Line 3: |
| | issue date = 01/15/2010 | | | issue date = 01/15/2010 |
| | title = Withdrawal of Relief Request Related to Code Case N-729-1, Table 1 | | | title = Withdrawal of Relief Request Related to Code Case N-729-1, Table 1 |
| | author name = David M J | | | author name = David M |
| | author affiliation = NRC/NRR/DORL/LPLIII-2 | | | author affiliation = NRC/NRR/DORL/LPLIII-2 |
| | addressee name = Pardee C G | | | addressee name = Pardee C |
| | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | | | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear |
| | docket = 05000455 | | | docket = 05000455 |
Line 21: |
Line 21: |
|
| |
|
| ==Dear Mr. Pardee:== | | ==Dear Mr. Pardee:== |
| By letter dated April 2, 2009 (Agencywide Documents Access and Management System (ADAMS) Package No. ML091 030449), as supplemented by letter dated October 14, 2009 (ADAMS Accession No. ML09288051 0), Exelon Generation Company, LLC (Exelon), submitted Relief Request (RR) 13R-17 for Byron Station, Unit NO.2. Specifically, Exelon requested relief through Section 55a of Part 50 of Title 10 of the Code of Federal Regulations (10 CFR 50.55a) from the requirements of Table 1 of Code Case N-729-1 of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, related to the extent of examination of the reactor pressure vessel head penetrations and welds. Subsequently, in a letter dated December 17, 2009 (ADAMS Accession No. ML093520172), this request was withdrawn. | | By letter dated April 2, 2009 (Agencywide Documents Access and Management System (ADAMS) Package No. ML091030449), as supplemented by letter dated October 14, 2009 (ADAMS Accession No. ML092880510), Exelon Generation Company, LLC (Exelon), submitted Relief Request (RR) 13R-17 for Byron Station, Unit NO.2. Specifically, Exelon requested relief through Section 55a of Part 50 of Title 10 of the Code of Federal Regulations (10 CFR 50.55a) from the requirements of Table 1 of Code Case N-729-1 of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, related to the extent of examination of the reactor pressure vessel head penetrations and welds. Subsequently, in a letter dated December 17, 2009 (ADAMS Accession No. ML093520172), this request was withdrawn. |
| Based on the letter of December 17, 2009, we have terminated our review of RR 13R-17 and have closed TAC No. ME1067. Sincerely, J. David, Senior Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-455 cc: Distribution via Listserv January 15, 2010 Mr. Charles G. Pardee President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 BYRON STATION, UNIT NO.2 -WITHDRAWAL OF RELIEF REQUEST RELATED TO CODE CASE N-729-1, TABLE 1 (TAC NO. ME1067) | | Based on the letter of December 17, 2009, we have terminated our review of RR 13R-17 and have closed TAC No. ME1067. Sincerely, J. David, Senior Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-455 cc: Distribution via Listserv January 15, 2010 Mr. Charles G. Pardee President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 BYRON STATION, UNIT NO.2 -WITHDRAWAL OF RELIEF REQUEST RELATED TO CODE CASE N-729-1, TABLE 1 (TAC NO. ME1067) |
|
| |
|
| ==Dear Mr. Pardee:== | | ==Dear Mr. Pardee:== |
| By letter dated April 2, 2009 (Agencywide Documents Access and Management System (ADAMS) Package No. ML091 030449), as supplemented by letter dated October 14, 2009 (ADAMS Accession No. ML092880510), Exelon Generation Company, LLC (Exelon), submitted Relief Request (RR) 13R-17 for Byron Station, Unit No.2. Specifically, Exelon requested relief through Section 55a of Part 50 of Title 10 of the Code of Federal Regulations (10 CFR 50.55a) from the requirements of Table 1 of Code Case N-729-1 of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, related to the extent of examination of the reactor pressure vessel head penetrations and welds. Subsequently, in a letter dated December 17, 2009 (ADAMS Accession No. ML093520172), this request was withdrawn. | | By letter dated April 2, 2009 (Agencywide Documents Access and Management System (ADAMS) Package No. ML091030449), as supplemented by letter dated October 14, 2009 (ADAMS Accession No. ML092880510), Exelon Generation Company, LLC (Exelon), submitted Relief Request (RR) 13R-17 for Byron Station, Unit No.2. Specifically, Exelon requested relief through Section 55a of Part 50 of Title 10 of the Code of Federal Regulations (10 CFR 50.55a) from the requirements of Table 1 of Code Case N-729-1 of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, related to the extent of examination of the reactor pressure vessel head penetrations and welds. Subsequently, in a letter dated December 17, 2009 (ADAMS Accession No. ML093520172), this request was withdrawn. |
