ML070610509: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 5: Line 5:
| author name = Vanwyen T
| author name = Vanwyen T
| author affiliation = Exelon Generation Co, LLC
| author affiliation = Exelon Generation Co, LLC
| addressee name = Fish T H
| addressee name = Fish T
| addressee affiliation = NRC/RGN-I/DRS/OB
| addressee affiliation = NRC/RGN-I/DRS/OB
| docket = 05000277, 05000278
| docket = 05000277, 05000278
Line 29: Line 29:
/ PLOR-301 CA WA: 295037EA1.04 URO: 4.5 SRO: 4.5 TASK D ESC R I PTI 0 N : Inject Boron into RPV (Alternate Path - RWCU Fails to Isolate) A. NOTES TO EVALUATOR:
/ PLOR-301 CA WA: 295037EA1.04 URO: 4.5 SRO: 4.5 TASK D ESC R I PTI 0 N : Inject Boron into RPV (Alternate Path - RWCU Fails to Isolate) A. NOTES TO EVALUATOR:
I. An asterisk (*) before the step number denotes a CRITICAL STEP.
I. An asterisk (*) before the step number denotes a CRITICAL STEP.
CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.  
CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.  
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
: 3. JPM Performance  
: 3. JPM Performance
: a. "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.  
: a. "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.
: 4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.  
: 4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
: 2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.  
: 2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
Page 3 of 7 2007 NRC JPM CR-a(1) (PLOR301CA Rev008)
Page 3 of 7 2007 NRC JPM CR-a(1) (PLOR301CA Rev008)
B. 'd C. D. E. F. ~, --- G TOOLS AND EQUIPMENT  
B. 'd C. D. E. F. ~, --- G TOOLS AND EQUIPMENT
: 1. REFERENCES  
: 1. REFERENCES
: 1. 2. TASK STANDARD  
: 1. 2. TASK STANDARD
: 1. Key for SBLC System keylock switch on Control Room panel C005A. RRC 1 1.1-2, Rev. 0, "Standby Liquid System Initiation During a Plant Event" SO I I .I .B-2, Rev. 3, "Standby Liquid Control System Initiation" Satisfactory task completion is indicated when a SBLC pump is running, boron is injecting into the Reactor vessel and RWCU system flow is secured. Estimated time to complete:
: 1. Key for SBLC System keylock switch on Control Room panel C005A. RRC 1 1.1-2, Rev. 0, "Standby Liquid System Initiation During a Plant Event" SO I I .I .B-2, Rev. 3, "Standby Liquid Control System Initiation" Satisfactory task completion is indicated when a SBLC pump is running, boron is injecting into the Reactor vessel and RWCU system flow is secured. Estimated time to complete:
4 minutes Non-Time Critical  
4 minutes Non-Time Critical
: 2. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to inject boron into the Reactor vessel using appropriate procedures.
: 2. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to inject boron into the Reactor vessel using appropriate procedures.
I will describe initial plant conditions and provide you access to the materials required to complete this task. TASK CONDITIONS/PREREQUISlTES  
I will describe initial plant conditions and provide you access to the materials required to complete this task. TASK CONDITIONS/PREREQUISlTES
: 1. INITIATING CUE The Control Room Supervisor directs you to inject boron into the Reactor vessel from the Control Room using Rapid Response Card RRCI 1 .I-2, "Standby Liquid System Initiation During a Plant Event". SBLC injection is required by T-I 01, "RPV Control".  
: 1. INITIATING CUE The Control Room Supervisor directs you to inject boron into the Reactor vessel from the Control Room using Rapid Response Card RRCI 1 .I-2, "Standby Liquid System Initiation During a Plant Event". SBLC injection is required by T-I 01, "RPV Control".  
*/ 2007 NRC JPM CR-a(1) (PLOR301CA Rev008) Page 4 of 7 H. PERFORMANCE CHECKLIST STEP ACT .. STEP NO 1 2 3 *4 Verify AO-2-02-039, Recirc Sample Inboard Is01 valve, is closed. (Cue: AO-2-02-039 green light is on, red light is off.) Inboard lsol valve, is closed. (Cue: AO-2-02-040 green light is on, red light is off.) Verify AO-2-02-040, Recirc Sample Verify key is inserted into 2(A)BP040 keylock switch. (Cue: Key is in keylock switch.) Trip all running RWCU pumps.
*/ 2007 NRC JPM CR-a(1) (PLOR301CA Rev008) Page 4 of 7 H. PERFORMANCE CHECKLIST STEP ACT .. STEP NO 1 2 3 *4 Verify AO-2-02-039, Recirc Sample Inboard Is01 valve, is closed. (Cue: AO-2-02-039 green light is on, red light is off.) Inboard lsol valve, is closed. (Cue: AO-2-02-040 green light is on, red light is off.) Verify AO-2-02-040, Recirc Sample Verify key is inserted into 2(A)BP040 keylock switch. (Cue: Key is in keylock switch.) Trip all running RWCU pumps.
Line 61: Line 61:
The evaluator will then terminate the exercise.  
The evaluator will then terminate the exercise.  
'-- *I ---- 2007 NRC JPM CR-a(1) (PLOR301CA Rev008)
'-- *I ---- 2007 NRC JPM CR-a(1) (PLOR301CA Rev008)
Page 7 of 7 TASK CONDITIONS/PREREQUISlTES  
Page 7 of 7 TASK CONDITIONS/PREREQUISlTES
: 1. SBLC injection is required by T-101, "RPV Control " . INITIATING CUE The Control Room Supervisor directs you to inject boron into the Reactor vessel from the Control Room using Rapid Response Card RRCI I .I-2, "Standby Liquid System Initiation During a Plant Event". v' EXELON NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET NAME: Last First M.I. SOC. SEC. NO. APPROVALS:
: 1. SBLC injection is required by T-101, "RPV Control " . INITIATING CUE The Control Room Supervisor directs you to inject boron into the Reactor vessel from the Control Room using Rapid Response Card RRCI I .I-2, "Standby Liquid System Initiation During a Plant Event". v' EXELON NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET NAME: Last First M.I. SOC. SEC. NO. APPROVALS:
Signature  
Signature  
Line 68: Line 68:
Signature I Title Date EFFECTIVE DATE: I I II Training Review for Completeness:
Signature I Title Date EFFECTIVE DATE: I I II Training Review for Completeness:
I PIMS CODE: 1 PlMS ENTRY: Signature/Date I I C' 2007 NRC JPM CR-b(2) (PLOR300CA Rev012) Page 1 of 6 TEMPORARY CHANGE FORM LOG \' CODE NO.: PLOR-300CA REV. NO.: 012 TITLE: *.d Manually Initiate HPCl (Alternate Path - Manual Initiation Pushbutton Fails to Operate) IO. 11. 12. 13. 14. 15. 2007 NRC JPM CR-b(2) (PLOR300CA RevOl2) Page 2 of 6 EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE  
I PIMS CODE: 1 PlMS ENTRY: Signature/Date I I C' 2007 NRC JPM CR-b(2) (PLOR300CA Rev012) Page 1 of 6 TEMPORARY CHANGE FORM LOG \' CODE NO.: PLOR-300CA REV. NO.: 012 TITLE: *.d Manually Initiate HPCl (Alternate Path - Manual Initiation Pushbutton Fails to Operate) IO. 11. 12. 13. 14. 15. 2007 NRC JPM CR-b(2) (PLOR300CA RevOl2) Page 2 of 6 EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE  
'-' POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 20600501 01 / PLOR-300CA WA: 295031 EA1.02 URO: 4.5 SRO: 4.5 TASK D ESC R I PTI 0 N : Manuallv Initiate HPCl (Alternate Path - Manual Initiation Pushbutton Fails to Operate) A. NOTES TO EVALUATOR:  
'-' POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 20600501 01 / PLOR-300CA WA: 295031 EA1.02 URO: 4.5 SRO: 4.5 TASK D ESC R I PTI 0 N : Manuallv Initiate HPCl (Alternate Path - Manual Initiation Pushbutton Fails to Operate) A. NOTES TO EVALUATOR:
: 1. An asterisk  
: 1. An asterisk
(*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.  
(*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.  
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
: 3. JPM Performance  
: 3. JPM Performance
: a. "Control Room" JPMs are designed to be performed in the simulator.
: a. "Control Room" JPMs are designed to be performed in the simulator.
If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.  
If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.
: 4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. 1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.  
: 4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. 1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
: 2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.  
: 2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee. 2007 NRC JPM CR-b(2) (PLORSOOCA RevOl2) Page 3 of 6 B. '-- c. D. E. F. ;cl- G. TOOLS AND EQUIPMENT 1. None REFERENCES  
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee. 2007 NRC JPM CR-b(2) (PLORSOOCA RevOl2) Page 3 of 6 B. '-- c. D. E. F. ;cl- G. TOOLS AND EQUIPMENT 1. None REFERENCES
: 1. TASK STANDARD 1. RRC 23.1-2, Rev.
: 1. TASK STANDARD 1. RRC 23.1-2, Rev.
4, "HPCI System Operation During a Plant Event" Satisfactory task completion is indicated when HPCl is injecting to the RPV at 5000 gpm. Estimated time to complete:
4, "HPCI System Operation During a Plant Event" Satisfactory task completion is indicated when HPCl is injecting to the RPV at 5000 gpm. Estimated time to complete:
5 minutes Non-Time Critical  
5 minutes Non-Time Critical
: 2. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to manually initiate the HPCl system and inject to the Reactor vessel at a flow rate of 5000 gpm using appropriate procedures.
: 2. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to manually initiate the HPCl system and inject to the Reactor vessel at a flow rate of 5000 gpm using appropriate procedures.
I will describe initial plant conditions and provide you access to the materials required to complete this task. TASK CONDITIONS/PREREQUISlTES I. INITIATING CUE The Control Room Supervisor directs you to initiate the HPCl system using the HPCl Manual Initiation pushbutton and inject to the Reactor vessel at 5000 gpm using RRC 23.1-2, "HPCI System Operation During a Plant Event".
I will describe initial plant conditions and provide you access to the materials required to complete this task. TASK CONDITIONS/PREREQUISlTES I. INITIATING CUE The Control Room Supervisor directs you to initiate the HPCl system using the HPCl Manual Initiation pushbutton and inject to the Reactor vessel at 5000 gpm using RRC 23.1-2, "HPCI System Operation During a Plant Event".
Line 98: Line 98:
II SignaturelDate  
II SignaturelDate  
-- ISSUE DATE:
-- ISSUE DATE:
COMPLETION DATE: PlMS CODE: PlMS ENTRY: I 2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 1 of 7 TEMPORARY CHANGE FORM LOG e CODE NO.: PLOR-023C REV. NO.: 007 TITLE: ADS RESET FOLLOWING BLOWDOWN 1. 2. 3. 4. 5. 6. 7. a. 11. 12.  
COMPLETION DATE: PlMS CODE: PlMS ENTRY: I 2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 1 of 7 TEMPORARY CHANGE FORM LOG e CODE NO.: PLOR-023C REV. NO.: 007 TITLE: ADS RESET FOLLOWING BLOWDOWN 1. 2. 3. 4. 5. 6. 7. a. 11. 12.
: 13. 14. 15. 2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 2 of 7 EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:
: 13. 14. 15. 2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 2 of 7 EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:
TASK-JPM DESIGNATOR:
TASK-JPM DESIGNATOR:
21 800401 01 / PLOR-023C WA: 218000A4.03 Unit Reactor Operator/Senior Reactor Operator RO: 4.2 SRO: 4.2 TASK DESCRIPTION: ADS RESET FOLLOWING BLOWDOWN A. NOTES TO EVALUATOR:  
21 800401 01 / PLOR-023C WA: 218000A4.03 Unit Reactor Operator/Senior Reactor Operator RO: 4.2 SRO: 4.2 TASK DESCRIPTION: ADS RESET FOLLOWING BLOWDOWN A. NOTES TO EVALUATOR:
: 1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.  
: 1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.  
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
: 3. JPM Performance  
: 3. JPM Performance
: a. "Control Room" JPMs are designed to be performed in the simulator.
: a. "Control Room" JPMs are designed to be performed in the simulator.
If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.  
If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.
: 4. Satisfactory performance of this JPM is accomplished if:  
: 4. Satisfactory performance of this JPM is accomplished if:
: a. The task standard is met. b. JPM completion time requirement is met. I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.  
: a. The task standard is met. b. JPM completion time requirement is met. I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
: 2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.  
: 2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 3 of 7 B. L/ C. D. E. F. .--J G. TOOLS AND EQUIPMENT None REFERENCES Procedure SO 1 G.7.C-2, Rev. 9, "Automatic Depressurization System Reset Following Blowdown" (R) TASK STANDARD 1. Satisfactory task completion is indicated when ADS logic reset, Vacuum breaker position indication reset, and ADS relief valve position indication reset.
2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 3 of 7 B. L/ C. D. E. F. .--J G. TOOLS AND EQUIPMENT None REFERENCES Procedure SO 1 G.7.C-2, Rev. 9, "Automatic Depressurization System Reset Following Blowdown" (R) TASK STANDARD 1. Satisfactory task completion is indicated when ADS logic reset, Vacuum breaker position indication reset, and ADS relief valve position indication reset.
Line 115: Line 115:
7 minutes (A.5) Non-Time Critical 2. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to reset the ADS system using appropriate procedures.
7 minutes (A.5) Non-Time Critical 2. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to reset the ADS system using appropriate procedures.
I will describe initial plant conditions and provide you access to the materials required to complete this task.
I will describe initial plant conditions and provide you access to the materials required to complete this task.
TASK CONDITIONS/PREREQUISlTES  
TASK CONDITIONS/PREREQUISlTES
: 1. 2. An automatic ADS initiation has occurred.
: 1. 2. An automatic ADS initiation has occurred.
RPV water level is now greater than -160" and the capability exists to maintain level above -160". The following annunciators have been reset:  
RPV water level is now greater than -160" and the capability exists to maintain level above -160". The following annunciators have been reset:
: a. b. Blowdown of the RPV is complete by evidence of SRVs closed due to lack of pressure to keep them open. Reactor pressure is 0 psig. Drywell pressure is 0.25 psig. 3. "System I ECCS REAC VESSEL LO-LO-LO LEVEL", panel 227 D-2. 'System II ECCS REAC VESSEL LO-LO-LO LEVEL", panel 228 C-2. 4. 5. 6. INITIATING CUE The Control Room Supervisor directs you to reset the ADS logic in accordance with SO 1 G.7.C-2. "Automatic Demessurization Svstem Reset Followina Blowdown". Section  
: a. b. Blowdown of the RPV is complete by evidence of SRVs closed due to lack of pressure to keep them open. Reactor pressure is 0 psig. Drywell pressure is 0.25 psig. 3. "System I ECCS REAC VESSEL LO-LO-LO LEVEL", panel 227 D-2. 'System II ECCS REAC VESSEL LO-LO-LO LEVEL", panel 228 C-2. 4. 5. 6. INITIATING CUE The Control Room Supervisor directs you to reset the ADS logic in accordance with SO 1 G.7.C-2. "Automatic Demessurization Svstem Reset Followina Blowdown". Section
: 4. I. v 2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 4 of 7 H. PERFORMANCE CHECKLIST II STEP NO *I *2 STEP ~ ~~ ~ ~~ Depress the "A" ADS LOGIC RESET-TIMER pushbutton, 2E-S2A. (Cue: Acknowledge pushbutton operation  
: 4. I. v 2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 4 of 7 H. PERFORMANCE CHECKLIST II STEP NO *I *2 STEP ~ ~~ ~ ~~ Depress the "A" ADS LOGIC RESET-TIMER pushbutton, 2E-S2A. (Cue: Acknowledge pushbutton operation  
.) Depress the "B" ADS LOGIC RESET- TIMER pushbutton, 2E-S2B. (Cue: Acknowledge pushbutton operation.)
.) Depress the "B" ADS LOGIC RESET- TIMER pushbutton, 2E-S2B. (Cue: Acknowledge pushbutton operation.)
Line 124: Line 124:
I3 **** NOTE **** The "BLOWDOWN RELIEF VALVES HIGH TEMP" annunciator will not reset unless all of the temperatures are below the alarm setpoint.
I3 **** NOTE **** The "BLOWDOWN RELIEF VALVES HIGH TEMP" annunciator will not reset unless all of the temperatures are below the alarm setpoint.
If necessary, as the Control Room Supervisor direct examinee to continue with resetting ADS. The "B" ADS LOGIC TIMER RESET pushbutton, 2E-S2B, is momentarily depressed at panel 2OCOO3-01.
If necessary, as the Control Room Supervisor direct examinee to continue with resetting ADS. The "B" ADS LOGIC TIMER RESET pushbutton, 2E-S2B, is momentarily depressed at panel 2OCOO3-01.
Reset the following annunciators:  
Reset the following annunciators:
: a. "BLOWDOWN AUX RELAYS ENERGIZED RHR OR CS". b. "BLOWDOWN RELIEF VALVES HIGH TEMP". (Cue: Acknowledge pushbutton operation.)
: a. "BLOWDOWN AUX RELAYS ENERGIZED RHR OR CS". b. "BLOWDOWN RELIEF VALVES HIGH TEMP". (Cue: Acknowledge pushbutton operation.)
Verify "BLOWDOWN AUX RELAYS ENERGIZED RHR OR CS" and "BLOWDOWN RELIEF VALVES HIGH TEMP" annunciators are clear. (Cue: Annunciators 227 E-4 and 227 B-4 are not lit.) Verify "BLOWDOWN TIMERS INITIATED" annunciator reset. (Cue: Annunciator 227 D-4 is not lit.)
Verify "BLOWDOWN AUX RELAYS ENERGIZED RHR OR CS" and "BLOWDOWN RELIEF VALVES HIGH TEMP" annunciators are clear. (Cue: Annunciators 227 E-4 and 227 B-4 are not lit.) Verify "BLOWDOWN TIMERS INITIATED" annunciator reset. (Cue: Annunciator 227 D-4 is not lit.)
Line 141: Line 141:
2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 7 of 7   
2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 7 of 7   
'.e' I. 2. 3. 4. ~-' 5. 6. TASK CONDITIONS/PREREQUISlTES An automatic ADS initiation has occurred.
'.e' I. 2. 3. 4. ~-' 5. 6. TASK CONDITIONS/PREREQUISlTES An automatic ADS initiation has occurred.
RPV water level is now greater than -160 inches and the capability exists to maintain level above -160 inches. The fo I I ow i ng an nu nc iators have been reset:  
RPV water level is now greater than -160 inches and the capability exists to maintain level above -160 inches. The fo I I ow i ng an nu nc iators have been reset:
: a. "System I ECCS REAC VESSEL LO-LO- LO LEVEL", panel 227 D-2. b. "System II ECCS REAC VESSEL LO-LO- LO LEVEL", panel 228 C-2. Blowdown of the RPV is complete by evidence of SRVs closed due to lack of pressure to keep them open. Reactor pressure is 0 psig. Drywell pressure is 0.25 psig. INITIATING CUE The Control Room Supervisor directs you to reset the ADS logic in accordance with SO lG.7.C-2, "Automatic Depressurization System Reset Following Blowdown", Section 4.1.
: a. "System I ECCS REAC VESSEL LO-LO- LO LEVEL", panel 227 D-2. b. "System II ECCS REAC VESSEL LO-LO- LO LEVEL", panel 228 C-2. Blowdown of the RPV is complete by evidence of SRVs closed due to lack of pressure to keep them open. Reactor pressure is 0 psig. Drywell pressure is 0.25 psig. INITIATING CUE The Control Room Supervisor directs you to reset the ADS logic in accordance with SO lG.7.C-2, "Automatic Depressurization System Reset Following Blowdown", Section 4.1.
EXELON NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET NAME: Last First M.I. SOC. SEC. NO. APPROVALS:
EXELON NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET NAME: Last First M.I. SOC. SEC. NO. APPROVALS:
Line 151: Line 151:
Signature  
Signature  
/ Title Date 11 II EFFECTIVE DATE: I I II I 11 Training Review for Completeness:
/ Title Date 11 II EFFECTIVE DATE: I I II I 11 Training Review for Completeness:
I PlMS CODE: I ENTRY: Sig nature/Date I I 2007 NRC JPM CR-d(4) (NEW) Page 1 of 8 TEMPORARY CHANGE FORM LOG L.' v CODE NO.: PLOR-NEWICA  
I PlMS CODE: I ENTRY: Sig nature/Date I I 2007 NRC JPM CR-d(4) (NEW) Page 1 of 8 TEMPORARY CHANGE FORM LOG L.' v CODE NO.: PLOR-NEWICA
: 9. IO. REV. NO.: TITLE: PERFORM CORE SPRAY B PUMP CAPACITY TEST FOR IST i i I 8. 11. 12. 13. 14. 2007 NRC JPM CR-d(4) (NEW) Page 2 of 8 EXELON NUCLEAR PEACH BO-TTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: TASK-JPM DESIGNATOR:
: 9. IO. REV. NO.: TITLE: PERFORM CORE SPRAY B PUMP CAPACITY TEST FOR IST i i I 8. 11. 12. 13. 14. 2007 NRC JPM CR-d(4) (NEW) Page 2 of 8 EXELON NUCLEAR PEACH BO-TTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: TASK-JPM DESIGNATOR:
20901401 01 / PLOR-NEWICA WA: 209001A4.04 Unit Reactor Operator/Senior Reactor Operator URO: 2.9 SRO: 2.9 TASK DESCRIPTION: Perform Core Spray B Pump Capacity Test For IST A. NOTES TO EVALUATOR:  
20901401 01 / PLOR-NEWICA WA: 209001A4.04 Unit Reactor Operator/Senior Reactor Operator URO: 2.9 SRO: 2.9 TASK DESCRIPTION: Perform Core Spray B Pump Capacity Test For IST A. NOTES TO EVALUATOR:
: 1. An asterisk (*) before the step number denotes a CRITICAL STEP.
: 1. An asterisk (*) before the step number denotes a CRITICAL STEP.
CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.  
CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.  
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
: 3. JPM Performance  
: 3. JPM Performance
: a. "Control Room" JPMs are designed to be performed in the simulator.
: a. "Control Room" JPMs are designed to be performed in the simulator.
If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.  
If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.
: 4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.  
: 4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
: 2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.  
: 2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
2007 NRC JPM CR-d(4) (NEW) Page 3 of 8
2007 NRC JPM CR-d(4) (NEW) Page 3 of 8
: 6. id' C. D. E. F. L---,' G. L-' TOOLS AND EQUIPMENT  
: 6. id' C. D. E. F. L---,' G. L-' TOOLS AND EQUIPMENT
: 1. None REFERENCES  
: 1. None REFERENCES
: 1. TASK STANDARD I. ST-0-014-212-2, Rev. 1, "Core Spray B Pump Capacity Test For IST" Satisfactory task completion is indicated when Core Spray 6 Pump Capacity Test For IST is complete and Core Spray 6 is returned to a normal standby lineup, as specified in the performance steps of ST-0-014-212-2, Section 6.0. 2. Estimated time to complete: 15 minutes Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to perform Core Spray 26 pump capacity test for IST using appropriate procedures.
: 1. TASK STANDARD I. ST-0-014-212-2, Rev. 1, "Core Spray B Pump Capacity Test For IST" Satisfactory task completion is indicated when Core Spray 6 Pump Capacity Test For IST is complete and Core Spray 6 is returned to a normal standby lineup, as specified in the performance steps of ST-0-014-212-2, Section 6.0. 2. Estimated time to complete: 15 minutes Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to perform Core Spray 26 pump capacity test for IST using appropriate procedures.
I will describe initial plant conditions and provide you access to the materials required to complete this task. TASK CONDITIONS/PREREQUISlTES  
I will describe initial plant conditions and provide you access to the materials required to complete this task. TASK CONDITIONS/PREREQUISlTES
: 1. 2. 3. The plant is operating at 100% power. An Equipment Operator is standing by in the 26 Core Spray Pump Room. Communications are available between the Control Room, 26 Core Spray Pump Room, 6 and D Core Spray Pump Triangle Room, and Cable Spreading Room. Core Spray pump 2B oil level is between the minimum and maximum lines on the sightglass.
