{{Adams|number = ML080320209}}
{{Adams
| number = ML080320209
| issue date = 02/01/2008
| title = IR 05000293-07-005 on 10/01/2007 - 12/31/2007 for Pilgrim Event Follow-up
| author name = Powell R J
| author affiliation = NRC/RGN-I/DRP/PB5
| addressee name = Bronson K
| addressee affiliation = Entergy Nuclear Operations, Inc
| docket = 05000293
| license number = DPR-035
| contact person = Powell R J, RI/DRP/610-337-6967
| document report number = IR-07-005
| document type = Inspection Report, Letter
| page count = 33
}}


{{IR-Nav| site = 05000293 | year = 2007 | report number = 005 }}
{{IR-Nav| site = 05000293 | year = 2007 | report number = 005 }}


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406 February 1, 2008  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406
 
February 1, 2008  


Mr. Kevin Bronson Site Vice President Entergy Nuclear Operations, Inc.
Mr. Kevin Bronson Site Vice President Entergy Nuclear Operations, Inc.
Line 21: Line 37:
This report documents one self-revealing finding of very low safety significance (Green) for which no violation of NRC requirements was identified.
This report documents one self-revealing finding of very low safety significance (Green) for which no violation of NRC requirements was identified.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosures, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosures, and your response (if any) will be available electronically for public ins pection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RA/ Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket No. 50-293 License No. DPR-35  
Sincerely,/RA/ Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket No. 50-293 License No. DPR-35  
Line 34: Line 50:


=SUMMARY OF FINDINGS=
=SUMMARY OF FINDINGS=
..............................................................................................................3
IR 05000293/2007-005; 10/01/2007-12/31/2007; Pilgrim Nuclear Power Station; Event
 
Follow-up.
 
The report covered a 13-week period of inspection by resident and region-based inspectors.
 
One Green finding was identified. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609, "Significance Determination Process" (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRC's program for overseeing the safe operation of nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.
 
===A. NRC-Identified and Self-Revealing Findings===
 
===Cornerstone: Initiating Events===
: '''Green.'''
A Green self-revealing finding was identified for Entergy
=s failure to ensure the proper verification and calibration of vacuum trip switch VTS-1 during refueling outage (RFO) 16. Specifically, personnel did not ensure that the proper verification/calibration technique was employed to determine the as-found low condenser vacuum turbine trip setpoint. Additionally, when the technician identified that the as-found data was significantly outside of historical as-found values, he did not question the validity of the data nor did he obtain a peer check. The technician then calibrated the instrument using the incorrect as-found data which resulted in an incorrect low vacuum trip setpoint and a subsequent turbine trip and reactor scram on July 10, 2007.
 
This finding is more than minor because it is associated with the human performance attribute of the Initiating Events Cornerstone and affects the cornerstone objective of limiting the likelihood of those events t hat upset plant stability during pow er operations. The finding is of very low safety significance (Green) because it did not contribute to both the likelihood of a reactor trip and the likelihood that mitigation equipment would be unavailable. This finding has a cross-cutting aspect in the area of Human Performance,
Work Practices, because Entergy proceeded in the face of uncertainty or unexpected circumstances when the VTS-1 setpoint was found significantly outside of expected as-found values. [H.4(a)] (Section 4OA3)
 
===B. Licensee-Identified Violations===
 
None.
 
4


=REPORT DETAILS=
=REPORT DETAILS=
..........................................................................................................................4 
 
===Summary of Plant Status===
 
Pilgrim Nuclear Power Station (PNPS) operated at or near 100 percent power during the inspection period with the following exceptions: On October 30, 2007, Entergy reduced power to approximately 48 percent to perform a thermal backwash on the main condenser. Entergy resumed 100 percent power operation on October 31, 2007. On December 10, 2007, Entergy shut down and commenced a planned outage to repair leaking safety relief valve, RV-203-3B.
 
Entergy restored the plant to 100 percent power on December 13, 2007. The plant remained at or near 100 percent for the remainder of the inspection period.


==REACTOR SAFETY==
==REACTOR SAFETY==
........................................................................................................................4 1R01 Adverse Weather Protection...............................................................................4
Cornerstones:  Initiating Events, Mitigating Systems, and Barrier Integrity
{{a|1R01}}
==1R01 Adverse Weather Protection==
{{IP sample|IP=IP 71111.01}}


====a. Inspection Scope====
(3 samples - 1 seasonal readiness, 2 impending adverse weather)
The inspectors performed a review of cold weather preparations during the onset of the cold weather season to evaluate the site's readiness for seasonal susceptibilities. The inspectors reviewed Entergy's preparations for cold weather and its impact on the protection of safety-related systems, structures and components (SSCs). The inspection focused on the intake structure, the station blackout diesel generator and the condensate storage and transfer system. The inspection was intended to ensure that Entergy's equipment, instrumentation, and supporting structures were configured in accordance with Entergy's procedures and that adequate controls were in place to ensure functionality of the systems in cold weather. The inspectors also conducted a site walkdown on November 1, 2007, to assess Entergy's readiness for the potential affects of hurricane Noel. The inspectors verified that all outside objects were properly anchored or tied down. In addition, the inspectors conducted a site walkdown on December 12, 2007, to evaluate site preparations for an approaching coastal storm with accompanying high winds.
====b. Findings====
No findings of significance were identified.
{{a|1R04}}
{{a|1R04}}
==1R04 Equipment Alignment.........................................................................................==
==1R04 Equipment Alignment==
.4
{{IP sample|IP=IP 71111.04}}
===.1 Partial System Walkdowns===
{{IP sample|IP=IP 71111.04Q}}
 
====a. Inspection Scope====
(4 samples)
 
The inspectors performed four partial system walkdowns during this inspection period.
 
The inspectors reviewed the documents listed in the Attachment to determine the correct 5system alignment. The inspectors conducted a partial walkdown of each system to determine if the critical portions of the selected systems were correctly aligned in accordance with these procedures and to identify any discrepancies that may have had an effect on operability. The walkdowns included selected switch and valve position checks, and verification of electrical power to critical components. Finally, the inspectors evaluated other elements, such as material condition, housekeeping, and component labeling. The following systems were reviewed based on their risk significance for the given plant configuration:
$ "B" Reactor Building Closed Cooling Water (RBCCW) system during degradation of the "A" RBCCW system;
$ "B" Residual Heat Removal (RHR) system during "A" RHR surveillance;
$ High Pressure Coolant Injection (HPCI) system while the Reactor Core Isolation Cooling (RCIC) system was out of service; and
$ RBCCW system "B" loop, upon restoration of "E" RBCCW pump following completion of 3.M.3-47.2, "'B' Train Functional Test of Individual Load Shed Component.
 
@
 
====b. Findings====
No findings of significance were identified.
 
===.2 Complete System Walkdown===
{{IP sample|IP=IP 71111.04S}}
 
====a. Inspection Scope====
(1 sample)
The inspectors completed a detailed review of the standby gas treatment (SBGT) system to verify the functional capability of the system. The inspectors conducted a walkdown of the system to verify that the critical components such as valves, switches, and breakers were aligned in accordance with procedures and to identify any discrepancies that could have an effect on operability.
 
The inspectors discussed system health with the system engineer and conducted a review of outstanding maintenance work orders to verify that the deficiencies did not significantly affect the SBGT system function. The inspectors also reviewed the condition report (CR) database to verify that equipment problems were being identified and appropriately resolved. In addition, the inspectors reviewed recent test results to ensure the air system leakage and charcoal filter efficiency met the requirements of Technical Specifications (TS) and procedures. Documents reviewed during the inspection are listed in the Attachment.
 
====b. Findings====
No findings of significance were identified.


{{a|1R05}}
61R05 Fire Protection (71111.05)
==1R05 Fire Protection....................................................................................................==
Fire Protection - Tours (71111.05Q)
.6


====a. Inspection Scope====
(8 samples)
The inspectors performed walkdowns of eight fire protection areas during the inspection period. The inspectors reviewed Entergy's fire protection program to determine the required fire protection design features, fire area boundaries, and combustible loading requirements for the selected areas. The inspectors walked down these areas to assess Entergy's control of transient combustible material and ignition sources. In addition, the inspectors evaluated the material condition and operational status of fire detection and suppression capabilities, fire barriers, and any related compensatory measures. The inspectors then compared the existing conditions of the areas to the fire protection program requirements to ensure all program requirements were being met. Documents reviewed during the inspection are listed in the Attachment. The fire protection areas reviewed were:
$ Fire Zone 5.2, "B" Train Salt Service Water Pump Room;
$ Fire Zone 1.22, "B" Reactor Building Closed Cooling Water Pumps and Heat Exchanger Rooms;
$ Fire Zone 4.2, "B" Emergency Diesel Day Tank Room;
$ Fire Zone 4.4, "A" Emergency Diesel Day Tank Room;
$ Fire Area 1.9, Fire Zone 2.2, "A" Switchgear and Load Center Room;
$ Fire Area 1.9, Fire Zone 3.5, Vital Motor Generator Set Room;
$ Fire Zone 1.3, High Pressure Coolant Injection Pump/Turbine Room; and
$ Fire Zone 2.3, Battery Room A A.@
====b. Findings====
No findings of significance were identified.
{{a|1R06}}
{{a|1R06}}
==1R06 Flood Protection Measures.................................................................................==
==1R06 Flood Protection Measures==
.6 1R11 Licensed Operator Requalification......................................................................7 1R12 Maintenance Effectiveness.................................................................................9 1R13 Maintenance Risk Assessments and Emergent Work Control...........................9 1R15 Operability Evaluations......................................................................................10
{{IP sample|IP=IP 71111.06}}
Internal Flooding Inspection
 
====a. Inspection Scope====
(1 sample)
The inspectors walked down selected areas of the plant including the cable spreading room, vital Motor Generator set, and HPCI pump room to assess the effectiveness of Entergy's internal flood control measures. The inspectors assessed the condition of watertight doors, floor sump systems, curbing, hatch and conduit seals, and floor drains.
 
The inspectors reviewed CR-PNP-2007-1020, "Review of NRC IN-2007-01, Recent Operating Experience Covering Hydrostatic Barriers," to determine whether Entergy was identifying internal flooding issues and taking appropriate corrective actions. The references used for this inspection are listed in the Attachment to this report.
 
====b. Findings====
No Findings of significance were identified.
{{a|1R11}}
==1R11 Licensed Operator Requalification==
{{IP sample|IP=IP 71111.11}}
===.1 Resident Inspector Quarterly Review===
{{IP sample|IP=IP 71111.11Q}}
 
====a. Inspection Scope====
(1 sample)
The inspectors observed licensed operator requalification training on November 6, 2007.
 
Specifically, the inspectors observed classroom Senior Reactor Operator (SRO) training on Emergency Planning, Emergency Action Level (EAL) Classification, and Protective Action Recommendation (PAR) procedures and processes. The inspectors assessed the training to determine if the training adequately prepared the SROs to determine EAL classification levels and to conduct PAR assessments. The inspectors reviewed the applicable training objectives to determine if they had been achieved. The inspectors verified that issues identified during the classroom session were entered into the corrective action program. Documents reviewed during the inspection are listed in the
.
 
====b. Findings====
No findings of significance were identified.
 
===.2 Licensed Operator Requalification===
{{IP sample|IP=IP 71111.11B}}
 
====a. Inspection Scope====
(1 sample)
The following inspection activities were performed using NUREG 1021, Revision 9, "Operator Licensing Examination Standards for Power Reactors," Inspection Procedure 7111111, "Licensed Operator Requalification Program," Appendix A, "Checklist for Evaluating Facility Testing Material" and Appendix B, "Suggested Interview Topics."
 
The inspectors reviewed documentation of operating history since the last requalification program inspection. Documents reviewed included NRC inspection reports and licensee CRs that involved human performance issues. The purpose of the review was to ensure operational events that occurred during the last two years were not indicative of possible training deficiencies. The inspectors also discussed facility operating events with the resident staff.
 
The inspectors reviewed comprehensive written exams (these exams were administered in the fall, 2006), and the scenarios and job performance measures administered during the weeks of September 10 and 17, 2007, to ensure the quality of these exams met or exceeded the criteria established in the Examination Standards and 10 CFR 55.59, "Requalification."  The inspectors observed the administration of the operating exams to two crews.
 
8Conformance with simulator requirements specified in 10 CFR 55.46, "Simulation Facilities" The inspectors observed simulator performance during the conduct of the examinations, and reviewed simulator discrepancy reports to determine whether facility staff was complying with the requirements of 10 CFR 55.46. The inspectors reviewed a sample of simulator tests including transients; normal and steady state; malfunctions; and core performance tests.
 
Conformance with operator license conditions The inspectors determined whether the operators were complying with the conditions of their license by reviewing the following:
$ five medical records (The records were complete; restrictions noted by the doctor were reflected on the individual's license; and physical exams were given within 24 months.); 
$ eight proficiency watch-standing records and one reactivation record (Records indicated the licensed operators conformed with proficiency and reactivation watch-standing requirements of 10 CFR 55.53, Conditions of Licenses.); and
$ remediation training records for four licensed operators (These operators had failed either an annual operating test, a comprehensive written exam, or a requalification segment evaluation. The remediation records were acceptable.).
Licensee's feedback system The inspectors interviewed operator requalification instructors, training and operations management, and two licensed operators for feedback regarding the implementation of the licensed operator requalification program to ensure the requalification program was meeting their needs and responsive to their recommended changes.
 
On October 29, 2007, the inspectors conducted an in-office review of licensee requalification exam results. These results reflected the operators' performance on the annual operating tests; the comprehensive written exams were administered in the fall, 2006, and therefore those test results were not part of this in-office review. The inspector assessed whether pass rates were consistent with the guidance of NRC IMC 0609, Appendix I, "Operator Requalification Human Performance SDP."  The inspectors verified that:
$ Crew failure rate on the dynamic simulator was less than 20 percent. (Failure rate was 0.0 percent)
$ Individual failure rate on the dynamic simulator test was less than or equal to 20 percent. (Failure rate was 0.0 percent)
$ Individual failure rate on the walkthrough test (job performance measures) was  less than or equal to 20 percent. (Failure rate was 0.0 percent)9$ Individual failure rate on the comprehensive written exam was less than or equal  to 20 percent. (As noted above, the comprehensive written exams were administered in the fall, 2006. Test results were previously documented in NRC IR 50-293/2006-005.)
 
$ More than 75 percent of the individuals passed all portions of the exam. (100% of the individuals passed all portions of the exam)
 
====b. Findings====
No findings of significance were identified.
{{a|1R12}}
==1R12 Maintenance Effectiveness==
{{IP sample|IP=IP 71111.12}}
 
====a. Inspection Scope====
(2 samples)
The inspectors reviewed action plans for two SSC issues and reviewed the performance history of these SSCs to assess the effectiveness of Entergy
=s maintenance activities. The inspectors reviewed Entergy
=s CRs, corrective actions, and functional failure determinations made in accordance with Entergy procedures and the requirements of 10 CFR 50.65(a)(1) and (a)(2), ARequirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants.
 
@  In addition, the inspectors reviewed selected SSC classification, goals, corrective actions, performance criteria and monitoring plans to return the (a)(1) systems to (a)(2) status. Also, the inspectors selected a sample of system health reports for review to evaluate the results of system performance monitoring, material condition, and operations impact, to determine if actions taken were reasonable and appropriate. The references used for this inspection are listed in the to this report. The following issues were reviewed:
$ Turbine Controls Subsystem failure, failed maintenance rule performance criteria of one functional failure in two years (CR-PNP-2007-03673); and
$ A B@ Emergency Diesel Generator (EDG) exceeded maintenance rule performance criteria due to functional failures on October 25, 2006, and January 4, 2007 (CR-PNP-2007-0052).
 
====b. Findings====
No findings of significance were identified.
{{a|1R13}}
==1R13 Maintenance Risk Assessments and Emergent Work Control==
{{IP sample|IP=IP 71111.13}}
 
====a. Inspection Scope====
(4 samples)
The inspectors evaluated online and shutdown risk management for emergent and planned activities. The inspectors reviewed maintenance risk evaluations, work schedules, and control room logs to determine if concurrent planned and emergent maintenance or surveillance activities adversely affect ed the plant risk already incurred with out-of-service components. The inspectors evaluated whether Entergy took the 10necessary steps to control work activities, minimize the probability of initiating events, and maintain the functional capability of mitigating systems. The inspectors assessed Entergy's risk management actions during plant walkdowns. Documents reviewed during the inspection are listed in the Attachment. The inspectors reviewed the conduct and adequacy of scheduled and emergent maintenance risk assessments for the following maintenance and testing activities:
$ Yellow risk condition during emergent unavailability of the "A" EDG due to an engine coolant leak in the turbo charger casing;
$ Vital Motor Generator Set maintenance;
$ Yellow Risk Condition during scheduled maintenance resulting in the unavailability of the HPCI system; and
$ Safety Relief Valve 3B pilot valve replacement outage shutdown risk assessment.
 
====b. Findings====
No findings of significance were identified.
{{a|1R15}}
==1R15 Operability Evaluations==
{{IP sample|IP=IP 71111.15}}
 
====a. Inspection Scope====
(5 samples)
The inspectors reviewed five operability determi nations associated with degraded or non-conforming conditions to determine if the operability determination was justified and if the mitigating systems or those affecting barrier integrity remained available such that no unrecognized increase in risk had occurred. The inspectors also reviewed compensatory measures to determine if the compensatory measures were in place and were appropriately controlled. The inspectors reviewed licensee performance against related TS and Updated Final Safety Analysis Report (UFSAR) requirements. The inspectors reviewed the following degraded or non-conforming conditions:
$ CR-PNP-2007-03708, Mechanical Pressure Regulator (MPR) Setpoint Adjustment;
$ CR-PNP-2006-01802, Minimum Condensate Storage Tank Level to prevent Vortex formation at the HPCI/RCIC suction; 
$ CR-PNP-2007-04172, EDG Fuel Oil Storage Volume;
$ CR-PNP-2007-04724, During the quarterly HPCI pump surveillance, the HPCI system did not achieve rated flow of 4250 gpm; and
$ CR-PNP-2007-04841, RHR pump P-203D revealed pump suction pressure drop outside acceptable range.
 
====b. Findings====
No findings of significance were identified.
 
111R19 Post-Maintenance Testing (71111.19)
 
====a. Inspection Scope====
(8 samples)
The inspectors reviewed eight samples of post-maintenance tests (PMT) during this inspection period. The inspectors reviewed these activities to determine whether the PMT adequately demonstrated that the safety-related function of the equipment was satisfied, given the scope of the work performed, and that operability of the system was restored. In addition, the inspectors evaluated the applicable test acceptance criteria to verify consistency with the associated design and licensing bases, as well as TS requirements.
 
The inspectors also evaluated whether conditions adverse to quality were entered into the corrective action program for resolution. Documents reviewed during the inspection are listed in the Attachment. The following maintenance activities and their post-maintenance tests were evaluated:
$ ACB-102 12-year Periodic Inspection & Maintenance, WO 51536960;
$ Salt Service Water Pump "D" Quarterly (TS/IST) Operability Test, WO 51535011; 
$ Replace Bladder in T-223A with New Butyl Rubber Bladder, WO 51532443;
$ "A" EDG Turbocharger Replacement, WO 00129585;
$ HPCI MO-6, MO-35, MO-3 and MO-14 hydraulic lock modifications per MRs  51534480, 51534482, 51534483 and 51534484;
$ HPCI flow controller replacement per WO 0013195; 
$ Repair/replace pilot valve on main steam Safety Relief Valve RV-203-3B; and
$ Source Range Monitor A B@ replacement per WO 51530724.
 
====b. Findings====
No findings of significance were identified.
{{a|1R20}}
==1R20 Refueling and Other Outage Activities==
{{IP sample|IP=IP 71111.20}}
 
====a. Inspection Scope====
(1 sample)
The inspectors reviewed shutdown and plant restart activities associated with a planned outage to replace the pilot on leaking Safety Relief Valve, RV-203-3B. The planned outage commenced on December 10, 2007, and was completed on December 12, 2007.
 
The inspectors reviewed Entergy
=s forced outage work schedule, risk evaluations, control room logs, and vessel cooldown and heatup rate data. The inspectors observed activities in the control room during the plant shutdown and startup. The inspectors conducted a walkdown of the primary containment to verify that there was no evidence of reactor coolant system leakage and that foreign material was being accounted for and controlled.
 
Documents reviewed during the inspection are listed in the Attachment.
 
====b. Findings====
No findings of significance were identified.
 
121R22 Surveillance Testing (71111.22)
 
====a. Inspection Scope====
(3 samples)
The inspectors reviewed three samples of surveillance activities to determine whether the
 
testing adequately demonstrated equipment operational readiness and the ability to perform the intended safety-related functions. The inspectors reviewed selected prerequisites and precautions to determine if they were met and if the tests were performed in accordance with the procedural steps. Additionally, the inspectors evaluated the applicable test acceptance criteria for consistency with associated design bases, licensing bases, and TS requirements. The inspectors also evaluated whether conditions adverse to quality were entered into the corrective action program for resolution.
 
Documents reviewed during the inspection are listed in the Attachment. The following surveillance tests were evaluated:
$ RCIC pump quarterly in-service test;
$ HPCI System Pump and Valve Quarterly and Biennial Comprehensive Operability; and $ Reactor Coolant System Leak Rate determination per TS 3/4.6.C, "Primary System Boundary Coolant Leakage."


{{a|1R19}}
====b. Findings====
==1R19 Post-Maintenance Testing.................................................................................11 1R20 Refueling and Other Outage Activities..............................................................11 1R22 Surveillance Testing..........................................................................................12==
No findings of significance were identified.


==RADIATION SAFETY==
==RADIATION SAFETY==
....................................................................................................................12 2OS3 Radiation Monitoring Instrumentation and Protective Equipment.....................12 2PS3 Radiological Environmental Monitoring Program and Radioactive Material Control Program.....................................................................................14 
 
===Cornerstone:===
Occupational Radiation Safety
 
2OS3 Radiation Monitoring Instrumentation and Protective Equipment (71121.03)
 
====a. Inspection Scope====
(9 samples)
During the period October 15-18, 2007, the inspector conducted the following activities to evaluate the operability and accuracy of radiation monito ring instrument ation, and the adequacy of the respiratory protection program relative to maintaining and issuing self-contained breathing apparatus (SCBA). Implementation of these programs was reviewed against the criteria contained in 10 CFR 20, "Standards for Protection Against Radiation;" applicable industry standards; and Pilgrim procedures.
 
The inspector reviewed the UFSAR to identify area, process, and emergency monitors that are installed at Pilgrim for the protection of workers. The inspectors reviewed the current calibration records for selected instrumentation, including the Turbine Building Radwaste Sump Area monitor (1815-8C), the Reactor Building 23' South East Access Area monitor (1815-2D), and the Reactor Building Outside Traversing In-Core Probe Room monitor (1815-2B).
 
The inspector selected hand-held radiation instruments, air monitors, contamination monitors, and electronic dosimeters currently in use in the plant, and reviewed the 13calibration records for this instrumentation. Included in this review were the calibration records for selected electronic dosimeters (DMC-2000), radiation survey instruments (RO-2, RO-2A, RO-20, Wide Range Telepole), contamination survey instruments (RM-14, MD-12, SAM-9), count room scalers (BC-4, SAC-4), and air samplers (H809V, Victoreen Lapel Sampler).
 
