ML17264A419: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 24: Line 24:
,~~~2~~~3.8-1 3.8-1 3.8-2 3.9-1 3,9-1 3.9-2 3.9-4 M%%RtJKK JRR~SGinna Station TRM Revision 0  
,~~~2~~~3.8-1 3.8-1 3.8-2 3.9-1 3,9-1 3.9-2 3.9-4 M%%RtJKK JRR~SGinna Station TRM Revision 0  


===3.0 LIHITIHG===
3.0 LIHITIHG COHOITIONS FOR OPERATION (LCO)APPLICABILITY SURVE ILLAHCE REOUIREHEHT (SR)APPLICABILITY The Technical Requirements (TRs)in this manual follow the same LCO applicabi lities as the Improved Technical Specifications with the exception of LCO 3.0.6 which deals solely with ITS LCOs on support/supported system inoperabilities.
COHOITIONS FOR OPERATION (LCO)APPLICABILITY SURVE ILLAHCE REOUIREHEHT (SR)APPLICABILITY The Technical Requirements (TRs)in this manual follow the same LCO applicabi lities as the Improved Technical Specifications with the exception of LCO 3.0.6 which deals solely with ITS LCOs on support/supported system inoperabilities.
The Technical Surveillance Requirements (TSRs)in this manual follow the same SR apiplicabilities as the Improved Technical Specifications.
The Technical Surveillance Requirements (TSRs)in this manual follow the same SR apiplicabilities as the Improved Technical Specifications.
The TRs in this manual also-follow the same organization as the Improved Technical Specifications (e.g., Reactivity Control System requirements are contained in TR Chapter 3,1).Ginna Station TRH TRH 3.0-l" Revision 0  
The TRs in this manual also-follow the same organization as the Improved Technical Specifications (e.g., Reactivity Control System requirements are contained in TR Chapter 3,1).Ginna Station TRH TRH 3.0-l" Revision 0  
Line 37: Line 36:
~I I I I~I  
~I I I I~I  


C REATS Toxic Ga s Instrumentation lR 3.3.1 3.3 IHSTRUHEHTATION
C REATS Toxic Ga s Instrumentation lR 3.3.1 3.3 IHSTRUHEHTATION 3.3.1 Control Room Emergency Air Treatment System (CREATS)Toxic Gas Instrumentation TR 3.3.1 The CREATS actuation instrumentation for each toxic gas Function in Table TR 3.3.1-1 shall be OPERABLE.APPLICABILITY:
 
====3.3.1 Control====
Room Emergency Air Treatment System (CREATS)Toxic Gas Instrumentation TR 3.3.1 The CREATS actuation instrumentation for each toxic gas Function in Table TR 3.3.1-1 shall be OPERABLE.APPLICABILITY:
HOOES 1, 2, 3, 4, 5'and 6.ACTIONS-HOTE-CREATS air intake may be unisolated fnr up to 1 hour per day for fresh air makeup to improve the working environment in the control room.COHO I T ION, RE/VIREO ACTIONS COMPLETION TINE A.One or more toxic gas functions with one channel inoperable, A.I Place CREATS in HOOE F.1 hour SURVEILLANCE RE(jUIREHENTS SURVEILLANCE FRE(UEHCY TSR 3.3.1.1 Perform COT.31 days TSR 3.3.1.2 Perform CHANNEL CALIBRATION.
HOOES 1, 2, 3, 4, 5'and 6.ACTIONS-HOTE-CREATS air intake may be unisolated fnr up to 1 hour per day for fresh air makeup to improve the working environment in the control room.COHO I T ION, RE/VIREO ACTIONS COMPLETION TINE A.One or more toxic gas functions with one channel inoperable, A.I Place CREATS in HOOE F.1 hour SURVEILLANCE RE(jUIREHENTS SURVEILLANCE FRE(UEHCY TSR 3.3.1.1 Perform COT.31 days TSR 3.3.1.2 Perform CHANNEL CALIBRATION.
)8 months Ginna Station TRH 3.3-1 Revision 0  
)8 months Ginna Station TRH 3.3-1 Revision 0  
'Circulating Water Flood Protection Instrumentation TR 3.3.2 3.3 INSTRUHENTATION
'Circulating Water Flood Protection Instrumentation TR 3.3.2 3.3 INSTRUHENTATION 3.3.2 Circulating Water Flood Protection Instrumentation TR 3.3.2 The Circulating Water Flood Protection instrumentation for'each Function in Table TR 3.3.2-I shall he OPERABLE.APPLICABILITY:
 
