{{#Wiki_filter:P RIDRIT Y I (ACCELERATED
{{#Wiki_filter:P RIDRIT Y I (ACCELERATED RIDS PROCESSING)
RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9408010261 DOC.DATE: 94/07/28 NOTARIZED:
REGULATORY
NO CIL:50-259 Browns Ferry Nuclear-Power Station, Unit 1, Tennessee UTH.N~~ME AUTHOR AFFILIATION CEiIN, R.L).Tennessee Valley Authority REC I P.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
INFORMATION
 
DISTRIBUTION
==SUBJECT:==
SYSTEM (RIDS)ACCESSION NBR:9408010261
Responds to NRC 940701 ltr re violation noted in Insp Rept 50-259/94-14.Corrective actions:Form SSP-26,"Voluntary Entry Into TS LCO for Plant Mods" prepared to obtain necessary evaluations
DOC.DATE: 94/07/28 NOTARIZED:
&approvasl for entering LCO 3.5.C.4.DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR t ENCL L SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: DOCKET 05000259 RECIPIENT ID CODE/NAME PD2-4-PD INTERNAL: ACRS AEOD/DSP/ROAB AEOD/TTC NRR/DORS/OEAB NRR/PMAS/IRCB-E DIR t EG~X7~M 0 2 RGN2 FILE 01 EXTERNAL: EG&G/BRYCE,J.H.
NO CIL:50-259
NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME TRIMBLE,D AEOD/DEIB AEOD/DSP/TPAB DEDRO NRR/DRCH/HHFB NUDOCS-ABSTRACT OGC/HDS3 , RES/HFB NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
Browns Ferry Nuclear-Power
PLEASE HELP US TO REDUCE iVASTE!CONTACTTHE DOCUMENT CONTROL DESK, ROO!1I PI-37 (E>i T.504-083)TO LLIhf!NATE YOUR MARIE FROM DISTRIBUTION LISTS I OR DOCUMENTS YOU DON"I'L'ED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 21  
Station, Unit 1, Tennessee UTH.N~~ME AUTHOR AFFILIATION
 
CEiIN, R.L).Tennessee Valley Authority REC I P.NAME RECIPIENT AFFILIATION
Tennessee vasey Authority, post otiice Box 2000.Decatur, Alabama 35609-2000 R.D.(Rick)Machon Vice President, Brovrns Ferry Nuclear Plan;July 28, 1994 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555 Gentlemen:
Document Control Branch (Document Control Desk)SUBJECT: Responds to NRC 940701 ltr re violation noted in Insp Rept 50-259/94-14.Corrective
10 CFR 2 Appendix C In the Matter Of Tennessee Valley Authority Docket Nos.50-259 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN)-NRC INSPECTION REPORT 50-259'0-260I 50-296/94-14 REPLY TO NOTICE OF VIOLATION (NOV)This letter provides our reply to the subject NOV regarding inadequate oversight of the recovery activities associated with Browns Ferry Unit 3.The NOV was transmitted by letter from Thomas A.Peebles, NRC, to O.D.Kingsley Jr., TVA, dated July 1, 1994.While TVA does not contest the underlying issue described in the NOV and Inspection Report, TVA does not believe that a violation of a legally binding requirement was involved.Instead, the issue appears to involve noncompliance with a commitment made in a NRC/TVA meeting on May 10, 1994.Therefore, TVA respectfully requests that NRC reclassify this NOV as a Notice of Deviation.
actions:Form
On May 10, 1994, TVA presented plans for controlling Unit 3 recovery activities that'equire entry into a Unit 2 Limiting Conditions for Operation (LCOs).The controls were based on NRC Inspection Manual Part 9900,"Maintenance
SSP-26,"Voluntary
-Voluntary Entry Into Limiting Conditions for Operation Action Statements to Perform Preventive Maintenance." The Inspection Manual was used since it was the best source of guidance for similar situations.
Entry Into TS LCO for Plant Mods" prepared to obtain necessary evaluations
9408010261 940728 PDR ADOCK 05000259 8 PDR  
&approvasl for entering LCO 3.5.C.4.DISTRIBUTION
 