The inspector reviewed the maintenance records, safety interlock checks, and current calibration source activity/dose rate determinations for the Shepard Model 78, Shepard Model 423, and Model 773 instrument calibrators.
 
The inspector evaluated the licensee's program for assuring quality in the radiation monitoring instrumentation and respiratory protection programs by reviewing 16 CRs related to radiation instrumentation, SCBA's, and the monitoring of plant radiation levels to determine if problems were identified in a timely manner and appropriate corrective actions were taken to resolve the related issues.
 
There were no incidents of personnel internal exposure resulting in a Committed Effective Dose Equivalent > 50 mrem that would require an in-depth evaluation of whole body counting instrumentation and bioassay techniques.
 
The inspector reviewed actions for radiation worker and radiation protection technician errors to determine whether the corrective actions were adequate to prevent recurrence.
 
The inspector verified calibration due dates and observed a technician performing source checks on a variety of instruments including portable radiation survey instruments (RO-2, Wide Range Telepole), contamination survey instruments (RM-14s, SAM 9), count room scalers (BC-4), and personal contamination monitors (PPM-1, PM-7).
 
The inspector reviewed surveillance records for ten SCBAs staged for use in the control room, Radiological Controlled Area access location, and the fire brigade equipment staging area in the fire service pump building. The inspector observed a technician perform an inspection of six of the ten units staged for use. The inspector observed a technician fill two SCBA air bottles from the air compressor unit. The sample results for breathing air, used to refill the SCBA tanks, were reviewed to confirm that air quality met CGA-G-7.1-2004 Grade D standards.
 
The inspector evaluated the adequacy of the respiratory protection program regarding the issuance of SCBAs to workers. Training and qualification records for licensed operators, radiation protection technicians, and fire brigade members required to wear SCBA's, in the event of an emergency, were reviewed.
 
====b. Findings====
No findings of significance were identified.
 
142PS3 Radiological Environmental Monitoring Program and Radioactive Material Control Program (71122.03)
 
====a. Inspection Scope====
(1 sample)
During the period October 15-18, 2007, the inspector conducted the following activity to determine whether the licensee's surveys and controls are adequate to prevent the inadvertent release of licensed materials into the public domain. Implementation of these controls was reviewed against the criteria contained in 10 CFR 20, "Standards for Protection Against Radiation;" TS; and Entergy procedures. This inspection activity represents completion of one sample relative to this inspection area.
 
The inspector observed the radioactive material survey and release locations. The methods used for control, survey, and release were inspected and included observations of the performance of personnel surveying and releasing material for unrestricted use and verifying that the work is performed in accordance with plant procedures.
 
====b. Findings====
No findings of significance were identified.


==OTHER ACTIVITIES==
==OTHER ACTIVITIES==
[OA].............................................................................................................14
[OA]
{{a|4OA1}}
{{a|4OA1}}
==4OA1 Performance Indicator (PI)................................................................................14==
==4OA1 Performance Indicator (PI)==
{{IP sample|IP=IP 71151}}
===.1 Mitigating System Cornerstone===


====a. Inspection Scope====
(2 samples)
The inspectors sampled data for the Mitigating System Performance Index PIs for the EDGs and cooling water systems (Salt Service Water and RBCCW) for the 4th quarter 2006 and 1st, 2nd and 3rd quarter 2007 to assess the completeness and accuracy of the reported information. The inspectors reviewed operator logs, CRs, maintenance rule documents, maintenance records, Licensee Event Reports (LERs), system health reports, and plant process computer information. The acceptance criteria used for the review were Nuclear Energy Institute (NEI) 99-02, Revision 5, "Regulatory Assessment Performance Indicator Guidelines."
====b. Findings====
No findings of significance were identified.
===.2 Physical Protection Cornerstone===
====a. Inspection Scope====
(3 samples)
The inspectors performed a review of PI data submitted by the licensee for the Physical Protection Cornerstone. The review was conducted of the licensee
=s programs for gathering, processing, evaluating, and submitting data for the Fitness-for-Duty, Personnel 15Screening, and Protected Area Security Equipment PIs. The inspectors determined whether the PIs had been properly reported as specified in NEI 99-02. The review included the licensee
=s tracking and trending reports, personnel interviews, and security event reports for the PI data collected since the last security baseline inspection. The inspector noted from the licensee
=s submittal that there were no reported failures to properly implement the requirements of 10 CFR 73, "Physical Protection of Plants and Materials," and 10 CFR 26, "Fitness for Duty Programs," during the reporting period. This inspection activity represents the completion of three samples relative to this inspection area; completing the annual inspection requirement.
====b. Findings====
No findings of significance were identified.
{{a|4OA2}}
{{a|4OA2}}
==4OA2 Identification and Resolution of Problems.........................................................15 4OA3 Event Follow-up.................................................................................................18==
==4OA2 Identification and Resolution of Problems==
{{IP sample|IP=IP 71152}}
===.1 Review of Items Entered into the Corrective Action Program (CAP)===


{{a|4OA6}}
====a. Inspection Scope====
==4OA6 Meetings, Including Exit.....................................................................................20==
The inspectors performed a screening of each item entered into the licensee's CAP. This review was accomplished by reviewing printouts of each CR, attending daily screening meetings and/or accessing the licensee's database. The purpose of this review was to identify conditions such as repetitive equipment failures or human performance issues that might warrant additional follow-up.
 
====b. Findings====
No findings of significance were identified.
 
===.2 Semi-Annual Review to Identify Trends===
 
====a. Inspection Scope====
(1 sample)
As required by Inspection Procedure 71152, "Identification and Resolution of Problems,"
the inspectors performed a review of Entergy
=s CAP and associated documents to identify trends that could indicate the existence of a more significant safety issue. The inspectors review was focused on repetitive equipment and corrective maintenance issues but also considered the results of daily inspector CAP item screening discussed in Section 4OA2.1. The review also included issues documented in CAP trend reports and site CAP performance indicator data. The inspectors review considered the six month period of June through December, 2007, although the inspectors also evaluated the trend review results discussed in NRC IR 05000293/2007003, which reviewed CRs from October 2006 through May 2007. Documents reviewed during the inspection are listed in the
.
16b. Assessment and Observations No findings of significance were identified. The inspectors noted a number of plant equipment configuration control issues discussed in the third quarter 2007 Pilgrim Station Quarterly Trend Report, including:
$ CR-PNP-2007-00303, PS-CKVS-B (Crankcase Pressure Switch A B@ Diesel) not valved in correctly;
$ CR-PNP-2007-01446, RCIC check valve 1301-CK-50 initial position found open instead of closed;
$ CR-PNP-2007-02383, Breaker B1446 (EDG A B@ Diesel Oil Transfer Pump) found A OFF,@ normal position is A ON;@ $ CR-PNP-2007-02468, Isolation valve found closed on Reactor Pressure Transmitter;
$ CR-PNP-2007-02476, Spare breaker found closed when it was expected to be open; and
$ CR-PNP-2007-02651, EDG failed to start (likely due to fuel rack and governor left in full fuel position).
 
The report concluded that the number of issues Adoes not exhibit an adverse or emerging trend,@ but that Operations Management considers the number of Amispositionings
@ to be at an unacceptable level. The inspectors also considered the number of issues discussed in the report to be at an unacceptable level, however, the inspectors also concluded that these issues represent a low level trend in the area of configuration control. The inspectors have discussed this trend with licensee management and will continue to monitor configuration control issues at Pilgrim during this assessment period.


ATTACHMENT:
===.3 Annual Sample: Review of Outage CRs===


=SUPPLEMENTAL INFORMATION=
====a. Inspection Scope====
(1 sample)
The inspectors reviewed a sample of CRs from Pilgrim's 2007 refueling outage to determine whether CRs initiated during the outage were processed and closed in accordance with Pilgrim procedures. The inspectors reviewed two Apparent Cause Evaluations conducted by Pilgrim. The inspectors evaluated whether corrective actions taken by Pilgrim addressed each CR as well as the overall process. Documents reviewed are listed in the Attachment.


==KEY POINTS OF CONTACT==
b. Assessment and Observations No findings of significance were identified. The inspectors determined that there were many instances where the condition review group (CRG) closed a lower level (Category D) CR to "supervisory oversight."  Managers would perform follow-up and close the CR with a general statement such as "Corrective actions for the CR were reviewed by the responsible manager. Upon the manager's recommendation, this CR is being closed."
......................................................................................................A-1


==LIST OF ITEMS==
This practice resulted in a condition where corrective actions for a particular issue could not be tracked or demonstrated. Pilgrim has since discontinued this practice as an acceptable closure strategy for Category D CRs.
OPENED, CLOSED AND DISCUSSED...........................................................A-1
==LIST OF DOCUMENTS REVIEWED==
..........................................................................................A-1
==LIST OF ACRONYMS==
.................................................................................................................A-7
: [[SUMMAR]] [[Y]]
: [[OF]] [[]]
: [[FINDIN]] [[]]
GS
IR 05000293/2007-005; 10/01/2007-12/31/2007; Pilgrim Nuclear Power Station; Event
Follow-up.  