: 1. 2. 3. The plant is operating at 100% power. An Equipment Operator is standing by in the 26 Core Spray Pump Room. Communications are available between the Control Room, 26 Core Spray Pump Room, 6 and D Core Spray Pump Triangle Room, and Cable Spreading Room. Core Spray pump 2B oil level is between the minimum and maximum lines on the sightglass.
Core Spray pump 26 static pump suction pressure is 6 psig. A second operator will record all data (simulated).  
Core Spray pump 26 static pump suction pressure is 6 psig. A second operator will record all data (simulated).
: 4. 5. 6. INITIATING CUE The Control Room Supervisor directs you to perform Core Spray 26 Pump Capacity Test For IST in accordance with ST-0-014-212-2 (provided). Provide examinee a copy of ST-0-014-212-2 with the following items completed:
: 4. 5. 6. INITIATING CUE The Control Room Supervisor directs you to perform Core Spray 26 Pump Capacity Test For IST in accordance with ST-0-014-212-2 (provided). Provide examinee a copy of ST-0-014-212-2 with the following items completed:
Section 1 of the cover page Procedure section 2.0, "Test Equipment" Procedure section 3.0, "Prerequisites" 2007 NRC JPM CR-d(4) (NEW) Page 4 of 8 H. PERFORMANCE CHECKLIST STEP STEP NO ACT I *2 3 CLOSE MO-2-14-011 B "Core Spray Outboard Disch". (Cue: Acknowledge control switch operation. MO-2-14-011 B green light is ON; red light is OFF.) P STANDARD MO-2-14-011 B control switch is momentarily placed in "CLOSE" at Panel 20C003. MO-2-14-011 B green light is verified ON; red light is verified OFF at Panel 20C003.
Section 1 of the cover page Procedure section 2.0, "Test Equipment" Procedure section 3.0, "Prerequisites" 2007 NRC JPM CR-d(4) (NEW) Page 4 of 8 H. PERFORMANCE CHECKLIST STEP STEP NO ACT I *2 3 CLOSE MO-2-14-011 B "Core Spray Outboard Disch". (Cue: Acknowledge control switch operation. MO-2-14-011 B green light is ON; red light is OFF.) P STANDARD MO-2-14-011 B control switch is momentarily placed in "CLOSE" at Panel 20C003. MO-2-14-011 B green light is verified ON; red light is verified OFF at Panel 20C003.
Line 196: Line 196:
/ PLOR-081 C KIA:
/ PLOR-081 C KIA:
21 9000A4.13 Unit Reactor Operator/Senior Reactor Operator URO: 3.9 SRO: 3.8 TASK DESCRIPTION:
21 9000A4.13 Unit Reactor Operator/Senior Reactor Operator URO: 3.9 SRO: 3.8 TASK DESCRIPTION:
HPSW lniection Into the Torus A. NOTES TO EVALUATOR:  
HPSW lniection Into the Torus A. NOTES TO EVALUATOR:
: 1. 2. 3. 4. 5. An asterisk (*) before the step number denotes a CRITICAL STEP.
: 1. 2. 3. 4. 5. An asterisk (*) before the step number denotes a CRITICAL STEP.
CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
System cues included in the performance checklist are to be provided to the examinee when no system response is available. JPM Performance  
System cues included in the performance checklist are to be provided to the examinee when no system response is available. JPM Performance
: a. "Control Room" JPMs are designed to be performed in the simulator.
: a. "Control Room" JPMs are designed to be performed in the simulator.
If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.  
If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.
: b. Satisfactory performance of this JPM is accomplished if:  
: b. Satisfactory performance of this JPM is accomplished if:
: a. b. The task standard is met. JPM completion time requirement is met. I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
: a. b. The task standard is met. JPM completion time requirement is met. I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.  
For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
: 2) The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.  
: 2) The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.  
*-- 2007 NRC JPM CR-e(1) (PLOR081C Rev005) Page 3 of 7 B. .I .-.---. C. D. E. F. G. TOOLS AND EQUIPMENT  
*-- 2007 NRC JPM CR-e(1) (PLOR081C Rev005) Page 3 of 7 B. .I .-.---. C. D. E. F. G. TOOLS AND EQUIPMENT
: 1. Keys for MO-2-10-174 and MO-2-10-176 REFERENCES  
: 1. Keys for MO-2-10-174 and MO-2-10-176 REFERENCES
: 1. T-231-2, Rev. 3, "HPSW Injection Into the Torus" TASK STANDARD I. Satisfactory task completion is indicated when the "2B" HPSW Pump is injecting water into the Torus. 2. Estimated time to complete:
: 1. T-231-2, Rev. 3, "HPSW Injection Into the Torus" TASK STANDARD I. Satisfactory task completion is indicated when the "2B" HPSW Pump is injecting water into the Torus. 2. Estimated time to complete:
10 minutes Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to inject water into the Torus using the "2B" HPSW pump using appropriate procedures.
10 minutes Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to inject water into the Torus using the "2B" HPSW pump using appropriate procedures.
I will describe initial plant conditions and provide you access to the materials required to complete this task.
I will describe initial plant conditions and provide you access to the materials required to complete this task.
TAS K CON D I TI 0 N S/P R E R E Q U IS IT ES 1. Use of this procedure has been directed by the T-100 procedures.  
TAS K CON D I TI 0 N S/P R E R E Q U IS IT ES 1. Use of this procedure has been directed by the T-100 procedures.
: 2. High Pressure Service Water Pumps are available.  
: 2. High Pressure Service Water Pumps are available.
: 3. A LOCA initiation signal has NOT occurred.  
: 3. A LOCA initiation signal has NOT occurred.
: 4. INITIATING CUE 4 KV Buses are receiving power from their respective startup feeds. The Control Room Supervisor directs you to perform T-231-2, "HPSW Injection into the Torus" in order to inject water into the Torus with the "2B" HPSW pump.  
: 4. INITIATING CUE 4 KV Buses are receiving power from their respective startup feeds. The Control Room Supervisor directs you to perform T-231-2, "HPSW Injection into the Torus" in order to inject water into the Torus with the "2B" HPSW pump.  
\-- 2007 NRC JPM CR-e(1) (PLOR081C Rev005) Page 4 of 7 H. PERFORMANCE CHECKLIST STEP NO STEP ACT STANDARD 1 Verify RHR pump 2BP035 shutdown.
\-- 2007 NRC JPM CR-e(1) (PLOR081C Rev005) Page 4 of 7 H. PERFORMANCE CHECKLIST STEP NO STEP ACT STANDARD 1 Verify RHR pump 2BP035 shutdown.
Line 237: Line 237:
The evaluator will then terminate the exercise.
The evaluator will then terminate the exercise.
2007 NRC JPM CR-e(1) (PLOR081C Rev005)
2007 NRC JPM CR-e(1) (PLOR081C Rev005)
Page 7 of 7 TASK CONDITIONS/PREREQUISlTES  
Page 7 of 7 TASK CONDITIONS/PREREQUISlTES
: 1. Use of this procedure has been directed by the T-100 procedures.  
: 1. Use of this procedure has been directed by the T-100 procedures.
: 2. High Pressure Service Water Pumps are available.  
: 2. High Pressure Service Water Pumps are available.
: 3. A LOCA initiation signal has - NOT occurred.  
: 3. A LOCA initiation signal has - NOT occurred.
: 4. 4 KV Buses are receiving power from their respective startup feeds. INITIATING CUE The Control Room Supervisor directs you to perform T-231-2, "HPSW Injection into the Torus" in order to inject water into the Torus with the Y2B" HPSW pump.
: 4. 4 KV Buses are receiving power from their respective startup feeds. INITIATING CUE The Control Room Supervisor directs you to perform T-231-2, "HPSW Injection into the Torus" in order to inject water into the Torus with the Y2B" HPSW pump.
EXELON NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET APPROVALS:
EXELON NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET APPROVALS:
Line 250: Line 250:
Unit Reactor 0 perator/Sen ior Reactor Ope rat0 r TASK-JPM DESIGNATOR: 23701 10101  
Unit Reactor 0 perator/Sen ior Reactor Ope rat0 r TASK-JPM DESIGNATOR: 23701 10101  
/ PLOR-O17C WA: 262001A4.04 RO: 3.6 SRO: 3.7 TASK DESCRIPTION:
/ PLOR-O17C WA: 262001A4.04 RO: 3.6 SRO: 3.7 TASK DESCRIPTION:
SYNCHRONIZE TURBINE GENERATOR OUTPUT WITH GRID AT MINIMUM LOAD A. NOTES TO EVALUATOR:  
SYNCHRONIZE TURBINE GENERATOR OUTPUT WITH GRID AT MINIMUM LOAD A. NOTES TO EVALUATOR:
: 1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.  
: 1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.  
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
: 3. JPM Performance  
: 3. JPM Performance  
-' a. "Control Room" JPMs are designed to be performed in the simulator.
-' a. "Control Room" JPMs are designed to be performed in the simulator.
If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.  
If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.
: 4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.  
: 4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
: 2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.  
: 2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
L- 2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 3 of 8
L- 2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 3 of 8
: 6. 'J C. D. E. F. i, G. TOOLS AND EQUIPMENT  
: 6. 'J C. D. E. F. i, G. TOOLS AND EQUIPMENT
: 1. 2. REFERENCES Procedure SO 50.1 .A-2 Rev. 11 , Main Generator Synchronizing and Loading (R) TASK STANDARD  
: 1. 2. REFERENCES Procedure SO 50.1 .A-2 Rev. 11 , Main Generator Synchronizing and Loading (R) TASK STANDARD
: 1. Synchroscope key for breaker operation (R) Key for synchro-check relay bypass key switch (R) Satisfactory task completion is indicated when the Main Generator is synchronized to the grid and initial load is placed on the generator. 2. Estimated time to complete: 12 minutes (A.5) Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to synchronize the Lain Generator to the grid and pickup load using appropriate procedures.
: 1. Synchroscope key for breaker operation (R) Key for synchro-check relay bypass key switch (R) Satisfactory task completion is indicated when the Main Generator is synchronized to the grid and initial load is placed on the generator. 2. Estimated time to complete: 12 minutes (A.5) Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to synchronize the Lain Generator to the grid and pickup load using appropriate procedures.
I will describe initial plant conditions and provide you access to the materials required to complete this task. TASK C 0 N D IT I 0 N S/P RE RE Q U IS IT E S 1. Plant startup in progress with reactor power approximately 16%. 2. All SO 50.1A-2, "Main Generator Synchronizing and Loading" prerequisites are met. 3. Generator terminal voltage is 22 Kv with the voltage regulator in automatic mode. 4. Generator ready to be synchronized to grid. 5. Power System Director has been notified.
I will describe initial plant conditions and provide you access to the materials required to complete this task. TASK C 0 N D IT I 0 N S/P RE RE Q U IS IT E S 1. Plant startup in progress with reactor power approximately 16%. 2. All SO 50.1A-2, "Main Generator Synchronizing and Loading" prerequisites are met. 3. Generator terminal voltage is 22 Kv with the voltage regulator in automatic mode. 4. Generator ready to be synchronized to grid. 5. Power System Director has been notified.
Line 304: Line 304:
TASK-JPM DESIGNATOR: PLOR-028C  
TASK-JPM DESIGNATOR: PLOR-028C  
/ 2770020401 WA: 29501 8.AA1.01 Unit Reactor Operator/Senior Reactor Operator URO: 3.3 SRO: 3.4 TASK DESCRIPTION:
/ 2770020401 WA: 29501 8.AA1.01 Unit Reactor Operator/Senior Reactor Operator URO: 3.3 SRO: 3.4 TASK DESCRIPTION:
Emerqencv Coolinq Water System Startup A. NOTES TO EVALUATOR:  
Emerqencv Coolinq Water System Startup A. NOTES TO EVALUATOR:
: 1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.  
: 1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.  
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
: 3. JPM Performance -v- a. "Control Room" JPMs are designed to be performed in the simulator.
: 3. JPM Performance -v- a. "Control Room" JPMs are designed to be performed in the simulator.
If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.  
If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
: 4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.  
: 4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
: 2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.  
: 2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
2007 NRC JPM CR-g(3) (PLOR-028C Rev 006) Page 3 of 9 B. ', .--..---'  
2007 NRC JPM CR-g(3) (PLOR-028C Rev 006) Page 3 of 9 B. ', .--..---'
: c. D. E. F. 'w G. 'v TOOLS AND EQUIPMENT  
: c. D. E. F. 'w G. 'v TOOLS AND EQUIPMENT
: 1. None REFERENCES  
: 1. None REFERENCES
: 1. SO 48.1 .B, Rev.11 I "Emergency Cooling Water System Startup" TASK STANDARD  
: 1. SO 48.1 .B, Rev.11 I "Emergency Cooling Water System Startup" TASK STANDARD
: 1. Satisfactory task completion is indicated when the Emergency Cooling Water System is in closed loop operation with the "C" ECT in service. 2. Estimated time to complete:
: 1. Satisfactory task completion is indicated when the Emergency Cooling Water System is in closed loop operation with the "C" ECT in service. 2. Estimated time to complete:
20 minutes Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to startup the ECW System using appropriate procedures.
20 minutes Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to startup the ECW System using appropriate procedures.
I will describe initial plant conditions and provide you access to the materials required to complete this task.
I will describe initial plant conditions and provide you access to the materials required to complete this task.
TASK CONDITIONS/PREREQUISlTES  
TASK CONDITIONS/PREREQUISlTES
: 1. The ECW System is setup per SO 48.1 .A, "Emergency Cooling Water Setup for Normal Operation".  
: 1. The ECW System is setup per SO 48.1 .A, "Emergency Cooling Water Setup for Normal Operation".
: 2. Damage has occurred to the Conowingo Dam due to an earthquake.  
: 2. Damage has occurred to the Conowingo Dam due to an earthquake.
: 3. Conowingo Pond level is 107' and slowly lowering.
: 3. Conowingo Pond level is 107' and slowly lowering.
The Main Control Room has been officially notified of an uncontrolled loss of river. 4. SE-3, "Loss of Conowingo Pond" has been entered and directs the ECW System placed in service using SO 48.1 .B, "Emergency Cooling Water Startup".  
The Main Control Room has been officially notified of an uncontrolled loss of river. 4. SE-3, "Loss of Conowingo Pond" has been entered and directs the ECW System placed in service using SO 48.1 .B, "Emergency Cooling Water Startup".
: 5. Steps 4.1 through 4.4 of SO 48.1.B have been successfully completed, including:
: 5. Steps 4.1 through 4.4 of SO 48.1.B have been successfully completed, including:
Placing the 'A' ESW pump (OAP057) in service and installing a momentary jumper to open MO-0841 Shutdown of all Service Water pumps on both units, Shutdown of all HPSW pumps on both units (a required for operation at this time), Shutdown of all Service Water Screen Wash pumps on both units. INITIATING CUE The Control Room Supervisor directs you to perform steps 4.5 through 4.14 of SO 48.1 .B, "Emergency Cooling Water Startup" in order to startup the Emergency Cooling Water System using the "A and "B" Emergency Cooling Tower Cells.
Placing the 'A' ESW pump (OAP057) in service and installing a momentary jumper to open MO-0841 Shutdown of all Service Water pumps on both units, Shutdown of all HPSW pumps on both units (a required for operation at this time), Shutdown of all Service Water Screen Wash pumps on both units. INITIATING CUE The Control Room Supervisor directs you to perform steps 4.5 through 4.14 of SO 48.1 .B, "Emergency Cooling Water Startup" in order to startup the Emergency Cooling Water System using the "A and "B" Emergency Cooling Tower Cells.
Line 336: Line 336:
25 Verify the "B" ECT Fan has started. P "B" ECT Fan red light ON is verified at panel OOC123. (Cue: "B" ECT Fan red light is on, and green light is off.) 26 Inform Control Room Supervisor of task completion.
25 Verify the "B" ECT Fan has started. P "B" ECT Fan red light ON is verified at panel OOC123. (Cue: "B" ECT Fan red light is on, and green light is off.) 26 Inform Control Room Supervisor of task completion.
P Task completion reported. (Cue: Control Room Supervisor acknowledges report.)
P Task completion reported. (Cue: Control Room Supervisor acknowledges report.)
2007 NRC JPM CR-g(3) (PLOR-028C Rev 006) Page 8 of 9
2007 NRC JPM CR-g(3) (PLOR-028C Rev 006) Page 8 of 9
: 1. ACT STEP STANDARD As an evaluator, ensure that you have positive control of all exam material provided to the examinee (Task Conditions/Prerequisites)
: 1. ACT STEP STANDARD As an evaluator, ensure that you have positive control of all exam material provided to the examinee (Task Conditions/Prerequisites)
AND procedures.
AND procedures.
Line 342: Line 342:
TERMINATING CUE When the Emergency Cooling Water System is in closed loop operation with the "A" and "B" ECT Cells in service, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
TERMINATING CUE When the Emergency Cooling Water System is in closed loop operation with the "A" and "B" ECT Cells in service, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
2007 NRC JPM CR-g(3) (PLOR-028C Rev 006) Page 9 of 9 TASK CONDITIONS/PREREQUISlTES  
2007 NRC JPM CR-g(3) (PLOR-028C Rev 006) Page 9 of 9 TASK CONDITIONS/PREREQUISlTES  
--%l I. The ECW System is setup per SO 48.1.A, "Emergency Cooling Water Setup for Normal Operation".  
--%l I. The ECW System is setup per SO 48.1.A, "Emergency Cooling Water Setup for Normal Operation".
: 2. Damage has occurred to the Conowingo Dam due to an earthquake.  
: 2. Damage has occurred to the Conowingo Dam due to an earthquake.
: 3. Conowingo Pond level is 107' and slowly lowering.
: 3. Conowingo Pond level is 107' and slowly lowering.
The Main Control Room has been officially notified of an uncontrolled loss of river. 4. SE-3, "Loss of Conowingo Pond" has been entered and directs the ECW System placed in service using SO 48.1 .B, "Emergency Cooling Water Startup".  
The Main Control Room has been officially notified of an uncontrolled loss of river. 4. SE-3, "Loss of Conowingo Pond" has been entered and directs the ECW System placed in service using SO 48.1 .B, "Emergency Cooling Water Startup".
: 5. Steps 4.1 through 4.4 of SO 48.1.6 have been successfully completed, including:
: 5. Steps 4.1 through 4.4 of SO 48.1.6 have been successfully completed, including:
a Placing the 'A' ESW pump (OAP057) in service and installing a momentary jumper to open MO-0841, Shutdown of all Service Water pumps on both units, a Shutdown of all HPSW pumps on both units (a required for operation at this time), a Shutdown of all Service Water Screen Wash pumps on both units.
a Placing the 'A' ESW pump (OAP057) in service and installing a momentary jumper to open MO-0841, Shutdown of all Service Water pumps on both units, a Shutdown of all HPSW pumps on both units (a required for operation at this time), a Shutdown of all Service Water Screen Wash pumps on both units.
Line 354: Line 354:
Signature I Title Date Signature I Title Date Signature I Title Date Signature I Title Date Date APPROVED FOR USE: Signature I Title EFFECTIVE DATE:
Signature I Title Date Signature I Title Date Signature I Title Date Signature I Title Date Date APPROVED FOR USE: Signature I Title EFFECTIVE DATE:
I I I I Training Review for Completeness:
I I I I Training Review for Completeness:
PlMS CODE: SignatureIDate I ENTRY: -. I I 2007 NRC JPM CR-h(2) (NEW) -VERSION 2 Page 1 of 7 TEMPORARY CHANGE FORM LOG '-'CODE NO.: TITLE: PLOR-NEW2CA REV. NO.: Plant Reactor Operator Response To Reactor Scram (Alternate Path - SBGT Fails To Automatically Initiate)  
PlMS CODE: SignatureIDate I ENTRY: -. I I 2007 NRC JPM CR-h(2) (NEW) -VERSION 2 Page 1 of 7 TEMPORARY CHANGE FORM LOG '-'CODE NO.: TITLE: PLOR-NEW2CA REV. NO.: Plant Reactor Operator Response To Reactor Scram (Alternate Path - SBGT Fails To Automatically Initiate)
: 1. 2. 3. I 4. 5. 6. 7. 8. 9. IO. 11. 12. 13. 14. 15. 2007 NRC JPM CR-h(2) (NEW) -VERSION 2 Page 2 of 7 EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:
: 1. 2. 3. I 4. 5. 6. 7. 8. 9. IO. 11. 12. 13. 14. 15. 2007 NRC JPM CR-h(2) (NEW) -VERSION 2 Page 2 of 7 EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:
Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 261 0050101 / PLOR-NEW2CA WA: 261000 A2.10 RO: 3.1 RO: 3.2 TASK D ESC R I PTI 0 N : Plant Reactor Operator Response to Reactor Scram (Alternate Path - SBGT Fails To Automatically Initiate)
Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 261 0050101 / PLOR-NEW2CA WA: 261000 A2.10 RO: 3.1 RO: 3.2 TASK D ESC R I PTI 0 N : Plant Reactor Operator Response to Reactor Scram (Alternate Path - SBGT Fails To Automatically Initiate)
A. NOTES TO EVALUATOR:  
A. NOTES TO EVALUATOR:
: 1. An asterisk  
: 1. An asterisk
(*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.  
(*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.  
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
: 3. JPM Performance  
: 3. JPM Performance  
-.-- a. "Control Room" JPMs are designed to be performed in the simulator.
-.-- a. "Control Room" JPMs are designed to be performed in the simulator.
If a 'Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.  
If a 'Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.
: 4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. 1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.  
: 4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. 1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
: 2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.  
: 2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee. .U' Page 3 of 7 2007 NRC JPM CR-h(2) (NEW) -VERSION 2 B. TOOLS AND EQUIPMENT None ..-. C. D. E. -w- F. G. REFERENCES  
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee. .U' Page 3 of 7 2007 NRC JPM CR-h(2) (NEW) -VERSION 2 B. TOOLS AND EQUIPMENT None ..-. C. D. E. -w- F. G. REFERENCES
: 1. RRC 94.2-2, Rev. 0, "Plant Reactor Operator Scram Actions" 2. RRC 94.2-2:1, Rev. 0, "PRO Scram Reports" 3. GP-4, Rev. 4, "Manual Reactor Scram"  
: 1. RRC 94.2-2, Rev. 0, "Plant Reactor Operator Scram Actions" 2. RRC 94.2-2:1, Rev. 0, "PRO Scram Reports" 3. GP-4, Rev. 4, "Manual Reactor Scram"
: 4. GP-8B1 Rev. 17, "PCIS Isolation - Groups II and 111" 5. COL GP-8B, Rev. 17, "Groups II and Ill Isolation"  
: 4. GP-8B1 Rev. 17, "PCIS Isolation - Groups II and 111" 5. COL GP-8B, Rev. 17, "Groups II and Ill Isolation"
: 6. SO 9A.1 .C, Rev.
: 6. SO 9A.1 .C, Rev.
9, "Response To Standby Gas Treatment System Automatic Start" TASK STANDARD 1. Satisfactory task completion is indicated when the examinee has isolated Reactor Building Ventilation and placed Standby Gas Treatment in service. 2. DIRECTIONS TO EXAMINEE Estimated time to complete:
