ML110140139: Difference between revisions
From kanterella
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 5: | Line 5: | ||
| author name = Roden J | | author name = Roden J | ||
| author affiliation = Tennessee Valley Authority | | author affiliation = Tennessee Valley Authority | ||
| addressee name = Laska G | | addressee name = Laska G | ||
| addressee affiliation = NRC/RGN-II/DRS | | addressee affiliation = NRC/RGN-II/DRS | ||
| docket = 05000390 | | docket = 05000390 |
Revision as of 00:40, 11 July 2019
ML110140139 | |
Person / Time | |
---|---|
Site: | Watts Bar |
Issue date: | 06/08/2010 |
From: | Roden J Tennessee Valley Authority |
To: | Laska G Division of Reactor Safety II |
References | |
50-390/10-301 | |
Download: ML110140139 (10) | |
Similar Documents at Watts Bar | |
---|---|
Category:Letter
MONTHYEARML23319A2452024-01-29029 January 2024
[Table view]Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML24008A2462024-01-18018 January 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000390/20234412023-12-21021 December 2023 Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) IR 05000390/20234042023-12-14014 December 2023 Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control IR 05000390/20230102023-11-30030 November 2023 RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20230032023-11-13013 November 2023 Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation ML23312A1432023-11-0808 November 2023 Submittal of Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 5 CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23251A2002023-09-11011 September 2023 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Units 1 and 2 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds IR 05000390/20230022023-08-16016 August 2023 Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002 ML23220A1582023-08-0909 August 2023 Integrated Inspection Report 05000390/2023002 and 05000391/2023002 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills IR 05000390/20230112023-07-24024 July 2023 Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011 CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out IR 05000390/20234032023-05-30030 May 2023 Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403 ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20220032023-05-0909 May 2023 Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) IR 05000390/20230012023-05-0404 May 2023 Integrated Inspection Report 05000390/2023001 and 05000391/2023001 CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23073A2762023-04-0303 April 2023 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (Letter) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report 2024-01-09 Category:License-Operator MONTHYEARML22314A0312022-11-10010 November 2022
[Table view]2B ML22217A0842022-08-0303 August 2022 NRC Operator Licensing Examination Approval 05000390/2022301 and 05000391/2022301 ML22007A1562022-01-0707 January 2022 Notification of Licensed Operator Initial Examination 05000390/2022301 and 05000391/2022301 WBL-21-023, Preparation and Scheduling of Operator Licensing Examination2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examination ML21111A3522021-04-16016 April 2021 March 2021 GFE IR 05000390/20203012021-01-19019 January 2021 Reissue - Watts Bar Nuclear Plant - NRC Operator License Examination Report 05000390/2020301 and 05000391/2020301 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20300A5892020-10-26026 October 2020 File 2B - Normal Release - Exam Administrative Items ML20300A5842020-10-26026 October 2020 Wb 2020301 Exam Final Items - Delayed Release - File 2A-2 ML20300A5852020-10-26026 October 2020 Wb 2020301 File 2A-3 Exam Administrative Items - Delayed Release ML20276A2052020-10-0202 October 2020 SRO Exam ML20276A1512020-10-0202 October 2020 RO Exam WBL-20-008, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations2020-03-10010 March 2020 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations ML20043F0702020-01-23023 January 2020 301, 2B, Exam Administrative Items (Normal Release) ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19256B0322019-09-13013 September 2019 Wb 2019-301, Post Exam Comments (Normal Release) L-19-031, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations ML19116A1442019-04-26026 April 2019 301 ADAMS-2C Exam QA Material ML19116A1392019-04-26026 April 2019 301 ADAMS-2A Draft Exam Material ML19100A2512019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Watts Bar Nuclear Plant ML19099A3022019-04-0909 April 2019 Confirmation of Requested Initial Operator License Examination for Watts Bar Nuclear Plant, Units 1 and 2 ML19045A3712019-02-12012 February 2019 March 2019 GFE Cover Letter Rii ML19029B1122019-01-29029 January 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2018-02 - Revised Preparation and Scheduling of Operator Licensing Examinations ML19018A2252019-01-18018 January 2019 Notification of Licensed Operator Initial Examination 05000390/2019301, 05000391/2019301 ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 IR 05000390/20183012018-11-0808 November 2018 NRC Operator License Examination Report 05000390/2018301 and 05000391/2018301 ML18298A1632018-10-25025 October 2018 301 Post Exam Comments ML18122A1412018-05-0202 May 2018 Nuclear Regulatory Commission (Nrg) Regulatory Issue Summary (RIS) 2018-02 - Preparation and Scheduling of Operator Licensing Examinations ML18044A9892018-02-13013 February 2018 Notification of Licensed Operator Initial Examination 05000390/2018301, 05000391/2018301 ML17191B4242017-07-10010 July 2017 Exam Administrative Items - Delay Release 2 Yrs ML17191B3462017-07-10010 July 2017 Exam Final Items - Delay Release 2 Yrs ML17165A4912017-06-14014 June 2017 302 Final Administrative Documents ML17165A4952017-06-14014 June 2017 302 Final Administrative JPMs ML17165A5152017-06-14014 June 2017 302 General Correspondence Redacted ML17165A5372017-06-14014 June 2017 302 Draft RO Written Exam ML17165A4942017-06-14014 June 2017 302 Final Simulator and in Plant JPMs ML17165A4932017-06-14014 June 2017 302 Final Simulator Scenarios ML17165A4852017-06-14014 June 2017 302 Draft Simulator and in Plant JPMs ML17165A4872017-06-14014 June 2017 302 Draft Administrative JPMs ML17165A4832017-06-14014 June 2017 302 Draft Simulator Scenarios ML17165A5412017-06-14014 June 2017 302 Draft SRO Written Exam ML17165A4772017-06-14014 June 2017 302 Draft Administrative Documents ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16257A7232016-09-13013 September 2016 Initial Exam 2016-301 Post Exam Comments ML16257A7142016-09-13013 September 2016 Initial Exam 2016-301 Final RO Written Exam - Delay Release 2 Years ML16257A7212016-09-13013 September 2016 Initial Exam 2016-301 Final SRO Written Exam - Delay Release 2 Years ML16200A1202016-07-15015 July 2016 Operator Licensing Written Examination Approval 05000390/2016301 and 05000391/2016301 ML16197A0392016-07-15015 July 2016 NRC Regulatory Issue Summary 2016-09 - Preparation and Scheduling of Operator Licensing Examinations ML16054A2772016-02-19019 February 2016 Notification of Licensed Operator Initial Examination 05000390/2016301, 05000391/2016301 ML15259A2822015-09-16016 September 2015 301 Draft Administrative Documents 2022-08-03 Category:Part 55 Examination Related Material MONTHYEARML22314A0312022-11-10010 November 2022
