Line 3: |
Line 3: |
| | issue date = 02/23/1978 | | | issue date = 02/23/1978 |
| | title = Letter on General Electric Report, Evaluation of Effects of Pool Swell in the Mark-I and Mark-II Containments, Nedm 20725-01, Dated November, 1974 | | | title = Letter on General Electric Report, Evaluation of Effects of Pool Swell in the Mark-I and Mark-II Containments, Nedm 20725-01, Dated November, 1974 |
| | author name = Sobon L J | | | author name = Sobon L |
| | author affiliation = General Electric Co | | | author affiliation = General Electric Co |
| | addressee name = Stolz J F | | | addressee name = Stolz J |
| | addressee affiliation = NRC/NRR | | | addressee affiliation = NRC/NRR |
| | docket = 05000397 | | | docket = 05000397 |
Revision as of 01:43, 17 June 2019
|
---|
Category:Letter
MONTHYEARGO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-012023-11-28028 November 2023 Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 GO2-23-121, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-27027 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000397/20230122023-11-20020 November 2023 Commercial Grade Dedication Inspection Report 05000397/2023012 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000397/20230102023-11-0909 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000397/2023010 IR 05000397/20230932023-11-0101 November 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023093 ML23299A2072023-10-26026 October 2023 Biennial Requalification Inspection Request for Information IR 05000397/20230032023-10-25025 October 2023 Integrated Inspection Report 05000397/2023003 IR 05000397/20230112023-10-0404 October 2023 License Renewal Phase 2 Report 05000397/2023011 IR 05000397/20234012023-09-11011 September 2023 Security Baseline Inspection Report 05000397/2023401 GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)2023-09-0606 September 2023 In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) ML24032A2182023-09-0101 September 2023 Information Request, Security IR 2024401 GO2-23-100, Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication2023-08-31031 August 2023 Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000397/20230052023-08-22022 August 2023 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2023005) - Mid Year Letter IR 05000397/20230022023-08-0101 August 2023 Integrated Inspection Report 05000397/2023002 GO2-23-093, Supplement to Reply to a Notice of Violation: EA-21-1702023-07-27027 July 2023 Supplement to Reply to a Notice of Violation: EA-21-170 ML23206A2442023-07-25025 July 2023 Energy Northwest Columbia Generating Station, Response to Apparent Violation in NRC Inspection Report 05000397/2023092; EA-23-054 GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation2023-07-19019 July 2023 Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation GO2-23-090, Reply to a Notice of Violation2023-07-12012 July 2023 Reply to a Notice of Violation ML23143A1202023-06-27027 June 2023 Request Number 4ISI-11 to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Regarding Alternate Examination of Reactor Vessel Welds GO2-23-073, Notification of NPDES Permit Issuance2023-06-26026 June 2023 Notification of NPDES Permit Issuance ML23163A2502023-06-12012 June 2023 Summary of Changes and Analysis for Revision 41 of Plant Procedures Manual 13.8.1 Emergency Dose Projection System Operations GO2-23-072, Cycle 27 Core Operating Limits Report2023-06-0505 June 2023 Cycle 27 Core Operating Limits Report ML23157A2702023-06-0101 June 2023 4-2022-011 -022 Letter - OI Closure to Licensee IR 05000397/20230922023-06-0101 June 2023 NRC Inspection Report 05000397/2023092 and Preliminary White Finding IR 05000397/20230902023-06-0101 June 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023090 GO2-23-055, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report IR 05000397/20230012023-05-0505 May 2023 Integrated Inspection Report 05000397/2023001 - April 26, 2023 GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications2023-05-0101 May 2023 License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications IR 05000397/20233012023-05-0101 May 2023 NRC Examination Report 05000397/2023301 GO2-23-053, 2022 Annual Environmental Operating Report2023-04-26026 April 2023 2022 Annual Environmental Operating Report GO2-23-057, 