9, "Response To Standby Gas Treatment System Automatic Start" TASK STANDARD 1. Satisfactory task completion is indicated when the examinee has isolated Reactor Building Ventilation and placed Standby Gas Treatment in service. 2. DIRECTIONS TO EXAMINEE Estimated time to complete:
IO minutes Non-Time Critical When given the initiating cue, perform Plant Reactor Operator scram actions in accordance with the Operations Manual.
IO minutes Non-Time Critical When given the initiating cue, perform Plant Reactor Operator scram actions in accordance with the Operations Manual.
I will describe initial plant conditions and provide you access to the materials required to complete this task. TAS K C 0 N D I TI 0 N S/P RE R EQ U I S ITE S 1. The plant was initially operating at full power when a plant transient occurred.  
I will describe initial plant conditions and provide you access to the materials required to complete this task. TAS K C 0 N D I TI 0 N S/P RE R EQ U I S ITE S 1. The plant was initially operating at full power when a plant transient occurred.
: 2. A GP-4 "Manual Reactor Scram" was performed.  
: 2. A GP-4 "Manual Reactor Scram" was performed.
: 3. 13KV House Loads were transferred to the Startup Feed Buses in accordance with RRC 53.1-2. INITIATING CUE The Control Room Supervisor directs you to perform the Plant Reactor Operator scram actions. NOTE to Examiner: Rapid Response Cards are Level 2 Procedures - not required to be in- hand. 2007 NRC JPM CR-h(2) (NEW) -VERSION 2 Page 4 of 7 H. PERFORMANCE CHECKLIST i 1 b GE NO 3 STEP ~~ ~ Verify Main Turbine is tripped. (Cue: Tripped light is ON, Reset light is OFF; Master Trip Solenoid Test Lights A and B are OFF.) Verify Main Generator lockout. (Cue: Main Generator output breakers and Alt Exc Fld Bkr green lights are ON, red lights are OFF. Annunciators 220 B-I and 220 B-2 are lit.) Verify Group I, II, and Ill isolations and SBGT initiation, as applicable. (Cue: All Group II and Ill isolation valves' green lights are ON, red lights are OFF at Panel 20C003.
: 3. 13KV House Loads were transferred to the Startup Feed Buses in accordance with RRC 53.1-2. INITIATING CUE The Control Room Supervisor directs you to perform the Plant Reactor Operator scram actions. NOTE to Examiner: Rapid Response Cards are Level 2 Procedures - not required to be in- hand. 2007 NRC JPM CR-h(2) (NEW) -VERSION 2 Page 4 of 7 H. PERFORMANCE CHECKLIST i 1 b GE NO 3 STEP ~~ ~ Verify Main Turbine is tripped. (Cue: Tripped light is ON, Reset light is OFF; Master Trip Solenoid Test Lights A and B are OFF.) Verify Main Generator lockout. (Cue: Main Generator output breakers and Alt Exc Fld Bkr green lights are ON, red lights are OFF. Annunciators 220 B-I and 220 B-2 are lit.) Verify Group I, II, and Ill isolations and SBGT initiation, as applicable. (Cue: All Group II and Ill isolation valves' green lights are ON, red lights are OFF at Panel 20C003.
The following conditions exist at Panel 20C012:) Damper / Fan -- Green Red PO-20465 ON OFF PO-20466 AO-20469-1 AO-20469-2 AO-20470-1 AO-20470-2 AO-20453 AO-2046 1 AO-20462 AO-20452 AO-20458 AO-20463 AO-20464 AO-20457 AO-20467 AO-20468 AO-20475-1 AO-20475-2 AO-20476-1 AO-20476-2 SBGT Fan 'A' SBGT Fan 'B' OFF ON OFF ON OFF OFF OFF ON ON OFF OFF ON ON OFF ON ON ON OFF OFF ON OFF ON OFF ON OFF ON ON ON OFF OFF ON ON OFF OFF ON OFF OFF OFF ON ON OFF ON ACT P STANDARD Main Turbine Tripped light is verified ON and Reset light is verified OFF at Panel 20C008A; Master Trip Solenoid Test Lights A and B are verified OFF at Panel 20C008B. Main Generator output breakers and Alt Exc Fld Bkr green lights are verified ON, red lights are verified OFF at Panel 20C009. Determine Group II and Ill isolations should have occurred due to low RPV water level.
The following conditions exist at Panel 20C012:) Damper / Fan -- Green Red PO-20465 ON OFF PO-20466 AO-20469-1 AO-20469-2 AO-20470-1 AO-20470-2 AO-20453 AO-2046 1 AO-20462 AO-20452 AO-20458 AO-20463 AO-20464 AO-20457 AO-20467 AO-20468 AO-20475-1 AO-20475-2 AO-20476-1 AO-20476-2 SBGT Fan 'A' SBGT Fan 'B' OFF ON OFF ON OFF OFF OFF ON ON OFF OFF ON ON OFF ON ON ON OFF OFF ON OFF ON OFF ON OFF ON ON ON OFF OFF ON ON OFF OFF ON OFF OFF OFF ON ON OFF ON ACT P STANDARD Main Turbine Tripped light is verified ON and Reset light is verified OFF at Panel 20C008A; Master Trip Solenoid Test Lights A and B are verified OFF at Panel 20C008B. Main Generator output breakers and Alt Exc Fld Bkr green lights are verified ON, red lights are verified OFF at Panel 20C009. Determine Group II and Ill isolations should have occurred due to low RPV water level.
Line 383: Line 383:
r Under "ACT" P - must perform S - must simulate I. TERMINATING CUE When all steps required to isolate Reactor Building Ventilation and place Standby Gas Treatment in service are complete, the Control Room Supervisor should be informed.
r Under "ACT" P - must perform S - must simulate I. TERMINATING CUE When all steps required to isolate Reactor Building Ventilation and place Standby Gas Treatment in service are complete, the Control Room Supervisor should be informed.
The evaluator will then terminate the exercise.
The evaluator will then terminate the exercise.
2007 NRC JPM CR-h(2) (NEW) -VERSION 2 Page 7 of 7 TASK CONDITIONS/PREREQUISlTES  I. The plant was initially operating at full power when a plant transient occurred.  
2007 NRC JPM CR-h(2) (NEW) -VERSION 2 Page 7 of 7 TASK CONDITIONS/PREREQUISlTES  I. The plant was initially operating at full power when a plant transient occurred.
: 2. A GP-4 "Manual Reactor Scram" was performed.  
: 2. A GP-4 "Manual Reactor Scram" was performed.
: 3. 13KV House Loads were transferred to the Startup Feed Buses in accordance with RRC 53.1-2. INITIATING CUE The Control Room Supervisor directs you to perform the Plant Reactor Operator scram actions.
: 3. 13KV House Loads were transferred to the Startup Feed Buses in accordance with RRC 53.1-2. INITIATING CUE The Control Room Supervisor directs you to perform the Plant Reactor Operator scram actions.
EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET  
EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET  
Line 393: Line 393:
I PlMS CODE: I II I I Signature/Date I ENTRY: II 2007 NRC JPM IP-i (PLOR316PA Rev003) Page 1 of 9 TEMPORARY CHANGE FORM LOG \L x. . -'CODE NO.: PLOR-316PA REV. NO.: 003 9. IO. 11. 12. 13. 14. 15. TITLE: Low CRD Scram Air Header Pressure - Unit 3 (Alternate Path - Standby Requlator Must be Placed In Service) i I 1 2. 3. 4. 5. 6. -- 2007 NRC JPM IP-i (PLOR316PA RevOO3) Page 2 of 9 EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:
I PlMS CODE: I II I I Signature/Date I ENTRY: II 2007 NRC JPM IP-i (PLOR316PA Rev003) Page 1 of 9 TEMPORARY CHANGE FORM LOG \L x. . -'CODE NO.: PLOR-316PA REV. NO.: 003 9. IO. 11. 12. 13. 14. 15. TITLE: Low CRD Scram Air Header Pressure - Unit 3 (Alternate Path - Standby Requlator Must be Placed In Service) i I 1 2. 3. 4. 5. 6. -- 2007 NRC JPM IP-i (PLOR316PA RevOO3) Page 2 of 9 EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:
Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2001500401/
Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2001500401/
PLOR-316PA WA: 201001A2.09 URO: 3.2 SRO: 3.1 TASK DESCRIPTION: Low CRD Scram Air Header Pressure - Unit 3 (Alternate Path - Standbv Renulator Must be Placed In Service) A. NOTES TO EVALUATOR:  
PLOR-316PA WA: 201001A2.09 URO: 3.2 SRO: 3.1 TASK DESCRIPTION: Low CRD Scram Air Header Pressure - Unit 3 (Alternate Path - Standbv Renulator Must be Placed In Service) A. NOTES TO EVALUATOR:
: 1. An asterisk  
: 1. An asterisk
(*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.  
(*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.  
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
: 3. JPM Performance  
: 3. JPM Performance  
--.-J a. "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.  
--.-J a. "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.
: 4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. 1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.  
: 4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. 1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
: 2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.  
: 2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
c-' 2007 NRC JPM IP-i (PLOR316PA Rev003) Page 3 of 9 B. L'C. J D. E. F. G. TOOLS AND EQUIPMENT None REFERENCES Procedure ON-108, Rev. 6, "Low CRD Scram Air Header Pressure" TASK STANDARD  
c-' 2007 NRC JPM IP-i (PLOR316PA Rev003) Page 3 of 9 B. L'C. J D. E. F. G. TOOLS AND EQUIPMENT None REFERENCES Procedure ON-108, Rev. 6, "Low CRD Scram Air Header Pressure" TASK STANDARD
: 1. Satisfactory task completion is indicated when Unit 3 scram air header PCV-5239A is in service and PCV-5239B has been removed from service. 2. Estimated time to complete:
: 1. Satisfactory task completion is indicated when Unit 3 scram air header PCV-5239A is in service and PCV-5239B has been removed from service. 2. Estimated time to complete:
14 minutes Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps of ON-108, "Low CRD Scram Air Header Pressure" procedure.
14 minutes Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps of ON-108, "Low CRD Scram Air Header Pressure" procedure.
I will describe initial plant conditions and provide you access to the materials required to complete this task. TASK CONDITIONS/PREREQUISlTES  
I will describe initial plant conditions and provide you access to the materials required to complete this task. TASK CONDITIONS/PREREQUISlTES
: 1. Unit 3 is operating at full power steady state conditions.  
: 1. Unit 3 is operating at full power steady state conditions.
: 2. "SCRAM VALVE PILOT AIR HEADER PRESS HI-LO" annunciator is up on alarm panel 311 D-2. 3. The cause of low scram air header pressure condition is NOT caused by a loss of the Instrument Air system. 4. Scram air header PCV-5239B is presently in service. INITIATING CUE The Control Room Supervisor directs you to restore the Unit 3 CRD scram air header pressure to approximately 73 psig per procedure ON-I 08, "Low CRD Scram Air Header Pressure".  
: 2. "SCRAM VALVE PILOT AIR HEADER PRESS HI-LO" annunciator is up on alarm panel 311 D-2. 3. The cause of low scram air header pressure condition is NOT caused by a loss of the Instrument Air system. 4. Scram air header PCV-5239B is presently in service. INITIATING CUE The Control Room Supervisor directs you to restore the Unit 3 CRD scram air header pressure to approximately 73 psig per procedure ON-I 08, "Low CRD Scram Air Header Pressure".  
\ ,' - 2007 NRC JPM IP-i (PLOR316PA Rev003) Page 4 of 9 H. PERFORMANCE CHECKLIST  
\ ,' - 2007 NRC JPM IP-i (PLOR316PA Rev003) Page 4 of 9 H. PERFORMANCE CHECKLIST  
'4 . 7 STEP NO 1 2 3 *4 STEP 3btain a copy of procedure ON-108. Verify low scram air header pressure locally on Pl-3-03-229 at CRD flow nest OR on Pl-3-03-312 on Panel 30C124. (Cue: Pl-3-03-229 indicates 63 psig. If the control room is called, report that PI 03-312 indicates 63 psig.) Check normal operation of the in-service scram air header pressure control regulator by observing loading pressure of approximately 80 psig and control pressure of approximately 75 psig on PCR-3-03-31688B pressure control regulator for PCV-5239B. (Cue: Loading pressure is approximately 80 psig, control pressure is 63 psig.) ~ ~ Adjust PCR knob (red knob) clockwise to raise scram air header pressure to 67 to 75 psig on Pl-3-03-229. (Cue: Red knob on PCR-3-03-31688B is turned (clockwise) until it will not turn further, Pl-3-03-229  
'4 . 7 STEP NO 1 2 3 *4 STEP 3btain a copy of procedure ON-108. Verify low scram air header pressure locally on Pl-3-03-229 at CRD flow nest OR on Pl-3-03-312 on Panel 30C124. (Cue: Pl-3-03-229 indicates 63 psig. If the control room is called, report that PI 03-312 indicates 63 psig.) Check normal operation of the in-service scram air header pressure control regulator by observing loading pressure of approximately 80 psig and control pressure of approximately 75 psig on PCR-3-03-31688B pressure control regulator for PCV-5239B. (Cue: Loading pressure is approximately 80 psig, control pressure is 63 psig.) ~ ~ Adjust PCR knob (red knob) clockwise to raise scram air header pressure to 67 to 75 psig on Pl-3-03-229. (Cue: Red knob on PCR-3-03-31688B is turned (clockwise) until it will not turn further, Pl-3-03-229
{Pl-3-03-312) indicates 65 psig. If asked, Loading Pressure is 80 psig and Control Pressure is 65 psig.)
{Pl-3-03-312) indicates 65 psig. If asked, Loading Pressure is 80 psig and Control Pressure is 65 psig.)
ACT SIP P P S STANDARD 9 copy of procedure ON-I08 is obtained.  
ACT SIP P P S STANDARD 9 copy of procedure ON-I08 is obtained.  
Line 424: Line 424:
If asked for any of the following pressures, then give the respective following indication:
If asked for any of the following pressures, then give the respective following indication:
Pl-3-03-229  
Pl-3-03-229  
/ Pl-3-03-312  
/ Pl-3-03-312
{Scram Air Header Pressure} indicates {rising pressure as red knob is turned in the clockwise direction until} - 73 psig Loading pressure indicates - 80 psig Control pressure indicates {rising pressure as red knob is turned in the clockwise direction until} - 75 psig) Close HV-3-03-31685B, Instrument Air Block Valve to PCV-5239B. (Cue: Valve handwheel is turned [CLOCKWISE]
{Scram Air Header Pressure} indicates {rising pressure as red knob is turned in the clockwise direction until} - 73 psig Loading pressure indicates - 80 psig Control pressure indicates {rising pressure as red knob is turned in the clockwise direction until} - 75 psig) Close HV-3-03-31685B, Instrument Air Block Valve to PCV-5239B. (Cue: Valve handwheel is turned [CLOCKWISE]
until stem length above valve yoke lowers 1 inch, then handwheel will not turn.) Close HV-3-03-31686BI lnstr Air Back Pressure to PCV-5239B. (Cue: Valve handwheel is turned [CLOCKWISE] until stem length above valve yoke lowers 1 inch, then handwheel will not turn.) Close HV-3-03-31681 B, lnstr Air Inlet Block VV to PCV-5239B. (Cue: Valve handwheel is turned [CLOCKWISE]
until stem length above valve yoke lowers 1 inch, then handwheel will not turn.) Close HV-3-03-31686BI lnstr Air Back Pressure to PCV-5239B. (Cue: Valve handwheel is turned [CLOCKWISE] until stem length above valve yoke lowers 1 inch, then handwheel will not turn.) Close HV-3-03-31681 B, lnstr Air Inlet Block VV to PCV-5239B. (Cue: Valve handwheel is turned [CLOCKWISE]
Line 450: Line 450:
PlMS CODE: ...- PIMS ENTRY: 2007 NRC JPM IP-j (PLOR197P Rev000) Page 1 of 6 TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-197P REV. NO.: 001 TITLE: Defeating RClC Low Pressure Isolations - Unit 2 4 ..,. 2. 3. 4. 5. 6. 7. 8. 9. IO. 11. 12. 13. 14. 15. 2007 NRC JPM IP-j (PLOR197P Rev000) Page 2 of 6 EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:
PlMS CODE: ...- PIMS ENTRY: 2007 NRC JPM IP-j (PLOR197P Rev000) Page 1 of 6 TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-197P REV. NO.: 001 TITLE: Defeating RClC Low Pressure Isolations - Unit 2 4 ..,. 2. 3. 4. 5. 6. 7. 8. 9. IO. 11. 12. 13. 14. 15. 2007 NRC JPM IP-j (PLOR197P Rev000) Page 2 of 6 EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:
Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 200451 0599 / PLOR-197P WA: 295031 EA1.05 URO: 4.3 SRO: 4.3 TASK DESCRIPTION:
Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 200451 0599 / PLOR-197P WA: 295031 EA1.05 URO: 4.3 SRO: 4.3 TASK DESCRIPTION:
Defeatina RClC Low Pressure Isolation - Unit 2 A. NOTES TO EVALUATOR:  
Defeatina RClC Low Pressure Isolation - Unit 2 A. NOTES TO EVALUATOR:
: 1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.  
: 1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.  
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
: 3. JPM Performance  
: 3. JPM Performance  
.. .-_- a. "Control Room" JPMs are designed to be performed in the simulator.
.. .-_- a. "Control Room" JPMs are designed to be performed in the simulator.
If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.  
If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.
: 4. Satisfactory performance of this JPM is accomplished if:  
: 4. Satisfactory performance of this JPM is accomplished if:
: a. The task standard is met. b. JPM completion time requirement is met. 1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.  
: a. The task standard is met. b. JPM completion time requirement is met. 1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
: 2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.  
: 2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
2007 NRC JPM IP-j (PLOR197P Rev000)
2007 NRC JPM IP-j (PLOR197P Rev000)
Page 3 of 6 B. -d C. D. E. F. G. TOOLS AND EQUIPMENT  
Page 3 of 6 B. -d C. D. E. F. G. TOOLS AND EQUIPMENT
: 1. T-225 Tool Package 2. EOP Tool Locker Key 3. Yellow copy of T-225-2, "Defeating RClC Low Pressure Isolation"  
: 1. T-225 Tool Package 2. EOP Tool Locker Key 3. Yellow copy of T-225-2, "Defeating RClC Low Pressure Isolation"
: 4. Green copy of T-225-3, "Defeating RClC Low Pressure Isolation" (in case examinee picks the wrong unit) REFERENCES  
: 4. Green copy of T-225-3, "Defeating RClC Low Pressure Isolation" (in case examinee picks the wrong unit) REFERENCES
: 1. T-225-2, Rev.
: 1. T-225-2, Rev.
3, "Defeating RClC Low Pressure Isolation" TASK STANDARD 1. Satisfactory task completion is indicated when the RClC low pressure isolation is defeated.  
3, "Defeating RClC Low Pressure Isolation" TASK STANDARD 1. Satisfactory task completion is indicated when the RClC low pressure isolation is defeated.
: 2. Estimated time to complete:
: 2. Estimated time to complete:
10 minutes Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to defeat the RClC low pressure isolation, using appropriate procedures.
10 minutes Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to defeat the RClC low pressure isolation, using appropriate procedures.
Line 492: Line 492:
Page 2 of 6 EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE  
Page 2 of 6 EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE  
%,-/ POSITION TITLE:
%,-/ POSITION TITLE:
Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2640010401/ PLOR-049P WA: 264000A2.10 URO: 3.9 SRO: 4.2 TASK DESCRIPTION: Diesel Generator Air Start Solenoid Override A. NOTES TO EVALUATOR:  
Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2640010401/ PLOR-049P WA: 264000A2.10 URO: 3.9 SRO: 4.2 TASK DESCRIPTION: Diesel Generator Air Start Solenoid Override A. NOTES TO EVALUATOR:
: 1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.  
: 1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.  
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
: 3. JPM Performance  
: 3. JPM Performance
: a. 'Control Room" JPMs are designed to be performed in the simulator.
: a. 'Control Room" JPMs are designed to be performed in the simulator.
If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.  
If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
: 4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. 1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.  
: 4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. 1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
: 2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.  
: 2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
2007 NRC JPM IP-k (PLOR049P RevOl5) Page 3 of 6 B. TOOLS AND EQUIPMENT None r/ --' c. REFERENCES D. E. F. Procedure A0 52A.2 Rev. 4, "Diesel Generator Air Start Solenoid Override" TASK STANDARD  
2007 NRC JPM IP-k (PLOR049P RevOl5) Page 3 of 6 B. TOOLS AND EQUIPMENT None r/ --' c. REFERENCES D. E. F. Procedure A0 52A.2 Rev. 4, "Diesel Generator Air Start Solenoid Override" TASK STANDARD
: 1. Satisfactory task completion is indicated when E-2 Diesel Generator has been started by overriding one of the air start solenoid valves.  
: 1. Satisfactory task completion is indicated when E-2 Diesel Generator has been started by overriding one of the air start solenoid valves.
: 2. Estimated time to complete:
: 2. Estimated time to complete:
15 minutes Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to start the E-2 Diesel Generator by overriding one of the air start solenoid valves using appropriate procedures.
15 minutes Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to start the E-2 Diesel Generator by overriding one of the air start solenoid valves using appropriate procedures.
I will describe initial plant conditions and provide you access to the materials required to complete this task. TASK CON D IT1 0 N S/P RE REQ U I S ITES 1. A loss of coolant accident has occurred.  
I will describe initial plant conditions and provide you access to the materials required to complete this task. TASK CON D IT1 0 N S/P RE REQ U I S ITES 1. A loss of coolant accident has occurred.
: 2. E-2 Diesel Generator failed to start. 3. Investigation reveals that both E-2 Diesel Generator air start solenoid valve coils have failed. 4. The prerequisites of procedure A0 52A.2 "Diesel Generator Air Start Solenoid Override" have been met.
: 2. E-2 Diesel Generator failed to start. 3. Investigation reveals that both E-2 Diesel Generator air start solenoid valve coils have failed. 4. The prerequisites of procedure A0 52A.2 "Diesel Generator Air Start Solenoid Override" have been met.
G. INITIATING CUE The Control Room Supervisor directs you to perform A0 52A.2 "Diesel Generator Air Start Solenoid Override" up to and including step 4.4 for the E-2 Diesel Generator.  
G. INITIATING CUE The Control Room Supervisor directs you to perform A0 52A.2 "Diesel Generator Air Start Solenoid Override" up to and including step 4.4 for the E-2 Diesel Generator.  
Line 517: Line 517:
The evaluator will then terminate the exercise.
The evaluator will then terminate the exercise.
Page 6 of 6 2007 NRC JPM IP-k (PLOR049P RevOl5)
Page 6 of 6 2007 NRC JPM IP-k (PLOR049P RevOl5)
TASK CONDlTlONSlPREREQUlSlTES . d' I. A loss of coolant accident has occurred.  
TASK CONDlTlONSlPREREQUlSlTES . d' I. A loss of coolant accident has occurred.
: 2. E-2 Diesel Generator failed to start. 3. Investigation reveals that both E-2 Diesel Generator air start solenoid valve coils have failed. 4. The prerequisites of procedure A0 52A.2 "Diesel Generator Air Start Solenoid Override'' have been met. INITIATING CUE The Control Room Supervisor directs you to perform A0 52A.2 "Diesel Generator Air Start Solenoid Override" up to and including step 4.4 for the E-2 Diesel Generator.}}
: 2. E-2 Diesel Generator failed to start. 3. Investigation reveals that both E-2 Diesel Generator air start solenoid valve coils have failed. 4. The prerequisites of procedure A0 52A.2 "Diesel Generator Air Start Solenoid Override'' have been met. INITIATING CUE The Control Room Supervisor directs you to perform A0 52A.2 "Diesel Generator Air Start Solenoid Override" up to and including step 4.4 for the E-2 Diesel Generator.}}

