ML12088A425: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:ENT000058 Submitted: March 28, 2012 FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER                  S                                                                    N                                                                                                              SC R            T                  D                  EN                N                                    LD            AT                                    EP              G                          ZE                        KS A
SC FF AF OL BE        IN                  R                        T          AT                                    FO              IO                              PR        T        IN          ET                                                    F D IN OL UP PO                  O                  N                    IO                                              SU                                            IN    AW                CH        SI                      AR            SU DLA DN M                              K                    PO              C                                    AF                L                            PE        PA                                PE                        M            IN O TIO                      e NU        AM                  R                  M                LO                                    SC            IN                                                  DR            SK          PI                      RE                SU F N LA F O                                                                                                                                PI                                                                                  Co      TI O EX              W                    CO                                                                                                                                                                                                  m pl      N ON EXTRACTION All blanket insulation. Remove 02_3RD POINT ES TO FWH 23B one blanket upstream and 1 IP2-06-30300,                                                                                                                                      9321-2068 1        3EXB-6                                90-DEG ELBOW                                                Y              blanket downstream of elbow.      Y        N                      SK-02      28 IAS, 51317542                                Located approximately 2' North and                                                                  & 9321-2069 6' West of column B/16,El. 32'.
Calculation reinspection.
03_3RD POINT ES TO FWH 23C                          All blanket insulation. Remove IP2-06-30303,                                                                                    5' of insulation from upstream 2        3EXC-2P                              STRAIGHT PIPE                                                Y                                                Y        N                      SK-03      20 IAS, 51317545                                Located approximately 9' North and                  elbow weld.
3' East of B/12El. 30'.                                                                                                                      Calculation reinspection.
Blanket and Cal Sil insulation.
03_3RD POINT ES TO FWH 23C Remove blanket upstream and IP2-06-30304, 3        3EXC-5                                90-DEG ELBOW                                                Y              60" of cal sil insulation        Y        N                      SK-03      28 IAS, 51317546                                Located 4' North and 3' East of downstream. Possible B/14, El. 25'.
asbestos.                                                                              Calculation reinspection.
03_3RD POINT ES TO FWH 23C                          All blanket insulation. Remove IP2-06-30305                                                                                      insulation on entire pipe (~ 7' 4        3EXC-7P                              STRAIGHT PIPE                                                Y                                                Y        N                      SK-03      28 IAS, 51317547                                  Located approximately 10' North                    long) exposing elbow welds on and 3' West of A/14, El. 32'.                        each end.                                                                              Calculation reinspection.
Only 10' is blanket, remainder downstream is cal sil. Remove 04_4TH POINT ES TO FWH 24A                          insulation so upstream elbow weld is accessible.Exam is 5    4EXA-3P US        IP2-06-30307          STRAIGHT PIPE                                                Y                                                Y        N                      SK-04      20 Located approximately 13' South of                  UPSM pipe, check extent of 17/CC3 El. 28'.                                      previous exam if cal sil needs to be removed.
Calculation reinspection.
05_4TH POINT ES TO FWH 24B                          All blanket insulation. Remove from connection at condenser 6        4EXB-12                              45-DEG ELBOW                                                Y                                                Y        N                      SK-05      20 Located approximately 12' South                    to valve 4EX-3.
and 26' East of A/17, el. 36'.                                                                                                              Calculation reinspection.
05_4TH POINT ES TO FWH 24B                          All blanket insulation. Remove on pipe and uncover welds on 7        4EXB-8P                              STRAIGHT PIPE                                                Y                                                Y        N                      SK-05      20
                                                                        . Located approximately 13' South                    both elbows and CL of A/17, El. 25'                                                                                                                      Calculation reinspection.
All blanket insulation. Remove 06_4TH POINT ES TO FWH 24C                          blanket on pipe and uncover welds at valves.
8    4EXC-14P          IP2-06-30315          STRAIGHT PIPE          Pipe located between valves 4EX-5    N                                                Y        N                      SK-06      20 and 4EX-6 Located approximately 20' East of A/15, El. 36'.
Calculation reinspection.
NCW_220                                              All blanket insulation. Remove blanket off valve FCV-1206 9        220-7P        IP2-06-30316          STRAIGHT PIPE          Located approximately 8' West and    N              body, downstream pipe and all    Y        N                  SK-220        12 CL F/15, El. 36'.                                    blanket on elbow.
Calculation reinspection.
2R18 FAC Scope (Ipe0067424).Xls                                                                                                      1 of 18                                                                                                        2R18 FAC Scope (Ipe0067424).Xls
 
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER                  S                                                                    N                                                                                                        SC R            T                D                  EN                N                                    LD            AT                                  EP              G                      ZE                      KS A
SC FF AF OL BE        IN                R                        T          AT                                    FO              IO                            PR        T        IN        ET                                                  F D IN OL UP PO                O                  N                    IO                                              SU                                            IN    AW              CH        SI                      AR            SU DLA DN M                            K                    PO              C                                    AF                L                            PE        PA                                PE                    M            IN O TIO                e NU        AM                R                  M                LO                                    SC            IN                                                  DR        SK        PI                      RE                SU F N LA F O                                                                                                                              PI                                                                              Co      TI O EX              W                    CO                                                                                                                                                                                            m pl      N ON NCW_249                                              All blanket insulation. Remove blanket from valve MS-LC-10        249-19R        IP2-06-30318          CON. EXPANDER          Located on elevated platform West    N              2505 through valve MPS-779      Y        N                  SK-249    6 X 10 of a A/19 and North of the HDT, El.
15'.                                                                                                                                    Calculation reinspection.
2R18 FAC Scope (Ipe0067424).Xls                                                                                                      2 of 18                                                                                                    2R18 FAC Scope (Ipe0067424).Xls
 
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER                    S                                                                              N                                                                                                                    SC R            T                D                    EN                N                                            LD            AT                                  EP                  G                          ZE                      KS A
SC FF AF OL BE        IN                R                          T          AT                                            FO              IO                            PR        T        IN          ET                                                            F D IN OL UP PO                O                    N                    IO                                                      SU                                          IN        AW              CH            SI                      AR                  SU DLA DN M                            K                      PO              C                                            AF                L                          PE        PA                                    PE                        M                  IN O TIO                e NU        AM                R                    M                LO                                            SC            IN                                                DR                SK          PI                      RE                    SU F N LA F O                                                                                                                                      PI                                                                                            Co      TI O EX              W                      CO                                                                                                                                                                                                                  m pl      N ON Thermal Shields over these                                                                Low Checworks hours. No components. Removal and                                                                  inspections of components on any reinstallation of the thermal                                                            23 FWH extraction line in 3EXC-22N                                                                                                                      shields will be required.
11                      IP2-06-30319              NOZZLE                                                                                                                                                                    condenser. Also recommended in See Remarks snapshot assessment.
Contiguous points from 23C FWH 03_3RD POINT ES TO FWH 23C                                                                                                                            to extraction header. C Train 12    3EXC-22          IP2-06-30519          MITERED ELBOW                                                        Y                                              Y        N                        SK-3        28"        selected as 22A and 22B 13    3EXC-21          IP2-06-30522          MITERED ELBOW Located in condenser 21.                                                                                                                                        extraction lines to be replaced 14    3EXC-21P          IP2-06-30524          MITERED PIPE                                                                                                                                                                  during 2R18. Note that support 15    3EXC-20          IP2-06-30525          MITERED ELBOW                                                                                                                                                                  work orders are tied to nozzle 16    3EXC-20P          IP2-06-30526          MITERED PIPE                                                                                                                                                                  inspection (IP2-06-30319) work 17    3EXC-19          IP2-06-30527          MITERED ELBOW                                                                                                                                                                  order. If this work order is de-18    3EXC-19P          IP2-06-30528          MITERED PIPE                                                                                                                                                                  scoped, support WO's must be 19    3EXC-14          IP2-06-30529              TEE                                                                                                                                                                      tied to another inspection.
Mud insulation. Replace with                                                              Leaking, patched areas Extraction Steam Trap                                                  blanket after exam.                                                          3/4"        downstream of this trap; see IP2-20                      IP2-06-30808                                                                                N                                              Y        N    9321-F-2031 PIPE, ELBOWS AND Located at column BB14 El. 15' TB                                                                                                                    1/2"        06-00419; CR-IP2-2006-03186.
EST-21                                  TEES                                                                                                                                                                        OE from Wolf Creek Blanket insulation over                                                                            System Engineer manway.                                                                                    recommendation.OE from Unit 3 Located in 36' El. East side TB,                                                                                                                        CR-IP3-2005-02334 ER-IP3                                                    INTERNAL            Southeast riser, near stairs to                                                                                                                            18223; WO IP3-05-18223 INSPECTION OF          mezzanine                                                                                                                                              Similar location to Unit 3 crack in 21    Crossunder        IP2-06-30809                                                                                Y                                              N        N        A235308                    32" CROSSUNDER            Manhole on vertical, above elbow.                                                                                                                                      weld.
RISER AND TEE.          Manway opposite valve MS-24-1                                                                                                                            Inspect internal cladding in riser pressure test valve.                                                                                                                                          and tee. Perform UT measurements if thinniing is found.
Representative pipe section of LP Gland piping inside condenser.
Y                                                                                                        Possible to work with slop drain PIPE AND ELBOWS                                                Coordinate scaffolding                                                                                              pipng replacement job as these LP Gland 22                  IP2-06-30811              Uninsulated lines Inside Condenser 21                          with extraction line                    N              Y        N        237145                      6"          lines are adjacent to the slop Piping Erosion only (return lines)                                          exam in condenser 21,                                                                                              drains. Siemens Westinghouse IP3-06-30319.                                                                                                      Service Bulletin 53009 ST.
System Engineer recommendation.
2R18 FAC Scope (Ipe0067424).Xls                                                                                                              3 of 18                                                                                                                2R18 FAC Scope (Ipe0067424).Xls
 
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER                    S                                                                    N                                                                                                              SC R            T                D                  EN                N                                    LD            AT                                  EP              G                          ZE                      KS A
SC FF AF OL BE        IN                R                        T          AT                                      FO              IO                            PR        T        IN          ET                                                      F D IN OL UP PO                O                      N                IO                                              SU                                            IN    AW                CH          SI                      AR              SU DLA DN M                            K                    PO              C                                      AF                L                            PE        PA                                  PE                        M              IN O TIO                e NU        AM                R                      M              LO                                      SC            IN                                                  DR            SK          PI                      RE                SU F N LA F O                                                                                                                                PI                                                                                    Co      TI O EX              W                    CO                                                                                                                                                                                                    m pl      N ON FEEDWATER Asbestos Insulation.
Two (2) feet upstream of valve                                                          No evidence of any inspections FW BFD 64 FT-418A Root                                                                  DNSM of these venturi. OE from PIPE    75/76_HEADER TO CON PEN E,F                                      Stop Stm Gen 21 Isolation,                                                              Mihama to inspect DNSM of flow 23                      IP2-06-30530      DOWNSTREAM OF                                                    N              and downstream of venturi        Y        N                      SK-75      18"          monitoring devices. Also OE BFD-69P DS                                                                                                            instrument root valve BFD                                              FLOW ELEMENT Unit 2 Aux Feed Building 33' El.                                                                                                                          from June 2006 CHUG Meeting 1 S/G 21 FT-418A low side                                                                Catawba Unit 2 experiencing o
root stop to downstream 45                                                                    wear in this location.
elbow.
All blanket insulation. Tee where 6" FW reg valve bypass line enters 18" main. 24 77/78_HEADER TO CON PEN G,H                                                                                                                  OE Catawaba 2. ODMI CR-IP2-Steam Generator. Two (2) 2005-03847 Bypass valve FCV-24        BFD-82T        IP2-06-30531              TEE                                                      Y              feet upstream on diameter        Y        N                      SK-77    6" X 18" Unit 2 Aux Feed Building 15' El. S/G                                                                                                            447L full open. Inspect Tee branch, and three (3) feet 24 feedwater train                                                                                                                              where bypass joins main upstream and downstream on 18" diameter main.
Blanket Insulation.
75/76_HEADER TO CON PEN E,F From valve to downstream elbow.
25        BFD-77R        IP2-06-30532          CON. EXPANDER          Unit 2 Aux Feed Building 15' El.      N                                              Y        N                      SK-76  12" x 18"          Calculation reinspection Immediately downstream of FCV-427 Blanket Insulation.
77/78_HEADER TO CON PEN G,H From valve to downstream elbow.
26        BFD-3R        IP2-06-30533          CON. EXPANDER          Unit 2 Aux Feed Building 15' El.      N                                              Y        N                      SK-78  12" x 18"          Calculation reinspection Immediately downstream of FCV-437 93_CON PEN "E" TO STM GEN                            Mirror insulation.
27        BFD-99        IP2-06-30535          90-DEG ELBOW                                                  Y              Two (2) feet upstream and        Y        N                      SK-93      18"            Calculation reinspection VC 104' El.                                          three (3) feet downstream.
94_CON PEN "H" TO STM GEN                            Mirror insulation.
28        BFD-101        IP2-06-30538          90-DEG ELBOW                                                  Y              Two (2) feet upstream and        Y        N                      SK-94      18"            Calculation reinspection VC 59' El.                                            three (3) feet downstream.
95_CON PEN "G" TO STM GEN                            Mirror insulation.
29        BFD-106        IP2-06-30540          90-DEG ELBOW                                                  Y              Two (2) feet upstream and        Y        N                      SK-95      18" VC 104' El.                                          three (3) feet downstream.                                                              Calculation reinspection Blanket Insulation. Remove 75/76_HEADER TO CON PEN E,F 30        BFD-79        IP2-06-30542          90-DEG ELBOW                                                  Y              blanket from Valve BFD-7-3 to    Y        N                      SK-77      18" Unit 2 Aux Feed Building 43' El.
penetration                                                                            Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls                                                                                                      4 of 18                                                                                                          2R18 FAC Scope (Ipe0067424).Xls
 
