ML22235A720
| ML22235A720 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 06/14/2022 |
| From: | Christopher Lally NRC/RGN-I/DORS/OB |
| To: | Constellation Energy Nuclear Group |
| Shared Package | |
| ML21020A063 | List: |
| References | |
| EPID L-2022-OLL-0004 | |
| Download: ML22235A720 (4) | |
Text
Form 2.1-1 Examination Preparation Checklist Facility: _______Peach Bottom____________________
Date of Examination: __5/23/22____
Developed by: Written:
Facility NRC
//
Operating:
Facility NRC Target Date*
Task Description Chief Examiners Initials
-240
- 1. Examination administration date confirmed (A.1-5). For NRC-prepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).
CML
-210
- 2. NRC examiners and facility licensee contact assigned (B.1 and C.1-3).
CML
-210
- 3. Facility licensee contact briefed on examination security and other requirements (D.4). As applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).
CML
-210
- 4. Reference material due for NRC-prepared examinations (F).
CML
-210
- 5. Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5).
CML
-195
- 6. Written examination outline developed by the NRC and sent to the facility licensee contact (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a).
CML
-150
- 7. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).
CML
-136
- 8. Operating test outlines reviewed by the NRC and feedback provided to the facility licensee (ES-2.3).
CML
-100
- 9. NRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3).
CML
-75
- 10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.
CML
-60
- 11. Preliminary waiver/excusal requests due (ES-2.2 E.1).
CML
-50
- 12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors authorization to proceed with the facility review granted (ES-2.3 D).
CML
-50
- 13. Examination review results discussed between the NRC and the facility licensee (B.14).
CML
-35
- 14. Examination preparatory week conducted by the NRC and the facility licensee (I).
CML
-30
- 15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1).
CML
-14
- 16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 prepared (ES-2.2 C and E).
CML
-7
- 17. Written examinations and operating tests approved by the NRC supervisor (C.9)
CML
-7
- 18. Facility licensee management feedback on the examination requested by the NRC supervisor (C.10).
CML
-7
- 19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.
CML
-7
- 20. Written examination administration guidelines reviewed with the facility licensee (D.14).
CML
-7
- 21. Approved scenarios and job performance measures distributed to NRC examiners (D.12).
CML
- Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.
Form 3.4-1 Transient and Event Checklist Facility: PBAPS Date of Exam: 05/23/22 Operating Test No.: 2022 NRC A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
All Positions RX 5
2 2
1 1
2 2
1 1 0 NOR 1
1 1
1 2
2 1
1 1
1 1 I/C 2,3
,4, 5,7
,8 3,4,7 2,5, 7,8 3,4,5
,6,8, 9,10 3,4, 8,9 5,6, 10 3,4,6
,7,8, 9
3,4,9 3,4,6
,7,8, 9
4,5,6
,7,9, 10 4,7,9
,10 5,6, 10 4
4 2 MAJ 6
6 6
7 7
7 5
5 5
8 8
8 2
2 1 Man Ctrl 6,9 9
6 6,7,8 6,7,8 1
1 0 TS 2,4 5,6 3,4 3,5 0
2 2 SRO-I 1 RX 1
1 1
NOR 1
1 2
1 I/C 2,3
,4, 5,7
,8 5,6, 10 3,4,9 12 4
MAJ 6
7 5
3 2
Man Ctrl 6
1 1
TS 2,4 2
2 SRO-I 2 RX 5
2 2
1 NOR 1
2 2
1 I/C 3,4,7 3,4,5
,6,8, 9,10 3,4,6
,7,8, 9
16 4
MAJ 6
7 5
3 2
Man Ctrl 6,9 6,7,8 5
1 TS 5,6 2
2 SRO-I 3 RX 2
1 2
1 NOR 1
2 2
1 I/C 2,5, 7,8 3,4, 8,9 3,4,6
,7,8, 9
14 4
MAJ 6
7 5
3 2
Man Ctrl 9
6,7,8 4
1 TS 3,4 2
2
Form 3.4-1 Transient and Event Checklist Facility: PBAPS Date of Exam: 05/23/22 Operating Test No.: 2022 NRC A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
SRO-I 4 RX 5
2 2
1 NOR 1
2 2
1 I/C 3,4,7 3,4,5
,6,8, 9,10 3,4,6
,7,8, 9
16 4
MAJ 6
7 5
3 2
Man Ctrl 6,9 6,7,8 5
1 TS 5,6 2
2 SRO-I 5 RX 2
1 2
1 NOR 2
1 1
I/C 3,4, 8,9 3,4,6
,7,8, 9
10 4
MAJ 7
5 2
2 Man Ctrl 9
6,7,8 4
1 TS 3,4 2
2 RO RX 1
1 1
NOR 1
1 2
1 I/C 2,5, 7,8 5,6, 10 3,4,9 10 4
MAJ 6
7 5
3 2
Man Ctrl 6
1 1
TS 0
0 SRO-U RX 0
0 NOR 1
1 1
I/C 2,3
,4, 5,7
,8 6
2 MAJ 6
1 1
Man Ctrl 0
0 TS 2,4 2
2
Form 3.4-1 Transient and Event Checklist Form 3.4-1 Instructions for the Events and Evolutions Checklist
- 1.
Mark the applicant license level for each simulator operating test number.
- 2.
For the set of scenario columns, fill in the associated event number from Form 3.3-1, Scenario Outline, to show the specific event types being used for the applicant while in the assigned crew position for that scenario.
- Minimums are subject to the instructions in Section C.2, License Level Criteria.
KEY: RX = Reactivity Manipulation; NOR = Normal Evolution; I/C = Instrument/Component Failure; MAJ = Major Transient; Man. Ctrl = Manual Control of Automatic Function; TS = Technical Specification Evaluation; RO = Reactor Operator; SRO-I or I = Instant Senior Reactor Operator; SRO-U or U = Upgrade Senior Reactor Operator; SRO = Senior Reactor Operator; ATC = At the Controls; and BOP = Balance of Plan