzanine deck NW end of turbine deck North of 6A HPFW Heater NW Corner of entrance to el vator B.
Hose Stations (Unit 4g l.
2.
3.
4 ~
5.
6.
7.
8.
EL 18'L 18'L 30'L 30'L 42'L 42'L 42'L 42'ast of 4160 V
SWGR room on column Passageway South of SG Feed
'Pump Room East of 480 V load center at stairway South end of mezzanine deck West end of turbine deck East side of turbine deck and north of 6A FW" Heater East side of turbine deck and east of 6B FW Heater Southwest Corner of turbine deck C.
Hose Stations (Auxiliary Bui ldin~)
1.
2.
3.
4, 5.
EL 18'L 18'L 18'L 50'L 50'ast-Hest passageway at west end East-West passageway at east end North-South passageway outside of Unit 3 Chg.
Pump Rm.
Roof of Unit 3 New Fuel Storage Area Roof of Unit 4 New Fuel Storage Area 3.14-4 2/11/82
~,
Ci ~
~
<<a, c.
Verify that each pump starts sequentially to maintain the Fire Protection Water system pressure
> 125 psig.
7.
System flow test equivalent with Chapter 5, Section 11 of the Fire Protecti'on Handbook.
14th Edition, published by the National Fire
'rotection Association.
3 Years 3.
FIRE HOSE STATIONS a.
Hose stations in the vicinity of safety related equipment shal I
be demonstrated operable by:
TEST 1.
Visual inspection of hose station equipment 2.,
Visual inspection of hose, re-racking.
and replacement of degraded gaskets in couplings.
3.
Partially open each hose station valve to verify valve operability and no flow blockage.
4.
Hose hydrostatic test at a
pressure of 150 psi or 50 psi above system pressure, whichever i s greater.
INTERVAL Monthly Anually 3 Years 3 Years 4.
Electrical penetration fire barriers protecting safety related areas shall be verified to be functional (intact) by a visual inspection:
1.
At least once per 18 months, and 2.
Prior to declaring a penetration fire barrier functional following repai'rs or maintenance.
4.15-2 2/11/82