| Based on the letter of December 17, 2009, we have terminated our review of RR 13R-17 and have closed TAC No. ME1067. Sincerely, IRA! Marshall J. David, Senior Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-455 cc: Distribution via Listserv DISTRIBUTION: | | Based on the letter of December 17, 2009, we have terminated our review of RR 13R-17 and have closed TAC No. ME1067. Sincerely, IRA! Marshall J. David, Senior Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-455 cc: Distribution via Listserv DISTRIBUTION: |
| PUBLIC LPL3-2 R1F RidsNrrDorlLpl3-2 Resource RidsNrrDciCpnb Resource RidsAcrsAcnw_MailCTR Resource RidsNrrLATHarris Resource RidsOgcRp Resource RidsRgn3MailCenter Resource RidsNrrDorlDpr Resource RidsNrrDci Resource JCollins, NRR RidsNrrPMByron Resource ADAMS Accession Number: ML 100120608 NRR-028 OFFICE LPL3-2/PM LPL3-2/LA CPNB/BC LPL3-2/BC NAME CGratton for MDavid THarris TLupold SCampbell DATE 1/15/10 1/15/10 1/14/10 1/15/10 OFFICIAL RECORD}} | | PUBLIC LPL3-2 R1F RidsNrrDorlLpl3-2 Resource RidsNrrDciCpnb Resource RidsAcrsAcnw_MailCTR Resource RidsNrrLATHarris Resource RidsOgcRp Resource RidsRgn3MailCenter Resource RidsNrrDorlDpr Resource RidsNrrDci Resource JCollins, NRR RidsNrrPMByron Resource ADAMS Accession Number: ML100120608 NRR-028 OFFICE LPL3-2/PM LPL3-2/LA CPNB/BC LPL3-2/BC NAME CGratton for MDavid THarris TLupold SCampbell DATE 1/15/10 1/15/10 1/14/10 1/15/10 OFFICIAL RECORD}} |
Letter Sequence Withdrawal |
---|
|
|
|
Similar Documents at Byron |
---|
Category:Code Relief or Alternative
MONTHYEARML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24194A0222024-07-22022 July 2024 Issuance of Relief Proposed Alternative Request Associated with Pressurizer Examinations ML22307A2462022-11-10010 November 2022 Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (EPIDs L-2021-LLR-0035 and L-2021-LLR-0036) RS-22-110, Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request.2022-09-20020 September 2022 Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request. RS-22-036, Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2022-03-10010 March 2022 Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML21280A0782021-10-27027 October 2021 Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21134A0062021-08-0303 August 2021 Proposed Alternatives to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (Epids L-2020-LLR-0099 and L-2020-LLR-0100) ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20245E5062020-09-0909 September 2020 Relief from the Requirements of the ASME Code (COVID-19) ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20099D9552020-04-17017 April 2020 Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive Examinations ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19035A2942019-02-25025 February 2019 Relief from the Requirements of the ASME Code JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds2019-02-15015 February 2019 Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-8802018-05-30030 May 2018 Proposed Alternative to Utilize Code Cases N-878 and N-880 JAFP-18-0052, Proposed Alternative to Utilize Code Case N-8792018-05-30030 May 2018 Proposed Alternative to Utilize Code Case N-879 ML17325B5712018-01-10010 January 2018 Non-Proprietary, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Services (CAC No. MF9854; EPID L-2017-LLR-0042) ML17249A2412017-09-19019 September 2017 Relief from the Requirements of the ASME Code RS-17-083, Inservice Inspection Program Third Interval Relief Requests 13R-12 and 13R-152017-06-29029 June 2017 Inservice Inspection Program Third Interval Relief Requests 13R-12 and 13R-15 ML17170A0132017-06-26026 June 2017 Proposed Alternative to Eliminate Examination of Threads in Reactor Pressure Vessel Flange (CAC Nos. MF8712-MF8729 and MF9548) ML17062A4282017-03-0606 March 2017 Request for Relief from the Requirements of the ASME Code ML17047A0382017-02-24024 February 2017 Request I4R-11 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) ML16327A3962016-12-20020 December 2016 Request I4R-01, Relief from the Requirements of the ASME Code ML16327A3182016-12-20020 December 2016 Request I4R-06, Relief from the Requirements of the ASME Code ML16327A4212016-12-19019 December 2016 Requested Relief from the Requirements of the Asme Code (CAC Nos. MF7641 and MF7642) ML16306A3662016-11-0808 November 2016 Request I4R-08, Relief from the Requirements of the ASME Code ML16230A2372016-09-0606 September 2016 Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322) ML16162A2112016-06-29029 June 2016 Request for Use of Alternative ML16109A3372016-04-27027 April 2016 Relief from the Requirements of the ASME Code (CAC Nos. MF6715, MF6716, MF6717, and MF6718) ML15173A4362015-06-30030 June 2015 Relief from the Requirements of the ASME Code RS-15-170, Submittal of Relief Requests Associated with the Fourth Inservice Testing Interval2015-06-22022 June 2015 Submittal of Relief Requests Associated with the Fourth Inservice Testing Interval ML12121A6372012-05-10010 May 2012 Request to Use Code Case N-789 ML1129907832012-02-0101 February 2012 Inservice Inspection Relief Request I3R-19: Alternative Requirements for the Repair of Reactor Vessel Head Penetrations ML1113306532011-06-0606 June 2011 Unacceptable with Opportunity to Supplement Alt. to ASME Code Requirements for Repair of Reactor Vessel Head Penetrations (TACs ME6071, ME6072, ME6073, and ME6074) ML1113302792011-05-25025 May 2011 Partial Withdrawal of Relief Request for Alternative to ASME Code Repairs ML1105909212011-03-0303 March 2011 Relief Request from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration Welds ML1008504952010-03-26026 March 2010 Application Accepted - Braidwood & Byron Relief Request Re. ASME Code Case N-729-1 (TACs ME3510 - ME3513) RS-10-046, Request for Relief from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration Welds2010-03-12012 March 2010 Request for Relief from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration Welds ML1002102312010-01-28028 January 2010 Relief Request 13R-16 for Reactor Pressure Vessel Head Penetration Examination Frequency ML1001206082010-01-15015 January 2010 Withdrawal of Relief Request Related to Code Case N-729-1, Table 1 ML0804400772008-02-27027 February 2008 Inservice Inspection Program Second Interval RR 12R-21, TAC MD4097 & MD4098 ML0732303122008-01-15015 January 2008 Relief, Inservice Inspection Program Second Interval Relief Requests I2R-22, I2R-23, I2R-25, and I2R-53, ML0712900112007-05-23023 May 2007 Evaluation of Proposed Alternatives for Inservice Inspection Examination Requirements ML0706800992007-03-29029 March 2007 Requests for Relief, Evaluation of Proposed Alternatives for Inservice Inspection Examination Requirements for Third 10-Year Interval Inservice Inspection Program Plan, MD3661, MD3662, and MD3663 ML0635303222007-03-19019 March 2007 Relief, Evaluation of Relief Request I3R-08 Pertaining to Structural Weld Overlays ML0705204802007-03-0909 March 2007 Relief, Evaluation of Relief Request 13R-06 for Control Rod Drive Canopy Seal Welds ML0625101692007-01-29029 January 2007 Evaluation of Relief Requests 13R-08 Pertaining to Structural Weld Overlays 2024-07-23
[Table view] Category:Letter
MONTHYEARRS-24-104, Nuclear Radiological Emergency Plan Document Revision2024-11-0101 November 2024 Nuclear Radiological Emergency Plan Document Revision RS-24-098, Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality2024-10-23023 October 2024 Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality ML24297A2702024-10-23023 October 2024 Notification of NRC Baseline Inspection and Request for Information: Inspection Report 05000455/2025002 RS-24-095, Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals2024-10-10010 October 2024 Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24281A1502024-10-0707 October 2024 Request for Information for NRC Commercial Grade Dedication Inspection Report 05000454/2025010 and 05000455/2025010 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A1272024-09-23023 September 2024 – Request for Additional Information (EPID 2023-LLA-0136) - Non-Proprietary BYRON 2024-0046, Cycle 27 Core Operating Limits Report2024-09-19019 September 2024 Cycle 27 Core Operating Limits Report RS-24-088, Relief Requests Associated with the Fifth Inservice Inspection Interval2024-09-13013 September 2024 Relief Requests Associated with the Fifth Inservice Inspection Interval ML24250A1182024-09-0606 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information 05000454/LER-2024-001, Both Trains of Control Room Ventilation Temperature Control System Inoperable2024-09-0505 September 2024 Both Trains of Control Room Ventilation Temperature Control System Inoperable ML24227A0522024-08-29029 August 2024 Audit Plan for LAR to Remove ATWS Mtc Limit IR 05000454/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Byron Station, Units 1 and 2 (Report 05000455/2024005 and 05000454/2024005) ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000454/20240112024-08-0808 August 2024 Phase 2 Post- Approval License Renewal Report 05000454/2024011 IR 05000454/20240022024-07-26026 July 2024 Integrated Inspection Report 05000454/2024002 and 05000455/2024002, and Exercise of Enforcement Discretion ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions RS-24-066, Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller2024-06-25025 June 2024 Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller ML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report BYRON 2024-0031, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-05-16016 May 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation IR 05000454/20240012024-05-10010 May 2024 Integrated Inspection Report 05000454/2024001; 05000455/2024001 and 07200068/2024001 BYRON 2024-0028, Annual Radiological Environmental Operating Report (AREOR)2024-05-0909 May 2024 Annual Radiological Environmental Operating Report (AREOR) BYRON 2024-0022, 2023 Regulatory Commitment Change Summary Report2024-05-0202 May 2024 2023 Regulatory Commitment