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER                    S                                                                      N                                                                                                          SC R            T                D                    EN                N                                    LD            AT                                    EP              G                          ZE                  KS A
SC FF AF OL BE        IN                R                          T          AT                                      FO              IO                              PR        T        IN          ET                                                F D IN OL UP PO                O                    N                    IO                                              SU                                            IN    AW                CH          SI                  AR          SU DLA DN M                            K                      PO              C                                      AF                L                            PE        PA                                    PE                  M          IN O TIO                e NU        AM                R                    M                LO                                      SC            IN                                                  DR              SK        PI                  RE              SU F N LA F O                                                                                                                                  PI                                                                              Co      TI O EX              W                      CO                                                                                                                                                                                              m pl      N ON Blanket insulation. Remove NCW_9321-F-2120 DS of Valve                                                                                                            blanket around valve and                                                      2X 31                      IP2-06-30812          CON. EXPANDER            Located West of control panel in      Y                                                Y    N        9321-F-2120 AF138                                                                                                                downstream blanket.                                                          2 1/2 HSB Building, El. 53'.
Calculation reinspection Possible Asbestos insulation                                                            CHECWORKS analysis and 32        BFD 29        IP2-06-30544          90-DEG ELBOW on BFD-29, followed by mirror                                                            snapshhot assessment 73_ BLR FEED PUMPS                                    insulation, then blanket on DISCHARGE HDR TO HP HTRS                              BFD-29P. Remove 4' Y              upstream of BFD-29 to            Y        N                      SK-73      30" 26A,B,C 33        BFD-29P        IP2-06-30545          STRAIGHT PIPE                                                                  upstream weld on BFD-32.
Located at A/20 El. 15'.
34        BFD-42N        IP2-06-30546              NOZZLE                                                                    Possible asbestos insulation.                                                            CHECWORKS analysis.
73_ BLR FEED PUMPS                                    Remove insulation around inlet DISCHARGE HDR TO HP HTRS                              nozzle and shell to expose Y                                                Y                                SK-73      18" 35        BFD-42        IP2-06-30547          45-DEG ELBOW            26A,B,C                                              shell to nozzle weld, upstream Located at A/20 El. 15' and 36'.                      elbow and straight pipe.
36        BFD-47N        IP2-06-30548            NOZZLE                                                                      Mirror insulation. Remove                                                                CHECWORKS analysis 37        BFD-47        IP2-06-30549          90-DEG ELBOW              FW74-4-FWH26C TO DISHDR                              insulation around outlet nozzle 38        BFD-47P        IP2-06-30553          STRAIGHT PIPE            Located at feedwater outlet from                    and shell to expose shell to 39        BFD-48        IP2-06-30554          90-DEG ELBOW                                                    Y              nozzle weld., downstream          Y                                SK-74      18" FW Heater 26C, approximately 13' South and 15' West of A/20, El. 36'                  piping to valve BFD-4-2; insure 40        BFD-48P        IP2-06-30555          STRAIGHT PIPE                                                                  valve to pipe weld exposed.
Possible asbestos insulation.                                                            CHECWORKS analysis FW74-5-FWH26 TO DISHDR                                Remove insulation around 41        BFD-61        IP2-06-30557          90-DEG ELBOW            Elbow located directly over and East  Y              elbow and 4' upstream and 6'      Y        N                        74        30" of condensate pumps                                  downstream on pipe.
Possible Asbestos insulation.                                                            CHECWORKS analysis.
42        BFD-80        IP2-06-30558          90-DEG ELBOW Remove insulation around                                                                Snapshot assessment.
elbows and 2' upstream of FW77-1-DISHDR TO SG24 Y              BFD-81 and 4' downstream of      Y        N                        77        18" Located in Aux Feed Building 33' El.
43        BFD-81        IP2-06-30559          45-DEG ELBOW                                                                  BFD-80.
All blanket insulation. On 30"                                                              CHECWORKS analysis 44        BFD-72T        IP2-06-30560            30" X 18" TEE                                                                  run, remove blankets from FW75-2-DISHDR TO SG21 FW76-2-DISHDR TO SG22                                  upstream elbow through 45        BFD-78T        IP2-06-30561            30" X 18" TEE                                                                    middle of last tee on 30"                                75; 76;        30" x FW77-2-DISHDR TO SG24              Y                                                Y        N header; on 18" branches,                                    77            18" Located in Aux Feed Building, inlet header to FCV's.                              remove 4' downstream of each 46        BFD-84T        IP2-06-30562            30" X 18" TEE                                                                                tee.
2R18 FAC Scope (Ipe0067424).Xls                                                                                                        5 of 18                                                                                                    2R18 FAC Scope (Ipe0067424).Xls
 
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER                  S                                                                    N                                                                                                    SC R            T                D                  EN                N                                    LD          AT                                EP              G                  ZE                    KS A
SC FF AF OL BE        IN                R                        T          AT                                    FO              IO                          PR        T        IN    ET                                                      F D IN OL UP PO                O                  N                    IO                                              SU                                        IN    AW          CH        SI                    AR                SU DLA DN M                            K                    PO              C                                    AF                L                        PE        PA                          PE                      M                IN O TIO                e NU        AM                R                M                  LO                                    SC            IN                                                DR        SK      PI                    RE                  SU F N LA F O                                                                                                                          PI                                                                              Co      TI O EX              W                  CO                                                                                                                                                                                          m pl      N ON US-FCV-1115                                                                                                          Possible asbestos.(Mud).
4E                                                                                                              Remove insulation on elbows                                                  Leak report, FCV-1115 leaking.
47                      IP2-06-30813            Elbow              Boiler Feed Pump 21 recirc line 4th                  and 2' upstream and 3'                                                      OE22805 FW recirc cr-mo elbow SEE and 5th elbow DNSM of BFP 21.                        downstream                                                                  leak @ elbow extradose REMARKS Back-to-Back elbows                  Y                                            Y        N    9321-F-2019            6 Approximately 10' South of column                                                                                                Originally mislabeled as US-LCV-US-FCV-1115                                                    A/16, El. 15'.                                                                                                                    1115 4E. Need to change WO's 48                      IP2-06-30814            Elbow 5E                                                                                                                                                                                            and substitute US-FCV-1115 4E.
2R18 FAC Scope (Ipe0067424).Xls                                                                                                    6 of 18                                                                                                2R18 FAC Scope (Ipe0067424).Xls
 
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER                  S                                                                      N                                                                                                                SC R            T                D                  EN                N                                      LD            AT                                    EP              G                            ZE                      KS A
SC FF AF OL BE          IN                R                        T          AT                                      FO              IO                              PR        T        IN          ET                                                      F D IN OL UP PO                O                    N                  IO                                                SU                                            IN    AW                CH            SI                    AR            SU DLA DN M                              K                    PO              C                                      AF                L                            PE        PA                                    PE                        M            IN O TIO                e NU          AM                R                    M              LO                                      SC            IN                                                  DR              SK          PI                    RE                SU F N LA F O                                                                                                                                  PI                                                                                    Co      TI O EX              W                    CO                                                                                                                                                                                                      m pl      N ON CONDENSATE 81_FWH 24 COND TO FWH 25                              Blanket and Mirror insulation.
(15' el TB) Located approx 15'                        Remove all the blanket at 49        CD-30          IP2-06-30563          90-DEG ELBOW          North and 9' East of 22 Seal            Y              elbow to downstream elbow        Y        N                      SK-81      14" Injection Booster Pmp at 29'el. Near                  weld and mirror insu up to Calculation reinspection column BB/17                                          drain vlv Mud insulation, possible asbestos. Remove insul from 50        CD-33          IP2-06-30569          90-DEG ELBOW 82/83_FWH 25 TO HEADER. 25B                                25B FWH shell nozzle, FWH - above shell manway,                            exposing shell to nozzle weld, Y                        to CD-18-1.            Y        N                      SK-82      14" approximately 7' South and 18' East of CC3/18, El. 36'.
51        CD-34          IP2-06-30570          90-DEG ELBOW Calculation reinspection Blanket Insulation. Remove all 82/83_FWH 25 TO HEADER. 15'                            insulation from upstrm 90 deg el. TB. Located on south east side                    elbow to header. In addition, 52        CD-59P          IP2-06-30571          STRAIGHT PIPE          of HDT and 15' west of MCC23.          Y              remove one piece of header        Y        N                      SK-82      24" Approximately 9' South and 13' East                    blanket insulation where pipe of CC3/18, El. 36'.                                    enters header.
Calculation reinspection Blanket Insulation. Remove all 83/84_HEADER TO BFP                                    insulation from root stop vlv SUCTION. 15' TB. Located at 22                        CD-55-1 to 90-deg elbow and 53        CD-75          IP2-06-30574          90-DEG ELBOW                                                  Y              from 90-deg elbow upstream        Y        N                      SK-84      24" MBFP suction line First elbow prior to pmp suction nozzle.                                apprx 24" (two bands of blanket insulation).
Calculation reinspection Possible asbestos (mud) on                                                                Per CHECWORKS and snapshot 54        CD-62T          IP2-06-30575              TEE                                                                      reducer. Remove all mirror                                                24"            assessment.
insul from Tee branch up to 82/83_FWH 25 TO HEADER. 15' upstrm elbow. Remove 3' of 55        CD-62-P1        IP2-06-30577          STRAIGHT PIPE          el TB. Located south side of HDT,                                                                                                24" Y              mirror insul upstrm of reducer. Y        N                      SK-82 approximately 9' South and 13' East Remove 3 blankets of insul of CC3/18, El. 15'.
downstrm of tee.                                                          14" X 56        CD-61R          IP2-06-30578 12" X 24" REDUCER 24" All blanket insulation.                                                                    CHECWORKS analysis. Few 57        CD-115          IP2-06-30579          90-DEG ELBOW          CD80A-3-FWH 22C TO HEADER                              Remove blankets from elbows                                                                inspections in this run.
Located approximately 6' South and      Y              and 3' upstream and              Y        N                  SK-80A            14 10' West of Column F/15, El. 36'.                      downstream of each elbow.
58        CD-116          IP2-06-30581          90-DEG ELBOW HEATER DRAINS Blanket Insulation. Remove 09_FWH 25 DRNS TO HTR DRN                              insulation from inlet side of 59 5EXD-20P DS IP2-06-30582                    STRAIGHT PIPE          TK. 15' TB on south west corner of      N              5EX-8 to upstream of 90-deg      Y        N                      SK-9        10" HDT near Col 18, row CC3                              elbow near floor Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls                                                                                                        7 of 18                                                                                                          2R18 FAC Scope (Ipe0067424).Xls
 
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER                    S                                                                          N                                                                                                                SC R            T                D                    EN                N                                      LD            AT                                    EP              G                              ZE                      KS A
SC FF AF OL BE        IN                R                          T            AT                                        FO              IO                              PR        T        IN          ET                                                      F D IN OL UP PO                O                      N                  IO                                                  SU                                            IN    AW                CH            SI                      AR            SU DLA DN M                            K                      PO                C                                        AF                L                            PE        PA                                      PE                    M            IN O TIO                e NU        AM                R                      M                LO                                        SC            IN                                                    DR              SK          PI                      RE              SU F N LA F O                                                                                                                                      PI                                                                                    Co      TI O EX              W                      CO                                                                                                                                                                                                        m pl      N ON Same as number 59 (above) 09_FWH 25 DRNS TO HTR DRN 60 5EXD-20P US IP2-06-30583                    STRAIGHT PIPE                                                    N                                                Y        N                      SK-9        10" TK. Same location as number 59 Calculation reinspection Blanket Insulation. Remove 24A FWH TO FWH 23A 36' TB.                              blanket from heat shell to first Located on south west corner of                          45-deg elbow, and insulation 61        4EXD-1P        IP2-06-30585          STRAIGHT PIPE                                                    N                                                Y        N                  SK-21A            6" 23A FWH approximately 5' North                          on vessel to expose vessel-to-and 6' East of CC3/12, El. 36'.                          nozzle weld.
Calculation reinspection 24A FWH TO FWH 23A 36' TB.                              Balnket insulation. Remove Located on south west corner of                          insulation from LCV-1115 to 62        4EXD-6        IP2-06-30586          CON. REDUCER                                                      N              4EX-8.                            Y        N                  SK-21A          4" X 3" 23A FWH approximately 3' North and 4' West of CC3/12, El. 36'                                                                                                                      Calculation reinspection Blanket Insulation. Remove all 90-DEG RED.                                                                    blanket from 4EX-8-1 to where 63        4EXD-40        IP2-06-30587                                  22A_FWH 24B DRN TO CV. 36'                                                                                                              6" X 4" ELBOW.                                                                          pipe penetrates floor.
TB. Located near 23B FWH at south west side of heater,            N                                                Y        N                  SK-22A approximately 3' North and 15' East 64 4EXD-40P DS IP2-06-30588                    STRAIGHT PIPE.                  of CC3/12, El. 36'.                                                                                                                6" Calculation reinspection Remove existing blanket 23A_FWH 24C DRN TO CV - 15'                              insulation between the two 90-TB. Located 8' west of MBFP                              deg elbows. Insure both pipe 65    4EXD-70P          IP2-06-30589          STRAIGHT PIPE                                                    Y                                                Y        N                  SK-23A            6" turbine oil conditioner next to stairs                  welds are exposed.
going to 5' el. Pipe located at 33' el.
Calculation reinspection Blanket Insulation. Remove all 25A/B_FWH 23B DRN TO CV. 15'                            of the exisiting blanket 66        3EXD-34        IP2-06-30590              TEE                TB. Located between 21B and 22A          Y              insulation.                        Y        N                  SK-25B            8" Inlet Waterbox.
Calculation reinspection Blanket insulation. Remove insulation from vlv 5EX-15-2 to NCW_18. 15'el TB. Located where pipe penetrates floor.
67        5EXC-14        IP2-06-30591          90-DEG ELBOW            between 22B and 23A inlet                N                                                Y        N                      SK-18        14" DO NOT REMOVE waterboxes.
INSULATION FROM 5EX                                                                                                                                  2.                                                                                          Calculation reinspection 68        5EXC-21        IP2-06-30592          90-DEG ELBOW NCW_18. 5' el TB. Located above and South of 24 Sump Pump Oil            Y                              N                Y        N                      SK-18        14" 5EXC-21P-1                                                                  Skimmer .
69                      IP2-06-30593          STRAIGHT PIPE US Calculation reinspection 15' TB. Located between 21B and                              All Blanket insulation.
22A inlet waterboxes.                                      Remoove blanket on pipe 70    205-22P US        IP2-06-30607          STRAIGHT PIPE                                                    N                                                Y        N                  SK-205            8 Located approximately 12' South                          between valves LCV-5003 and and 15' East of A/16 El. 15'.                            5EX-504, exposing all welds.
Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls                                                                                                          8 of 18                                                                                                            2R18 FAC Scope (Ipe0067424).Xls
 