====3.3.2 Circulating====
Water Flood Protection Instrumentation TR 3.3.2 The Circulating Water Flood Protection instrumentation for'each Function in Table TR 3.3.2-I shall he OPERABLE.APPLICABILITY:
HODES I and 2.ACTIONS-NOTE------
HODES I and 2.ACTIONS-NOTE------
Separate Condition entry is allowed for each set.CONDITION REQUIRED ACTION COHPLET ION T IHE A.One or more Functions with one required channel in one or more set(s)inoperable.
Separate Condition entry is allowed for each set.CONDITION REQUIRED ACTION COHPLET ION T IHE A.One or more Functions with one required channel in one or more set(s)inoperable.
Line 60: Line 53:
Reactor Vesse)>lead Vents TR 3.4.1 SURVEILLANCE REQUIREHENTS SURVEILLANCE FREQUENCY TSR 3.4.1.1 Verify the required reactor hea'd vent manual isolation valves are locked open.18 months TSR 3.4.1.2 Verify flow through the required reactor vessel head vent path using either liquid or gas.10 monthsGinna Station TRH TRH 3.4-2 Revision 0  
Reactor Vesse)>lead Vents TR 3.4.1 SURVEILLANCE REQUIREHENTS SURVEILLANCE FREQUENCY TSR 3.4.1.1 Verify the required reactor hea'd vent manual isolation valves are locked open.18 months TSR 3.4.1.2 Verify flow through the required reactor vessel head vent path using either liquid or gas.10 monthsGinna Station TRH TRH 3.4-2 Revision 0  


===3.7 PLANT===
3.7 PLANT SYSTEHS There are no technical requirements associated with this Chapter.I IGinna Station...TRH 3.7-1 Revision 0 V.e l' Refueling Manip Lor Crane interlocks TR 3.9.3'l 3.9 REFUELING OPERAl I ONS 3.9.3 Refueling Manipulator Crane Interlocks TR 3.9.3 The refueling manipulator crane interlocks shall be OPERABLE.APPLICABILITY:
SYSTEHS There are no technical requirements associated with this Chapter.I IGinna Station...TRH 3.7-1 Revision 0 V.e l' Refueling Manip Lor Crane interlocks TR 3.9.3'l 3.9 REFUELING OPERAl I ONS 3.9.3 Refueling Manipulator Crane Interlocks TR 3.9.3 The refueling manipulator crane interlocks shall be OPERABLE.APPLICABILITY:
During use nf the refueling manipulator crane with fuel in the vessel.ACTIONS CONDITION REQUIRED ACTION COHPLETION TIHE A.Refuel ing manipul ator crane interlocks inoperable.
During use nf the refueling manipulator crane with fuel in the vessel.ACTIONS CONDITION REQUIRED ACTION COHPLETION TIHE A.Refuel ing manipul ator crane interlocks inoperable.
A.I Suspend use of refueling manipulator
A.I Suspend use of refueling manipulator
--crane.Immedi~te 1 y SURVEILLANCE RE(U I REMEN TS SURVEILLANCE FREQUENCY TSR 3.9,3.1 Veri fy the refuel ing manipulator crane interlocks are OPERABLE.Once prior to refueling operations 0 Ginna Station TRH TRH 3.9-: Revision 0}}
--crane.Immedi~te 1 y SURVEILLANCE RE(U I REMEN TS SURVEILLANCE FREQUENCY TSR 3.9,3.1 Veri fy the refuel ing manipulator crane interlocks are OPERABLE.Once prior to refueling operations 0 Ginna Station TRH TRH 3.9-: Revision 0}}

Revision as of 09:29, 6 May 2019

Rev 0 to Technical Requirements Manual (Trm).
ML17264A419
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/24/1996
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
References
PROC-960224, NUDOCS 9604010159
Download: ML17264A419 (23)


Text

GINNA STATION TRIVl Revision 0 TECH ICAL REQUIR MENTS MANUAL (T)R sponsible Manager Eff tive Oate N/p~Controlled Copy Ho.~~/96040101S9 960224 PDR ADOCK 05000244 P P DFt