[Table view]2B ML22217A0842022-08-0303 August 2022 NRC Operator Licensing Examination Approval 05000390/2022301 and 05000391/2022301 ML22007A1562022-01-0707 January 2022 Notification of Licensed Operator Initial Examination 05000390/2022301 and 05000391/2022301 WBL-21-023, Preparation and Scheduling of Operator Licensing Examination2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examination IR 05000390/20203012021-01-19019 January 2021 Reissue - Watts Bar Nuclear Plant - NRC Operator License Examination Report 05000390/2020301 and 05000391/2020301 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20300A5892020-10-26026 October 2020 File 2B - Normal Release - Exam Administrative Items ML20300A5852020-10-26026 October 2020 Wb 2020301 File 2A-3 Exam Administrative Items - Delayed Release ML20300A5842020-10-26026 October 2020 Wb 2020301 Exam Final Items - Delayed Release - File 2A-2 ML20276A2052020-10-0202 October 2020 SRO Exam ML20276A1512020-10-0202 October 2020 RO Exam WBL-20-008, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations2020-03-10010 March 2020 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations ML20043F0702020-01-23023 January 2020 301, 2B, Exam Administrative Items (Normal Release) ML19256B0322019-09-13013 September 2019 Wb 2019-301, Post Exam Comments (Normal Release) L-19-031, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations ML19116A1392019-04-26026 April 2019 301 ADAMS-2A Draft Exam Material ML19116A1442019-04-26026 April 2019 301 ADAMS-2C Exam QA Material ML19100A2512019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Watts Bar Nuclear Plant ML19099A3022019-04-0909 April 2019 Confirmation of Requested Initial Operator License Examination for Watts Bar Nuclear Plant, Units 1 and 2 ML19029B1122019-01-29029 January 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2018-02 - Revised Preparation and Scheduling of Operator Licensing Examinations ML19018A2252019-01-18018 January 2019 Notification of Licensed Operator Initial Examination 05000390/2019301, 05000391/2019301 IR 05000390/20183012018-11-0808 November 2018 NRC Operator License Examination Report 05000390/2018301 and 05000391/2018301 ML18298A1632018-10-25025 October 2018 301 Post Exam Comments ML18122A1412018-05-0202 May 2018 Nuclear Regulatory Commission (Nrg) Regulatory Issue Summary (RIS) 2018-02 - Preparation and Scheduling of Operator Licensing Examinations ML18044A9892018-02-13013 February 2018 Notification of Licensed Operator Initial Examination 05000390/2018301, 05000391/2018301 ML17191B3462017-07-10010 July 2017 Exam Final Items - Delay Release 2 Yrs ML17191B4242017-07-10010 July 2017 Exam Administrative Items - Delay Release 2 Yrs ML17165A4772017-06-14014 June 2017 302 Draft Administrative Documents ML17165A4912017-06-14014 June 2017 302 Final Administrative Documents ML17165A4952017-06-14014 June 2017 302 Final Administrative JPMs ML17165A5152017-06-14014 June 2017 302 General Correspondence Redacted ML17165A5372017-06-14014 June 2017 302 Draft RO Written Exam ML17165A4942017-06-14014 June 2017 302 Final Simulator and in Plant JPMs ML17165A4932017-06-14014 June 2017 302 Final Simulator Scenarios ML17165A4852017-06-14014 June 2017 302 Draft Simulator and in Plant JPMs ML17165A4872017-06-14014 June 2017 302 Draft Administrative JPMs ML17165A4832017-06-14014 June 2017 302 Draft Simulator Scenarios ML17165A5412017-06-14014 June 2017 302 Draft SRO Written Exam ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16257A7212016-09-13013 September 2016 Initial Exam 2016-301 Final SRO Written Exam - Delay Release 2 Years ML16257A7232016-09-13013 September 2016 Initial Exam 2016-301 Post Exam Comments ML16257A7142016-09-13013 September 2016 Initial Exam 2016-301 Final RO Written Exam - Delay Release 2 Years ML16200A1202016-07-15015 July 2016 Operator Licensing Written Examination Approval 05000390/2016301 and 05000391/2016301 ML16054A2772016-02-19019 February 2016 Notification of Licensed Operator Initial Examination 05000390/2016301, 05000391/2016301 ML15259A2822015-09-16016 September 2015 301 Draft Administrative Documents ML15259A2902015-09-16016 September 2015 301 Draft RO Written Exam ML15259A2922015-09-16016 September 2015 301 Draft SRO Written Exam ML15259A2952015-09-16016 September 2015 301 Draft Simulator Scenarios ML15259A2962015-09-16016 September 2015 301 Draft Simulator and In-Plant JPMs ML15259A3962015-09-16016 September 2015 301 Draft Administrative JPMs 2022-08-03 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML110140139&oldid=1780756"