| Daily Event Statut at Fort Calhoun -Saturday Fort Calhoun Flooding Status (changes from yesterday's report are in bold)1. Reactor Status: Shutdown 2. Reactor is covered with > 23-ft of cooling water 3. offsite power and Emergency Diesel Generators are available. | | Daily Event Statut at Fort Calhoun -Saturday Fort Calhoun Flooding Status (changes from yesterday's report are in bold)1. Reactor Status: Shutdown 2. Reactor is covered with > 23-ft of cooling water 3. offsite power and Emergency Diesel Generators are available. |
| Both vital buses are energized at this time.i 4. Spent Fuel Pooling cooling is in service and protected. | | Both vital buses are energized at this time.i 4. Spent Fuel Pooling cooling is in service and protected. |
| 1 5. Shutdown cooling is in service and protected I 6. Current river level is 1006' 4" at Fort Calhoun Station -the river level has rjemained steady over the last 24 hours.I/I. Current Blair gauge level is 32.3 ft., which is stable in the last 24 hours.Current NWS/USACE predictions are for a slight decrease in river level over the next 4 days.1 8. Early Sunday morning (June 26, 2011), one of the AquaDams that was protectingplant ruptured. | | 1 5. Shutdown cooling is in service and protected I 6. Current river level is 1006' 4" at Fort Calhoun Station -the river level has rjemained steady over the last [[estimated NRC review hours::24 hours]].I/I. Current Blair gauge level is 32.3 ft., which is stable in the last [[estimated NRC review hours::24 hours]].Current NWS/USACE predictions are for a slight decrease in river level over the next 4 days.1 8. Early Sunday morning (June 26, 2011), one of the AquaDams that was protectingplant ruptured. |
| The AquaDam was a backup (secondary) flood protection barrier. All primary barriers are intact and are providing adequate protection to the site. The station is on 345 kv power.Water has not entered any vital equipment, and no personnel were injured. water has equalized Page 1 information in this record was deleted In accordance with thy Freedom of Information Act, exemp ions fo IA-r FW Daily Event Statut at Fort Calhoun 7-2.txt onsite, repair efforts are underway. | | The AquaDam was a backup (secondary) flood protection barrier. All primary barriers are intact and are providing adequate protection to the site. The station is on 345 kv power.Water has not entered any vital equipment, and no personnel were injured. water has equalized Page 1 information in this record was deleted In accordance with thy Freedom of Information Act, exemp ions fo IA-r FW Daily Event Statut at Fort Calhoun 7-2.txt onsite, repair efforts are underway. |
| This section of the AquaDam is expected to be replaced in the next two weeks.10. The site has implemented procedures to protect power supplies and vitalýquipment. | | This section of the AquaDam is expected to be replaced in the next two weeks.10. The site has implemented procedures to protect power supplies and vitalýquipment. |
|
---|
Category:E-Mail
MONTHYEARML24025A1792024-01-23023 January 2024 State Consultation Response e-mail on Fort Calhoun Station, Unit 1 License Termination Plan License Amendment– (License No. DPR-40, Docket No. 50-285) ML24024A2242024-01-22022 January 2024 State Consultation e-mail on Fort Calhoun Station, Unit 1 License Termination Plan License Amendment- (License No. DPR-40, Docket No. 50-285) ML23311A0862023-11-0505 November 2023 Letter to M Morales Re Ft Calhoun License Termination Section 7 Determination for Ipac 2022-0029456 ML23038A1882023-01-31031 January 2023 Request for Additional Time to Respond to Request for Additional Information on License Amendment Request for Approval of License Termination Plan (License No. DPR-40, Docket No. 50-285) ML22222A1192022-08-0808 August 2022 Email Section 106 NHPA- Ft Calhoun Station License Termination Plan ML21069A2482021-03-10010 March 2021 Umax, 07200054, 05000361, 05000362, FSAR Revision 4 for San Onofre ISFSI ML21335A3352021-01-25025 January 2021 January 25, 2021 e-mail from J. Parrott, NRC to C. Cameron, OPPD Use of Resrad Model to Represent Well Water Concentrations in a Basement Substructure (License No. DPR-40, Docket No. 50-285) ML20204B0782020-07-22022 July 2020 Donna Gilmore Email Holtec Umax