{{#Wiki_filter:Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C1 of C413 Attachment C Form 9.6: Seismic Walkdown Checklists (SWCs)SWCs Removed: SWELl -083, SWELl -084, SWELl -095, SWELl -096, SWELl -097, SWELl -098, SWELl -099, SWELl-100 Updated final versions of these SWCs, which required follow-up internal electrical cabinet inspections, are included in Attachment J.
{{#Wiki_filter:Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C1 of C413 Attachment C Form 9.6: Seismic Walkdown Checklists (SWCs)SWCs Removed: SWELl -083, SWELl -084, SWELl -095, SWELl -096, SWELl -097, SWELl -098, SWELl -099, SWELl-100 Updated final versions of these SWCs, which required follow-up internal electrical cabinet inspections, are included in Attachment J.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C2 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ NF- UI--Seismic Walkdown Checklist (SWC) SWELl- 005 Equipment ID No. CV305-127 Equip. Class' Pneumatic-Operated Valves (07)Equipment Description RPS Scram Water Outlet Valve Location:
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C2 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ NF- UI--Seismic Walkdown Checklist (SWC) SWELl- 005 Equipment ID No. CV305-127 Equip. Class' Pneumatic-Operated Valves (07)Equipment Description RPS Scram Water Outlet Valve Location:
Bldg. RB Floor El. 23 Room, Area 145 HCU Manufacturer, Model, Etc. (optional but recommended)
Bldg. RB Floor El. 23 Room, Area 145 HCU Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Line 25: Line 28:
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Note: Checked anchorage of HCU to concrete.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Note: Checked anchorage of HCU to concrete.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y-I NE YZ Nn U[I N/A[Z Y[ N[-] UF-] N/AZ Y[ NEil U[I N/AZ-]1 Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y-I NE YZ Nn U[I N/A[Z Y[ N[-] UF-] N/AZ Y[ NEil U[I N/AZ-]1 Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C3 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NE] UE]Seismic Walkdown Checklist (SWC) SWELl- 005 Equipment ID No. CV305-127 Equip. Class Pneumatic-Operated Valves (07)Equipment Description RPS Scram Water Outlet Valve 5. Is the anchorage configuration consistent with plant documentation?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C3 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NE] UE]Seismic Walkdown Checklist (SWC) SWELl- 005 Equipment ID No. CV305-127 Equip. Class Pneumatic-Operated Valves (07)Equipment Description RPS Scram Water Outlet Valve 5. Is the anchorage configuration consistent with plant documentation?
YE NFE UE N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YE NFE UE N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Y[E NE] UF]potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of Y[E NE] UF]potentially adverse seismic conditions?
Line 31: Line 37:
The air operator on HCU 26-39 is close to the horizontal Unistrut, but is not in contact with it. There is sufficient clearance so that this is not considered to be a potential adverse seismic interaction.
The air operator on HCU 26-39 is close to the horizontal Unistrut, but is not in contact with it. There is sufficient clearance so that this is not considered to be a potential adverse seismic interaction.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YN NEI UE- N/AE-YN NEI UE- N/AE-YE N[-] Url N/A--YN NEI U--EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C4 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YN NEI- Ur]Seismic Walkdown Checklist (SWC) SWELl- 005 Equipment ID No. CV305-127 Equip. Class Pneumatic-Operated Valves (07)Equipment Description RPS Scram Water Outlet Valve Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YN NEI UE- N/AE-YN NEI UE- N/AE-YE N[-] Url N/A--YN NEI U--EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C4 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YN NEI- Ur]Seismic Walkdown Checklist (SWC) SWELl- 005 Equipment ID No. CV305-127 Equip. Class Pneumatic-Operated Valves (07)Equipment Description RPS Scram Water Outlet Valve Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YN N[-] UI]adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could YN N[-] UI]adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Detailed inspections were performed and photos taken of 2 of the 145 C V305-127 valves: HCU 26-39 (West) and on HCU 42-19 (East). The remainder of the CV305-127 valves were inspected for overall configuration compliance along with their HCU assembly as part of the area walk-by. Note that this included a detailed visual inspection of the anchorages of all HCUs.SWELI-O05 is on AWC-014 andAWC-016.
Detailed inspections were performed and photos taken of 2 of the 145 C V305-127 valves: HCU 26-39 (West) and on HCU 42-19 (East). The remainder of the CV305-127 valves were inspected for overall configuration compliance along with their HCU assembly as part of the area walk-by. Note that this included a detailed visual inspection of the anchorages of all HCUs.SWELI-O05 is on AWC-014 andAWC-016.
I) }uI Evaluated by: David Small Date: 10/18/2012 Halie Aroz 10/18/2012 EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C5 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y; NE] UM Seismic Walkdown Checklist (SWC) SWELl- 005 Equipment ID No. CV305-127 Equip. Class Pneumatic-Operated Valves (07)Equipment Description RPS Scram Water Outlet Valve Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C6 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[ NFIj U-I Seismic Walkdown Checklist (SWC) SWELl- 005 Equipment ID No. CV305-127 Equip. Class Pneumatic-Operated Valves (07)Equipment Description RPS Scram Water Outlet Valve Note: Typical CV305-127 valve.Note: Typical HCU anchorage.
I) }uI Evaluated by: David Small Date: 10/18/2012 Halie Aroz 10/18/2012 EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C5 of C413 ATTACHMENT  
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C7 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: Y[ NEIl UI-Seismic Walkdown Checklist (SWC) SWELl- 006 Equipment ID No. SOV305-117-1/4 Equip. Classi Motor-Operated  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y; NE] UM Seismic Walkdown Checklist (SWC) SWELl- 005 Equipment ID No. CV305-127 Equip. Class Pneumatic-Operated Valves (07)Equipment Description RPS Scram Water Outlet Valve Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C6 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[ NFIj U-I Seismic Walkdown Checklist (SWC) SWELl- 005 Equipment ID No. CV305-127 Equip. Class Pneumatic-Operated Valves (07)Equipment Description RPS Scram Water Outlet Valve Note: Typical CV305-127 valve.Note: Typical HCU anchorage.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C7 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet I of 4 Status: Y[ NEIl UI-Seismic Walkdown Checklist (SWC) SWELl- 006 Equipment ID No. SOV305-117-1/4 Equip. Classi Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 1/4 Scram Pilot Location:
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 1/4 Scram Pilot Location:
Bldg. RB Floor El. 23 Ri Manufacturer, Model, Etc. (optional but recommended) oom, Area 145 HCU Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Bldg. RB Floor El. 23 Ri Manufacturer, Model, Etc. (optional but recommended) oom, Area 145 HCU Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Line 43: Line 61:
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE[ NO YEI NEI U[E] N/AZ YE] NE] U[I N/A]Y[-] N[]i UEi N/A[1 Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE[ NO YEI NEI U[E] N/AZ YE] NE] U[I N/A]Y[-] N[]i UEi N/A[1 Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C8 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NI I UI-J Seismic Walkdown Checklist (SWC) SWELl- 006 Equipment ID No. SOV305-117-1/4 Equip. Class Motor-Operated  
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C8 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NI I UI-J Seismic Walkdown Checklist (SWC) SWELl- 006 Equipment ID No. SOV305-117-1/4 Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 1/4 Scram Pilot 5. Is the anchorage configuration consistent with plant documentation?
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 1/4 Scram Pilot 5. Is the anchorage configuration consistent with plant documentation?
Y[] NE] UI- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Y[] NE] UI- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Line 49: Line 70:
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ N[: uEr N/AL]YN NEJ U[I N/AL]YZ NEI U[-] N/A[]YE N- UL-EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C9 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YZ NEI UL-Seismic Walkdown Checklist (SWC) SWELl- 006 Equipment ID No. SOV305-117-1/4 Equip. Class Motor-Operated  
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ N[: uEr N/AL]YN NEJ U[I N/AL]YZ NEI U[-] N/A[]YE N- UL-EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C9 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YZ NEI UL-Seismic Walkdown Checklist (SWC) SWELl- 006 Equipment ID No. SOV305-117-1/4 Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 1/4 Scram Pilot Other Adverse Conditions
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 1/4 Scram Pilot Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YZ NEI UF adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could YZ NEI UF adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
A detailed inspection was performed and photos taken of one of the 73 SO V305-117-1/4 scram pilots: HCU 26-39 (West). The remainder of the SOV305-117-1/4 scram pilots were inspected for overall configuration compliance along with their HCU assembly as part of the area walk-by. Note that this included a detailed visual inspection of the anchorages of all HCUs. Drawing No. M1N16-7, Rev. El identifies HCU 26-39 as part of Set 1.The component did not have a tag on any of the HCUs, and so was identified using the P&ID, Drawing No. M250 SH1, Rev. 73.SWEL1-006 is on AWC-014.Evaluated by: David Small ý -J H-alie Aroz Date: 10/11/2012 10/11/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C10 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ N-- UD-]Seismic Walkdown Checklist (SWC) SWELl- 006 Equipment ID No. SOV305-117-1/4 Equip. Class Motor-Operated  
A detailed inspection was performed and photos taken of one of the 73 SO V305-117-1/4 scram pilots: HCU 26-39 (West). The remainder of the SOV305-117-1/4 scram pilots were inspected for overall configuration compliance along with their HCU assembly as part of the area walk-by. Note that this included a detailed visual inspection of the anchorages of all HCUs. Drawing No. M1N16-7, Rev. El identifies HCU 26-39 as part of Set 1.The component did not have a tag on any of the HCUs, and so was identified using the P&ID, Drawing No. M250 SH1, Rev. 73.SWEL1-006 is on AWC-014.Evaluated by: David Small ý -J H-alie Aroz Date: 10/11/2012 10/11/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C10 of C413 ATTACHMENT  
& Solenoid-Operated Valves (08)Equipment Description RPS Grm 1/4 Scram Pilot Photographs Note: Note: Typical component (SOV305-117-1/4 on bottom).EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page Cll of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NE] UL-Seismic Walkdown Checklist (SWC) SWELl- 007 Equipment ID No. SOV305-117-2/3 Equip. Class, Motor-Operated  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ N-- UD-]Seismic Walkdown Checklist (SWC) SWELl- 006 Equipment ID No. SOV305-117-1/4 Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RPS Grm 1/4 Scram Pilot Photographs Note: Note: Typical component (SOV305-117-1/4 on bottom).EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page Cll of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NE] UL-Seismic Walkdown Checklist (SWC) SWELl- 007 Equipment ID No. SOV305-117-2/3 Equip. Class, Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 2/3 Scram Pilot Location:
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 2/3 Scram Pilot Location:
Bldg. RB Floor El. 23 Room, Area 145 HCU Manufacturer, Model, Etc. (optional but recommended)
Bldg. RB Floor El. 23 Room, Area 145 HCU Manufacturer, Model, Etc. (optional but recommended)
Line 62: Line 92:
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-] N[-] uE]- N/AN Y[I- N[E] UE N/AZ YE] NEI U[I N/AN IEnter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-] N[-] uE]- N/AN Y[I- N[E] UE N/AZ YE] NEI U[I N/AN IEnter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page C12 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NE] U[-1 Seismic Walkdown Checklist (SWC) SWELl- 007 Equipment ID No. S0V305-117-2/3 Equip. Class Motor-Operated  
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page C12 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NE] U[-1 Seismic Walkdown Checklist (SWC) SWELl- 007 Equipment ID No. S0V305-117-2/3 Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 2/3 Scram Pilot 5. Is the anchorage configuration consistent with plant documentation?
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 2/3 Scram Pilot 5. Is the anchorage configuration consistent with plant documentation?
YE] NF] Ur] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YE] NF] Ur] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Line 68: Line 101:
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?YZ NE] UE-] NIAE]YZ NF-] UE] N/AE]YZ NE]I UE N/AEl 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C13 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: Y; NEI U-Seismic Walkdown Checklist (SWC) SWELl- 007 Equipment ID No. S0V305-117-2/3 Equip. Class Motor-Operated  
: 9. Do attached lines have adequate flexibility to avoid damage?YZ NE] UE-] NIAE]YZ NF-] UE] N/AE]YZ NE]I UE N/AEl 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C13 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: Y; NEI U-Seismic Walkdown Checklist (SWC) SWELl- 007 Equipment ID No. S0V305-117-2/3 Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 2/3 Scram Pilot Other Adverse Conditions
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 2/3 Scram Pilot Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Y[ NEI U[: adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could Y[ NEI U[: adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
A detailed inspection was performed and photos taken of one of the 72 SOV305-117-2/3 scram pilots: HCU 42-19 (East). The remainder of the SOV305-117-2/3 scram pilots were inspected for overall configuration compliance along with their HCU assembly as part of the area walk-by. Note that this included a detailed visual inspection of the anchorages of all HCUs. Drawing No. MIN16-7, Rev. El identifies HCU 42-19 as part of Set 3.The component did not have a tag on any of the HCUs, and so was identified using the P&ID, Drawing No. M250 SH1, Rev. 73.SWEL 1-007 is on AWC-016.?/4"j ) V,-A Evaluated by: David Small Date: 10/18/2012 HalteAroz 10/18/2012
A detailed inspection was performed and photos taken of one of the 72 SOV305-117-2/3 scram pilots: HCU 42-19 (East). The remainder of the SOV305-117-2/3 scram pilots were inspected for overall configuration compliance along with their HCU assembly as part of the area walk-by. Note that this included a detailed visual inspection of the anchorages of all HCUs. Drawing No. MIN16-7, Rev. El identifies HCU 42-19 as part of Set 3.The component did not have a tag on any of the HCUs, and so was identified using the P&ID, Drawing No. M250 SH1, Rev. 73.SWEL 1-007 is on AWC-016.?/4"j ) V,-A Evaluated by: David Small Date: 10/18/2012 HalteAroz 10/18/2012
()EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C14 of C413 ATrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ NF U--Seismic Walkdown Checklist (SWC) SWELl- 007 Equipment ID No. SOV305-117-213 Equip. Class Motor-Operated  
()EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C14 of C413 ATrACHMENT  
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 2/3 Scram Pilot Photographs Note: Note: Typical component (SO V305-117-2/3 on bottom).EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page 01 5 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: Y[ N[- U[--Seismic Walkdown Checklist (SWC) SWELl- 008 Equipment ID No. SOV305-118-1/4 Equip. Class' Motor-Operated  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ NF U--Seismic Walkdown Checklist (SWC) SWELl- 007 Equipment ID No. SOV305-117-213 Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 2/3 Scram Pilot Photographs Note: Note: Typical component (SO V305-117-2/3 on bottom).EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page 01 5 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet I of 4 Status: Y[ N[- U[--Seismic Walkdown Checklist (SWC) SWELl- 008 Equipment ID No. SOV305-118-1/4 Equip. Class' Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 1/4 Scram Pilot Location:
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 1/4 Scram Pilot Location:
Bldg. RB Floor El. 23 R Manufacturer, Model, Etc. (optional but recommended) oom, Area 145 HCU Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Bldg. RB Floor El. 23 R Manufacturer, Model, Etc. (optional but recommended) oom, Area 145 HCU Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Line 81: Line 123:
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE-I NE YE-- NE] UE[ N/As YE] NE] UE] N/A[YE] N[-] UE] N/A[Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE-I NE YE-- NE] UE[ N/As YE] NE] UE] N/A[YE] N[-] UE] N/A[Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C16 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NE] UDl Seismic Walkdown Checklist (SWC) SWELl- 008 Equipment ID No. SOV305-118-1/4 Equip. Class Motor-Operated  
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C16 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NE] UDl Seismic Walkdown Checklist (SWC) SWELl- 008 Equipment ID No. SOV305-118-1/4 Equip. Class Motor-Operated  
& Solenoid-Ooerated Valves (08)Equipment Description RPS Grp 1/4 Scram Pilot 5. Is the anchorage configuration consistent with plant documentation?
& Solenoid-Ooerated Valves (08)Equipment Description RPS Grp 1/4 Scram Pilot 5. Is the anchorage configuration consistent with plant documentation?
YE] N[] UE] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YE] N[] UE] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Line 87: Line 132:
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YN NEI ur] N/Ar]Y[ N-] ur] N/AF]YN NEI U] N/A[]Y~N N]UM]EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-QOOO1, Rev. 1 Attachment C Page C017 of 0413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YO( NM UM-Seismic Walkdown Checklist (SWC) SWELl- 008 Equipment ID No. SOV305-118-1/4 Equip. Class Motor-Operated  
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YN NEI ur] N/Ar]Y[ N-] ur] N/AF]YN NEI U] N/A[]Y~N N]UM]EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-QOOO1, Rev. 1 Attachment C Page C017 of 0413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YO( NM UM-Seismic Walkdown Checklist (SWC) SWELl- 008 Equipment ID No. SOV305-118-1/4 Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 1/4 Scram Pilot Other Adverse Conditions
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 1/4 Scram Pilot Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Yo( NEI UE'adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could Yo( NEI UE'adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
A detailed inspection was performed and photos taken of one of the 73 SOV305-118-1/4 scram pilots: HCU 26-39 (West). The remainder of the SOV305-118-1/4 scram pilots were inspected for overall configuration compliance along with their HCU assembly as part of the area walk-by. Note that this included a detailed visual inspection of the anchorages of all HCUs. Drawing No. M1N16-7, Rev. El identifies HCU 26-39 as part of Set 1.The component did not have a tag on any of the HCUs, and so was identified using the P&ID, Drawing No. M250 SHI, Rev. 73.SWEL 1-008 is on AWC-014.Q 0=j L'P Evaluated by: David Small Date: 10/11/2012 Halie Aroz r/ ll 10/11/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C18 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ ND Ur-Seismic Walkdown Checklist (SWC) SWELl- 008 Equipment ID No. SOV305-118-1/4 Equip. Class Motor-Operated  
A detailed inspection was performed and photos taken of one of the 73 SOV305-118-1/4 scram pilots: HCU 26-39 (West). The remainder of the SOV305-118-1/4 scram pilots were inspected for overall configuration compliance along with their HCU assembly as part of the area walk-by. Note that this included a detailed visual inspection of the anchorages of all HCUs. Drawing No. M1N16-7, Rev. El identifies HCU 26-39 as part of Set 1.The component did not have a tag on any of the HCUs, and so was identified using the P&ID, Drawing No. M250 SHI, Rev. 73.SWEL 1-008 is on AWC-014.Q 0=j L'P Evaluated by: David Small Date: 10/11/2012 Halie Aroz r/ ll 10/11/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C18 of C413 ATTACHMENT  
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 1/4 Scram Pilot Photographs Note: Note: Typical component (SO V305-118-1/4 on top).EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page 019 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 4 Status: YZ No U--Seismic Walkdown Checklist (SWC) SWELl- 009 Equipment ID No. SOV305-118-2/3 Equip. Class, Motor-Operated  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ ND Ur-Seismic Walkdown Checklist (SWC) SWELl- 008 Equipment ID No. SOV305-118-1/4 Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 1/4 Scram Pilot Photographs Note: Note: Typical component (SO V305-118-1/4 on top).EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page 019 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 1 of 4 Status: YZ No U--Seismic Walkdown Checklist (SWC) SWELl- 009 Equipment ID No. SOV305-118-2/3 Equip. Class, Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 2/3 Scram Pilot Location:
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 2/3 Scram Pilot Location:
Bldg. RB Floor El. 23 R Manufacturer, Model, Etc. (optional but recommended) oom, Area 145 HCU Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Bldg. RB Floor El. 23 R Manufacturer, Model, Etc. (optional but recommended) oom, Area 145 HCU Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Line 99: Line 153:
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YI- NO YI-] NE] UE] N/A[Y[-] NEJ UE] N/A[YEr- NEJ UE] N/As I Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YI- NO YI-] NE] UE] N/A[Y[-] NEJ UE] N/A[YEr- NEJ UE] N/As I Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C20 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NE] Ur Seismic Walkdown Checklist (SWC) SWELl- 009 Equipment ID No. SOV305-118-2/3 Equip. Class Motor-Operated  
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C20 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NE] Ur Seismic Walkdown Checklist (SWC) SWELl- 009 Equipment ID No. SOV305-118-2/3 Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RPS Gro 2/3 Scram Pilot 5. Is the anchorage configuration consistent with plant documentation?
& Solenoid-Operated Valves (08)Equipment Description RPS Gro 2/3 Scram Pilot 5. Is the anchorage configuration consistent with plant documentation?
Y[] NE] UE] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Y[] NE] UE] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Line 105: Line 162:
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NE-] UE[] N/AE-]YZ NE] uE] N/AE-]YZ NE] UE"] N/AE-]YZ N-] uE]EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C21 of 0413 ATTACHMENT 9.6 Sheet 3 of 4 SEISMIC WALKDOWN CHECKLIST FORM Status: YN NEI] U Seismic Walkdown Checklist (SWC) SWELl- 009 Equipment ID No. SOV305-118-2/3 Equip. Class Motor-Operated  
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NE-] UE[] N/AE-]YZ NE] uE] N/AE-]YZ NE] UE"] N/AE-]YZ N-] uE]EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C21 of 0413 ATTACHMENT  
 
