Category:Letter
MONTHYEARML24313A1012024-11-13013 November 2024 SLRA Supplemental Environmental Audit Plan ML24310A2832024-11-0404 November 2024 Issuance of the Core Operating Limits Report for Reload 25, Cycle 26 ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24227A5492024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval 05000277/LER-2024-002, Uncoordinated DC Circuits Cause Unanalyzed Condition2024-04-0808 April 2024 Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report 2024-09-06
[Table view] Category:License-Operator
MONTHYEARML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval ML24166A0652023-07-27027 July 2023 Final Qa/Related Forms 1.3-1, 2.1-1, 2.3-1, 2.3-2, 2.3-4, 3.4-1 ML23178A0352023-06-27027 June 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML21237A5242023-06-0101 June 2023 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML23005A1062023-01-0505 January 2023 Requalification Program Inspection ML22235A7202022-06-14014 June 2022 Administrative Files ML22250A6832022-06-0202 June 2022 Administered Examination Files - Administered Written Test ML22243A2292022-05-27027 May 2022 Administered Examination Files - Administered Operating Test ML22242A2602022-05-16016 May 2022 Proposed Examination Submittal - Quality Checklists ML22206A2692022-05-11011 May 2022 Final Operating Test ML22206A2582022-05-11011 May 2022 Final RO & SRO Written Examination with Answer Key ML22299A1002022-05-11011 May 2022 Final Exam Review Checklists; Form 2.3-3, Form 2.3-5, and Form 5.1-1 ML22299A0102022-05-11011 May 2022 Final Qa/Related Forms ML22243A1072022-03-28028 March 2022 Proposed Examination Submittal - Proposed Operating Test ML22206A2642022-03-28028 March 2022 Proposed Examination Submittal - Proposed Written Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21348A7372021-12-0303 December 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21348A7452021-12-0303 December 2021 Draft Operating Test Outlines (Folder 2) ML21348A7512021-12-0303 December 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21348A7522021-12-0303 December 2021 Final Operating Test Outlines (Folder 3) ML21348A7342021-12-0303 December 2021 Final QA Related Forms (Folder 1) ML21348A7562021-12-0303 December 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21348A0542021-06-10010 June 2021 Final Qa/Related Forms (Folder 1) ML21348A0652021-06-10010 June 2021 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21237A5142021-06-0101 June 2021 Final Operating Test (Sections a, B, and C (Folder 3) ML21237A5182021-06-0101 June 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21239A0822021-05-18018 May 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21237A5352021-05-10010 May 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21105A6592021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Peach Bottom Atomic Power Station, Units 2 and 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21237A4782021-03-26026 March 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21237A5072021-03-26026 March 2021 Written - Draft Examination and Operating Test Outlines (Folder 2) ML21237A5022021-03-26026 March 2021 Draft - Written Examination (Folder 2) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A0542021-01-12012 January 2021 Requalification Program Inspection ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20261H4032020-09-17017 September 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20260H1632020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20260H1652020-06-30030 June 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20184A2482020-06-30030 June 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21056A2232020-06-30030 June 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML21056A2212020-06-30030 June 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21056A2202020-06-30030 June 2020 Final Qa/Related Forms (Folder 1) ML20260H1642020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20260H1672020-06-30030 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20184A2472020-06-30030 June 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20260H1662020-06-30030 June 2020 Draft Written Examination (Folder 2), Test Answer Key ML20147A1662020-05-26026 May 2020 Operator Licensing Examination Approval ML20105A1822020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Peach Bottom Atomic Power Station, Units 2 and 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) 2024-04-11