List of Effective Pages (TAM)Pa e Rev.TOC Pa e Rev..Section 3.4 Pa e Rev.Pa e Rev~Section 1.0 TRH 1.0-1 Section 2.0 ,TRH 2.0-1 Section 3.0 TRH 3.0-1 Section 3.1 TRH 3.1-1 TRH 3.1-2 TRM 3.1-3 TRH 3.1-4 TRH 3.1-5 TRM 3.1-6 TRM 3.1-7 TRH 3.1-8 TRH 3.1-9 Section 3.2 TRH 3.2-1 Section 3.3 TRH 3.3-1 TRH 3.3-P TRH 3.3-3 TRH 3.3-4 TRM 3.3-5 TRH 3.3-6 TRM 3.4-1 TRM 3.4-2 TRM 3.4-3 TRM 3.4-4 TRH 3.4-5 TRH 3.4-6 TRM 3.4-7 Section 3.5 TRH 3.5-1 Section 3.6 TRH 3.6-1 Section 3.7 TRH 3.7-1 Section 3.8 TRH 3.8-1 TRH 3.8-'2 TRH 3.8-3 Section 3.9 TRM 3.9-1 TRH 3.9-2 TRM 3.9-3 TRH 3,9-4 0 0 0 0'0 0 0 ip 0 0 0-LEP-i

TABLE OF CONTENTS 1.0 2.0 3.0 3.0 3.1 3.1.1 3.1.2 3.1.3 3.2 3.3 3.3,1 3.3.2 3.3.3 3.4 3.4.1 3.4.2 3.5 3.6 USE ANO APPLICATION SAFETY LIHITS (SLs)LIMITING CONDITION FOR OPERATION (LCO)APPLICABILITY SURVEILLANCE RE(UIREMENT (SR)APPLICABILITY REACTIVITY CONTROL SYSTEMS.Boron Injection System-MODES 1, 2, 3, and Boron Injection System-HOOES 5 and 6 Rod Group Alignment Limits Safety Analyses Re-Evaluation POWER OISIN'IBUT'ON LIHITS 4 INSTRUMENTATION Control Room Emergency Air Treatment System (CREATS)Instrumentation Circulating Water Flood Protection Instrumentation

.Movable In-Core Instrumentation REACTOR COOLANT SYSTEH (RCS)Reactor Vessel Head Vents RCS Chemistry EMERGENCY CORE COOLING SYSTEHS (ECCS)CONTAINMENT SYSTEHS 1.0-1 2.0-1 3.0-1 3.0-1 3.1-1 3.1-1 3.1-6 3.1-8 3.2-1 3.3-1 3.3-1 3.3-3 3.3-6 3.4-1 3.4-1 3.4-3 3.5-I 3.'6-1 3.7 PLANT SYSTEMS I~~3.7-1 3.8 3.8.1 3.8.2 3~9 3,9.1 3.9.2 3,9.3 ELECTRICAL POWER SYSTEHS Offsite Power Sources Diesel Generator (OG)Load Sequencer.REFUELING OPERATIONS Fuel Storage in Spent Fuel Pool (SFP)Region Fuel Assembly Hovement in Auxiliary Building Refueling Hanipulator Crane Interlocks

,~~~2~~~3.8-1 3.8-1 3.8-2 3.9-1 3,9-1 3.9-2 3.9-4 M%%RtJKK JRR~SGinna Station TRM Revision 0

3.0 LIHITIHG COHOITIONS FOR OPERATION (LCO)APPLICABILITY SURVE ILLAHCE REOUIREHEHT (SR)APPLICABILITY The Technical Requirements (TRs)in this manual follow the same LCO applicabi lities as the Improved Technical Specifications with the exception of LCO 3.0.6 which deals solely with ITS LCOs on support/supported system inoperabilities.

The Technical Surveillance Requirements (TSRs)in this manual follow the same SR apiplicabilities as the Improved Technical Specifications.

The TRs in this manual also-follow the same organization as the Improved Technical Specifications (e.g., Reactivity Control System requirements are contained in TR Chapter 3,1).Ginna Station TRH TRH 3.0-l" Revision 0

ACTIONS continued CONDITION REQUIRED ACTIONS COMPLETION TIHE D.Required Action and associated Completion Time of Condition C not met.D.I Be in MODE 5, 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> E.Both boron injection subsystems inoperable.

E.I Enter LCO 3'.3.Immediately Ginna Station TRH TRH 3.1-2 Revision 0 Boron injection System-MODES 5 and 6 IR 3.1.2 3.1 REACTIVITY CONTROL SYSTEMS 3.1,2 Boron Injection System-MODES 5 and 6 TR 3.1.2 One boron injection subsystem shall be OPERABLE.APPLICABILITY:

MODES 5 and 6.ACTIONS CONDITION RE(VIREO ACTIONS COMPLETION TIHE A.Required boron injection subsystem inoperable.

0*4 A.l Suspend CORE ALTERATIONS.

