ML13322A416: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 13: | Line 13: | ||
| page count = 2 | | page count = 2 | ||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:Dominion Energy Kewaunee, Inc. 4D minion N490 Hwy 42, Kewaunee, WI 54216 Web Address: www.dom.com | {{#Wiki_filter:Dominion Energy Kewaunee, Inc. 4D minion N490 Hwy 42, Kewaunee, WI 54216 Web Address: www.dom.com NOV 0 7 2013 ATTN: Document Control Desk Serial No. 13-239 U. S. Nuclear Regulatory Commission LIC/RR/R0 Washington, DC 20555-0001 Docket No.: 50-305 License No.: DPR-43 DOMINION ENERGY KEWAUNEE, INC.KEWAUNEE POWER STATION INSPECTION REPORT 0500030512013504 -RESPONSE TO NRC REQUEST On January 24, 2013, the Nuclear Regulatory Commission (NRC) issued an inspection report for the Kewaunee Power Station (KPS) (Reference | ||
NOV 0 7 2013 ATTN: Document Control Desk Serial No. 13-239 U. S. Nuclear Regulatory | : 1) indicating a preliminary significance determination for a White finding. On April 4, 2013, the NRC issued the final significance determination for a White finding and notice of violation (Reference 2).The April 4, 2013 letter (Reference | ||
Commission | : 2) also informed Dominion Energy Kewaunee, Inc.(DEK) the NRC would be conducting a supplemental inspection using Inspection Procedure 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area," when NRC has been notified by DEK of its readiness for the inspection. | ||
LIC/RR/R0 Washington, DC 20555-0001 | On May 31, 2013, the NRC issued a letter describing the termination of the Reactor Oversight Process for KPS and commencement of the Decommissioning Power Reactor Inspection Program (Reference 3). In that letter the NRC states that it will conduct the inspection for the Emergency Preparedness White finding using Inspection Procedure 92702, "Follow-Up on Corrective Actions for Violations and Deviations," to verify appropriate corrective actions are being implemented instead of using Inspection Procedure 95001.DEK has undertaken the steps necessary to assure that the cause evaluation and corrective actions are of sufficient scope and breadth to address the identified performance deficiencies. | ||
Docket No.: 50-305 License No.: DPR-43 DOMINION ENERGY KEWAUNEE, INC.KEWAUNEE POWER STATION INSPECTION | DEK requests the NRC perform the inspection identified in Reference 3 starting on or after November 12, 2013.If you have questions or require additional information, please feel free to contact Mr.Richard P. Repshas at 920-388-8217. | ||
REPORT 0500030512013504 -RESPONSE | Very truly yours, Site Vi e resident, Kewaunee Power Station Serial No. 13-239 Page 2 of 2 | ||
TO NRC REQUEST On January 24, 2013, the Nuclear Regulatory | |||
Commission (NRC) issued an inspection | ==References:== | ||
report for the Kewaunee Power Station (KPS) (Reference | : 1. Letter from Kenneth G. O'Brien (NRC) to David A. Heacock (DEK), "Kewaunee Power Station-NRC Emergency Preparedness Inspection Report 05000305/2012503; Preliminary White Finding," dated January 24, 2013. (ADAMS Accession No. ML13024A422) | ||
1) indicating | : 2. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Final Significance Determination of A White Finding With Proposed Followup and Notice of Violation; NRC Inspection Report No. 05000305/2013504; Kewaunee Power Station," dated April 4, 2013. (ADAMS Accession No. ML13094A270) | ||
a preliminary | : 3. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Termination Of Reactor Oversight Process For Kewaunee Power Station And Commencement Of Decommissioning Inspection Program," dated May 31, 2013. (ADAMS Accession No. ML13151A375) | ||
significance | Commitments made by this letter: NONE cc: Regional Administrator, Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Mr. K. D. Feintuch Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08-Dl 5 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Kewaunee Power Station}} | ||
determination | |||
for a White finding. On April 4, 2013, the NRC issued the final significance | |||
determination | |||
for a White finding and notice of violation (Reference | |||
2).The April 4, 2013 letter (Reference | |||
2) also informed Dominion Energy Kewaunee, Inc.(DEK) the NRC would be conducting | |||
a supplemental | |||
inspection | |||
using Inspection | |||
Procedure | |||
95001, "Inspection | |||
for One or Two White Inputs in a Strategic | |||
Performance | |||
Area," when NRC has been notified by DEK of its readiness | |||
for the inspection. | |||
On May 31, 2013, the NRC issued a letter describing | |||
the termination | |||
of the Reactor Oversight | |||
Process for KPS and commencement | |||
of the Decommissioning | |||
Power Reactor Inspection | |||
Program (Reference | |||
3). In that letter the NRC states that it will conduct the inspection | |||
for the Emergency | |||
Preparedness | |||
White finding using Inspection | |||
Procedure | |||
92702, "Follow-Up | |||
on Corrective | |||
Actions for Violations | |||
and Deviations," to verify appropriate | |||
corrective | |||
actions are being implemented | |||
instead of using Inspection | |||
Procedure | |||
95001.DEK has undertaken | |||
the steps necessary | |||
to assure that the cause evaluation | |||