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER                    S                                                                    N                                                                                                                    SC R            T                D                    EN                N                                  LD            AT                                  EP              G                            ZE                      KS A
SC FF AF OL BE        IN                R                          T          AT                                    FO              IO                            PR        T        IN          ET                                                            F D IN OL UP PO                O                    N                    IO                                              SU                                          IN    AW                CH            SI                      AR                  SU DLA DN M                            K                      PO              C                                    AF                L                          PE        PA                                    PE                        M                  IN O TIO                e NU        AM                R                    M                LO                                    SC            IN                                                  DR            SK            PI                      RE                    SU F N LA F O                                                                                                                              PI                                                                                            Co      TI O EX              W                      CO                                                                                                                                                                                                        m pl      N ON 15' TB. Located between 21B and 22A inlet water boxes 71    205-24P US        IP2-06-30608          STRAIGHT PIPE                                                Y                              N              Y        N                  SK-205          8 approximately 12' South and 25' East of A/16, El. 5'.
Calculation reinspection 15' TB. Located between 21 and 22                  Blanket Insulation. Rmove 72        4EXD-75        IP2-06-30609          90-DEG ELBOW            MBFP and above the MBFP Lube        Y              existing Blanket insulation. Y        N                  SK-23B          6" Oil Conitioner Tank.                                                                                                                          Calculation reinspection HD23A-1-FWH24C TO CV                                Mirror insulation. Remove 73        4EXD-61        IP2-06-30610          6" X 4" RED. EL        Located approximately 3' North and  N              insul from 4EX-8-2 to where      Y        N                  SK-23A      6" X 4" CHECWORKS analysis and 17' West of A/12, El. 36'.                          line penetrates floor                                                              snapshot assessment.
Blanket Insulation. Remove all                                                    CHECWORKS analysis and HD23A-1-FWH24C TO CV. 36' TB.                                insulation between LCV-1115                                                        snapshot assessment.
74        4EXD-60        IP2-06-30611      4" X 3" REDUCER. Located near 23C FWH at south                                and 4EX-8-2.                                                              4" X 3" west side of heater.                          N                                              Y        N                  SK-23A HD23A-1-FWH24C TO CV. Same 75    4EXD-60P          IP2-06-30618          STRAIGHT PIPE.                                                                                                                                        3" as pt 74.
Blanket Insulation. Remove                                                                No inspections UPSM and DNSM 76    HD-4A DS          IP2-06-30626          STRAIGHT PIPE                                                              insulation from 2' upstream of                                                            of flow element. OE Mihama.
Flow Element, downstream to HD20-2-HDP22 TO BFP SUCTION.
Header.
15' TB. Located near discharge      Y                                              Y        N                      SK-20        12" side of 22 HDTP-Col. 15 row CC3.
77    HD-6P US          IP2-06-30628          STRAIGHT PIPE Balnket Insulation. Remove Piping between restricting orifice                  insulation from 3EX-540 to                                                                OE Susquehanna Unit 2 and isolation valve 3EX-540. 23B                    restricting orifice                                                                      OE Oconee Unit 3 and Beaver 78 239-11E              IP2-06-30630          90 degree elbow        FWH Operating vent.                  N                                              Y        N        A235304    SK-239          2          Valley Unit 2 6/26/06 CHUG Located Northeast end of FWH                                                                                                                  Meeting FW Htr vent d/s of 23B, El. 36'.                                                                                                                                continuous flow restricting orifice.
Altran Small Bore review 2R18 FAC Scope (Ipe0067424).Xls                                                                                                      9 of 18                                                                                                                2R18 FAC Scope (Ipe0067424).Xls
 
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER                  S                                                                            N                                                                                                              SC R            T                D                  EN                N                                          LD            AT                                    EP              G                        ZE                      KS A
SC FF AF OL BE        IN                R                        T          AT                                            FO              IO                              PR        T        IN        ET                                                        F D IN OL UP PO                O                    N                  IO                                                    SU                                            IN    AW              CH        SI                    AR                  SU DLA DN M                            K                    PO              C                                            AF                L                            PE        PA                              PE                        M                IN O TIO                e NU        AM                R                    M              LO                                            SC            IN                                                  DR        SK          PI                    RE                    SU F N LA F O                                                                                                                                      PI                                                                                    Co      TI O EX              W                    CO                                                                                                                                                                                                          m pl      N ON Reheater Drains Blanket Insulation.
Remove insulation on tee 45B_FE 1257-1 TO LCV 1104                                  mainand upstream to 45 elbow 79        MS-1A25        IP2-06-30635              TEE                Located approximately13' South of            Y              and downstream to FE-1257;        Y        N                  SK-45B      6 A/18 at the condenser wall, El. 36'                        branch to pipe hanger.
Calculation reinspection 45C_HDR [1] TO FWH 26A,B,C                                  Blanket Insulation.
Located approximately 5' North and                          Remove blankets on elbow                                                              Calculation reinspection.
80        MS-1A38        IP2-06-30638          45-DEG ELBOW                                                        Y              and blankets on upstream and      Y        N                  SK-45C      10 17' West of A/18, El. 15'. Above                                                                                                                  OE23342 RHD elbow leak at HDT.                                                        downstream pipes.                                                                    Davis Bessir Blanket Insulation.
45C_HDR [1] TO FWH 26A,B,C                                  Remove insulation on pipe to MS-1A67P 81                      IP2-06-30640          STRAIGHT PIPE          Located approximately 11' North              N              tees on both ends, exposing all  Y        N                  SK-45C      6 US and 18' West of A/18, El. 33'.                              welds.
Calculation reinspection 82        MS-1A59        IP2-06-30667          90-DEG ELBOW          45D_HDR [1] TO FWH 26 (CONT.)                              Blanket Insulation.
Located approximately 10' North                            Remove insulation from MS-1A59P                                                        and 16' East of CC3/18, El. 15'.            Y              upstream pipe to downstream      Y        N                  SK-45D      6 83                      IP2-06-30672          STRAIGHT PIPE                                                                                                                                                              Calculation reinspection.
US                                                          Top of HDT accessible from west                            elbow.
OE23342 RHD elbow leak at valve platform @ north end of HDT.                                                                                                                        Davis Bessie Blanket insulation.
Remopve blanket on elbow 48A/B_RDT 21B TO LCV 1105 and upstream and downstream 84        MS-1B26        IP2-06-30673          90-DEG ELBOW          Located approximately 6' North and          Y                                                Y        N                  SK- 48A      6 straight pipe.
24' East of A/15, El. 36'.
Calculation reinspection 85        MS-2B12        IP2-06-30675          90-DEG ELBOW                                                                    Blanket Insulation.
Remove insulation on pipe Y
49A/B_RDT 22B TO LCV 1105A                              upstream of elbow and 6' on Work with exam points Located approximately 1' South and                      straight pipe. Work with exam        Y        N                  SK-49A      6 86    MS-2B12P          IP2-06-30676          STRAIGHT PIPE                                            MS-2B11-P1 (99) and 11' West of F/16, El. 36'                                points MS-2B11-P1 (99) and MS-2B11 (100).
MS-2B11 (100).
Calculation reinspection Blanket insulation.
87        MS-2B16        IP2-06-30678          45-DEG ELBOW                                                                        Remove blanket minimum 1' 49A/B_RDT 22B TO LCV 1105A Located approximately 14' South              Y              upstream of MS-2B16 through      Y        N                  SK-49A      6 and 14' West of F/16, El. 36'.                                  MS-2B17 and 2" on 88        MS-2B17        IP2-06-30679          45-DEG ELBOW                                                                                                                                                            Calculation reinspection. Includes downstream pipe.
pipe MS-2B16P Blanket Insulation.
49A/B_RDT 22B TO LCV 1105A                                  Remove blanket upstream of 89        MS-2B22        IP2-06-30680          90-DEG ELBOW          Located approximately 5' South and          N              elbow MS-2B22 and on              Y        N                  SK-49A      10 30' East of A/14, El. 36'.                                  downstream to expose elbow-to-elbow weld.
Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls                                                                                                            10 of 18                                                                                                          2R18 FAC Scope (Ipe0067424).Xls
 
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER                  S                                                                                N                                                                                                              SC R            T                D                  EN                N                                              LD            AT                                  EP              G                        ZE                        KS A
SC FF AF OL BE        IN                R                        T          AT                                              FO              IO                            PR        T        IN          ET                                                      F D IN OL UP PO                O                    N                  IO                                                        SU                                            IN    AW                CH        SI                      AR                SU DLA DN M                            K                    PO              C                                              AF                L                            PE        PA                                PE                        M                IN O TIO                e NU        AM                R                    M              LO                                              SC            IN                                                  DR              SK      PI                      RE                  SU F N LA F O                                                                                                                                        PI                                                                                    Co      TI O EX              W                    CO                                                                                                                                                                                                            m pl      N ON Blanket Insulation.
Remove insulation on tee runto 49C_HDR [2] TO FWH 26A,B,C                                    upstream and downstream 90        MS-2B42        IP2-06-30681              TEE                Located approximately 10' South                N              flanges, and blankets on        Y        N                  SK-49C and 4' East of CC3/19, El. 36'.                                vertical pipe to next tee.
Calculation reinspection Blanket insulation.
49C_HDR [2] TO FWH 26A,B,C 91        MS-2B50        IP2-06-30682          90-DEG ELBOW          Located approximately 5' North and              Y                                              Y        N                  SK-49C Calculation reinspection. Include 21' West of A/19, El. 15'.
UPSM pipe MS-2B63P. OE23342 49C_HDR [2] TO FWH 26A,B,C                                    Blanket insulation.                                                                  RHD elbow leak at Davis Bessie 92        MS-2B52        IP2-06-30683          90-DEG ELBOW          Located approximately 4' South and              Y                                              Y        N                  SK-49C 21' West of A/19, El. 15'.
50A_RDT 23B TO LCV 1105B                                      Blanket insulation                                                                    Calculation reinspection.
93        MS-3B14        IP2-06-30684          90-DEG ELBOW          Located approximately 3' North and              Y                                              Y        N                  SK-50A                  OE23342 RHD elbow leak at 14' West of F/17, El. 36'.                                                                                                                          Davis Bessie 50A_RDT 23B TO LCV 1105B                                      Blanket and Mirror insulation MS-3B22P 94                        IP2-06-30685          STRAIGHT PIPE          Locate approximately 10' South and              Y                                              Y        N                  SK-50A US 30' West of F/14, El. 36'.                                                                                                                          Calculation reinspection.
50A_RDT 23B TO LCV 1105B                                      Blanket insul;ation 95        MS-3B25        IP2-06-30688          90-DEG ELBOW          Located approximately 6' South and              Y                                              Y        N                  SK-50A 38' West of F/14, El. 36'.                                                                                                                          Calculation reinspection.
96        MS-2A33        IP2-06-30689              TEE                                                                              Blanket Insulation NCW_46B                                                        Remove blanket around valve Located approximately 2' North and              Y              MS-17 body up to condenser      Y        N                  SK-46B 97        MS-2A34        IP2-06-30692              TEE 25' East of A/17, El. 36'.                                    connection.                                                                                Calculation reinspection.
Blanket insulation and Mirror insulation on nozzle-to-tank connection.
98    MS-2B11N          IP2-06-30695            NOZZLE                                                              N              Remove insulation on nozzle and expose nozzle to tank MSD-49A-1-RHDT22B TO CV                                      weld.
99    MS-2B11P-1        IP2-06-30699          STRAIGHT PIPE          Located approximately 8' South and                            Blanket Insulation.                                                                    CHECWORKS PICK Snapshot Y        N                      49A        6 13' West of F/16, El. 53' 98 and 99                            Remove blanket from 53'                                                                assessment recommendation.
adjacent to valve MS-890                  Y              through floor penetration to Work scaffold with    elbow and downstream pipe.
exam points MS-2B12      Work with exam points MS-100        MS-2B11        IP2-06-30701            ELBOW (85) and MS-2B12P      2B12 (85) and MS-2B12P (86).
(86).
MSR DRAINS 27_MS 21A DRAIN TO MSDT 21A                      Y          N Located adjacent to Northwest        Access to elbow and 1'                                            Y silver 101        1A-20        IP2-06-30705          45-DEG ELBOW          Drains Collection Tank access            upstream and                                          Y                            SK-33B        6 (Lead platform; El. 15'                      downstream to next                                              ?)
elbow.                                                                                                Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls                                                                                                                11 of 18                                                                                                        2R18 FAC Scope (Ipe0067424).Xls
 
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER                S                                                                    N                                                                                                        SC R            T                D                EN                N                                    LD          AT                                  EP              G                          ZE                    KS A
SC FF AF OL BE        IN                R                      T          AT                                    FO              IO                            PR        T        IN          ET                                                F D IN OL UP PO                O                  N                IO                                              SU                                          IN    AW                CH        SI                    AR            SU DLA DN M                            K                  PO              C                                    AF                L                          PE        PA                                PE                        M          IN O TIO                e NU        AM                R                  M              LO                                    SC            IN                                                DR            SK          PI                    RE              SU F N LA F O                                                                                                                          PI                                                                                Co      TI O EX              W                  CO                                                                                                                                                                                            m pl      N ON Mud insulation around tee, possible asbestos; mirror insulation on tee run and MSD28-5-MS22A TO MSDT 22A                            blanket on tee branch.
Under MSR 22A Located                                Remove mud on tee 3 feet of 102        2A-18        IP2-06-30707            TEE                                                    Y                                            Y        N                      SK-28      12 approximately 8' South and 12' East                  mirror both sides of tee run of A/17, El. 53'                                    and blanket between tee and downstream elbow.
Checworks analysis 2R18 FAC Scope (Ipe0067424).Xls                                                                                                  12 of 18                                                                                                  2R18 FAC Scope (Ipe0067424).Xls
 