===9.6 Sheet===
3 of 4 SEISMIC WALKDOWN CHECKLIST FORM Status: YN NEI] U Seismic Walkdown Checklist (SWC) SWELl- 009 Equipment ID No. SOV305-118-2/3 Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 2/3 Scram Pilot Other Adverse Conditions
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 2/3 Scram Pilot Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YN NE] UE[adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could YN NE] UE[adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
A detailed inspection was performed and photos taken of one of the 72 SOV305-118-2/3 scram pilots: HCU 42-19 (East). The remainder of the SOV305-118-2/3 scram pilots were inspected for overall configuration compliance along with their HCU assembly as part of the area walk-by. Note that this included a detailed visual inspection of the anchorages of all HCUs. Drawing No. MIN16-7, Rev. El identifies HCU 42-19 as part of Set 3.The component did not have a tag on any of the HCUs, and so was identified using the P&ID, Drawing No. M250 SH1, Rev. 73.SWEL 1-009 is on AWC-016.,i2~jyLu Evaluated by: David Small Date: 10/18/2012 Halle Aroz 10/18/2012 k.../EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C22 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: Y[ NIE U-Seismic Walkdown Checklist (SWC) SWELl- 009 Equipment ID No. SOV305-118-2/3 Equip. Class Motor-Operated  
A detailed inspection was performed and photos taken of one of the 72 SOV305-118-2/3 scram pilots: HCU 42-19 (East). The remainder of the SOV305-118-2/3 scram pilots were inspected for overall configuration compliance along with their HCU assembly as part of the area walk-by. Note that this included a detailed visual inspection of the anchorages of all HCUs. Drawing No. MIN16-7, Rev. El identifies HCU 42-19 as part of Set 3.The component did not have a tag on any of the HCUs, and so was identified using the P&ID, Drawing No. M250 SH1, Rev. 73.SWEL 1-009 is on AWC-016.,i2~jyLu Evaluated by: David Small Date: 10/18/2012 Halle Aroz 10/18/2012 k.../EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C22 of C413 ATTACHMENT  
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 2/3 Scram Pilot Photographs Note: Note: Typical component (SO V305-118-2/3 on top).EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C23 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YZ NF Ur-Seismic Walkdown Checklist (SWC) SWELl- 010 Equipment ID No. P203A Equip. Class, Vertical Pumps (06)Equipment Description RHR Pump A Location:
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: Y[ NIE U-Seismic Walkdown Checklist (SWC) SWELl- 009 Equipment ID No. SOV305-118-2/3 Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RPS Grp 2/3 Scram Pilot Photographs Note: Note: Typical component (SO V305-118-2/3 on top).EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C23 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YZ NF Ur-Seismic Walkdown Checklist (SWC) SWELl- 010 Equipment ID No. P203A Equip. Class, Vertical Pumps (06)Equipment Description RHR Pump A Location:
Bldg. RB Floor El. -17.5 Room, Area SE QD Manufacturer, Model, Etc. (optional but recommended)
Bldg. RB Floor El. -17.5 Room, Area SE QD Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL The space below each of the following questions may be used to record the results of judgments and findings.
Line 120: Line 186:
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?A surface crack is visible near one anchor, but since all bolts are cast in place in the foundation, this is not a structural deficiency.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?A surface crack is visible near one anchor, but since all bolts are cast in place in the foundation, this is not a structural deficiency.
Although one anchor bolt and nut is not visible, the concrete next to this and all other anchors is visible and free of cracking.1 Enter the equipment class name from Appendix B: Classes of Equipment.
Although one anchor bolt and nut is not visible, the concrete next to this and all other anchors is visible and free of cracking.1 Enter the equipment class name from Appendix B: Classes of Equipment.
YE NDl U[-] N/A-YN ND UD- N/A[-D EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C24 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NEr] UD]Seismic Walkdown Checklist (SWC) SWELl- 010 Equipment ID No. P203A Equip. Class Vertical Pumps (06)Equipment Description RHR Pump A 5. Is the anchorage configuration consistent with plant documentation?
YE NDl U[-] N/A-YN ND UD- N/A[-D EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C24 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NEr] UD]Seismic Walkdown Checklist (SWC) SWELl- 010 Equipment ID No. P203A Equip. Class Vertical Pumps (06)Equipment Description RHR Pump A 5. Is the anchorage configuration consistent with plant documentation?
YE] N] Ur- N/AS (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YE] N] Ur- N/AS (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Three anchors match drawing C-100 and SEW's package.6. Based on the above anchorage evaluations, is the anchorage free of YE NE: UE-potentially adverse seismic conditions?
Three anchors match drawing C-100 and SEW's package.6. Based on the above anchorage evaluations, is the anchorage free of YE NE: UE-potentially adverse seismic conditions?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ N[-] uEr N/AEF YN NE UE- N/AE1 YN NE- UE[ N/AE1 YZ NEI U-]EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C25 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ N13 UD--Seismic Walkdown Checklist (SWC) SWELl- 010 Equipment ID No. P203A Equip. Class Vertical Pumps (06)Equipment Description RHR Pump A Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ N[-] uEr N/AEF YN NE UE- N/AE1 YN NE- UE[ N/AE1 YZ NEI U-]EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C25 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ N13 UD--Seismic Walkdown Checklist (SWC) SWELl- 010 Equipment ID No. P203A Equip. Class Vertical Pumps (06)Equipment Description RHR Pump A Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Y; NEi ULi adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could Y; NEi ULi adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Area walk-by is on A WC-032.A~. IW~.4A~Evaluated by: Gar Sweder Date: 10-9-12 0 Laura Maclay ILIJ'TYCL IO4 10-9-12 VI UJ EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C26 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y[ NE] Ur-1 Seismic Walkdown Checklist (SWC) SWELl- 010 Equipment ID No. P203A Equip. Class Vertical Pumps (06)Equipment Description RHR Pump A Photographs Note: Equipment tag Note: Partial view of anchorage EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C27 of 0413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Seismic Walkdown Checklist (SWC) SWELl- 010 Equipment ID No. P203A Equip. Class Vertical Pumps (06)Equipment Description RHR Pump A Status: YE NIE U-I Note: Overall view Note: Surface crack, refer to response in question #4.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C28 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ Nr-' U'Seismic Walkdown Checklist (SWC) SWELl- 011 Equipment ID No. P203C Equip. Class' Vertical Pumps (06)Equipment Description RHR Pump C Location:
Area walk-by is on A WC-032.A~. IW~.4A~Evaluated by: Gar Sweder Date: 10-9-12 0 Laura Maclay ILIJ'TYCL IO4 10-9-12 VI UJ EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C26 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y[ NE] Ur-1 Seismic Walkdown Checklist (SWC) SWELl- 010 Equipment ID No. P203A Equip. Class Vertical Pumps (06)Equipment Description RHR Pump A Photographs Note: Equipment tag Note: Partial view of anchorage EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C27 of 0413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 5 of 5 Seismic Walkdown Checklist (SWC) SWELl- 010 Equipment ID No. P203A Equip. Class Vertical Pumps (06)Equipment Description RHR Pump A Status: YE NIE U-I Note: Overall view Note: Surface crack, refer to response in question #4.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C28 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ Nr-' U'Seismic Walkdown Checklist (SWC) SWELl- 011 Equipment ID No. P203C Equip. Class' Vertical Pumps (06)Equipment Description RHR Pump C Location:
Bldg. RB Floor El. -17.5 Room, Area SE QD Manufacturer, Model, Etc. (optional but recommended)
Bldg. RB Floor El. -17.5 Room, Area SE QD Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Line 137: Line 218:
Two visible anchors are free of corrosion.
Two visible anchors are free of corrosion.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE NEIl ur- N/Ar-YN NEI U[-- N/ADl Although two anchor bolts are not visible, the area near the bolts is free of cracking.'Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE NEIl ur- N/Ar-YN NEI U[-- N/ADl Although two anchor bolts are not visible, the area near the bolts is free of cracking.'Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C29 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NE] U--Seismic Walkdown Checklist (SWC) SWELl- 011 Equipment ID No. P203C Equip. Class Vertical Pumps (06)Equipment Description RHR Pump C 5. Is the anchorage configuration consistent with plant documentation?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C29 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NE] U--Seismic Walkdown Checklist (SWC) SWELl- 011 Equipment ID No. P203C Equip. Class Vertical Pumps (06)Equipment Description RHR Pump C 5. Is the anchorage configuration consistent with plant documentation?
YEI NEI UI- N/A[D (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YEI NEI UI- N/A[D (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Refer to response to question #1 above.6. Based on the above anchorage evaluations, is the anchorage free of Y[ NEil UE-potentially adverse seismic conditions?
Refer to response to question #1 above.6. Based on the above anchorage evaluations, is the anchorage free of Y[ NEil UE-potentially adverse seismic conditions?
Line 143: Line 227:
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NE] UE[ N/A[-YZ NE] UE-- N/A--YN NE] UE[- N/AE--YN N-] Ur]EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C30 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YZ{ NEI Ul Seismic Walkdown Checklist (SWC) SWELl- 011 Equipment ID No. P203C Equip. Class Vertical Pumps (06)Equipment Description RHR Pump C Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NE] UE[ N/A[-YZ NE] UE-- N/A--YN NE] UE[- N/AE--YN N-] Ur]EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C30 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YZ{ NEI Ul Seismic Walkdown Checklist (SWC) SWELl- 011 Equipment ID No. P203C Equip. Class Vertical Pumps (06)Equipment Description RHR Pump C Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YO N[-] UI-adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could YO N[-] UI-adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Area walk-by is on AWC-032.Evaluated by: Gary Sweder J3i. .. & _Laura Maclay .O. \V \Date: 10-9-12 10-9-12 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C31 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YE NF- UD" Seismic Walkdown Checklist (SWC) SWELl- 011 Equipment ID No. P203C Equip. Class Vertical Pumps (06)Equipment Description RHR Pump C Photographs Note: Equipment tag Note: Two anchors not visible due to lead shielding, note pedestal near anchorage is visible.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C32 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ ND] U[i Seismic Walkdown Checklist (SWC) SWELl- 012 Equipment ID No. P205 Equip. Class, Horizontal Pumps (05)Equipment Description HPCI Pump Location:
Area walk-by is on AWC-032.Evaluated by: Gary Sweder J3i. .. & _Laura Maclay .O. \V \Date: 10-9-12 10-9-12 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C31 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YE NF- UD" Seismic Walkdown Checklist (SWC) SWELl- 011 Equipment ID No. P203C Equip. Class Vertical Pumps (06)Equipment Description RHR Pump C Photographs Note: Equipment tag Note: Two anchors not visible due to lead shielding, note pedestal near anchorage is visible.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C32 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ ND] U[i Seismic Walkdown Checklist (SWC) SWELl- 012 Equipment ID No. P205 Equip. Class, Horizontal Pumps (05)Equipment Description HPCI Pump Location:
Bldg. RB Floor El. -17.5 Room, Area HPCI RM Manufacturer, Model, Etc. (optional but recommended)
Bldg. RB Floor El. -17.5 Room, Area HPCI RM Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL The space below each of the following questions may be used to record the results of judgments and findings.
Line 152: Line 245:
YZ N[-]2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
YZ N[-]2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YZ NEI ULI N/AD-Y[ NDI Ui- N/AD-YZ Nr- Ur- N/AD-Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YZ NEI ULI N/AD-Y[ NDI Ui- N/AD-YZ Nr- Ur- N/AD-Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C33 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YN NEI U-Seismic Walkdown Checklist (SWC) SWELl- 012 Equipment ID No. -P205 Equip. Class Horizontal Pumps (05)Equipment Description HPCI Pump 5. Is the anchorage configuration consistent with plant documentation?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C33 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YN NEI U-Seismic Walkdown Checklist (SWC) SWELl- 012 Equipment ID No. -P205 Equip. Class Horizontal Pumps (05)Equipment Description HPCI Pump 5. Is the anchorage configuration consistent with plant documentation?
YO Ni] Ui- N/A--(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YO Ni] Ui- N/A--(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage configuration verified and dimensions spot checked using C185, E7 and C186, E3.6. Based on the above anchorage evaluations, is the anchorage free of YO N[i U[i potentially adverse seismic conditions?
Anchorage configuration verified and dimensions spot checked using C185, E7 and C186, E3.6. Based on the above anchorage evaluations, is the anchorage free of YO N[i U[i potentially adverse seismic conditions?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YO NE] U[i N/A[--8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE7 NO UEi N/AEl and masonry block walls not likely to collapse onto the equipment?
YO NE] U[i N/A[--8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE7 NO UEi N/AEl and masonry block walls not likely to collapse onto the equipment?
Open S-hook on southwest side of pump. CR-PNP-2012-04594 was written to address the issue and it has been wired to secure it.9. Do attached lines have adequate flexibility to avoid damage?YO NE-] UEi N/AE 10. Based on the above seismic interaction evaluations, is equipment free YE-- NO UEl of potentially adverse seismic interaction effects?See Response #8.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C34 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NE] UI-Seismic Walkdown Checklist (SWC) SWELl- 012 Equipment ID No. P205 Equip. Class Horizontal Pumps (05)Equipment Description HPCI Pump Other Adverse Conditions
Open S-hook on southwest side of pump. CR-PNP-2012-04594 was written to address the issue and it has been wired to secure it.9. Do attached lines have adequate flexibility to avoid damage?YO NE-] UEi N/AE 10. Based on the above seismic interaction evaluations, is equipment free YE-- NO UEl of potentially adverse seismic interaction effects?See Response #8.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C34 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NE] UI-Seismic Walkdown Checklist (SWC) SWELl- 012 Equipment ID No. P205 Equip. Class Horizontal Pumps (05)Equipment Description HPCI Pump Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Y21 NEi U-adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could Y21 NEi U-adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Area walk-by is AWC-04.P205 is not directly labeled in the field. Label request was entered in eSOMS to have the item label created.The turbine and the pump are on different skids. However the concrete pedestals are quite rigid and are tied together.
Area walk-by is AWC-04.P205 is not directly labeled in the field. Label request was entered in eSOMS to have the item label created.The turbine and the pump are on different skids. However the concrete pedestals are quite rigid and are tied together.
Therefore there is no potential for differential movement between pump and driver.This was confirmed by the SEWs package.Evaluated by: Ga Sweder / A I.-.-0 Date: 10-15-12 Laura Maelav YWYLAý "fnCa DQUA-10-15-12 4 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C35 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ No- U]Seismic Walkdown Checklist (SWC) SWELl- 012 Equipment ID No. P205 Equip. Class Horizontal Pumps (05)Equipment Description HPCI Pump Photographs Note: P205 is not directly labeled, therefore the equipment is verified by its adjoining components.