and corrective | |||
actions are of sufficient | |||
scope and breadth to address the identified | |||
performance | |||
deficiencies. | |||
DEK requests the NRC perform the inspection | |||
identified | |||
in Reference | |||
3 starting on or after November 12, 2013.If you have questions | |||
or require additional | |||
information, please feel free to contact Mr.Richard P. Repshas at 920-388-8217. | |||
Very truly yours, Site Vi e resident, Kewaunee Power Station | |||
Serial No. 13-239 Page 2 of 2 References: | |||
1. Letter from Kenneth G. O'Brien (NRC) to David A. Heacock (DEK), "Kewaunee Power Station-NRC | |||
Emergency | |||
Preparedness | |||
Inspection | |||
Report 05000305/2012503; | |||
Preliminary | |||
White Finding," dated January 24, 2013. (ADAMS Accession | |||
No. ML13024A422) | |||
2. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Final Significance | |||
Determination | |||
of A White Finding With Proposed Followup and Notice of Violation; | |||
NRC Inspection | |||
Report No. 05000305/2013504; | |||
Kewaunee Power Station," dated April 4, 2013. (ADAMS Accession | |||
No. ML13094A270) | |||
3. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Termination | |||
Of Reactor Oversight | |||
Process For Kewaunee Power Station And Commencement | |||
Of Decommissioning | |||
Inspection | |||
Program," dated May 31, 2013. (ADAMS Accession No. ML13151A375) | |||
Commitments | |||
made by this letter: NONE cc: Regional Administrator, Region III U. S. Nuclear Regulatory | |||
Commission | |||
2443 Warrenville | |||
Road Suite 210 Lisle, IL 60532-4352 | |||
Mr. K. D. Feintuch Project Manager U.S. Nuclear Regulatory | |||
Commission | |||
One White Flint North, Mail Stop 08-Dl 5 11555 Rockville | |||
Pike Rockville, MD 20852-2738 | |||
NRC Senior Resident Inspector Kewaunee Power Station | |||
}} |
Revision as of 04:47, 19 August 2019
ML13322A416 | |
Person / Time | |
---|---|
Site: | Kewaunee |
Issue date: | 11/07/2013 |
From: | Jordan A Dominion, Dominion Energy Kewaunee |
To: | Document Control Desk, NRC/RGN-III |
References | |
Download: ML13322A416 (2) | |
Text
Dominion Energy Kewaunee, Inc. 4D minion N490 Hwy 42, Kewaunee, WI 54216 Web Address: www.dom.com NOV 0 7 2013 ATTN: Document Control Desk Serial No.13-239 U. S. Nuclear Regulatory Commission LIC/RR/R0 Washington, DC 20555-0001 Docket No.: 50-305 License No.: DPR-43 DOMINION ENERGY KEWAUNEE, INC.KEWAUNEE POWER STATION INSPECTION REPORT 0500030512013504 -RESPONSE TO NRC REQUEST On January 24, 2013, the Nuclear Regulatory Commission (NRC) issued an inspection report for the Kewaunee Power Station (KPS) (Reference
- 1) indicating a preliminary significance determination for a White finding. On April 4, 2013, the NRC issued the final significance determination for a White finding and notice of violation (Reference 2).The April 4, 2013 letter (Reference
- 2) also informed Dominion Energy Kewaunee, Inc.(DEK) the NRC would be conducting a supplemental inspection using Inspection Procedure 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area," when NRC has been notified by DEK of its readiness for the inspection.
On May 31, 2013, the NRC issued a letter describing the termination of the Reactor Oversight Process for KPS and commencement of the Decommissioning Power Reactor Inspection Program (Reference 3). In that letter the NRC states that it will conduct the inspection for the Emergency Preparedness White finding using Inspection Procedure 92702, "Follow-Up on Corrective Actions for Violations and Deviations," to verify appropriate corrective actions are being implemented instead of using Inspection Procedure 95001.DEK has undertaken the steps necessary to assure that the cause evaluation and corrective actions are of sufficient scope and breadth to address the identified performance deficiencies.
DEK requests the NRC perform the inspection identified in Reference 3 starting on or after November 12, 2013.If you have questions or require additional information, please feel free to contact Mr.Richard P. Repshas at 920-388-8217.
Very truly yours, Site Vi e resident, Kewaunee Power Station Serial No.13-239 Page 2 of 2
References:
- 1. Letter from Kenneth G. O'Brien (NRC) to David A. Heacock (DEK), "Kewaunee Power Station-NRC Emergency Preparedness Inspection Report 05000305/2012503; Preliminary White Finding," dated January 24, 2013. (ADAMS Accession No. ML13024A422)
- 2. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Final Significance Determination of A White Finding With Proposed Followup and Notice of Violation; NRC Inspection Report No. 05000305/2013504; Kewaunee Power Station," dated April 4, 2013. (ADAMS Accession No. ML13094A270)
- 3. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Termination Of Reactor Oversight Process For Kewaunee Power Station And Commencement Of Decommissioning Inspection Program," dated May 31, 2013. (ADAMS Accession No. ML13151A375)
Commitments made by this letter: NONE cc: Regional Administrator, Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Mr. K. D. Feintuch Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08-Dl 5 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Kewaunee Power Station