ML18191A211

From kanterella
Jump to navigation Jump to search
Letter on General Electric Report, Evaluation of Effects of Pool Swell in the Mark-I and Mark-II Containments, Nedm 20725-01, Dated November, 1974
ML18191A211
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/23/1978
From: Sobon L
General Electric Co
To: Stolz J
Office of Nuclear Reactor Regulation
References
MFN-081-78, NEDM 20725-01
Download: ML18191A211 (4)


Text

STAG)ARD DISTRIBUTION F QiCOMWG MATERIAL RELA~G TO TI CONTALKKNT NRC PORM 196 U~o NUCLEAR REGULATORY CO MISSION OOCXET NUMSER I2 78)

MYRtANR&

NRC OISTRlBUTtON FoR PART 50 OOCKET MATERlAL TOP ICAL REPORT OATS OP OOCUMENT TO: Mrs John F, Stolz General Electrf.c 02/21/78 San Jose, CA. 95125 OATS RECEIVEO L J ~ Sobon 02 27 78

>>'TTE R QNO ORIZEO PROP INPUT PORM NUMEER OP COPIES RECEIVEO

~ OR C}coP Y I FINAL NCLASSIPIEO OESCRIPTION ENCLOSU RE Requesting withdrawal of NEDM 20725-01, entitled: "Evaluation of Effects af Pool Swell in the Mark-I and Mark-II Co tianment s,"

from consideration as part of the Mark II rogram, and requesting to destroy'or return those copi s in NRC's possession, ~ ~

LETTERS OF INCORPORATION WILL BE PLACED IN 2p EACH DOCKET LISTED BELOW .

NOTE- CYS .MILL BE PLACED IN iTHE LPDR FOR,.

THE FOLLOWED ZIMMER 50<<358 ViiE MILE POLIT 50 410 LIMERICK 50 353 MPPS-2 0-397 BAILLY>> 67 jcm 02/28/78 SHOREHVi . $ 0-3+2 LA SALLE 50-373/374 FOR ACTION/INFORMATION INTERNALDISTR I BUTION ENTRAL FT. S 2 W 9 t s fo eac LETTER OiiLY NRC PER R>> DEYOUNG DR~S 7 Se Note o e D>> VASSALLO K MiKL ViSIC 0>> PARR ACRS I6 J>> T I>> SZGPr'.LL R>> TEDESCO G>> LAINAS 7 M>> RUSHBROOK J>> IQKGHT 2) W>> P~

C ANDERSON S>> VARGA I>> PELTIZR LYiilCH iQ)

J>> SNELL A>> BGUR"ILK W~ ~K S ~ MINER EXTERNAL DISTRIBUTION CONTROL iVUMBER

qp 1g tP (gPI1)f "NUCLEAR ENERGY PRO J ECTS DIVISION GENERAL ELECTRIC COMPANY, 175 CURTNER AVE., SAN JOSE, CALIFORNIA 95125 MFN-081- 78 MC 681 (408) 925-3495 February 23, 1978 U. S. Nuclear Regulatory Commission Division of Projects Management Office of Nuclear Reactor Regulation Washington, D. C. 20555 Attention:. Mr. John F. Stolz, Chief Light Water Reactors Branch No. 1 c~I I

.,~'entlemen:

SUBJECT:

GENERAL ELECTRIC REPORT, "EVALUATION OF EFFECTS OF POOL SWELL IN THE MARK-I AND MARK-II CONTAINMENTS,"

NEDM 20725-01, DATED NOVEMBER, 1974

Reference:

Letter, "Mark II Containment," to R. F. Boyd (NRC) from I. F. Stuart (GE), dated January 15, 1976, GE-MFN 008-76 The subject report was submitted to the NRC in January 1976. Although never intended for distribution outside General Electric, ten (10) copies were provided to the Staff as requested, because NEDM 20725-01 had been referenced in the Mark II DFFR, NEDO 21061, [Revision 0],

dated September '1975.

As stated in the referenced letter, inclusion of NEDM 20725-01 as a DFFR reference was unnecessary because the analytical model contained in the report had been provided in DFFR, Revision 0. The subsequent DFFR Revisions 1 and 2, which entirely superseded the respective previous revisions, therefore did not include reference to NEDM 20725-01.

Because the report NEDM 20725-01 is not referenced in the presently applicable DFFR (Revision 2) and the pool swell.. model has been described in the Pool Swell Model Repor t, NEDO/NEDE 21544P, submitted as part of the Mar k II Supporting Program in February, 1977, the unpublished NEDM 20725-01 has no application in the Mark II Program.

GENERAL ',i ELECTHIC Mr. John F. Stolz Page 2 February 21, 1978 Please withdraw report NEDM 20725-01 from consideration as part of the Mark II Program; destroy or return those copies in your possession.

Any questions regarding this matter should be directed to L. H. Frauenholz, the Mk II Containment Licensing Engineer, (408) 925-2623.

Sincerely,

'L. J.'"Sobon, 'Mana'ger BWR Containment Licensing Containment Improvement Programs JS: at/171-172 cc: C. J. Anderson (NRC)

H. C. Brinkmann (Mark II Owners Group)

L. S. Gifford (GE Bethesda)

S. Miner (NRC)

I. A. Peltier (NRC)

R. L. Tedesco (NRC)

File 2.10

f'1 I

1

~

h