CODE: IEOID COPIES RECEIVED:LTR
U.S.Nuclear Regulatory Commission Page 2 July 28, 1994 During the meeting, TVA indicated that formal, documented evaluations and management reviews of the Unit 2 LCOs entered for performing Unit 3 recovery activities would be performed due to the special circumstances involved.The reviews and evaluations were beyond those normally conducted'by on-shift licensed personnel when entering LCOs.TVA implemented the controls for these reviews and evaluations using plant procedures before commencing the initial Unit 3 activity that placed Unit 2 into an LCO.TVA believes that the NOV concerns a situation involving noncompliance with the commitment to perform the additional reviews and evaluations for each of the Unit 2 LCOs involved with an Emergency Diesel Generator (EDG)outage before entering that LCO for the Unit 3 recovery work.Accordingly, TVA requests that the NRC reclassify the NOV as a Notice o Deviation.
t ENCL L SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
The enclosure provides TVA's reply to the NOV.There are no commitments contained in this submittal.
of Violation Response NOTES: DOCKET 05000259 RECIPIENT ID CODE/NAME PD2-4-PD INTERNAL: ACRS AEOD/DSP/ROAB
Zf you have any questions regarding this reply, please contact Mr.Pedro Salas at{205)729-2636.R.D.M on Site Vice President Enclosure cc: See page 3 U.S.Nuclear Regulatory Commission Page 3 July 28, 1994 Enclosure cc (Enclosure):
AEOD/TTC NRR/DORS/OEAB
Mr.Mark S.Lesser, Section Chief U.S.Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637'thens, Alabama 35611 Mr.J.F.Williams, Project Manager U.S.Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr.D.C.Trimble, Project Manager U.S.Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)REPLY TO NOTICE OF VIOLATION (NOV)INSPECTION REPORT NUMBER 50-259~50-260 g 50-296/94/14 RESTATEMENT OF THE VIOLATION During an NRC inspection conducted during the period of June 13-17, 1994, a violation of NRC requirements was identified.
NRR/PMAS/IRCB-E
In accordance with the"General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR part 2, Appendix Cg the violation is listed below: 10 CFR 50, Appendix B, Criterion V, states that activities affecting quality shall be prescribed by documented instructions, procedures, or drawings of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings.Contrary to the above, Browns Ferry procedure SSP-7.1,"Work Contxol," which was controlling an activity affecting quality, was inadequate in that it did not include a review by personnel cognizant of current plant conditions.
DIR t EG~X7~M 0 2 RGN2 FILE 01 EXTERNAL: EG&G/BRYCE,J.H.
Consequently, on June 13, 1994, the work planning process to conduct the Unit 3 design modification W17275A did not require entry into a Unit 2 Limited Condition of Operation (LCO).Entry into Unit 2 LCO 3.5.C.4 for the Residual Heat Removal Service Water System (RHRSW)was not included in the planning process as required and it was not properly entered until after the work had commenced.
NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME TRIMBLE,D AEOD/DEIB AEOD/DSP/TPAB
This is a Severity Level IV violation (Supplement I.D).
DEDRO NRR/DRCH/HHFB
TVA's Re 1 to the Violation NOTE TVA does not contest the underlying issue described in the above NOV.However, TVA is providing the following discussion to clarify the information in the NOV and associated Inspection Report about Unit 2 Technical Specification (TS)LCO 3.5.C.4 not being properly entered until after the work had commenced.
NUDOCS-ABSTRACT
The involved on-shift Shift Technical Advisor (STA)was aware that removing the 3D Emergency Diesel Generator from service resulted in LCO 3.5.C.4 being entered.However, the STA did not consider it necessary to stop work, immediately log the LCO entry, and have additional reviews and evaluations performed expressly for LCO 3.5.C.4.The basis for this action was that the 30-day duration for LCO 3.5.C.4 is the same or longer than the other involved LCOs, extensive management reviews had been performed for entering the other LCOs to perform the work, and the duration of the work scope was significantly less than 30 days.Subsequently, the STA decided to log entry into the LCO.The STA amended the LCO Tracking Log to show entry into the LCO at 0100 Central Standard Time (CST).Also, the STA made the appropriate"late entry" at 0600 CST in the STA log.The STA's actions were consistent with TVA procedural controls.Reason for The Violation This issue resulted from inadequate procedural guidance for voluntarily entering Unit 2 LCOs in support of Unit 3 recovery activities.
OGC/HDS3 , RES/HFB NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
Specifically, Site Standard Practice (SSP)-7.1,"Work Control," did not require: Utilization of an on-shift licensed individual during the planning process to ensure that the latest plant information was used, Utilization of the most current LCO status when planning voluntary LCO entries for Unit 3 recovery activities, and Performance of a"last minute" review by cognizant on-shift personnel to ensure that plant conditions were consistent with those originally planned and that entry into unplanned LCO's was not required.E-2  
PLEASE HELP US TO REDUCE iVASTE!CONTACTTHE
 
