ML13154A276: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 14: Line 14:
| document type = License-Operator, Part 55 Examination Related Material, Memoranda
| document type = License-Operator, Part 55 Examination Related Material, Memoranda
| page count = 2
| page count = 2
| project = TAC:U01867
| stage = Draft Other
}}
}}



Revision as of 07:50, 22 January 2019

Peach Bottom - NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2)
ML13154A276
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/06/2013
From: Fish T H
Operations Branch I
To: Kelly M
Exelon Generation Co
Jackson D E
Shared Package
ML12318A009 List:
References
TAC U01867
Download: ML13154A276 (2)


Text

To: Todd Fish, NRC Chief Examiner From: Mike Kelly, Peach Bottom Regulatory Exam Author

Subject:

Revisions to Peach Bottom Operating Exam Materials for the March 2013 Initial NRC License Examination Date: March 6, 2013 The following materials were revised based on comments from the NRC Examination Team during the on-site exam preparation held February 11-13,2013.

A. Administrative IPMs: Replaced two RO Admin JPMs based on LOO-l and being discriminatory. Modified critical versus non-critical steps for 1 SRO Conduct of Operations JPM and 1 SRO Emergency Plan JPM. Added additional cue to 1 SRO Conduct of Operations JPM. Clarified the 'deliverable' for the SRO Radiation Control JPM. Made additional editorial changes to various JPMs based on NRC examiner comments.

B. Control Room JPMs: Modified critical versus non-critical steps for 3 JPMs. Added time-compression cues to one JPM. Made editorial changes to various JPMs based on NRC examiner comments.

C. In-plant JPMs: Changed one JPM performance unit to support geographic diversity. Modified critical versus non-critical steps for 1 JPM. Re-classified 1 JPM as alternate-path. Made editorial changes to various JPMs based on NRC examiner comments. -1 D. Simulator scenarios: Scenario 1 Minor changes to Simulator Operator instructions. Minor scripting modifications. Changed sequence of some events. Scenario 2 Minor scripting modifications Added 'C' event #6 for PRO. Added 'C' event #9 for URO. Modified Simulator Setup and Simulator Operator instructions to support new events. Scenario 3: Minor changes to Simulator Operator instructions. Minor scripting modifications. -2