Revision as of 05:23, 13 July 2019

Final - Section B Operating Exam (Folder 3)
ML070610509
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/29/2007
From: Vanwyen T
Exelon Generation Co
To: Todd Fish
Operations Branch I
Sykes, Marvin D.
Shared Package
ML060800089 List:
References
Download: ML070610509 (91)


Text

EXELON NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET NAME: Last First M.I. SOC. SEC. NO. APPROVALS:

ISSUE DATE: COMPLETION DATE: Signature I Title Date Training Review for Completeness:

Signature

/Title Date PIMS CODE:

Signature I Title Date Signature

/Title Date EFFECTIVE DATE:

/ J I I PIMS ENTRY: S ig natu re/Date I I - Page 1 of 7 2007 NRC JPM CR-a(1) (PLOR301CA Rev008)

TEMPORARY CHANGE FORM LOG --, e CODE NO.: PLOR-301 CA 9. 10. 11. 12. 13. 14. 15. REV. NO.:

008 TITLE: lniect Boron into RPV (Alternate Path - RWCU Fails to Isolate) 2007 NRC JPM CR-a(1) (PLOR301CA Rev008)

Page 2 of 7 PECO NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:

Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2001 100501

/ PLOR-301 CA WA: 295037EA1.04 URO: 4.5 SRO: 4.5 TASK D ESC R I PTI 0 N : Inject Boron into RPV (Alternate Path - RWCU Fails to Isolate) A. NOTES TO EVALUATOR:

I. An asterisk (*) before the step number denotes a CRITICAL STEP.

CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.

2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

Page 3 of 7 2007 NRC JPM CR-a(1) (PLOR301CA Rev008)

B. 'd C. D. E. F. ~, --- G TOOLS AND EQUIPMENT

1. REFERENCES
1. 2. TASK STANDARD
1. Key for SBLC System keylock switch on Control Room panel C005A. RRC 1 1.1-2, Rev. 0, "Standby Liquid System Initiation During a Plant Event" SO I I .I .B-2, Rev. 3, "Standby Liquid Control System Initiation" Satisfactory task completion is indicated when a SBLC pump is running, boron is injecting into the Reactor vessel and RWCU system flow is secured. Estimated time to complete:

4 minutes Non-Time Critical

2. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to inject boron into the Reactor vessel using appropriate procedures.

I will describe initial plant conditions and provide you access to the materials required to complete this task. TASK CONDITIONS/PREREQUISlTES

1. INITIATING CUE The Control Room Supervisor directs you to inject boron into the Reactor vessel from the Control Room using Rapid Response Card RRCI 1 .I-2, "Standby Liquid System Initiation During a Plant Event". SBLC injection is required by T-I 01, "RPV Control".
  • / 2007 NRC JPM CR-a(1) (PLOR301CA Rev008) Page 4 of 7 H. PERFORMANCE CHECKLIST STEP ACT .. STEP NO 1 2 3 *4 Verify AO-2-02-039, Recirc Sample Inboard Is01 valve, is closed. (Cue: AO-2-02-039 green light is on, red light is off.) Inboard lsol valve, is closed. (Cue: AO-2-02-040 green light is on, red light is off.) Verify AO-2-02-040, Recirc Sample Verify key is inserted into 2(A)BP040 keylock switch. (Cue: Key is in keylock switch.) Trip all running RWCU pumps.

P P P (Cue: Acknowledge control switch operations.) Turn keylock switch to start "Sys A(B)". (Cue: Acknowledge keylock switch operation.)

Verify RWCU System isolated. (Cue: MO-15, MO-18, and MO-68 red lights are on, green lights are off.) P P P Verify all RWCU pumps are secured. (Cue: A and B RWCU Pumps green lights are on, red lights are off.) i- STANDARD AO-2-02-039 green light verified ON at panel 20C004A. 5 6 7 AO-2-02-040 green light verified ON at panel 20C004A. Close MO-2-12-15, RWCU Inboard Isolation valve. Key verified inserted into 2(A)BP040 keylock switch at panel 20C005A. P Keylock switch turned to the "START SYS A(B)" position at panel 20C005A. L RWCU failure to isolate is recognized (Cue: Acknowledge control switch operation.)

~~ All running RWCU Pump control switches are momentarily placed in the STOP position at panel 20C004A. A, B, and C RWCU pump green lights verified ON and flow decreases to 0 on FI-2-12-141A and FI-2-12-141B at panel 20C004A. // Performing either step 8 (close MO-15) step 9 (close MO-18) satisfies the critical step. p8 MO-2-12-15 control switch momentarily placed in the CLOSE position at panel 20C004A. Page 5 of 7

'--/ STEP *9 *I 0 11 12 Close MO-2-12-18, RWCU Outboard Isolation valve. -- (Cue: Acknowledge control switch operation.) . 13 14 15 Close MO-2-12-68, RWCU Outlet valve. (Cue: Acknowledge control switch operation.) Verify MO-2-12-15, MO-2-12-18 and MO-2-12-68 are closed. (Cue: MO-I 5, MO-18, and MO-68 green lights are on, red lights are off.) Ac k n ow I ed g e the "C LEAN - U P FI LTERIDEMI N SYSTEM TROUBLE" annunciator. (Cue: Annunciators 215 C-3 is lit solid.) Verify SBLC Pump A(B) starts and injects. (Cue: SBLC Pump A(B) red light is on, green light is off; PI-065 reads approximately 100 psi greater than Reactor pressure; LI-66 indication is slowly lowering; Reactor power is slowly lowering.)

Inform Control Room Supervisor of task corn pie tion. (Cue: Control Room Supervisor acknowledges report.)

As an evaluator ensure that you have positive control of all exam material provide to the examinee (Task Conditions/Prerequisites)

AND procedures.

', ACT P P P P P P P P ~ STANDARD ~- ~ MO-2-12-18 control switch momentarily placed in the CLOSE position at panel 2 OC004A. MO-2-12-68 control switch momentarily placed in the CLOSE position at panel 20 C 0 04A. MO-2-12-15, AND/OR MO-2-12-18, AND/OR MO-2-12-68 green light(s) verified ON at panel 20C004A. The annunciator "ACKNOWLEDGE" pushbutton is depressed on panel 20c012. SBLC Pump A(B) red light is verified ON. SBLC Pump discharge pressure verified approximately 100 psi > reactor pressure on PI-2-11-065.

Lowering Reactor power verified.

All at panel 20C005A. Task completion reported.

Positive control established.

2007 NRC JPM CR-a(1) (PLOR301CA Rev008) Page 6 of 7

'U' I. Under "ACT" P - must perform S - must simulate TERMINATING CUE When a SBLC pump is running and boron is injecting into the Reactor vessel with RWCU flow secured, the Control Room Supervisor should be informed.

The evaluator will then terminate the exercise.

'-- *I ---- 2007 NRC JPM CR-a(1) (PLOR301CA Rev008)

Page 7 of 7 TASK CONDITIONS/PREREQUISlTES

1. SBLC injection is required by T-101, "RPV Control " . INITIATING CUE The Control Room Supervisor directs you to inject boron into the Reactor vessel from the Control Room using Rapid Response Card RRCI I .I-2, "Standby Liquid System Initiation During a Plant Event". v' EXELON NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET NAME: Last First M.I. SOC. SEC. NO. APPROVALS:

Signature

/Title Date ISSUE DATE: COMPLETION DATE: Signature I Title Date Signature

/Title Date Signature I Title Date APPROVED FOR USE:

Signature I Title Date EFFECTIVE DATE: I I II Training Review for Completeness:

I PIMS CODE: 1 PlMS ENTRY: Signature/Date I I C' 2007 NRC JPM CR-b(2) (PLOR300CA Rev012) Page 1 of 6 TEMPORARY CHANGE FORM LOG \' CODE NO.: PLOR-300CA REV. NO.: 012 TITLE: *.d Manually Initiate HPCl (Alternate Path - Manual Initiation Pushbutton Fails to Operate) IO. 11. 12. 13. 14. 15. 2007 NRC JPM CR-b(2) (PLOR300CA RevOl2) Page 2 of 6 EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE

'-' POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 20600501 01 / PLOR-300CA WA: 295031 EA1.02 URO: 4.5 SRO: 4.5 TASK D ESC R I PTI 0 N : Manuallv Initiate HPCl (Alternate Path - Manual Initiation Pushbutton Fails to Operate) A. NOTES TO EVALUATOR:

1. An asterisk

(*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.

2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. "Control Room" JPMs are designed to be performed in the simulator.

If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.

4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. 1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee. 2007 NRC JPM CR-b(2) (PLORSOOCA RevOl2) Page 3 of 6 B. '-- c. D. E. F. ;cl- G. TOOLS AND EQUIPMENT 1. None REFERENCES
1. TASK STANDARD 1. RRC 23.1-2, Rev.

4, "HPCI System Operation During a Plant Event" Satisfactory task completion is indicated when HPCl is injecting to the RPV at 5000 gpm. Estimated time to complete:

5 minutes Non-Time Critical

2. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to manually initiate the HPCl system and inject to the Reactor vessel at a flow rate of 5000 gpm using appropriate procedures.

I will describe initial plant conditions and provide you access to the materials required to complete this task. TASK CONDITIONS/PREREQUISlTES I. INITIATING CUE The Control Room Supervisor directs you to initiate the HPCl system using the HPCl Manual Initiation pushbutton and inject to the Reactor vessel at 5000 gpm using RRC 23.1-2, "HPCI System Operation During a Plant Event".

RPV Level is -25 inches and lowering.

2007 NRC JPM CR-b(2) (PLOR300CA RevOl2) Page 4 of 6 H. PERFORMANCE CHECKLIST STEP NO '-4 STEP ACT Ip Obtain copy of RRC 23.1-2 "HPCI Operation During a Plant Event". 2 Arm and depress the HPCl Manual I nit ia t i o n Push b utton . (Cue: Acknowledge pushbutton operation.)

"3 Recognize that the Manual Initiation pushbutton did not function. (Cue: HPCl discharge pressure, flow and speed indicate zero. Aux oil pump green light is on, red light is off.) **** NOTE **** STANDARD References Section A of RRC "HPCI Injection Using Manual Initiation PB". HPCl Manual Initiation Pushbutton collar is rotated clockwise to the ARMED position and then the pushbutton is momentarily DEPRESSED at panel 20C004B. Manual Initiation pushbutton failure to function is recognized. Examinee should now refer to Section B of RRC, "HPCI Injection by Manual Component Operation" . If notified as the Control Room Supervisor that the HPCl Manual Initiation Pushbutton did li not unction, cue the examinee to initiate HPCl and inject to the reactor vessel at 5000 gpm. *4 5 6 Simultaneously start the Auxiliary Oil Pump, 20P026 and open M0-2-23-014 "Sup ply" va Ive. (Cue: Acknowledge control switch operation.)