Therefore there is no potential for differential movement between pump and driver.This was confirmed by the SEWs package.Evaluated by: Ga Sweder / A I.-.-0 Date: 10-15-12 Laura Maelav YWYLAý "fnCa DQUA-10-15-12 4 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C35 of C413 ATTACHMENT  
Note: View of pump and anchorage EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C36 of 0413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Seismic Walkdown Checklist (SWC) SWELl- 012 Equipment ID No. P205 Equip. Class Horizontal Pumps (05)Equipment Description HPCI Pump Status: YN NEI uL-]Note: Open S-hook Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOO01, Rev. 1 Attachment C Page C37 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 4 Status: Y[ N[-] U --Seismic Walkdown Checklist (SWC) SWELl- 013 Equipment ID No. MO1001-16A Equip. Classi Motor-Operated  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ No- U]Seismic Walkdown Checklist (SWC) SWELl- 012 Equipment ID No. P205 Equip. Class Horizontal Pumps (05)Equipment Description HPCI Pump Photographs Note: P205 is not directly labeled, therefore the equipment is verified by its adjoining components.
Note: View of pump and anchorage EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C36 of 0413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 5 of 5 Seismic Walkdown Checklist (SWC) SWELl- 012 Equipment ID No. P205 Equip. Class Horizontal Pumps (05)Equipment Description HPCI Pump Status: YN NEI uL-]Note: Open S-hook Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOO01, Rev. 1 Attachment C Page C37 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 1 of 4 Status: Y[ N[-] U --Seismic Walkdown Checklist (SWC) SWELl- 013 Equipment ID No. MO1001-16A Equip. Classi Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop Ht Exch Bypass Location:
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop Ht Exch Bypass Location:
Bldg. RB Floor El. -3 R Manufacturer, Model, Etc. (optional but recommended) oom, Area SE QD Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Bldg. RB Floor El. -3 R Manufacturer, Model, Etc. (optional but recommended) oom, Area SE QD Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Line 169: Line 277:
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[- NO YF-1 NEi U[-I N/A[YEI NEI UE- N/A[Y-I NEI UEr N/A[Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[- NO YF-1 NEi U[-I N/A[YEI NEI UE- N/A[Y-I NEI UEr N/A[Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page C38 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NE] UL-Seismic Walkdown Checklist (SWC) SWELl- 013 Equipment ID No. MOIOOI-16A Equip. Class Motor-Operated  
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page C38 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NE] UL-Seismic Walkdown Checklist (SWC) SWELl- 013 Equipment ID No. MOIOOI-16A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop Ht Exch Bypass 5. Is the anchorage configuration consistent with plant documentation?
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop Ht Exch Bypass 5. Is the anchorage configuration consistent with plant documentation?
Y] N[-] U[-] N/A0 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Y] N[-] U[-] N/A0 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Line 176: Line 287:
There is a large scaffold near the component, but it has a tag stating it has been seismically evaluated.
There is a large scaffold near the component, but it has a tag stating it has been seismically evaluated.
Therefore, it does not present a seismic interaction concern.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Therefore, it does not present a seismic interaction concern.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NEI uE] N/AE]Y[ NEI UE] N/AE]YE NE] UE] N/AE]YE NE] U-]EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C39 of C41 3 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YE NEl U[]Seismic Walkdown Checklist (SWC) SWELl- 013 Equipment ID No. Mor101-16A Equip. Class Motor-Operated  
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NEI uE] N/AE]Y[ NEI UE] N/AE]YE NE] UE] N/AE]YE NE] U-]EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C39 of C41 3 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YE NEl U[]Seismic Walkdown Checklist (SWC) SWELl- 013 Equipment ID No. Mor101-16A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop Ht Exch Bypass Other Adverse Conditions
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop Ht Exch Bypass Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YO NEI UE1 Comments (Additional pages may be added as necessary)
YO NEI UE1 Comments (Additional pages may be added as necessary)
The body of the valve is insulated and so is not visible. All other visible components were checked during the walkdown.SWEL 1-013 is on AWC-007.912j I,,J] Date: 10/09/2012 Evaluated by: David Small Halie Aroz 10/09/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 040 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: Y¥ ND ULI Seismic Walkdown Checklist (SWC) SWELl- 013 Equipment ID No. MO1001-16A Equip. Class Motor-Operated  
The body of the valve is insulated and so is not visible. All other visible components were checked during the walkdown.SWEL 1-013 is on AWC-007.912j I,,J] Date: 10/09/2012 Evaluated by: David Small Halie Aroz 10/09/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 040 of C413 ATTACHMENT  
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop Ht Exch Bypass Photographs Note: Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C41 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: Y[ NR- U[--Seismic Walkdown Checklist (SWC) SWELl- 014 Equipment ID No. A8 Equip. Class' Medium-Voltage, Metal-Clad Switch-gear (03)Equipment Description 4KV Emercq Buss Location:
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: Y¥ ND ULI Seismic Walkdown Checklist (SWC) SWELl- 013 Equipment ID No. MO1001-16A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop Ht Exch Bypass Photographs Note: Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C41 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet I of 5 Status: Y[ NR- U[--Seismic Walkdown Checklist (SWC) SWELl- 014 Equipment ID No. A8 Equip. Class' Medium-Voltage, Metal-Clad Switch-gear (03)Equipment Description 4KV Emercq Buss Location:
Bldg. N/A Floor El. 23 Room, Area YARD Manufacturer, Model, Etc. (optional but recommended)
Bldg. N/A Floor El. 23 Room, Area YARD Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Line 193: Line 313:
Although they are fused there is no flaking of metal or any apparent reduction in bolt or nut diameter.
Although they are fused there is no flaking of metal or any apparent reduction in bolt or nut diameter.
Therefore there is no loss of strength and the anchor will perform its design function.4. Is the anchorage free of visible cracks in the concrete near the anchors?YI- NO YO NE!I UiE N/All YE NE! UL- N/AZ!YE NEI UiE N/Ar-' Enter the equipment class name from Appendix B: Classes of Equipment.
Therefore there is no loss of strength and the anchor will perform its design function.4. Is the anchorage free of visible cracks in the concrete near the anchors?YI- NO YO NE!I UiE N/All YE NE! UL- N/AZ!YE NEI UiE N/Ar-' Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C42 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NF U-Seismic Walkdown Checklist (SWC) SWELl- 014 Equipment ID No. A8 Equip. Class Medium-Voltage, Metal-Clad Switch-gear (03)Equipment Description 4KV Emerq Buss 5. Is the anchorage configuration consistent with plant documentation?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C42 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NF U-Seismic Walkdown Checklist (SWC) SWELl- 014 Equipment ID No. A8 Equip. Class Medium-Voltage, Metal-Clad Switch-gear (03)Equipment Description 4KV Emerq Buss 5. Is the anchorage configuration consistent with plant documentation?
YE] N[i ULi N/A](Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YE] N[i ULi N/A](Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Refer to question #1.6. Based on the above anchorage evaluations, is the anchorage free of Y[ NEI UEr potentially adverse seismic conditions?
Refer to question #1.6. Based on the above anchorage evaluations, is the anchorage free of Y[ NEI UEr potentially adverse seismic conditions?
Line 202: Line 325:
It is in good condition.
It is in good condition.
Light bulbs within the cabinets are plastic coated and do not pose a seismic hazard.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?A small plastic hose next to the batteries inside of the panel was noted.Due to restaints of not breaking the plane of the cabinet while it is open, it could not be determined if this is part of the battery assembly.
Light bulbs within the cabinets are plastic coated and do not pose a seismic hazard.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?A small plastic hose next to the batteries inside of the panel was noted.Due to restaints of not breaking the plane of the cabinet while it is open, it could not be determined if this is part of the battery assembly.
It does not pose a seismic risk.YZ NEI Ur- N/A[:]YN NEI Un N/AD Y[ NEJ U-- N/AD--Y[ NE-I U -EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C43 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NF UI-Seismic Walkdown Checklist (SWC) SWELl- 014 Equipment ID No. A8 Equip. Class Medium-Volta-ge, Metal-Clad Switchqear (03)Equipment Description 4KV Emer, Buss Other Adverse Conditions
It does not pose a seismic risk.YZ NEI Ur- N/A[:]YN NEI Un N/AD Y[ NEJ U-- N/AD--Y[ NE-I U -EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C43 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NF UI-Seismic Walkdown Checklist (SWC) SWELl- 014 Equipment ID No. A8 Equip. Class Medium-Volta-ge, Metal-Clad Switchqear (03)Equipment Description 4KV Emer, Buss Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YE NEI- UI-adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could YE NEI- UI-adversely affect the safety functions of the equipment?
Floor of Diesel Gen Breaker-152-181 is visible corroded.
Floor of Diesel Gen Breaker-152-181 is visible corroded.
CR-PNP-2012-04540 was written to correct the issue.Comments .(Additional pages may be added as necessary)
CR-PNP-2012-04540 was written to correct the issue.Comments .(Additional pages may be added as necessary)
Area walk-by is A WC-026.Y 4~lA oSS a t OOl~C~n .1 * .4 k1,a I n ja~--V GtU -t9 v *U)Date: 10-11-12 10-11-12 Gary Sweder}7Jk-U IL -~-0~EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C44 of C413 ATrTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NE] UMI Seismic Walkdown Checklist (SWC) SWELl- 014 Equipment ID No. A8 Equip. Class Medium-Voltage, Metal-Clad Switchgear (03)Equipment Description 4KV Emerci Buss Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C45 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[ NFI U-I Seismic Walkdown Checklist (SWC) SWELl- 014 Equipment ID No. A8 Equip. Class Medium-Volta-ue, Metal-Clad Switch-gear (03)Equipment Description 4KV Emerq Buss Note: Inside of panel closest to entrance door.Note corroded anchor clip and anchor.Note: Close-up of corroded anchor EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 046 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ NE] ULI Seismic Walkdown Checklist (SWC) SWELl- 015 Equipment ID No. MO1001-28A Equip. Class, Motor-Operated  
Area walk-by is A WC-026.Y 4~lA oSS a t OOl~C~n .1 * .4 k1,a I n ja~--V GtU -t9 v *U)Date: 10-11-12 10-11-12 Gary Sweder}7Jk-U IL -~-0~EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C44 of C413 ATrTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NE] UMI Seismic Walkdown Checklist (SWC) SWELl- 014 Equipment ID No. A8 Equip. Class Medium-Voltage, Metal-Clad Switchgear (03)Equipment Description 4KV Emerci Buss Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C45 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[ NFI U-I Seismic Walkdown Checklist (SWC) SWELl- 014 Equipment ID No. A8 Equip. Class Medium-Volta-ue, Metal-Clad Switch-gear (03)Equipment Description 4KV Emerq Buss Note: Inside of panel closest to entrance door.Note corroded anchor clip and anchor.Note: Close-up of corroded anchor EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 046 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ NE] ULI Seismic Walkdown Checklist (SWC) SWELl- 015 Equipment ID No. MO1001-28A Equip. Class, Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Iniection Location:
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Iniection Location:
Bldg. RB Floor El. 23 R Manufacturer, Model, Etc. (optional but recommended) oom, Area A VLV Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Bldg. RB Floor El. 23 R Manufacturer, Model, Etc. (optional but recommended) oom, Area A VLV Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Line 212: Line 347:
In-line component, no anchorage 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
In-line component, no anchorage 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE- NO YE] NE-] Ur N/A]YE- NE: uE- N/AZ YE: NE] Ur- N/AN 1 Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE- NO YE] NE-] Ur N/A]YE- NE: uE- N/AZ YE: NE] Ur- N/AN 1 Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C47 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: Y[ NFI U-Seismic Walkdown Checklist (SWC) SWELl- 015 Equipment ID No. MO100I-28A Equip. Class Motor-Operated  
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C47 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: Y[ NFI U-Seismic Walkdown Checklist (SWC) SWELl- 015 Equipment ID No. MO100I-28A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Injection 5. Is the anchorage configuration consistent with plant documentation?
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Injection 5. Is the anchorage configuration consistent with plant documentation?
YLI Nil UM- N/A[(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YLI Nil UM- N/A[(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Line 219: Line 357:
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Masonry walls 63.4, 63.5, and 63.6 (C941Shl, El) are safety related, therefore seismically qualified and acceptable.
Masonry walls 63.4, 63.5, and 63.6 (C941Shl, El) are safety related, therefore seismically qualified and acceptable.
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ N[-] U- N/AD-YZ N["] UL- N/A[-]Y[ NE] U'- N/AD]Y[ NEI UF EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page 048 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NEI UrI Seismic Walkdown Checklist (SWC) SWELl- 015 Equipment ID No. MO1001-28A Equip. Class Motor-Operated  
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ N[-] U- N/AD-YZ N["] UL- N/A[-]Y[ NE] U'- N/AD]Y[ NEI UF EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page 048 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NEI UrI Seismic Walkdown Checklist (SWC) SWELl- 015 Equipment ID No. MO1001-28A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Iniection Other Adverse Conditions
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Iniection Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YN NEI UE-adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could YN NEI UE-adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
A broken placard was noted on the valve body. This is a general housekeeping concern, not a seismic interaction hazard, and was reported to Operations for suggested fix.Area Walk-By is on A WC-0 11~. ... Y\. ~C Imltarl hI- nr. Qwnwrodar Date: 16- /1 -/Z-.,.V i IU * .4 Vtl I'It. U- US69A %' aC%+/--U AA David Small i1 , EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C49 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YN NE] ULI Seismic Walkdown Checklist (SWC) SWELl- 015 Equipment ID No. MO1001-28A Equip. Class Motor-Operated  
A broken placard was noted on the valve body. This is a general housekeeping concern, not a seismic interaction hazard, and was reported to Operations for suggested fix.Area Walk-By is on A WC-0 11~. ... Y\. ~C Imltarl hI- nr. Qwnwrodar Date: 16- /1 -/Z-.,.V i IU * .4 Vtl I'It. U- US69A %' aC%+/--U AA David Small i1 , EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C49 of C413 ATTACHMENT  
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Injection Photographs Note: Label Note: View of Valve EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C50 of C41 3 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NF Ur-]Seismic Walkdown Checklist (SWC) SWELl- 015 Equipment ID No. MO1001-28A Equip. Class Motor-Operated  
 