The report covered a 13-week period of inspection by resident and region-based inspectors.
One Green finding was identified. The significance of most findings is indicated by their color
(Green, White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609, "Significance
Determination Process" (SDP). Findings for which the SDP does not apply may be Green or be
assigned a severity level after
: [[NRC]] [[management review. The]]
NRC's program for overseeing
the safe operation of nuclear power reactors is described in
: [[NUR]] [[]]
EG-1649, "Reactor Oversight
Process," Revision 4, dated December 2006.
: [[A.]] [[]]
: [[NRC]] [[-Identified and Self-Revealing Findings  Cornerstone: Initiating Events  Green. A Green self-revealing finding was identified for Entergy=s failure to ensure the proper verification and calibration of vacuum trip switch]]
: [[VTS]] [[-1 during refueling outage (]]
RFO) 16. Specifically, personnel did not ensure that the proper verification/calibration
technique was employed to determine the as-found low condenser vacuum turbine trip
setpoint. Additionally, when the technician identified that the as-found data was
significantly outside of historical as-found values, he did not question the validity of the
data nor did he obtain a peer check. The technician then calibrated the instrument using
the incorrect as-found data which resulted in an incorrect low vacuum trip setpoint and a
subsequent turbine trip and reactor scram on July 10, 2007. This finding is more than minor because it is associated with the human performance
attribute of the Initiating Events Cornerstone and affects the cornerstone objective of
limiting the likelihood of those events that upset plant stability during power operations. The finding is of very low safety significance (Green) because it did not contribute to both
the likelihood of a reactor trip and the likelihood that mitigation equipment would be
unavailable. This finding has a cross-cutting aspect in the area of Human Performance,
Work Practices, because Entergy proceeded in the face of uncertainty or unexpected
circumstances when the VTS-1 setpoint was found significantly outside of expected as-
found values. [H.4(a)] (Section
: [[4OA]] [[3)  B. Licensee-Identified Violations  None.]]
: [[REPORT]] [[]]
DETAILS
Summary of Plant Status
Pilgrim Nuclear Power Station (PNPS) operated at or near 100 percent power during the
inspection period with the following exceptions: On October 30, 2007, Entergy reduced power to
approximately 48 percent to perform a thermal backwash on the main condenser. Entergy
resumed 100 percent power operation on October 31, 2007. On December 10, 2007, Entergy
shut down and commenced a planned outage to repair leaking safety relief valve, RV-203-3B.
Entergy restored the plant to 100 percent power on December 13, 2007. The plant remained at
or near 100 percent for the remainder of the inspection period.
1.
: [[REACTO]] [[R]]
SAFETY  Cornerstones:  Initiating Events, Mitigating Systems, and Barrier Integrity
1R01 Adverse Weather Protection (71111.01)
a. Inspection Scope (3 samples - 1 seasonal readiness, 2 impending adverse weather)  The inspectors performed a review of cold weather preparations during the onset of the
cold weather season to evaluate the site's readiness for seasonal susceptibilities. The inspectors reviewed Entergy's preparations for cold weather and its impact on the
protection of safety-related systems, structures and components (SSCs). The inspection
focused on the intake structure, the station blackout diesel generator and the condensate
storage and transfer system. The inspection was intended to ensure that Entergy's
equipment, instrumentation, and supporting structures were configured in accordance
with Entergy's procedures and that adequate controls were in place to ensure
functionality of the systems in cold weather. The inspectors also conducted a site
walkdown on November 1, 2007, to assess Entergy's readiness for the potential affects
of hurricane Noel. The inspectors verified that all outside objects were properly anchored
or tied down. In addition, the inspectors conducted a site walkdown on December
2, 2007, to evaluate site preparations for an approaching coastal storm with
accompanying high winds.
b. Findings  No findings of significance were identified.
1R04 Equipment Alignment (71111.04) 
.1 Partial System Walkdowns (71111.04Q)
a. Inspection Scope (4 samples)
The inspectors performed four partial system walkdowns during this inspection period.
The inspectors reviewed the documents listed in the Attachment to determine the correct
5system alignment. The inspectors conducted a partial walkdown of each system to determine if the critical portions of the selected systems were correctly aligned in
accordance with these procedures and to identify any discrepancies that may have had
an effect on operability. The walkdowns included selected switch and valve position checks, and verification of electrical power to critical components. Finally, the inspectors
evaluated other elements, such as material condition, housekeeping, and component
labeling. The following systems were reviewed based on their risk significance for the
given plant configuration:  $ "B" Reactor Building Closed Cooling Water (RBCCW) system during degradation of the "A"
: [[RBCCW]] [[system; $ "B" Residual Heat Removal (]]
: [[RHR]] [[) system during "A"]]
: [[RHR]] [[surveillance; $ High Pressure Coolant Injection (]]
: [[HPCI]] [[) system while the Reactor Core Isolation Cooling (RCIC) system was out of service; and $]]
: [[RBCCW]] [[system "B" loop, upon restoration of "E"]]
RBCCW pump following completion of 3.M.3-47.2, "'B' Train Functional Test of Individual Load Shed
Component.@    b. Findings  No findings of significance were identified. 
.2 Complete System Walkdown (71111.04S)
a. Inspection Scope (1 sample)  The inspectors completed a detailed review of the standby gas treatment (SBGT) system
to verify the functional capability of the system. The inspectors conducted a walkdown of the system to verify that the critical components such as valves, switches, and breakers
were aligned in accordance with procedures and to identify any discrepancies that could
have an effect on operability. The inspectors discussed system health with the system engineer and conducted a
review of outstanding maintenance work orders to verify that the deficiencies did not
significantly affect the
: [[SB]] [[]]
GT system function. The inspectors also reviewed the
condition report (CR) database to verify that equipment problems were being identified
and appropriately resolved. In addition, the inspectors reviewed recent test results to
ensure the air system leakage and charcoal filter efficiency met the requirements of
Technical Specifications (TS) and procedures. Documents reviewed during the
inspection are listed in the Attachment.
b. Findings  No findings of significance were identified.
61R05 Fire Protection (71111.05)  Fire Protection - Tours (71111.05Q)
a. Inspection Scope (8 samples)
The inspectors performed walkdowns of eight fire protection areas during the inspection
period. The inspectors reviewed Entergy's fire protection program to determine the
required fire protection design features, fire area boundaries, and combustible loading
requirements for the selected areas. The inspectors walked down these areas to assess
Entergy's control of transient combustible material and ignition sources. In addition, the
inspectors evaluated the material condition and operational status of fire detection and
suppression capabilities, fire barriers, and any related compensatory measures. The inspectors then compared the existing conditions of the areas to the fire protection
program requirements to ensure all program requirements were being met. Documents
reviewed during the inspection are listed in the Attachment. The fire protection areas
reviewed were:  $ Fire Zone 5.2, "B" Train Salt Service Water Pump Room; $ Fire Zone 1.22, "B" Reactor Building Closed Cooling Water Pumps and Heat Exchanger Rooms; $ Fire Zone 4.2, "B" Emergency Diesel Day Tank Room; $ Fire Zone 4.4, "A" Emergency Diesel Day Tank Room; $ Fire Area 1.9, Fire Zone 2.2, "A" Switchgear and Load Center Room; $ Fire Area 1.9, Fire Zone 3.5, Vital Motor Generator Set Room; $ Fire Zone 1.3, High Pressure Coolant Injection Pump/Turbine Room; and $ Fire Zone 2.3, Battery Room AA.@    b. Findings  No findings of significance were identified.
1R06 Flood Protection Measures (71111.06)  Internal Flooding Inspection
a. Inspection Scope (1 sample)  The inspectors walked down selected areas of the plant including the cable spreading
room, vital Motor Generator set, and
: [[HP]] [[]]
CI pump room to assess the effectiveness of
Entergy's internal flood control measures. The inspectors assessed the condition of
watertight doors, floor sump systems, curbing, hatch and conduit seals, and floor drains.
The inspectors reviewed
: [[CR]] [[-]]
: [[PNP]] [[-2007-1020, "Review of]]
: [[NRC]] [[]]
IN-2007-01, Recent
Operating Experience Covering Hydrostatic Barriers," to determine whether Entergy was
identifying internal flooding issues and taking appropriate corrective actions. The
references used for this inspection are listed in the Attachment to this report.
b. Findings  No Findings of significance were identified.
1R11 Licensed Operator Requalification (71111.11) 
.1 Resident Inspector Quarterly Review (71111.11Q)
a. Inspection Scope (1 sample)  The inspectors observed licensed operator requalification training on November 6, 2007.
Specifically, the inspectors observed classroom Senior Reactor Operator (SRO) training
on Emergency Planning, Emergency Action Level (EAL) Classification, and Protective
Action Recommendation (PAR) procedures and processes. The inspectors assessed
the training to determine if the training adequately prepared the
: [[SRO]] [[s to determine]]
EAL
classification levels and to conduct PAR assessments. The inspectors reviewed the
applicable training objectives to determine if they had been achieved. The inspectors
verified that issues identified during the classroom session were entered into the
corrective action program. Documents reviewed during the inspection are listed in the
Attachment.
b. Findings  No findings of significance were identified. 
.2 Licensed Operator Requalification (71111.11B)
a. Inspection Scope (1 sample)  The following inspection activities were performed using
: [[NUR]] [[]]
EG 1021, Revision 9,
"Operator Licensing Examination Standards for Power Reactors," Inspection Procedure
7111111, "Licensed Operator Requalification Program," Appendix A,
"Checklist for Evaluating Facility Testing Material" and Appendix B, "Suggested Interview Topics."  The inspectors reviewed documentation of operating history since the last requalification
program inspection. Documents reviewed included NRC inspection reports and licensee
CRs that involved human performance issues. The purpose of the review was to ensure
operational events that occurred during the last two years were not indicative of possible
training deficiencies. The inspectors also discussed facility operating events with the resident staff. The inspectors reviewed comprehensive written exams (these exams were administered
in the fall, 2006), and the scenarios and job performance measures administered during
the weeks of September 10 and 17, 2007, to ensure the quality of these exams met or
exceeded the criteria established in the Examination Standards and 10 CFR 55.59,
"Requalification."  The inspectors observed the administration of the operating exams to
two crews.
8Conformance with simulator requirements specified in 10 CFR 55.46, "Simulation Facilities"  The inspectors observed simulator performance during the conduct of the examinations,
and reviewed simulator discrepancy reports to determine whether facility staff was complying with the requirements of 10 CFR 55.46. The inspectors reviewed a sample of
simulator tests including transients; normal and steady state; malfunctions; and core
performance tests. Conformance with operator license conditions  The inspectors determined whether the operators were complying with the conditions of
their license by reviewing the following:  $ five medical records (The records were complete; restrictions noted by the doctor were reflected on the individual's license; and physical exams were given within
months.);  $ eight proficiency watch-standing records and one reactivation record (Records indicated the licensed operators conformed with proficiency and reactivation
watch-standing requirements of 10 CFR 55.53, Conditions of Licenses.); and $ remediation training records for four licensed operators (These operators had failed either an annual operating test, a comprehensive written exam, or a
requalification segment evaluation. The remediation records were acceptable.). Licensee's feedback system    The inspectors interviewed operator requalification instructors, training and operations
management, and two licensed operators for feedback regarding the implementation of
the licensed operator requalification program to ensure the requalification program was
meeting their needs and responsive to their recommended changes. On October 29, 2007, the inspectors conducted an in-office review of licensee
requalification exam results. These results reflected the operators' performance on the
annual operating tests; the comprehensive written exams were administered in the fall,
2006, and therefore those test results were not part of this in-office review. The
inspector assessed whether pass rates were consistent with the guidance of
: [[NRC]] [[]]
IMC
0609, Appendix I, "Operator Requalification Human Performance SDP."  The inspectors
verified that:  $ Crew failure rate on the dynamic simulator was less than 20 percent. (Failure rate was 0.0 percent)  $ Individual failure rate on the dynamic simulator test was less than or equal to 20 percent.  (Failure rate was 0.0 percent)  $ Individual failure rate on the walkthrough test (job performance measures) was  less than or equal to 20 percent.  (Failure rate was 0.0 percent)
9$ Individual failure rate on the comprehensive written exam was less than or equal  to 20 percent.  (As noted above, the comprehensive written exams were administered in the fall, 2006. Test results were previously documented in NRC
IR 50-293/2006-005.)  $ More than 75 percent of the individuals passed all portions of the exam. (100% of the individuals passed all portions of the exam)
b. Findings  No findings of significance were identified.
1R12 Maintenance Effectiveness (71111.12)
a. Inspection Scope (2 samples)  The inspectors reviewed action plans for two SSC issues and reviewed the performance
history of these
: [[SSC]] [[s to assess the effectiveness of Entergy=s maintenance activities. The inspectors reviewed Entergy=s]]
: [[CR]] [[s, corrective actions, and functional failure determinations made in accordance with Entergy procedures and the requirements of]]
: [[10 CFR]] [[50.65(a)(1) and (a)(2),]]
ARequirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants.@  In addition, the inspectors reviewed selected SSC classification, goals, corrective actions, performance criteria and monitoring plans to return the (a)(1) systems to (a)(2) status. Also, the inspectors selected a sample of
system health reports for review to evaluate the results of system performance
monitoring, material condition, and operations impact, to determine if actions taken were
reasonable and appropriate. The references used for this inspection are listed in the
to this report. The following issues were reviewed:  $ Turbine Controls Subsystem failure, failed maintenance rule performance criteria of one functional failure in two years (CR-PNP-2007-03673); and $
: [[AB]] [[@ Emergency Diesel Generator (]]
EDG) exceeded maintenance rule performance criteria due to functional failures on October 25, 2006, and January 4, 2007 (CR-PNP-2007-0052).
b. Findings  No findings of significance were identified.
1R13 Maintenance Risk Assessments and Emergent Work Control (71111.13)
a. Inspection Scope (4 samples)  The inspectors evaluated online and shutdown risk management for emergent and
planned activities. The inspectors reviewed maintenance risk evaluations, work
schedules, and control room logs to determine if concurrent planned and emergent
maintenance or surveillance activities adversely affected the plant risk already incurred with out-of-service components. The inspectors evaluated whether Entergy took the
10necessary steps to control work activities, minimize the probability of initiating events, and maintain the functional capability of mitigating systems. The inspectors assessed Entergy's risk management actions during plant walkdowns. Documents reviewed during
the inspection are listed in the Attachment. The inspectors reviewed the conduct and
adequacy of scheduled and emergent maintenance risk assessments for the following
maintenance and testing activities:  $ Yellow risk condition during emergent unavailability of the "A"
: [[EDG]] [[due to an engine coolant leak in the turbo charger casing; $ Vital Motor Generator Set maintenance; $ Yellow Risk Condition during scheduled maintenance resulting in the unavailability of the]]
HPCI system; and $ Safety Relief Valve 3B pilot valve replacement outage shutdown risk assessment.
b. Findings  No findings of significance were identified.
1R15 Operability Evaluations (71111.15)
a. Inspection Scope (5 samples)  The inspectors reviewed five operability determinations associated with degraded or non-conforming conditions to determine if the operability determination was justified and if the mitigating systems or those affecting barrier integrity remained available such that no
unrecognized increase in risk had occurred. The inspectors also reviewed compensatory
measures to determine if the compensatory measures were in place and were
appropriately controlled. The inspectors reviewed licensee performance against related
: [[TS]] [[and Updated Final Safety Analysis Report (]]
UFSAR) requirements. The inspectors
reviewed the following degraded or non-conforming conditions:  $
: [[CR]] [[-]]
: [[PNP]] [[-2007-03708, Mechanical Pressure Regulator (MPR) Setpoint Adjustment; $]]
: [[CR]] [[-]]
: [[PNP]] [[-2006-01802, Minimum Condensate Storage Tank Level to prevent Vortex formation at the]]
: [[HPCI]] [[/]]
: [[RCIC]] [[suction;  $]]
: [[CR]] [[-]]
: [[PNP]] [[-2007-04172,]]
: [[EDG]] [[Fuel Oil Storage Volume; $]]
: [[CR]] [[-PNP-2007-04724, During the quarterly]]
: [[HPCI]] [[pump surveillance, the]]
: [[HPCI]] [[system did not achieve rated flow of 4250 gpm; and $]]
: [[CR]] [[-]]
PNP-2007-04841, RHR pump P-203D revealed pump suction pressure drop outside acceptable range.
b. Findings  No findings of significance were identified.
111R19 Post-Maintenance Testing (71111.19)
a. Inspection Scope (8 samples)  The inspectors reviewed eight samples of post-maintenance tests (PMT) during this
inspection period. The inspectors reviewed these activities to determine whether the PMT
adequately demonstrated that the safety-related function of the equipment was satisfied,
given the scope of the work performed, and that operability of the system was restored. In addition, the inspectors evaluated the applicable test acceptance criteria to verify
consistency with the associated design and licensing bases, as well as TS requirements.
The inspectors also evaluated whether conditions adverse to quality were entered into the
corrective action program for resolution. Documents reviewed during the inspection are
listed in the Attachment. The following maintenance activities and their post-maintenance
tests were evaluated:  $
: [[ACB]] [[-102 12-year Periodic Inspection & Maintenance,]]
: [[WO]] [[51536960; $ Salt Service Water Pump "D" Quarterly (TS/IST) Operability Test,]]
: [[WO]] [[51535011;  $ Replace Bladder in T-223A with New Butyl Rubber Bladder,]]
: [[WO]] [[51532443; $ "A"]]
: [[EDG]] [[Turbocharger Replacement,]]
: [[WO]] [[00129585; $]]
: [[HPCI]] [[]]
: [[MO]] [[-6,]]
: [[MO]] [[-35,]]
: [[MO]] [[-3 and]]
: [[MO]] [[-14 hydraulic lock modifications per]]
: [[MR]] [[s  51534480, 51534482, 51534483 and 51534484; $]]
: [[HPCI]] [[flow controller replacement per]]
: [[WO]] [[0013195;  $ Repair/replace pilot valve on main steam Safety Relief Valve]]
: [[RV]] [[-203-3B; and $ Source Range Monitor]]
AB@ replacement per WO 51530724. b. Findings  No findings of significance were identified.
1R20 Refueling and Other Outage Activities (71111.20)
a. Inspection Scope (1 sample)  The inspectors reviewed shutdown and plant restart activities associated with a planned
outage to replace the pilot on leaking Safety Relief Valve, RV-203-3B. The planned
outage commenced on December 10, 2007, and was completed on December 12, 2007.
The inspectors reviewed Entergy=s forced outage work schedule, risk evaluations, control room logs, and vessel cooldown and heatup rate data. The inspectors observed activities in the control room during the plant shutdown and startup. The inspectors conducted a
walkdown of the primary containment to verify that there was no evidence of reactor
coolant system leakage and that foreign material was being accounted for and controlled.
Documents reviewed during the inspection are listed in the Attachment.
b. Findings  No findings of significance were identified.
21R22 Surveillance Testing (71111.22)
a. Inspection Scope (3 samples)  The inspectors reviewed three samples of surveillance activities to determine whether the
testing adequately demonstrated equipment operational readiness and the ability to perform the intended safety-related functions. The inspectors reviewed selected
prerequisites and precautions to determine if they were met and if the tests were
performed in accordance with the procedural steps. Additionally, the inspectors evaluated
the applicable test acceptance criteria for consistency with associated design bases,
licensing bases, and TS requirements. The inspectors also evaluated whether conditions
adverse to quality were entered into the corrective action program for resolution.
Documents reviewed during the inspection are listed in the Attachment. The following
surveillance tests were evaluated:  $
: [[RCIC]] [[pump quarterly in-service test; $]]
HPCI System Pump and Valve Quarterly and Biennial Comprehensive Operability; and $ Reactor Coolant System Leak Rate determination per TS 3/4.6.C, "Primary System Boundary Coolant Leakage."
b. Findings  No findings of significance were identified. 2.
: [[RADIAT]] [[]]
: [[ION]] [[]]
: [[SAFE]] [[]]
TY  Cornerstone:  Occupational Radiation Safety
2OS3 Radiation Monitoring Instrumentation and Protective Equipment (71121.03)
a. Inspection Scope (9 samples)  During the period October 15-18, 2007, the inspector conducted the following activities to
evaluate the operability and accuracy of radiation monitoring instrumentation, and the adequacy of the respiratory protection program relative to maintaining and issuing
self-contained breathing apparatus (SCBA). Implementation of these programs was
reviewed against the criteria contained in 10 CFR 20, "Standards for Protection Against
Radiation;" applicable industry standards; and Pilgrim procedures. The inspector reviewed the
: [[UFS]] [[]]
AR to identify area, process, and emergency monitors
that are installed at Pilgrim for the protection of workers. The inspectors reviewed the
current calibration records for selected instrumentation, including the Turbine Building
Radwaste Sump Area monitor (1815-8C), the Reactor Building 23' South East Access
Area monitor (1815-2D), and the Reactor Building Outside Traversing In-Core Probe
Room monitor (1815-2B). The inspector selected hand-held radiation instruments, air monitors, contamination
monitors, and electronic dosimeters currently in use in the plant, and reviewed the
13calibration records for this instrumentation. Included in this review were the calibration records for selected electronic dosimeters (DMC-2000), radiation survey instruments
(RO-2,
: [[RO]] [[-2A,]]
: [[RO]] [[-20, Wide Range Telepole), contamination survey instruments (RM-14,]]
: [[MD]] [[-12,]]
SAM-9), count room scalers (BC-4, SAC-4), and air samplers (H809V, Victoreen
Lapel Sampler). The inspector reviewed the maintenance records, safety interlock checks, and current
calibration source activity/dose rate determinations for the Shepard Model 78, Shepard
Model 423, and Model 773 instrument calibrators. The inspector evaluated the licensee's program for assuring quality in the radiation
monitoring instrumentation and respiratory protection programs by reviewing 16 CRs
related to radiation instrumentation,
: [[SC]] [[]]
BA's, and the monitoring of plant radiation levels to
determine if problems were identified in a timely manner and appropriate corrective
actions were taken to resolve the related issues. There were no incidents of personnel internal exposure resulting in a Committed Effective
Dose Equivalent > 50 mrem that would require an in-depth evaluation of whole body
counting instrumentation and bioassay techniques. The inspector reviewed actions for radiation worker and radiation protection technician
errors to determine whether the corrective actions were adequate to prevent recurrence. The inspector verified calibration due dates and observed a technician performing source
checks on a variety of instruments including portable radiation survey instruments (RO-2,
Wide Range Telepole), contamination survey instruments (RM-14s, SAM 9), count room
scalers (BC-4), and personal contamination monitors (PPM-1,
: [[PM]] [[-7). The inspector reviewed surveillance records for ten]]
SCBAs staged for use in the control
room, Radiological Controlled Area access location, and the fire brigade equipment
staging area in the fire service pump building. The inspector observed a technician
perform an inspection of six of the ten units staged for use. The inspector observed a
technician fill two
: [[SC]] [[]]
BA air bottles from the air compressor unit. The sample results for
breathing air, used to refill the
: [[SCBA]] [[tanks, were reviewed to confirm that air quality met]]
CGA-G-7.1-2004 Grade D standards. The inspector evaluated the adequacy of the respiratory protection program regarding the
issuance of
: [[SC]] [[]]
BAs to workers. Training and qualification records for licensed operators,
radiation protection technicians, and fire brigade members required to wear
: [[SC]] [[]]
BA's, in
the event of an emergency, were reviewed.
b. Findings  No findings of significance were identified.
142PS3 Radiological Environmental Monitoring Program and Radioactive Material Control Program (71122.03)
a. Inspection Scope (1 sample)  During the period October 15-18, 2007, the inspector conducted the following activity to
determine whether the licensee's surveys and controls are adequate to prevent the
inadvertent release of licensed materials into the public domain. Implementation of these
controls was reviewed against the criteria contained in 10 CFR 20, "Standards for
Protection Against Radiation;" TS; and Entergy procedures. This inspection activity
represents completion of one sample relative to this inspection area. The inspector observed the radioactive material survey and release locations. The
methods used for control, survey, and release were inspected and included observations
of the performance of personnel surveying and releasing material for unrestricted use and
verifying that the work is performed in accordance with plant procedures.
b. Findings  No findings of significance were identified. 4.
: [[OTHER]] [[]]
: [[ACTIVI]] [[TIES [OA]]]
: [[4OA]] [[1 Performance Indicator (]]
PI) (71151) 
.1 Mitigating System Cornerstone
a. Inspection Scope (2 samples)  The inspectors sampled data for the Mitigating System Performance Index
: [[PI]] [[s for the]]
: [[EDG]] [[s and cooling water systems (Salt Service Water and]]
RBCCW) for the 4th quarter
2006 and 1st, 2nd and 3rd quarter 2007 to assess the completeness and accuracy of the
reported information. The inspectors reviewed operator logs, CRs, maintenance rule
documents, maintenance records, Licensee Event Reports (LERs), system health reports,
and plant process computer information. The acceptance criteria used for the review
were Nuclear Energy Institute (NEI) 99-02, Revision 5, "Regulatory Assessment
Performance Indicator Guidelines."
b. Findings  No findings of significance were identified. 
.2 Physical Protection Cornerstone
a. Inspection Scope (3 samples)  The inspectors performed a review of PI data submitted by the licensee for the Physical
Protection Cornerstone. The review was conducted of the licensee=s programs for gathering, processing, evaluating, and submitting data for the Fitness-for-Duty, Personnel
15Screening, and Protected Area Security Equipment
: [[PI]] [[s. The inspectors determined whether the]]
PIs had been properly reported as specified in NEI 99-02. The review
included the licensee=s tracking and trending reports, personnel interviews, and security event reports for the
: [[PI]] [[data collected since the last security baseline inspection. The inspector noted from the licensee=s submittal that there were no reported failures to properly implement the requirements of 10]]
CFR 73, "Physical Protection of Plants and Materials," and 10 CFR 26, "Fitness for Duty Programs," during the reporting period. This
inspection activity represents the completion of three samples relative to this inspection
area; completing the annual inspection requirement.
b. Findings  No findings of significance were identified.
4OA2 Identification and Resolution of Problems (71152) 
.1 Review of Items Entered into the Corrective Action Program (CAP)
a. Inspection Scope  The inspectors performed a screening of each item entered into the licensee's CAP. This
review was accomplished by reviewing printouts of each CR, attending daily screening
meetings and/or accessing the licensee's database. The purpose of this review was to
identify conditions such as repetitive equipment failures or human performance issues
that might warrant additional follow-up.
b. Findings  No findings of significance were identified. 
.2 Semi-Annual Review to Identify Trends
a. Inspection Scope (1 sample)  As required by Inspection Procedure 71152, "Identification and Resolution of Problems,"
the inspectors performed a review of Entergy=s CAP and associated documents to identify trends that could indicate the existence of a more significant safety issue. The inspectors review was focused on repetitive equipment and corrective maintenance issues but also
considered the results of daily inspector
: [[CAP]] [[item screening discussed in Section]]
: [[4OA]] [[2.1. The review also included issues documented in]]
CAP trend reports and site CAP
performance indicator data. The inspectors review considered the six month period of
June through December, 2007, although the inspectors also evaluated the trend review
results discussed in
: [[NRC]] [[]]
IR 05000293/2007003, which reviewed CRs from October 2006
through May 2007. Documents reviewed during the inspection are listed in the
Attachment.
16b. Assessment and Observations  No findings of significance were identified. The inspectors noted a number of plant
equipment configuration control issues discussed in the third quarter 2007 Pilgrim Station
Quarterly Trend Report, including:  $
: [[CR]] [[-]]
: [[PNP]] [[-2007-00303,]]
: [[PS]] [[-]]
: [[CKVS]] [[-B (Crankcase Pressure Switch]]
: [[AB]] [[@ Diesel) not valved in correctly; $]]
: [[CR]] [[-PNP-2007-01446,]]
: [[RCIC]] [[check valve 1301-]]
: [[CK]] [[-50 initial position found open instead of closed; $]]
: [[CR]] [[-]]
: [[PNP]] [[-2007-02383, Breaker B1446 (EDG]]
: [[AB]] [[@ Diesel Oil Transfer Pump) found]]
: [[AOFF]] [[,@ normal position is]]
: [[AON]] [[;@ $]]
: [[CR]] [[-PNP-2007-02468, Isolation valve found closed on Reactor Pressure Transmitter; $]]
: [[CR]] [[-]]
: [[PNP]] [[-2007-02476, Spare breaker found closed when it was expected to be open; and $]]
: [[CR]] [[-]]
PNP-2007-02651, EDG failed to start (likely due to fuel rack and governor left in full fuel position). The report concluded that the number of issues Adoes not exhibit an adverse or emerging trend,@ but that Operations Management considers the number of Amispositionings@ to be at an unacceptable level. The inspectors also considered the number of issues discussed in the report to be at an unacceptable level, however, the inspectors also concluded that
these issues represent a low level trend in the area of configuration control. The
inspectors have discussed this trend with licensee management and will continue to monitor configuration control issues at Pilgrim during this assessment period. 
.3 Annual Sample: Review of Outage CRs
a. Inspection Scope (1 sample)  The inspectors reviewed a sample of CRs from Pilgrim's 2007 refueling outage to
determine whether CRs initiated during the outage were processed and closed in
accordance with Pilgrim procedures. The inspectors reviewed two Apparent Cause
Evaluations conducted by Pilgrim. The inspectors evaluated whether corrective actions
taken by Pilgrim addressed each CR as well as the overall process. Documents reviewed
are listed in the Attachment.
b. Assessment and Observations  No findings of significance were identified. The inspectors determined that there were
many instances where the condition review group (CRG) closed a lower level (Category
D)
: [[CR]] [[to "supervisory oversight."  Managers would perform follow-up and close the]]
CR
with a general statement such as "Corrective actions for the CR were reviewed by the
responsible manager. Upon the manager's recommendation, this CR is being closed."
This practice resulted in a condition where corrective actions for a particular issue could
not be tracked or demonstrated. Pilgrim has since discontinued this practice as an
acceptable closure strategy for Category D CRs.
17.4 Annual Sample: Review of Motor Operated Valve (MOV) Hydraulic Lock
17.4 Annual Sample: Review of Motor Operated Valve (MOV) Hydraulic Lock
a. Inspection Scope (1 sample) The inspectors selected
 
: [[CR]] [[-]]
====a. Inspection Scope====
PNP-2006-04328 for detailed review. The CR was written to
(1 sample)
determine the cause of a safety-related
The inspectors selected CR-PNP-2006-04328 for detailed review. The CR was written to determine the cause of a safety-related MOV failure in the RHR system during routine surveillance testing. The inspectors reviewed the licensee's root cause analysis, corrective actions, and the prioritization of the corrective actions.
: [[MOV]] [[failure in the]]
 
RHR system during routine
b. Assessment and Observations No findings of significance were identified. The inspectors determined that the licensee performed a thorough root cause analysis and took timely corrective actions to prevent recurrence. The root cause was determined to be hydraulic locking of the MOV actuator due to grease found inside of the spring package. The grease prevented the spring package from compressing which in turn prevented the thermal overloads from tripping.
surveillance testing. The inspectors reviewed the licensee's root cause analysis,
 
corrective actions, and the prioritization of the corrective actions.
The tripping of the thermal overloads stops the motor and provides the indication that the valve is closed.
b. Assessment and Observations No findings of significance were identified. The inspectors determined that the licensee
 
performed a thorough root cause analysis and took timely corrective actions to prevent
The root cause analysis determined that newer MOVs in the plant were not susceptible to hydraulic lock because the valves have an internal grease relief path from the spring package to the actuator housing. However, most MOVs at Pilgrim did not have the internal grease relief path. Immediate corrective actions included looking inside the spring package of all safety-related MOVs for grease. Long term corrective actions for this issue included a design modification to provide an external grease relief path from the spring package back to the actuator housing. All of the high priority valves have been modified. The last low priority valve to receive this modification is scheduled to be performed in the next refueling outage. The inspectors determined that the prioritization of the corrective actions was appropriate.
recurrence. The root cause was determined to be hydraulic locking of the MOV actuator
 
due to grease found inside of the spring package. The grease prevented the spring
===.5 Annual Sample: Follow-up Review of Component Design Bases Inspection (CDBI)===
package from compressing which in turn prevented the thermal overloads from tripping.
 
The tripping of the thermal overloads stops the motor and provides the indication that the
Finding Regardi ng the Inadequate Operability Determination for the HPCI Turbine Trip Solenoid Failure
valve is closed. The root cause analysis determined that newer MOVs in the plant were not susceptible to
 
hydraulic lock because the valves have an internal grease relief path from the spring
====a. Inspection Scope====
package to the actuator housing. However, most MOVs at Pilgrim did not have the
(1 sample)
internal grease relief path. Immediate corrective actions included looking inside the
The inspectors reviewed the corrective actions for a finding identified during the CDBI and documented in inspection report number 05000293/2006006. The finding was associated with Entergy
spring package of all safety-related MOVs for grease. Long term corrective actions for
=s failure to declare the HPCI system inoperable due to a HPCI turbine trip solenoid failure. The inspectors reviewed CR-PNP-2006-01460 to determine whether the corrective actions were appropriate and completed. As part of this review, the inspectors examined various safety system operating procedure changes to assess their adequacy.
this issue included a design modification to provide an external grease relief path from the
 
spring package back to the actuator housing. All of the high priority valves have been
modified. The last low priority valve to receive this modification is scheduled to be
performed in the next refueling outage. The inspectors determined that the prioritization
of the corrective actions was appropriate.
.5 Annual Sample: Follow-up Review of Component Design Bases Inspection (CDBI) Finding Regarding the Inadequate Operability Determination for the
: [[HPCI]] [[Turbine Trip Solenoid Failure     a. Inspection Scope (1 sample) The inspectors reviewed the corrective actions for a finding identified during the]]
CDBI and
documented in inspection report number 05000293/2006006. The finding was associated
with Entergy=s failure to declare the
: [[HPCI]] [[system inoperable due to a]]
: [[HPCI]] [[turbine trip solenoid failure. The inspectors reviewed]]
: [[CR]] [[-]]
PNP-2006-01460 to determine whether the corrective actions were appropriate and completed. As part of this review, the inspectors
examined various safety system operating procedure changes to assess their adequacy.
The documents reviewed are listed in the Attachment to this report.
The documents reviewed are listed in the Attachment to this report.
b. Assessment and Observations
b. Assessment and Observations
No findings of significance were identified. Entergy=s initial failure to declare
 
: [[HPCI]] [[inoperable was due to licensing and operations department management focusing on the ability of the]]
No findings of significance were identified. Entergy
HPCI system to perform its accident analysis function versus a discussion of
=s initial failure to declare HPCI inoperable was due to licensing and operations department management focusing on the ability of the HPCI system to perform its accident analysis function versus a discussion of 18the HPCI system TS requirements. The fo cus did not address the ability of the HPCI system to automatically trip on high water level in the reactor vessel, as described in TS 3.2.B, "Protective Instrumentation Core and Containment Cooling Systems - Initiation and Control."  As a result, the HPCI system should have been considered inoperable regardless of the ability of the system to perform its accident analysis function.
18the
 
: [[HPCI]] [[system]]
The inspectors determined that the licensee
: [[TS]] [[requirements. The focus did not address the ability of the]]
=s corrective actions were appropriate. Entergy determined the failure to declare HPCI inoperable was due to a lack of independence of the operations department and licensi ng departments in reviewing operability determinations. The inspectors noted that Entergy immediately implemented operations department training regarding independent review of emerging TS issues. Also, Entergy revised safety system operating procedures to include a section on TS instrumentation requirements.
: [[HPCI]] [[system to automatically trip on high water level in the reactor vessel, as described in]]
{{a|4OA3}}
TS
==4OA3 Event Follow-up==
3.2.B, "Protective Instrumentation Core and Containment Cooling Systems - Initiation and
{{IP sample|IP=IP 71153}}
Control."  As a result, the
===.1 Infrequently Performed Evolution: MG Set Power Transfer===
: [[HP]] [[]]
 
CI system should have been considered inoperable
====a. Inspection Scope====
regardless of the ability of the system to perform its accident analysis function. The inspectors determined that the licensee=s corrective actions were appropriate. Entergy determined the failure to declare
(1 sample)
: [[HP]] [[]]
On October 3, 2007, Pilgrim operators performed a planned manual transfer of vital alternating current (AC) power from its normal power source, the vital MG set, to its alternate power source, bus B15, with the plant at power. This infrequently performed evolution was conducted to remove the vital MG set from service for repairs. The evolution posed several challenges to Pilgrim operators because the transfer of the vital AC power from its normal to its alternate source would cause a momentary interruption in vital AC power. Similar evolutions in the past had resulted in complications such as the receipt of reactor building isolation signals, feed regulating valve position lock ups, and recirculation pump scoop tube position lock ups. Entergy developed a new procedure for this evolution, Procedure 2.2.16, Attachment 8, "A Manual Transfer of Y2 to Motor Control Center (MCC)
CI inoperable was due to a lack of independence of the operations department and licensing departments in reviewing operability determinations. The inspectors noted that Entergy immediately implemented operations
B15 with the Units On-line."  The procedure established several compensatory measures to mitigate the effects of a component malfunction or unexpected response. For instance, operators were briefed on Procedure 2.4.49, Section 4.4, "A Manual Lockup of Feed Regulating Valve(s) from the Condenser Bay," and were stationed outside the condenser bay to take manual control of the valves if needed. Additionally, operators inserted a reactor building isolation signal before the vital power transfer, to prevent the signal from coming in during the transfer. The inspectors reviewed the procedure and observed the evolution from the control room to assess operator actions, command and control, and the adequacy of communications within the control room and between the control room and the field.
department training regarding independent review of emerging TS issues. Also, Entergy
 
revised safety system operating procedures to include a section on TS instrumentation
====b. Findings====
requirements.
No findings of significance were identified.
4OA3 Event Follow-up (71153
 