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER                    S                                                                    N                                                                                                            SC R              T                D                    EN                N                                    LD            AT                              EP              G                            ZE                      KS A
SC FF AF OL BE          IN                R                          T          AT                                    FO              IO                        PR        T        IN          ET                                                          F D IN OL UP PO                O                      N                IO                                              SU                                      IN    AW                CH            SI                    AR                SU DLA DN M                              K                      PO              C                                    AF                L                      PE        PA                                      PE                    M                IN O TIO                e NU        AM                  R                      M              LO                                    SC            IN                                              DR              SK          PI                    RE                    SU F N LA F O                                                                                                                            PI                                                                                        Co      TI O EX              W                      CO                                                                                                                                                                                                  m pl      N ON MAIN STEAM Y                                                                                    Calculation reinspection from Main Steam flow Venturi from 24 9321-F-2540                              2R17; IP-CALC-06-00178.
103                        IP2-06-22106                                  SG.                                  Y                                          Y        N                                  28" 9321-F-2542                              Inspect pipe downstream of FE-VC El. 107' FE-449                                STRAIGHT PIPE                                                                                                                                                    449.
NCW_210                                              N                                    Y silver                                            Calculation reinspection.
104        210-3P-2        IP2-06-30709          STRAIGHT PIPE          Located on the South side of the      Y                                          Y                            SK-210          4        Inspect 2 pipes between valves (Lead Drains Collection Tank, El. 15'.                                                        ?)                                              MS-96 and MS-97 Y
22 S/G Main Steam Flow Venturi                                                                                                            Per OE 15860 from Calvert Cliffs.
9321-F-2541 105                        IP2-06-30720                                  Needs pipe whip restraint removal    Y                                          Y        N                                  28"        Piping wall erosion found around VC El. 107'                                                                                                                              the drain slots at the DNSM end FE-429-DS                              Straight Pipe                                                                                                                                                        of the Main Steam Flow Venturi.
Y 23 S/G Main Steam Flow Venturi                                                                                                            Per OE 15860 from Calvert Cliffs.
9321-F-2541 106                        IP2-06-30721                                  Needs pipe whip restraint removal    Y                                          Y        N                                  28"        Piping wall erosion found around VC El. 107'                                                                                                                              the drain slots at the DNSM end FE-439-DS                              Straight Pipe                                                                                                                                                        of the Main Steam Flow Venturi.
Gland Seal Steam Supply                              Blanket insulation.
107                        IP2-06-30722                                  Located approximately 6' South and    N                                          Y        N                      263        3" X 6" 263-13R                                Expander                    21' West of F/19, El. 36'.                                                                                                                Calculation reinspection Blanket insulation                                                                  OE Wolf Creek. And Darlington Review of WRT's for MST's.
Located 7' North F16; blanket                                                            Y 108                        IP2-06-30723                                                                        N                                          Y          9321-F-2042                                OE IP2-04-25162 leaking strainer insulation                                                                            silver threads. Could be more MST-51                                Pipe, Elbow, Tee                                                                                                                                                      extensive in dnsm piping.
Located on El. 15' in Aux Feed                                    All mirror insulation 109                        IP2-06-30724 Main Steam Trap 64 Building, adjacent to 22 Auxiliary                  N                                          Y        N    9321-F-2041                  1", 1/2" OE Wolf Creek. And Darlington MST-64                            Class 1 piping    Feedwater Pump.                                                                                                                                      Review of WRT's for MST's.
110                        IP2-06-30725 206-16E                                                                                                                                                                                                      "Plant Problems Affecting Downstream of                                                                                                                                                      Thermal Efficiency" report; leaking valve PCV- Located approximately 5' N and 15'                                                                                                                Operational Focus Meeting.
Y                              Y          Y        Y                      206          8" 1121. Main steam W fROM F17, Under El. 36' grating                                                                                                                    Leak report, large leakers to dump to condenser.                                                                                                                                                  main condenser. WRT IP2  111                        IP2-06-30726 19922.
206-16P NCW_153 Main Steam                                  Blanket insulation.
Located in Aux Feedwater Building,                  Remove blanket from pipe 112    MS23-1 DS          IP2-06-30727          STRAIGHT PIPE          El. 65'                              Y              support to VC penetration. Y        N                  SK-153          28" Located adjacent to valve MS-42, S/G 23 to ABFP 22 root stop.                                                                                                              Calculation reinspection NCW_214                                              Mirror insulation 113        214-26E        IP2-06-30729          90-DEG ELBOW            Located at base of column A/16, El. N                                          Y        N                  SK-214 53'.                                                                                                                                      Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls                                                                                                        13 of 18                                                                                                        2R18 FAC Scope (Ipe0067424).Xls
 
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER                    S                                                                              N                                                                                                        SC R            T                D                    EN                N                                            LD            AT                                EP              G                      ZE                      KS A
SC FF AF OL BE        IN                R                          T          AT                                              FO              IO                          PR        T        IN        ET                                                      F D IN OL UP PO                O                    N                  IO                                                        SU                                        IN    AW              CH        SI                      AR                SU DLA DN M                            K                      PO                C                                            AF                L                        PE        PA                            PE                        M                IN O TIO                e NU        AM                R                    M                LO                                              SC            IN                                                DR        SK        PI                      RE                  SU F N LA F O                                                                                                                                      PI                                                                                  Co      TI O EX              W                      CO                                                                                                                                                                                                      m pl      N ON NCW_254                                                      Blanket insulation 114        254-15E        IP2-06-30730          90-DEG ELBOW            Top of HP Turbine downstream of                Y                                            Y        N                  SK-254 valve MS-1206. El. 53'                                                                                                                        Calculation reinspection NCW_259                                                      Blanket insulation.
Located on North end of HP 115        259-9E        IP2-06-30731          90-DEG ELBOW                                                          N                                            Y        N                  SK-259 Turbine, behind Governor Panel El.
53'                                                                                                                                            Calculation reinspection All blanket insulation NCW_267 116        267-6T        IP2-06-30732              TEE                Located approximately12' West and              Y                                            Y        N                  SK-267 5' South of East Mezz. Stairs, El. 60' Calculation reinspection NCW_267                                                      All blanket insulation.
117        267-33P        IP2-06-30733          STRAIGHT PIPE          Located approximately 13' South                N                                            Y        N                  SK-267 and 5' West of F/18, El. 36'                                                                                                                  Calculation reinspection Blanket insulation.
NCW_259                                                      Remove insulation around 259-15E                                                        Top of HP Turbine downstream of                              elbow and include insulation                                                    OE from Unit 3. Wear found in 118      SEE            IP2-06-30781          90-DEG ELBOW            valve MS-1208.                                y              around valve and downstream    Y        N                  SK-259              these components.
REMARKS                                                          Located approximately 10' South                              pipe, exposing elbow welds.                                                      Originally mislabeled as MS-863-and 40' West of F/20, El. 53'.                                                                                                                DS. Need to change WO's and substitute 259-15E NCW_254                                                      Blanket insulation.                                                              OE from Unit 3. Wear found in 254-3E                                                          Top of HP Turbine downstream of                              Remove insulation around                                                        these components.
119      SEE              IP2-06-30782          90-DEG ELBOW            valve MS-1207.                                y              elbow and include insulation  Y        N                  SK-254              Originally mislabeled as MS-866-REMARKS                                                          Located approximately 30' East of                            around valve and downstream                                                      DS. Need to change WO's and A/19, El. 53'.                                                pipe, exposing elbow welds.                                                      substitute 254-3E.
FEEDWATER HEATER SHELLS Inspection of shell                                                                      Mirror Insulation 120                      IP2-06-30784      around extraction          Feedwater Heater 25B shell, El. 36            y                                            Y        N                                        Similar to inspection for FWH 25A FWH 25B                              steam inlets.                                                                                                                                                              and C performed in 2000 Inspection of worn                                                                        Mirror Insulation 121                      IP2-06-30785      areas identified in        Feedwater Heater 24A shell, El. 36            y                                            Y        N FWH24A                                2R16                                                                                                                                                                      Calculation reinspection Inspection of worn                                                                        Mirror Insulation 122                      IP2-06-30786      areas identified in        Feedwater Heater 24B shell, El. 36            y                                            Y        N FWH24B                                2R16                                                                                                                                                                      Calculation reinspection Inspection of worn                                                                        Mirror Insulation 123                      IP2-06-30787      areas identified in        Feedwater Heater 24C shell, El. 36            y                                            Y        N FWH24C                                2R16                                                                                                                                                                      Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls                                                                                                                14 of 18                                                                                                    2R18 FAC Scope (Ipe0067424).Xls
 
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER                  S                                                                              N                                                                                                          SC R            T                D                    EN                N                                          LD              AT                                EP              G                          ZE                    KS A
SC FF AF OL BE        IN                  R                        T          AT                                          FO                IO                          PR        T        IN          ET                                                      F D IN OL UP PO                O                    N                    IO                                                      SU                                          IN    AW                CH          SI                    AR                SU DLA DN M                              K                    PO                C                                          AF                  L                          PE        PA                                PE                      M              IN O TIO                e NU        AM                R                    M                LO                                          SC              IN                                                DR              SK        PI                    RE                  SU F N LA F O                                                                                                                                    PI                                                                                    Co      TI O EX              W                      CO                                                                                                                                                                                                        m pl      N ON STEAM JET AIR EJECTORS Blanket insulation. Remove TB 36', located approximately 4'                              from tee and minimum of 1' IP2-06-30789 Tee downstream of                                                            N                                              Y        N                      252        3 PCV-1222 steam                  South and 3' West of B/13, El. 36'.                            from both ends of run and                                                                System engineer 124        252-1T                      supply to SJAE                                                                                            branch                                                                      recommendation, & OE 125        252-5E        IP2-06-30790                                                                                              Possible asbestos.(Mud).        Y Main steam supply to TB 36', located approximately 4'                        Y Remove insulation on elbows N                      252        3        System Engineer IP2-06-30791  SJAE's, Elbows    South and 3' West of B/13, El. 36'.                                      and 1' upstream and 2'        Y                                                    recommendation; elbows DNSM 126        252-7E                      DNSM of PCV-1222                                                                                  downstream                                                                      of FE; back-to-back config.
BOILER FEED PUMP TURBINE Feed Pump Turbine                                                                    N IP2-06-30792                          TB 5' Located under Boiler Feed                                                                    Y 127        215-1P                              #21 drain to BFPT                                                    Y                                                        N                      215                  From Altran small bore review Pump Turbine.
128        215-2E        IP2-06-30793            drip tank.                                                                                                      Y                                                      and calculation reinspection.
HIGH PRESSURE TURBINE DRAINS Y                                                                                      OE19798 Failure at bi-metallic Piping UPSM and                                                                                                                                                                    weld at VC Summer. OE Unit 3; 129                      IP2-06-30794                    33' Mezz. TB                                            Y                                              Y        N                      272 DNSM of orifice                                                                                                                                                                    thinned pipe in this location 272-3P                      block                                                                                                                                                                              replaced.
First tee UPSM of                                                                          Y FCV-1155, including                                                                                                                                                                FCV-1155 leaking; no previous 130                      IP2-06-30795                    33' Mezz. TB                                            N                                              Y        N                      236 236-FCV1155                      adjacent elbow and                                                                                                                                                                inspections. OE Unit 3, wear T US                        pipe.                                                                                                                                                                              found in similar components.
ADDED SCOPE Feedwater Heater                                                                      Y                                                                                      Leak under FWH 25C 131                      IP2-06-31989      25C extraction steam        TB 36'-9                                    Y                                              Y        N                        7        18        reinforcement pad CR-IP2-2006-5EX-10N                          inlet nozzle.                                                                                                                                                                06057 Feedwater Heater                                                                      Y                                                                                      Leak under FWH 25C 132                      IP2-06-31994      25B extraction steam        TB 36'-9                                    Y                                              Y        N                        7        18        reinforcement pad CR-IP2-2006-5EX-7N                          inlet nozzle.                                                                                                                                                                06057 Feedwater Heater                                                                      Y                                                                                      Leak under FWH 25C 133                      IP2-06-31996      25A extraction steam        TB 36'-9                                    Y                                              Y        N                        7        18        reinforcement pad CR-IP2-2006-5EX-1N                          inlet nozzle.                                                                                                                                                                06057 Feedwater Heater                                                                      Y                                                                                      Leak under FWH 25C 134                      IP2-06-31998      23A extraction steam        TB 36'-9                                    Y                                              Y        N                        1        18        reinforcement pad CR-IP2-2006-3EXA-1N                          inlet nozzle.                                                                                                                                                                06057 CONTINGENCY WORK ORDERS SUPPORT WORK ORDERS relocation of pipe IP2-06-30969 whip restraints to FE-429-DS                        support FAC exam relocation of pipe IP2-06-30970 whip restraints to FE-439-DS                        support FAC exam 2R18 FAC Scope (Ipe0067424).Xls                                                                                                                15 of 18                                                                                                      2R18 FAC Scope (Ipe0067424).Xls
 
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER              S                                                  N                                                                  SC R            T              D              EN            N                      LD        AT              EP                G                ZE        KS A
SC FF AF OL BE        IN              R                    T        AT                        FO          IO            PR        T        IN    ET                                  F D IN OL UP PO              O              N                IO                            SU                        IN      AW          CH        SI        AR          SU DLA DN M                        K                PO          C                        AF            L          PE        PA                        PE        M          IN O TIO                e NU        AM              R            M              LO                        SC        IN                                DR        SK      PI        RE            SU F N LA F O                                                                                      PI                                                          Co      TI O EX            W                CO                                                                                                                                  m          N pp g                                                                                                                                pl        ON thermal insulation LP Gland      IP2-06-30971 removal/replacement Piping Erosion              by Boilermakers to FAC Exams                  thermal insulation inside 21      IP2-06-30977 removal/replacement condenser                  by Boilermalers to FAC Exams                  Open 21 condenser inside 21      IP2-06-30978 for FAC exams inside condenser                  condenser.
2R18 FAC Scope (Ipe0067424).Xls                                                                        16 of 18                                                            2R18 FAC Scope (Ipe0067424).Xls
 