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Injection Photographs Note: Broken Placard Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page C51 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 4 Status: Y[ NE UE Seismic Walkdown Checklist (SWC) SWELl- 016 Equipment ID No. MO1001-29A Equip. Class' Motor-Operated  
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YN NE] ULI Seismic Walkdown Checklist (SWC) SWELl- 015 Equipment ID No. MO1001-28A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Injection Photographs Note: Label Note: View of Valve EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C50 of C41 3 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NF Ur-]Seismic Walkdown Checklist (SWC) SWELl- 015 Equipment ID No. MO1001-28A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Injection Photographs Note: Broken Placard Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page C51 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 1 of 4 Status: Y[ NE UE Seismic Walkdown Checklist (SWC) SWELl- 016 Equipment ID No. MO1001-29A Equip. Class' Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Injection Location:
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Injection Location:
Bldg. RB Floor El. 23 R Manufacturer, Model, Etc. (optional but recommended) oom, Area A VL V Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL The space below each of the following questions may be used to record the results of judgments and findings.
Bldg. RB Floor El. 23 R Manufacturer, Model, Etc. (optional but recommended) oom, Area A VL V Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL The space below each of the following questions may be used to record the results of judgments and findings.
Line 231: Line 381:
In-line component, no anchorage 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
In-line component, no anchorage 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-] NEI YE-] NEi uE-] N/AN YE[- NE] U[-] N/A[YE- NEI UEi N/A]1 Enter the equipment class name from Appendix 13: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-] NEI YE-] NEi uE-] N/AN YE[- NE] U[-] N/A[YE- NEI UEi N/A]1 Enter the equipment class name from Appendix 13: Classes of Equipment.
EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-O0O01, Rev. 1 Attachment C Page 052 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: Y[ NF U-Seismic Walkdown Checklist (SWC) SWELl- 016 Equipment ID No. MO100I-29A Equip. Class Motor-Operated  
EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-O0O01, Rev. 1 Attachment C Page 052 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: Y[ NF U-Seismic Walkdown Checklist (SWC) SWELl- 016 Equipment ID No. MO100I-29A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Injection 5. Is the anchorage configuration consistent with plant documentation?
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Injection 5. Is the anchorage configuration consistent with plant documentation?
Y[I Ni] UrI N/AM (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Y[I Ni] UrI N/AM (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Line 238: Line 391:
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Masonry walls 63.4, 63.5, and 63.6 (C941Shl, El) are safety related, therefore seismically qualified and acceptable.
Masonry walls 63.4, 63.5, and 63.6 (C941Shl, El) are safety related, therefore seismically qualified and acceptable.
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ Nr-1 U[-D N/A[-]YZ NDI Ur N/AD-I Y[ NDJ U[] N/AD-YZ ND- U--EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C53 of C413 AI'rACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YE NEI UI-Seismic Walkdown Checklist (SWC) SWELl- 016 Equipment ID No. MO1001-29A Equip. Class Motor-Operated  
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ Nr-1 U[-D N/A[-]YZ NDI Ur N/AD-I Y[ NDJ U[] N/AD-YZ ND- U--EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C53 of C413 AI'rACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YE NEI UI-Seismic Walkdown Checklist (SWC) SWELl- 016 Equipment ID No. MO1001-29A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Injection Other Adverse Conditions
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Injection Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YZ NEI UE Comments (Additional pages may be added as necessary)
YZ NEI UE Comments (Additional pages may be added as necessary)
MO 1001-29A has both thermal and radiation shielding Area Walk-By is on A WC-0 11 Evaluated by: Gary Sweder ,~C'i~iU J~N(kJ-Qr{LA
MO 1001-29A has both thermal and radiation shielding Area Walk-By is on A WC-0 11 Evaluated by: Gary Sweder ,~C'i~iU J~N(kJ-Qr{LA
'3 52~J Li?Date: ZO / 7-1z-(C /17 /112, navid rmnII EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C54 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ NrI UrL-Seismic Walkdown Checklist (SWC) SWELl- 016 Equipment ID No. MOIOOI-29A Equip. Class Motor-Operated  
'3 52~J Li?Date: ZO / 7-1z-(C /17 /112, navid rmnII EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C54 of C413 ATTACHMENT  
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Injection Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page 055 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NE] UEI]Seismic Walkdown Checklist (SWC) SWELl- 017 Equipment ID No. MO1001-34A Equip. Class' Motor-Operated  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ NrI UrL-Seismic Walkdown Checklist (SWC) SWELl- 016 Equipment ID No. MOIOOI-29A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Injection Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page 055 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NE] UEI]Seismic Walkdown Checklist (SWC) SWELl- 017 Equipment ID No. MO1001-34A Equip. Class' Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR Loop A Torus Return Location:
& Solenoid-Operated Valves (08)Equipment Description RHR Loop A Torus Return Location:
Bldg. RB Floor El. 9 R Manufacturer, Model, Etc. (optional but recommended) oom, Area SE QD Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL The space below each of the following questions may be used to record the results of judgments and findings.
Bldg. RB Floor El. 9 R Manufacturer, Model, Etc. (optional but recommended) oom, Area SE QD Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL The space below each of the following questions may be used to record the results of judgments and findings.
Line 251: Line 413:
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-- NO YE] NE] UE] N/AO YE] NE-] uE] N/AO Y[E] N[-] U[] N/A[I Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-- NO YE] NE] UE] N/AO YE] NE-] uE] N/AO Y[E] N[-] U[] N/A[I Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C56 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: Y[ NFR- Ur]Seismic Walkdown Checklist (SWC) SWELl- 017 Equipment ID No. MO1001-34A Equip. Class Motor-Operated  
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C56 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: Y[ NFR- Ur]Seismic Walkdown Checklist (SWC) SWELl- 017 Equipment ID No. MO1001-34A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR Loop A Torus Return 5. Is the anchorage configuration consistent with plant documentation?
& Solenoid-Operated Valves (08)Equipment Description RHR Loop A Torus Return 5. Is the anchorage configuration consistent with plant documentation?
Y[-- NFi UiL N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Y[-- NFi UiL N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Line 257: Line 422:
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NFil UD N/A-]YZ NEI ULI N/A--YZ Nil u[-] N/A[-]YZ NEL ULI EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C57 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YN Ný UE-Seismic Walkdown Checklist (SWC) SWELl- 017 Equipment ID No. MO1001-34A Equip. Class Motor-Operated  
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NFil UD N/A-]YZ NEI ULI N/A--YZ Nil u[-] N/A[-]YZ NEL ULI EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C57 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YN Ný UE-Seismic Walkdown Checklist (SWC) SWELl- 017 Equipment ID No. MO1001-34A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR Loop A Torus Return Other Adverse Conditions
& Solenoid-Operated Valves (08)Equipment Description RHR Loop A Torus Return Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Y0 N[l U[-]adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could Y0 N[l U[-]adversely affect the safety functions of the equipment?
Line 263: Line 431:
The paint is stripped around the weld between the valve body and the piping. There is mild surface corrosion in the area, but this is not considered an adverse seismic condition.
The paint is stripped around the weld between the valve body and the piping. There is mild surface corrosion in the area, but this is not considered an adverse seismic condition.
SWEL 1-017 is on AWC-007.2w~t4 Evaluated by: David Small Date: 10/09/2012 Halie Aroz 10/09/2012
SWEL 1-017 is on AWC-007.2w~t4 Evaluated by: David Small Date: 10/09/2012 Halie Aroz 10/09/2012
-%--," 0 L)EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C58 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YE N[-] U[-Seismic Walkdown Checklist (SWC) SWELl- 017 Equipment ID No. MOIOOI-34A Equip. Class Motor-Operated  
-%--," 0 L)EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C58 of C413 ATTACHMENT  
& Solenoid-Operated Valves (08)Equipment Description RHR Loop A Torus Retum Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page C59 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YN Nr-F Ur Seismic Walkdown Checklist (SWC) SWELl- 018 Equipment ID No. MOIOOI-36A Equip. Class' Motor-Operated  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YE N[-] U[-Seismic Walkdown Checklist (SWC) SWELl- 017 Equipment ID No. MOIOOI-34A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR Loop A Torus Retum Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page C59 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YN Nr-F Ur Seismic Walkdown Checklist (SWC) SWELl- 018 Equipment ID No. MOIOOI-36A Equip. Class' Motor-Operated  
& Solenoid-Ogerated Valves (08)Equipment Description RHR Loop A Torus Return Location:
& Solenoid-Ogerated Valves (08)Equipment Description RHR Loop A Torus Return Location:
Bldg. RB Floor El. -1.5 Rc Manufacturer, Model, Etc. (optional but recommended) om, Area SE QD Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Bldg. RB Floor El. -1.5 Rc Manufacturer, Model, Etc. (optional but recommended) om, Area SE QD Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Line 271: Line 445:
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-] NO YE] NE- U[-] N/AO YE]- NE] Ur] N/A2 Y[E] NEI U[- N/AZ I Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-] NO YE] NE- U[-] N/AO YE]- NE] Ur] N/A2 Y[E] NEI U[- N/AZ I Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C60 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NE] U--Seismic Walkdown Checklist (SWC) SWELl- 018 Equipment ID No. MO1001-36A Equip. Class Motor-Operated  
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C60 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NE] U--Seismic Walkdown Checklist (SWC) SWELl- 018 Equipment ID No. MO1001-36A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR Loon A Torus Return 5. Is the anchorage configuration consistent with plant documentation?
& Solenoid-Operated Valves (08)Equipment Description RHR Loon A Torus Return 5. Is the anchorage configuration consistent with plant documentation?
YIO NI] U[i N/A[(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YIO NI] U[i N/A[(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Line 277: Line 454:
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
The 1-1/2" rigid steel power conduit to Core Spray Valve MO 1400-3A is in contact with the motor operator of MO 100 1-36A. The conduit appears slightly bent due to this contact. Due to the potential for adverse interaction during a seismic event, CR-PNP-2012-04442 was written to address the concem. WR 286594 has been initiated to reroute the conduit to provide clearance with the motor. See attached photo.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
The 1-1/2" rigid steel power conduit to Core Spray Valve MO 1400-3A is in contact with the motor operator of MO 100 1-36A. The conduit appears slightly bent due to this contact. Due to the potential for adverse interaction during a seismic event, CR-PNP-2012-04442 was written to address the concem. WR 286594 has been initiated to reroute the conduit to provide clearance with the motor. See attached photo.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YEI NZ Ur- N/A[YZ N[-] U-- N/A--YZ N[-] Ur-] N/AF-]YF- NZ Ur-1 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C61 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ Nn Ur-Seismic Walkdown Checklist (SWC) SWELl- 018 Equipment ID No. MO1001-36A Equip. Class Motor-Operated  
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YEI NZ Ur- N/A[YZ N[-] U-- N/A--YZ N[-] Ur-] N/AF-]YF- NZ Ur-1 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C61 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ Nn Ur-Seismic Walkdown Checklist (SWC) SWELl- 018 Equipment ID No. MO1001-36A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR Loop A Torus Return Other Adverse Conditions
& Solenoid-Operated Valves (08)Equipment Description RHR Loop A Torus Return Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YED NEI U-j adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could YED NEI U-j adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
The paint is stripped around the welds between the valve body and the piping. There is mild surface corrosion in the area, but this is not considered an adverse seismic condition.
The paint is stripped around the welds between the valve body and the piping. There is mild surface corrosion in the area, but this is not considered an adverse seismic condition.
Under the valve, two pins were found duct taped to a stanchion above a spring can. This was discussed with operations and engineering management, and was determined to be an acceptable practice for holding the pins in place; therefore, it is not a seismic interaction or a housekeeping concern.SWEL1-018 is on AWC-007.Evaluated by: David Small 0 J/ I 'A Halie Aroz Date: 10/09/2012 10/09/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C62 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y[ Nr I U--I Seismic Walkdown Checklist (SWC) SWELl- 018 Equipment ID No. MOIOOI-36A Equip. Class Motor-Operated  
Under the valve, two pins were found duct taped to a stanchion above a spring can. This was discussed with operations and engineering management, and was determined to be an acceptable practice for holding the pins in place; therefore, it is not a seismic interaction or a housekeeping concern.SWEL1-018 is on AWC-007.Evaluated by: David Small 0 J/ I 'A Halie Aroz Date: 10/09/2012 10/09/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C62 of C413 ATTACHMENT  
& Solenoid-Operated Valves (08)Equipment Description RHR Loop A Torus Return Photographs Note: Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C63 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YN NR U-Seismic Walkdown Checklist (SWC) SWELl- 018 Equipment ID No. MOIOOI-36A Equip. Class Motor-Operated  
 