.1 Infrequently Performed Evolution: MG Set Power Transfer
19.2 LER Review and Closeout (1 sample)
a. Inspection Scope (1 sample) On October 3, 2007, Pilgrim operators performed a planned manual transfer of vital
(Closed) LER 05000293/2007-005-00, Reactor Scram Resulting from Low Vacuum Turbine Trip
alternating current (AC) power from its normal power source, the vital MG set, to its
 
alternate power source, bus B15, with the plant at power. This infrequently performed
====a. Inspection Scope====
evolution was conducted to remove the vital MG set from service for repairs. The evolution
The inspectors reviewed Entergy
posed several challenges to Pilgrim operators because the transfer of the vital AC power
=s actions associated with LER 50-293/2007-05-00, which discussed the July 10, 2007, low vacuum turbine trip and automatic reactor scram event. The inspectors reviewed the licensee
from its normal to its alternate source would cause a momentary interruption in vital AC
=s LER and associated root cause evaluation. Additionally, the inspectors verified that follow-up actions, taken or planned, were appropriate to address the event. This LER is closed.
power. Similar evolutions in the past had resulted in complications such as the receipt of
 
reactor building isolation signals, feed regulating valve position lock ups, and recirculation
====b. Findings====
pump scoop tube position lock ups. Entergy developed a new procedure for this evolution,
 
Procedure 2.2.16, Attachment 8, "A Manual Transfer of Y2 to Motor Control Center (MCC)
=====Introduction:=====
B15 with the Units On-line."  The procedure established several compensatory measures
A Green self-revealing finding was identified for Entergy
to mitigate the effects of a component malfunction or unexpected response. For instance,
=s failure to ensure the proper verification and calibration of vacuum trip switch VTS-1 during refueling outage (RFO) 16. Specifically, personnel did not ensure that the proper verification/calibration technique was employed to determine the as-found low condenser vacuum turbine trip setpoint. Additionally, when the technician identified that the as-found data was significantly outside of historical as-found values, he did not question the validity of the data nor did he obtain a peer check. The technician then calibrated the instrument using the incorrect as-found data which resulted in an incorrect low vacuum trip setpoint and a subsequent turbine trip and reactor scram on July 10, 2007.
operators were briefed on Procedure 2.4.49, Section 4.4, "A Manual Lockup of Feed
 
Regulating Valve(s) from the Condenser Bay," and were stationed outside the condenser
=====Description:=====
bay to take manual control of the valves if needed. Additionally, operators inserted a
On July 10, 2007, an unplanned automatic reactor scram occurred while performing condenser thermal backwashes at approximately 48 percent power. The reactor protection system (RPS) scram signal was initiated by the trip of the main turbine on low condenser vacuum. Pilgrim operators stabilized t he plant in a shutdown condition and made a four-hour notification to the NRC. Post scram review of the as-found setpoint for vacuum trip switch, VTS-1, revealed that the trip setpoint was set to actuate at 24.35
reactor building isolation signal before the vital power transfer, to prevent the signal from
@ Hg rather than the expected 21.95
coming in during the transfer. The inspectors reviewed the procedure and observed the
@ B 22.45@ Hg. Entergy recalibrated the vacuum switch and restored the plant to 100 percent power on July 16, 2007.
evolution from the control room to assess operator actions, command and control, and the
 
adequacy of communications within the control room and between the control room and
the field.
b. Findings No findings of significance were identified.
19.2
: [[LER]] [[Review and Closeout (1 sample)   (Closed)]]
LER 05000293/2007-005-00, Reactor Scram Resulting from Low Vacuum Turbine Trip
a. Inspection Scope   The inspectors reviewed Entergy=s actions associated with
: [[LER]] [[50-293/2007-05-00, which discussed the July 10, 2007, low vacuum turbine trip and automatic reactor scram event. The inspectors reviewed the licensee=s]]
LER and associated root cause evaluation. Additionally, the inspectors verified that follow-up actions, taken or planned, were appropriate to address the event. This LER is closed.
b. Findings   Introduction: A Green self-revealing finding was identified for Entergy=s failure to ensure the proper verification and calibration of vacuum trip switch
: [[VTS]] [[-1 during refueling outage (]]
RFO) 16. Specifically, personnel did not ensure that the proper verification/calibration
technique was employed to determine the as-found low condenser vacuum turbine trip
setpoint. Additionally, when the technician identified that the as-found data was
significantly outside of historical as-found values, he did not question the validity of the data
nor did he obtain a peer check. The technician then calibrated the instrument using the
incorrect as-found data which resulted in an incorrect low vacuum trip setpoint and a
subsequent turbine trip and reactor scram on July 10, 2007. Description: On July 10, 2007, an unplanned automatic reactor scram occurred while performing condenser thermal backwashes at approximately 48 percent power. The reactor
protection system (RPS) scram signal was initiated by the trip of the main turbine on low
condenser vacuum. Pilgrim operators stabilized the plant in a shutdown condition and made a four-hour notification to the NRC. Post scram review of the as-found setpoint for
vacuum trip switch, VTS-1, revealed that the trip setpoint was set to actuate at 24.35@ Hg rather than the expected 21.95@ B 22.45@ Hg. Entergy recalibrated the vacuum switch and restored the plant to 100 percent power on July 16, 2007.
Entergy conducted a root cause evaluation of the unplanned scram and summarized their results in LER 2007-005-00, "Reactor Scram Resulting from Low Vacuum Turbine Trip."
Entergy conducted a root cause evaluation of the unplanned scram and summarized their results in LER 2007-005-00, "Reactor Scram Resulting from Low Vacuum Turbine Trip."
Entergy determined that the root cause of the event was that the technician who had
 
calibrated the
Entergy determined that the root cause of the event was that the technician who had calibrated the VTS-1 switch during RFO 16 had not properly implemented human performance tools (e.g., training) for this particular type of large volume instrument to ensure a proper calibration. Specifically, since the bellows for VTS-1 are very large, the vacuum must be decreased slowly during the calibration in order for an accurate setpoint to be obtained. While obtaining the as-found setpoint, the technician did not decrease the vacuum slowly which resulted in faulty as-found results. Additionally, when the as-found data suggested that the vacuum switch was considerably outside of historical results, the technician did not question the validity of the data nor did he obtain a peer check. The technician then made adjustments to the instrument using the incorrect as-found data.
: [[VTS]] [[-1 switch during]]
 
RFO 16 had not properly implemented human
20Entergy=s root cause report also discussed several weaknesses with Procedure 8.F.51, ATurbine Generator and Auxiliary Instruments Calibration.
performance tools (e.g., training) for this particular type of large volume instrument to
 
ensure a proper calibration. Specifically, since the bellows for VTS-1 are very large, the
@  Specifically, the root cause report noted that Aadditional details in the procedure would provide an additional barrier to ensure the proper calibration technique is achieved.
vacuum must be decreased slowly during the calibration in order for an accurate setpoint to
 
be obtained. While obtaining the as-found setpoint, the technician did not decrease the
@  However, the inspectors noted that Entergy had not identified these procedural weaknesses as a contributing cause to this event. The inspectors concluded that the lack of procedural specificity and guidance contributed to the improper calibration of VTS-1. Entergy
vacuum slowly which resulted in faulty as-found results. Additionally, when the as-found
=s corrective actions for this aspect included adding steps to the procedure to decrease the vacuum at a slower rate, to include detailed guidance on the adjustments of the trip and span of the vacuum trip assembly, and to require supervisory review of as-found data and testing techniques prior to performing adjustments.
data suggested that the vacuum switch was considerably outside of historical results, the
 
technician did not question the validity of the data nor did he obtain a peer check. The
=====Analysis:=====
technician then made adjustments to the instrument using the incorrect as-found data.
The performance deficiency associated with this finding is that Entergy did not ensure the proper verification and calibration of vacuum trip switch VTS-1 during RFO 16.
20Entergy=s root cause report also discussed several weaknesses with Procedure
 
: [[8.F.]] [[51,]]
The improper setpoint resulted in a low vacuum turbine trip and consequent automatic reactor scram on July 10, 2007.
ATurbine Generator and Auxiliary Instruments Calibration.@  Specifically, the root cause report noted that Aadditional details in the procedure would provide an additional barrier to ensure the proper calibration technique is achieved.@  However, the inspectors noted that Entergy had not identified these procedural weaknesses as a contributing cause to this event. The inspectors concluded that the lack of procedural specificity and guidance
 
contributed to the improper calibration of VTS-1. Entergy=s corrective actions for this aspect included adding steps to the procedure to decrease the vacuum at a slower rate, to include detailed guidance on the adjustments of the trip and span of the vacuum trip
This finding is more than minor because it is associated with the human performance attribute of the Initiating Events Cornerstone and affects the  
assembly, and to require supervisory review of as-found data and testing techniques prior
 
to performing adjustments.
cornerstone objective of limiting the likelihood of those events that upset plant stability during power operations. The inspectors conducted a Phase 1 screening in accordance with IMC 0609, "Significance Determination Process," Appendix A, "Reactor Inspection Findings for At-Power Situations."  The finding was determined to be of very low safety significance (Green) because it did not contribute to both the likelihood of a reactor trip and the likelihood that mitigation equipment would be unavailable. This finding has a cross-cutting aspect in the area of Human Performance, Work Practices, because Entergy proceeded in the face of uncertainty or unexpected circumstances by continuing with the calibration procedure even though the vacuum trip switch setpoint was found significantly outside of historical as-found values. [H.4(a)]  
Analysis: The performance deficiency associated with this finding is that Entergy did not ensure the proper verification and calibration of vacuum trip switch
 
: [[VTS]] [[-1 during]]
=====Enforcement:=====
RFO 16.
Enforcement action does not apply because the performance deficiency did not involve a violation of a regulatory requirement in that the vacuum trip switch is not a safety-related component. Entergy has entered this issue into their corrective action program as CR-PNP-2007-3231. Corrective actions included recalibrating VTS-1 before the plant restart, providing remedial training for the technician who had conducted the improper calibration, and adding vacuum switch fundamentals as a continuing training topic for the instrumentation and controls (I&C) technicians. Additional corrective actions planned by Entergy include revising Procedure 8.F.51 to include more detailed guidance and to require a supervisory review of as-found data prior to performing adjustments; conducting just-in-time training prior to the RFO 17 vacuum trip switch setpoint verification and calibration; and identifying and revising other I&C procedures involving critical calibrations. Because this violation does not involve a violation of regulatory requirements and has a very low safety significance, it is identified as FIN 05000293/2007005-01, Improper Calibration of Vacuum Trip Switch Results in an Automatic Reactor Scram.
The improper setpoint resulted in a low vacuum turbine trip and consequent automatic
 
reactor scram on July 10, 2007. This finding is more than minor because it is associated
{{a|4OA6}}
with the human performance attribute of the Initiating Events Cornerstone and affects the
==4OA6 Meetings, Including Exit==
cornerstone objective of limiting the likelihood of those events that upset plant stability during power operations. The inspectors conducted a Phase 1 screening in accordance
 
with IMC 0609, "Significance Determination Process," Appendix A, "Reactor Inspection
On October 18, 2007, an Occupational Radiation and Public Radiation Safety exit meeting was conducted. The preliminary inspection results were presented to Robert Smith, 21General Manager Pilgrim Operations, and other members of the Pilgrim staff. The licensee did not identify any material as proprietary during this inspection.
Findings for At-Power Situations."  The finding was determined to be of very low safety
 
significance (Green) because it did not contribute to both the likelihood of a reactor trip and
On October 18, 2007, the Security inspection results were presented to members of licensee management.
the likelihood that mitigation equipment would be unavailable. This finding has a
 
cross-cutting aspect in the area of Human Performance, Work Practices, because Entergy
On January 9, 2008, the resident inspectors conducted an exit meeting and presented the preliminary inspection results to Mr. Kevin Bronson, Site Vice President, and other members of the Pilgrim staff. The inspectors confirmed that no proprietary information was provided or examined during the inspection.
proceeded in the face of uncertainty or unexpected circumstances by continuing with the
 
calibration procedure even though the vacuum trip switch setpoint was found significantly
ATTACHMENT:
outside of historical as-found values. [H.4(a)] Enforcement: Enforcement action does not apply because the performance deficiency did not involve a violation of a regulatory requirement in that the vacuum trip switch is not a
 
safety-related component. Entergy has entered this issue into their corrective action
=SUPPLEMENTAL INFORMATION=
program as
 
: [[CR]] [[-]]
==KEY POINTS OF CONTACT==
PNP-2007-3231. Corrective actions included recalibrating VTS-1 before
 
the plant restart, providing remedial training for the technician who had conducted the
===Licensee personnel===
improper calibration, and adding vacuum switch fundamentals as a continuing training
:
topic for the instrumentation and controls (I&C) technicians. Additional corrective actions
S. Bethay  Nuclear Safety Assurance Director  
planned by Entergy include revising Procedure 8.F.51 to include more detailed guidance
: [[contact::K. Bronson  Site Vice President]], Pilgrim  
and to require a supervisory review of as-found data prior to performing adjustments;
: [[contact::H. Bouska  Supervisor]], Operations Training
conducting just-in-time training prior to the RFO 17 vacuum trip switch setpoint verification
D. Burke  Security Manager  
and calibration; and identifying and revising other I&C procedures involving critical
: [[contact::L. Foreaker  Supervisor]], Radiation Instrumentation  
calibrations. Because this violation does not involve a violation of regulatory requirements and has a very low safety significance, it is identified as
: [[contact::J. Henderson  Manager]], Radiation Protection
: [[FIN]] [[05000293/2007005-01, Improper Calibration of Vacuum Trip Switch Results in an Automatic Reactor Scram. 4]]
M. Gakka  Licensing  
OA6 Meetings, Including Exit On October 18, 2007, an Occupational Radiation and Public Radiation Safety exit meeting
: [[contact::T. Kelly  Technician]], Radiation Protection  
was conducted. The preliminary inspection results were presented to Robert Smith,
: [[contact::R. Larson  Technician]], Radiation Protection
21General Manager Pilgrim Operations, and other members of the Pilgrim staff. The licensee did not identify any material as proprietary during this inspection. On October 18, 2007, the Security inspection results were presented to members of
licensee management. On January 9, 2008, the resident inspectors conducted an exit meeting and presented the
preliminary inspection results to Mr. Kevin Bronson, Site Vice President, and other
members of the Pilgrim staff. The inspectors confirmed that no proprietary information was
provided or examined during the inspection.
: [[ATTACH]] [[]]
: [[MENT]] [[:]]
: [[SUPPLE]] [[]]
: [[MENTAL]] [[]]
: [[INFORM]] [[]]
: [[ATION]] [[A-1]]
: [[SUPPLE]] [[]]
: [[MENTAL]] [[]]
: [[INFORM]] [[]]
: [[ATION]] [[]]
: [[KEY]] [[]]
: [[POINTS]] [[]]
: [[OF]] [[]]
CONTACT
Licensee personnel:
S. Bethay  Nuclear Safety Assurance Director
K. Bronson  Site Vice President, Pilgrim
H. Bouska  Supervisor, Operations Training
D. Burke  Security Manager
L. Foreaker  Supervisor, Radiation Instrumentation
J. Henderson  Manager, Radiation Protection
M. Gakka  Licensing
T. Kelly  Technician, Radiation Protection
R. Larson  Technician, Radiation Protection
W. Lobo  Licensing Engineer
W. Lobo  Licensing Engineer
J. Lynch  Licensing Manager
J. Lynch  Licensing Manager
F. Marcussen  Protective Services Department Manager
F. Marcussen  Protective Services Department Manager
C. McMorrow  Senior Operations Instructor
C. McMorrow  Senior Operations Instructor
D. Noyes  Operations Director
D. Noyes  Operations Director  
M. Santiago  Superintendent, Nuclear Training
: [[contact::M. Santiago  Superintendent]], Nuclear Training  
L. Seehaus  Technician, Radiation Protection
: [[contact::L. Seehaus  Technician]], Radiation Protection
R. Smith  Plant Operations General Manager
R. Smith  Plant Operations General Manager
: [[D.]] [[Towmey  Lead Technician, Radiation Protection]]
: [[contact::D. Towmey  Lead Technician]], Radiation Protection  
: [[LIST]] [[]]
 
: [[OF]] [[]]
==LIST OF ITEMS==
: [[ITEMS]] [[]]
 
: [[OPENED]] [[,]]
===OPENED, CLOSED AND DISCUSSED===
: [[CLOSED]] [[]]
 
: [[AND]] [[]]
===Opened and Closed===
: [[DISCUS]] [[]]
: 05000293/2007005-01 FIN Improper Calibration of Vacuum Trip Switch Results in an  Automatic Reactor Scram
SED
 
Opened and Closed
===Closed===
05000293/2007005-01 FIN Improper Calibration of Vacuum Trip Switch Results in an  Automatic Reactor Scram
: [[Closes LER::05000293/LER-2007-005]]-00 LER Reactor Scram Resulting from Low Vacuum Turbine Trip  
Closed
 