Verify the Auxiliary Oil Pump started. (Cue: Auxiliary Oil pump red light is on green light is off and annunciator 222 D-5 is alarming, "HPCI AUXILIARY OIL PUMP RUNNING", Turbine Stop and Control valve red lights are on.) Verify MO-2-23-014, "Supply" valve is open. (Cue: MO-14 red light is on, green light is off, HPCl discharge pressure and speed rise.) P P P Auxiliary oil pump control switch is placed in the START position while simultaneously placing MO-2-23-014

'Supply" control switch momentarily in the "OPEN" position at panel 20C004B.

Verify the Auxiliary Oil pump red light is ON at panel 20C004B or annunciator 222 D-5 is alarming at panel 20C204C. MO-2-23-14 red light verified ON, HPCl discharge pressure (Pl-2-23-109) and HPCl speed (SPI-4505) rising at panel 20C004B. 2007 NRC JPM CR-b(2) (PLOR300CA RevOl2) Page 5 of 6 8 9 10 11 12 STEP Open MO-2-23-019, "To Feed Line" valve. (Cue: Acknowledge control switch operation.) Verify MO-2-23-019, "To Feed Line" valve is open. (Cue: MO-19 red light is on, green light is off, HPCl flow rise.) Start the HPCl Gland Seal Condenser Vacuum pump, 20K002. (Cue: Vac pump red light is on, green light is off.) Verify pump flowrate of 5000 gpm. (Cue: Fl-2-23-108 indicates 5000 gpm.) Inform Control Room Supervisor that HPCl was manually started and is injecting into the RPV. (Cue: Control Room Supervisor acknowledges report.)

As an evaluator ensure that you have positive control of all exam material provided to the examinee (Task Conditions/Prerequisites)

AND procedures.

ACT P P P P P P STANDARD VlO-2-23-01 9 control switch is nomentarily placed in the OPEN position at panel 20C004B. ~~ ~ M0-2-23-019 red light is verified ON and flow (Fl-2-23-108) rising at panel 20C004B. HPCl Gland Seal Condenser Vacuum Pump control switch is placed in the START position at panel 20C004B. A HPCl flowrate of approximately 5000 gpm is verified on Fl-2-23-108 at panel 20C004B. Task completion reported. Positive control established. Under "ACT" P - must perform S - must simulate I. TERMINATING CUE When HPCl is injecting into the Reactor vessel at a flow rate of 5000 gpm, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

L,' 2007 NRC JPM CR-b(2) (PLOR300CA RevOl2) Page 6 of 6 TASK CONDlTlONSlPREREQUlSlTES -L/, I. RPV Level is -25 inches and lowering.

INITIATING CUE The Control Room Supervisor directs you to initiate the HPCI system using the HPCI Manual Initiation pushbutton and inject to the Reactor vessel at 5000 gpm using RRC 23.1-2, "HPCI System Operation During a Plant Event".

v' EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET APPROVALS:

Signature I Title Date Signature I Title Date Signature I Title Date Signature I Title Date -i/APPROVED FOR USE: Date Signature I Title EFFECTIVE DATE: / I 1 NAME: Last First M.I. SOC. SEC. NO. COMMENTS: Training Review for Completeness:

II SignaturelDate

-- ISSUE DATE:

COMPLETION DATE: PlMS CODE: PlMS ENTRY: I 2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 1 of 7 TEMPORARY CHANGE FORM LOG e CODE NO.: PLOR-023C REV. NO.: 007 TITLE: ADS RESET FOLLOWING BLOWDOWN 1. 2. 3. 4. 5. 6. 7. a. 11. 12.

13. 14. 15. 2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 2 of 7 EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:

TASK-JPM DESIGNATOR:

21 800401 01 / PLOR-023C WA: 218000A4.03 Unit Reactor Operator/Senior Reactor Operator RO: 4.2 SRO: 4.2 TASK DESCRIPTION: ADS RESET FOLLOWING BLOWDOWN A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. "Control Room" JPMs are designed to be performed in the simulator.

If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.

4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met. b. JPM completion time requirement is met. I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 3 of 7 B. L/ C. D. E. F. .--J G. TOOLS AND EQUIPMENT None REFERENCES Procedure SO 1 G.7.C-2, Rev. 9, "Automatic Depressurization System Reset Following Blowdown" (R) TASK STANDARD 1. Satisfactory task completion is indicated when ADS logic reset, Vacuum breaker position indication reset, and ADS relief valve position indication reset.

Estimated time to complete:

7 minutes (A.5) Non-Time Critical 2. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to reset the ADS system using appropriate procedures.

I will describe initial plant conditions and provide you access to the materials required to complete this task.

TASK CONDITIONS/PREREQUISlTES

1. 2. An automatic ADS initiation has occurred.

RPV water level is now greater than -160" and the capability exists to maintain level above -160". The following annunciators have been reset:

a. b. Blowdown of the RPV is complete by evidence of SRVs closed due to lack of pressure to keep them open. Reactor pressure is 0 psig. Drywell pressure is 0.25 psig. 3. "System I ECCS REAC VESSEL LO-LO-LO LEVEL", panel 227 D-2. 'System II ECCS REAC VESSEL LO-LO-LO LEVEL", panel 228 C-2. 4. 5. 6. INITIATING CUE The Control Room Supervisor directs you to reset the ADS logic in accordance with SO 1 G.7.C-2. "Automatic Demessurization Svstem Reset Followina Blowdown". Section
4. I. v 2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 4 of 7 H. PERFORMANCE CHECKLIST II STEP NO *I *2 STEP ~ ~~ ~ ~~ Depress the "A" ADS LOGIC RESET-TIMER pushbutton, 2E-S2A. (Cue: Acknowledge pushbutton operation

.) Depress the "B" ADS LOGIC RESET- TIMER pushbutton, 2E-S2B. (Cue: Acknowledge pushbutton operation.)

ACT P P STANDARD The "A" ADS LOGIC TIMER RESET pushbutton, 2E-S2AI is momentarily depressed at panel 2OCOO3-01.

I3 **** NOTE **** The "BLOWDOWN RELIEF VALVES HIGH TEMP" annunciator will not reset unless all of the temperatures are below the alarm setpoint.

If necessary, as the Control Room Supervisor direct examinee to continue with resetting ADS. The "B" ADS LOGIC TIMER RESET pushbutton, 2E-S2B, is momentarily depressed at panel 2OCOO3-01.

Reset the following annunciators:

a. "BLOWDOWN AUX RELAYS ENERGIZED RHR OR CS". b. "BLOWDOWN RELIEF VALVES HIGH TEMP". (Cue: Acknowledge pushbutton operation.)

Verify "BLOWDOWN AUX RELAYS ENERGIZED RHR OR CS" and "BLOWDOWN RELIEF VALVES HIGH TEMP" annunciators are clear. (Cue: Annunciators 227 E-4 and 227 B-4 are not lit.) Verify "BLOWDOWN TIMERS INITIATED" annunciator reset. (Cue: Annunciator 227 D-4 is not lit.)

P The alarm "RESET" pushbutton is momentarily depressed on panel 20C003.

~ "BLOWDOWN AUX RELAYS ENERGIZED RHR OR CS" and "BLOWDOWN RELIEF VALVES HIGH TEMP" annunciators are verified clear on alarm panels 227 E-4 and 227 B-4. "BLOWDOWN TIMERS INITIATED" annunciator is verified clear on alarm panel 227 D-4. 2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 5 of 7 E 6 7 8 *9 *I 0 11 STEP Verify "SAFETY RELIEF VALVE OPEN" annunciator reset. (Cue: Annunciator 210 D-2 is not lit.) Verify the ADS valves indicate closed (Cue: RV-2-02-71A1 B, C, G, & K green lights are on, red lights are off.)

~ Monitor temperature recorder TR-2 103 to ensure each valve has reseated. (Cue: TR-2-02-103 points TE-2-2-113Al B, C, G, & K read -32OOF and are decreasing slowly.) Depress the "A" ADS LOGIC RESET - DRYWELL HIGH PRESS pushbutton, 2E- S3A. (Cue: Acknowledge pushbutton operation.)

Depress the "B" ADS LOGIC RESET DRYWELL HIGH PRESS pushbutton 2E- S3B. (Cue: Acknowledge push button operation.)

~ ____~ ~~ Reset the following annunciators: a. "DRYWELL HI PRESS SIGNAL SEALED IN". b. "HIGH DRYWELL PRESSURE BYPASS TIMERS INITIATED". (Cue: Acknowledge pushbutton operation.)

ACT P STANDARD "SAFETY RELIEF VALVE OPEN" annunciator is verified clear on alarm panel 210 D-2. RV-2-02-71A, B, C, G, & K green lights verified ON at panel 2OCOO3-01.

TR-2-02-103 monitored at panel 20C003- 01 to ensure each ADS valve has reseated, as indicated by each point trending downward from -320-340°F.

The "A1 ADS DRYWELL HIGH PRESSURE LOGIC RESET pushbutton, 2A-S3A, is momentarily depressed at panel 2OCOO3-01.

The "B" ADS DRYWELL HIGH PRESS LOGIC RESET pushbutton, 2E-S3B, is momentarily depressed at panel 20C003- 01. The alarm "RESET" pushbutton is momentarily depressed on panel 20C003. --' 2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 6 of 7

~~ STEP 12 13 I Verify "DRYWELL HI PRESS SIGNAL SEALED IN" and "HIGH DRYWELL PRESSURE BYPASS TIMERS INITIATED" annunciators are clear. (Cue: Annunciators 227 A-4 and 227 A-3 are not lit.) Inform the Control Room Supervisor of task completion. (Cue: Control Room Supervisor acknowledges report.) 14 As an evaluator, ensure that you have positive control of all exam material provided to the examinee (Task Conditions/Prerequisites)

AND procedures.

ACT P P P STANDARD "DRYWELL HI PRESS SIGNAL SEALED IN" and "HIGH DRYWELL PRESSURE BY PASS TI M E RS I N I TI AT ED" annunciators are verified clear on alarm panels 227 A-4 and 227 A-3. ~ ~~ ~ Task completion reported. Positive control established. Under "ACT" P - must perform S - must simulate ij I. TERMINATING CUE When the ADS logic has been reset, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 7 of 7

'.e' I. 2. 3. 4. ~-' 5. 6. TASK CONDITIONS/PREREQUISlTES An automatic ADS initiation has occurred.

RPV water level is now greater than -160 inches and the capability exists to maintain level above -160 inches. The fo I I ow i ng an nu nc iators have been reset:

a. "System I ECCS REAC VESSEL LO-LO- LO LEVEL", panel 227 D-2. b. "System II ECCS REAC VESSEL LO-LO- LO LEVEL", panel 228 C-2. Blowdown of the RPV is complete by evidence of SRVs closed due to lack of pressure to keep them open. Reactor pressure is 0 psig. Drywell pressure is 0.25 psig. INITIATING CUE The Control Room Supervisor directs you to reset the ADS logic in accordance with SO lG.7.C-2, "Automatic Depressurization System Reset Following Blowdown", Section 4.1.

EXELON NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET NAME: Last First M.I. SOC. SEC. NO. APPROVALS:

Signature

/Title Date Signature

/Title Date Signature I Title Date Signature

/Title Date - If ISSUE DATE:

COMPLETION DATE: APPROVED FOR USE:

Signature

/ Title Date 11 II EFFECTIVE DATE: I I II I 11 Training Review for Completeness:

I PlMS CODE: I ENTRY: Sig nature/Date I I 2007 NRC JPM CR-d(4) (NEW) Page 1 of 8 TEMPORARY CHANGE FORM LOG L.' v CODE NO.: PLOR-NEWICA

9. IO. REV. NO.: TITLE: PERFORM CORE SPRAY B PUMP CAPACITY TEST FOR IST i i I 8. 11. 12. 13. 14. 2007 NRC JPM CR-d(4) (NEW) Page 2 of 8 EXELON NUCLEAR PEACH BO-TTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: TASK-JPM DESIGNATOR:

20901401 01 / PLOR-NEWICA WA: 209001A4.04 Unit Reactor Operator/Senior Reactor Operator URO: 2.9 SRO: 2.9 TASK DESCRIPTION: Perform Core Spray B Pump Capacity Test For IST A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP.

CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.

2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. "Control Room" JPMs are designed to be performed in the simulator.

If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.

4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

2007 NRC JPM CR-d(4) (NEW) Page 3 of 8

6. id' C. D. E. F. L---,' G. L-' TOOLS AND EQUIPMENT
1. None REFERENCES
1. TASK STANDARD I. ST-0-014-212-2, Rev. 1, "Core Spray B Pump Capacity Test For IST" Satisfactory task completion is indicated when Core Spray 6 Pump Capacity Test For IST is complete and Core Spray 6 is returned to a normal standby lineup, as specified in the performance steps of ST-0-014-212-2, Section 6.0. 2. Estimated time to complete: 15 minutes Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to perform Core Spray 26 pump capacity test for IST using appropriate procedures.

I will describe initial plant conditions and provide you access to the materials required to complete this task. TASK CONDITIONS/PREREQUISlTES

1. 2. 3. The plant is operating at 100% power. An Equipment Operator is standing by in the 26 Core Spray Pump Room. Communications are available between the Control Room, 26 Core Spray Pump Room, 6 and D Core Spray Pump Triangle Room, and Cable Spreading Room. Core Spray pump 2B oil level is between the minimum and maximum lines on the sightglass.

Core Spray pump 26 static pump suction pressure is 6 psig. A second operator will record all data (simulated).

4. 5. 6. INITIATING CUE The Control Room Supervisor directs you to perform Core Spray 26 Pump Capacity Test For IST in accordance with ST-0-014-212-2 (provided). Provide examinee a copy of ST-0-014-212-2 with the following items completed:

Section 1 of the cover page Procedure section 2.0, "Test Equipment" Procedure section 3.0, "Prerequisites" 2007 NRC JPM CR-d(4) (NEW) Page 4 of 8 H. PERFORMANCE CHECKLIST STEP STEP NO ACT I *2 3 CLOSE MO-2-14-011 B "Core Spray Outboard Disch". (Cue: Acknowledge control switch operation. MO-2-14-011 B green light is ON; red light is OFF.) P STANDARD MO-2-14-011 B control switch is momentarily placed in "CLOSE" at Panel 20C003. MO-2-14-011 B green light is verified ON; red light is verified OFF at Panel 20C003.

If this JPM is being performed in parallel with another JPM, direct candidate NOT to make the plant page announcement prior to starting 28 Core Spray pump. START 2BP037 "Core Spray B Pump". (Cue: Acknowledge control switch operation. ) VERIFY Core Spray 2B Pump STARTS and is RUNNING by observing motor current on 14A-MI 6 and discharge pressure on PI-2-14-048B "Core Spray Disch P". (Cue: Ammeter 14A-MI B indicates 40 amps, PI-2-14-048B indicates 350 psig.) VERIFY MO-2-14-005B

'Core Spray B Min Flow" automatically OPENS. (Cue: MO-2-14-005B green light is OFF; red light is ON.) VERIFY 2DP037 "Core Spray D Pump" is NOT rotating. (Cue: Core Spray D Pump is NOT rotating .) P P P P "Starting 28 Core Spray pump" is announced on plant page prior to starting Core Spray pump 2B. 2B Core Spray pump control switch is momentarily placed in the "START" position at Panel 20C003.

2B Core Spray pump green light is verified OFF, red light is verified ON. Pump motor amps on ammeter 14A-MI B and discharge pressure on PI-2-14-048B are verified rising at Panel 20C003.

MO-2-14-005B green light is verified OFF; red light is verified ON at Panel 20C003. Directs Equipment Operator to verify Core Spray D Pump is NOT rotating.

Page 5 of 8 2007 NRC JPM CR-d(4) (NEW)

STEP OPEN MO-2-14-026B "Core Spray Full Flow Test". (Cue: Acknowledge control switch operation. MO-2-14-026B green light is OFF; red light is ON.) ~~ ~~ ~~ VERIFY MO-2-14-005B "Core Spray B Min Flow" automatically CLOSES. (Cue: MO-2-14-005B green light is ON; red light is OFF.) ACT P P STANDARD MO-2-14-026B control switch is momentarily placed in "OPEN" at Panel 20C003. MO-2-14-026B green light is verified OFF; red light is verified ON at Panel 20C003. MO-2-14-005B green light is verified ON; red light is verified OFF at Panel 20C003.

Time-compress by telling the examinee Core Spray B Pump has been running for 5 minutes. If necessary, remind examinee a second operator will record all test data. // r 9 *I 0 THROTTLE MO-2-14-0268 "Core Spray Full Flow Test" to obtain Rated Flow of 3125 to 3175 gpm as read on computer point H056. (Cue: Acknowledge control switch and red push button operation.

MO-2-14-026B green light is ON; red light is ON. Computer point H056 indicates 31 50 gPmJ VERIFY discharge pressure is greater than or equal to 240 psig as read on PI-2-14-080B. (Cue: PI-2-14-080B indicates 255 psig.)

THROTTLE MO-2-14-026B "Core Spray Full Flow Test" to obtain Rated Flow of 2000 to 2050 gpm as read on computer point H056. (Cue: Acknowledge control switch and red pushbutton operation.

MO-2-14-026B green light is ON; red light is ON. Computer point H056 indicates 2025 gpm.1 P MO-2-14-026B control switch is momentarily placed in "CLOSE" at Panel 20C003. Red pushbutton is depressed to stop valve stroke. Valve control switch and red pushbutton are operated as necessary to achieve 3125 to 3175 gpm as read on PMS computer point H056. MO-2-14-026B green and red lights are verified ON at Panel 20C003. Directs Equipment Operator to report Core Spray B Pump discharge pressure as read on PI-2-14-080B. MO-2-14-026B control switch is momentarily placed in "CLOSE" at Panel 20C003. Red pushbutton is depressed to stop valve stroke. Valve control switch and red pushbutton are operated as necessary to achieve 2000 to 2050 gpm as read on PMS computer point H056. MO-2-14-026B green and red lights are verified ON at Panel 20C003.

2007 NRC JPM CR-d(4) (NEW) Page 6 of 8

  • I 1 12 *I 3 14 *I 5 16 CLOSE MO-2-14-026B "Core Spray Full Flow Test". (Cue: Acknowledge control switch operation. MO-2-14-026B green light is ON; red light is OFF.) VERIFY MO-2-14-005B "Core Spray B Min Flow" automatically OPENS. (Cue: MO-2-14-005B green light is OFF; red light is ON.) SHUTDOWN 2BP037 "Core Spray B Pump" . (Cue: Acknowledge control switch operation. Core Spray B Pump green light is ON; red light is OFF. Pump motor amps and pump discharge pressure are zero.) VERIFY MO-2-14-005B "Core Spray B Min Flow" automatically CLOSES. (Cue: MO-2-14-005B green light is ON; red light is OFF.) Open MO-2-14-011 B "Core Spray Outboard Disch". (Cue: Acknowledge control switch operation. MO-2-14-011 B green light is OFF; red light is ON.) As an evaluator, ensure that you have positive control of all exam material provided to the examinee (Task Con d it io ns/P re req u isi tes) AN D procedures.

ACT P P STANDARD MO-2-14-026B control switch is momentarily placed in "CLOSE" at Panel 20C003. MO-2-14-026B green light is verified ON; red light is verified OFF at Panel 20C003. MO-2-14-005B green light is verified OFF; red light is verified ON at Panel 20C003. 2B Core Spray pump control switch is momentarily placed in the "STOP" position at Panel 20C003. 2B Core Spray pump green light is verified ON, red light is verified OFF. Pump motor amps on ammeter 14A-MI B and discharge pressure on PI-2-14-048B are verified at zero at Panel 20C003. MO-2-14-005B green light is verified ON; red light is verified OFF at Panel 20C003. MO-2-14-011 B control switch is momentarily placed in "OPEN" at Panel 20C003. MO-2-14-011 B green light is verified OFF; red light is verified ON at Panel 20C003. ~~~ ~ Positive control established.

2007 NRC JPM CR-d(4) (NEW) Page 7 of 8 Under "ACT" P - must perform S - must simulate

J I. TERMINATING CUE When the Core Spray 2B pump capacity test for IST is complete and Core Spray 2B is returned to a normal standby lineup, the Control Room Supervisor should be informed.