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval ML24166A0652023-07-27027 July 2023 Final Qa/Related Forms 1.3-1, 2.1-1, 2.3-1, 2.3-2, 2.3-4, 3.4-1 ML23178A0352023-06-27027 June 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML21237A5242023-06-0101 June 2023 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML22235A7202022-06-14014 June 2022 Administrative Files ML22250A6832022-06-0202 June 2022 Administered Examination Files - Administered Written Test ML22243A2292022-05-27027 May 2022 Administered Examination Files - Administered Operating Test ML22242A2602022-05-16016 May 2022 Proposed Examination Submittal - Quality Checklists ML22299A1002022-05-11011 May 2022 Final Exam Review Checklists; Form 2.3-3, Form 2.3-5, and Form 5.1-1 ML22206A2692022-05-11011 May 2022 Final Operating Test ML22206A2582022-05-11011 May 2022 Final RO & SRO Written Examination with Answer Key ML22299A0102022-05-11011 May 2022 Final Qa/Related Forms ML22206A2642022-03-28028 March 2022 Proposed Examination Submittal - Proposed Written Examination ML22243A1072022-03-28028 March 2022 Proposed Examination Submittal - Proposed Operating Test RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21348A7342021-12-0303 December 2021 Final QA Related Forms (Folder 1) ML21348A7512021-12-0303 December 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21348A7562021-12-0303 December 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21348A7372021-12-0303 December 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21348A7452021-12-0303 December 2021 Draft Operating Test Outlines (Folder 2) ML21348A7522021-12-0303 December 2021 Final Operating Test Outlines (Folder 3) ML21348A0542021-06-10010 June 2021 Final Qa/Related Forms (Folder 1) ML21348A0652021-06-10010 June 2021 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21237A5182021-06-0101 June 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21237A5142021-06-0101 June 2021 Final Operating Test (Sections a, B, and C (Folder 3) ML21239A0822021-05-18018 May 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21237A5352021-05-10010 May 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21237A5022021-03-26026 March 2021 Draft - Written Examination (Folder 2) ML21237A5072021-03-26026 March 2021 Written - Draft Examination and Operating Test Outlines (Folder 2) ML21237A4782021-03-26026 March 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20261H4032020-09-17017 September 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20184A2472020-06-30030 June 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20184A2482020-06-30030 June 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20260H1632020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20260H1642020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21056A2212020-06-30030 June 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20260H1672020-06-30030 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21056A2202020-06-30030 June 2020 Final Qa/Related Forms (Folder 1) ML21056A2232020-06-30030 June 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20260H1652020-06-30030 June 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20260H1662020-06-30030 June 2020 Draft Written Examination (Folder 2), Test Answer Key ML20147A1662020-05-26026 May 2020 Operator Licensing Examination Approval ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19275E4622019-09-30030 September 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18128A0062018-05-0707 May 2018 Senior Reactor and Reactor Operator Initial License Examinations 2024-04-11
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 February 2, 2017 Mr. Bryan Hanson Senior Vice President, Exelon Generation, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.
Warrenville, IL 60555
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3
Dear Mr. Hanson:
In a telephone conversation on January 31, 2017, Mr. Brian Fuller, Senior Operations Engineer, and Ms. Julie McDonald, Senior Operations Instructor, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Peach Bottom Atomic Power Station, Units 2 and 3 facility. The inspection is planned for the week of February 27, 2017, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations and operating test scheduled for the week of the inspection to the NRC by February 13, 2017. Ms.
McDonald has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S.
Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C.
20503.
B. Hanson The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Brian Fuller at (610) 337-5077.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-277, 50-278 License Nos. DPR-44, DPR-56 cc: Distribution via ListServ
B. Hanson Letter to Mr. Bryan C. Hanson from Mr. Donald E. Jackson.
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3, dated February 2, 2017 cc: Distribution via ListServ Distribution w/encl: (via E-mail)
DDorman, RA (R1ORAMAIL RESOURCE)
DLew, DRA (R1ORAMAIL RESOURCE)
MScott, DRP (R1DRPMAIL RESOURCE)
DPelton, DRP (R1DRPMAIL RESOURCE)
RLorson, DRS (R1DRSMAIL RESOURCE)
JYerokun, DRS (R1DRSMAIL RESOURCE)
DSchroeder, DRP JHeinly, DRP, SRI JBowen, RI, OEDO SBarber, DRP BSmith, DRP, RI BFuller, DRS Examiner, DRS ATurilin, DRP SSchmitt, DRP, AA DJackson, DRS Operations Branch Chief RidsNrrPMPeachBottom Resource N. L. Salgado, NRR/DIRS/IOLB RidsNrrDorlLpl1-2 Resource Distribution:
DRS Master Exam File (C. Bixler) (w/concurrences)
DOCUMENT NAME: G:\DRS\Operations Branch\FULLER\Requal FY17 Peach Bottom\PB Requal Notification.docx (ADAMS TEMPLATE NRR-079)
ADAMS PKG: ML16210A443 ADAMS ACCESSION NO.: ML17034A466 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB NAME BFuller/DEJ for DEJackson/DEJ DATE 02/02/2017 02/02/2017 OFFICIAL RECORD COPY