05000293/2007-005-00
==LIST OF DOCUMENTS REVIEWED==
: [[LER]] [[Reactor Scram Resulting from Low Vacuum Turbine Trip]]
Section 1R01
: [[LIST]] [[]]
: UFSAR Table 10.9-1, Design Temperatures
: [[OF]] [[]]
: NRC
: [[DOCUME]] [[]]
: IN 96-036, Degradation of Cooling Water Systems Due to Icing
: [[NTS]] [[]]
: NRC
: [[REVIEW]] [[]]
: IN 98-002, Nuclear Power Plant Cold Weather Problems and Protective Measures 
: [[ED]] [[Section 1R01]]
===Procedure===
: [[UFS]] [[]]
: 8.C.40, Seasonal Weather Surve illance, Attachment 1, Cold Weather Preparations, Revision 19 Procedure 2.2.35, Condensate Storage and Transfer System, Revision 40 
: [[AR]] [[Table 10.9-1, Design Temperatures]]
: Section 1R04
: [[NRC]] [[]]
: Drawing M215 Sheet 2, Revision 48, P&ID Cooling Water System Reactor Building Drawing M215 Sheet 5, Revision E8, Composite P&ID Cooling Water System Reactor Building 
: [[IN]] [[96-036, Degradation of Cooling Water Systems Due to Icing]]
===Procedure===
: [[NRC]] [[]]
: 2.2.30, Revision 65, RBCCW System
IN 98-002, Nuclear Power Plant Cold Weather Problems and Protective Measures
: CR-PNP-2007-04299 
Procedure 8.C.40, Seasonal Weather Surveillance, Attachment 1, Cold Weather Preparations, Revision 19 Procedure 2.2.35, Condensate Storage and Transfer System, Revision 40
===Procedure===
A-2 Section 1R04 Drawing M215 Sheet 2, Revision 48,
: 2.2.19, Residual Heat Removal System, Revision 95
: [[P&]] [[]]
: M241, P21D, Residual Heat Removal System, Revision 47
ID Cooling Water System Reactor Building
: PNPS Procedure 2.2.21, Revision 72, High Pressure Coolant Injection System 
Drawing M215 Sheet 5, Revision E8, Composite
===Procedure===
: [[P&]] [[]]
: 7.1.44, "Sampling of Charcoal Cells in SBGT and Control Room Environmental Filters' Systems for Methyl Iodide Testing", completed on 11/28/06 for "B" SBGT
ID Cooling Water System Reactor Building
: LO-NOE-2007-00092
Procedure 2.2.30, Revision 65,
: PNPS Procedure 2.2.50, SBGT
: [[RBC]] [[]]
: PNPS Drawing M294, Heating Ventilation and Air Conditioning SBGT System Control Diagram, Revision 16
: [[CW]] [[System]]
: WO 05106023, Leak Rate Test of Air Supply for SBGT System Dampers, 10/2/07
: [[CR]] [[-]]
: PNPS Procedure 8.M.2-7.1.19, Revision 4, Attachment 4, "Allowable Daily Leakage Rate"
PNP-2007-04299
: PNPS Final Safety Analysis Report, Revision 10, Chapter 5.3.3.4, SBGT System  
Procedure 2.2.19, Residual Heat Removal System, Revision 95
: PNPS Final Safety Analysis Report, Revision 10, Chapter 7.18, Reactor Building Isolation and Control System
M241, P21D, Residual Heat Removal System, Revision 47
: CR-PNP-2007-03013
: [[PN]] [[]]
: Pilgrim TS 3.7.B, SBGT System and Control Room High Efficiency Air Filtration System 
PS Procedure 2.2.21, Revision 72, High Pressure Coolant Injection System
===Procedure===
Procedure 7.1.44, "Sampling of Charcoal Cells in
: 2.2.30, RBCCW System, Revision 65 
: [[SBGT]] [[and Control Room Environmental Filters' Systems for Methyl Iodide Testing", completed on 11/28/06 for "B"]]
===Procedure===
: [[SBGT]] [[]]
: 3.M.3-47.2, A B@ Train Functional Test of Individual Load Shed Components,
: [[LO]] [[-]]
: Revision 18
: [[NOE]] [[-2007-00092]]
: Section 1R05
: [[PNPS]] [[Procedure 2.2.50,]]
: Pre Fire Plan, Screenhouse Building EL. 23' Pre Fire Plan, Reactor Building Quads, EL. 17'6"
: [[SBGT]] [[]]
: 89XM-1-ER-Q, Updated Fire Hazards Analysis, Revision E5 
: [[PNPS]] [[Drawing M294, Heating Ventilation and Air Conditioning]]
===Procedure===
: [[SBGT]] [[System Control Diagram, Revision]]
: 5.5.2, Special Fire Procedure, Revisions 29 and 37
: [[16 WO]] [[05106023, Leak Rate Test of Air Supply for]]
: PNPS Procedure 8.B.17.2, Inspection of Fire Damper Assemblies, Attachment 1, Revision 9, completed 4/3/07 PNPS Procedure 8.B.17.2, Inspection of Fire Damper Assemblies, Attachment 11, Revision 9, completed 4/4/07
: [[SBGT]] [[System Dampers, 10/2/07]]
: Section 1R06
: [[PN]] [[]]
: PNPS-PSA, Revision 1, PNPS Probabilistic Safety Assessment IPE Update NRC
: [[PS]] [[Procedure 8.M.2-7.1.19, Revision 4, Attachment 4, "Allowable Daily Leakage Rate"]]
: IN 2007-01, Recent Operating Experience Concerning Hydrostatic Barriers 
: [[PNPS]] [[Final Safety Analysis Report, Revision 10, Chapter 5.3.3.4,]]
===Procedure===
: [[SBGT]] [[System]]
: 3.M.4-96, Floor Plug and Vault Hatch Seals
: [[PNPS]] [[Final Safety Analysis Report, Revision 10, Chapter 7.18, Reactor Building Isolation and Control System]]
: CR-PNP-2007-01020,
CR-PNP-2007-03013
: CR-PNP-2006-03750,
Pilgrim
: CR-PNP-04223,
: [[TS]] [[3.7.B,]]
: CR-PNP-00312,
SBGT System and Control Room High Efficiency Air Filtration System
: CR-PNP-01123,
Procedure 2.2.30,
: CR-PNP-02708,
: [[RBC]] [[]]
: CR-PNP-03457
CW System, Revision 65
: Section 1R11
Procedure
: Lesson Plan O-RO-07-02-01, Revision 4, Emergency Classification and Notification
: [[3.M.]] [[3-47.2,]]
: NRC
AB@ Train Functional Test of Individual Load Shed Components,   Revision 18  Section 1R05 Pre Fire Plan, Screenhouse Building EL. 23'
: RIS 2007-02, Clarification of NRC Guidance for Emergency Notifications During Quickly Changing Events
Pre Fire Plan, Reactor Building Quads,
: EP-IP-100, Revision 26, Emergency Classification and Notification 
: [[EL.]] [[17'6"]]
: A-3EP-IP-300, Revision 6, Offsite Radiological Dose Assessment
: [[89XM]] [[-1-]]
: EP-IP-400, Revision 11, PARs Lesson Plan O-RO-07-03-03, Revision 0, PARs,
ER-Q, Updated Fire Hazards Analysis, Revision E5
: EP-IP-400
Procedure 5.5.2, Special Fire Procedure, Revisions 29 and 37
: CR-PNP-2007-4587, Control Room does not have the same weather assessment capability (160' Met Tower) for EAL assessment as the EOE
: [[PNPS]] [[Procedure 8.B.17.2, Inspection of Fire Damper Assemblies, Attachment 1, Revision 9, completed 4/3/07]]
: CR-PNP-2007-4591,
PNPS Procedure 8.B.17.2, Inspection of Fire Damper Assemblies, Attachment 11, Revision 9, completed 4/4/07
: EP-IP-400 states that core temperature >2400F is indication of substantial core damage, this temperature is not able to be obtained Section 1R12
Section 1R06
: EN-DC-203 R0, MR Program
: [[PNPS]] [[-]]
: EN-DC-204 R0, MR Scope and Basis
: [[PSA]] [[, Revision 1,]]
: EN-DC-205 R0, MR Monitoring
: [[PNPS]] [[Probabilistic Safety Assessment]]
: EN-DC-206 R0, MR (a)(1) Process
: [[IPE]] [[Update]]
: EN-LI-102 R9, CA Process
: [[NRC]] [[]]
: EN-LI-121 R6, Entergy Trending Process
IN 2007-01, Recent Operating Experience Concerning Hydrostatic Barriers
: CR-PNP-2007-00552
Procedure
: A B@ EDG exceeded MR reliability performance criteria
: [[3.M.]] [[4-96, Floor Plug and Vault Hatch Seals]]
: CR-PNP-2007-03849 CA1 Functional Failure Determination Form (9/3/07)
: [[CR]] [[-]]
: CR-PNP-2007-03673 Turbine Controls System (a)(1) Action Plan
: [[PNP]] [[-2007-01020,]]
: CR-PNP-2007-00552
: [[CR]] [[-]]
: A B@ EDG (a)(1) Action Plan Health Report, System 02, Reactor Recirculation 3
: [[PNP]] [[-2006-03750,]]
rd Qtr 2007 Health Report, System 29, Salt Service Water 3
: [[CR]] [[-]]
rd Qtr 2007 Health Report, System 01, Main Steam, 3
: [[PNP]] [[-04223,]]
rd Qtr 2007 10/09/2007, MR Expert Panel Meeting Minutes Section 1R13
: [[CR]] [[-]]
: Risk Management Actions
: [[PNP]] [[-00312,]]
: CR-PNP-2007-04579, Small leak observed at the base of the "A" EDG turbo charger gas inlet casing Procedure 2.2.16, Revision 50, Attachment 8, Manual Transfer of Y2 to MCC B15 with the unit on-line TS 3.5.C.2, HPCI System Equipment out of service (EOOS) quantitative risk assessment tool 
: [[CR]] [[-]]
===Procedure===
: [[PNP]] [[-01123,]]
: 3.M.1-45, Outage Shutdown Risk Assessment, Revision 6
: [[CR]] [[-]]
: Risk Assessment Review Checklist for 12/10 08:00 to 12/12 18:00
: [[PNP]] [[-02708,]]
: EOOS Scheduler
: [[CR]] [[-]]
=s Evaluation for PNPS for 12/10 0:00 to 12/13 12:00 Risk Assessment Review Checklist for 12/10 08:00 to 12/12 18:00, Revision A
: [[PNP]] [[-03457  Section 1R11  Lesson Plan O-RO-07-02-01, Revision 4, Emergency Classification and Notification]]
: Section 1R15
: [[NRC]] [[]]
: CR-PNP-2007-03708, Adjustments of the MPR Setpoint have been required.
: [[RIS]] [[2007-02, Clarification of]]
: ODMI Action Plan for MPR Setpoint Adjustments Apparent Cause Evaluation for MPR Setpoint Drifting
: [[NRC]] [[Guidance for Emergency Notifications During Quickly Changing Events]]
: CR-PNP-2006-01802
EP-IP-100, Revision 26, Emergency Classification and Notification
: CR-PNP-2007-04172
A-3EP-IP-300, Revision 6, Offsite Radiological Dose Assessment
: Operability Determination for CR-
: [[EP]] [[-]]
: PNP-2007-04172 Procedure 8.9.1, Revision107, Attachment 3, EDGs On-Site Fuel Oil Quantity
IP-400, Revision 11, PARs
: TS 3.9.A, Revision 212, Auxiliary Elec trical Equipment TS 3.5.C, HPCI System
Lesson Plan O-RO-07-03-03, Revision 0,
: TS 3.12, Fire Protection, Alternate Shutdown Panels
: [[PAR]] [[s,]]
: CR-PNP-2007-04724, HPCI did not achieve rated flow during operability testing 50.72 Notification for loss of HPCI Safety Function Entergy procedure
: [[EP]] [[-IP-400]]
: ENN-OP-104, AOperability Determinations
: [[CR]] [[-]]
@
: [[PNP]] [[-2007-4587, Control Room does not have the same weather assessment capability (160' Met Tower) for]]
: CR-PNP-2007-04841, Initial operability review for pump P203D
: [[EAL]] [[assessment as the]]
pump suction pressure drop value not acceptable
: [[EOE]] [[]]
: CR-PNP-2007-04871, LPCI system loop
: [[CR]] [[-]]
: A B@ pump and valve quarterly operability Procedure 8.5.2.2.2, LPCI system loop
: [[PNP]] [[-2007-4591,]]
: A B@ Operability-Pump Quarterly and Biennial (Comprehensive) Flow Rate Tests and Valve Tests
: [[EP]] [[-]]
: 51535468 01, Work Order, LPCI system loop
: [[IP]] [[-400 states that core temperature >2400F is indication of substantial core damage, this temperature is not able to be obtained  Section 1R12]]
: A B@ PP V1v Quarterly Operability P203D Test Date Sheet, RHR Inservice pump test data sheets for 11/26 and 12/3/2007  
: [[EN]] [[-]]
: Section 1R19
: [[DC]] [[-203 R0, MR Program]]
===Procedure===
: [[EN]] [[-]]
: 8.5.3.2.1, Revision 19, Attachment 1D, Quarterly and Biennial (Tech Spec/IST) Test Procedure for SSW pump D (P-208-D)
: [[DC]] [[-204 R0, MR Scope and Basis]]
: CR-PNP- 2007-04274,
: [[EN]] [[-]]
: CR 2007-04251,
: [[DC]] [[-205 R0, MR Monitoring]]
: CR 2007-04264
: [[EN]] [[-]]
: Apparent Cause Evaluation for
: [[DC]] [[-206 R0, MR (a)(1) Process]]
: CR 2007-4274
: [[EN]] [[-]]
: WO 51532443, Replace Bladder in T-223A with New Butyl Rubber Bladder, 10/11/07
: [[LI]] [[-102 R9, CA Process]]
: WO 00129585, "A" EDG, Leakage Observed from Base of Turbocharger,
: [[EN]] [[-]]
: CR 2007-04172
: [[LI]] [[-121 R6, Entergy Trending Process]]
: CR-PNP-2007-04724
: [[CR]] [[-]]
: M1J18-11, Elementary Diagram High Pressure Coolant Injection System
: [[PNP]] [[-2007-00552]]
: 4533K40-800, page 43/44, Figure 24: Schematic Diagram of Type 540-01 and 540-51 controller (for HPCI flow controller)
: [[AB]] [[@]]
: MR 51534480 - Install Hydraulic Lock Modification for HPCI
: [[EDG]] [[exceeded]]
: MO-6
: [[MR]] [[reliability performance criteria]]
: MR 51534482 - Install Hydraulic Lock Modification for HPCI
: [[CR]] [[-PNP-2007-03849]]
: MO-35
: [[CA]] [[1 Functional Failure Determination Form (9/3/07)]]
: MR 51534483 - Install Hydraulic Lock Modification for HPCI
: [[CR]] [[-PNP-2007-03673 Turbine Controls System (a)(1) Action Plan]]
: MO-3
: [[CR]] [[-]]
: MR 51534484 - Install Hydraulic Lock Modification for HPCI
: [[PNP]] [[-2007-00552]]
: MO-14 
: [[AB]] [[@]]
===Procedure===
: [[EDG]] [[(a)(1) Action Plan Health Report, System 02, Reactor Recirculation 3rd Qtr 2007 Health Report, System 29, Salt Service Water 3rd Qtr 2007 Health Report, System 01, Main Steam, 3rd Qtr 2007 10/09/2007, MR Expert Panel Meeting Minutes  Section 1R13 Risk Management Actions]]
: 1.3.34, Operations Administrative Policies and Processes, Revision 113 
: [[CR]] [[-]]
===Procedure===
: [[PNP]] [[-2007-04579, Small leak observed at the base of the "A"]]
: 2.2.21.5, HPCI Injection and Pressure Control, Revision 13 
: [[EDG]] [[turbo charger gas inlet casing Procedure 2.2.16, Revision 50, Attachment 8, Manual Transfer of Y2 to]]
===Procedure===
: [[MCC]] [[B15 with the unit on-line]]
: 8.5.4.1, HPCI System Pump and Valve Quarterly and Biennial Comprehensive Operability, Revision 102 
: [[TS]] [[3.5.C.2,]]
===Procedure===
HPCI System
: 8.5.4.4, HPCI Valve (Quarterly) Operability Test, Revision 48 Procedure 8.E.23, HPCI System Instrument Calibration, Revision 65 
Equipment out of service (EOOS) quantitative risk assessment tool
===Procedure===
Procedure 3.M.1-45, Outage Shutdown Risk Assessment, Revision 6
: 8.M.2-2.5.7, Instrument Functional/Calibration Test For HPCI Suppression Chamber Water Level, Revision 49
Risk Assessment Review Checklist for 12/10 08:00 to 12/12 18:00
: WO 00131058, HPCI Injection Flow Controller
: [[EOOS]] [[Scheduler=s Evaluation for]]
: 50.72 Event Report to USNRC: High Pressure Coolant Injection Inoperable, dated November 20, 2007 Control Room (day) Shift Narrative Logs, dated November 19, 2007
: [[PNPS]] [[for 12/10 0:00 to 12/13 12:00 Risk Assessment Review Checklist for 12/10 08:00 to 12/12 18:00, Revision A  Section 1R15]]
: LER 2000-002-00, AHigh Pressure Coolant Injection System Inoperable due to Power Inverter Failure@ TS 3.12, Fire Protection, Alternate Shutdown Panels
: [[CR]] [[-]]
: WO 00125819, Source Range Monitor (SRM) Discriminator (SRM B)
: [[PNP]] [[-2007-03708, Adjustments of the MPR Setpoint have been required.]]
: WO 00133189, SRM B Neutron Flux Response Functional Test
: [[ODMI]] [[Action Plan for]]
: CR-PNP-2007-04937, Air leakage identified at connection between the solenoid valve and the manifold Procedure 3.M.4-6, Removal, installation, Test, Disassembly, Inspection, and Reassembly of Main Steam Relief Valves 3379-270-3 E5, Main Steam SRV Sheets 1, 2, 3 and 4 
MPR Setpoint Adjustments
: A-53379-271-1 E1, Main Steam SRV Parts List Sheets 1, 2, 3, and 4
Apparent Cause Evaluation for
: WO 51535014, WO
: [[MPR]] [[Setpoint Drifting]]
: RV-203-3B Tailpipe temperature has trended up-pilot valve change out
: [[CR]] [[-]]
: WO 00133198, WO Automatic Depressurization System subsystem manual opening of relief valves Procedure 2.1.19, Suppression chamber temperatures 
: [[PNP]] [[-2006-01802]]
===Procedure===
: [[CR]] [[-]]
: 8.5.6.2, Special test for ADS system manual opening of relief valves
PNP-2007-04172
: Section 1R20
Operability Determination for
: PNP On-Line Master Schedule, dated 11/30/07, 12/10/07, and 12/11/07
: [[CR]] [[-]]
===Procedure===
: [[PNP]] [[-2007-04172 Procedure 8.9.1, Revision107, Attachment 3, EDGs On-Site Fuel Oil Quantity]]
: 2.1.5, Controlled Shutdown from Power, Revision 103 
: [[TS]] [[3.9.A, Revision 212, Auxiliary Electrical Equipment]]
===Procedure===
: [[TS]] [[3.5.C,]]
: 2.2.19.1, Residual Heat Removal System - Shutdown Cooling Mode of Operation, Revision 24 Procedure 2.1.1, Startup from Shutdown, Revision 162
: [[HP]] [[]]
: Procedure, 2.1.7, Vessel Heatup and Cooldown, Revision 52, completed 12/12/2007
CI System
: Section 1R22
TS 3.12, Fire Protection, Alternate Shutdown Panels
===Procedure===
A-4CR-PNP-2007-04724,
: 8.5.5.1, Revision 56, RCIC Pump Quarterly and Biennial Operability Flow rate and Valve Test at approximately 1000 psig
: [[HPCI]] [[did not achieve rated flow during operability testing 50.72 Notification for loss of]]
: WO 51534877, RCIC Pump Operability and Flow Rate Te st at 1000 psig, 10/10/07
HPCI Safety Function
: CR-PNP-2007-04640;
Entergy procedure
: CR-PNP-2007-04816;
: [[ENN]] [[-]]
: CR-PNP-2007-04835 
: [[OP]] [[-104,]]
===Procedure===
: [[AO]] [[perability Determinations@]]
: 6.1-220, Radiological Controls for High Risk Evolutions, Revision 2 
: [[CR]] [[-PNP-2007-04841, Initial operability review for pump P203D pump suction pressure drop value not acceptable]]
===Procedure===
: [[CR]] [[-]]
: 8.I.1.1, Inservice Pump and Valve Te sting Program, Revision 21 Procedure 8.5.4.1, HPCI System Pump and Valve Quarterly and Biennial Comprehensive Operability, Revision 102
: [[PNP]] [[-2007-04871,]]
: EN-RP-131, Attachment 9.2, Revision 3, Air Sampling results from November 11, 2007
: [[LPCI]] [[system loop]]
: EN-RP-131, Attachment 9.2, Revision 3, Air Sampling results from November 19, 2007
: [[AB]] [[@ pump and valve quarterly operability Procedure 8.5.2.2.2,]]
: Control Room (day) Shift Narrative Logs, dated 11/20/2007
: [[LPCI]] [[system loop]]
: Technical Specification 3.5.C, High Pressure Coolant Injection
: [[AB]] [[@ Operability-Pump Quarterly and Biennial (Comprehensive) Flow Rate Tests and Valve Tests 51535468 01, Work Order,]]
: UFSAR Section 6.5.2.3, High Pressure Coolant Injection System
: [[LPCI]] [[system loop]]
: USNRC Letter to Entergy: PNPS - Entergy Relief Request
: [[AB]] [[@]]
: PR-03 High Pressure Coolant Injection Pump, dated August 29, 2005 
: [[PP]] [[V1v Quarterly Operability P203D Test Date Sheet,]]
===Procedure===
: [[RHR]] [[Inservice pump test data sheets for 11/26 and 12/3/2007  Section 1R19 Procedure 8.5.3.2.1, Revision 19, Attachment 1D, Quarterly and Biennial (Tech Spec/IST) Test Procedure for]]
: 2.1.15, Daily Surveillance Log, Revision
: [[SSW]] [[pump D (P-208-D)]]
===Procedure===
: [[CR]] [[-PNP- 2007-04274,]]
: 8.M.2-5, Drywell Drain Sump Integrator, Revision 9, Attachment 1, completed 10/18/07 
: [[CR]] [[2007-04251,]]
===Procedure===
CR 2007-04264
: 8.M.2-5, Drywell Drain Sump Integrator, Revision 9, Attachment 2, completed 10/6/05
Apparent Cause Evaluation for CR 2007-4274
: Drawing C-75, Reactor Building Foundations Drywell Concrete @ El. 9'-2, Revision 4
: [[WO]] [[51532443, Replace Bladder in T-223A with New Butyl Rubber Bladder, 10/11/07]]
: ER#
: [[WO]] [[00129585, "A"]]
: 06110910, Attachment 9.1  
: [[EDG]] [[, Leakage Observed from Base of Turbocharger, CR 2007-04172]]
: Control Room Shift Narrative Logs, dated 12/5/2007 through 12/7/2007
: [[CR]] [[-]]
: Sections 2OS1/2OS2/20S3
PNP-2007-04724
: 6.5-003, Revision 8, Radiation Protection Instrumentation Calibration Frequency
M1J18-11, Elementary Diagram High Pressure Coolant Injection System
: 6.5-160, Revision 31, Calibration of the Area Radiation Monitoring System
4533K40-800, page 43/44, Figure 24: Schematic Diagram of Type 540-01 and 540-51 controller (for
: 6.5-170, Revision 21, Calibration of Ventilation System Radiation Monitors Using ARM Type Sensor/Converters 6.5-307, Revision 16, Calibration of the Eberline
: [[HPCI]] [[flow controller)]]
: RO-2/RO2A or
: [[MR]] [[51534480 - Install Hydraulic Lock Modification for]]
: RO-20 Ion Chamber  
: [[HPCI]] [[]]
: 6.5-311, Revision 10, Calibration of the Eberline Model
: [[MO]] [[-6]]
: RO-7 Radiation Monitor
: [[MR]] [[51534482 - Install Hydraulic Lock Modification for]]
: 6.5-341, Revision 11, Calibration of the
: [[HPCI]] [[MO-35]]
: MDC 2000S Electronic Dosimeter
: [[MR]] [[51534483 - Install Hydraulic Lock Modification for]]
: 6.7.1-106, Revision 14, Inspection and Testing of Respiratory Protection Equipment
: [[HPCI]] [[MO-3]]
: 6.7.1-201, Revision 8, Operation of the SCBA Air Compressor 
: [[MR]] [[51534484 - Install Hydraulic Lock Modification for]]
: A-6EN-RP-121, Revision 1, Radioactive Material Control
HPCI MO-14
: EN-RP-301, Revision 0, Radiation Protection Instrument Control
Procedure 1.3.34, Operations Administrative Policies and Processes, Revision 113
: EN-RP-303, Revision 0, Source Checking of Radiation Protection Instrumentation
Procedure 2.2.21.5,
: EN-RP-502, Revision 1, Inspection and Maintenance of Respiratory Protection Equipment Calibration Records:
: [[HP]] [[]]
: Electronic Dosimeter Calibration (Serial Nos.
CI Injection and Pressure Control, Revision 13
: 176631,
Procedure 8.5.4.1,
: 219267,
: [[HPCI]] [[System Pump and Valve Quarterly and Biennial Comprehensive Operability, Revision 102 Procedure 8.5.4.4,]]
: 178032,
: [[HPCI]] [[Valve (Quarterly) Operability Test, Revision 48 Procedure]]
: 177025, 170628)
: [[8.E.]] [[23,]]
: E-520 (Serial No. 722)
HPCI System Instrument Calibration, Revision 65
: SAC-4 (Serial No. 1402)
Procedure
: BC-4 (Serial No. 484)
: [[8.M.]] [[2-2.5.7, Instrument Functional/Calibration Test For]]
: Victoreen Lapel Sampler (Serial No. c1138)
: [[HPCI]] [[Suppression Chamber Water Level, Revision]]
: H809V (Serial No. 6168)
: [[49 WO]] [[00131058,]]
: PM-7(Serial No. 600, 392)
HPCI Injection Flow Controller
: Wide Range Telepole (Serial No. 6603-027)
50.72 Event Report to
: RO-2 (Serial No. 3410)
: [[USN]] [[]]
: RO-2A (Serial No. 3295)
: [[RC]] [[: High Pressure Coolant Injection Inoperable, dated November 20, 2007 Control Room (day) Shift Narrative Logs, dated November 19, 2007]]
: RO-20 (Serial No. 325, 285)
: [[LER]] [[2000-002-00,]]
: RO-7 (Serial No. 1030)
: [[AH]] [[igh Pressure Coolant Injection System Inoperable due to Power Inverter Failure@]]
: RM-14 (Serial No. 8565)
: [[TS]] [[3.12, Fire Protection, Alternate Shutdown Panels]]
: SAM-9 (Serial No. 308)
: [[WO]] [[00125819, Source Range Monitor (SRM) Discriminator (SRM B)]]
: MD-12 (Serial No. 135005)
: [[WO]] [[00133189,]]
: CR-PNP-2007-00078, 00426, 01012, 01077
: [[SRM]] [[B Neutron Flux Response Functional Test]]
: CR-PNP-2006-00844, 01290, 01792
: [[CR]] [[-]]
: CR-PNP-2007-00341, 01372, 03317
: [[PNP]] [[-2007-04937, Air leakage identified at connection between the solenoid valve and the manifold Procedure]]
: CR-PNP-2006-00620, 00843, 01432, 03085, 03922, 03935
: [[3.M.]] [[4-6, Removal, installation, Test, Disassembly, Inspection, and Reassembly of Main Steam Relief Valves 3379-270-3 E5, Main Steam]]
: SCBA Numbers :1, 2, 3, 4, 5, 10, 11, 12, 13, 14 
SRV Sheets 1, 2, 3 and 4
===Miscellaneous===
A-53379-271-1 E1, Main Steam
: Records & Reports:
: [[SRV]] [[Parts List Sheets 1, 2, 3, and 4]]
: Mask Qualification List Root Cause Analysis Report for
: [[WO]] [[51535014,]]
: CR-PNP-07-3880
: [[WO]] [[]]
: Instructional Module C-FB-02-02-01, Revision 7 Self-Contained Breathing Apparatus
: [[RV]] [[-203-3B Tailpipe temperature has trended up-pilot valve change out]]
: Section 4OA2
: [[WO]] [[00133198,]]
: Limitorque Maintenance Update 90-1  
WO Automatic Depressurization System subsystem manual opening of relief valves Procedure 2.1.19, Suppression chamber temperatures
: Limitorque Maintenance Update 88-2
Procedure 8.5.6.2, Special test for ADS system manual opening of relief valves
: ER 07101434, Revision 0, Installation of External Grease Relief Bypass on Limitorque Actuators
Section 1R20 PNP On-Line Master Schedule, dated 11/30/07, 12/10/07, and 12/11/07
: ER 07112191, Revision 0, Revision to
Procedure 2.1.5, Controlled Shutdown from Power, Revision 103
: VM-0390 to Provide Additional Instructions for Installation of MOV External Grease Relief Modifications
Procedure 2.2.19.1, Residual Heat Removal System - Shutdown Cooling Mode of Operation, Revision 24 Procedure 2.1.1, Startup from Shutdown, Revision 162
: DRN 07-01007, Limitorque Valve Controls Third quarter 2007 Pilgrim Station Quarterly Trend Report
Procedure, 2.1.7, Vessel Heatup and Cooldown, Revision 52, completed 12/12/2007
: NRC
Section 1R22 Procedure 8.5.5.1, Revision 56,
: IR 2007-003
: [[RCIC]] [[Pump Quarterly and Biennial Operability Flow rate and Valve Test at approximately 1000 psig]]
: CR-PNP-2007-03925, Potential Adverse Trend in Station Mispositioning errors
: [[WO]] [[51534877,]]
: CR-PNP-2007-00303,
: [[RCIC]] [[Pump Operability and Flow Rate Test at 1000 psig, 10/10/07]]
: PS-CKVS-B (crankcase pressure switch
: [[CR]] [[-PNP-2007-04640;]]
: A B@ diesel) not valved in correctly
: [[CR]] [[-]]
: CR-PNP-2007-01446, RCIC check valve 1301-CK-50 initial position found open instead of closed
: [[PNP]] [[-2007-04816;]]
: CR-PNP-2007-2383, Breaker B1446 (EDG
: [[CR]] [[-]]
: A B@ Diesel Oil Transfer Pump) found
PNP-2007-04835
: A OFF@, normal position is
Procedure 6.1-220, Radiological Controls for High Risk Evolutions, Revision 2
: A ON@
Procedure
: CR-PNP-2007-02468, Isolation valve found closed on Reactor Pressure Transmitter
: [[8.I.]] [[1.1, Inservice Pump and Valve Testing Program, Revision 21 Procedure 8.5.4.1,]]
: CR-PNP-2007-02476, Spare breaker found closed when it was expected to be open
: [[HPCI]] [[System Pump and Valve Quarterly and Biennial Comprehensive Operability, Revision]]
: CR-PNP-2007-02651, EDG failed to start (likely due to fuel rack and governor left in full fuel position)
: [[102 EN]] [[-]]
: A-7Procedure 2.2.21, High Pressure Coolant Injection System, Revision 72 Procedure 2.2.19, Residual Heat Removal System, Revision 95 
: [[RP]] [[-131, Attachment 9.2, Revision 3, Air Sampling results from November 11, 2007]]
===Procedure===
: [[EN]] [[-]]
: 2.2.3, Automatic Depressurization System, Revision 23  
RP-131, Attachment 9.2, Revision 3, Air Sampling results from November 19, 2007
===Procedure===
Control Room (day) Shift Narrative Logs, dated 11/20/2007
: 2.2.8, Emergency Diesel Generator, Revision 90
Technical Specification 3.5.C, High Pressure Coolant Injection
==LIST OF ACRONYMS==
: [[UFS]] [[]]
: [[AC]] [[alternating current]]
: [[AR]] [[Section 6.5.2.3, High Pressure Coolant Injection System]]
: [[ADAMS]] [[Agencywide Documents Access and Management System]]
: [[USNRC]] [[Letter to Entergy:]]
PNPS - Entergy Relief Request PR-03 High Pressure Coolant Injection Pump, dated August 29, 2005 Procedure 2.1.15, Daily Surveillance Log, Revision  Procedure 8.M.2-5, Drywell Drain Sump Integrator, Revision 9, Attachment 1, completed 10/18/07
Procedure 8.M.2-5, Drywell Drain Sump Integrator, Revision 9, Attachment 2, completed 10/6/05
Drawing C-75, Reactor Building Foundations Drywell Concrete @ El. 9'-2, Revision 4
ER# 06110910, Attachment 9.1
Control Room Shift Narrative Logs, dated 12/5/2007 through 12/7/2007
Sections
: [[2OS]] [[1/2]]
OS2/20S3 6.5-003, Revision 8, Radiation Protection Instrumentation Calibration Frequency
6.5-160, Revision 31, Calibration of the Area Radiation Monitoring System
6.5-170, Revision 21, Calibration of Ventilation System Radiation Monitors Using
: [[ARM]] [[Type Sensor/Converters 6.5-307, Revision 16, Calibration of the Eberline]]
RO-2/RO2A or RO-20 Ion Chamber
6.5-311, Revision 10, Calibration of the Eberline Model RO-7 Radiation Monitor
6.5-341, Revision 11, Calibration of the MDC 2000S Electronic Dosimeter
6.7.1-106, Revision 14, Inspection and Testing of Respiratory Protection Equipment
6.7.1-201, Revision 8, Operation of the
: [[SC]] [[]]
BA Air Compressor
A-6EN-RP-121, Revision 1, Radioactive Material Control
: [[EN]] [[-]]
: [[RP]] [[-301, Revision 0, Radiation Protection Instrument Control]]
: [[EN]] [[-]]
: [[RP]] [[-303, Revision 0, Source Checking of Radiation Protection Instrumentation]]
: [[EN]] [[-]]
RP-502, Revision 1, Inspection and Maintenance of Respiratory Protection Equipment
Calibration Records:
Electronic Dosimeter Calibration (Serial Nos. 176631, 219267, 178032, 177025, 170628)
E-520 (Serial No. 722)
SAC-4 (Serial No. 1402)
BC-4 (Serial No. 484)
Victoreen Lapel Sampler (Serial No. c1138)
H809V (Serial No. 6168)
PM-7(Serial No. 600, 392)
Wide Range Telepole (Serial No. 6603-027)
RO-2 (Serial No. 3410)
RO-2A (Serial No. 3295)
RO-20 (Serial No. 325, 285)
RO-7 (Serial No. 1030)
RM-14 (Serial No. 8565)
SAM-9 (Serial No. 308)
: [[MD]] [[-12 (Serial No. 135005)]]
: [[CR]] [[-]]
: [[PNP]] [[-2007-00078, 00426, 01012, 01077]]
: [[CR]] [[-]]
: [[PNP]] [[-2006-00844, 01290, 01792]]
: [[CR]] [[-]]
: [[PNP]] [[-2007-00341, 01372, 03317]]
: [[CR]] [[-]]
: [[PNP]] [[-2006-00620, 00843, 01432, 03085, 03922, 03935]]
: [[SC]] [[]]
BA Numbers :1, 2, 3, 4, 5, 10, 11, 12, 13, 14
Miscellaneous Records & Reports:
Mask Qualification List
Root Cause Analysis Report for
: [[CR]] [[-]]
PNP-07-3880
Instructional Module C-FB-02-02-01, Revision 7 Self-Contained Breathing Apparatus
Section 4OA2 Limitorque Maintenance Update 90-1
Limitorque Maintenance Update 88-2
: [[ER]] [[07101434, Revision 0, Installation of External Grease Relief Bypass on Limitorque Actuators]]
: [[ER]] [[07112191, Revision 0, Revision to]]
: [[VM]] [[-0390 to Provide Additional Instructions for Installation of]]
: [[MOV]] [[External Grease Relief Modifications]]
DRN 07-01007, Limitorque Valve Controls
Third quarter 2007 Pilgrim Station Quarterly Trend Report
: [[NRC]] [[]]
: [[IR]] [[2007-003]]
: [[CR]] [[-]]
: [[PNP]] [[-2007-03925, Potential Adverse Trend in Station Mispositioning errors]]
: [[CR]] [[-]]
: [[PNP]] [[-2007-00303,]]
: [[PS]] [[-]]
: [[CKVS]] [[-B (crankcase pressure switch]]
: [[AB]] [[@ diesel) not valved in correctly]]
: [[CR]] [[-PNP-2007-01446,]]
: [[RCIC]] [[check valve 1301-]]
: [[CK]] [[-50 initial position found open instead of closed]]
: [[CR]] [[-]]
: [[PNP]] [[-2007-2383, Breaker B1446 (EDG]]
: [[AB]] [[@ Diesel Oil Transfer Pump) found]]
: [[AOFF]] [[@, normal position is]]
: [[AON]] [[@]]
: [[CR]] [[-PNP-2007-02468, Isolation valve found closed on Reactor Pressure Transmitter]]
: [[CR]] [[-]]
: [[PNP]] [[-2007-02476, Spare breaker found closed when it was expected to be open]]
: [[CR]] [[-]]
PNP-2007-02651, EDG failed to start (likely due to fuel rack and governor left in full fuel position)
A-7Procedure 2.2.21, High Pressure Coolant Injection System, Revision 72 Procedure 2.2.19, Residual Heat Removal System, Revision 95
Procedure 2.2.3, Automatic Depressurization System, Revision 23
Procedure 2.2.8, Emergency Diesel Generator, Revision 90
: [[LIST]] [[]]
: [[OF]] [[]]
: [[ACRONY]] [[]]
: [[MS]] [[AC  alternating current]]
: [[ADA]] [[]]
MS Agencywide Documents Access and Management System
: [[CAP]] [[corrective action program]]
: [[CAP]] [[corrective action program]]
: [[CD]] [[]]
: [[CDBI]] [[component design bases inspection]]
BI  component design bases inspection
: [[CFR]] [[Code of Federal Regulations]]
CFR Code of Federal Regulations
: [[CR]] [[condition report]]
CR condition report
: [[CRG]] [[Condition Review Group]]
CRG Condition Review Group
: [[DRP]] [[Division of Reactor Projects]]
DRP Division of Reactor Projects
: [[DRS]] [[Division of Reactor Safety]]
DRS Division of Reactor Safety
EAL  emergency action level
EAL  emergency action level
EDG  emergency diesel generator
EDG  emergency diesel generator
gpm  gallon per minute
gpm  gallon per minute
Hg  mercury
Hg  mercury
: [[HP]] [[]]
: [[HPCI]] [[high pressure coolant injection]]
CI  high pressure coolant injection
: [[I&C]] [[instrumentation and controls]]
I&C instrumentation and controls
: [[IMC]] [[Inspection Manual Chapter]]
IMC Inspection Manual Chapter
: [[IR]] [[Inspection Report]]
IR Inspection Report
: [[LER]] [[Licensee Event Report]]
LER Licensee Event Report
: [[MCC]] [[motor control center]]
MCC motor control center
: [[MG]] [[motor generator]]
MG motor generator
: [[MO]] [[motor-operated]]
MO motor-operated
MOV  motor-operated valve
MOV  motor-operated valve
MPR  mechanical pressure regulator
MPR  mechanical pressure regulator
mrem  millirem
mrem  millirem
NEI Nuclear Energy Institute
: [[NEI]] [[Nuclear Energy Institute]]
NRC Nuclear Regulatory Commission
: [[NRC]] [[Nuclear Regulatory Commission]]
: [[PAR]] [[Protective Action Recommendation]]
: [[PAR]] [[Protective Action Recommendation]]
: [[PA]] [[]]
: [[PARS]] [[Publicly Available Records]]
RS  Publicly Available Records
: [[PI]] [[Performance Indicator]]
PI Performance Indicator
: [[PMT]] [[post-maintenance test]]
: [[PMT]] [[post-maintenance test]]
: [[PN]] [[]]
: [[PNPS]] [[Pilgrim Nuclear Power Station]]
: [[PS]] [[Pilgrim Nuclear Power Station]]
: [[RBCCW]] [[reactor building closed cooling water]]
: [[RBC]] [[]]
: [[RCIC]] [[reactor core isolation cooling]]
: [[CW]] [[reactor building closed cooling water]]
: [[RCS]] [[reactor coolant system]]
: [[RC]] [[]]
: [[RFO]] [[refueling outage]]
IC  reactor core isolation cooling
: [[RHR]] [[residual heat removal]]
RCS  reactor coolant system
: [[RV]] [[relief valve]]
RFO  refueling outage
RHR residual heat removal
RV relief valve
: [[RPS]] [[reactor protection system]]
: [[RPS]] [[reactor protection system]]
: [[SB]] [[]]
: [[SBGT]] [[stand by gas treatment]]
: [[GT]] [[stand by gas treatment]]
SCBA self-contained breathing apparatus
: [[SC]] [[]]
 