AND A.2 Suspend positive reactivity changes.AND~*.o A.3 Initiate action to restore required boron injection subsystem to OPERABLE st'atus.Immedi a te1 y Immediately Immediately Ginna Station TRH TRM 3.1-6 Revision 0

~I I I I~I

C REATS Toxic Ga s Instrumentation lR 3.3.1 3.3 IHSTRUHEHTATION 3.3.1 Control Room Emergency Air Treatment System (CREATS)Toxic Gas Instrumentation TR 3.3.1 The CREATS actuation instrumentation for each toxic gas Function in Table TR 3.3.1-1 shall be OPERABLE.APPLICABILITY:

HOOES 1, 2, 3, 4, 5'and 6.ACTIONS-HOTE-CREATS air intake may be unisolated fnr up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per day for fresh air makeup to improve the working environment in the control room.COHO I T ION, RE/VIREO ACTIONS COMPLETION TINE A.One or more toxic gas functions with one channel inoperable, A.I Place CREATS in HOOE F.1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> SURVEILLANCE RE(jUIREHENTS SURVEILLANCE FRE(UEHCY TSR 3.3.1.1 Perform COT.31 days TSR 3.3.1.2 Perform CHANNEL CALIBRATION.

)8 months Ginna Station TRH 3.3-1 Revision 0

'Circulating Water Flood Protection Instrumentation TR 3.3.2 3.3 INSTRUHENTATION 3.3.2 Circulating Water Flood Protection Instrumentation TR 3.3.2 The Circulating Water Flood Protection instrumentation for'each Function in Table TR 3.3.2-I shall he OPERABLE.APPLICABILITY:

HODES I and 2.ACTIONS-NOTE------

Separate Condition entry is allowed for each set.CONDITION REQUIRED ACTION COHPLET ION T IHE A.One or more Functions with one required channel in one or more set(s)inoperable.

Initiate action to verify that affected function set is OPERABLE.Immediately B.One or more Functions with two or more required channels per set inoperable.

B.I Restore set to OPERABLE status.7 days C.One or more Functions wl th both sets inoperable.

C.I Restore at least one set to OPERABLE" status.24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> D.Required Action and Assn~i~ted Completion Time rut met.D.l Be in MODE 3.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Ginna Station TRH 3.3-3 Revision 0

t eactor Vessel fiead Vents TR 3.4.1 3.4 RfACTOR COOLANT SYSTEM (RCS)3.4.1 Reactor Vessel Head Vents TR 3.4.1 Two reactor vessel head vent valves, in one vent flow path, shall be OPERABLE and closed.APPL I CAB IL I TY: 'OOES 1, 2, and 3.'CT IONS CONO I T ION REQUIRED ACTIONS COMPLETION TIHE A.One or more required reactor vessel head vent valves inoperable.

OR One or more required reactor vessel head vent valves open.-------------NOTE------------

LCO 3.0.4 is not applicable.

Initiate action to close required vent valve(s).A.2 Initiate action to remove motive power I'rom each required vent valve actuator.Immediately Immediately AD 3 Restore required reactor vessel head vent valve(s)to OPfRABLE status.30 days B.Required Actions and associated Completion Time not met.B.l Be in HOOE 3.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> B.2 Be in MOOE 4.36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Ginna Station TRH TRH 3.4-1 Revision 0

Reactor Vesse)>lead Vents TR 3.4.1 SURVEILLANCE REQUIREHENTS SURVEILLANCE FREQUENCY TSR 3.4.1.1 Verify the required reactor hea'd vent manual isolation valves are locked open.18 months TSR 3.4.1.2 Verify flow through the required reactor vessel head vent path using either liquid or gas.10 monthsGinna Station TRH TRH 3.4-2 Revision 0

3.7 PLANT SYSTEHS There are no technical requirements associated with this Chapter.I IGinna Station...TRH 3.7-1 Revision 0 V.e l' Refueling Manip Lor Crane interlocks TR 3.9.3'l 3.9 REFUELING OPERAl I ONS 3.9.3 Refueling Manipulator Crane Interlocks TR 3.9.3 The refueling manipulator crane interlocks shall be OPERABLE.APPLICABILITY:

During use nf the refueling manipulator crane with fuel in the vessel.ACTIONS CONDITION REQUIRED ACTION COHPLETION TIHE A.Refuel ing manipul ator crane interlocks inoperable.

A.I Suspend use of refueling manipulator

--crane.Immedi~te 1 y SURVEILLANCE RE(U I REMEN TS SURVEILLANCE FREQUENCY TSR 3.9,3.1 Veri fy the refuel ing manipulator crane interlocks are OPERABLE.Once prior to refueling operations 0 Ginna Station TRH TRH 3.9-: Revision 0