DOCUMENT CONTROL DESK, ROO!1I PI-37 (E>i T.504-083)TO LLIhf!NATE
.2.Corrective 8te s Taken and Results Achieved A Form SSP-26,"Voluntary Entry Into a TS LCO for Plant Modifications," was prepared to obtain the necessary evaluations and approvals for entering LCO 3.5.C.4.3~TVA generated a Problem Evaluation Report (PER)to determine the root cause and to develop corrective actions.Based on the results of TVA's evaluation, TVA revised SSP-7.1 to require that:~The on-shift STA be involved in the planning process so that LCO evaluations are performed using the latest plant information,~The current LCO tracking information be used in the planning process, and~The STA conduct a"last minute" review of the existing LCO/Inoperable equipment log to ensure that emergent plant conditions will not require entry into LCOs not previously approved.Corrective Ste s That have been or Vill Be Taken to Prevent Recurrence The corrective actions described above are considered adequate for preventing recurrence of this situation.
YOUR MARIE FROM DISTRIBUTION
The above actions will ensure that the appropriate management review is obtained for each LCO before entering a Unit 2 LCO for Unit 3 recovery work.4.Date Vhen Full Com liance Vill he Achieved Full compliance was achieved on June 17, 1994, when the SSP-7.1 was revised and issued with the actions specified in Section 2 above.E-3}}
LISTS I OR DOCUMENTS YOU DON"I'L'ED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 21  
Tennessee vasey Authority, post otiice Box 2000.Decatur, Alabama 35609-2000
R.D.(Rick)Machon Vice President, Brovrns Ferry Nuclear Plan;July 28, 1994 U.S.Nuclear Regulatory
Commission
ATTN: Document Control Desk Washington, D.C.20555 Gentlemen:
10 CFR 2 Appendix C In the Matter Of Tennessee Valley Authority Docket Nos.50-259 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN)-NRC INSPECTION
REPORT 50-259'0-260I
50-296/94-14
REPLY TO NOTICE OF VIOLATION (NOV)This letter provides our reply to the subject NOV regarding inadequate
oversight of the recovery activities
associated
with Browns Ferry Unit 3.The NOV was transmitted
by letter from Thomas A.Peebles, NRC, to O.D.Kingsley Jr., TVA, dated July 1, 1994.While TVA does not contest the underlying
issue described in the NOV and Inspection
Report, TVA does not believe that a violation of a legally binding requirement
was involved.Instead, the issue appears to involve noncompliance
with a commitment
made in a NRC/TVA meeting on May 10, 1994.Therefore, TVA respectfully
requests that NRC reclassify
this NOV as a Notice of Deviation.
On May 10, 1994, TVA presented plans for controlling
Unit 3 recovery activities
that'equire
entry into a Unit 2 Limiting Conditions
for Operation (LCOs).The controls were based on NRC Inspection
Manual Part 9900,"Maintenance
-Voluntary Entry Into Limiting Conditions
for Operation Action Statements
to Perform Preventive
Maintenance." The Inspection
Manual was used since it was the best source of guidance for similar situations.
9408010261
940728 PDR ADOCK 05000259 8 PDR  
U.S.Nuclear Regulatory
Commission
Page 2 July 28, 1994 During the meeting, TVA indicated that formal, documented
evaluations
and management
reviews of the Unit 2 LCOs entered for performing
Unit 3 recovery activities
would be performed due to the special circumstances
involved.The reviews and evaluations
were beyond those normally conducted'by
on-shift licensed personnel when entering LCOs.TVA implemented
the controls for these reviews and evaluations
using plant procedures
before commencing
the initial Unit 3 activity that placed Unit 2 into an LCO.TVA believes that the NOV concerns a situation involving noncompliance
with the commitment
to perform the additional
reviews and evaluations
for each of the Unit 2 LCOs involved with an Emergency Diesel Generator (EDG)outage before entering that LCO for the Unit 3 recovery work.Accordingly, TVA requests that the NRC reclassify
the NOV as a Notice o Deviation.
The enclosure provides TVA's reply to the NOV.There are no commitments
contained in this submittal.
Zf you have any questions regarding this reply, please contact Mr.Pedro Salas at{205)729-2636.R.D.M on Site Vice President Enclosure cc: See page 3  
U.S.Nuclear Regulatory
Commission
Page 3 July 28, 1994 Enclosure cc (Enclosure):
Mr.Mark S.Lesser, Section Chief U.S.Nuclear Regulatory
Commission
Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637'thens, Alabama 35611 Mr.J.F.Williams, Project Manager U.S.Nuclear Regulatory
Commission
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr.D.C.Trimble, Project Manager U.S.Nuclear Regulatory
Commission
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852  
ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)REPLY TO NOTICE OF VIOLATION (NOV)INSPECTION
REPORT NUMBER 50-259~50-260 g 50-296/94/14
RESTATEMENT
OF THE VIOLATION During an NRC inspection
conducted during the period of June 13-17, 1994, a violation of NRC requirements
was identified.
In accordance
with the"General Statement of Policy and Procedure for NRC Enforcement
Actions," 10 CFR part 2, Appendix Cg the violation is listed below: 10 CFR 50, Appendix B, Criterion V, states that activities
affecting quality shall be prescribed
by documented
instructions, procedures, or drawings of a type appropriate
to the circumstances
and shall be accomplished
in accordance
with these instructions, procedures, or drawings.Contrary to the above, Browns Ferry procedure SSP-7.1,"Work Contxol," which was controlling
an activity affecting quality, was inadequate
in that it did not include a review by personnel cognizant of current plant conditions.
Consequently, on June 13, 1994, the work planning process to conduct the Unit 3 design modification
W17275A did not require entry into a Unit 2 Limited Condition of Operation (LCO).Entry into Unit 2 LCO 3.5.C.4 for the Residual Heat Removal Service Water System (RHRSW)was not included in the planning process as required and it was not properly entered until after the work had commenced.
This is a Severity Level IV violation (Supplement
I.D).  
TVA's Re 1 to the Violation NOTE TVA does not contest the underlying
issue described in the above NOV.However, TVA is providing the following discussion
to clarify the information
in the NOV and associated
Inspection
Report about Unit 2 Technical Specification (TS)LCO 3.5.C.4 not being properly entered until after the work had commenced.
The involved on-shift Shift Technical Advisor (STA)was aware that removing the 3D Emergency Diesel Generator from service resulted in LCO 3.5.C.4 being entered.However, the STA did not consider it necessary to stop work, immediately
log the LCO entry, and have additional
reviews and evaluations
performed expressly for LCO 3.5.C.4.The basis for this action was that the 30-day duration for LCO 3.5.C.4 is the same or longer than the other involved LCOs, extensive management
reviews had been performed for entering the other LCOs to perform the work, and the duration of the work scope was significantly
less than 30 days.Subsequently, the STA decided to log entry into the LCO.The STA amended the LCO Tracking Log to show entry into the LCO at 0100 Central Standard Time (CST).Also, the STA made the appropriate"late entry" at 0600 CST in the STA log.The STA's actions were consistent
with TVA procedural
controls.Reason for The Violation This issue resulted from inadequate
procedural
guidance for voluntarily
entering Unit 2 LCOs in support of Unit 3 recovery activities.
Specifically, Site Standard Practice (SSP)-7.1,"Work Control," did not require: Utilization
of an on-shift licensed individual
during the planning process to ensure that the latest plant information
was used, Utilization
of the most current LCO status when planning voluntary LCO entries for Unit 3 recovery activities, and Performance
of a"last minute" review by cognizant on-shift personnel to ensure that plant conditions
were consistent
with those originally
planned and that entry into unplanned LCO's was not required.E-2  
.2.Corrective
8te s Taken and Results Achieved A Form SSP-26,"Voluntary
Entry Into a TS LCO for Plant Modifications," was prepared to obtain the necessary evaluations
and approvals for entering LCO 3.5.C.4.3~TVA generated a Problem Evaluation
Report (PER)to determine the root cause and to develop corrective
actions.Based on the results of TVA's evaluation, TVA revised SSP-7.1 to require that:~The on-shift STA be involved in the planning process so that LCO evaluations
are performed using the latest plant information,~The current LCO tracking information
be used in the planning process, and~The STA conduct a"last minute" review of the existing LCO/Inoperable
equipment log to ensure that emergent plant conditions
will not require entry into LCOs not previously
approved.Corrective
Ste s That have been or Vill Be Taken to Prevent Recurrence
The corrective
actions described above are considered
adequate for preventing
recurrence
of this situation.
The above actions will ensure that the appropriate
management
review is obtained for each LCO before entering a Unit 2 LCO for Unit 3 recovery work.4.Date Vhen Full Com liance Vill he Achieved Full compliance
was achieved on June 17, 1994, when the SSP-7.1 was revised and issued with the actions specified in Section 2 above.E-3
}}