& Solenoid-Operated Valves (08)Equipment Description RHR Loop A Torus Return Note: MO1400-3A conduit in contact with the motor.Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 064 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NF- Ur-Seismic Walkdown Checklist (SWC) SWELl- 020 Equipment ID No. MO1001-7A Equip. Class' Motor-Operated  
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y[ Nr I U--I Seismic Walkdown Checklist (SWC) SWELl- 018 Equipment ID No. MOIOOI-36A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR Loop A Torus Return Photographs Note: Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C63 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YN NR U-Seismic Walkdown Checklist (SWC) SWELl- 018 Equipment ID No. MOIOOI-36A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR Loop A Torus Return Note: MO1400-3A conduit in contact with the motor.Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 064 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NF- Ur-Seismic Walkdown Checklist (SWC) SWELl- 020 Equipment ID No. MO1001-7A Equip. Class' Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203A Suction Location:
& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203A Suction Location:
Bldg. RB Floor El. -17.5 Rc Manufacturer, Model, Etc. (optional but recommended),om, Area SE QD Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Bldg. RB Floor El. -17.5 Rc Manufacturer, Model, Etc. (optional but recommended),om, Area SE QD Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Line 291: Line 480:
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE-] NO YE-- NEI ULI N/AO YEl NEl U[E N/AO YF] NE] U[-E N/AZ I Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE-] NO YE-- NEI ULI N/AO YEl NEl U[E N/AO YF] NE] U[-E N/AZ I Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 065 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: Y[ NE UEl Seismic Walkdown Checklist (SWC) SWELl- 020 Equipment ID No. MO1001-7A Equip. Class Motor-Operated  
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 065 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: Y[ NE UEl Seismic Walkdown Checklist (SWC) SWELl- 020 Equipment ID No. MO1001-7A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203A Suction 5. Is the anchorage configuration consistent with plant documentation?
& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203A Suction 5. Is the anchorage configuration consistent with plant documentation?
Y[E NE] UE-] N/A (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Y[E NE] UE-] N/A (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Line 297: Line 489:
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Scaffold at base of valve is safety related per scaffold log 12-0 1, ECR 13360 and does not pose a seismic hazard.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Scaffold at base of valve is safety related per scaffold log 12-0 1, ECR 13360 and does not pose a seismic hazard.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NEi UE- N/AE[YZ NEl UE- NIAE YZ NE-] U[E- N/AE-YZ NE-] uE EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C66 of 0413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: Y[ N["] Ul-Seismic Walkdown Checklist (SWC) SWELl- 020 Equipment ID No. MO1001-7A Equip. Class Motor-Operated  
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NEi UE- N/AE[YZ NEl UE- NIAE YZ NE-] U[E- N/AE-YZ NE-] uE EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C66 of 0413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: Y[ N["] Ul-Seismic Walkdown Checklist (SWC) SWELl- 020 Equipment ID No. MO1001-7A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203A Suction Other Adverse Conditions
& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203A Suction Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YZ NEI uL Comments (Additional pages may be added as necessary)
YZ NEI uL Comments (Additional pages may be added as necessary)
Area walk-by is on AWC-032.Evaluated by: Gary Sweder Date: 10-9-12-- (,j -Laura Macla v )AWCLOct-6YLCQ 10-9-12 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C67 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ NE] Ur Seismic Walkdown Checklist (SWC) SWELl- 020 Equipment ID No. MO1001-7A Equip. Class Motor-Operated  
Area walk-by is on AWC-032.Evaluated by: Gary Sweder Date: 10-9-12-- (,j -Laura Macla v )AWCLOct-6YLCQ 10-9-12 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C67 of C413 ATTACHMENT  
& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203A Suction Photographs EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C68 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ Nr-] Ur-Seismic Walkdown Checklist (SWC) SWELl- 021 Equipment ID No. M01001-7C Equip. Classi Motor-Operated  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ NE] Ur Seismic Walkdown Checklist (SWC) SWELl- 020 Equipment ID No. MO1001-7A Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203A Suction Photographs EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C68 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ Nr-] Ur-Seismic Walkdown Checklist (SWC) SWELl- 021 Equipment ID No. M01001-7C Equip. Classi Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203C Suction Location:
& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203C Suction Location:
Bldg. RB Floor El. -17.5 R Manufacturer, Model, Etc. (optional but recommended) oom, Area SE QD Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Bldg. RB Floor El. -17.5 R Manufacturer, Model, Etc. (optional but recommended) oom, Area SE QD Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Line 308: Line 509:
Inline component, no anchorage.
Inline component, no anchorage.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE-- N[Y--] NE] UEi N/AZ YEI NEI UEr N/A[YE] NEI uEr N/AZ I Enter the equipment class name from Appendix B: Classes of Equipment, EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C69 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YM NEI UI-Seismic Walkdown Checklist (SWC) SWELl- 021 Equipment ID No. M01001-7C Equip. Class Motor-Operated  
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE-- N[Y--] NE] UEi N/AZ YEI NEI UEr N/A[YE] NEI uEr N/AZ I Enter the equipment class name from Appendix B: Classes of Equipment, EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C69 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YM NEI UI-Seismic Walkdown Checklist (SWC) SWELl- 021 Equipment ID No. M01001-7C Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203C Suction 5. Is the anchorage configuration consistent with plant documentation?
& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203C Suction 5. Is the anchorage configuration consistent with plant documentation?
YI] NFI UF- N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YI] NFI UF- N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Line 314: Line 518:
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Scaffold at base of valve is safety related per scaffold log 12-01, ECR 13360 and does not pose a seismic hazard.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Scaffold at base of valve is safety related per scaffold log 12-01, ECR 13360 and does not pose a seismic hazard.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NEI U[-] N/Ar]Y[ NiE UI- N/A[-]YN NEII U[] N/A-]YZ NiE UE[EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C70 of 0413 A'RACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: Y0 NEI U[-Seismic Walkdown Checklist (SWC) SWELl- 021 Equipment ID No. M01001-7C Equip. Class Motor-Operated  
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NEI U[-] N/Ar]Y[ NiE UI- N/A[-]YN NEII U[] N/A-]YZ NiE UE[EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C70 of 0413 A'RACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: Y0 NEI U[-Seismic Walkdown Checklist (SWC) SWELl- 021 Equipment ID No. M01001-7C Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203C Suction Other Adverse Conditions
& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203C Suction Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YN NEI UL Comments (Additional pages may be added as necessary)
YN NEI UL Comments (Additional pages may be added as necessary)
Area walk-by is on AWC-032.Evaluated by: Garv Sweder Date: 10-9-12 Q Laura Maclay WT' V.U01.. U Y Ii C1L(tA 10-9-12 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C71 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ NE] ULI Seismic Walkdown Checklist (SWC) SWELl- 021 Equipment ID No. M01001-7C Equip. Class Motor-Operated  
Area walk-by is on AWC-032.Evaluated by: Garv Sweder Date: 10-9-12 Q Laura Maclay WT' V.U01.. U Y Ii C1L(tA 10-9-12 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C71 of C413 ATTACHMENT  
& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203C Suction Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C72 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NF- UIZI Seismic Walkdown Checklist (SWC) SWELl- 022 Equipment ID No. E207A Equip. Class, Tanks and Heat Exchangers (21)Equipment Description RHR A Loop Heat Exchanger Location:
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ NE] ULI Seismic Walkdown Checklist (SWC) SWELl- 021 Equipment ID No. M01001-7C Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203C Suction Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C72 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NF- UIZI Seismic Walkdown Checklist (SWC) SWELl- 022 Equipment ID No. E207A Equip. Class, Tanks and Heat Exchangers (21)Equipment Description RHR A Loop Heat Exchanger Location:
Bldg. RB Floor El. -17.5 Room, Area SE QD Manufacturer, Model, Etc. (optional but recommended)
Bldg. RB Floor El. -17.5 Room, Area SE QD Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Line 328: Line 541:
Anchorage from the component to the steel frame is in good condition.
Anchorage from the component to the steel frame is in good condition.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Equipment is anchored to a steel frame which sits on embedded plates in the wall. Due to high location on the wall, this is not visible.'Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Equipment is anchored to a steel frame which sits on embedded plates in the wall. Due to high location on the wall, this is not visible.'Enter the equipment class name from Appendix B: Classes of Equipment.
YO NO YZ NEI UE! N/AEJ YZ NE- ULI N/AZ!YEI' NI- U-- N/AZ EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C73 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NM] U-Seismic Walkdown Checklist (SWC) SWELl- 022 Equipment ID No. E207A Equip. Class Tanks and Heat Exchangers (21)Equipment Description RHR A Loop Heat Exchanger 5. Is the anchorage configuration consistent with plant documentation?
YO NO YZ NEI UE! N/AEJ YZ NE- ULI N/AZ!YEI' NI- U-- N/AZ EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C73 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NM] U-Seismic Walkdown Checklist (SWC) SWELl- 022 Equipment ID No. E207A Equip. Class Tanks and Heat Exchangers (21)Equipment Description RHR A Loop Heat Exchanger 5. Is the anchorage configuration consistent with plant documentation?
YE] NE] UEI N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YE] NE] UEI N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Refer to response to question 1 above.6. Based on the above anchorage evaluations, is the anchorage free of YN NE] UI-potentially adverse seismic conditions?
Refer to response to question 1 above.6. Based on the above anchorage evaluations, is the anchorage free of YN NE] UI-potentially adverse seismic conditions?
Line 334: Line 550:
Component is covered in lead shielding.
Component is covered in lead shielding.
Scaffold at top of Heat Exchanger is safety related per scaffold log 12-0 1, ECR 13360 and does not pose a seismic hazard.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Scaffold at top of Heat Exchanger is safety related per scaffold log 12-0 1, ECR 13360 and does not pose a seismic hazard.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y[ NEI UE] N/A--YZ NE] uE] N/AE]YZ NE] U[-] N/A[E]YN NE] uE-EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C74 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YZ NM UM-I Seismic Walkdown Checklist (SWC) SWELl- 022 Equipment ID No. E207A Equip. Class Tanks and Heat Exchangers (21)Equipment Description RHR A Loop Heat Exchanger Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y[ NEI UE] N/A--YZ NE] uE] N/AE]YZ NE] U[-] N/A[E]YN NE] uE-EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C74 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YZ NM UM-I Seismic Walkdown Checklist (SWC) SWELl- 022 Equipment ID No. E207A Equip. Class Tanks and Heat Exchangers (21)Equipment Description RHR A Loop Heat Exchanger Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YED NE] U[-E adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could YED NE] U[-E adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Area walk-by is on AWC-032.Evaluated by: Gary Sweder Date: 10-9-12 p Laura Maclay 40LAYYLcC 2 A 10-9-12 EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C75 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ N[-] UD Seismic Walkdown Checklist (SWC) SWELl- 022 Equipment ID No. E207A Equip. Class Tanks and Heat Exchangers (21)Equipment Description RHR A Loop Heat Exchanger Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C76 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NF UI-]Seismic Walkdown Checklist (SWC) SWELl- 024 Equipment ID No. M01201-5 Equip. Class, Motor-Operated  
Area walk-by is on AWC-032.Evaluated by: Gary Sweder Date: 10-9-12 p Laura Maclay 40LAYYLcC 2 A 10-9-12 EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C75 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ N[-] UD Seismic Walkdown Checklist (SWC) SWELl- 022 Equipment ID No. E207A Equip. Class Tanks and Heat Exchangers (21)Equipment Description RHR A Loop Heat Exchanger Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C76 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NF UI-]Seismic Walkdown Checklist (SWC) SWELl- 024 Equipment ID No. M01201-5 Equip. Class, Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RWCU Suction Line Isolation Location:
& Solenoid-Operated Valves (08)Equipment Description RWCU Suction Line Isolation Location:
Bldg. RB Floor El. 51 R Manufacturer, Model, Etc. (optional but recommended) oom, Area RWCU HX Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Bldg. RB Floor El. 51 R Manufacturer, Model, Etc. (optional but recommended) oom, Area RWCU HX Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Line 344: Line 569:
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YF- N YI-- N[I U["] N/AO YE" NEI UEI N/AZ YEI NEl uLE- N/A[IEnter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YF- N YI-- N[I U["] N/AO YE" NEI UEI N/AZ YEI NEl uLE- N/A[IEnter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C77 of 0413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NF U-Seismic Walkdown Checklist (SWC) SWELl- 024 Equipment ID No. M01201-5 Equip. Class Motor-Operated  
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C77 of 0413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NF U-Seismic Walkdown Checklist (SWC) SWELl- 024 Equipment ID No. M01201-5 Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RWCU Suction Line Isolation 5. Is the anchorage configuration consistent with plant documentation?
& Solenoid-Operated Valves (08)Equipment Description RWCU Suction Line Isolation 5. Is the anchorage configuration consistent with plant documentation?
Yr] NEi Ur] N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yr] NEi Ur] N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Line 351: Line 579:
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Long term scaffolding, log 11-99, tag 12169 is erected in the room and is evaluated to show it does not pose an adverse seismic interaction.
Long term scaffolding, log 11-99, tag 12169 is erected in the room and is evaluated to show it does not pose an adverse seismic interaction.
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NEI UE] N/AE]YN NEI] uE] N/AE]YZ NE] UE] N/AE]YZ N[-] U-]EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C78 of C413 ATrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YO N-Il UE-Seismic Walkdown Checklist (SWC) SWELl- 024 Equipment ID No. M01201-5 Equip. Class Motor-Operated  
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NEI UE] N/AE]YN NEI] uE] N/AE]YZ NE] UE] N/AE]YZ N[-] U-]EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C78 of C413 ATrACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YO N-Il UE-Seismic Walkdown Checklist (SWC) SWELl- 024 Equipment ID No. M01201-5 Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RWCU Suction Line Isolation Other Adverse Conditions
& Solenoid-Operated Valves (08)Equipment Description RWCU Suction Line Isolation Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YZ N[:]UE1 Comments (Additional pages may be added as necessary)
YZ N[:]UE1 Comments (Additional pages may be added as necessary)
Valve body is obstructed by shielding.
Valve body is obstructed by shielding.
The Area Walk-By Checklist is AWC-028.Evaluated by: Gary Sweder A A-, Date: I-)- -I1E David Small lof /2.EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C79 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: Y[ NIjI Ur--Seismic Walkdown Checklist (SWC) SWELl- 024 Equipment ID No. M01201-5 Equip. Class Motor-Operated  
The Area Walk-By Checklist is AWC-028.Evaluated by: Gary Sweder A A-, Date: I-)- -I1E David Small lof /2.EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C79 of C413 ATTACHMENT  
& Solenoid-Operated Valves (08)Equipment Description RWCU Suction Line Isolation Photographs Note: Valve Identification EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 080 of C413 ATTACHMENT 9.6 Sheet 1 of 5 SEISMIC WALKDOWN CHECKLIST FORM Status: YZ NF-] U[Seismic Walkdown Checklist (SWC) SWELl- 025 Equipment ID No. M01201-80 Equip. Class, Motor-Operated  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: Y[ NIjI Ur--Seismic Walkdown Checklist (SWC) SWELl- 024 Equipment ID No. M01201-5 Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RWCU Suction Line Isolation Photographs Note: Valve Identification EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 080 of C413 ATTACHMENT  
 