The evaluator will then terminate the exercise.

-\--- 2007 NRC JPM CR-d(4) (NEW) Page 8 of 8 TASK CONDlTlONSlPREREQUlSlTES L/ I= 2. 3. 4. 5. 6. The plant is operating at 100% power. An Equipment Operator is standing by in the 2B Core Spray Pump Room. Communications are available between the Control Room, 2B Core Spray Pump Room, B and D Core Spray Pump Triangle Room, and Cable Spreading Room. Core Spray pump 2B oil level is between the minimum and maximum lines on the sig h tg lass. Core Spray pump 2B static pump suction pressure is 6 psig. A second operator will record all data (s i m u lated) = INITIATING CUE The Control Roam Supervisor directs you to perform Core Spray 2B pump capacity test for IST in accordance with ST-0-014-212-2 (provided).

L-EXELON NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET SOC. SEC. NO. 11 APPROVALS: COMPLETION DATE:

e Signature I Title Date Signature I Title Date Signature I Title Date Signature I Title Date .L. .r APPROVED FOR USE: Signature I Title Date ll EFFECTIVE DATE: I i Last First M.I. ISSUE DATE: Training Review for Completeness:

II Signatu re/Date 'v PlMS CODE: ~ ~~ ~ PlMS ENTRY: 2007 NRC JPM CR-e(1) (PLOR081C RevOOS) Page 1 of 7 TEMPORARY CHANGE FORM LOG 1. 2. 3. 4. 5. 6. 7. ' 8. -4 CODE NO.: PLOR-081C

-' REV. NO.: 005 9. IO. 11. 12. 13. 14. 15. i TITLE: HPSW Iniection Into the Torus 2007 NRC JPM CR-e(1) (PLOR081C RevOO5) Page 2 of 7 EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: TASK-JPM DESIGNATOR:

2004800501

/ PLOR-081 C KIA:

21 9000A4.13 Unit Reactor Operator/Senior Reactor Operator URO: 3.9 SRO: 3.8 TASK DESCRIPTION:

HPSW lniection Into the Torus A. NOTES TO EVALUATOR:

1. 2. 3. 4. 5. An asterisk (*) before the step number denotes a CRITICAL STEP.

CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.

System cues included in the performance checklist are to be provided to the examinee when no system response is available. JPM Performance

a. "Control Room" JPMs are designed to be performed in the simulator.

If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.

b. Satisfactory performance of this JPM is accomplished if:
a. b. The task standard is met. JPM completion time requirement is met. I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.

For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.

2) The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
  • -- 2007 NRC JPM CR-e(1) (PLOR081C Rev005) Page 3 of 7 B. .I .-.---. C. D. E. F. G. TOOLS AND EQUIPMENT
1. Keys for MO-2-10-174 and MO-2-10-176 REFERENCES
1. T-231-2, Rev. 3, "HPSW Injection Into the Torus" TASK STANDARD I. Satisfactory task completion is indicated when the "2B" HPSW Pump is injecting water into the Torus. 2. Estimated time to complete:

10 minutes Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to inject water into the Torus using the "2B" HPSW pump using appropriate procedures.

I will describe initial plant conditions and provide you access to the materials required to complete this task.

TAS K CON D I TI 0 N S/P R E R E Q U IS IT ES 1. Use of this procedure has been directed by the T-100 procedures.

2. High Pressure Service Water Pumps are available.
3. A LOCA initiation signal has NOT occurred.
4. INITIATING CUE 4 KV Buses are receiving power from their respective startup feeds. The Control Room Supervisor directs you to perform T-231-2, "HPSW Injection into the Torus" in order to inject water into the Torus with the "2B" HPSW pump.

\-- 2007 NRC JPM CR-e(1) (PLOR081C Rev005) Page 4 of 7 H. PERFORMANCE CHECKLIST STEP NO STEP ACT STANDARD 1 Verify RHR pump 2BP035 shutdown.

P "B" RHR pump green light verified ON at panel 2OCOO3-02. (Cue: "B" RHR pump green light ON, red light OFF.) 2 ~ ~~~ ~~ Verify RHR pump 2DP035 shutdown.

"D" RHR pump green light verified ON at panel 206003-02. (Cue: "D" RHR pump green light ON, red light OFF.) 3 Close MO-2-10-154B, "Outboard Disch" (Cue: Acknowledge switch operation.) MO-2-10-1548 control switch is momentarily placed in the CLOSE position at panel 2OCOO3-02. Verify closed MO-2-10-154B, "Outboard Disc h 'I. P MO-154B green light verified ON, red light verified OFF on panel 2OCOO3-02. (Cue: MO-154B green light ON, red light OFF.) "B" HPSW pump green light verified ON at panel 2OCOO3-02.

Verify HPSW 2BP042 pump shutdown.

P (Cue: "B" HPSW pump green light ON, red light OFF.) Verify HPSW 2DP042 pump shutdown.

"D" HPSW pump green light verified ON at panel 2OCOO3-02. (Cue: "D" HPSW pump green light ON, red light OFF.) Verify closed MO-2-10-089B, "B HPSW Hx Out". MO-089B green light verified ON, red light verified OFF at panel 2OCOO3-02. (Cue: MO-089B green light ON, red light OFF.) ~~~ ~~ Verify closed MO-2-10-089D "D HPSW Hx Out". MO-089D green light verified ON, red light verified OFF at panel 206003-02. (Cue: MO-089D green light ON red light OFF.) 2007 NRC JPM CR-e(1) (PLOR081C RevOOS) Page 5 of 7 STANDARD STEP ACT P P 9 Verify closed MO-2-32-2344 (1 0-1 86), "HPSW Loop Cross Tie". M0-2344 (1 0-1 86) green light verified ON, red light verified OFF at panel 2OCOO3-03. (Cue: MO-2344 (I 0-1 86) green light ON, red light OFF.) *I 0 Open MO-2-10-174, "HPSW/RHR Em Inner Cross Tie". Key is obtained from the SSV keybox, inserted into MO-174 keylock switch and placed in the OPEN position at panel NOTE: MO-174 may be opened in parallel with MO-176.

2OCOO3-03. (Cue: Acknowledge keylock switch operation.)

11 Verify open MO-2-10-174, "HPSWIRHR Em Inner Cross Tie".

P MO-I74 red light verified on at panel 2OCOO3-03. (Cue: MO-174 red light is ON, green light is OFF.) *I 2 Open MO-2-10-176, "HPSW/RHR Em Outer Cross Tie". P Key is obtained from the SSV keybox, inserted into MO-176 keylock switch and placed in the OPEN position at panel 2OCOO3-03. (Cue: Acknowledge keylock switch operation.)

NOTE: MO-176 may be opened in parallel with MO-174. P MO-176 red light verified on at panel 2OCOO3-03.

13 Verify open MO-2-10-176, "HPSW/RHR Em Outer Cross Tie". (Cue: MO-176 red light is ON, green light is OFF.) *I4 Open MO-2-10-039B, "Torus Hdr". (Cue: Acknowledge switch operation.)

MO-2-10-039B control switch is momentarily placed in the OPEN position at panel 2OCOO3-02.

~ MO-2-10-039B red light verified ON at panel 2OCOO3-02.

15 Verify open MO-2-10-039B, "Torus Hdr". (Cue: MO-39B red light is on, green light is off.) Page 6 of 7 2007 NRC JPM CR-e(1) (PLOR081C RevOO5)

  • I6 17 18 *I 9 20 21 STEP Start the "B" HPSW pump. (Cue: "B" HPSW pump red light is on, green light is off and annunciator 225 B-5 is alarming.)

Verify proper start of the "B" HPSW pump. (Cue: 10A-A2B indicates 62 amps and PI-2330B indicates 395 psig.) Acknowledge the "RHR DISCH HDRS HI PRESS & SHUTDOWN SUCTION HDRS HI PRESS" annunciator. (Cue: Annunciator 225 B-5 is lit solid.) Throttle open MO-2-1 0-034B1 Full Flow Test valve to maintain HPSW flow less than 5300 gpm on FI-2-10-139B. (Cue: FI-l39B reads 5300 gpm.) Inform Shift Supervisor of task completion. (Cue: Shift Supervisor acknowledges report . ) As an evaluator, ensure that you have positive control of all exam material provided to the examinee (Task Conditions/Prerequisites)

AND procedures.

ACT P P P P P P STANDARD "B" HPSW pump control switch is momentarily placed in the START position at panel 2OCOO3-02. Pump amps and discharge pressure are verified stable after starting current decays. ~~ ~ The an n uncia tor "AC KN OW LEDGE" pushbutton is depressed on panel 2OCOO3-04.

MO-2-10-034B control switch is momentarily placed in the OPEN position until 4500-5300 gpm is obtained on FI 10-139B1 THEN the red stop travel pushbutton is depressed at panel 2OCOO3-02.

Task completion reported. Positive control established. Under "ACT" P - must perform S - must simulate I. TERMINATING CUE When the "B" HPSW pump is injecting into the Torus, the Control Room Supervisor should be informed.

The evaluator will then terminate the exercise.

2007 NRC JPM CR-e(1) (PLOR081C Rev005)

Page 7 of 7 TASK CONDITIONS/PREREQUISlTES

1. Use of this procedure has been directed by the T-100 procedures.
2. High Pressure Service Water Pumps are available.
3. A LOCA initiation signal has - NOT occurred.
4. 4 KV Buses are receiving power from their respective startup feeds. INITIATING CUE The Control Room Supervisor directs you to perform T-231-2, "HPSW Injection into the Torus" in order to inject water into the Torus with the Y2B" HPSW pump.

EXELON NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET APPROVALS:

Signature I Title Date Signature I Title Date Signature I Title Date Signature I Title Date .. APPROVED FOR USE: Signature

/Title Date EFFECTIVE DATE: 1 1 II NAME: Last First M.I. SOC. SEC. NO. COMMENTS:

ISSUE DATE: COMPLETION DATE:

I I Training Review for Completeness:

PlMS CODE: t I I PlMS ENTRY: SignaturelDate I I L' 2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 1 of 8 TEMPORARY CHANGE FORM LOG ' 11. 12. 13. 14. 15. .-d CODE NO.: PLOR-Ol7C REV. NO.: 009 TITLE: SYNCHRONIZE TURBINE GENERATOR OUTPUT WITH GRID AT MINIMUM LOAD 2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 2 of 8 EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:

Unit Reactor 0 perator/Sen ior Reactor Ope rat0 r TASK-JPM DESIGNATOR: 23701 10101

/ PLOR-O17C WA: 262001A4.04 RO: 3.6 SRO: 3.7 TASK DESCRIPTION:

SYNCHRONIZE TURBINE GENERATOR OUTPUT WITH GRID AT MINIMUM LOAD A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance

-' a. "Control Room" JPMs are designed to be performed in the simulator.

If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.

4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

L- 2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 3 of 8

6. 'J C. D. E. F. i, G. TOOLS AND EQUIPMENT
1. 2. REFERENCES Procedure SO 50.1 .A-2 Rev. 11 , Main Generator Synchronizing and Loading (R) TASK STANDARD
1. Synchroscope key for breaker operation (R) Key for synchro-check relay bypass key switch (R) Satisfactory task completion is indicated when the Main Generator is synchronized to the grid and initial load is placed on the generator. 2. Estimated time to complete: 12 minutes (A.5) Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to synchronize the Lain Generator to the grid and pickup load using appropriate procedures.

I will describe initial plant conditions and provide you access to the materials required to complete this task. TASK C 0 N D IT I 0 N S/P RE RE Q U IS IT E S 1. Plant startup in progress with reactor power approximately 16%. 2. All SO 50.1A-2, "Main Generator Synchronizing and Loading" prerequisites are met. 3. Generator terminal voltage is 22 Kv with the voltage regulator in automatic mode. 4. Generator ready to be synchronized to grid. 5. Power System Director has been notified.

INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to synchronize the Main Generator to the grid and pick up load in accordance with steps 4.1 1 through 4.24 of SO 50.1 .A-2, "Main Generator Synchronizing and Loading". Provide examinee with a copy of SO 50.1 .A-2, completed up to, but not including, step 4.1 1. L- 2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 4 of 8 H. PERFORMANCE CHECKLIST STEP NO i .-. STEP STANDARD ACT 1 Obtain copy of SO 50.1 .A-2.

P Copy of SO 50.1 .A-2 obtained.

  • 2 Turn on synchroscope for breaker 21 5 or 225. Synchroscope key obtained from Panel 30C009 inserted into selected breaker sync switch and placed in the "ON" position at Panel 20C209. (Cue: Synchroscope meter rotating and incoming voltmeters and sensing lights are activated

.) *3 Use turbine load selector pushbuttons to adjust generator speed. Load selector pushbuttons are momentaril!

depressed to get synchroscope rotating slowly in the "FAST" direction at Panel 20C209. (Cue: Synchroscope is rotating slowly in clockwise direction

.) 4 Check both synchronizing lights for proper operations. (Cue: Both lights lit brightly at the "6 o'clock position", both lights out at the "12 o'clock position".)

Sync lights verified ON at "6 o'clock position" OFF at "12 o'clock position" at Panel 20C209.

P P *5 Use the auto voltage regulator rheostat to adjust generator voltage so that incoming voltage is slightly higher than running voltage. Auto voltage regulator rheostat adjusted to set incoming voltage slightly higher than running voltage while maintaining generator voltage between 20.9 and 23.1 KV at Panel 20C209. (Cue: Incoming voltage meter is reading slightly higher than running voltage.)

6 Verify the sync scope is rotating slowly in the "FAST" direction.

Synchroscope verified for rotation - slowly in the "FAST" direction at Panel 20C209. (Cue: Sync scope is rotating slowly in the clockwise direction.)

  • 7 ~~ When the synchroscope is within five degrees (green lines) of the "12 o'clock" position then close the selected breaker. ~ ~~~~~~ ~

215 (225) breaker control switch is taken tc CLOSE when the synchroscope is within approximately 5 degrees of "12 o'clock

position at Panel 20C209. (Cue: Acknowledge control switch operation.) 2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 5 of 8

---. --r k.8 9 10 *I 1 STEP 12 Place the remaining breaker's (225 or 21 5) sync switch to ON. (Cue: Synchroscope is at the 12 o'clock position.

Incoming and running voltages are equal.) Place the SYNC CHK RELAY BYPASS KEY switch in BYPASS. (Cue: Acknowledge key switch operation.)

13 II Verify selected breaker is closed. P P (Cue: Breaker closed - red light onlgreen light off, synchroscope stops rotating at the "I 2 o'clock

position.) Verify synchroscope pointer at "12 o'clock

position. (Cue: Synchroscope at "12 o'clock

position and lights off.) Turn off synchroscope for breaker 215 or 225. (Cue: Acknowledge sync switch operation.)

Pick up load on the generator until all nine bypass valves are closed. (Cue: All nine bypass valves red lights are off, green lights are on.) ACT P P P P 14 ~ STANDARD Selected breakers red indicating light is verified ON at Panel 20C209. Synchroscope pointer verified at "1 2 o'clock position at Panel 20C209.

Synchroscope placed in the "OFF" position for breaker 215 or 225 at Panel 20C209. **** NOTE: ***e At the examiner's discretion, this JPM may be terminated at this point.

~ The "RAISE" load selector pushbutton is depressed on Panel 20C209 until all nine bypass valve red lights are OFF at Panel 20C008B. Verify incoming and running voltage are matched. (Cue: Incoming and running voltages are 11 (equal.) P Synchroscope key obtained from Panel 20C209 inserted into selected breaker (225 or 215) sync switch and placed in the "ON" position at Panel 20C209.

~ Key is obtained from CRS keybox, inserted into the SYNC CHK RELAY BYPASS switch and placed in the "BYPASS" position at Panel 20C209.

~- ~ Incoming and running voltage are verified to be matched on the INCOMING and RUNNING voltage meters at Panel 20C209. Page 6 of 8 2007 NRC JPM CR-f(4) (PLOR017C RevOO9) 15 16 17 18 19 20 21 ~ STEP Verify the synchroscope within five degrees (green lines) of the "I2 o'clock position". (Cue: Synchroscope at "12 o'clock

position.)

Close the selected breaker (225 or 215). (Cue: Acknowledge breaker control switch operation.) Verify breaker 225 or 21 5 is closed. (Cue: Breaker 225 or 215 red light on, green light off, the synchroscope needle is stopped at the 12 o'clock position and sync lights out.) Place the 225 or 21 5 breaker sync switch to OFF. (Cue: Breaker sync switch is placed in OFF and incoming and running voltage meters drop to 0 volts.) Place the SYNC CHK RELAY BYPASS KEYSWITCH in NORM. (Cue: Sync chk relay bypass keyswitch is in NORM.) ~ ~ Inform the Control Room Supervisor of task completion. (Cue: Control Room Supervisor acknowledges report.)

As an evaluator, ensure that you have positive control of all exam material provided to the examinee (Task Cond itions/Prerequisites) AND procedures.

ACT P P P P P 7 STANDARD The synchroscope is verified to be within 5 degrees of the "12 o'clock" position, inside the green lines on the meter face at Panel 206209. The selected breaker (225 or 21 5) control switch is placed in the "CLOSED position. ~~ ~ ~ Breaker 225 or 215 red light on, sync scopes stopped at 12 o'clock position and sync lights "OFF" verified at Panel 20C209. Breaker 225 or 21 5 sync switch is placed in the OFF position at Panel 20C209. SYNC CHK RELAY BYPASS KEYSWITCH is placed in the NORMAL position at Panel 20C209 and the key is returned to the SSV keybox. Task completion reported. Positive control established.

2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 7 of 8 Under "ACT" P - must perform S - must simulate TERMINATING CUE J I. When the Main Generator is synchronized to the grid and load is picked up in accordance with steps 4.1 1 through 4.24 of procedure SO 50.1 .A-2, the Control Room Supervisor should be informed.

The evaluator will then terminate the exercise.

-4 2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 8 of 8 TASK CONDlTlONSlPREREQUlSlTES d 1. Plant startup in progress with reactor power approximately 16%. 2. All SO 50.1A-2, "Main Generator Synchronizing and Loading" prerequisites are met. 3. Generator terminal voltage is 22 KV with the voltage regulator in automatic mode. 4. Generator ready to be synchronized to grid. 5. Power System Director has been notified.

INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to synchronize the Main Generator to the grid and pick up load in accordance with steps 4.11 through 4.24 of SO 50.1 .A-2, "Main Generator Synchronizing and Loading".

EXELON NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET NAME: Last First M.I. APPROVALS:

Signature I Title Date ISSUE DATE: Signature I Title Date Signature I Title Date Signature

/Title Date APPROVED FOR USE: Signature I Title Date ll EFFECTIVE DATE: I / SOC. SEC. NO. 1 COMPLETION DATE:

COMMENTS: Training Review for Completeness:

1 PlMS CODE: PlMS ENTRY: Signature/Date I 'd Page 1 of 9 2007 NRC JPM CR-g(3) (PLOR-028C Rev 006)

TEMPORARY CHANGE FORM LOG -L.l CODE NO.: PLOR-028C REV. NO.: 006 TITLE: Emergency Coolina Water System Startup i i I I 2. 3. 4. 10. 11. 12. ~ 13. 14. 15. 2007 NRC JPM CR-g(3) (PLOR-028C Rev 006) Page 2 of 9 EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:

TASK-JPM DESIGNATOR: PLOR-028C

/ 2770020401 WA: 29501 8.AA1.01 Unit Reactor Operator/Senior Reactor Operator URO: 3.3 SRO: 3.4 TASK DESCRIPTION:

Emerqencv Coolinq Water System Startup A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance -v- a. "Control Room" JPMs are designed to be performed in the simulator.

If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.

4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

2007 NRC JPM CR-g(3) (PLOR-028C Rev 006) Page 3 of 9 B. ', .--..---'

c. D. E. F. 'w G. 'v TOOLS AND EQUIPMENT
1. None REFERENCES
1. SO 48.1 .B, Rev.11 I "Emergency Cooling Water System Startup" TASK STANDARD
1. Satisfactory task completion is indicated when the Emergency Cooling Water System is in closed loop operation with the "C" ECT in service. 2. Estimated time to complete:

20 minutes Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to startup the ECW System using appropriate procedures.

I will describe initial plant conditions and provide you access to the materials required to complete this task.

TASK CONDITIONS/PREREQUISlTES

1. The ECW System is setup per SO 48.1 .A, "Emergency Cooling Water Setup for Normal Operation".
2. Damage has occurred to the Conowingo Dam due to an earthquake.
3. Conowingo Pond level is 107' and slowly lowering.