Materials (07200054, 05000361, 05000362) ML20113F0622020-04-22022 April 2020 E-mail Results of Acceptance Review of OPPD Request for Exemption from 10 CFR 20, App G, Section Iii.E (License No. DPR-40, Docket No. 50-285) ML20100J2272020-03-26026 March 2020 E-mail Notification to the State of Nebraska on the Issuance of the License Amendment for Revised Security Plans to Reflect an ISFSI-only Configuration (License No. DPR-40, Docket Nos. 50-285 and 72-54) ML20100L7232020-03-15015 March 2020 Email: Town of Desoto National Register of Historic Places Eligibility ML19353C3612019-12-11011 December 2019 E-mail to State of Nebraska Informing of the Pending Revision to the Emergency Plan to Reflect Independent Spent Fuel Storage Installation Only Status (License DPR-40, Docket Nos. 50-285 and 72-054) ML19309F1112019-10-11011 October 2019 ISFSI-Only Tech Specs ML19241A1812019-08-21021 August 2019 Request for Additional Information on Proposed Changes to the FCS Emergency Plan and Emergency Action Level Scheme to Reflect an ISFSI-only Status ML19175A0212019-06-19019 June 2019 Acceptance Review - License Amendment Request to Revise Security and Safeguards Requirements to Reflect ISFSI-Only Configuration ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19126A2802019-05-0101 May 2019 Acceptance Review - License Amendment Request for ISFSI-Only EP and EAL Scheme ML18100A2712018-04-0909 April 2018 04-09-18 OPPD E-Mail (FCS Permanently Defueled Emergency Plan Implementation) ML17236A3442017-08-24024 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun Exemption from 10 CFR 140.11(a)(4), Off-site Primary and Secondary Liability Insurance (MF9664) ML17236A3462017-08-24024 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun LAR Regarding Permanently Defueled TS (MF9567) ML17234A4692017-08-22022 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun LAR Regarding Removal of Dry Cask Loading Limits (MF9831) ML17194A9732017-07-13013 July 2017 NRR E-mail Capture - Final RAI for Fort Calhoun Ultimate Strength Design for Aux. Bldg LAR (MF8525) ML17191B0212017-07-10010 July 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review of Modification of LC 3.C to Delete Commission-approved CSP ML17184A0042017-06-30030 June 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review of Removal of Dry Cask Loading Limits ML17139C5082017-05-19019 May 2017 NRR E-mail Capture - (External_Sender) Need Corrected Page 6 for LIC-17-0043 ML17144A0132017-05-19019 May 2017 NRR E-mail Capture - Fort Calhoun PSDAR - Findings and Concerns ML17142A0202017-05-19019 May 2017 NRR E-mail Capture - (External_Sender) Need Corrected Page 6 to TQ-DC-FC-101 ML17139C8342017-05-19019 May 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review Partial Exemption from Record Retention Requirements ML17139B6762017-05-18018 May 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review Exemption from 10 CFR 140.11(a)(4), Off-Site Liability Insurance ML17139B6782017-05-18018 May 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review Exemption from 10 CFR 50.54(w)(1), On-Site Property Damage Insurance ML17136A1692017-05-16016 May 2017 NRR E-mail Capture - (External_Sender) OPPD FCS Decommissioning Financial Reports ML17115A4722017-04-25025 April 2017 NRR E-mail Capture - (External_Sender) Corrected Page 18 to TQ-DC-FC-201 ML17114A3112017-04-24024 April 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review TS Changes to Align for Decommissioning ML17112A0362017-04-20020 April 2017 NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Permanently Defueled EP and EAL Scheme Change LAR ML17090A3942017-03-31031 March 2017 NRR E-mail Capture - Fort Calhoun - Final RAI Regarding Administrative Control TS Change LAR (MF8437) ML17082A0022017-03-22022 March 2017 NRR E-mail Capture - Fort Calhoun Station - Final Nsir/Dpr RAI Regarding Proposed Emergency Planning Exemption ML17081A0192017-03-21021 March 2017 NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Proposed Emergency Planning Exemption ML17052A0272017-02-15015 February 2017 NRR E-mail Capture - Fort Calhoun Station, Unit No. 1 - Acceptance of Requested Amendment Revise Permanently Defueled Emergency Plan and EAL Scheme ML17033A9692017-02-0202 February 2017 NRR E-mail