BA self-contained breathing apparatus
A-8SDP  Significance Determination Process
A-8SDP  Significance Determination Process SRM source range monitor
: [[SRM]] [[source range monitor]]
SRO senior reactor operator
: [[SRO]] [[senior reactor operator]]
SRV safety relief valve
: [[SRV]] [[safety relief valve]]
SSC system, structure, or component
: [[SSC]] [[system, structure, or component]]
SSW salt service water
: [[SSW]] [[salt service water]]
: [[TS]] [[Technical Specifications]]
: [[TS]] [[Technical Specifications]]
: [[UFS]] [[]]
: [[UFSAR]] [[Updated Final Safety Analysis Report]]
AR Updated Final Safety Analysis Report
: [[URI]] [[unresolved item]]
URI unresolved item
: [[VTS]] [[vacuum trip switch]]
VTS vacuum trip switch
: [[WO]] [[work order]]
: [[WO]] [[work order]]
}}
}}

Revision as of 00:52, 31 August 2018

IR 05000293-07-005 on 10/01/2007 - 12/31/2007 for Pilgrim Event Follow-up
ML080320209
Person / Time
Site: Pilgrim
Issue date: 02/01/2008
From: Powell R J
NRC/RGN-I/DRP/PB5
To: Bronson K
Entergy Nuclear Operations
Powell R J, RI/DRP/610-337-6967
References
IR-07-005
Download: ML080320209 (33)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406

February 1, 2008

Mr. Kevin Bronson Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508

SUBJECT: PILGRIM NUCLEAR POWER STATION - NRC INTEGRATED INSPECTION REPORT 05000293/2007005

Dear Mr. Bronson:

On December 31, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Pilgrim Nuclear Power Station (PNPS). The enclosed report documents the results, which were discussed on January 9, 2008, with you and members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

This report documents one self-revealing finding of very low safety significance (Green) for which no violation of NRC requirements was identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosures, and your response (if any) will be available electronically for public ins pection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket No. 50-293 License No. DPR-35

Enclosure:

Inspection Report 05000293/2007005

w/Attachment:

Supplemental Information

cc w/encl:

SUMMARY OF FINDINGS

IR 05000293/2007-005; 10/01/2007-12/31/2007; Pilgrim Nuclear Power Station; Event

Follow-up.

The report covered a 13-week period of inspection by resident and region-based inspectors.

One Green finding was identified. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609, "Significance Determination Process" (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRC's program for overseeing the safe operation of nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.

A. NRC-Identified and Self-Revealing Findings

Cornerstone: Initiating Events

Green.

A Green self-revealing finding was identified for Entergy

=s failure to ensure the proper verification and calibration of vacuum trip switch VTS-1 during refueling outage (RFO) 16. Specifically, personnel did not ensure that the proper verification/calibration technique was employed to determine the as-found low condenser vacuum turbine trip setpoint. Additionally, when the technician identified that the as-found data was significantly outside of historical as-found values, he did not question the validity of the data nor did he obtain a peer check. The technician then calibrated the instrument using the incorrect as-found data which resulted in an incorrect low vacuum trip setpoint and a subsequent turbine trip and reactor scram on July 10, 2007.

This finding is more than minor because it is associated with the human performance attribute of the Initiating Events Cornerstone and affects the cornerstone objective of limiting the likelihood of those events t hat upset plant stability during pow er operations. The finding is of very low safety significance (Green) because it did not contribute to both the likelihood of a reactor trip and the likelihood that mitigation equipment would be unavailable. This finding has a cross-cutting aspect in the area of Human Performance,

Work Practices, because Entergy proceeded in the face of uncertainty or unexpected circumstances when the VTS-1 setpoint was found significantly outside of expected as-found values. H.4(a) (Section 4OA3)

B. Licensee-Identified Violations

None.

4

REPORT DETAILS

Summary of Plant Status

Pilgrim Nuclear Power Station (PNPS) operated at or near 100 percent power during the inspection period with the following exceptions: On October 30, 2007, Entergy reduced power to approximately 48 percent to perform a thermal backwash on the main condenser. Entergy resumed 100 percent power operation on October 31, 2007. On December 10, 2007, Entergy shut down and commenced a planned outage to repair leaking safety relief valve, RV-203-3B.

Entergy restored the plant to 100 percent power on December 13, 2007. The plant remained at or near 100 percent for the remainder of the inspection period.

REACTOR SAFETY

Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity

1R01 Adverse Weather Protection

a. Inspection Scope

(3 samples - 1 seasonal readiness, 2 impending adverse weather)

The inspectors performed a review of cold weather preparations during the onset of the cold weather season to evaluate the site's readiness for seasonal susceptibilities. The inspectors reviewed Entergy's preparations for cold weather and its impact on the protection of safety-related systems, structures and components (SSCs). The inspection focused on the intake structure, the station blackout diesel generator and the condensate storage and transfer system. The inspection was intended to ensure that Entergy's equipment, instrumentation, and supporting structures were configured in accordance with Entergy's procedures and that adequate controls were in place to ensure functionality of the systems in cold weather. The inspectors also conducted a site walkdown on November 1, 2007, to assess Entergy's readiness for the potential affects of hurricane Noel. The inspectors verified that all outside objects were properly anchored or tied down. In addition, the inspectors conducted a site walkdown on December 12, 2007, to evaluate site preparations for an approaching coastal storm with accompanying high winds.

b. Findings

No findings of significance were identified.

1R04 Equipment Alignment

.1 Partial System Walkdowns

a. Inspection Scope

(4 samples)

The inspectors performed four partial system walkdowns during this inspection period.

The inspectors reviewed the documents listed in the Attachment to determine the correct 5system alignment. The inspectors conducted a partial walkdown of each system to determine if the critical portions of the selected systems were correctly aligned in accordance with these procedures and to identify any discrepancies that may have had an effect on operability. The walkdowns included selected switch and valve position checks, and verification of electrical power to critical components. Finally, the inspectors evaluated other elements, such as material condition, housekeeping, and component labeling. The following systems were reviewed based on their risk significance for the given plant configuration:

$ "B" Reactor Building Closed Cooling Water (RBCCW) system during degradation of the "A" RBCCW system;

$ "B" Residual Heat Removal (RHR) system during "A" RHR surveillance;

$ High Pressure Coolant Injection (HPCI) system while the Reactor Core Isolation Cooling (RCIC) system was out of service; and

$ RBCCW system "B" loop, upon restoration of "E" RBCCW pump following completion of 3.M.3-47.2, "'B' Train Functional Test of Individual Load Shed Component.

@

b. Findings

No findings of significance were identified.

.2 Complete System Walkdown

a. Inspection Scope

(1 sample)

The inspectors completed a detailed review of the standby gas treatment (SBGT) system to verify the functional capability of the system. The inspectors conducted a walkdown of the system to verify that the critical components such as valves, switches, and breakers were aligned in accordance with procedures and to identify any discrepancies that could have an effect on operability.

The inspectors discussed system health with the system engineer and conducted a review of outstanding maintenance work orders to verify that the deficiencies did not significantly affect the SBGT system function. The inspectors also reviewed the condition report (CR) database to verify that equipment problems were being identified and appropriately resolved. In addition, the inspectors reviewed recent test results to ensure the air system leakage and charcoal filter efficiency met the requirements of Technical Specifications (TS) and procedures. Documents reviewed during the inspection are listed in the Attachment.

b. Findings

No findings of significance were identified.

61R05 Fire Protection (71111.05)

Fire Protection - Tours (71111.05Q)

a. Inspection Scope

(8 samples)

The inspectors performed walkdowns of eight fire protection areas during the inspection period. The inspectors reviewed Entergy's fire protection program to determine the required fire protection design features, fire area boundaries, and combustible loading requirements for the selected areas. The inspectors walked down these areas to assess Entergy's control of transient combustible material and ignition sources. In addition, the inspectors evaluated the material condition and operational status of fire detection and suppression capabilities, fire barriers, and any related compensatory measures. The inspectors then compared the existing conditions of the areas to the fire protection program requirements to ensure all program requirements were being met. Documents reviewed during the inspection are listed in the Attachment. The fire protection areas reviewed were:

$ Fire Zone 5.2, "B" Train Salt Service Water Pump Room;

$ Fire Zone 1.22, "B" Reactor Building Closed Cooling Water Pumps and Heat Exchanger Rooms;

$ Fire Zone 4.2, "B" Emergency Diesel Day Tank Room;

$ Fire Zone 4.4, "A" Emergency Diesel Day Tank Room;

$ Fire Area 1.9, Fire Zone 2.2, "A" Switchgear and Load Center Room;

$ Fire Area 1.9, Fire Zone 3.5, Vital Motor Generator Set Room;

$ Fire Zone 1.3, High Pressure Coolant Injection Pump/Turbine Room; and

$ Fire Zone 2.3, Battery Room A A.@

b. Findings

No findings of significance were identified.

1R06 Flood Protection Measures

Internal Flooding Inspection

a. Inspection Scope

(1 sample)

The inspectors walked down selected areas of the plant including the cable spreading room, vital Motor Generator set, and HPCI pump room to assess the effectiveness of Entergy's internal flood control measures. The inspectors assessed the condition of watertight doors, floor sump systems, curbing, hatch and conduit seals, and floor drains.

The inspectors reviewed CR-PNP-2007-1020, "Review of NRC IN-2007-01, Recent Operating Experience Covering Hydrostatic Barriers," to determine whether Entergy was identifying internal flooding issues and taking appropriate corrective actions. The references used for this inspection are listed in the Attachment to this report.

b. Findings

No Findings of significance were identified.

1R11 Licensed Operator Requalification

.1 Resident Inspector Quarterly Review

a. Inspection Scope

(1 sample)

The inspectors observed licensed operator requalification training on November 6, 2007.

Specifically, the inspectors observed classroom Senior Reactor Operator (SRO) training on Emergency Planning, Emergency Action Level (EAL) Classification, and Protective Action Recommendation (PAR) procedures and processes. The inspectors assessed the training to determine if the training adequately prepared the SROs to determine EAL classification levels and to conduct PAR assessments. The inspectors reviewed the applicable training objectives to determine if they had been achieved. The inspectors verified that issues identified during the classroom session were entered into the corrective action program. Documents reviewed during the inspection are listed in the

.

b. Findings

No findings of significance were identified.

.2 Licensed Operator Requalification

a. Inspection Scope

(1 sample)

The following inspection activities were performed using NUREG 1021, Revision 9, "Operator Licensing Examination Standards for Power Reactors," Inspection Procedure 7111111, "Licensed Operator Requalification Program," Appendix A, "Checklist for Evaluating Facility Testing Material" and Appendix B, "Suggested Interview Topics."

The inspectors reviewed documentation of operating history since the last requalification program inspection. Documents reviewed included NRC inspection reports and licensee CRs that involved human performance issues. The purpose of the review was to ensure operational events that occurred during the last two years were not indicative of possible training deficiencies. The inspectors also discussed facility operating events with the resident staff.

The inspectors reviewed comprehensive written exams (these exams were administered in the fall, 2006), and the scenarios and job performance measures administered during the weeks of September 10 and 17, 2007, to ensure the quality of these exams met or exceeded the criteria established in the Examination Standards and 10 CFR 55.59, "Requalification." The inspectors observed the administration of the operating exams to two crews.

