{{#Wiki_filter:Dominion Energy Kewaunee, Inc. 4D minion N490 Hwy 42, Kewaunee, WI 54216 Web Address: www.dom.com
{{#Wiki_filter:Dominion Energy Kewaunee, Inc. 4D minion N490 Hwy 42, Kewaunee, WI 54216 Web Address: www.dom.com NOV 0 7 2013 ATTN: Document Control Desk Serial No. 13-239 U. S. Nuclear Regulatory Commission LIC/RR/R0 Washington, DC 20555-0001 Docket No.: 50-305 License No.: DPR-43 DOMINION ENERGY KEWAUNEE, INC.KEWAUNEE POWER STATION INSPECTION REPORT 0500030512013504 -RESPONSE TO NRC REQUEST On January 24, 2013, the Nuclear Regulatory Commission (NRC) issued an inspection report for the Kewaunee Power Station (KPS) (Reference
NOV 0 7 2013 ATTN: Document Control Desk Serial No. 13-239 U. S. Nuclear Regulatory  
: 1) indicating a preliminary significance determination for a White finding. On April 4, 2013, the NRC issued the final significance determination for a White finding and notice of violation (Reference 2).The April 4, 2013 letter (Reference
Commission  
: 2) also informed Dominion Energy Kewaunee, Inc.(DEK) the NRC would be conducting a supplemental inspection using Inspection Procedure 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area," when NRC has been notified by DEK of its readiness for the inspection.
LIC/RR/R0 Washington, DC 20555-0001  
On May 31, 2013, the NRC issued a letter describing the termination of the Reactor Oversight Process for KPS and commencement of the Decommissioning Power Reactor Inspection Program (Reference 3). In that letter the NRC states that it will conduct the inspection for the Emergency Preparedness White finding using Inspection Procedure 92702, "Follow-Up on Corrective Actions for Violations and Deviations," to verify appropriate corrective actions are being implemented instead of using Inspection Procedure 95001.DEK has undertaken the steps necessary to assure that the cause evaluation and corrective actions are of sufficient scope and breadth to address the identified performance deficiencies.
Docket No.: 50-305 License No.: DPR-43 DOMINION ENERGY KEWAUNEE, INC.KEWAUNEE POWER STATION INSPECTION  
DEK requests the NRC perform the inspection identified in Reference 3 starting on or after November 12, 2013.If you have questions or require additional information, please feel free to contact Mr.Richard P. Repshas at 920-388-8217.
REPORT 0500030512013504 -RESPONSE  
Very truly yours, Site Vi e resident, Kewaunee Power Station Serial No. 13-239 Page 2 of 2  
TO NRC REQUEST On January 24, 2013, the Nuclear Regulatory  
 
Commission (NRC) issued an inspection
==References:==
report for the Kewaunee Power Station (KPS) (Reference  
: 1. Letter from Kenneth G. O'Brien (NRC) to David A. Heacock (DEK), "Kewaunee Power Station-NRC Emergency Preparedness Inspection Report 05000305/2012503; Preliminary White Finding," dated January 24, 2013. (ADAMS Accession No. ML13024A422)
1) indicating  
: 2. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Final Significance Determination of A White Finding With Proposed Followup and Notice of Violation; NRC Inspection Report No. 05000305/2013504; Kewaunee Power Station," dated April 4, 2013. (ADAMS Accession No. ML13094A270)
a preliminary
: 3. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Termination Of Reactor Oversight Process For Kewaunee Power Station And Commencement Of Decommissioning Inspection Program," dated May 31, 2013. (ADAMS Accession No. ML13151A375)
significance  
Commitments made by this letter: NONE cc: Regional Administrator, Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Mr. K. D. Feintuch Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08-Dl 5 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Kewaunee Power Station}}
determination  
for a White finding. On April 4, 2013, the NRC issued the final significance  
determination  
for a White finding and notice of violation (Reference  
2).The April 4, 2013 letter (Reference  
2) also informed Dominion Energy Kewaunee, Inc.(DEK) the NRC would be conducting  
a supplemental  
inspection  
using Inspection
Procedure  
95001, "Inspection  
for One or Two White Inputs in a Strategic  
Performance
Area," when NRC has been notified by DEK of its readiness  
for the inspection.
On May 31, 2013, the NRC issued a letter describing  
the termination  
of the Reactor Oversight  
Process for KPS and commencement  
of the Decommissioning  
Power Reactor Inspection  
Program (Reference  
3). In that letter the NRC states that it will conduct the inspection  
for the Emergency  
Preparedness  
White finding using Inspection
Procedure  
92702, "Follow-Up  
on Corrective  
Actions for Violations  
and Deviations," to verify appropriate  
corrective  
actions are being implemented  
instead of using Inspection
Procedure  
95001.DEK has undertaken  
the steps necessary  
to assure that the cause evaluation  
and corrective  
actions are of sufficient  
scope and breadth to address the identified
performance  
deficiencies.  
DEK requests the NRC perform the inspection  
identified  
in Reference  
3 starting on or after November 12, 2013.If you have questions  
or require additional  
information, please feel free to contact Mr.Richard P. Repshas at 920-388-8217.
Very truly yours, Site Vi e resident, Kewaunee Power Station  
Serial No. 13-239 Page 2 of 2 References:
1. Letter from Kenneth G. O'Brien (NRC) to David A. Heacock (DEK), "Kewaunee Power Station-NRC  
Emergency  
Preparedness  
Inspection  
Report 05000305/2012503;  
Preliminary  
White Finding," dated January 24, 2013. (ADAMS Accession  
No. ML13024A422)
2. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Final Significance
Determination  
of A White Finding With Proposed Followup and Notice of Violation;
NRC Inspection  
Report No. 05000305/2013504;  
Kewaunee Power Station," dated April 4, 2013. (ADAMS Accession  
No. ML13094A270)
3. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Termination  
Of Reactor Oversight  
Process For Kewaunee Power Station And Commencement  
Of Decommissioning  
Inspection  
Program," dated May 31, 2013. (ADAMS Accession No. ML13151A375)
Commitments  
made by this letter: NONE cc: Regional Administrator, Region III U. S. Nuclear Regulatory  
Commission
2443 Warrenville  
Road Suite 210 Lisle, IL 60532-4352
Mr. K. D. Feintuch Project Manager U.S. Nuclear Regulatory  
Commission
One White Flint North, Mail Stop 08-Dl 5 11555 Rockville  
Pike Rockville, MD 20852-2738
NRC Senior Resident Inspector Kewaunee Power Station
}}