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER              S                                                                    N                                                                                              SC R            T                D              EN                N                                  LD            AT                  EP              G                              ZE                  KS A
SC FF AF OL BE            IN              R                    T          AT                                    FO              IO            PR        T        IN          ET                                                        F D IN OL UP PO                O              N                    IO                                            SU                          IN    AW                CH            SI                    AR              SU DLA DN M                            K                PO                C                                  AF                L          PE        PA                                      PE                    M              IN O TIO                e NU            AM              R              M                LO                                    SC            IN                                DR              SK          PI                    RE                  SU F N LA F O                                                                                                        PI                                                                                      Co      TI O EX              W                CO                                                                                                                                                                                  m pl      N ON REPAIR/REPLACEMENT WORK ORDERS Repair/Replace                                                                  N extraction lines from the LP Turbine to the IP2-06-21854                      Inside 23 condenser.                      Y                                      N                                    22" 22A Feedwater                                                                                                                                            Based on 2R17 FAC exam this LPFW22A-                      Heater inside the 23                                                                                                                                    piping is worn and requires 1N, -2N                      Condenser.
p      p                                                                                                                                            repair/replacemrnt during 2R18 extraction lines from                                                          N                                                                        Based on 2R17 FAC exam this LPFW22B-        IP2-06-21860 the LP Turbine to the Inside 22 condenser.                      Y                                      N                                    22"        piping is worn and requires 1N, -2N                      22B Feedwater                                                                                                                                            repair/replacemrnt during 2R18.
Y IP2-06-30979 Replace small bore          Turnine building 15'                N                                      N    9321-F-2131                      1" MST-43                      piping Y
IP2-06-30980 Replace small bore          Turbine Building 15'                N                                      N    9321-F-2151                    1" 3/4" EST-2                      piping Y
IP2-06-30982 Replace small bore          Turnbine Building 15'                N                                      N    9321-F-2151                    1" 3/4" EST-5                      piping Y
IP2-06-30983 Extraction Steam            Turbine Building 15'                Y                                      N                      SK-2    20" X 28" 3EXB-10R                      Reducer Y
IP2-06-31991 Repair of FWH 25C          TB 36'-9                            Y                                      N                        7            18 5EX-10N                    inlet nozzle                                                                                                                                            Repair based on source of leak Y
IP2-06-31995 Repair of FWH 25B          TB 36'-9                            Y                                      N                        7            18        Repair based on source of 25C 5EX-7N                      inlet nozzle                                                                                                                                            FWH leak Repair of FWH 25A                                                              Y                                                                        Repair based on source of 25C IP2-06-31997                            TB 36'-9                            Y                                      N                        7            18 5EX-1N                      inlet nozzle                                                                                                                                            FWH leak LEGEND PRE-OUTAGE Insulation likely to A
contain asbestos 2R18 FAC Scope (Ipe0067424).Xls                                                                                              17 of 18                                                                                          2R18 FAC Scope (Ipe0067424).Xls
 
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER              S                                                  N                                                                  SC R            T                D              EN            N                      LD        AT              EP                G                ZE        KS A
SC FF AF OL BE        IN                R                    T        AT                        FO          IO            PR        T        IN    ET                                  F D IN OL UP PO                O              N                IO                            SU                        IN      AW          CH        SI        AR          SU DLA DN M                            K                PO          C                        AF            L          PE        PA                        PE        M          IN O TIO                e NU        AM                R              M              LO                        SC        IN                                DR        SK      PI        RE            SU F N LA F O                                                                                      PI                                                          Co      TI O EX              W                CO                                                                                                                                  m pl      N ON Insulation is a welded stainless TS steel Thermal Shield 2R18 FAC Scope (Ipe0067424).Xls                                                                            18 of 18                                                            2R18 FAC Scope (Ipe0067424).Xls
 
1                                                              FLOW ACCELERATED CORROSION PRE-OUTAGE INSPECTION POINTS 2R18P ER IP2-06-26282 RD          TI                                                                      S BE                        INT                                          ER          ON SC AF          DR        SK                AR R                                                                                                      N                    AW              SI NU                          PO                                      O        DE                    LO        IN    FO LD                ET      ZE      K RK            SC                    CA        S U              IN        CH          RE M                    EX                                                                                            LATI          G      PI            M AM                                      W                  RI                    TI    PA        O                  PE O                  P                    O      INT    N Following locations walked down and found to be unsuitable for pre-outage exams due to high    Following exams possible to temperature or location.                        examine pre-outage 220-7P                                        4EXD-75 249-19R CD-115 CD-116 5EXC-14 5EXC-21 5EXC-121P-1 US 205-22P US 204-24P US 4EXD-61 4EXD-60 239-11E 206-16E 1 of 1                                                                2R18P
 
1                                            FLOW ACCELERATED CORROSION PRE-OUTAGE INSPECTION POINTS 2R18P ER IP2-06-26282 PO              Re                          RI                                            AF                G                                          KS R                            as                          PT                                              FO        AW          ET MBE              IN                  o De n f                          IO                    LO                        LD                    C    SI                    M T              le or                          N                      C              SU                IN            H    ZE                    AR NU          AM                        tio                  SC                              AT                LA TI    DR          SK                            RE n                                                  IO        PA        O                      PI EX                                            DE                                    N      SC  IN INT    N                      PE EXTRACTION Moisture separator separating tank A vent to header upstream of FWH 25a,b,and c connection                                                      7&
SS CR_mo        to header                      5EX-18 Fabricated cross.                            7A CONDENSATE HEATER DRAINS Valve LCV-1104B found open and piping had excessive vibration. CR-IP2-2006-03261 IP2-06-22870 to close valve. Reducer inspected in 1987 &
ss REHEATER      Check DNSM pipe to see if      R13. Inspect reducer DNSM of                                            Leaking valve in plant. Also OE MS-3A24R                DRAINS          damaged.                      valve and DNSM tee                                                      from Hope Creek; OE19325 Valve LCV-1104B found open and piping had excessive vibration. CR-IP2-2006-03261 47 IP2-06-22870 to close valve. Reducer inspected in 1987 &
Check DNSM pipe to see if      R13. Inspect reducer DNSM of                                            Leaking valve in plant. Also OE MS-3A23P                ss              damaged.                      valve and DNSM tee                                                      from Hope Creek; OE19325 1 of 3                                                                                Deletions
 
2                                        FLOW ACCELERATED CORROSION PRE-OUTAGE INSPECTION POINTS 2R18P ER IP2-06-26282 PO            Re                          RI                                              AF                G                                      KS R                          as                          PT                                                FO        AW      ET MBE              IN              o De n f                          IO                    LO                          LD                  C    SI                    M T          le or                          N                      C                SU                IN        H    ZE                    AR NU          AM                    tio                  SC                              AT                  LA TI      DR      SK                            RE n                                                  IO          PA        O                  PI EX                                        DE                                    N        SC  IN INT    N                    PE Valve LCV-1104B found open and piping had excessive vibration. CR-IP2-2006-03261 IP2-06-22870 to close valve.
Check DNSM pipe to see if                                                                              Leaking valve in plant. Also OE MS-3A24                  ss            damaged.                                                                                              from Hope Creek; OE19325 REHEATER DRAINS Through wall leak on Unit 3 (CR-Located over HDT visible from                                      IP3-32006-02270) on Unit 2 South side of HDT approx 20' N                                      similar location:branch extension MS-1A41                  ss            Reheater Drain tee from RHDT's column 18 25' East of CC                    45C            10x10x6 MS-1A63P.
Through wall leak on Unit 3 (CR-IP3-32006-02270) on Unit 2 MS-1A63P                ss                                                                                        45C            6' pipe similar location:tee MS-1A41 2 of 3                                                                                Deletions
 
3                                  FLOW ACCELERATED CORROSION PRE-OUTAGE INSPECTION POINTS 2R18P ER IP2-06-26282 PO      Re                    RI                                    AF                G                        KS R                  as                    PT                                      FO        AW      ET MBE            IN          o De n f                  IO              LO                      LD                C    SI      M T      le or                    N                C            SU                IN        H    ZE    AR NU        AM                tio          SC                          AT                LA TI    DR      SK              RE n                                      IO        PA        O                  PI EX                            DE                              N      SC  IN INT    N                  PE STEAM JET AIR EJECTORS 3 of 3                                                            Deletions}}

Latest revision as of 06:09, 12 November 2019

Entergy Pre-Filed Evidentiary Hearing Exhibit ENT000058 - Flow Accelerated Corrosion Inspection Points for 2R18, Er IP2-06-26282
ML12088A425
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/28/2012
From:
Entergy Nuclear Operations
To:
Atomic Safety and Licensing Board Panel
SECY RAS
Shared Package
ML12088A422] List: The part "]" of the query was not understood.</br>Results might not be as expected.
References
RAS 22102, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01
Download: ML12088A425 (22)


Text

ENT000058 Submitted: March 28, 2012 FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER S N SC R T D EN N LD AT EP G ZE KS A

SC FF AF OL BE IN R T AT FO IO PR T IN ET F D IN OL UP PO O N IO SU IN AW CH SI AR SU DLA DN M K PO C AF L PE PA PE M IN O TIO e NU AM R M LO SC IN DR SK PI RE SU F N LA F O PI Co TI O EX W CO m pl N ON EXTRACTION All blanket insulation. Remove 02_3RD POINT ES TO FWH 23B one blanket upstream and 1 IP2-06-30300, 9321-2068 1 3EXB-6 90-DEG ELBOW Y blanket downstream of elbow. Y N SK-02 28 IAS, 51317542 Located approximately 2' North and & 9321-2069 6' West of column B/16,El. 32'.

Calculation reinspection.

03_3RD POINT ES TO FWH 23C All blanket insulation. Remove IP2-06-30303, 5' of insulation from upstream 2 3EXC-2P STRAIGHT PIPE Y Y N SK-03 20 IAS, 51317545 Located approximately 9' North and elbow weld.

3' East of B/12El. 30'. Calculation reinspection.

Blanket and Cal Sil insulation.

03_3RD POINT ES TO FWH 23C Remove blanket upstream and IP2-06-30304, 3 3EXC-5 90-DEG ELBOW Y 60" of cal sil insulation Y N SK-03 28 IAS, 51317546 Located 4' North and 3' East of downstream. Possible B/14, El. 25'.

asbestos. Calculation reinspection.

03_3RD POINT ES TO FWH 23C All blanket insulation. Remove IP2-06-30305 insulation on entire pipe (~ 7' 4 3EXC-7P STRAIGHT PIPE Y Y N SK-03 28 IAS, 51317547 Located approximately 10' North long) exposing elbow welds on and 3' West of A/14, El. 32'. each end. Calculation reinspection.

Only 10' is blanket, remainder downstream is cal sil. Remove 04_4TH POINT ES TO FWH 24A insulation so upstream elbow weld is accessible.Exam is 5 4EXA-3P US IP2-06-30307 STRAIGHT PIPE Y Y N SK-04 20 Located approximately 13' South of UPSM pipe, check extent of 17/CC3 El. 28'. previous exam if cal sil needs to be removed.

Calculation reinspection.

05_4TH POINT ES TO FWH 24B All blanket insulation. Remove from connection at condenser 6 4EXB-12 45-DEG ELBOW Y Y N SK-05 20 Located approximately 12' South to valve 4EX-3.

and 26' East of A/17, el. 36'. Calculation reinspection.

05_4TH POINT ES TO FWH 24B All blanket insulation. Remove on pipe and uncover welds on 7 4EXB-8P STRAIGHT PIPE Y Y N SK-05 20

. Located approximately 13' South both elbows and CL of A/17, El. 25' Calculation reinspection.

All blanket insulation. Remove 06_4TH POINT ES TO FWH 24C blanket on pipe and uncover welds at valves.

8 4EXC-14P IP2-06-30315 STRAIGHT PIPE Pipe located between valves 4EX-5 N Y N SK-06 20 and 4EX-6 Located approximately 20' East of A/15, El. 36'.

Calculation reinspection.

NCW_220 All blanket insulation. Remove blanket off valve FCV-1206 9 220-7P IP2-06-30316 STRAIGHT PIPE Located approximately 8' West and N body, downstream pipe and all Y N SK-220 12 CL F/15, El. 36'. blanket on elbow.

Calculation reinspection.

2R18 FAC Scope (Ipe0067424).Xls 1 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER S N SC R T D EN N LD AT EP G ZE KS A

SC FF AF OL BE IN R T AT FO IO PR T IN ET F D IN OL UP PO O N IO SU IN AW CH SI AR SU DLA DN M K PO C AF L PE PA PE M IN O TIO e NU AM R M LO SC IN DR SK PI RE SU F N LA F O PI Co TI O EX W CO m pl N ON NCW_249 All blanket insulation. Remove blanket from valve MS-LC-10 249-19R IP2-06-30318 CON. EXPANDER Located on elevated platform West N 2505 through valve MPS-779 Y N SK-249 6 X 10 of a A/19 and North of the HDT, El.

15'. Calculation reinspection.

2R18 FAC Scope (Ipe0067424).Xls 2 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER S N SC R T D EN N LD AT EP G ZE KS A

SC FF AF OL BE IN R T AT FO IO PR T IN ET F D IN OL UP PO O N IO SU IN AW CH SI AR SU DLA DN M K PO C AF L PE PA PE M IN O TIO e NU AM R M LO SC IN DR SK PI RE SU F N LA F O PI Co TI O EX W CO m pl N ON Thermal Shields over these Low Checworks hours. No components. Removal and inspections of components on any reinstallation of the thermal 23 FWH extraction line in 3EXC-22N shields will be required.

11 IP2-06-30319 NOZZLE condenser. Also recommended in See Remarks snapshot assessment.

Contiguous points from 23C FWH 03_3RD POINT ES TO FWH 23C to extraction header. C Train 12 3EXC-22 IP2-06-30519 MITERED ELBOW Y Y N SK-3 28" selected as 22A and 22B 13 3EXC-21 IP2-06-30522 MITERED ELBOW Located in condenser 21. extraction lines to be replaced 14 3EXC-21P IP2-06-30524 MITERED PIPE during 2R18. Note that support 15 3EXC-20 IP2-06-30525 MITERED ELBOW work orders are tied to nozzle 16 3EXC-20P IP2-06-30526 MITERED PIPE inspection (IP2-06-30319) work 17 3EXC-19 IP2-06-30527 MITERED ELBOW order. If this work order is de-18 3EXC-19P IP2-06-30528 MITERED PIPE scoped, support WO's must be 19 3EXC-14 IP2-06-30529 TEE tied to another inspection.

Mud insulation. Replace with Leaking, patched areas Extraction Steam Trap blanket after exam. 3/4" downstream of this trap; see IP2-20 IP2-06-30808 N Y N 9321-F-2031 PIPE, ELBOWS AND Located at column BB14 El. 15' TB 1/2" 06-00419; CR-IP2-2006-03186.

EST-21 TEES OE from Wolf Creek Blanket insulation over System Engineer manway. recommendation.OE from Unit 3 Located in 36' El. East side TB, CR-IP3-2005-02334 ER-IP3 INTERNAL Southeast riser, near stairs to 18223; WO IP3-05-18223 INSPECTION OF mezzanine Similar location to Unit 3 crack in 21 Crossunder IP2-06-30809 Y N N A235308 32" CROSSUNDER Manhole on vertical, above elbow. weld.

RISER AND TEE. Manway opposite valve MS-24-1 Inspect internal cladding in riser pressure test valve. and tee. Perform UT measurements if thinniing is found.