8Conformance with simulator requirements specified in 10 CFR 55.46, "Simulation Facilities" The inspectors observed simulator performance during the conduct of the examinations, and reviewed simulator discrepancy reports to determine whether facility staff was complying with the requirements of 10 CFR 55.46. The inspectors reviewed a sample of simulator tests including transients; normal and steady state; malfunctions; and core performance tests.

Conformance with operator license conditions The inspectors determined whether the operators were complying with the conditions of their license by reviewing the following:

$ five medical records (The records were complete; restrictions noted by the doctor were reflected on the individual's license; and physical exams were given within 24 months.);

$ eight proficiency watch-standing records and one reactivation record (Records indicated the licensed operators conformed with proficiency and reactivation watch-standing requirements of 10 CFR 55.53, Conditions of Licenses.); and

$ remediation training records for four licensed operators (These operators had failed either an annual operating test, a comprehensive written exam, or a requalification segment evaluation. The remediation records were acceptable.).

Licensee's feedback system The inspectors interviewed operator requalification instructors, training and operations management, and two licensed operators for feedback regarding the implementation of the licensed operator requalification program to ensure the requalification program was meeting their needs and responsive to their recommended changes.

On October 29, 2007, the inspectors conducted an in-office review of licensee requalification exam results. These results reflected the operators' performance on the annual operating tests; the comprehensive written exams were administered in the fall, 2006, and therefore those test results were not part of this in-office review. The inspector assessed whether pass rates were consistent with the guidance of NRC IMC 0609, Appendix I, "Operator Requalification Human Performance SDP." The inspectors verified that:

$ Crew failure rate on the dynamic simulator was less than 20 percent. (Failure rate was 0.0 percent)

$ Individual failure rate on the dynamic simulator test was less than or equal to 20 percent. (Failure rate was 0.0 percent)

$ Individual failure rate on the walkthrough test (job performance measures) was less than or equal to 20 percent. (Failure rate was 0.0 percent)9$ Individual failure rate on the comprehensive written exam was less than or equal to 20 percent. (As noted above, the comprehensive written exams were administered in the fall, 2006. Test results were previously documented in NRC IR 50-293/2006-005.)

$ More than 75 percent of the individuals passed all portions of the exam. (100% of the individuals passed all portions of the exam)

b. Findings

No findings of significance were identified.

1R12 Maintenance Effectiveness

a. Inspection Scope

(2 samples)

The inspectors reviewed action plans for two SSC issues and reviewed the performance history of these SSCs to assess the effectiveness of Entergy

=s maintenance activities. The inspectors reviewed Entergy

=s CRs, corrective actions, and functional failure determinations made in accordance with Entergy procedures and the requirements of 10 CFR 50.65(a)(1) and (a)(2), ARequirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants.

@ In addition, the inspectors reviewed selected SSC classification, goals, corrective actions, performance criteria and monitoring plans to return the (a)(1) systems to (a)(2) status. Also, the inspectors selected a sample of system health reports for review to evaluate the results of system performance monitoring, material condition, and operations impact, to determine if actions taken were reasonable and appropriate. The references used for this inspection are listed in the to this report. The following issues were reviewed:

$ Turbine Controls Subsystem failure, failed maintenance rule performance criteria of one functional failure in two years (CR-PNP-2007-03673); and

$ A B@ Emergency Diesel Generator (EDG) exceeded maintenance rule performance criteria due to functional failures on October 25, 2006, and January 4, 2007 (CR-PNP-2007-0052).

b. Findings

No findings of significance were identified.

1R13 Maintenance Risk Assessments and Emergent Work Control

a. Inspection Scope

(4 samples)

The inspectors evaluated online and shutdown risk management for emergent and planned activities. The inspectors reviewed maintenance risk evaluations, work schedules, and control room logs to determine if concurrent planned and emergent maintenance or surveillance activities adversely affect ed the plant risk already incurred with out-of-service components. The inspectors evaluated whether Entergy took the 10necessary steps to control work activities, minimize the probability of initiating events, and maintain the functional capability of mitigating systems. The inspectors assessed Entergy's risk management actions during plant walkdowns. Documents reviewed during the inspection are listed in the Attachment. The inspectors reviewed the conduct and adequacy of scheduled and emergent maintenance risk assessments for the following maintenance and testing activities:

$ Yellow risk condition during emergent unavailability of the "A" EDG due to an engine coolant leak in the turbo charger casing;

$ Vital Motor Generator Set maintenance;

$ Yellow Risk Condition during scheduled maintenance resulting in the unavailability of the HPCI system; and

$ Safety Relief Valve 3B pilot valve replacement outage shutdown risk assessment.

b. Findings

No findings of significance were identified.

1R15 Operability Evaluations

a. Inspection Scope

(5 samples)

The inspectors reviewed five operability determi nations associated with degraded or non-conforming conditions to determine if the operability determination was justified and if the mitigating systems or those affecting barrier integrity remained available such that no unrecognized increase in risk had occurred. The inspectors also reviewed compensatory measures to determine if the compensatory measures were in place and were appropriately controlled. The inspectors reviewed licensee performance against related TS and Updated Final Safety Analysis Report (UFSAR) requirements. The inspectors reviewed the following degraded or non-conforming conditions:

$ CR-PNP-2007-03708, Mechanical Pressure Regulator (MPR) Setpoint Adjustment;

$ CR-PNP-2006-01802, Minimum Condensate Storage Tank Level to prevent Vortex formation at the HPCI/RCIC suction;

$ CR-PNP-2007-04172, EDG Fuel Oil Storage Volume;

$ CR-PNP-2007-04724, During the quarterly HPCI pump surveillance, the HPCI system did not achieve rated flow of 4250 gpm; and

$ CR-PNP-2007-04841, RHR pump P-203D revealed pump suction pressure drop outside acceptable range.

b. Findings

No findings of significance were identified.

111R19 Post-Maintenance Testing (71111.19)

a. Inspection Scope

(8 samples)

The inspectors reviewed eight samples of post-maintenance tests (PMT) during this inspection period. The inspectors reviewed these activities to determine whether the PMT adequately demonstrated that the safety-related function of the equipment was satisfied, given the scope of the work performed, and that operability of the system was restored. In addition, the inspectors evaluated the applicable test acceptance criteria to verify consistency with the associated design and licensing bases, as well as TS requirements.

The inspectors also evaluated whether conditions adverse to quality were entered into the corrective action program for resolution. Documents reviewed during the inspection are listed in the Attachment. The following maintenance activities and their post-maintenance tests were evaluated:

$ ACB-102 12-year Periodic Inspection & Maintenance, WO 51536960;

$ Salt Service Water Pump "D" Quarterly (TS/IST) Operability Test, WO 51535011;

$ Replace Bladder in T-223A with New Butyl Rubber Bladder, WO 51532443;

$ "A" EDG Turbocharger Replacement, WO 00129585;

$ HPCI MO-6, MO-35, MO-3 and MO-14 hydraulic lock modifications per MRs 51534480, 51534482, 51534483 and 51534484;

$ HPCI flow controller replacement per WO 0013195;

$ Repair/replace pilot valve on main steam Safety Relief Valve RV-203-3B; and

$ Source Range Monitor A B@ replacement per WO 51530724.

b. Findings

No findings of significance were identified.

1R20 Refueling and Other Outage Activities

a. Inspection Scope

(1 sample)

The inspectors reviewed shutdown and plant restart activities associated with a planned outage to replace the pilot on leaking Safety Relief Valve, RV-203-3B. The planned outage commenced on December 10, 2007, and was completed on December 12, 2007.

The inspectors reviewed Entergy

=s forced outage work schedule, risk evaluations, control room logs, and vessel cooldown and heatup rate data. The inspectors observed activities in the control room during the plant shutdown and startup. The inspectors conducted a walkdown of the primary containment to verify that there was no evidence of reactor coolant system leakage and that foreign material was being accounted for and controlled.

Documents reviewed during the inspection are listed in the Attachment.

b. Findings

No findings of significance were identified.

121R22 Surveillance Testing (71111.22)

a. Inspection Scope

(3 samples)

The inspectors reviewed three samples of surveillance activities to determine whether the

testing adequately demonstrated equipment operational readiness and the ability to perform the intended safety-related functions. The inspectors reviewed selected prerequisites and precautions to determine if they were met and if the tests were performed in accordance with the procedural steps. Additionally, the inspectors evaluated the applicable test acceptance criteria for consistency with associated design bases, licensing bases, and TS requirements. The inspectors also evaluated whether conditions adverse to quality were entered into the corrective action program for resolution.

Documents reviewed during the inspection are listed in the Attachment. The following surveillance tests were evaluated:

$ RCIC pump quarterly in-service test;

$ HPCI System Pump and Valve Quarterly and Biennial Comprehensive Operability; and $ Reactor Coolant System Leak Rate determination per TS 3/4.6.C, "Primary System Boundary Coolant Leakage."

b. Findings

No findings of significance were identified.

RADIATION SAFETY

Cornerstone:

Occupational Radiation Safety

2OS3 Radiation Monitoring Instrumentation and Protective Equipment (71121.03)

a. Inspection Scope

(9 samples)

During the period October 15-18, 2007, the inspector conducted the following activities to evaluate the operability and accuracy of radiation monito ring instrument ation, and the adequacy of the respiratory protection program relative to maintaining and issuing self-contained breathing apparatus (SCBA). Implementation of these programs was reviewed against the criteria contained in 10 CFR 20, "Standards for Protection Against Radiation;" applicable industry standards; and Pilgrim procedures.

The inspector reviewed the UFSAR to identify area, process, and emergency monitors that are installed at Pilgrim for the protection of workers. The inspectors reviewed the current calibration records for selected instrumentation, including the Turbine Building Radwaste Sump Area monitor (1815-8C), the Reactor Building 23' South East Access Area monitor (1815-2D), and the Reactor Building Outside Traversing In-Core Probe Room monitor (1815-2B).

The inspector selected hand-held radiation instruments, air monitors, contamination monitors, and electronic dosimeters currently in use in the plant, and reviewed the 13calibration records for this instrumentation. Included in this review were the calibration records for selected electronic dosimeters (DMC-2000), radiation survey instruments (RO-2, RO-2A, RO-20, Wide Range Telepole), contamination survey instruments (RM-14, MD-12, SAM-9), count room scalers (BC-4, SAC-4), and air samplers (H809V, Victoreen Lapel Sampler).

The inspector reviewed the maintenance records, safety interlock checks, and current calibration source activity/dose rate determinations for the Shepard Model 78, Shepard Model 423, and Model 773 instrument calibrators.

The inspector evaluated the licensee's program for assuring quality in the radiation monitoring instrumentation and respiratory protection programs by reviewing 16 CRs related to radiation instrumentation, SCBA's, and the monitoring of plant radiation levels to determine if problems were identified in a timely manner and appropriate corrective actions were taken to resolve the related issues.

There were no incidents of personnel internal exposure resulting in a Committed Effective Dose Equivalent > 50 mrem that would require an in-depth evaluation of whole body counting instrumentation and bioassay techniques.

The inspector reviewed actions for radiation worker and radiation protection technician errors to determine whether the corrective actions were adequate to prevent recurrence.

The inspector verified calibration due dates and observed a technician performing source checks on a variety of instruments including portable radiation survey instruments (RO-2, Wide Range Telepole), contamination survey instruments (RM-14s, SAM 9), count room scalers (BC-4), and personal contamination monitors (PPM-1, PM-7).

The inspector reviewed surveillance records for ten SCBAs staged for use in the control room, Radiological Controlled Area access location, and the fire brigade equipment staging area in the fire service pump building. The inspector observed a technician perform an inspection of six of the ten units staged for use. The inspector observed a technician fill two SCBA air bottles from the air compressor unit. The sample results for breathing air, used to refill the SCBA tanks, were reviewed to confirm that air quality met CGA-G-7.1-2004 Grade D standards.

The inspector evaluated the adequacy of the respiratory protection program regarding the issuance of SCBAs to workers. Training and qualification records for licensed operators, radiation protection technicians, and fire brigade members required to wear SCBA's, in the event of an emergency, were reviewed.

b. Findings

No findings of significance were identified.

142PS3 Radiological Environmental Monitoring Program and Radioactive Material Control Program (71122.03)

a. Inspection Scope

(1 sample)

During the period October 15-18, 2007, the inspector conducted the following activity to determine whether the licensee's surveys and controls are adequate to prevent the inadvertent release of licensed materials into the public domain. Implementation of these controls was reviewed against the criteria contained in 10 CFR 20, "Standards for Protection Against Radiation;" TS; and Entergy procedures. This inspection activity represents completion of one sample relative to this inspection area.

The inspector observed the radioactive material survey and release locations. The methods used for control, survey, and release were inspected and included observations of the performance of personnel surveying and releasing material for unrestricted use and verifying that the work is performed in accordance with plant procedures.

b. Findings

No findings of significance were identified.

OTHER ACTIVITIES

[OA]

4OA1 Performance Indicator (PI)

.1 Mitigating System Cornerstone

a. Inspection Scope

(2 samples)

The inspectors sampled data for the Mitigating System Performance Index PIs for the EDGs and cooling water systems (Salt Service Water and RBCCW) for the 4th quarter 2006 and 1st, 2nd and 3rd quarter 2007 to assess the completeness and accuracy of the reported information. The inspectors reviewed operator logs, CRs, maintenance rule documents, maintenance records, Licensee Event Reports (LERs), system health reports, and plant process computer information. The acceptance criteria used for the review were Nuclear Energy Institute (NEI) 99-02, Revision 5, "Regulatory Assessment Performance Indicator Guidelines."

b. Findings

No findings of significance were identified.

.2 Physical Protection Cornerstone

a. Inspection Scope

(3 samples)

The inspectors performed a review of PI data submitted by the licensee for the Physical Protection Cornerstone. The review was conducted of the licensee

=s programs for gathering, processing, evaluating, and submitting data for the Fitness-for-Duty, Personnel 15Screening, and Protected Area Security Equipment PIs. The inspectors determined whether the PIs had been properly reported as specified in NEI 99-02. The review included the licensee

=s tracking and trending reports, personnel interviews, and security event reports for the PI data collected since the last security baseline inspection. The inspector noted from the licensee

=s submittal that there were no reported failures to properly implement the requirements of 10 CFR 73, "Physical Protection of Plants and Materials," and 10 CFR 26, "Fitness for Duty Programs," during the reporting period. This inspection activity represents the completion of three samples relative to this inspection area; completing the annual inspection requirement.

b. Findings

No findings of significance were identified.

4OA2 Identification and Resolution of Problems

.1 Review of Items Entered into the Corrective Action Program (CAP)

a. Inspection Scope

The inspectors performed a screening of each item entered into the licensee's CAP. This review was accomplished by reviewing printouts of each CR, attending daily screening meetings and/or accessing the licensee's database. The purpose of this review was to identify conditions such as repetitive equipment failures or human performance issues that might warrant additional follow-up.

b. Findings

No findings of significance were identified.

.2 Semi-Annual Review to Identify Trends

a. Inspection Scope

(1 sample)

As required by Inspection Procedure 71152, "Identification and Resolution of Problems,"

the inspectors performed a review of Entergy

=s CAP and associated documents to identify trends that could indicate the existence of a more significant safety issue. The inspectors review was focused on repetitive equipment and corrective maintenance issues but also considered the results of daily inspector CAP item screening discussed in Section 4OA2.1. The review also included issues documented in CAP trend reports and site CAP performance indicator data. The inspectors review considered the six month period of June through December, 2007, although the inspectors also evaluated the trend review results discussed in NRC IR 05000293/2007003, which reviewed CRs from October 2006 through May 2007. Documents reviewed during the inspection are listed in the

.

16b. Assessment and Observations No findings of significance were identified. The inspectors noted a number of plant equipment configuration control issues discussed in the third quarter 2007 Pilgrim Station Quarterly Trend Report, including:

$ CR-PNP-2007-00303, PS-CKVS-B (Crankcase Pressure Switch A B@ Diesel) not valved in correctly;

$ CR-PNP-2007-01446, RCIC check valve 1301-CK-50 initial position found open instead of closed;

$ CR-PNP-2007-02383, Breaker B1446 (EDG A B@ Diesel Oil Transfer Pump) found A OFF,@ normal position is A ON;@ $ CR-PNP-2007-02468, Isolation valve found closed on Reactor Pressure Transmitter;

$ CR-PNP-2007-02476, Spare breaker found closed when it was expected to be open; and

$ CR-PNP-2007-02651, EDG failed to start (likely due to fuel rack and governor left in full fuel position).

The report concluded that the number of issues Adoes not exhibit an adverse or emerging trend,@ but that Operations Management considers the number of Amispositionings

@ to be at an unacceptable level. The inspectors also considered the number of issues discussed in the report to be at an unacceptable level, however, the inspectors also concluded that these issues represent a low level trend in the area of configuration control. The inspectors have discussed this trend with licensee management and will continue to monitor configuration control issues at Pilgrim during this assessment period.

.3 Annual Sample: Review of Outage CRs

a. Inspection Scope

(1 sample)

The inspectors reviewed a sample of CRs from Pilgrim's 2007 refueling outage to determine whether CRs initiated during the outage were processed and closed in accordance with Pilgrim procedures. The inspectors reviewed two Apparent Cause Evaluations conducted by Pilgrim. The inspectors evaluated whether corrective actions taken by Pilgrim addressed each CR as well as the overall process. Documents reviewed are listed in the Attachment.

b. Assessment and Observations No findings of significance were identified. The inspectors determined that there were many instances where the condition review group (CRG) closed a lower level (Category D) CR to "supervisory oversight." Managers would perform follow-up and close the CR with a general statement such as "Corrective actions for the CR were reviewed by the responsible manager. Upon the manager's recommendation, this CR is being closed."

This practice resulted in a condition where corrective actions for a particular issue could not be tracked or demonstrated. Pilgrim has since discontinued this practice as an acceptable closure strategy for Category D CRs.

17.4 Annual Sample: Review of Motor Operated Valve (MOV) Hydraulic Lock

a. Inspection Scope

(1 sample)

The inspectors selected CR-PNP-2006-04328 for detailed review. The CR was written to determine the cause of a safety-related MOV failure in the RHR system during routine surveillance testing. The inspectors reviewed the licensee's root cause analysis, corrective actions, and the prioritization of the corrective actions.

b. Assessment and Observations No findings of significance were identified. The inspectors determined that the licensee performed a thorough root cause analysis and took timely corrective actions to prevent recurrence. The root cause was determined to be hydraulic locking of the MOV actuator due to grease found inside of the spring package. The grease prevented the spring package from compressing which in turn prevented the thermal overloads from tripping.

The tripping of the thermal overloads stops the motor and provides the indication that the valve is closed.

The root cause analysis determined that newer MOVs in the plant were not susceptible to hydraulic lock because the valves have an internal grease relief path from the spring package to the actuator housing. However, most MOVs at Pilgrim did not have the internal grease relief path. Immediate corrective actions included looking inside the spring package of all safety-related MOVs for grease. Long term corrective actions for this issue included a design modification to provide an external grease relief path from the spring package back to the actuator housing. All of the high priority valves have been modified. The last low priority valve to receive this modification is scheduled to be performed in the next refueling outage. The inspectors determined that the prioritization of the corrective actions was appropriate.

.5 Annual Sample: Follow-up Review of Component Design Bases Inspection (CDBI)

Finding Regardi ng the Inadequate Operability Determination for the HPCI Turbine Trip Solenoid Failure

a. Inspection Scope

(1 sample)

The inspectors reviewed the corrective actions for a finding identified during the CDBI and documented in inspection report number 05000293/2006006. The finding was associated with Entergy

=s failure to declare the HPCI system inoperable due to a HPCI turbine trip solenoid failure. The inspectors reviewed CR-PNP-2006-01460 to determine whether the corrective actions were appropriate and completed. As part of this review, the inspectors examined various safety system operating procedure changes to assess their adequacy.

The documents reviewed are listed in the Attachment to this report.

b. Assessment and Observations

No findings of significance were identified. Entergy

=s initial failure to declare HPCI inoperable was due to licensing and operations department management focusing on the ability of the HPCI system to perform its accident analysis function versus a discussion of 18the HPCI system TS requirements. The fo cus did not address the ability of the HPCI system to automatically trip on high water level in the reactor vessel, as described in TS 3.2.B, "Protective Instrumentation Core and Containment Cooling Systems - Initiation and Control." As a result, the HPCI system should have been considered inoperable regardless of the ability of the system to perform its accident analysis function.

The inspectors determined that the licensee

=s corrective actions were appropriate. Entergy determined the failure to declare HPCI inoperable was due to a lack of independence of the operations department and licensi ng departments in reviewing operability determinations. The inspectors noted that Entergy immediately implemented operations department training regarding independent review of emerging TS issues. Also, Entergy revised safety system operating procedures to include a section on TS instrumentation requirements.

4OA3 Event Follow-up

.1 Infrequently Performed Evolution: MG Set Power Transfer

a. Inspection Scope

(1 sample)

On October 3, 2007, Pilgrim operators performed a planned manual transfer of vital alternating current (AC) power from its normal power source, the vital MG set, to its alternate power source, bus B15, with the plant at power. This infrequently performed evolution was conducted to remove the vital MG set from service for repairs. The evolution posed several challenges to Pilgrim operators because the transfer of the vital AC power from its normal to its alternate source would cause a momentary interruption in vital AC power. Similar evolutions in the past had resulted in complications such as the receipt of reactor building isolation signals, feed regulating valve position lock ups, and recirculation pump scoop tube position lock ups. Entergy developed a new procedure for this evolution, Procedure 2.2.16, Attachment 8, "A Manual Transfer of Y2 to Motor Control Center (MCC)

B15 with the Units On-line." The procedure established several compensatory measures to mitigate the effects of a component malfunction or unexpected response. For instance, operators were briefed on Procedure 2.4.49, Section 4.4, "A Manual Lockup of Feed Regulating Valve(s) from the Condenser Bay," and were stationed outside the condenser bay to take manual control of the valves if needed. Additionally, operators inserted a reactor building isolation signal before the vital power transfer, to prevent the signal from coming in during the transfer. The inspectors reviewed the procedure and observed the evolution from the control room to assess operator actions, command and control, and the adequacy of communications within the control room and between the control room and the field.

b. Findings

No findings of significance were identified.

19.2 LER Review and Closeout (1 sample)

(Closed) LER 05000293/2007-005-00, Reactor Scram Resulting from Low Vacuum Turbine Trip

a. Inspection Scope

The inspectors reviewed Entergy

=s actions associated with LER 50-293/2007-05-00, which discussed the July 10, 2007, low vacuum turbine trip and automatic reactor scram event. The inspectors reviewed the licensee

=s LER and associated root cause evaluation. Additionally, the inspectors verified that follow-up actions, taken or planned, were appropriate to address the event. This LER is closed.

b. Findings

Introduction:

A Green self-revealing finding was identified for Entergy

=s failure to ensure the proper verification and calibration of vacuum trip switch VTS-1 during refueling outage (RFO) 16. Specifically, personnel did not ensure that the proper verification/calibration technique was employed to determine the as-found low condenser vacuum turbine trip setpoint. Additionally, when the technician identified that the as-found data was significantly outside of historical as-found values, he did not question the validity of the data nor did he obtain a peer check. The technician then calibrated the instrument using the incorrect as-found data which resulted in an incorrect low vacuum trip setpoint and a subsequent turbine trip and reactor scram on July 10, 2007.