===9.6 Sheet===
1 of 5 SEISMIC WALKDOWN CHECKLIST FORM Status: YZ NF-] U[Seismic Walkdown Checklist (SWC) SWELl- 025 Equipment ID No. M01201-80 Equip. Class, Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RWCU Return Line Isolation Location:
& Solenoid-Operated Valves (08)Equipment Description RWCU Return Line Isolation Location:
Bldg. RB Floor El. 51 Rc Manufacturer, Model, Etc. (optional but recommended) oom, Area RWCU HX Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Bldg. RB Floor El. 51 Rc Manufacturer, Model, Etc. (optional but recommended) oom, Area RWCU HX Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Line 363: Line 600:
In-line component, no anchorage 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
In-line component, no anchorage 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE- NZ YLI NEI Uil N/A]YEI- NE]l UEr N/AZ YEI- NEI urE- N/A;I Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE- NZ YLI NEI Uil N/A]YEI- NE]l UEr N/AZ YEI- NEI urE- N/A;I Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C81 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: Y[ NOIl U[I Seismic Walkdown Checklist (SWC) SWELl- 025 Equipment ID No. M01201-80 Equip. Class Motor-Operated  
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C81 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: Y[ NOIl U[I Seismic Walkdown Checklist (SWC) SWELl- 025 Equipment ID No. M01201-80 Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RWCU Return Line Isolation 5. Is the anchorage configuration consistent with plant documentation?
& Solenoid-Operated Valves (08)Equipment Description RWCU Return Line Isolation 5. Is the anchorage configuration consistent with plant documentation?
YI- NFI ULI N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YI- NFI ULI N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Line 370: Line 610:
A ladder at the north end of the room could not be verified to be secure.However, this is not deemed to pose an adverse seismic interaction due to the light weight of an aluminum ladder in comparison to the valve body.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
A ladder at the north end of the room could not be verified to be secure.However, this is not deemed to pose an adverse seismic interaction due to the light weight of an aluminum ladder in comparison to the valve body.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Long term scaffolding, logs 11-99, 11-56, and 11-99 are erected and approved for use in the room and do not present a potentially adverse seismic interaction.
Long term scaffolding, logs 11-99, 11-56, and 11-99 are erected and approved for use in the room and do not present a potentially adverse seismic interaction.
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y[ N[il Ur] N/Ar]Y[E N[-] Ur] N/AE]YO N[] UI-- N/ALE YO NEL UF-EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C82 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YN NEIl UI-Seismic Walkdown Checklist (SWC) SWELl- 025 Equipment ID No. M01201-80 Equip. Class Motor-Operated  
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y[ N[il Ur] N/Ar]Y[E N[-] Ur] N/AE]YO N[] UI-- N/ALE YO NEL UF-EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C82 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YN NEIl UI-Seismic Walkdown Checklist (SWC) SWELl- 025 Equipment ID No. M01201-80 Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RWCU Return Line Isolation Other Adverse Conditions
& Solenoid-Operated Valves (08)Equipment Description RWCU Return Line Isolation Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
YU NEIUE1 Comments (Additional pages may be added as necessary)
YU NEIUE1 Comments (Additional pages may be added as necessary)
The Area Walk-By Checklist is A WC-028.Evaluated by: Gary Sweder ,A a...L4 L "-,4 "U, Date: /o-/?-(Z'3 David Small-ja 6-7 1112-David Smal EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C83 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ N[-] U--Seismic Walkdown Checklist (SWC) SWELl- 025 Equipment ID No. M01201-80 Equip. Class Motor-Operated  
The Area Walk-By Checklist is A WC-028.Evaluated by: Gary Sweder ,A a...L4 L "-,4 "U, Date: /o-/?-(Z'3 David Small-ja 6-7 1112-David Smal EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C83 of C413 ATTACHMENT  
& Solenoid-Operated Valves (08)Equipment Description RWCU Return Line Isolation Photographs Note: Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C84 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NE U[D Seismic Walkdown Checklist (SWC) SWELl- 025 Equipment ID No. M01201-80 Equip. Class Motor-Operated  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ N[-] U--Seismic Walkdown Checklist (SWC) SWELl- 025 Equipment ID No. M01201-80 Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RWCU Return Line Isolation Photographs Note: Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C84 of C413 ATTACHMENT  
 