Capture - Fort Calhoun Station - Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment ML16350A0392016-12-15015 December 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8858) Fort Calhoun, Unit 1 - License Amendment Request (LAR) 16-06; Removal of License Condition 3.D., Fire Protection Program ML16351A0432016-12-15015 December 2016 NRR E-mail Capture - (External_Sender) Fort Calhoun Station Offsite Response Organizations ML16334A3002016-11-29029 November 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8525) Fort Calhoun, Unit 1 - License Amendment Request LAR-16-04 to Revise Current Licensing Basis to Use Aci Ultimate Strength Requirements ML16333A2312016-11-28028 November 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8843)Fort Calhoun, Unit 1, Request for Rescission of Interim Compensatory Measure B.1.a from EA-02-026, Order for Interim Safeguards and Security Compensatory Measures. ML16333A0992016-11-28028 November 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8452), Fort Calhoun, Unit 1 - Request for Exemption from Specific Provisions in 10 CFR 73.55 ML16286A0812016-10-12012 October 2016 NRR E-mail Capture - Acceptance Review Fort Calhoun Station, Unit 1, License Amendment Request 16-03, Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning ML16278A0292016-10-0303 October 2016 NRR E-mail Capture - Acceptance Review Fort Calhoun Station Radiological Emergency Response Plan (RERP) for Decommissioning ML16257A0262016-09-12012 September 2016 NRR E-mail Capture - (External_Sender) OPPD Slides for 9/13/16 Pre-Application Meeting on Class 1 Structures ML16207A0182016-07-22022 July 2016 NRR E-mail Capture - Acceptance Review ML16137A0092016-05-16016 May 2016 NRR E-mail Capture - Acceptance Review CAC No. MF7574 ML16131A7312016-05-10010 May 2016 NRR E-mail Capture - (External_Sender) Question Rvi Inspection Results 2024-01-23
[Table view] Category:Status Report
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24102A1622024-03-18018 March 2024 NRC Presentation on Reviews of Final Status Survey Reports Given at the March 27, 2024, Public Meeting with OPPD on Fort Calhoun Station Unit 1 Submittal of Phase I Final Status Surveys – (License No. DPR-40, Docket No. 50-285) LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-19-0005, 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report2019-03-28028 March 2019 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report LIC-17-0021, Transmittal of 2017 Biennial Decommissioning Funding Status Report2017-03-24024 March 2017 Transmittal of 2017 Biennial Decommissioning Funding Status Report LIC-17-0018, Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2017-02-24024 February 2017 Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events LIC-16-0061, Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2016-08-12012 August 2016 Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events LIC-16-0062, Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation2016-08-12012 August 2016 Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation LIC-16-0010, Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2016-02-29029 February 2016 Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML16057A1232016-02-26026 February 2016 Cy 2015 Baseline Completion LIC-16-0009, Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation2016-02-26026 February 2016 Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation LIC-15-0100, Updated Status of Generic Letter (GL) 2004-02 and Generic Safety Issue (GSI) 191, Pressurized Water Reactor Sump Performance2016-01-0404 January 2016 Updated Status of Generic Letter (GL) 2004-02 and Generic Safety Issue (GSI) 191, Pressurized Water Reactor Sump Performance LIC-15-0098, Fifth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-08-27027 August 2015 Fifth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events LIC-15-0096, Fifth Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation2015-08-19019 August 2015 Fifth Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation LIC-15-0082, ISFSI - Transmittal of Attachments B and C of 2015 Biennial Decommissioning Funding Status Report2015-06-0909 June 2015 ISFSI - Transmittal of Attachments B and C of 2015 Biennial Decommissioning Funding