Description:

On July 10, 2007, an unplanned automatic reactor scram occurred while performing condenser thermal backwashes at approximately 48 percent power. The reactor protection system (RPS) scram signal was initiated by the trip of the main turbine on low condenser vacuum. Pilgrim operators stabilized t he plant in a shutdown condition and made a four-hour notification to the NRC. Post scram review of the as-found setpoint for vacuum trip switch, VTS-1, revealed that the trip setpoint was set to actuate at 24.35

@ Hg rather than the expected 21.95

@ B 22.45@ Hg. Entergy recalibrated the vacuum switch and restored the plant to 100 percent power on July 16, 2007.

Entergy conducted a root cause evaluation of the unplanned scram and summarized their results in LER 2007-005-00, "Reactor Scram Resulting from Low Vacuum Turbine Trip."

Entergy determined that the root cause of the event was that the technician who had calibrated the VTS-1 switch during RFO 16 had not properly implemented human performance tools (e.g., training) for this particular type of large volume instrument to ensure a proper calibration. Specifically, since the bellows for VTS-1 are very large, the vacuum must be decreased slowly during the calibration in order for an accurate setpoint to be obtained. While obtaining the as-found setpoint, the technician did not decrease the vacuum slowly which resulted in faulty as-found results. Additionally, when the as-found data suggested that the vacuum switch was considerably outside of historical results, the technician did not question the validity of the data nor did he obtain a peer check. The technician then made adjustments to the instrument using the incorrect as-found data.

20Entergy=s root cause report also discussed several weaknesses with Procedure 8.F.51, ATurbine Generator and Auxiliary Instruments Calibration.

@ Specifically, the root cause report noted that Aadditional details in the procedure would provide an additional barrier to ensure the proper calibration technique is achieved.

@ However, the inspectors noted that Entergy had not identified these procedural weaknesses as a contributing cause to this event. The inspectors concluded that the lack of procedural specificity and guidance contributed to the improper calibration of VTS-1. Entergy

=s corrective actions for this aspect included adding steps to the procedure to decrease the vacuum at a slower rate, to include detailed guidance on the adjustments of the trip and span of the vacuum trip assembly, and to require supervisory review of as-found data and testing techniques prior to performing adjustments.

Analysis:

The performance deficiency associated with this finding is that Entergy did not ensure the proper verification and calibration of vacuum trip switch VTS-1 during RFO 16.

The improper setpoint resulted in a low vacuum turbine trip and consequent automatic reactor scram on July 10, 2007.

This finding is more than minor because it is associated with the human performance attribute of the Initiating Events Cornerstone and affects the

cornerstone objective of limiting the likelihood of those events that upset plant stability during power operations. The inspectors conducted a Phase 1 screening in accordance with IMC 0609, "Significance Determination Process," Appendix A, "Reactor Inspection Findings for At-Power Situations." The finding was determined to be of very low safety significance (Green) because it did not contribute to both the likelihood of a reactor trip and the likelihood that mitigation equipment would be unavailable. This finding has a cross-cutting aspect in the area of Human Performance, Work Practices, because Entergy proceeded in the face of uncertainty or unexpected circumstances by continuing with the calibration procedure even though the vacuum trip switch setpoint was found significantly outside of historical as-found values. H.4(a)

Enforcement:

Enforcement action does not apply because the performance deficiency did not involve a violation of a regulatory requirement in that the vacuum trip switch is not a safety-related component. Entergy has entered this issue into their corrective action program as CR-PNP-2007-3231. Corrective actions included recalibrating VTS-1 before the plant restart, providing remedial training for the technician who had conducted the improper calibration, and adding vacuum switch fundamentals as a continuing training topic for the instrumentation and controls (I&C) technicians. Additional corrective actions planned by Entergy include revising Procedure 8.F.51 to include more detailed guidance and to require a supervisory review of as-found data prior to performing adjustments; conducting just-in-time training prior to the RFO 17 vacuum trip switch setpoint verification and calibration; and identifying and revising other I&C procedures involving critical calibrations. Because this violation does not involve a violation of regulatory requirements and has a very low safety significance, it is identified as FIN 05000293/2007005-01, Improper Calibration of Vacuum Trip Switch Results in an Automatic Reactor Scram.

4OA6 Meetings, Including Exit

On October 18, 2007, an Occupational Radiation and Public Radiation Safety exit meeting was conducted. The preliminary inspection results were presented to Robert Smith, 21General Manager Pilgrim Operations, and other members of the Pilgrim staff. The licensee did not identify any material as proprietary during this inspection.

On October 18, 2007, the Security inspection results were presented to members of licensee management.

On January 9, 2008, the resident inspectors conducted an exit meeting and presented the preliminary inspection results to Mr. Kevin Bronson, Site Vice President, and other members of the Pilgrim staff. The inspectors confirmed that no proprietary information was provided or examined during the inspection.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee personnel

S. Bethay Nuclear Safety Assurance Director

K. Bronson Site Vice President, Pilgrim
H. Bouska Supervisor, Operations Training

D. Burke Security Manager

L. Foreaker Supervisor, Radiation Instrumentation
J. Henderson Manager, Radiation Protection

M. Gakka Licensing

T. Kelly Technician, Radiation Protection
R. Larson Technician, Radiation Protection

W. Lobo Licensing Engineer

J. Lynch Licensing Manager

F. Marcussen Protective Services Department Manager

C. McMorrow Senior Operations Instructor

D. Noyes Operations Director

M. Santiago Superintendent, Nuclear Training
L. Seehaus Technician, Radiation Protection

R. Smith Plant Operations General Manager

D. Towmey Lead Technician, Radiation Protection

LIST OF ITEMS

OPENED, CLOSED AND DISCUSSED

Opened and Closed

05000293/2007005-01 FIN Improper Calibration of Vacuum Trip Switch Results in an Automatic Reactor Scram

Closed

05000293/LER-2007-005-00 LER Reactor Scram Resulting from Low Vacuum Turbine Trip

LIST OF DOCUMENTS REVIEWED

Section 1R01

UFSAR Table 10.9-1, Design Temperatures
NRC
IN 96-036, Degradation of Cooling Water Systems Due to Icing
NRC
IN 98-002, Nuclear Power Plant Cold Weather Problems and Protective Measures

Procedure

8.C.40, Seasonal Weather Surve illance, Attachment 1, Cold Weather Preparations, Revision 19 Procedure 2.2.35, Condensate Storage and Transfer System, Revision 40
Section 1R04
Drawing M215 Sheet 2, Revision 48, P&ID Cooling Water System Reactor Building Drawing M215 Sheet 5, Revision E8, Composite P&ID Cooling Water System Reactor Building

Procedure

2.2.30, Revision 65, RBCCW System
CR-PNP-2007-04299

Procedure

2.2.19, Residual Heat Removal System, Revision 95
M241, P21D, Residual Heat Removal System, Revision 47
PNPS Procedure 2.2.21, Revision 72, High Pressure Coolant Injection System

Procedure

7.1.44, "Sampling of Charcoal Cells in SBGT and Control Room Environmental Filters' Systems for Methyl Iodide Testing", completed on 11/28/06 for "B" SBGT
LO-NOE-2007-00092
PNPS Procedure 2.2.50, SBGT
PNPS Drawing M294, Heating Ventilation and Air Conditioning SBGT System Control Diagram, Revision 16
WO 05106023, Leak Rate Test of Air Supply for SBGT System Dampers, 10/2/07
PNPS Procedure 8.M.2-7.1.19, Revision 4, Attachment 4, "Allowable Daily Leakage Rate"
PNPS Final Safety Analysis Report, Revision 10, Chapter 5.3.3.4, SBGT System
PNPS Final Safety Analysis Report, Revision 10, Chapter 7.18, Reactor Building Isolation and Control System
CR-PNP-2007-03013
Pilgrim TS 3.7.B, SBGT System and Control Room High Efficiency Air Filtration System

Procedure

2.2.30, RBCCW System, Revision 65

Procedure

3.M.3-47.2, A B@ Train Functional Test of Individual Load Shed Components,
Revision 18
Section 1R05
Pre Fire Plan, Screenhouse Building EL. 23' Pre Fire Plan, Reactor Building Quads, EL. 17'6"
89XM-1-ER-Q, Updated Fire Hazards Analysis, Revision E5

Procedure

5.5.2, Special Fire Procedure, Revisions 29 and 37
PNPS Procedure 8.B.17.2, Inspection of Fire Damper Assemblies, Attachment 1, Revision 9, completed 4/3/07 PNPS Procedure 8.B.17.2, Inspection of Fire Damper Assemblies, Attachment 11, Revision 9, completed 4/4/07
Section 1R06
PNPS-PSA, Revision 1, PNPS Probabilistic Safety Assessment IPE Update NRC
IN 2007-01, Recent Operating Experience Concerning Hydrostatic Barriers

Procedure

3.M.4-96, Floor Plug and Vault Hatch Seals
CR-PNP-2007-01020,
CR-PNP-2006-03750,
CR-PNP-04223,
CR-PNP-00312,
CR-PNP-01123,
CR-PNP-02708,
CR-PNP-03457
Section 1R11
Lesson Plan O-RO-07-02-01, Revision 4, Emergency Classification and Notification
NRC
RIS 2007-02, Clarification of NRC Guidance for Emergency Notifications During Quickly Changing Events
EP-IP-100, Revision 26, Emergency Classification and Notification
A-3EP-IP-300, Revision 6, Offsite Radiological Dose Assessment
EP-IP-400, Revision 11, PARs Lesson Plan O-RO-07-03-03, Revision 0, PARs,
EP-IP-400
CR-PNP-2007-4587, Control Room does not have the same weather assessment capability (160' Met Tower) for EAL assessment as the EOE
CR-PNP-2007-4591,
EP-IP-400 states that core temperature >2400F is indication of substantial core damage, this temperature is not able to be obtained Section 1R12
EN-DC-203 R0, MR Program
EN-DC-204 R0, MR Scope and Basis
EN-DC-205 R0, MR Monitoring
EN-DC-206 R0, MR (a)(1) Process
EN-LI-102 R9, CA Process
EN-LI-121 R6, Entergy Trending Process
CR-PNP-2007-00552
A B@ EDG exceeded MR reliability performance criteria
CR-PNP-2007-03849 CA1 Functional Failure Determination Form (9/3/07)
CR-PNP-2007-03673 Turbine Controls System (a)(1) Action Plan
CR-PNP-2007-00552
A B@ EDG (a)(1) Action Plan Health Report, System 02, Reactor Recirculation 3

rd Qtr 2007 Health Report, System 29, Salt Service Water 3

rd Qtr 2007 Health Report, System 01, Main Steam, 3

rd Qtr 2007 10/09/2007, MR Expert Panel Meeting Minutes Section 1R13

Risk Management Actions
CR-PNP-2007-04579, Small leak observed at the base of the "A" EDG turbo charger gas inlet casing Procedure 2.2.16, Revision 50, Attachment 8, Manual Transfer of Y2 to MCC B15 with the unit on-line TS 3.5.C.2, HPCI System Equipment out of service (EOOS) quantitative risk assessment tool

Procedure

3.M.1-45, Outage Shutdown Risk Assessment, Revision 6
Risk Assessment Review Checklist for 12/10 08:00 to 12/12 18:00
EOOS Scheduler

=s Evaluation for PNPS for 12/10 0:00 to 12/13 12:00 Risk Assessment Review Checklist for 12/10 08:00 to 12/12 18:00, Revision A

Section 1R15
CR-PNP-2007-03708, Adjustments of the MPR Setpoint have been required.
ODMI Action Plan for MPR Setpoint Adjustments Apparent Cause Evaluation for MPR Setpoint Drifting
CR-PNP-2006-01802
CR-PNP-2007-04172
Operability Determination for CR-
PNP-2007-04172 Procedure 8.9.1, Revision107, Attachment 3, EDGs On-Site Fuel Oil Quantity
TS 3.9.A, Revision 212, Auxiliary Elec trical Equipment TS 3.5.C, HPCI System
TS 3.12, Fire Protection, Alternate Shutdown Panels
CR-PNP-2007-04724, HPCI did not achieve rated flow during operability testing 50.72 Notification for loss of HPCI Safety Function Entergy procedure
ENN-OP-104, AOperability Determinations

@

CR-PNP-2007-04841, Initial operability review for pump P203D

pump suction pressure drop value not acceptable

CR-PNP-2007-04871, LPCI system loop
A B@ pump and valve quarterly operability Procedure 8.5.2.2.2, LPCI system loop
A B@ Operability-Pump Quarterly and Biennial (Comprehensive) Flow Rate Tests and Valve Tests
51535468 01, Work Order, LPCI system loop
A B@ PP V1v Quarterly Operability P203D Test Date Sheet, RHR Inservice pump test data sheets for 11/26 and 12/3/2007
Section 1R19

Procedure

8.5.3.2.1, Revision 19, Attachment 1D, Quarterly and Biennial (Tech Spec/IST) Test Procedure for SSW pump D (P-208-D)
CR-PNP- 2007-04274,
CR 2007-04251,
CR 2007-04264
Apparent Cause Evaluation for
CR 2007-4274
WO 51532443, Replace Bladder in T-223A with New Butyl Rubber Bladder, 10/11/07
WO 00129585, "A" EDG, Leakage Observed from Base of Turbocharger,
CR 2007-04172
CR-PNP-2007-04724
M1J18-11, Elementary Diagram High Pressure Coolant Injection System
4533K40-800, page 43/44, Figure 24: Schematic Diagram of Type 540-01 and 540-51 controller (for HPCI flow controller)
MR 51534480 - Install Hydraulic Lock Modification for HPCI
MO-6
MR 51534482 - Install Hydraulic Lock Modification for HPCI
MO-35
MR 51534483 - Install Hydraulic Lock Modification for HPCI
MO-3
MR 51534484 - Install Hydraulic Lock Modification for HPCI
MO-14

Procedure

1.3.34, Operations Administrative Policies and Processes, Revision 113

Procedure

2.2.21.5, HPCI Injection and Pressure Control, Revision 13

Procedure

8.5.4.1, HPCI System Pump and Valve Quarterly and Biennial Comprehensive Operability, Revision 102

Procedure

8.5.4.4, HPCI Valve (Quarterly) Operability Test, Revision 48 Procedure 8.E.23, HPCI System Instrument Calibration, Revision 65

Procedure

8.M.2-2.5.7, Instrument Functional/Calibration Test For HPCI Suppression Chamber Water Level, Revision 49
WO 00131058, HPCI Injection Flow Controller
50.72 Event Report to USNRC: High Pressure Coolant Injection Inoperable, dated November 20, 2007 Control Room (day) Shift Narrative Logs, dated November 19, 2007
LER 2000-002-00, AHigh Pressure Coolant Injection System Inoperable due to Power Inverter Failure@ TS 3.12, Fire Protection, Alternate Shutdown Panels
WO 00125819, Source Range Monitor (SRM) Discriminator (SRM B)
WO 00133189, SRM B Neutron Flux Response Functional Test
CR-PNP-2007-04937, Air leakage identified at connection between the solenoid valve and the manifold Procedure 3.M.4-6, Removal, installation, Test, Disassembly, Inspection, and Reassembly of Main Steam Relief Valves 3379-270-3 E5, Main Steam SRV Sheets 1, 2, 3 and 4
A-53379-271-1 E1, Main Steam SRV Parts List Sheets 1, 2, 3, and 4
WO 51535014, WO
RV-203-3B Tailpipe temperature has trended up-pilot valve change out
WO 00133198, WO Automatic Depressurization System subsystem manual opening of relief valves Procedure 2.1.19, Suppression chamber temperatures

Procedure

8.5.6.2, Special test for ADS system manual opening of relief valves
Section 1R20
PNP On-Line Master Schedule, dated 11/30/07, 12/10/07, and 12/11/07

Procedure

2.1.5, Controlled Shutdown from Power, Revision 103

Procedure

2.2.19.1, Residual Heat Removal System - Shutdown Cooling Mode of Operation, Revision 24 Procedure 2.1.1, Startup from Shutdown, Revision 162
Procedure, 2.1.7, Vessel Heatup and Cooldown, Revision 52, completed 12/12/2007
Section 1R22

Procedure

8.5.5.1, Revision 56, RCIC Pump Quarterly and Biennial Operability Flow rate and Valve Test at approximately 1000 psig
WO 51534877, RCIC Pump Operability and Flow Rate Te st at 1000 psig, 10/10/07
CR-PNP-2007-04640;
CR-PNP-2007-04816;
CR-PNP-2007-04835

Procedure

6.1-220, Radiological Controls for High Risk Evolutions, Revision 2

Procedure

8.I.1.1, Inservice Pump and Valve Te sting Program, Revision 21 Procedure 8.5.4.1, HPCI System Pump and Valve Quarterly and Biennial Comprehensive Operability, Revision 102
EN-RP-131, Attachment 9.2, Revision 3, Air Sampling results from November 11, 2007
EN-RP-131, Attachment 9.2, Revision 3, Air Sampling results from November 19, 2007
Control Room (day) Shift Narrative Logs, dated 11/20/2007
Technical Specification 3.5.C, High Pressure Coolant Injection
UFSAR Section 6.5.2.3, High Pressure Coolant Injection System
USNRC Letter to Entergy: PNPS - Entergy Relief Request
PR-03 High Pressure Coolant Injection Pump, dated August 29, 2005

Procedure

2.1.15, Daily Surveillance Log, Revision

Procedure

8.M.2-5, Drywell Drain Sump Integrator, Revision 9, Attachment 1, completed 10/18/07

Procedure

8.M.2-5, Drywell Drain Sump Integrator, Revision 9, Attachment 2, completed 10/6/05
Drawing C-75, Reactor Building Foundations Drywell Concrete @ El. 9'-2, Revision 4
ER#
06110910, Attachment 9.1
Control Room Shift Narrative Logs, dated 12/5/2007 through 12/7/2007
Sections 2OS1/2OS2/20S3
6.5-003, Revision 8, Radiation Protection Instrumentation Calibration Frequency
6.5-160, Revision 31, Calibration of the Area Radiation Monitoring System
6.5-170, Revision 21, Calibration of Ventilation System Radiation Monitors Using ARM Type Sensor/Converters 6.5-307, Revision 16, Calibration of the Eberline
RO-2/RO2A or
RO-20 Ion Chamber
6.5-311, Revision 10, Calibration of the Eberline Model
RO-7 Radiation Monitor
6.5-341, Revision 11, Calibration of the
MDC 2000S Electronic Dosimeter
6.7.1-106, Revision 14, Inspection and Testing of Respiratory Protection Equipment
6.7.1-201, Revision 8, Operation of the SCBA Air Compressor
A-6EN-RP-121, Revision 1, Radioactive Material Control
EN-RP-301, Revision 0, Radiation Protection Instrument Control
EN-RP-303, Revision 0, Source Checking of Radiation Protection Instrumentation
EN-RP-502, Revision 1, Inspection and Maintenance of Respiratory Protection Equipment Calibration Records:
Electronic Dosimeter Calibration (Serial Nos.
176631,
219267,
178032,
177025, 170628)
E-520 (Serial No. 722)
SAC-4 (Serial No. 1402)
BC-4 (Serial No. 484)
Victoreen Lapel Sampler (Serial No. c1138)
H809V (Serial No. 6168)
PM-7(Serial No. 600, 392)
Wide Range Telepole (Serial No. 6603-027)
RO-2 (Serial No. 3410)
RO-2A (Serial No. 3295)
RO-20 (Serial No. 325, 285)
RO-7 (Serial No. 1030)
RM-14 (Serial No. 8565)
SAM-9 (Serial No. 308)
MD-12 (Serial No. 135005)
CR-PNP-2007-00078, 00426, 01012, 01077
CR-PNP-2006-00844, 01290, 01792
CR-PNP-2007-00341, 01372, 03317
CR-PNP-2006-00620, 00843, 01432, 03085, 03922, 03935
SCBA Numbers :1, 2, 3, 4, 5, 10, 11, 12, 13, 14

Miscellaneous

Records & Reports:
Mask Qualification List Root Cause Analysis Report for
CR-PNP-07-3880
Instructional Module C-FB-02-02-01, Revision 7 Self-Contained Breathing Apparatus
Section 4OA2
Limitorque Maintenance Update 90-1
Limitorque Maintenance Update 88-2
ER 07101434, Revision 0, Installation of External Grease Relief Bypass on Limitorque Actuators
ER 07112191, Revision 0, Revision to
VM-0390 to Provide Additional Instructions for Installation of MOV External Grease Relief Modifications
DRN 07-01007, Limitorque Valve Controls Third quarter 2007 Pilgrim Station Quarterly Trend Report
NRC
IR 2007-003
CR-PNP-2007-03925, Potential Adverse Trend in Station Mispositioning errors
CR-PNP-2007-00303,
PS-CKVS-B (crankcase pressure switch
A B@ diesel) not valved in correctly
CR-PNP-2007-01446, RCIC check valve 1301-CK-50 initial position found open instead of closed
CR-PNP-2007-2383, Breaker B1446 (EDG
A B@ Diesel Oil Transfer Pump) found
A OFF@, normal position is
A ON@
CR-PNP-2007-02468, Isolation valve found closed on Reactor Pressure Transmitter
CR-PNP-2007-02476, Spare breaker found closed when it was expected to be open
CR-PNP-2007-02651, EDG failed to start (likely due to fuel rack and governor left in full fuel position)
A-7Procedure 2.2.21, High Pressure Coolant Injection System, Revision 72 Procedure 2.2.19, Residual Heat Removal System, Revision 95

Procedure

2.2.3, Automatic Depressurization System, Revision 23

Procedure

2.2.8, Emergency Diesel Generator, Revision 90

LIST OF ACRONYMS

AC alternating current
ADAMS Agencywide Documents Access and Management System
CAP corrective action program
CDBI component design bases inspection
CFR Code of Federal Regulations
CR condition report
CRG Condition Review Group
DRP Division of Reactor Projects
DRS Division of Reactor Safety

EAL emergency action level

EDG emergency diesel generator

gpm gallon per minute

Hg mercury

HPCI high pressure coolant injection
I&C instrumentation and controls
IMC Inspection Manual Chapter
IR Inspection Report
LER Licensee Event Report
MCC motor control center
MG motor generator
MO motor-operated

MOV motor-operated valve

MPR mechanical pressure regulator

mrem millirem

NEI Nuclear Energy Institute
NRC Nuclear Regulatory Commission
PAR Protective Action Recommendation
PARS Publicly Available Records
PI Performance Indicator
PMT post-maintenance test
PNPS Pilgrim Nuclear Power Station
RBCCW reactor building closed cooling water
RCIC reactor core isolation cooling
RCS reactor coolant system
RFO refueling outage
RHR residual heat removal
RV relief valve
RPS reactor protection system
SBGT stand by gas treatment

SCBA self-contained breathing apparatus

A-8SDP Significance Determination Process

SRM source range monitor
SRO senior reactor operator
SRV safety relief valve
SSC system, structure, or component
SSW salt service water
TS Technical Specifications
UFSAR Updated Final Safety Analysis Report
URI unresolved item
VTS vacuum trip switch
WO work order