===9.6 SEISMIC===
WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NE U[D Seismic Walkdown Checklist (SWC) SWELl- 025 Equipment ID No. M01201-80 Equip. Class Motor-Operated  
& Solenoid-Operated Valves (08)Equipment Description RWCU Return Line Isolation Note: Ladder Note: EN-DC-168 REV 0}}
& Solenoid-Operated Valves (08)Equipment Description RWCU Return Line Isolation Note: Ladder Note: EN-DC-168 REV 0}}

Revision as of 23:47, 12 October 2018

PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C1 of C413 Through Page C84 of C413
ML13232A131
Person / Time
Site: Pilgrim
Issue date: 06/17/2013
From: Maclay L
Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation
References
2.13.056 PNPS-CS-12-00001, Rev 1
Download: ML13232A131 (84)


Text

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C1 of C413 Attachment C Form 9.6: Seismic Walkdown Checklists (SWCs)SWCs Removed: SWELl -083, SWELl -084, SWELl -095, SWELl -096, SWELl -097, SWELl -098, SWELl -099, SWELl-100 Updated final versions of these SWCs, which required follow-up internal electrical cabinet inspections, are included in Attachment J.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C2 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ NF- UI--Seismic Walkdown Checklist (SWC) SWELl- 005 Equipment ID No. CV305-127 Equip. Class' Pneumatic-Operated Valves (07)Equipment Description RPS Scram Water Outlet Valve Location:

Bldg. RB Floor El. 23 Room, Area 145 HCU Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Inline component, no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware?Note: Checked anchorage of HCU to concrete.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Y-I NE YZ Nn U[I N/A[Z Y[ N[-] UF-] N/AZ Y[ NEil U[I N/AZ-]1 Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C3 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NE] UE]Seismic Walkdown Checklist (SWC) SWELl- 005 Equipment ID No. CV305-127 Equip. Class Pneumatic-Operated Valves (07)Equipment Description RPS Scram Water Outlet Valve 5. Is the anchorage configuration consistent with plant documentation?

YE NFE UE N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Y[E NE] UF]potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

The air operator on HCU 26-39 is close to the horizontal Unistrut, but is not in contact with it. There is sufficient clearance so that this is not considered to be a potential adverse seismic interaction.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YN NEI UE- N/AE-YN NEI UE- N/AE-YE N[-] Url N/A--YN NEI U--EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C4 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YN NEI- Ur]Seismic Walkdown Checklist (SWC) SWELl- 005 Equipment ID No. CV305-127 Equip. Class Pneumatic-Operated Valves (07)Equipment Description RPS Scram Water Outlet Valve Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN N[-] UI]adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Detailed inspections were performed and photos taken of 2 of the 145 C V305-127 valves: HCU 26-39 (West) and on HCU 42-19 (East). The remainder of the CV305-127 valves were inspected for overall configuration compliance along with their HCU assembly as part of the area walk-by. Note that this included a detailed visual inspection of the anchorages of all HCUs.SWELI-O05 is on AWC-014 andAWC-016.

I) }uI Evaluated by: David Small Date: 10/18/2012 Halie Aroz 10/18/2012 EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C5 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y; NE] UM Seismic Walkdown Checklist (SWC) SWELl- 005 Equipment ID No. CV305-127 Equip. Class Pneumatic-Operated Valves (07)Equipment Description RPS Scram Water Outlet Valve Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C6 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[ NFIj U-I Seismic Walkdown Checklist (SWC) SWELl- 005 Equipment ID No. CV305-127 Equip. Class Pneumatic-Operated Valves (07)Equipment Description RPS Scram Water Outlet Valve Note: Typical CV305-127 valve.Note: Typical HCU anchorage.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C7 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet I of 4 Status: Y[ NEIl UI-Seismic Walkdown Checklist (SWC) SWELl- 006 Equipment ID No. SOV305-117-1/4 Equip. Classi Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RPS Grp 1/4 Scram Pilot Location:

Bldg. RB Floor El. 23 Ri Manufacturer, Model, Etc. (optional but recommended) oom, Area 145 HCU Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Inline component, no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?YE[ NO YEI NEI U[E] N/AZ YE] NE] U[I N/A]Y[-] N[]i UEi N/A[1 Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C8 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NI I UI-J Seismic Walkdown Checklist (SWC) SWELl- 006 Equipment ID No. SOV305-117-1/4 Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RPS Grp 1/4 Scram Pilot 5. Is the anchorage configuration consistent with plant documentation?

Y[] NE] UI- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YZ N[L ULI potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ N[: uEr N/AL]YN NEJ U[I N/AL]YZ NEI U[-] N/A[]YE N- UL-EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C9 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YZ NEI UL-Seismic Walkdown Checklist (SWC) SWELl- 006 Equipment ID No. SOV305-117-1/4 Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RPS Grp 1/4 Scram Pilot Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI UF adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

A detailed inspection was performed and photos taken of one of the 73 SO V305-117-1/4 scram pilots: HCU 26-39 (West). The remainder of the SOV305-117-1/4 scram pilots were inspected for overall configuration compliance along with their HCU assembly as part of the area walk-by. Note that this included a detailed visual inspection of the anchorages of all HCUs. Drawing No. M1N16-7, Rev. El identifies HCU 26-39 as part of Set 1.The component did not have a tag on any of the HCUs, and so was identified using the P&ID, Drawing No. M250 SH1, Rev. 73.SWEL1-006 is on AWC-014.Evaluated by: David Small ý -J H-alie Aroz Date: 10/11/2012 10/11/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C10 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ N-- UD-]Seismic Walkdown Checklist (SWC) SWELl- 006 Equipment ID No. SOV305-117-1/4 Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RPS Grm 1/4 Scram Pilot Photographs Note: Note: Typical component (SOV305-117-1/4 on bottom).EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page Cll of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NE] UL-Seismic Walkdown Checklist (SWC) SWELl- 007 Equipment ID No. SOV305-117-2/3 Equip. Class, Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RPS Grp 2/3 Scram Pilot Location:

Bldg. RB Floor El. 23 Room, Area 145 HCU Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Y[-] NZ of the 50% of SWEL items requiring such verification)?

Inline component, no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-] N[-] uE]- N/AN Y[I- N[E] UE N/AZ YE] NEI U[I N/AN IEnter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page C12 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NE] U[-1 Seismic Walkdown Checklist (SWC) SWELl- 007 Equipment ID No. S0V305-117-2/3 Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RPS Grp 2/3 Scram Pilot 5. Is the anchorage configuration consistent with plant documentation?

YE] NF] Ur] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YE NEI UI-potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?YZ NE] UE-] NIAE]YZ NF-] UE] N/AE]YZ NE]I UE N/AEl 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C13 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: Y; NEI U-Seismic Walkdown Checklist (SWC) SWELl- 007 Equipment ID No. S0V305-117-2/3 Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RPS Grp 2/3 Scram Pilot Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NEI U[: adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

A detailed inspection was performed and photos taken of one of the 72 SOV305-117-2/3 scram pilots: HCU 42-19 (East). The remainder of the SOV305-117-2/3 scram pilots were inspected for overall configuration compliance along with their HCU assembly as part of the area walk-by. Note that this included a detailed visual inspection of the anchorages of all HCUs. Drawing No. MIN16-7, Rev. El identifies HCU 42-19 as part of Set 3.The component did not have a tag on any of the HCUs, and so was identified using the P&ID, Drawing No. M250 SH1, Rev. 73.SWEL 1-007 is on AWC-016.?/4"j ) V,-A Evaluated by: David Small Date: 10/18/2012 HalteAroz 10/18/2012

()EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C14 of C413 ATrACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ NF U--Seismic Walkdown Checklist (SWC) SWELl- 007 Equipment ID No. SOV305-117-213 Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RPS Grp 2/3 Scram Pilot Photographs Note: Note: Typical component (SO V305-117-2/3 on bottom).EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page 01 5 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet I of 4 Status: Y[ N[- U[--Seismic Walkdown Checklist (SWC) SWELl- 008 Equipment ID No. SOV305-118-1/4 Equip. Class' Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RPS Grp 1/4 Scram Pilot Location:

Bldg. RB Floor El. 23 R Manufacturer, Model, Etc. (optional but recommended) oom, Area 145 HCU Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Inline component, no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?YE-I NE YE-- NE] UE[ N/As YE] NE] UE] N/A[YE] N[-] UE] N/A[Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C16 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NE] UDl Seismic Walkdown Checklist (SWC) SWELl- 008 Equipment ID No. SOV305-118-1/4 Equip. Class Motor-Operated

& Solenoid-Ooerated Valves (08)Equipment Description RPS Grp 1/4 Scram Pilot 5. Is the anchorage configuration consistent with plant documentation?

YE] N[] UE] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YE NEI U[-]potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YN NEI ur] N/Ar]Y[ N-] ur] N/AF]YN NEI U] N/A[]Y~N N]UM]EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-QOOO1, Rev. 1 Attachment C Page C017 of 0413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YO( NM UM-Seismic Walkdown Checklist (SWC) SWELl- 008 Equipment ID No. SOV305-118-1/4 Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RPS Grp 1/4 Scram Pilot Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Yo( NEI UE'adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

A detailed inspection was performed and photos taken of one of the 73 SOV305-118-1/4 scram pilots: HCU 26-39 (West). The remainder of the SOV305-118-1/4 scram pilots were inspected for overall configuration compliance along with their HCU assembly as part of the area walk-by. Note that this included a detailed visual inspection of the anchorages of all HCUs. Drawing No. M1N16-7, Rev. El identifies HCU 26-39 as part of Set 1.The component did not have a tag on any of the HCUs, and so was identified using the P&ID, Drawing No. M250 SHI, Rev. 73.SWEL 1-008 is on AWC-014.Q 0=j L'P Evaluated by: David Small Date: 10/11/2012 Halie Aroz r/ ll 10/11/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C18 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ ND Ur-Seismic Walkdown Checklist (SWC) SWELl- 008 Equipment ID No. SOV305-118-1/4 Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RPS Grp 1/4 Scram Pilot Photographs Note: Note: Typical component (SO V305-118-1/4 on top).EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page 019 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 1 of 4 Status: YZ No U--Seismic Walkdown Checklist (SWC) SWELl- 009 Equipment ID No. SOV305-118-2/3 Equip. Class, Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RPS Grp 2/3 Scram Pilot Location:

Bldg. RB Floor El. 23 R Manufacturer, Model, Etc. (optional but recommended) oom, Area 145 HCU Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Inline component, no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?YI- NO YI-] NE] UE] N/A[Y[-] NEJ UE] N/A[YEr- NEJ UE] N/As I Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C20 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NE] Ur Seismic Walkdown Checklist (SWC) SWELl- 009 Equipment ID No. SOV305-118-2/3 Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RPS Gro 2/3 Scram Pilot 5. Is the anchorage configuration consistent with plant documentation?

Y[] NE] UE] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YZ NWI U[--potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NE-] UE[] N/AE-]YZ NE] uE] N/AE-]YZ NE] UE"] N/AE-]YZ N-] uE]EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C21 of 0413 ATTACHMENT

9.6 Sheet

3 of 4 SEISMIC WALKDOWN CHECKLIST FORM Status: YN NEI] U Seismic Walkdown Checklist (SWC) SWELl- 009 Equipment ID No. SOV305-118-2/3 Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RPS Grp 2/3 Scram Pilot Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NE] UE[adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

A detailed inspection was performed and photos taken of one of the 72 SOV305-118-2/3 scram pilots: HCU 42-19 (East). The remainder of the SOV305-118-2/3 scram pilots were inspected for overall configuration compliance along with their HCU assembly as part of the area walk-by. Note that this included a detailed visual inspection of the anchorages of all HCUs. Drawing No. MIN16-7, Rev. El identifies HCU 42-19 as part of Set 3.The component did not have a tag on any of the HCUs, and so was identified using the P&ID, Drawing No. M250 SH1, Rev. 73.SWEL 1-009 is on AWC-016.,i2~jyLu Evaluated by: David Small Date: 10/18/2012 Halle Aroz 10/18/2012 k.../EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C22 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: Y[ NIE U-Seismic Walkdown Checklist (SWC) SWELl- 009 Equipment ID No. SOV305-118-2/3 Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RPS Grp 2/3 Scram Pilot Photographs Note: Note: Typical component (SO V305-118-2/3 on top).EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C23 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YZ NF Ur-Seismic Walkdown Checklist (SWC) SWELl- 010 Equipment ID No. P203A Equip. Class, Vertical Pumps (06)Equipment Description RHR Pump A Location:

Bldg. RB Floor El. -17.5 Room, Area SE QD Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

This is an anchored component, but due to lead shielding, one of the anchor bolts cannot be visually inspected, therefore, this is not part of the 50% anchorage verification.

2. Is the anchorage free of bent, broken, missing or loose hardware?Three visible anchors are in good condition.

Y[-7 NZ YE Nr7 UD7 N/A[l 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Three visible anchors are free of oxidation.

4. Is the anchorage free of visible cracks in the concrete near the anchors?A surface crack is visible near one anchor, but since all bolts are cast in place in the foundation, this is not a structural deficiency.

Although one anchor bolt and nut is not visible, the concrete next to this and all other anchors is visible and free of cracking.1 Enter the equipment class name from Appendix B: Classes of Equipment.

