IR 05000269/2019005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Code of Federal Regulations
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ust 26, 2019


/RA/
==SUBJECT:==
UPDATED INSPECTION PLAN FOR OCONEE NUCLEAR STATION UNITS 1, 2, AND 3 (NRC INSPECTION REPORT 05000269/2019005, 05000270/2019005, AND 05000287/2019005)
 
==Dear Mr. Burchfield:==
The enclosed inspection plan lists the inspections scheduled through June 30, 2021, for Oconee Nuclear Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised.
 
The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant.
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4611 with any questions you have regarding this letter.
 
Sincerely,
/RA/
Frank Ehrhardt, Chief Reactor Project Branch 1 Division of Reactor Projects Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55 Enclosure:
Oconee Inspection Activity Plan (09/01/2019 - 06/30/2021)
cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR OCONEE NUCLEAR STATION UNITS 1, 2, AND 3 (NRC INSPECTION REPORT 05000269/2019005, 05000270/2019005, AND 05000287/2019005)
DISTRIBUTION:
M. Kowal, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMOconee Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
ADAMS Accession Number: ML19238A136 OFFICE RII:DRP RII:DRP RII: DRP NAME JWorosilo MToth FEhrhardt DATE 8/15/2019 8/20/2019 8/20/2019 OFFICIAL AGENCY RECORD
 
Enclosure
 
3
}}
}}

Latest revision as of 22:59, 7 October 2019

Updated Inspection Plan for Oconee Nuclear Station Units 1, 2, and 3 (NRC Inspection Report 05000269/2019005, 05000270/2019005, and 05000287/2019005)
ML19238A136
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/26/2019
From: Frank Ehrhardt
Division Reactor Projects II
To: Burchfield J
Duke Energy Carolinas
Reeder D
References
IR 2019005
Download: ML19238A136 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ust 26, 2019

SUBJECT:

UPDATED INSPECTION PLAN FOR OCONEE NUCLEAR STATION UNITS 1, 2, AND 3 (NRC INSPECTION REPORT 05000269/2019005, 05000270/2019005, AND 05000287/2019005)

Dear Mr. Burchfield:

The enclosed inspection plan lists the inspections scheduled through June 30, 2021, for Oconee Nuclear Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised.

The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4611 with any questions you have regarding this letter.

Sincerely,

/RA/

Frank Ehrhardt, Chief Reactor Project Branch 1 Division of Reactor Projects Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55 Enclosure:

Oconee Inspection Activity Plan (09/01/2019 - 06/30/2021)

cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR OCONEE NUCLEAR STATION UNITS 1, 2, AND 3 (NRC INSPECTION REPORT 05000269/2019005, 05000270/2019005, AND 05000287/2019005)

DISTRIBUTION:

M. Kowal, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMOconee Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

ADAMS Accession Number: ML19238A136 OFFICE RII:DRP RII:DRP RII: DRP NAME JWorosilo MToth FEhrhardt DATE 8/15/2019 8/20/2019 8/20/2019 OFFICIAL AGENCY RECORD

Enclosure

3