Representative pipe section of LP Gland piping inside condenser.

Y Possible to work with slop drain PIPE AND ELBOWS Coordinate scaffolding pipng replacement job as these LP Gland 22 IP2-06-30811 Uninsulated lines Inside Condenser 21 with extraction line N Y N 237145 6" lines are adjacent to the slop Piping Erosion only (return lines) exam in condenser 21, drains. Siemens Westinghouse IP3-06-30319. Service Bulletin 53009 ST.

System Engineer recommendation.

2R18 FAC Scope (Ipe0067424).Xls 3 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER S N SC R T D EN N LD AT EP G ZE KS A

SC FF AF OL BE IN R T AT FO IO PR T IN ET F D IN OL UP PO O N IO SU IN AW CH SI AR SU DLA DN M K PO C AF L PE PA PE M IN O TIO e NU AM R M LO SC IN DR SK PI RE SU F N LA F O PI Co TI O EX W CO m pl N ON FEEDWATER Asbestos Insulation.

Two (2) feet upstream of valve No evidence of any inspections FW BFD 64 FT-418A Root DNSM of these venturi. OE from PIPE 75/76_HEADER TO CON PEN E,F Stop Stm Gen 21 Isolation, Mihama to inspect DNSM of flow 23 IP2-06-30530 DOWNSTREAM OF N and downstream of venturi Y N SK-75 18" monitoring devices. Also OE BFD-69P DS instrument root valve BFD FLOW ELEMENT Unit 2 Aux Feed Building 33' El. from June 2006 CHUG Meeting 1 S/G 21 FT-418A low side Catawba Unit 2 experiencing o

root stop to downstream 45 wear in this location.

elbow.

All blanket insulation. Tee where 6" FW reg valve bypass line enters 18" main. 24 77/78_HEADER TO CON PEN G,H OE Catawaba 2. ODMI CR-IP2-Steam Generator. Two (2) 2005-03847 Bypass valve FCV-24 BFD-82T IP2-06-30531 TEE Y feet upstream on diameter Y N SK-77 6" X 18" Unit 2 Aux Feed Building 15' El. S/G 447L full open. Inspect Tee branch, and three (3) feet 24 feedwater train where bypass joins main upstream and downstream on 18" diameter main.

Blanket Insulation.

75/76_HEADER TO CON PEN E,F From valve to downstream elbow.

25 BFD-77R IP2-06-30532 CON. EXPANDER Unit 2 Aux Feed Building 15' El. N Y N SK-76 12" x 18" Calculation reinspection Immediately downstream of FCV-427 Blanket Insulation.

77/78_HEADER TO CON PEN G,H From valve to downstream elbow.

26 BFD-3R IP2-06-30533 CON. EXPANDER Unit 2 Aux Feed Building 15' El. N Y N SK-78 12" x 18" Calculation reinspection Immediately downstream of FCV-437 93_CON PEN "E" TO STM GEN Mirror insulation.

27 BFD-99 IP2-06-30535 90-DEG ELBOW Y Two (2) feet upstream and Y N SK-93 18" Calculation reinspection VC 104' El. three (3) feet downstream.

94_CON PEN "H" TO STM GEN Mirror insulation.

28 BFD-101 IP2-06-30538 90-DEG ELBOW Y Two (2) feet upstream and Y N SK-94 18" Calculation reinspection VC 59' El. three (3) feet downstream.

95_CON PEN "G" TO STM GEN Mirror insulation.

29 BFD-106 IP2-06-30540 90-DEG ELBOW Y Two (2) feet upstream and Y N SK-95 18" VC 104' El. three (3) feet downstream. Calculation reinspection Blanket Insulation. Remove 75/76_HEADER TO CON PEN E,F 30 BFD-79 IP2-06-30542 90-DEG ELBOW Y blanket from Valve BFD-7-3 to Y N SK-77 18" Unit 2 Aux Feed Building 43' El.

penetration Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls 4 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER S N SC R T D EN N LD AT EP G ZE KS A

SC FF AF OL BE IN R T AT FO IO PR T IN ET F D IN OL UP PO O N IO SU IN AW CH SI AR SU DLA DN M K PO C AF L PE PA PE M IN O TIO e NU AM R M LO SC IN DR SK PI RE SU F N LA F O PI Co TI O EX W CO m pl N ON Blanket insulation. Remove NCW_9321-F-2120 DS of Valve blanket around valve and 2X 31 IP2-06-30812 CON. EXPANDER Located West of control panel in Y Y N 9321-F-2120 AF138 downstream blanket. 2 1/2 HSB Building, El. 53'.

Calculation reinspection Possible Asbestos insulation CHECWORKS analysis and 32 BFD 29 IP2-06-30544 90-DEG ELBOW on BFD-29, followed by mirror snapshhot assessment 73_ BLR FEED PUMPS insulation, then blanket on DISCHARGE HDR TO HP HTRS BFD-29P. Remove 4' Y upstream of BFD-29 to Y N SK-73 30" 26A,B,C 33 BFD-29P IP2-06-30545 STRAIGHT PIPE upstream weld on BFD-32.

Located at A/20 El. 15'.

34 BFD-42N IP2-06-30546 NOZZLE Possible asbestos insulation. CHECWORKS analysis.

73_ BLR FEED PUMPS Remove insulation around inlet DISCHARGE HDR TO HP HTRS nozzle and shell to expose Y Y SK-73 18" 35 BFD-42 IP2-06-30547 45-DEG ELBOW 26A,B,C shell to nozzle weld, upstream Located at A/20 El. 15' and 36'. elbow and straight pipe.

36 BFD-47N IP2-06-30548 NOZZLE Mirror insulation. Remove CHECWORKS analysis 37 BFD-47 IP2-06-30549 90-DEG ELBOW FW74-4-FWH26C TO DISHDR insulation around outlet nozzle 38 BFD-47P IP2-06-30553 STRAIGHT PIPE Located at feedwater outlet from and shell to expose shell to 39 BFD-48 IP2-06-30554 90-DEG ELBOW Y nozzle weld., downstream Y SK-74 18" FW Heater 26C, approximately 13' South and 15' West of A/20, El. 36' piping to valve BFD-4-2; insure 40 BFD-48P IP2-06-30555 STRAIGHT PIPE valve to pipe weld exposed.

Possible asbestos insulation. CHECWORKS analysis FW74-5-FWH26 TO DISHDR Remove insulation around 41 BFD-61 IP2-06-30557 90-DEG ELBOW Elbow located directly over and East Y elbow and 4' upstream and 6' Y N 74 30" of condensate pumps downstream on pipe.

Possible Asbestos insulation. CHECWORKS analysis.

42 BFD-80 IP2-06-30558 90-DEG ELBOW Remove insulation around Snapshot assessment.

elbows and 2' upstream of FW77-1-DISHDR TO SG24 Y BFD-81 and 4' downstream of Y N 77 18" Located in Aux Feed Building 33' El.

43 BFD-81 IP2-06-30559 45-DEG ELBOW BFD-80.

All blanket insulation. On 30" CHECWORKS analysis 44 BFD-72T IP2-06-30560 30" X 18" TEE run, remove blankets from FW75-2-DISHDR TO SG21 FW76-2-DISHDR TO SG22 upstream elbow through 45 BFD-78T IP2-06-30561 30" X 18" TEE middle of last tee on 30" 75; 76; 30" x FW77-2-DISHDR TO SG24 Y Y N header; on 18" branches, 77 18" Located in Aux Feed Building, inlet header to FCV's. remove 4' downstream of each 46 BFD-84T IP2-06-30562 30" X 18" TEE tee.

2R18 FAC Scope (Ipe0067424).Xls 5 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER S N SC R T D EN N LD AT EP G ZE KS A

SC FF AF OL BE IN R T AT FO IO PR T IN ET F D IN OL UP PO O N IO SU IN AW CH SI AR SU DLA DN M K PO C AF L PE PA PE M IN O TIO e NU AM R M LO SC IN DR SK PI RE SU F N LA F O PI Co TI O EX W CO m pl N ON US-FCV-1115 Possible asbestos.(Mud).

4E Remove insulation on elbows Leak report, FCV-1115 leaking.

47 IP2-06-30813 Elbow Boiler Feed Pump 21 recirc line 4th and 2' upstream and 3' OE22805 FW recirc cr-mo elbow SEE and 5th elbow DNSM of BFP 21. downstream leak @ elbow extradose REMARKS Back-to-Back elbows Y Y N 9321-F-2019 6 Approximately 10' South of column Originally mislabeled as US-LCV-US-FCV-1115 A/16, El. 15'. 1115 4E. Need to change WO's 48 IP2-06-30814 Elbow 5E and substitute US-FCV-1115 4E.

2R18 FAC Scope (Ipe0067424).Xls 6 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER S N SC R T D EN N LD AT EP G ZE KS A

SC FF AF OL BE IN R T AT FO IO PR T IN ET F D IN OL UP PO O N IO SU IN AW CH SI AR SU DLA DN M K PO C AF L PE PA PE M IN O TIO e NU AM R M LO SC IN DR SK PI RE SU F N LA F O PI Co TI O EX W CO m pl N ON CONDENSATE 81_FWH 24 COND TO FWH 25 Blanket and Mirror insulation.

(15' el TB) Located approx 15' Remove all the blanket at 49 CD-30 IP2-06-30563 90-DEG ELBOW North and 9' East of 22 Seal Y elbow to downstream elbow Y N SK-81 14" Injection Booster Pmp at 29'el. Near weld and mirror insu up to Calculation reinspection column BB/17 drain vlv Mud insulation, possible asbestos. Remove insul from 50 CD-33 IP2-06-30569 90-DEG ELBOW 82/83_FWH 25 TO HEADER. 25B 25B FWH shell nozzle, FWH - above shell manway, exposing shell to nozzle weld, Y to CD-18-1. Y N SK-82 14" approximately 7' South and 18' East of CC3/18, El. 36'.

51 CD-34 IP2-06-30570 90-DEG ELBOW Calculation reinspection Blanket Insulation. Remove all 82/83_FWH 25 TO HEADER. 15' insulation from upstrm 90 deg el. TB. Located on south east side elbow to header. In addition, 52 CD-59P IP2-06-30571 STRAIGHT PIPE of HDT and 15' west of MCC23. Y remove one piece of header Y N SK-82 24" Approximately 9' South and 13' East blanket insulation where pipe of CC3/18, El. 36'. enters header.

Calculation reinspection Blanket Insulation. Remove all 83/84_HEADER TO BFP insulation from root stop vlv SUCTION. 15' TB. Located at 22 CD-55-1 to 90-deg elbow and 53 CD-75 IP2-06-30574 90-DEG ELBOW Y from 90-deg elbow upstream Y N SK-84 24" MBFP suction line First elbow prior to pmp suction nozzle. apprx 24" (two bands of blanket insulation).

Calculation reinspection Possible asbestos (mud) on Per CHECWORKS and snapshot 54 CD-62T IP2-06-30575 TEE reducer. Remove all mirror 24" assessment.

insul from Tee branch up to 82/83_FWH 25 TO HEADER. 15' upstrm elbow. Remove 3' of 55 CD-62-P1 IP2-06-30577 STRAIGHT PIPE el TB. Located south side of HDT, 24" Y mirror insul upstrm of reducer. Y N SK-82 approximately 9' South and 13' East Remove 3 blankets of insul of CC3/18, El. 15'.

downstrm of tee. 14" X 56 CD-61R IP2-06-30578 12" X 24" REDUCER 24" All blanket insulation. CHECWORKS analysis. Few 57 CD-115 IP2-06-30579 90-DEG ELBOW CD80A-3-FWH 22C TO HEADER Remove blankets from elbows inspections in this run.

Located approximately 6' South and Y and 3' upstream and Y N SK-80A 14 10' West of Column F/15, El. 36'. downstream of each elbow.

58 CD-116 IP2-06-30581 90-DEG ELBOW HEATER DRAINS Blanket Insulation. Remove 09_FWH 25 DRNS TO HTR DRN insulation from inlet side of 59 5EXD-20P DS IP2-06-30582 STRAIGHT PIPE TK. 15' TB on south west corner of N 5EX-8 to upstream of 90-deg Y N SK-9 10" HDT near Col 18, row CC3 elbow near floor Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls 7 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER S N SC R T D EN N LD AT EP G ZE KS A

SC FF AF OL BE IN R T AT FO IO PR T IN ET F D IN OL UP PO O N IO SU IN AW CH SI AR SU DLA DN M K PO C AF L PE PA PE M IN O TIO e NU AM R M LO SC IN DR SK PI RE SU F N LA F O PI Co TI O EX W CO m pl N ON Same as number 59 (above) 09_FWH 25 DRNS TO HTR DRN 60 5EXD-20P US IP2-06-30583 STRAIGHT PIPE N Y N SK-9 10" TK. Same location as number 59 Calculation reinspection Blanket Insulation. Remove 24A FWH TO FWH 23A 36' TB. blanket from heat shell to first Located on south west corner of 45-deg elbow, and insulation 61 4EXD-1P IP2-06-30585 STRAIGHT PIPE N Y N SK-21A 6" 23A FWH approximately 5' North on vessel to expose vessel-to-and 6' East of CC3/12, El. 36'. nozzle weld.

Calculation reinspection 24A FWH TO FWH 23A 36' TB. Balnket insulation. Remove Located on south west corner of insulation from LCV-1115 to 62 4EXD-6 IP2-06-30586 CON. REDUCER N 4EX-8. Y N SK-21A 4" X 3" 23A FWH approximately 3' North and 4' West of CC3/12, El. 36' Calculation reinspection Blanket Insulation. Remove all 90-DEG RED. blanket from 4EX-8-1 to where 63 4EXD-40 IP2-06-30587 22A_FWH 24B DRN TO CV. 36' 6" X 4" ELBOW. pipe penetrates floor.

TB. Located near 23B FWH at south west side of heater, N Y N SK-22A approximately 3' North and 15' East 64 4EXD-40P DS IP2-06-30588 STRAIGHT PIPE. of CC3/12, El. 36'. 6" Calculation reinspection Remove existing blanket 23A_FWH 24C DRN TO CV - 15' insulation between the two 90-TB. Located 8' west of MBFP deg elbows. Insure both pipe 65 4EXD-70P IP2-06-30589 STRAIGHT PIPE Y Y N SK-23A 6" turbine oil conditioner next to stairs welds are exposed.

going to 5' el. Pipe located at 33' el.