The Main Control Room has been officially notified of an uncontrolled loss of river. 4. SE-3, "Loss of Conowingo Pond" has been entered and directs the ECW System placed in service using SO 48.1 .B, "Emergency Cooling Water Startup".

5. Steps 4.1 through 4.4 of SO 48.1.B have been successfully completed, including:

Placing the 'A' ESW pump (OAP057) in service and installing a momentary jumper to open MO-0841 Shutdown of all Service Water pumps on both units, Shutdown of all HPSW pumps on both units (a required for operation at this time), Shutdown of all Service Water Screen Wash pumps on both units. INITIATING CUE The Control Room Supervisor directs you to perform steps 4.5 through 4.14 of SO 48.1 .B, "Emergency Cooling Water Startup" in order to startup the Emergency Cooling Water System using the "A and "B" Emergency Cooling Tower Cells.

Page 4 of 9 2007 NRC JPM CR-g(3) (PLOR-028C Rev 006)

H. PERFORMANCE CHECKLIST " STEP '-2 NO STEP ACT 1 *2 Obtain a copy of procedure SO 48.1 .B P Close MO-2233A Unit 2A Sluice Gate. (Cue: Acknowledge control switch operation.)

P 3 Verify MO-2233A Unit 2A Sluice Gate is P going closed. (Cue: MO-2233A red and green lights are on.) lp 11 *6 1 Close MO-3233A Unit 3A Sluice Gate. *4 (Cue: Acknowledge control switch operation.) Close MO-2233B Unit 2B Sluice Gate. (Cue: Acknowledge control switch operation

.) P 11 5 \\ Verify MO-22338 Unit 2B Sluice Gate is P going closed. (Cue: MO-22338 red and green lights are on.) STANDARD 7 A copy of procedure SO 48.1 .B is obtained Verify MO-3233A Unit 3A Sluice Gate is P going closed. (Cue: MO-3233A red and green lights are on.) MO-2233A control switch is momentarily placed in the LOWER position at panel OOC123. "8 9 _1 MO-2233A green light is verified ON at panel OOC123. Close MO-3233B Unit 3B Sluice Gate. (Cue: Acknowledge control switch operation.) going closed. (Cue: MO-3233B red and green lights are on.) P Verify MO-3233B Unit 3B Sluice Gate is P MO-2233B control switch is momentarily placed in the LOWER position at panel OOC123. MO-2233B green light is verified ON at panel OOC123. MO-3233A control switch is momentarily placed in the LOWER position at panel OOC123. MO-3233A green light is verified ON at panel OOC123. MO-32338 control switch is momentarily placed in the LOWER position at panel OOC123. MO-3233B green light is verified ON at panel OOC123. 2007 NRC JPM CR-g(3) (PLOR-028C Rev 006) Page 5 of 9 STEP NO STEP 11 I I I ACT STANDARD When all sluice gates are going closed cue the examinee that the stroke time of the sluice gates has been compressed from the original 12 minutes. 10 *I I 12 13 Check "ESW WASH TO POND VALVE MO-0498 OPEN" annunciator is lit. (Cue: Annunciator 001 D-5 is lit.) As the Sluice Gates are closing: 0. Depress "Permit to Close" push button 69-5643. 0. Close MO-0498, ESW Disch to Pond Valve. (Cue: Acknowledge pushbutton and control switch operation.) Verify MO-0498 ESW Disch to Pond valve is closed. (Cue: MO-0498 green light is on, and red light is off.) When MO-0498 is closed: Verify "A" ESW Booster Pump starts and discharge pressure increases to 60 psig (40-65 psig) and motor current increases to 29 amps (25-35 amps). (Cue: "A" ESW Booster Pump red light is on, and green light is off; PI-0550 indicates 60 psig; "AI ESW Booster Pump ammeter indicates 29 amps.) P P P P ESW WASH TO POND VALVE MO-0498 )PEN" annunciator is verified lit on alarm )anel 001 D-5. ~ 4s the Sluice Gates are closing, "Permit to ;lose" pushbutton 69-5643 is momentarily lepressed and MO-0498 control switch is nomentarily placed in the CLOSE position within 200 seconds of depressing the 'Permit to Close" pushbutton at panel lOC123. vl0-0498 green light is verified ON at >anel OOC123. 'AI ESW Booster Pump red light is verified 3N. Discharge pressure is verified letween 40 and 65 psig on PI-0550, motor xrrent is verified between 25 and 35 3mps on the "Ag ESW Booster pump 3mmeter at panel OOCl23. 4 2007 NRC JPM CR-g(3) (PLOR-028C Rev 006) Page 6 of 9 14 15 16 *I 7 18 STEP When MO-0498 is closed: Dispatch Equipment Operator to verify suction pressure is between 0" and 8" Hg vacuum as read on PI-0821A located in the EDG Cardox Room. (Cue: Equipment Operator reports that "A" ESW Booster Pump suction pressure is 4" Hg vacuum.) When MO-0498 is closed:

Verify "ESW DISCH TO POND MO-0498 OPEN" annunciator is clear. (Cue: Annunciator 001 D-5 is not lit.) When MO-2233A, MO-2233B, MO- 3233A, and MO-3233B are fully closed, verify MO-2804A1 MO-2804B, MO-3804A1 and MO-3804B HPSW Bay Inlet Valves automatically open to maintain Service Water Bay level at 106.0 ft. (Cue: LI-2804A, 2804B, 3804A4, and 3804B setpoint is 106.0 ft.) (Evaluator Note:

It takes approximately 20 minutes for HPSW bay inlet valves to begin controlling.) Close MO-2486 Unit 2 HPSW Disch to Pond valve. (Cue: Acknowledge control switch operation.) Verify MO-2486 Unit 2 HPSW Disch to Pond valve is closed. (Cue: MO-2486 green light is on, and red light is off.) ACT P P P STANDARD Equipment Operator is directed to verify xoper "A1 ESW Booster Pump suction xessu re. 'ESW DISCH TO POND MO-0498 OPEN" annunciator is verified clear on alarm oanel001 D-5. When MO-2233A, MO-2233B, MO-3233A1 and MO-3233B are fully closed, Service Water Bay level setpoint is verified to be at 106.0 ft. and controllers in "AUTO" on LIC- 2804A, 2804B, 3804A, and 3804B at panel OOC123. MO-2486 control switch is momentarily placed in the CLOSE position at panel OOC123. MO-2486 green light is verified ON at panel OOC123. 2007 NRC JPM CR-g(3) (PLOR-028C Rev 006) Page 7 of 9 STANDARD STEP ACT P ~~ MO-3486 control switch is momentarily placed in the CLOSE position at panel DOC1 23. "1 9 Close M0-3486 Unit 3 HPSW Discharge to Pond Valve. (Cue: Acknowledge control switch operation.)

20 Verify MO-3486 Unit 3 HPSW Discharge to Pond Valve is closed. MO-3486 green light is verified ON at panel OOC123. P P P P (Cue: MO-3486 green light is on, and red light is off.) When MO-2486 and MO-3486 are fully closed, verify MO-2803 and MO-3803, HPSW Disch to Cooling Tower valves automatically open. When MO-2486 and MO-3486 are fully closed, MO-2803 and MO-3803 red lights are verified ON at panel OOC123. 21 *22 (Cue: MO-2803 and MO-3803 red lights are on, and green lights are off.) "AI ECT Fan control switch is momentarily placed in the START position at panel OOC123. Start the "A" ECT Fan. (Cue: Acknowledge control switch operation.)

Verify the'"A" ECT Fan has started. "Af ECT Fan red light ON is verified at panel OOC123. 23 *24 (Cue: "A" ECT Fan red light is on, and green light is off.) Start the "Bl' ECT Fan. P "B" ECT Fan control switch is momentarily placed in the START position at panel OOC123. (Cue: Acknowledge control switch operation.)

25 Verify the "B" ECT Fan has started. P "B" ECT Fan red light ON is verified at panel OOC123. (Cue: "B" ECT Fan red light is on, and green light is off.) 26 Inform Control Room Supervisor of task completion.

P Task completion reported. (Cue: Control Room Supervisor acknowledges report.)

2007 NRC JPM CR-g(3) (PLOR-028C Rev 006) Page 8 of 9

1. ACT STEP STANDARD As an evaluator, ensure that you have positive control of all exam material provided to the examinee (Task Conditions/Prerequisites)

AND procedures.

P Under "ACT" P - must perform S - must simulate Positive control established.

TERMINATING CUE When the Emergency Cooling Water System is in closed loop operation with the "A" and "B" ECT Cells in service, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

2007 NRC JPM CR-g(3) (PLOR-028C Rev 006) Page 9 of 9 TASK CONDITIONS/PREREQUISlTES

--%l I. The ECW System is setup per SO 48.1.A, "Emergency Cooling Water Setup for Normal Operation".

2. Damage has occurred to the Conowingo Dam due to an earthquake.
3. Conowingo Pond level is 107' and slowly lowering.

The Main Control Room has been officially notified of an uncontrolled loss of river. 4. SE-3, "Loss of Conowingo Pond" has been entered and directs the ECW System placed in service using SO 48.1 .B, "Emergency Cooling Water Startup".

5. Steps 4.1 through 4.4 of SO 48.1.6 have been successfully completed, including:

a Placing the 'A' ESW pump (OAP057) in service and installing a momentary jumper to open MO-0841, Shutdown of all Service Water pumps on both units, a Shutdown of all HPSW pumps on both units (a required for operation at this time), a Shutdown of all Service Water Screen Wash pumps on both units.

INITIATING CUE The Control Room Supervisor directs you to perform steps 4.5 through 4.14 of SO 48.1 .B, "Emergency Cooling Water Startup

in order to startup the Emergency Cooling Water System using the "A" and "B" Emergency Cooling Tower Cells. L,.

'4' NAME: Last First M.I. SOC. SEC.

NO. EXELON NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET ISSUE DATE: COMPLETION DATE: APPROVALS:

Signature I Title Date Signature I Title Date Signature I Title Date Signature I Title Date Date APPROVED FOR USE: Signature I Title EFFECTIVE DATE:

I I I I Training Review for Completeness:

PlMS CODE: SignatureIDate I ENTRY: -. I I 2007 NRC JPM CR-h(2) (NEW) -VERSION 2 Page 1 of 7 TEMPORARY CHANGE FORM LOG '-'CODE NO.: TITLE: PLOR-NEW2CA REV. NO.: Plant Reactor Operator Response To Reactor Scram (Alternate Path - SBGT Fails To Automatically Initiate)

1. 2. 3. I 4. 5. 6. 7. 8. 9. IO. 11. 12. 13. 14. 15. 2007 NRC JPM CR-h(2) (NEW) -VERSION 2 Page 2 of 7 EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:

Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 261 0050101 / PLOR-NEW2CA WA: 261000 A2.10 RO: 3.1 RO: 3.2 TASK D ESC R I PTI 0 N : Plant Reactor Operator Response to Reactor Scram (Alternate Path - SBGT Fails To Automatically Initiate)

A. NOTES TO EVALUATOR:

1. An asterisk

(*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.

2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance

-.-- a. "Control Room" JPMs are designed to be performed in the simulator.

If a 'Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.

4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. 1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee. .U' Page 3 of 7 2007 NRC JPM CR-h(2) (NEW) -VERSION 2 B. TOOLS AND EQUIPMENT None ..-. C. D. E. -w- F. G. REFERENCES
1. RRC 94.2-2, Rev. 0, "Plant Reactor Operator Scram Actions" 2. RRC 94.2-2:1, Rev. 0, "PRO Scram Reports" 3. GP-4, Rev. 4, "Manual Reactor Scram"
4. GP-8B1 Rev. 17, "PCIS Isolation - Groups II and 111" 5. COL GP-8B, Rev. 17, "Groups II and Ill Isolation"
6. SO 9A.1 .C, Rev.

9, "Response To Standby Gas Treatment System Automatic Start" TASK STANDARD 1. Satisfactory task completion is indicated when the examinee has isolated Reactor Building Ventilation and placed Standby Gas Treatment in service. 2. DIRECTIONS TO EXAMINEE Estimated time to complete:

IO minutes Non-Time Critical When given the initiating cue, perform Plant Reactor Operator scram actions in accordance with the Operations Manual.

I will describe initial plant conditions and provide you access to the materials required to complete this task. TAS K C 0 N D I TI 0 N S/P RE R EQ U I S ITE S 1. The plant was initially operating at full power when a plant transient occurred.

2. A GP-4 "Manual Reactor Scram" was performed.
3. 13KV House Loads were transferred to the Startup Feed Buses in accordance with RRC 53.1-2. INITIATING CUE The Control Room Supervisor directs you to perform the Plant Reactor Operator scram actions. NOTE to Examiner: Rapid Response Cards are Level 2 Procedures - not required to be in- hand. 2007 NRC JPM CR-h(2) (NEW) -VERSION 2 Page 4 of 7 H. PERFORMANCE CHECKLIST i 1 b GE NO 3 STEP ~~ ~ Verify Main Turbine is tripped. (Cue: Tripped light is ON, Reset light is OFF; Master Trip Solenoid Test Lights A and B are OFF.) Verify Main Generator lockout. (Cue: Main Generator output breakers and Alt Exc Fld Bkr green lights are ON, red lights are OFF. Annunciators 220 B-I and 220 B-2 are lit.) Verify Group I, II, and Ill isolations and SBGT initiation, as applicable. (Cue: All Group II and Ill isolation valves' green lights are ON, red lights are OFF at Panel 20C003.

The following conditions exist at Panel 20C012:) Damper / Fan -- Green Red PO-20465 ON OFF PO-20466 AO-20469-1 AO-20469-2 AO-20470-1 AO-20470-2 AO-20453 AO-2046 1 AO-20462 AO-20452 AO-20458 AO-20463 AO-20464 AO-20457 AO-20467 AO-20468 AO-20475-1 AO-20475-2 AO-20476-1 AO-20476-2 SBGT Fan 'A' SBGT Fan 'B' OFF ON OFF ON OFF OFF OFF ON ON OFF OFF ON ON OFF ON ON ON OFF OFF ON OFF ON OFF ON OFF ON ON ON OFF OFF ON ON OFF OFF ON OFF OFF OFF ON ON OFF ON ACT P STANDARD Main Turbine Tripped light is verified ON and Reset light is verified OFF at Panel 20C008A; Master Trip Solenoid Test Lights A and B are verified OFF at Panel 20C008B. Main Generator output breakers and Alt Exc Fld Bkr green lights are verified ON, red lights are verified OFF at Panel 20C009. Determine Group II and Ill isolations should have occurred due to low RPV water level.

PClS Group II and Ill isolation status is verified at panel 2OCOO3-01 , SBGT system status is verified at panel 20C012. Recognize SBGT Fans 'A' and 'B' failed to start and the following Reactor Building Ventilation dampers failed to reposition:

Damper / Fan PO-2 0465 AO-20469-I AO-20470-1 AO-20453 AO-2046 1 AO-20458 AO-20463 AO-20467 AO-20475-1 AO-2 0475-2 Required OPEN OPEN OPEN CLOSED CLOSED CLOSED CLOSED CLOSED OPEN OPEN Actual CLOSED CLOSED CLOSED OPEN OPEN OPEN OPEN OPEN CLOSED CLOSED May attempt to start 'B' SBGT Fan since it is already aligned for operation (fan will not start). 2007 NRC JPM CR-h(2) (NEW) -VERSION 2 Page 5 of 7 STEP NO *7 - "8 "9 *I 0 .- STEP ACT STANDARD ~~ Open PO-20465, "Exh to Stby Gas Treat Equip Cell". (Cue: PO-20465 green light is OFF, red light is ON.) ~ P Open AO-20469-1, "DM Rx Bldg Equip Exh". I (Cue: AO-20469-1 green light is OFF, red light is ON.) P **** NOTE: e*** Examinee may obtain a copy of SO 9A.l.C to isolate Reactor Building Ventilation and place Standby Gas Treatment in service. *4 *5 *6 Close AO-20453, "Ventilation Supply Ref u e I". (Cue: AO-20453 green light is ON, red light is OFF.) Ip Open AO-20470-1, "Refuel Flr. Exh". P (Cue: AO-20470-1 green light is OFF, red light is ON.) Close AO-20461, "Ventilation Exhaust Refuel". (Cue: AO-20461 green light is ON, red light is OFF.) P Close AO-20458, "Ventilation Supply Rx Bldg". (Cue: AO-20458 green light is ON, red light is OFF.) P Close AO-20463, "Ventilation Exhaust Rx Bldg". (Cue: AO-20463 green light is ON, red light is OFF.) At Panel 20C012, PO-20465 control switch placed in OPEN, green light verified OFF and red light verified ON. P ~ ~ At Panel 20C012, AO-20469-1 control switch placed in OPEN, green light verified OFF and red light verified ON. At Panel 20C012, AO-20470-1 control switch placed in OPEN, green light verified OFF and red light verified ON. At Panel 20C012, AO-20453 control switch placed in CLOSE, green light verified ON and red light verified OFF. At Panel 20C012, AO-20461 control switch placed in CLOSE, green light verified ON and red light verified OFF. At Panel 20C012, AO-20458 control switch placed in CLOSE, green light verified ON and red light verified OFF. At Panel 20C012, AO-20463 control switch placed in CLOSE, green light verified ON and red light verified OFF. 2007 NRC JPM CR-h(2) (NEW) -VERSION 2 Page 6 of 7 pE *I I *I2 Close AO-20467, "Ventilation Exhaust Equip Cell". (Cue: AO-20467 green light is ON, red light is OFF.) Treatment A Filter Inlet". (Cue: AO-00475-1 green light is OFF, red light is ON.) Open AO-00475-1, "Standby Gas Open AO-00475-2, "Standby Gas Treatment A Filter Outlet". (Cue: AO-00475-2 green light is OFF, red light is ON.) *I 3 P P P "14 Start SBGT Fan 'A. (Cue: SBGT Fan 'A' green light is OFF, red light is ON.) P STEP I ACT -L As an evaluator ensure that you have positive control of all exam material provided to the examinee (Task Cond itions/Prerequisites)

AND procedures.

P STANDARD At Panel 20C012, AO-20467 control switch placed in CLOSE, green light verified ON and red light verified OFF. At Panel 20C012, AO-00475-1 control switch placed in OPEN, green light verified OFF and red light verified ON. Acknowledges annunciator 216 A-5 "Standby Gas Treatment Filters Not in Aut 0". At Panel 20C012, AO-00475-2 control switch placed in OPEN, green light verified OFF and red light verified ON. At Panel 20C012, SBGT Fan 'A' control switch placed in RUN, green light verified OFF and red light verified ON.

Observes SBGT flow increase and Reactor Building vacuum increase. Positive control established EXAMINER CUE: Inform the examinee that this JPM is now complete.

r Under "ACT" P - must perform S - must simulate I. TERMINATING CUE When all steps required to isolate Reactor Building Ventilation and place Standby Gas Treatment in service are complete, the Control Room Supervisor should be informed.

The evaluator will then terminate the exercise.

2007 NRC JPM CR-h(2) (NEW) -VERSION 2 Page 7 of 7 TASK CONDITIONS/PREREQUISlTES I. The plant was initially operating at full power when a plant transient occurred.

2. A GP-4 "Manual Reactor Scram" was performed.
3. 13KV House Loads were transferred to the Startup Feed Buses in accordance with RRC 53.1-2. INITIATING CUE The Control Room Supervisor directs you to perform the Plant Reactor Operator scram actions.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET

'i APPROVALS:

-' APPROVED FOR USE: Signature I Title Date Signature I Title Date NAME: Last First M.I. SOC. SEC. NO.

Signature I Title Date ISSUE DATE: COMPLETION DATE:

EFFECTIVE DATE: I I I1 1) Training Review for Completeness:

I PlMS CODE: I II I I Signature/Date I ENTRY: II 2007 NRC JPM IP-i (PLOR316PA Rev003) Page 1 of 9 TEMPORARY CHANGE FORM LOG \L x. . -'CODE NO.: PLOR-316PA REV. NO.: 003 9. IO. 11. 12. 13. 14. 15. TITLE: Low CRD Scram Air Header Pressure - Unit 3 (Alternate Path - Standby Requlator Must be Placed In Service) i I 1 2. 3. 4. 5. 6. -- 2007 NRC JPM IP-i (PLOR316PA RevOO3) Page 2 of 9 EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:

Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2001500401/

PLOR-316PA WA: 201001A2.09 URO: 3.2 SRO: 3.1 TASK DESCRIPTION: Low CRD Scram Air Header Pressure - Unit 3 (Alternate Path - Standbv Renulator Must be Placed In Service) A. NOTES TO EVALUATOR:

1. An asterisk

(*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.