Revision as of 02:57, 17 August 2019

Responds to NRC 940701 Ltr Re Violation Noted in Insp Rept 50-259/94-14.Corrective Actions:Form SSP-26, Voluntary Entry Into TS LCO for Plant Mods Prepared to Obtain Necessary Evaluations & Approvals for Entering LCO 3.5.C.4
ML18037B001
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 07/28/1994
From: Machon R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9408010261
Download: ML18037B001 (11)


Text

P RIDRIT Y I (ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9408010261 DOC.DATE: 94/07/28 NOTARIZED:

NO CIL:50-259 Browns Ferry Nuclear-Power Station, Unit 1, Tennessee UTH.N~~ME AUTHOR AFFILIATION CEiIN, R.L).Tennessee Valley Authority REC I P.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to NRC 940701 ltr re violation noted in Insp Rept 50-259/94-14.Corrective actions:Form SSP-26,"Voluntary Entry Into TS LCO for Plant Mods" prepared to obtain necessary evaluations

&approvasl for entering LCO 3.5.C.4.DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR t ENCL L SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: DOCKET 05000259 RECIPIENT ID CODE/NAME PD2-4-PD INTERNAL: ACRS AEOD/DSP/ROAB AEOD/TTC NRR/DORS/OEAB NRR/PMAS/IRCB-E DIR t EG~X7~M 0 2 RGN2 FILE 01 EXTERNAL: EG&G/BRYCE,J.H.

NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME TRIMBLE,D AEOD/DEIB AEOD/DSP/TPAB DEDRO NRR/DRCH/HHFB NUDOCS-ABSTRACT OGC/HDS3 , RES/HFB NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACTTHE DOCUMENT CONTROL DESK, ROO!1I PI-37 (E>i T.504-083)TO LLIhf!NATE YOUR MARIE FROM DISTRIBUTION LISTS I OR DOCUMENTS YOU DON"I'L'ED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 21

Tennessee vasey Authority, post otiice Box 2000.Decatur, Alabama 35609-2000 R.D.(Rick)Machon Vice President, Brovrns Ferry Nuclear Plan;July 28, 1994 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555 Gentlemen:

10 CFR 2 Appendix C In the Matter Of Tennessee Valley Authority Docket Nos.50-259 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN)-NRC INSPECTION REPORT 50-259'0-260I 50-296/94-14 REPLY TO NOTICE OF VIOLATION (NOV)This letter provides our reply to the subject NOV regarding inadequate oversight of the recovery activities associated with Browns Ferry Unit 3.The NOV was transmitted by letter from Thomas A.Peebles, NRC, to O.D.Kingsley Jr., TVA, dated July 1, 1994.While TVA does not contest the underlying issue described in the NOV and Inspection Report, TVA does not believe that a violation of a legally binding requirement was involved.Instead, the issue appears to involve noncompliance with a commitment made in a NRC/TVA meeting on May 10, 1994.Therefore, TVA respectfully requests that NRC reclassify this NOV as a Notice of Deviation.

On May 10, 1994, TVA presented plans for controlling Unit 3 recovery activities that'equire entry into a Unit 2 Limiting Conditions for Operation (LCOs).The controls were based on NRC Inspection Manual Part 9900,"Maintenance

-Voluntary Entry Into Limiting Conditions for Operation Action Statements to Perform Preventive Maintenance." The Inspection Manual was used since it was the best source of guidance for similar situations.

9408010261 940728 PDR ADOCK 05000259 8 PDR

U.S.Nuclear Regulatory Commission Page 2 July 28, 1994 During the meeting, TVA indicated that formal, documented evaluations and management reviews of the Unit 2 LCOs entered for performing Unit 3 recovery activities would be performed due to the special circumstances involved.The reviews and evaluations were beyond those normally conducted'by on-shift licensed personnel when entering LCOs.TVA implemented the controls for these reviews and evaluations using plant procedures before commencing the initial Unit 3 activity that placed Unit 2 into an LCO.TVA believes that the NOV concerns a situation involving noncompliance with the commitment to perform the additional reviews and evaluations for each of the Unit 2 LCOs involved with an Emergency Diesel Generator (EDG)outage before entering that LCO for the Unit 3 recovery work.Accordingly, TVA requests that the NRC reclassify the NOV as a Notice o Deviation.