Calculation reinspection Blanket Insulation. Remove all 25A/B_FWH 23B DRN TO CV. 15' of the exisiting blanket 66 3EXD-34 IP2-06-30590 TEE TB. Located between 21B and 22A Y insulation. Y N SK-25B 8" Inlet Waterbox.

Calculation reinspection Blanket insulation. Remove insulation from vlv 5EX-15-2 to NCW_18. 15'el TB. Located where pipe penetrates floor.

67 5EXC-14 IP2-06-30591 90-DEG ELBOW between 22B and 23A inlet N Y N SK-18 14" DO NOT REMOVE waterboxes.

INSULATION FROM 5EX 2. Calculation reinspection 68 5EXC-21 IP2-06-30592 90-DEG ELBOW NCW_18. 5' el TB. Located above and South of 24 Sump Pump Oil Y N Y N SK-18 14" 5EXC-21P-1 Skimmer .

69 IP2-06-30593 STRAIGHT PIPE US Calculation reinspection 15' TB. Located between 21B and All Blanket insulation.

22A inlet waterboxes. Remoove blanket on pipe 70 205-22P US IP2-06-30607 STRAIGHT PIPE N Y N SK-205 8 Located approximately 12' South between valves LCV-5003 and and 15' East of A/16 El. 15'. 5EX-504, exposing all welds.

Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls 8 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER S N SC R T D EN N LD AT EP G ZE KS A

SC FF AF OL BE IN R T AT FO IO PR T IN ET F D IN OL UP PO O N IO SU IN AW CH SI AR SU DLA DN M K PO C AF L PE PA PE M IN O TIO e NU AM R M LO SC IN DR SK PI RE SU F N LA F O PI Co TI O EX W CO m pl N ON 15' TB. Located between 21B and 22A inlet water boxes 71 205-24P US IP2-06-30608 STRAIGHT PIPE Y N Y N SK-205 8 approximately 12' South and 25' East of A/16, El. 5'.

Calculation reinspection 15' TB. Located between 21 and 22 Blanket Insulation. Rmove 72 4EXD-75 IP2-06-30609 90-DEG ELBOW MBFP and above the MBFP Lube Y existing Blanket insulation. Y N SK-23B 6" Oil Conitioner Tank. Calculation reinspection HD23A-1-FWH24C TO CV Mirror insulation. Remove 73 4EXD-61 IP2-06-30610 6" X 4" RED. EL Located approximately 3' North and N insul from 4EX-8-2 to where Y N SK-23A 6" X 4" CHECWORKS analysis and 17' West of A/12, El. 36'. line penetrates floor snapshot assessment.

Blanket Insulation. Remove all CHECWORKS analysis and HD23A-1-FWH24C TO CV. 36' TB. insulation between LCV-1115 snapshot assessment.

74 4EXD-60 IP2-06-30611 4" X 3" REDUCER. Located near 23C FWH at south and 4EX-8-2. 4" X 3" west side of heater. N Y N SK-23A HD23A-1-FWH24C TO CV. Same 75 4EXD-60P IP2-06-30618 STRAIGHT PIPE. 3" as pt 74.

Blanket Insulation. Remove No inspections UPSM and DNSM 76 HD-4A DS IP2-06-30626 STRAIGHT PIPE insulation from 2' upstream of of flow element. OE Mihama.

Flow Element, downstream to HD20-2-HDP22 TO BFP SUCTION.

Header.

15' TB. Located near discharge Y Y N SK-20 12" side of 22 HDTP-Col. 15 row CC3.

77 HD-6P US IP2-06-30628 STRAIGHT PIPE Balnket Insulation. Remove Piping between restricting orifice insulation from 3EX-540 to OE Susquehanna Unit 2 and isolation valve 3EX-540. 23B restricting orifice OE Oconee Unit 3 and Beaver 78 239-11E IP2-06-30630 90 degree elbow FWH Operating vent. N Y N A235304 SK-239 2 Valley Unit 2 6/26/06 CHUG Located Northeast end of FWH Meeting FW Htr vent d/s of 23B, El. 36'. continuous flow restricting orifice.

Altran Small Bore review 2R18 FAC Scope (Ipe0067424).Xls 9 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER S N SC R T D EN N LD AT EP G ZE KS A

SC FF AF OL BE IN R T AT FO IO PR T IN ET F D IN OL UP PO O N IO SU IN AW CH SI AR SU DLA DN M K PO C AF L PE PA PE M IN O TIO e NU AM R M LO SC IN DR SK PI RE SU F N LA F O PI Co TI O EX W CO m pl N ON Reheater Drains Blanket Insulation.

Remove insulation on tee 45B_FE 1257-1 TO LCV 1104 mainand upstream to 45 elbow 79 MS-1A25 IP2-06-30635 TEE Located approximately13' South of Y and downstream to FE-1257; Y N SK-45B 6 A/18 at the condenser wall, El. 36' branch to pipe hanger.

Calculation reinspection 45C_HDR [1] TO FWH 26A,B,C Blanket Insulation.

Located approximately 5' North and Remove blankets on elbow Calculation reinspection.

80 MS-1A38 IP2-06-30638 45-DEG ELBOW Y and blankets on upstream and Y N SK-45C 10 17' West of A/18, El. 15'. Above OE23342 RHD elbow leak at HDT. downstream pipes. Davis Bessir Blanket Insulation.

45C_HDR [1] TO FWH 26A,B,C Remove insulation on pipe to MS-1A67P 81 IP2-06-30640 STRAIGHT PIPE Located approximately 11' North N tees on both ends, exposing all Y N SK-45C 6 US and 18' West of A/18, El. 33'. welds.

Calculation reinspection 82 MS-1A59 IP2-06-30667 90-DEG ELBOW 45D_HDR [1] TO FWH 26 (CONT.) Blanket Insulation.

Located approximately 10' North Remove insulation from MS-1A59P and 16' East of CC3/18, El. 15'. Y upstream pipe to downstream Y N SK-45D 6 83 IP2-06-30672 STRAIGHT PIPE Calculation reinspection.

US Top of HDT accessible from west elbow.

OE23342 RHD elbow leak at valve platform @ north end of HDT. Davis Bessie Blanket insulation.

Remopve blanket on elbow 48A/B_RDT 21B TO LCV 1105 and upstream and downstream 84 MS-1B26 IP2-06-30673 90-DEG ELBOW Located approximately 6' North and Y Y N SK- 48A 6 straight pipe.

24' East of A/15, El. 36'.

Calculation reinspection 85 MS-2B12 IP2-06-30675 90-DEG ELBOW Blanket Insulation.

Remove insulation on pipe Y

49A/B_RDT 22B TO LCV 1105A upstream of elbow and 6' on Work with exam points Located approximately 1' South and straight pipe. Work with exam Y N SK-49A 6 86 MS-2B12P IP2-06-30676 STRAIGHT PIPE MS-2B11-P1 (99) and 11' West of F/16, El. 36' points MS-2B11-P1 (99) and MS-2B11 (100).

MS-2B11 (100).

Calculation reinspection Blanket insulation.

87 MS-2B16 IP2-06-30678 45-DEG ELBOW Remove blanket minimum 1' 49A/B_RDT 22B TO LCV 1105A Located approximately 14' South Y upstream of MS-2B16 through Y N SK-49A 6 and 14' West of F/16, El. 36'. MS-2B17 and 2" on 88 MS-2B17 IP2-06-30679 45-DEG ELBOW Calculation reinspection. Includes downstream pipe.

pipe MS-2B16P Blanket Insulation.

49A/B_RDT 22B TO LCV 1105A Remove blanket upstream of 89 MS-2B22 IP2-06-30680 90-DEG ELBOW Located approximately 5' South and N elbow MS-2B22 and on Y N SK-49A 10 30' East of A/14, El. 36'. downstream to expose elbow-to-elbow weld.

Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls 10 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER S N SC R T D EN N LD AT EP G ZE KS A

SC FF AF OL BE IN R T AT FO IO PR T IN ET F D IN OL UP PO O N IO SU IN AW CH SI AR SU DLA DN M K PO C AF L PE PA PE M IN O TIO e NU AM R M LO SC IN DR SK PI RE SU F N LA F O PI Co TI O EX W CO m pl N ON Blanket Insulation.

Remove insulation on tee runto 49C_HDR [2] TO FWH 26A,B,C upstream and downstream 90 MS-2B42 IP2-06-30681 TEE Located approximately 10' South N flanges, and blankets on Y N SK-49C and 4' East of CC3/19, El. 36'. vertical pipe to next tee.

Calculation reinspection Blanket insulation.

49C_HDR [2] TO FWH 26A,B,C 91 MS-2B50 IP2-06-30682 90-DEG ELBOW Located approximately 5' North and Y Y N SK-49C Calculation reinspection. Include 21' West of A/19, El. 15'.

UPSM pipe MS-2B63P. OE23342 49C_HDR [2] TO FWH 26A,B,C Blanket insulation. RHD elbow leak at Davis Bessie 92 MS-2B52 IP2-06-30683 90-DEG ELBOW Located approximately 4' South and Y Y N SK-49C 21' West of A/19, El. 15'.

50A_RDT 23B TO LCV 1105B Blanket insulation Calculation reinspection.

93 MS-3B14 IP2-06-30684 90-DEG ELBOW Located approximately 3' North and Y Y N SK-50A OE23342 RHD elbow leak at 14' West of F/17, El. 36'. Davis Bessie 50A_RDT 23B TO LCV 1105B Blanket and Mirror insulation MS-3B22P 94 IP2-06-30685 STRAIGHT PIPE Locate approximately 10' South and Y Y N SK-50A US 30' West of F/14, El. 36'. Calculation reinspection.

50A_RDT 23B TO LCV 1105B Blanket insul;ation 95 MS-3B25 IP2-06-30688 90-DEG ELBOW Located approximately 6' South and Y Y N SK-50A 38' West of F/14, El. 36'. Calculation reinspection.

96 MS-2A33 IP2-06-30689 TEE Blanket Insulation NCW_46B Remove blanket around valve Located approximately 2' North and Y MS-17 body up to condenser Y N SK-46B 97 MS-2A34 IP2-06-30692 TEE 25' East of A/17, El. 36'. connection. Calculation reinspection.

Blanket insulation and Mirror insulation on nozzle-to-tank connection.

98 MS-2B11N IP2-06-30695 NOZZLE N Remove insulation on nozzle and expose nozzle to tank MSD-49A-1-RHDT22B TO CV weld.

99 MS-2B11P-1 IP2-06-30699 STRAIGHT PIPE Located approximately 8' South and Blanket Insulation. CHECWORKS PICK Snapshot Y N 49A 6 13' West of F/16, El. 53' 98 and 99 Remove blanket from 53' assessment recommendation.

adjacent to valve MS-890 Y through floor penetration to Work scaffold with elbow and downstream pipe.

exam points MS-2B12 Work with exam points MS-100 MS-2B11 IP2-06-30701 ELBOW (85) and MS-2B12P 2B12 (85) and MS-2B12P (86).

(86).

MSR DRAINS 27_MS 21A DRAIN TO MSDT 21A Y N Located adjacent to Northwest Access to elbow and 1' Y silver 101 1A-20 IP2-06-30705 45-DEG ELBOW Drains Collection Tank access upstream and Y SK-33B 6 (Lead platform; El. 15' downstream to next  ?)

elbow. Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls 11 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER S N SC R T D EN N LD AT EP G ZE KS A

SC FF AF OL BE IN R T AT FO IO PR T IN ET F D IN OL UP PO O N IO SU IN AW CH SI AR SU DLA DN M K PO C AF L PE PA PE M IN O TIO e NU AM R M LO SC IN DR SK PI RE SU F N LA F O PI Co TI O EX W CO m pl N ON Mud insulation around tee, possible asbestos; mirror insulation on tee run and MSD28-5-MS22A TO MSDT 22A blanket on tee branch.

Under MSR 22A Located Remove mud on tee 3 feet of 102 2A-18 IP2-06-30707 TEE Y Y N SK-28 12 approximately 8' South and 12' East mirror both sides of tee run of A/17, El. 53' and blanket between tee and downstream elbow.

Checworks analysis 2R18 FAC Scope (Ipe0067424).Xls 12 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER S N SC R T D EN N LD AT EP G ZE KS A

SC FF AF OL BE IN R T AT FO IO PR T IN ET F D IN OL UP PO O N IO SU IN AW CH SI AR SU DLA DN M K PO C AF L PE PA PE M IN O TIO e NU AM R M LO SC IN DR SK PI RE SU F N LA F O PI Co TI O EX W CO m pl N ON MAIN STEAM Y Calculation reinspection from Main Steam flow Venturi from 24 9321-F-2540 2R17; IP-CALC-06-00178.

103 IP2-06-22106 SG. Y Y N 28" 9321-F-2542 Inspect pipe downstream of FE-VC El. 107' FE-449 STRAIGHT PIPE 449.

NCW_210 N Y silver Calculation reinspection.

104 210-3P-2 IP2-06-30709 STRAIGHT PIPE Located on the South side of the Y Y SK-210 4 Inspect 2 pipes between valves (Lead Drains Collection Tank, El. 15'.  ?) MS-96 and MS-97 Y

22 S/G Main Steam Flow Venturi Per OE 15860 from Calvert Cliffs.

9321-F-2541 105 IP2-06-30720 Needs pipe whip restraint removal Y Y N 28" Piping wall erosion found around VC El. 107' the drain slots at the DNSM end FE-429-DS Straight Pipe of the Main Steam Flow Venturi.

Y 23 S/G Main Steam Flow Venturi Per OE 15860 from Calvert Cliffs.

9321-F-2541 106 IP2-06-30721 Needs pipe whip restraint removal Y Y N 28" Piping wall erosion found around VC El. 107' the drain slots at the DNSM end FE-439-DS Straight Pipe of the Main Steam Flow Venturi.

Gland Seal Steam Supply Blanket insulation.

107 IP2-06-30722 Located approximately 6' South and N Y N 263 3" X 6" 263-13R Expander 21' West of F/19, El. 36'. Calculation reinspection Blanket insulation OE Wolf Creek. And Darlington Review of WRT's for MST's.

Located 7' North F16; blanket Y 108 IP2-06-30723 N Y 9321-F-2042 OE IP2-04-25162 leaking strainer insulation silver threads. Could be more MST-51 Pipe, Elbow, Tee extensive in dnsm piping.