Status Report LIC-15-0047, Biennial Decommissioning Funding Status Report & Omaha Public Power District (OPPD) Nuclear Decommissioning Funding Plan for Fort Calhoun Station Independent Spent Fuel Storage Installation (ISFSI)2015-03-31031 March 2015 Biennial Decommissioning Funding Status Report & Omaha Public Power District (OPPD) Nuclear Decommissioning Funding Plan for Fort Calhoun Station Independent Spent Fuel Storage Installation (ISFSI) LIC-15-0032, OPPD, Fort Calhoun, Unit 1 - Fourth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-02-27027 February 2015 OPPD, Fort Calhoun, Unit 1 - Fourth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML14239A6792014-08-27027 August 2014 Third Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML14237A5742014-08-25025 August 2014 Third Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation ML14055A4122014-02-24024 February 2014 Omaha Public Power District'S Second Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events LIC-14-0023, Omaha Public Power District'S Second Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation2014-02-24024 February 2014 Omaha Public Power District'S Second Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation LIC-13-0123, Omaha Public Power District'S First Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events-Redacted2013-08-28028 August 2013 Omaha Public Power District'S First Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events-Redacted LIC-13-0038, Biennial Decommissioning Funding Status Report2013-03-29029 March 2013 Biennial Decommissioning Funding Status Report ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML12122A0712012-05-14014 May 2012 Enclosure 1: April 2012 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 ML12019A3372011-07-0202 July 2011 Email from Thomas Farnholtz to Kriss Kennedy... Linda Howell, Subject: FW: Daily Event Status at Fort Calhoun - Saturday ML1107505722011-03-16016 March 2011 Biennial Decommissioning Funding Status Report LIC-07-0025, Revised Fort Calhoun Station, Unit 1, 2007 Biennial Decommissioning Funding Status Report2007-04-25025 April 2007 Revised Fort Calhoun Station, Unit 1, 2007 Biennial Decommissioning Funding Status Report ML0708001482007-03-16016 March 2007 2007 Biennial Decommissioning Funding Status Report LIC-05-0029, Biennial Decommissioning Funding Status Report2005-03-11011 March 2005 Biennial Decommissioning Funding Status Report LIC-03-0066, Biennial Decommissioning Funding Status Report, Revised2003-05-12012 May 2003 Biennial Decommissioning Funding Status Report, Revised LIC-03-0026, Biennial Decommissioning Funding Status Report2003-02-28028 February 2003 Biennial Decommissioning Funding Status Report ML0224007982002-02-0101 February 2002 E-mail from Beth Wetzel Bulletin 2001-01 Status Report ML0224007812002-01-18018 January 2002 E-mail from Jacob Zimmerman, Bulletin 2001-01 Status Report 2024-09-18
[Table view] |
Text
FW Daily Event Statut at Fort Calhoun 7-2.txt t1rom: Farnholtz, Thomas Afs-&I1 Sent: Saturday, July 02, 2011 8:59 AM Tio: Kennedy, Kriss; Clark, Jeff; vegel, Anton; Howell, Linda qc: Azua, Ray
Subject:
FW: Daily Event Statut at Fort Calhoun -Saturday Good Morning -Plant status for Saturday July 2, 2011. NO significant changes from yesterday.
Water level seems to be stable at about 1006' 5" plus or minus an inch or two. The licensee is kýeeing up withN in-leakage as required.
John Kirkland is here for day shift and 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> coverage isý,Onti nui ng.Have a. great weekend.-r--:- Orig!nal Message -----From:.BERCK, ALLEN [1]
sent: Saturday, July 02, 2011 7:42 AM ....Toa: Bill Poo0k; Dan; Eric Plautz; Jeff Theulen; Jon Schwarz; Kirkland, John; Larry Oliver; Laurel Ryan,; : Paul. Johnson; Whitney Shipley; 'Rasmusson, Melanie';
kathy.stodola@iowa:.gov; F arnholtz,:
Thomas CC: .EBERS, :STEVEN W; DEANGELIS, PETER A; MOELLER, CHRISTOPHER J;HANKINS, RHONDA R; BERCK, ALLEN; SILKE :.DEENA L; RELLER, MARK H
Subject:
Daily Event Statut at Fort Calhoun -Saturday Fort Calhoun Flooding Status (changes from yesterday's report are in bold)1. Reactor Status: Shutdown 2. Reactor is covered with > 23-ft of cooling water 3. offsite power and Emergency Diesel Generators are available.