The enclosure provides TVA's reply to the NOV.There are no commitments contained in this submittal.

Zf you have any questions regarding this reply, please contact Mr.Pedro Salas at{205)729-2636.R.D.M on Site Vice President Enclosure cc: See page 3 U.S.Nuclear Regulatory Commission Page 3 July 28, 1994 Enclosure cc (Enclosure):

Mr.Mark S.Lesser, Section Chief U.S.Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637'thens, Alabama 35611 Mr.J.F.Williams, Project Manager U.S.Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr.D.C.Trimble, Project Manager U.S.Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)REPLY TO NOTICE OF VIOLATION (NOV)INSPECTION REPORT NUMBER 50-259~50-260 g 50-296/94/14 RESTATEMENT OF THE VIOLATION During an NRC inspection conducted during the period of June 13-17, 1994, a violation of NRC requirements was identified.

In accordance with the"General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR part 2, Appendix Cg the violation is listed below: 10 CFR 50, Appendix B, Criterion V, states that activities affecting quality shall be prescribed by documented instructions, procedures, or drawings of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings.Contrary to the above, Browns Ferry procedure SSP-7.1,"Work Contxol," which was controlling an activity affecting quality, was inadequate in that it did not include a review by personnel cognizant of current plant conditions.

Consequently, on June 13, 1994, the work planning process to conduct the Unit 3 design modification W17275A did not require entry into a Unit 2 Limited Condition of Operation (LCO).Entry into Unit 2 LCO 3.5.C.4 for the Residual Heat Removal Service Water System (RHRSW)was not included in the planning process as required and it was not properly entered until after the work had commenced.

This is a Severity Level IV violation (Supplement I.D).

TVA's Re 1 to the Violation NOTE TVA does not contest the underlying issue described in the above NOV.However, TVA is providing the following discussion to clarify the information in the NOV and associated Inspection Report about Unit 2 Technical Specification (TS)LCO 3.5.C.4 not being properly entered until after the work had commenced.

The involved on-shift Shift Technical Advisor (STA)was aware that removing the 3D Emergency Diesel Generator from service resulted in LCO 3.5.C.4 being entered.However, the STA did not consider it necessary to stop work, immediately log the LCO entry, and have additional reviews and evaluations performed expressly for LCO 3.5.C.4.The basis for this action was that the 30-day duration for LCO 3.5.C.4 is the same or longer than the other involved LCOs, extensive management reviews had been performed for entering the other LCOs to perform the work, and the duration of the work scope was significantly less than 30 days.Subsequently, the STA decided to log entry into the LCO.The STA amended the LCO Tracking Log to show entry into the LCO at 0100 Central Standard Time (CST).Also, the STA made the appropriate"late entry" at 0600 CST in the STA log.The STA's actions were consistent with TVA procedural controls.Reason for The Violation This issue resulted from inadequate procedural guidance for voluntarily entering Unit 2 LCOs in support of Unit 3 recovery activities.

Specifically, Site Standard Practice (SSP)-7.1,"Work Control," did not require: Utilization of an on-shift licensed individual during the planning process to ensure that the latest plant information was used, Utilization of the most current LCO status when planning voluntary LCO entries for Unit 3 recovery activities, and Performance of a"last minute" review by cognizant on-shift personnel to ensure that plant conditions were consistent with those originally planned and that entry into unplanned LCO's was not required.E-2

.2.Corrective 8te s Taken and Results Achieved A Form SSP-26,"Voluntary Entry Into a TS LCO for Plant Modifications," was prepared to obtain the necessary evaluations and approvals for entering LCO 3.5.C.4.3~TVA generated a Problem Evaluation Report (PER)to determine the root cause and to develop corrective actions.Based on the results of TVA's evaluation, TVA revised SSP-7.1 to require that:~The on-shift STA be involved in the planning process so that LCO evaluations are performed using the latest plant information,~The current LCO tracking information be used in the planning process, and~The STA conduct a"last minute" review of the existing LCO/Inoperable equipment log to ensure that emergent plant conditions will not require entry into LCOs not previously approved.Corrective Ste s That have been or Vill Be Taken to Prevent Recurrence The corrective actions described above are considered adequate for preventing recurrence of this situation.

The above actions will ensure that the appropriate management review is obtained for each LCO before entering a Unit 2 LCO for Unit 3 recovery work.4.Date Vhen Full Com liance Vill he Achieved Full compliance was achieved on June 17, 1994, when the SSP-7.1 was revised and issued with the actions specified in Section 2 above.E-3