ML092290034: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 08/17/2009
| issue date = 08/17/2009
| title = 08/17/09 - 08/19/09-Meeting Slides for 11th International Seminar on Fire Safety in Nuclear Power Plants and Installations, Risk-Informed, Performance-Based Fire Protection: a U.S. Regulatory Perspective
| title = 08/17/09 - 08/19/09-Meeting Slides for 11th International Seminar on Fire Safety in Nuclear Power Plants and Installations, Risk-Informed, Performance-Based Fire Protection: a U.S. Regulatory Perspective
| author name = Klein A R
| author name = Klein A
| author affiliation = NRC/NRR/DRA/AFPB
| author affiliation = NRC/NRR/DRA/AFPB
| addressee name =  
| addressee name =  

Revision as of 20:27, 11 July 2019

08/17/09 - 08/19/09-Meeting Slides for 11th International Seminar on Fire Safety in Nuclear Power Plants and Installations, Risk-Informed, Performance-Based Fire Protection: a U.S. Regulatory Perspective
ML092290034
Person / Time
Site: Oconee, Harris  Duke Energy icon.png
Issue date: 08/17/2009
From: Klein A
NRC/NRR/DRA/AFPB
To:
Alex Klein, 415-3477
References
Download: ML092290034 (8)


Text

Risk-Informed, Performance-Based Fire Protection: A U.S. Regulatory Perspective11th International Seminar on FIRE SAFETY IN NUCLEAR POWER PLANTS AND INSTALLATIONS INSTALLATIONSAlexander Klein, PE August 17-19, 2009 BACKGROUND*Fire Protection Regulations-Title 10 of the Code of Federal Regulations (CFR) Section 50.48, "Fire protection"-General Design Criterion (GDC)3, "Fire 2 protection" -AppendixR, "Fire Protection Program for Nuclear Power Facilities Operating Prior to January1,1979"-10 CFR 50.48(c) "National Fire Protection Association Standard NFPA 805" REGULATORY INFRASTRUCTURE*Regulatory Guide (RG) 1.205, "Risk-Informed, Performance-Based Fire Protection for Existing Light-Water Nuclear Power Plants" NEI 04 02"GuidanceforImplementingaRisk Informed 3-NEI 04-02 , Guidance for Implementing a Risk-Informed , Performance-Based Fire Protection Program Under 10CFR50.48(c)"*NUREG-0800, "Standard Review Plan"-SRP Section 9.5.1.1 -new SRP Section 9.5.1.2 (draft)*Triennial fire protection inspection procedures PILOT PLANTS *Shearon Harris Nuclear Power Plant*Oconee Nuclear Power Plant (Units 1, 2, 3) 4*Pilot Plant Process-status*NFPA 805 Frequently Asked Question (FAQ)

Process LESSONS LEARNED*What are some of the initial lessons learned from the pilot plants?-License Amendment Request 5-Review of engineering evaluations-Treatment of the risk of prior approved recovery actions-Interface between RG 1.205 and RG 1.200 LEVERAGING NFPA 805 TOOLS*Reduce regulatory burden

  • A ddress emer g ent issues 6 g*Improve fire risk management
  • Use in non-fire protection areas PATH FORWARD*Update regulatory guidance*Develop inspection procedures
  • Com plete the p ilot p lant p rocess 7pppp*Communicate lessons learned
  • Prepare for license amendment requests QUESTIONS 8