Both vital buses are energized at this time.i 4. Spent Fuel Pooling cooling is in service and protected.
1 5. Shutdown cooling is in service and protected I 6. Current river level is 1006' 4" at Fort Calhoun Station -the river level has rjemained steady over the last 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />.I/I. Current Blair gauge level is 32.3 ft., which is stable in the last 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />.Current NWS/USACE predictions are for a slight decrease in river level over the next 4 days.1 8. Early Sunday morning (June 26, 2011), one of the AquaDams that was protectingplant ruptured.
The AquaDam was a backup (secondary) flood protection barrier. All primary barriers are intact and are providing adequate protection to the site. The station is on 345 kv power.Water has not entered any vital equipment, and no personnel were injured. water has equalized Page 1 information in this record was deleted In accordance with thy Freedom of Information Act, exemp ions fo IA-r FW Daily Event Statut at Fort Calhoun 7-2.txt onsite, repair efforts are underway.
This section of the AquaDam is expected to be replaced in the next two weeks.10. The site has implemented procedures to protect power supplies and vitalýquipment.
water is onsite, and flood barriers are protecting vital equipment.
- 11. No release of radioactivity has occurred.I 12. Fort Calhoun has declared a Notification of unusual Event at 08:00 6/6/11.1 13. Backup evacuation route onsite is inundated however the primary route onsite is Oassable and not expected to be affected.I 14. Power was removed from siren 257 and 260 in Pottawattamie Co. IA, which is just 6n the 6dge of the 10-mile EPZ south east of the plant. siren 75, 76 in Desoto National'i1dlife Refuge I'ave no power. Currently the refuge is closed due to flooding, siren 1 east of Fort Calhoun on Lounty road 34 between Fort Calhoun and Boyer chute Recreational Area is without'bower. This area is closed due to flooding.
Power was removed to one additional siren in Washington county sirens 69 was removed from service due to flooding and may require route alerting for any non-evacuated residents.
Power was removed from siren 259. This siren is located in Pottawattamie County on DeSoto Trail, west of 110th street. County to verify evacuation route alerting capability if needed. Power has been removed from sirens 143 and 144 in Pottawattamie Co. IA due to flooding.
This area has been evacuated and is not populated.
I 15. The Reception and Care Center in Fremont is now official, replacing Bellevue.irhis has been planned for quite some time, but also provides us with greater protection for the public, as no evacuation routes to that location are affected at this time.1 16. At this time no known major evacuation routes are affected without contingency actions planned. Interstate 29 in both directions:
from Exit 54A (G Avenue) to Exit 71 (1-680 exit): 1-680 road closed to traffic because of flooding.
1-680 is closed in both directions:
from before Exit 1 i130th Street to Exit 62: 1-29; old Mormon Bridge Road --- road closed because of flooding.Oighway 30 from Blair to Missouri valley is re-opened; flood barrier work will restart on Tuesday, but does not impact evacuation routes.I IRequested Information from states and counties: I 1. when offsite evacuation routes are affected please contact emergency planning.I 12. when the Blair water plant is affected please contact emergency planning.3. Authorized power outages that affect or could affect siren operability, please contact ,mergency planning.Page 2 FW Daily Event Statut at Fort Calhoun 7-2.txt-he river flow rate and level have been relatively constant at Blair NE. The Corp of n ineers is I e easing Gavin's Point dam at 160,300 cubic feet per second (cfs).Emergency Planning Contacts at FCS: Steve. Gebers::L ager.: I(b)(6) ..,ork Phone:] ? ý1 -: R.......[Cell Phone: (b)(6)Allen Berck: Faqer: This e-mail contains Omaha Public Power District's confidential and proprietary information and is for use only by the intended recipient.