2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance

--.-J a. "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.

4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. 1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

c-' 2007 NRC JPM IP-i (PLOR316PA Rev003) Page 3 of 9 B. L'C. J D. E. F. G. TOOLS AND EQUIPMENT None REFERENCES Procedure ON-108, Rev. 6, "Low CRD Scram Air Header Pressure" TASK STANDARD

1. Satisfactory task completion is indicated when Unit 3 scram air header PCV-5239A is in service and PCV-5239B has been removed from service. 2. Estimated time to complete:

14 minutes Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps of ON-108, "Low CRD Scram Air Header Pressure" procedure.

I will describe initial plant conditions and provide you access to the materials required to complete this task. TASK CONDITIONS/PREREQUISlTES

1. Unit 3 is operating at full power steady state conditions.
2. "SCRAM VALVE PILOT AIR HEADER PRESS HI-LO" annunciator is up on alarm panel 311 D-2. 3. The cause of low scram air header pressure condition is NOT caused by a loss of the Instrument Air system. 4. Scram air header PCV-5239B is presently in service. INITIATING CUE The Control Room Supervisor directs you to restore the Unit 3 CRD scram air header pressure to approximately 73 psig per procedure ON-I 08, "Low CRD Scram Air Header Pressure".

\ ,' - 2007 NRC JPM IP-i (PLOR316PA Rev003) Page 4 of 9 H. PERFORMANCE CHECKLIST

'4 . 7 STEP NO 1 2 3 *4 STEP 3btain a copy of procedure ON-108. Verify low scram air header pressure locally on Pl-3-03-229 at CRD flow nest OR on Pl-3-03-312 on Panel 30C124. (Cue: Pl-3-03-229 indicates 63 psig. If the control room is called, report that PI 03-312 indicates 63 psig.) Check normal operation of the in-service scram air header pressure control regulator by observing loading pressure of approximately 80 psig and control pressure of approximately 75 psig on PCR-3-03-31688B pressure control regulator for PCV-5239B. (Cue: Loading pressure is approximately 80 psig, control pressure is 63 psig.) ~ ~ Adjust PCR knob (red knob) clockwise to raise scram air header pressure to 67 to 75 psig on Pl-3-03-229. (Cue: Red knob on PCR-3-03-31688B is turned (clockwise) until it will not turn further, Pl-3-03-229

{Pl-3-03-312) indicates 65 psig. If asked, Loading Pressure is 80 psig and Control Pressure is 65 psig.)

ACT SIP P P S STANDARD 9 copy of procedure ON-I08 is obtained.

~~ Scram air header pressure is monitored ,n Pl-3-03-229 or Pl-3-03-312. -oading Pressure and control pressure is monitored on PCR-3-03-31688B.

PCR-3-03-31688B red knob is turned clockwise while observing Pl-3-03-229 until the knob will not turn further.

        • NOTE****

If requested the evaluator will serve as the second equipment operator to monitor pressure.

  • 5 Open HV-3-03-31681AI lnstr Air Inlet Block VV to PCV-3-03-5239A. (Cue: Valve handwheel is turned [COUNTERCLOCKWISE]

until stem length above valve yoke rises I inch, then will not turn.) S HV-3-03-31681A handwheel is turned COUNTERCLOCKWISE until resistance of valve backseat is felt. 2007 NRC JPM IP-i (PLOR316PA Rev003) Page 5 of 9

  • 6 "7 *8 STEP Open HV-3-03-31682A, lnstr Air Outlet Block Vv from PCV-3-03-5239A. (Cue: Valve handwheel is turned [COUNTERCLOCKWISE] until stem length above valve yoke rises 1 inch, then will not turn.)

Open HV-3-03-31686A, lnstr Air Back Pressure to PCV-5239A. (Cue: Valve handwheel is turned [COUNTERCLOCKWISE] until stem length above valve yoke rises 1 inch, then will not turn.) Open HV-3-03-31685A, Instrument Air Block Valve to PCV-5239A. (Cue: Valve handwheel is turned [COUNTERCLOCKWISE] until stem length above valve yoke rises 1 inch, then will not turn.) (Cue: If asked for any of the following pressures, then give the respective following indication(s):

Pl-3-03-229

/ Pl-3-03-312 (Scram Air Header Pressure) indicates - 65 psig Loading pressure indicates - 80 psig Control pressure indicates - 63 psig) ACT S S S STANDARD iV-3-03-31682A handwheel is turned ;OUNTERCLOCKWlSE until resistance ,f valve backseat is felt. ~~ iV-3-03-31686A handwheel is turned 2OUNTERCLOCKWlSE until resistance 3f valve backseat is felt. ~ ~ HV-3-03-31685A handwheel is turned SOUNTERCLOCKWISE until resistance Df valve backseat is felt. b- 2007 NRC JPM IP-i (PLOR316PA Rev003) Page 6 of 9 pF *9 10 11 12 STEP Adjust scram air header pressure to between 67 and 75 psig using the red knob [turned Clockwise] on PCR-3 3 1688A. (Cue: Red knob on PCR-3-03-31688A is adjusted.

If asked for any of the following pressures, then give the respective following indication:

Pl-3-03-229

/ Pl-3-03-312

{Scram Air Header Pressure} indicates {rising pressure as red knob is turned in the clockwise direction until} - 73 psig Loading pressure indicates - 80 psig Control pressure indicates {rising pressure as red knob is turned in the clockwise direction until} - 75 psig) Close HV-3-03-31685B, Instrument Air Block Valve to PCV-5239B. (Cue: Valve handwheel is turned [CLOCKWISE]

until stem length above valve yoke lowers 1 inch, then handwheel will not turn.) Close HV-3-03-31686BI lnstr Air Back Pressure to PCV-5239B. (Cue: Valve handwheel is turned [CLOCKWISE] until stem length above valve yoke lowers 1 inch, then handwheel will not turn.) Close HV-3-03-31681 B, lnstr Air Inlet Block VV to PCV-5239B. (Cue: Valve handwheel is turned [CLOCKWISE]

until stem length above valve yoke lowers 1 inch, then handwheel will not turn further.)

ACT S S S S STANDARD XR-3-03-31688A is manipulated [turned

>lockwise] to adjust scram air header iressure monitored on Pl-3-03-229.

iV-3-03-31685B handwheel is turned :LOCKWISE until resistance of valve seai s felt. iV-3-03-31686B handwheel is turned :LOCKWISE until resistance of valve seai s felt. iV-3-03-31681 B handwheel is turned :LOCKWISE until resistance of valve sea s felt. 2007 NRC JPM IP-i (PLOR316PA Rev003) Page 7 of 9

- STEP I3 14 15 Close HV-3-03-316826, lnstr Air Outlet Block Vv from PCV-52396.

,. (Cue: Valve handwheel is turned [CLOCKWISE]

until stem length above valve yoke lowers 1 inch, then handwheel will not turn.) ' 16 17 Verify proper operation of the standby scram air header PCR, PCR-3-03-31688A "Pressure Control Regulator for PCV- 5239A" by observing Loading Pressure of approximately 80 psig and Control Pressure of 75 psig. (Cue: Loading pressure is approximately 80 psig, Control Pressure is 75 psig.) Verify scam air header pressure on PI 03-229 at the CRD flow nest OR on PI 03-312 on Panel 30C124 is satisfactory (67 to 75 psig). (Cue: Scram air header pressure is 73 psig on Pl-3-03-229

/ Pl-3-03-312.) Inform Control Room of task completion. (Cue: Control Room acknowledges report.) As an evaluator ensure that you have positive control of all exam material provided to the examinee (Task Conditions/Prerequisites)

AND procedures.

ACT S P P S P STANDARD HV-3-03-3 1682B handwheel is turned CLOCKWISE until resistance of valve seat is felt. ~ Loading Pressure and Control Pressure is monitored on PCR-3-03-31688A.

Scram air header pressure is monitored on Pl-3-03-229

/ Pl-3-03-312.

Task completion reported using telephone, hand held radio or GAI-TRONICS page system. Positive control established.

L' 2007 NRC JPM IP-i (PLOR316PA RevOO3) Page 8 of 9

.- ..J I. Under "ACT" P - must perform S - must simulate TERMINATING CUE When Unit 3 scram air header PCV-5239A is in service and PCV-5239B has been removed from service, the Control Room Supervisor should be informed. The evaluator may then terminate the exercise.

Page 9 of 9 2007 NRC JPM IP-i (PLORSIGPA Rev003)

,-Ll 1. 2. 3. 4. ., - TASK CONDlTlONSlPREREQUlSlTES Unit 3 is operating at full power steady state conditions . "SCRAM VALVE PILOT AIR HEADER PRESS HI-LO" annunciator is up on alarm panel 311 D-2. The cause of low scram air header pressure condition is - NOT caused by a loss of the Instrument Air system. Scram air header PCV-5239B is presently in service. INITIATING CUE The Control Room Supervisor directs you to restore the Unit 3 CRD scram air header pressure to approximately 73 psig per procedure ON-108, "Low CRD Scram Air Header Pressure".

EXELON NUCLEAR Nuclear Generation Group I OJT/TPE MATERIAL COVERSHEET APPROVED FOR USE: Signature I Title Date APPROVALS:

Signature I Title Date Signature I Title Date Signature I Title Date Signature I Title Date Ii EFFECTIVE DATE: I I NAME: Last First M.I. ISSUE DATE: SOC. SEC.

NO. COMPLETION DATE:

COMMENTS:

PlMS CODE: ...- PIMS ENTRY: 2007 NRC JPM IP-j (PLOR197P Rev000) Page 1 of 6 TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-197P REV. NO.: 001 TITLE: Defeating RClC Low Pressure Isolations - Unit 2 4 ..,. 2. 3. 4. 5. 6. 7. 8. 9. IO. 11. 12. 13. 14. 15. 2007 NRC JPM IP-j (PLOR197P Rev000) Page 2 of 6 EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:

Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 200451 0599 / PLOR-197P WA: 295031 EA1.05 URO: 4.3 SRO: 4.3 TASK DESCRIPTION:

Defeatina RClC Low Pressure Isolation - Unit 2 A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance

.. .-_- a. "Control Room" JPMs are designed to be performed in the simulator.

If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "ln-Plant" JPMs, no equipment will be operated without Shift Management approval.

4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met. b. JPM completion time requirement is met. 1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

2007 NRC JPM IP-j (PLOR197P Rev000)

Page 3 of 6 B. -d C. D. E. F. G. TOOLS AND EQUIPMENT

1. T-225 Tool Package 2. EOP Tool Locker Key 3. Yellow copy of T-225-2, "Defeating RClC Low Pressure Isolation"
4. Green copy of T-225-3, "Defeating RClC Low Pressure Isolation" (in case examinee picks the wrong unit) REFERENCES
1. T-225-2, Rev.

3, "Defeating RClC Low Pressure Isolation" TASK STANDARD 1. Satisfactory task completion is indicated when the RClC low pressure isolation is defeated.

2. Estimated time to complete:

10 minutes Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to defeat the RClC low pressure isolation, using appropriate procedures.

I will describe initial plant conditions and provide you access to the materials required to complete this task. TASK CONDITIONS/PREREQU BITES I. A transient has occurred on Unit 2. 2. Use of this procedure has been directed by the 1-100 procedures.

INITIATING CUE The Control Room Supervisor directs you to perform steps 4.1 and 4.2 of T-225-2, "Defeating RClC Low Pressure Isolation".

d' Page 4 of 6 2007 NRC JPM IP-j (PLOR197P Rev000)

H. PERFORMANCE CHECKLIST NO *I *2 STEP Obtain the key for the Emergency Operating Procedure Tool Locker. (Cue: When examinee requests EOP Tool Locker key from WECS examinee identifies the location of the WECS key box and its associated key then evaluator should provide the EOP Tool Locker key.) Open Emergency Operating Procedure Tool Locker and obtain T-225-2 Tool Kit. (Cue: Equipment obtained.)

ACT S P STANDARD Emergency Operating Procedure Tool Locker Key requested from WECS examinee identifies the location of the WECS key box and its associated key.

Tool Locker located on Radwaste Building El. 165' is unlocked, opened and 1-225-2 Tool Kit is located. When examinee locates tool kit, inform him/her that helshe now has the tools to perform the procedure. Provide the examinee with a copy of T-225-2 (or T-225-3, depending on which tool kit has been chosen). DO NOT allow equipment to be removed from the locker. Relock the locker before leaving the area. *3 *4 *7 --- I Open panel 20633 back panel doors. (Cue: Panel 20C33 doors are open.) Lift leads BG-13 and UV-C from terminal BB-45. (Cue: Leads are lifted.) Tape leads BG-13 and UV-C. (Cue: Leads are taped.) Close panel 20633 back panel doors. (Cue: Panel 20C33 doors are closed and latched .) Open panel 20C34 back panel doors. (Cue: Panel 20C34 doors are open.) P S S P P Door handle turned, doors pulled outward to gain access to terminal strip BB at back of panel 20C33 in the Cable Spreading Room. Terminal screw is turned COUNTERCLOCKWISE until loose. The terminal screw is removed with a "CAPTURE" screwdriver, then the leads are removed.

Tape is wrapped around end of each lead ensuring no metal is exposed. Door closed and relatched using handle.

Door handle turned, doors pulled outward to gain access to terminal strip BB at back of panel 20C34 in the Cable Spreading Room. 2007 NRC JPM IP-j (PLOR197P Rev000) Page 5 of 6

  • 8 9 10 11 12 Lift leads AA-59 and ACA-13 from terminal (Cue: Leads are lifted.) BB-69. S Tape leads AA-59 and ACA-13. (Cue: Leads are taped.) ~ Close panel 20C34 back panel doors. (Cue: Panel 20634 doors are closed and latched .) Inform Control Room of task completion.

P S (Cue: Control Room acknowledges report.) As an evaluator ensure that you have positive control of all exam material provided to the examinee (Task Cond itions/Prerequisites)

AND procedures.

P STANDARD ~~ Terminal screw is turned COUNTERCLOCKWISE until loose. The terminal screw is removed with a "CAPTURE" screwdriver, then the leads are removed.

Tape is wrapped around end of each lead ensuring no metal is exposed. Doors are closed and relatched using hand le. Task completion reported using telephone or GAI-TRONICS page system. NOTE: Hand held radios are NOT to be used in the Cable Spreading Room. Positive control established.

Under "ACT P - must perform S - must simulate I. TERMINATING CUE When the low pressure isolation for RClC is defeated, the Control Room Supervisor should be informed.

The evaluator will then terminate the exercise.

d Page 6 of 6 2007 NRC JPM IP-j (PLOR197P Rev000)

TASK CONDITIONS/PREREQUlSlTES I. A transient has occurred on Unit 2. 2. Use of this procedure has been directed by the T-I00 procedures. INITIATING CUE The Control Room Supervisor directs you to perform steps 4.1 and 4.2 of T-225-2, "Defeating RClC Low Pressure Isolation".

EXELON NUCLEAR Nuclear Generation Group OJTITPE MATERIAL COVERSHEET APPROVALS:

Signature

/Title Date Signature I Title Date Signature I Title Date Signature I Title Date II EFFECTIVE DATE: I I NAME: Last First M.I. SOC. SEC. NO. COMMENTS:

ISSUE DATE: COMPLETION DATE: ~~ ~ Training Review for Completeness:

I 1 PlMS CODE: Signature/Date I ENTRY: I I \/ J 2007 NRC JPM IP-k (PLOR049P Rev015) Page 1 of 6 TEMPORARY CHANGE FORM LOG J 2. 3. 4. 5. 6. 7. 8. e CODE NO.: PLOR-049P REV. NO.: 015 TITLE: Diesel Generator Air Start Solenoid Override *- *- /' 9. IO. 11. 12. 13. 14. 15. 2007 NRC JPM IP-k (PLOR049P RevOl5)

Page 2 of 6 EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE

%,-/ POSITION TITLE:

Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2640010401/ PLOR-049P WA: 264000A2.10 URO: 3.9 SRO: 4.2 TASK DESCRIPTION: Diesel Generator Air Start Solenoid Override A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. 'Control Room" JPMs are designed to be performed in the simulator.

If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S). b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.

4. Satisfactory performance of this JPM is accomplished if: a. The task standard is met. b. JPM completion time requirement is met. 1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

2007 NRC JPM IP-k (PLOR049P RevOl5) Page 3 of 6 B. TOOLS AND EQUIPMENT None r/ --' c. REFERENCES D. E. F. Procedure A0 52A.2 Rev. 4, "Diesel Generator Air Start Solenoid Override" TASK STANDARD

1. Satisfactory task completion is indicated when E-2 Diesel Generator has been started by overriding one of the air start solenoid valves.
2. Estimated time to complete:

15 minutes Non-Time Critical DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to start the E-2 Diesel Generator by overriding one of the air start solenoid valves using appropriate procedures.

I will describe initial plant conditions and provide you access to the materials required to complete this task. TASK CON D IT1 0 N S/P RE REQ U I S ITES 1. A loss of coolant accident has occurred.

2. E-2 Diesel Generator failed to start. 3. Investigation reveals that both E-2 Diesel Generator air start solenoid valve coils have failed. 4. The prerequisites of procedure A0 52A.2 "Diesel Generator Air Start Solenoid Override" have been met.

G. INITIATING CUE The Control Room Supervisor directs you to perform A0 52A.2 "Diesel Generator Air Start Solenoid Override" up to and including step 4.4 for the E-2 Diesel Generator.

'4 2007 NRC JPM IP-k (PLOR049P RevOlS) Page 4 of 6 H. PERFORMANCE CHECKLIST

-1 NO 1 *2 3 *4 STEP Obtain a copy of procedure A0 52A.2. Reset the E-2 diesel generator control circuitry. (Cue: RESET pushbutton has been depressed.)

Verify the E-2 D/G start failure lockout relay is reset. (Cue: Annunciator C-2, "START FAILURE" on panel OBC097 is not lit.) Override SV-0-52C-7233B SV-0-52C-7234B. (Cue: Air flow is heard, EDG engine speed increases rapidly to a steady RPM, heat is felt coming from exhaust manifold.)

Turn SV-0-52C-7233B SV-0-52C-72346 fully counter clockwise to the mechanical stop. (Cue: Air flow heard in previous step stops.) Request Control Room operator verify cooling water flow is started to E-2 Diesel Generator. (Cue: "A1 ESW pump is running with discharge pressure indication of 52 psig.) Inform the Control Room of task completion. (Cue: Control Room acknowledges report.) ACT P S P S S S S STANDARD A copy of procedure A0 52A.2 is obtained. "RESET" pushbutton is momentarily DEPRESSED at the E-2 diesel gauge panel. Annunciator C-2, "START FA1 LU RE" is verified clear at panel OBC097. ~~ SV-0-52C-7233B Manual Override handle - OR SV-0-52C-7234B Manual Override handle is turned clockwise to mechanical stop. SV-0-52C-7233B SV-0-52C-7234B handle is turned counterclockwise to mechanical stop. Control Room operator is requested to verify cooling water flow is started to E-2 Diesel Generator using radio or GAI-TRONICS page system. Task completion reported using hand held radio or GAI-TRONICS page system. 2007 NRC JPM IP-k (PLOR049P RevOl5)

Page 5 of 6 I. STEP ACT STANDARD As an evaluator ensure you have positive control of all exam material provided to the examinee (Task Conditions/Prerequisites)

AND procedures.

Under "ACT" P - must perform S - must simulate P Positive control established TERMINATING CUE When A0 52A.2 has been completed up to and including Step 4.4, the Control Room Supervisor should be informed.

The evaluator will then terminate the exercise.

Page 6 of 6 2007 NRC JPM IP-k (PLOR049P RevOl5)

TASK CONDlTlONSlPREREQUlSlTES . d' I. A loss of coolant accident has occurred.

2. E-2 Diesel Generator failed to start. 3. Investigation reveals that both E-2 Diesel Generator air start solenoid valve coils have failed. 4. The prerequisites of procedure A0 52A.2 "Diesel Generator Air Start Solenoid Override have been met. INITIATING CUE The Control Room Supervisor directs you to perform A0 52A.2 "Diesel Generator Air Start Solenoid Override" up to and including step 4.4 for the E-2 Diesel Generator.