Located on El. 15' in Aux Feed All mirror insulation 109 IP2-06-30724 Main Steam Trap 64 Building, adjacent to 22 Auxiliary N Y N 9321-F-2041 1", 1/2" OE Wolf Creek. And Darlington MST-64 Class 1 piping Feedwater Pump. Review of WRT's for MST's.

110 IP2-06-30725 206-16E "Plant Problems Affecting Downstream of Thermal Efficiency" report; leaking valve PCV- Located approximately 5' N and 15' Operational Focus Meeting.

Y Y Y Y 206 8" 1121. Main steam W fROM F17, Under El. 36' grating Leak report, large leakers to dump to condenser. main condenser. WRT IP2 111 IP2-06-30726 19922.

206-16P NCW_153 Main Steam Blanket insulation.

Located in Aux Feedwater Building, Remove blanket from pipe 112 MS23-1 DS IP2-06-30727 STRAIGHT PIPE El. 65' Y support to VC penetration. Y N SK-153 28" Located adjacent to valve MS-42, S/G 23 to ABFP 22 root stop. Calculation reinspection NCW_214 Mirror insulation 113 214-26E IP2-06-30729 90-DEG ELBOW Located at base of column A/16, El. N Y N SK-214 53'. Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls 13 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER S N SC R T D EN N LD AT EP G ZE KS A

SC FF AF OL BE IN R T AT FO IO PR T IN ET F D IN OL UP PO O N IO SU IN AW CH SI AR SU DLA DN M K PO C AF L PE PA PE M IN O TIO e NU AM R M LO SC IN DR SK PI RE SU F N LA F O PI Co TI O EX W CO m pl N ON NCW_254 Blanket insulation 114 254-15E IP2-06-30730 90-DEG ELBOW Top of HP Turbine downstream of Y Y N SK-254 valve MS-1206. El. 53' Calculation reinspection NCW_259 Blanket insulation.

Located on North end of HP 115 259-9E IP2-06-30731 90-DEG ELBOW N Y N SK-259 Turbine, behind Governor Panel El.

53' Calculation reinspection All blanket insulation NCW_267 116 267-6T IP2-06-30732 TEE Located approximately12' West and Y Y N SK-267 5' South of East Mezz. Stairs, El. 60' Calculation reinspection NCW_267 All blanket insulation.

117 267-33P IP2-06-30733 STRAIGHT PIPE Located approximately 13' South N Y N SK-267 and 5' West of F/18, El. 36' Calculation reinspection Blanket insulation.

NCW_259 Remove insulation around 259-15E Top of HP Turbine downstream of elbow and include insulation OE from Unit 3. Wear found in 118 SEE IP2-06-30781 90-DEG ELBOW valve MS-1208. y around valve and downstream Y N SK-259 these components.

REMARKS Located approximately 10' South pipe, exposing elbow welds. Originally mislabeled as MS-863-and 40' West of F/20, El. 53'. DS. Need to change WO's and substitute 259-15E NCW_254 Blanket insulation. OE from Unit 3. Wear found in 254-3E Top of HP Turbine downstream of Remove insulation around these components.

119 SEE IP2-06-30782 90-DEG ELBOW valve MS-1207. y elbow and include insulation Y N SK-254 Originally mislabeled as MS-866-REMARKS Located approximately 30' East of around valve and downstream DS. Need to change WO's and A/19, El. 53'. pipe, exposing elbow welds. substitute 254-3E.

FEEDWATER HEATER SHELLS Inspection of shell Mirror Insulation 120 IP2-06-30784 around extraction Feedwater Heater 25B shell, El. 36 y Y N Similar to inspection for FWH 25A FWH 25B steam inlets. and C performed in 2000 Inspection of worn Mirror Insulation 121 IP2-06-30785 areas identified in Feedwater Heater 24A shell, El. 36 y Y N FWH24A 2R16 Calculation reinspection Inspection of worn Mirror Insulation 122 IP2-06-30786 areas identified in Feedwater Heater 24B shell, El. 36 y Y N FWH24B 2R16 Calculation reinspection Inspection of worn Mirror Insulation 123 IP2-06-30787 areas identified in Feedwater Heater 24C shell, El. 36 y Y N FWH24C 2R16 Calculation reinspection 2R18 FAC Scope (Ipe0067424).Xls 14 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER S N SC R T D EN N LD AT EP G ZE KS A

SC FF AF OL BE IN R T AT FO IO PR T IN ET F D IN OL UP PO O N IO SU IN AW CH SI AR SU DLA DN M K PO C AF L PE PA PE M IN O TIO e NU AM R M LO SC IN DR SK PI RE SU F N LA F O PI Co TI O EX W CO m pl N ON STEAM JET AIR EJECTORS Blanket insulation. Remove TB 36', located approximately 4' from tee and minimum of 1' IP2-06-30789 Tee downstream of N Y N 252 3 PCV-1222 steam South and 3' West of B/13, El. 36'. from both ends of run and System engineer 124 252-1T supply to SJAE branch recommendation, & OE 125 252-5E IP2-06-30790 Possible asbestos.(Mud). Y Main steam supply to TB 36', located approximately 4' Y Remove insulation on elbows N 252 3 System Engineer IP2-06-30791 SJAE's, Elbows South and 3' West of B/13, El. 36'. and 1' upstream and 2' Y recommendation; elbows DNSM 126 252-7E DNSM of PCV-1222 downstream of FE; back-to-back config.

BOILER FEED PUMP TURBINE Feed Pump Turbine N IP2-06-30792 TB 5' Located under Boiler Feed Y 127 215-1P #21 drain to BFPT Y N 215 From Altran small bore review Pump Turbine.

128 215-2E IP2-06-30793 drip tank. Y and calculation reinspection.

HIGH PRESSURE TURBINE DRAINS Y OE19798 Failure at bi-metallic Piping UPSM and weld at VC Summer. OE Unit 3; 129 IP2-06-30794 33' Mezz. TB Y Y N 272 DNSM of orifice thinned pipe in this location 272-3P block replaced.

First tee UPSM of Y FCV-1155, including FCV-1155 leaking; no previous 130 IP2-06-30795 33' Mezz. TB N Y N 236 236-FCV1155 adjacent elbow and inspections. OE Unit 3, wear T US pipe. found in similar components.

ADDED SCOPE Feedwater Heater Y Leak under FWH 25C 131 IP2-06-31989 25C extraction steam TB 36'-9 Y Y N 7 18 reinforcement pad CR-IP2-2006-5EX-10N inlet nozzle. 06057 Feedwater Heater Y Leak under FWH 25C 132 IP2-06-31994 25B extraction steam TB 36'-9 Y Y N 7 18 reinforcement pad CR-IP2-2006-5EX-7N inlet nozzle. 06057 Feedwater Heater Y Leak under FWH 25C 133 IP2-06-31996 25A extraction steam TB 36'-9 Y Y N 7 18 reinforcement pad CR-IP2-2006-5EX-1N inlet nozzle. 06057 Feedwater Heater Y Leak under FWH 25C 134 IP2-06-31998 23A extraction steam TB 36'-9 Y Y N 1 18 reinforcement pad CR-IP2-2006-3EXA-1N inlet nozzle. 06057 CONTINGENCY WORK ORDERS SUPPORT WORK ORDERS relocation of pipe IP2-06-30969 whip restraints to FE-429-DS support FAC exam relocation of pipe IP2-06-30970 whip restraints to FE-439-DS support FAC exam 2R18 FAC Scope (Ipe0067424).Xls 15 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER S N SC R T D EN N LD AT EP G ZE KS A

SC FF AF OL BE IN R T AT FO IO PR T IN ET F D IN OL UP PO O N IO SU IN AW CH SI AR SU DLA DN M K PO C AF L PE PA PE M IN O TIO e NU AM R M LO SC IN DR SK PI RE SU F N LA F O PI Co TI O EX W CO m N pp g pl ON thermal insulation LP Gland IP2-06-30971 removal/replacement Piping Erosion by Boilermakers to FAC Exams thermal insulation inside 21 IP2-06-30977 removal/replacement condenser by Boilermalers to FAC Exams Open 21 condenser inside 21 IP2-06-30978 for FAC exams inside condenser condenser.

2R18 FAC Scope (Ipe0067424).Xls 16 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER S N SC R T D EN N LD AT EP G ZE KS A

SC FF AF OL BE IN R T AT FO IO PR T IN ET F D IN OL UP PO O N IO SU IN AW CH SI AR SU DLA DN M K PO C AF L PE PA PE M IN O TIO e NU AM R M LO SC IN DR SK PI RE SU F N LA F O PI Co TI O EX W CO m pl N ON REPAIR/REPLACEMENT WORK ORDERS Repair/Replace N extraction lines from the LP Turbine to the IP2-06-21854 Inside 23 condenser. Y N 22" 22A Feedwater Based on 2R17 FAC exam this LPFW22A- Heater inside the 23 piping is worn and requires 1N, -2N Condenser.

p p repair/replacemrnt during 2R18 extraction lines from N Based on 2R17 FAC exam this LPFW22B- IP2-06-21860 the LP Turbine to the Inside 22 condenser. Y N 22" piping is worn and requires 1N, -2N 22B Feedwater repair/replacemrnt during 2R18.

Y IP2-06-30979 Replace small bore Turnine building 15' N N 9321-F-2131 1" MST-43 piping Y

IP2-06-30980 Replace small bore Turbine Building 15' N N 9321-F-2151 1" 3/4" EST-2 piping Y

IP2-06-30982 Replace small bore Turnbine Building 15' N N 9321-F-2151 1" 3/4" EST-5 piping Y

IP2-06-30983 Extraction Steam Turbine Building 15' Y N SK-2 20" X 28" 3EXB-10R Reducer Y

IP2-06-31991 Repair of FWH 25C TB 36'-9 Y N 7 18 5EX-10N inlet nozzle Repair based on source of leak Y

IP2-06-31995 Repair of FWH 25B TB 36'-9 Y N 7 18 Repair based on source of 25C 5EX-7N inlet nozzle FWH leak Repair of FWH 25A Y Repair based on source of 25C IP2-06-31997 TB 36'-9 Y N 7 18 5EX-1N inlet nozzle FWH leak LEGEND PRE-OUTAGE Insulation likely to A

contain asbestos 2R18 FAC Scope (Ipe0067424).Xls 17 of 18 2R18 FAC Scope (Ipe0067424).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R18 ER IP2-06-26282 ER S N SC R T D EN N LD AT EP G ZE KS A

SC FF AF OL BE IN R T AT FO IO PR T IN ET F D IN OL UP PO O N IO SU IN AW CH SI AR SU DLA DN M K PO C AF L PE PA PE M IN O TIO e NU AM R M LO SC IN DR SK PI RE SU F N LA F O PI Co TI O EX W CO m pl N ON Insulation is a welded stainless TS steel Thermal Shield 2R18 FAC Scope (Ipe0067424).Xls 18 of 18 2R18 FAC Scope (Ipe0067424).Xls

1 FLOW ACCELERATED CORROSION PRE-OUTAGE INSPECTION POINTS 2R18P ER IP2-06-26282 RD TI S BE INT ER ON SC AF DR SK AR R N AW SI NU PO O DE LO IN FO LD ET ZE K RK SC CA S U IN CH RE M EX LATI G PI M AM W RI TI PA O PE O P O INT N Following locations walked down and found to be unsuitable for pre-outage exams due to high Following exams possible to temperature or location. examine pre-outage 220-7P 4EXD-75 249-19R CD-115 CD-116 5EXC-14 5EXC-21 5EXC-121P-1 US 205-22P US 204-24P US 4EXD-61 4EXD-60 239-11E 206-16E 1 of 1 2R18P

1 FLOW ACCELERATED CORROSION PRE-OUTAGE INSPECTION POINTS 2R18P ER IP2-06-26282 PO Re RI AF G KS R as PT FO AW ET MBE IN o De n f IO LO LD C SI M T le or N C SU IN H ZE AR NU AM tio SC AT LA TI DR SK RE n IO PA O PI EX DE N SC IN INT N PE EXTRACTION Moisture separator separating tank A vent to header upstream of FWH 25a,b,and c connection 7&

SS CR_mo to header 5EX-18 Fabricated cross. 7A CONDENSATE HEATER DRAINS Valve LCV-1104B found open and piping had excessive vibration. CR-IP2-2006-03261 IP2-06-22870 to close valve. Reducer inspected in 1987 &

ss REHEATER Check DNSM pipe to see if R13. Inspect reducer DNSM of Leaking valve in plant. Also OE MS-3A24R DRAINS damaged. valve and DNSM tee from Hope Creek; OE19325 Valve LCV-1104B found open and piping had excessive vibration. CR-IP2-2006-03261 47 IP2-06-22870 to close valve. Reducer inspected in 1987 &

Check DNSM pipe to see if R13. Inspect reducer DNSM of Leaking valve in plant. Also OE MS-3A23P ss damaged. valve and DNSM tee from Hope Creek; OE19325 1 of 3 Deletions

2 FLOW ACCELERATED CORROSION PRE-OUTAGE INSPECTION POINTS 2R18P ER IP2-06-26282 PO Re RI AF G KS R as PT FO AW ET MBE IN o De n f IO LO LD C SI M T le or N C SU IN H ZE AR NU AM tio SC AT LA TI DR SK RE n IO PA O PI EX DE N SC IN INT N PE Valve LCV-1104B found open and piping had excessive vibration. CR-IP2-2006-03261 IP2-06-22870 to close valve.

Check DNSM pipe to see if Leaking valve in plant. Also OE MS-3A24 ss damaged. from Hope Creek; OE19325 REHEATER DRAINS Through wall leak on Unit 3 (CR-Located over HDT visible from IP3-32006-02270) on Unit 2 South side of HDT approx 20' N similar location:branch extension MS-1A41 ss Reheater Drain tee from RHDT's column 18 25' East of CC 45C 10x10x6 MS-1A63P.

Through wall leak on Unit 3 (CR-IP3-32006-02270) on Unit 2 MS-1A63P ss 45C 6' pipe similar location:tee MS-1A41 2 of 3 Deletions

3 FLOW ACCELERATED CORROSION PRE-OUTAGE INSPECTION POINTS 2R18P ER IP2-06-26282 PO Re RI AF G KS R as PT FO AW ET MBE IN o De n f IO LO LD C SI M T le or N C SU IN H ZE AR NU AM tio SC AT LA TI DR SK RE n IO PA O PI EX DE N SC IN INT N PE STEAM JET AIR EJECTORS 3 of 3 Deletions