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 2022 Annual Radioactive Effluent Release Report ML23110A2642023-04-20020 April 2023 Request for Information License Renewal Phase 2 Inspection GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-041, Generation Station - Level of Financial Protection - Annual Reporting Requirement2023-03-15015 March 2023 Generation Station - Level of Financial Protection - Annual Reporting Requirement GO2-23-038, Plant Decommissioning Fund Status Report2023-03-15015 March 2023 Plant Decommissioning Fund Status Report ML23013A0812023-03-15015 March 2023 Issuance of Amendment No. 270 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4B GO2-23-034, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462023-03-13013 March 2023 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 2024-01-08
[Table view] |
Text
STAG)ARD DISTRIBUTION F QiCOMWG MATERIAL RELA~G TO TI CONTALKKNT NRC PORM 196 U~o NUCLEAR REGULATORY CO MISSION I2 78)NRC OISTRlBUTtON FoR PART 50 OOCKET MATERlAL OOCXET NUMSER MYRtANR&TOP ICAL REPORT TO: Mrs John F, Stolz General Electrf.c San Jose, CA.95125 L J~Sobon OATS OP OOCUMENT 02/21/78 OATS RECEIVEO 02 27 78>>'TTE R~OR I FINAL C}coP Y OESCRIPTION QNO ORIZEO NCLASSIPIEO PROP INPUT PORM ENCLOSU RE NUMEER OP COPIES RECEIVEO Requesting withdrawal of NEDM 20725-01, entitled: "Evaluation of Effects af Pool Swell in the Mark-I and Mark-II Co from consideration as part of the Mark II requesting to destroy'or return those copi NRC's possession,~~LETTERS OF INCORPORATION WILL BE PLACED IN EACH DOCKET LISTED BELOW.NOTE-CYS.MILL BE PLACED IN iTHE LPDR FOR,.THE FOLLOWED ZIMMER 50<<358 ViiE MILE POLIT 50 410 LIMERICK 50 353 MPPS-2 0-397 BAILLY>>67 SHOREHVi.$0-3+2 jcm 02/28/78 LA SALLE 50-373/374 ti anment s," rogram, and s in 2p FOR ACTION/INFORMATION ENTRAL FT.S 2 W 9 t s fo eac NRC PER DR~S 7 Se Note o e ViSIC ACRS I 6 I>>SZGPr'.LL G>>LAINAS 7 J>>IQKGHT 2)C ANDERSON I>>PELTIZR INTERNAL DISTR I BUTION LETTER OiiLY R>>DEYOUNG D>>VASSALLO K MiKL 0>>PARR J>>T R>>TEDESCO M>>RUSHBROOK W>>P~S>>VARGA LYiilCH iQ)J>>SNELL A>>BGUR"ILK W~~K S~MINER EXTERNAL DISTRIBUTION CONTROL iVUMBER qp 1g tP (gPI1)f"NUCLEAR ENERGY GENERAL ELECTRIC COMPANY, 175 CURTNER AVE., SAN JOSE, CALIFORNIA 95125 MC 681 (408)925-3495 PRO J ECTS DIVISION MFN-081-78 February 23, 1978 U.S.Nuclear Regulatory Commission Division of Projects Management Office of Nuclear Reactor Regulation Washington, D.C.20555 Attention:.
Mr.John F.Stolz, Chief Light Water Reactors Branch No.1 c~I I.,~'entlemen:
SUBJECT:
GENERAL ELECTRIC REPORT,"EVALUATION OF EFFECTS OF POOL SWELL IN THE MARK-I AND MARK-II CONTAINMENTS," NEDM 20725-01, DATED NOVEMBER, 1974
Reference:
Letter,"Mark II Containment," to R.F.Boyd (NRC)from I.F.Stuart (GE), dated January 15, 1976, GE-MFN 008-76 The subject report was submitted to the NRC in January 1976.Although never intended for distribution outside General Electric, ten (10)copies were provided to the Staff as requested, because NEDM 20725-01 had been referenced in the Mark II DFFR, NEDO 21061,[Revision 0], dated September'1975.As stated in the referenced letter, inclusion of NEDM 20725-01 as a DFFR reference was unnecessary because the analytical model contained in the report had been provided in DFFR, Revision 0.The subsequent DFFR Revisions 1 and 2, which entirely superseded the respective previous revisions, therefore did not include reference to NEDM 20725-01.Because the report NEDM 20725-01 is not referenced in the presently applicable DFFR (Revision 2)and the pool swell..model has been described in the Pool Swell Model Repor t, NEDO/NEDE 21544P, submitted as part of the Mar k II Supporting Program in February, 1977, the unpublished NEDM 20725-01 has no application in the Mark II Program.
GENERAL',i ELECTHIC Mr.John F.Stolz Page 2 February 21, 1978 Please withdraw report NEDM 20725-01 from consideration as part of the Mark II Program;destroy or return those copies in your possession.
Any questions regarding this matter should be directed to L.H.Frauenholz, the Mk II Containment Licensing Engineer, (408)925-2623.Sincerely,'L.J.'"Sobon,'Mana'ger BWR Containment Licensing Containment Improvement Programs JS: at/171-172 cc: C.J.Anderson (NRC)H.C.Brinkmann (Mark II Owners Group)L.S.Gifford (GE Bethesda)S.Miner (NRC)I.A.Peltier (NRC)R.L.Tedesco (NRC)File 2.10 f'1 I~1 h