Revision as of 04:47, 19 August 2019

Kewaunne Power Station, Response to NRC Inspection Report 05000305-13-504 Request
ML13322A416
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 11/07/2013
From: Jordan A
Dominion, Dominion Energy Kewaunee
To:
Document Control Desk, NRC/RGN-III
References
Download: ML13322A416 (2)


Text

Dominion Energy Kewaunee, Inc. 4D minion N490 Hwy 42, Kewaunee, WI 54216 Web Address: www.dom.com NOV 0 7 2013 ATTN: Document Control Desk Serial No.13-239 U. S. Nuclear Regulatory Commission LIC/RR/R0 Washington, DC 20555-0001 Docket No.: 50-305 License No.: DPR-43 DOMINION ENERGY KEWAUNEE, INC.KEWAUNEE POWER STATION INSPECTION REPORT 0500030512013504 -RESPONSE TO NRC REQUEST On January 24, 2013, the Nuclear Regulatory Commission (NRC) issued an inspection report for the Kewaunee Power Station (KPS) (Reference

1) indicating a preliminary significance determination for a White finding. On April 4, 2013, the NRC issued the final significance determination for a White finding and notice of violation (Reference 2).The April 4, 2013 letter (Reference
2) also informed Dominion Energy Kewaunee, Inc.(DEK) the NRC would be conducting a supplemental inspection using Inspection Procedure 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area," when NRC has been notified by DEK of its readiness for the inspection.

On May 31, 2013, the NRC issued a letter describing the termination of the Reactor Oversight Process for KPS and commencement of the Decommissioning Power Reactor Inspection Program (Reference 3). In that letter the NRC states that it will conduct the inspection for the Emergency Preparedness White finding using Inspection Procedure 92702, "Follow-Up on Corrective Actions for Violations and Deviations," to verify appropriate corrective actions are being implemented instead of using Inspection Procedure 95001.DEK has undertaken the steps necessary to assure that the cause evaluation and corrective actions are of sufficient scope and breadth to address the identified performance deficiencies.

DEK requests the NRC perform the inspection identified in Reference 3 starting on or after November 12, 2013.If you have questions or require additional information, please feel free to contact Mr.Richard P. Repshas at 920-388-8217.

Very truly yours, Site Vi e resident, Kewaunee Power Station Serial No.13-239 Page 2 of 2

References:

1. Letter from Kenneth G. O'Brien (NRC) to David A. Heacock (DEK), "Kewaunee Power Station-NRC Emergency Preparedness Inspection Report 05000305/2012503; Preliminary White Finding," dated January 24, 2013. (ADAMS Accession No. ML13024A422)
2. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Final Significance Determination of A White Finding With Proposed Followup and Notice of Violation; NRC Inspection Report No. 05000305/2013504; Kewaunee Power Station," dated April 4, 2013. (ADAMS Accession No. ML13094A270)
3. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Termination Of Reactor Oversight Process For Kewaunee Power Station And Commencement Of Decommissioning Inspection Program," dated May 31, 2013. (ADAMS Accession No. ML13151A375)

Commitments made by this letter: NONE cc: Regional Administrator, Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Mr. K. D. Feintuch Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08-Dl 5 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Kewaunee Power Station