Change Summary Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML24116A1192024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) ML24113A1272024-04-22022 April 2024 Audit Plan in Support of Review of LAR Revision of TS 3.7.15, 3.7.16, and 4.3.1 (EPID: L-2023-LLA-0136) (Non-Proprietary) ML24113A2892024-04-22022 April 2024 Notification of NRC Baseline Inspection and Request for Information BYRON 2024-0020, Annual Dose Report for 20232024-04-18018 April 2024 Annual Dose Report for 2023 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition BYRON 2024-0021, Registration of Use of Cask to Store Spent Fuel2024-04-11011 April 2024 Registration of Use of Cask to Store Spent Fuel RS-24-034, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-04-10010 April 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors IR 05000454/20244012024-04-0303 April 2024 Cyber Security Inspection Report 05000454/2024401 and 05000455/2024401 (Public) RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report BYRON 2024-0019, Registration of Use of Cask to Store Spent Fuel2024-03-28028 March 2024 Registration of Use of Cask to Store Spent Fuel RS-24-024, Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-22022 March 2024 Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds IR 05000454/20230112024-03-20020 March 2024 Fire Protection Team Inspection Report 05000454/2023011 and 05000455/2023011 IR 05000454/20240102024-03-15015 March 2024 Comprehensive Engineering Team Inspection Report 05000454/2024010 and 05000455/2024010 IR 05000454/20230062024-02-28028 February 2024 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000455/2023006 and 05000454/2023006) IR 05000454/20230042024-02-0202 February 2024 Integrated Inspection Report 05000454/2023004 and 05000455/2023004 ML24022A2722024-01-23023 January 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000454/2024011 ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 2024-09-06
[Table view] |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 January 2010 Mr. Charles G. Pardee President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 BYRON STATION, UNIT NO.2 -WITHDRAWAL OF RELIEF REQUEST RELATED TO CODE CASE N-729-1, TABLE 1 (TAC NO. ME1067)
Dear Mr. Pardee:
By letter dated April 2, 2009 (Agencywide Documents Access and Management System (ADAMS) Package No. ML091030449), as supplemented by letter dated October 14, 2009 (ADAMS Accession No. ML092880510), Exelon Generation Company, LLC (Exelon), submitted Relief Request (RR) 13R-17 for Byron Station, Unit NO.2. Specifically, Exelon requested relief through Section 55a of Part 50 of Title 10 of the Code of Federal Regulations (10 CFR 50.55a) from the requirements of Table 1 of Code Case N-729-1 of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, related to the extent of examination of the reactor pressure vessel head penetrations and welds. Subsequently, in a letter dated December 17, 2009 (ADAMS Accession No. ML093520172), this request was withdrawn.
Based on the letter of December 17, 2009, we have terminated our review of RR 13R-17 and have closed TAC No. ME1067. Sincerely, J. David, Senior Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-455 cc: Distribution via Listserv January 15, 2010 Mr. Charles G. Pardee President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 BYRON STATION, UNIT NO.2 -WITHDRAWAL OF RELIEF REQUEST RELATED TO CODE CASE N-729-1, TABLE 1 (TAC NO. ME1067)
Dear Mr. Pardee:
By letter dated April 2, 2009 (Agencywide Documents Access and Management System (ADAMS) Package No. ML091030449), as supplemented by letter dated October 14, 2009 (ADAMS Accession No. ML092880510), Exelon Generation Company, LLC (Exelon), submitted Relief Request (RR) 13R-17 for Byron Station, Unit No.2. Specifically, Exelon requested relief through Section 55a of Part 50 of Title 10 of the Code of Federal Regulations (10 CFR 50.55a) from the requirements of Table 1 of Code Case N-729-1 of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, related to the extent of examination of the reactor pressure vessel head penetrations and welds. Subsequently, in a letter dated December 17, 2009 (ADAMS Accession No. ML093520172), this request was withdrawn.
Based on the letter of December 17, 2009, we have terminated our review of RR 13R-17 and have closed TAC No. ME1067. Sincerely, IRA! Marshall J. David, Senior Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-455 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL3-2 R1F RidsNrrDorlLpl3-2 Resource RidsNrrDciCpnb Resource RidsAcrsAcnw_MailCTR Resource RidsNrrLATHarris Resource RidsOgcRp Resource RidsRgn3MailCenter Resource RidsNrrDorlDpr Resource RidsNrrDci Resource JCollins, NRR RidsNrrPMByron Resource ADAMS Accession Number: ML100120608 NRR-028 OFFICE LPL3-2/PM LPL3-2/LA CPNB/BC LPL3-2/BC NAME CGratton for MDavid THarris TLupold SCampbell DATE 1/15/10 1/15/10 1/14/10 1/15/10 OFFICIAL RECORD