YE NDl U[-] N/A-YN ND UD- N/A[-D EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C24 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NEr] UD]Seismic Walkdown Checklist (SWC) SWELl- 010 Equipment ID No. P203A Equip. Class Vertical Pumps (06)Equipment Description RHR Pump A 5. Is the anchorage configuration consistent with plant documentation?

YE] N] Ur- N/AS (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Three anchors match drawing C-100 and SEW's package.6. Based on the above anchorage evaluations, is the anchorage free of YE NE: UE-potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ N[-] uEr N/AEF YN NE UE- N/AE1 YN NE- UE[ N/AE1 YZ NEI U-]EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C25 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ N13 UD--Seismic Walkdown Checklist (SWC) SWELl- 010 Equipment ID No. P203A Equip. Class Vertical Pumps (06)Equipment Description RHR Pump A Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y; NEi ULi adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Area walk-by is on A WC-032.A~. IW~.4A~Evaluated by: Gar Sweder Date: 10-9-12 0 Laura Maclay ILIJ'TYCL IO4 10-9-12 VI UJ EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C26 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y[ NE] Ur-1 Seismic Walkdown Checklist (SWC) SWELl- 010 Equipment ID No. P203A Equip. Class Vertical Pumps (06)Equipment Description RHR Pump A Photographs Note: Equipment tag Note: Partial view of anchorage EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C27 of 0413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 5 of 5 Seismic Walkdown Checklist (SWC) SWELl- 010 Equipment ID No. P203A Equip. Class Vertical Pumps (06)Equipment Description RHR Pump A Status: YE NIE U-I Note: Overall view Note: Surface crack, refer to response in question #4.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C28 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ Nr-' U'Seismic Walkdown Checklist (SWC) SWELl- 011 Equipment ID No. P203C Equip. Class' Vertical Pumps (06)Equipment Description RHR Pump C Location:

Bldg. RB Floor El. -17.5 Room, Area SE QD Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Pump is an anchored component, but due to lead shielding, only two anchors are visible, therefore this item is not part of the 50% anchorage verification.

2. Is the anchorage free of bent, broken, missing or loose hardware?Two visible anchors are in good condition.

YI-- NE YIE Nr- Ur-I N/A-Z 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Two visible anchors are free of corrosion.

4. Is the anchorage free of visible cracks in the concrete near the anchors?YE NEIl ur- N/Ar-YN NEI U[-- N/ADl Although two anchor bolts are not visible, the area near the bolts is free of cracking.'Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C29 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NE] U--Seismic Walkdown Checklist (SWC) SWELl- 011 Equipment ID No. P203C Equip. Class Vertical Pumps (06)Equipment Description RHR Pump C 5. Is the anchorage configuration consistent with plant documentation?

YEI NEI UI- N/A[D (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Refer to response to question #1 above.6. Based on the above anchorage evaluations, is the anchorage free of Y[ NEil UE-potentially adverse seismic conditions?

Two anchors visible and in good condition.

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NE] UE[ N/A[-YZ NE] UE-- N/A--YN NE] UE[- N/AE--YN N-] Ur]EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C30 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YZ{ NEI Ul Seismic Walkdown Checklist (SWC) SWELl- 011 Equipment ID No. P203C Equip. Class Vertical Pumps (06)Equipment Description RHR Pump C Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO N[-] UI-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Area walk-by is on AWC-032.Evaluated by: Gary Sweder J3i. .. & _Laura Maclay .O. \V \Date: 10-9-12 10-9-12 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C31 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YE NF- UD" Seismic Walkdown Checklist (SWC) SWELl- 011 Equipment ID No. P203C Equip. Class Vertical Pumps (06)Equipment Description RHR Pump C Photographs Note: Equipment tag Note: Two anchors not visible due to lead shielding, note pedestal near anchorage is visible.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C32 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ ND] U[i Seismic Walkdown Checklist (SWC) SWELl- 012 Equipment ID No. P205 Equip. Class, Horizontal Pumps (05)Equipment Description HPCI Pump Location:

Bldg. RB Floor El. -17.5 Room, Area HPCI RM Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YZ N[-]2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?YZ NEI ULI N/AD-Y[ NDI Ui- N/AD-YZ Nr- Ur- N/AD-Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C33 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YN NEI U-Seismic Walkdown Checklist (SWC) SWELl- 012 Equipment ID No. -P205 Equip. Class Horizontal Pumps (05)Equipment Description HPCI Pump 5. Is the anchorage configuration consistent with plant documentation?

YO Ni] Ui- N/A--(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage configuration verified and dimensions spot checked using C185, E7 and C186, E3.6. Based on the above anchorage evaluations, is the anchorage free of YO N[i U[i potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

YO NE] U[i N/A[--8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE7 NO UEi N/AEl and masonry block walls not likely to collapse onto the equipment?

Open S-hook on southwest side of pump. CR-PNP-2012-04594 was written to address the issue and it has been wired to secure it.9. Do attached lines have adequate flexibility to avoid damage?YO NE-] UEi N/AE 10. Based on the above seismic interaction evaluations, is equipment free YE-- NO UEl of potentially adverse seismic interaction effects?See Response #8.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C34 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NE] UI-Seismic Walkdown Checklist (SWC) SWELl- 012 Equipment ID No. P205 Equip. Class Horizontal Pumps (05)Equipment Description HPCI Pump Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y21 NEi U-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Area walk-by is AWC-04.P205 is not directly labeled in the field. Label request was entered in eSOMS to have the item label created.The turbine and the pump are on different skids. However the concrete pedestals are quite rigid and are tied together.

Therefore there is no potential for differential movement between pump and driver.This was confirmed by the SEWs package.Evaluated by: Ga Sweder / A I.-.-0 Date: 10-15-12 Laura Maelav YWYLAý "fnCa DQUA-10-15-12 4 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C35 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ No- U]Seismic Walkdown Checklist (SWC) SWELl- 012 Equipment ID No. P205 Equip. Class Horizontal Pumps (05)Equipment Description HPCI Pump Photographs Note: P205 is not directly labeled, therefore the equipment is verified by its adjoining components.

Note: View of pump and anchorage EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C36 of 0413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 5 of 5 Seismic Walkdown Checklist (SWC) SWELl- 012 Equipment ID No. P205 Equip. Class Horizontal Pumps (05)Equipment Description HPCI Pump Status: YN NEI uL-]Note: Open S-hook Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOO01, Rev. 1 Attachment C Page C37 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 1 of 4 Status: Y[ N[-] U --Seismic Walkdown Checklist (SWC) SWELl- 013 Equipment ID No. MO1001-16A Equip. Classi Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR A Loop Ht Exch Bypass Location:

Bldg. RB Floor El. -3 R Manufacturer, Model, Etc. (optional but recommended) oom, Area SE QD Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Inline component, no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[- NO YF-1 NEi U[-I N/A[YEI NEI UE- N/A[Y-I NEI UEr N/A[Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page C38 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NE] UL-Seismic Walkdown Checklist (SWC) SWELl- 013 Equipment ID No. MOIOOI-16A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR A Loop Ht Exch Bypass 5. Is the anchorage configuration consistent with plant documentation?

Y] N[-] U[-] N/A0 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YO NE! ULi potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

There is a large scaffold near the component, but it has a tag stating it has been seismically evaluated.

Therefore, it does not present a seismic interaction concern.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NEI uE] N/AE]Y[ NEI UE] N/AE]YE NE] UE] N/AE]YE NE] U-]EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C39 of C41 3 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YE NEl U[]Seismic Walkdown Checklist (SWC) SWELl- 013 Equipment ID No. Mor101-16A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR A Loop Ht Exch Bypass Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YO NEI UE1 Comments (Additional pages may be added as necessary)

The body of the valve is insulated and so is not visible. All other visible components were checked during the walkdown.SWEL 1-013 is on AWC-007.912j I,,J] Date: 10/09/2012 Evaluated by: David Small Halie Aroz 10/09/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 040 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: Y¥ ND ULI Seismic Walkdown Checklist (SWC) SWELl- 013 Equipment ID No. MO1001-16A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR A Loop Ht Exch Bypass Photographs Note: Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C41 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet I of 5 Status: Y[ NR- U[--Seismic Walkdown Checklist (SWC) SWELl- 014 Equipment ID No. A8 Equip. Class' Medium-Voltage, Metal-Clad Switch-gear (03)Equipment Description 4KV Emercq Buss Location:

Bldg. N/A Floor El. 23 Room, Area YARD Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Due to lack of visual verification of rear cabinet anchors, this was not chosen for the 50% verification.

2. Is the anchorage free of bent, broken, missing or loose hardware?Anchorage at the back of the panel is not visible without breaking the plane of the cabinet, but anchors at the front of the cabinet are in good condition.
3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Anchor bolt on outside of cabinet securing a clip is corroded and the threads of the anchor are no longer visible. CR-PNP-2012-04509 was written to correct the issue. The corrosion is only on the surface with no apparent loss of metal thickness.

Therefore there is no loss of strength and the hold down plates will perform their design function.

The one anchor bolt is fused to the nut by general but localized corrosion.

Although they are fused there is no flaking of metal or any apparent reduction in bolt or nut diameter.

Therefore there is no loss of strength and the anchor will perform its design function.4. Is the anchorage free of visible cracks in the concrete near the anchors?YI- NO YO NE!I UiE N/All YE NE! UL- N/AZ!YE NEI UiE N/Ar-' Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C42 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NF U-Seismic Walkdown Checklist (SWC) SWELl- 014 Equipment ID No. A8 Equip. Class Medium-Voltage, Metal-Clad Switch-gear (03)Equipment Description 4KV Emerq Buss 5. Is the anchorage configuration consistent with plant documentation?

YE] N[i ULi N/A](Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Refer to question #1.6. Based on the above anchorage evaluations, is the anchorage free of Y[ NEI UEr potentially adverse seismic conditions?

This component was a previous outlier for IPEEE. The addition of clips, verified in the field, was completed.

Refer to question #3 above for explanation of bolt corrosion at clip.Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Maintenance tools (flashlight, screwdriver, etc.) are located next to the panels, but per procedure 1.17.1, this is acceptable placement and does not pose a seismic hazard.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

This component is located in a small enclosure specifically designed for this equipment.

It is in good condition.

Light bulbs within the cabinets are plastic coated and do not pose a seismic hazard.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?A small plastic hose next to the batteries inside of the panel was noted.Due to restaints of not breaking the plane of the cabinet while it is open, it could not be determined if this is part of the battery assembly.

It does not pose a seismic risk.YZ NEI Ur- N/A[:]YN NEI Un N/AD Y[ NEJ U-- N/AD--Y[ NE-I U -EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C43 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NF UI-Seismic Walkdown Checklist (SWC) SWELl- 014 Equipment ID No. A8 Equip. Class Medium-Volta-ge, Metal-Clad Switchqear (03)Equipment Description 4KV Emer, Buss Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE NEI- UI-adversely affect the safety functions of the equipment?

Floor of Diesel Gen Breaker-152-181 is visible corroded.

CR-PNP-2012-04540 was written to correct the issue.Comments .(Additional pages may be added as necessary)

Area walk-by is A WC-026.Y 4~lA oSS a t OOl~C~n .1 * .4 k1,a I n ja~--V GtU -t9 v *U)Date: 10-11-12 10-11-12 Gary Sweder}7Jk-U IL -~-0~EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C44 of C413 ATrTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NE] UMI Seismic Walkdown Checklist (SWC) SWELl- 014 Equipment ID No. A8 Equip. Class Medium-Voltage, Metal-Clad Switchgear (03)Equipment Description 4KV Emerci Buss Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C45 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[ NFI U-I Seismic Walkdown Checklist (SWC) SWELl- 014 Equipment ID No. A8 Equip. Class Medium-Volta-ue, Metal-Clad Switch-gear (03)Equipment Description 4KV Emerq Buss Note: Inside of panel closest to entrance door.Note corroded anchor clip and anchor.Note: Close-up of corroded anchor EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 046 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ NE] ULI Seismic Walkdown Checklist (SWC) SWELl- 015 Equipment ID No. MO1001-28A Equip. Class, Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Iniection Location:

Bldg. RB Floor El. 23 R Manufacturer, Model, Etc. (optional but recommended) oom, Area A VLV Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

In-line component, no anchorage 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?YE- NO YE] NE-] Ur N/A]YE- NE: uE- N/AZ YE: NE] Ur- N/AN 1 Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C47 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: Y[ NFI U-Seismic Walkdown Checklist (SWC) SWELl- 015 Equipment ID No. MO100I-28A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Injection 5. Is the anchorage configuration consistent with plant documentation?

YLI Nil UM- N/A[(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Y[ NEI] U[I]potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Masonry walls 63.4, 63.5, and 63.6 (C941Shl, El) are safety related, therefore seismically qualified and acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ N[-] U- N/AD-YZ N["] UL- N/A[-]Y[ NE] U'- N/AD]Y[ NEI UF EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page 048 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NEI UrI Seismic Walkdown Checklist (SWC) SWELl- 015 Equipment ID No. MO1001-28A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Iniection Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NEI UE-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

A broken placard was noted on the valve body. This is a general housekeeping concern, not a seismic interaction hazard, and was reported to Operations for suggested fix.Area Walk-By is on A WC-0 11~. ... Y\. ~C Imltarl hI- nr. Qwnwrodar Date: 16- /1 -/Z-.,.V i IU * .4 Vtl I'It. U- US69A %' aC%+/--U AA David Small i1 , EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C49 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YN NE] ULI Seismic Walkdown Checklist (SWC) SWELl- 015 Equipment ID No. MO1001-28A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Injection Photographs Note: Label Note: View of Valve EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C50 of C41 3 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NF Ur-]Seismic Walkdown Checklist (SWC) SWELl- 015 Equipment ID No. MO1001-28A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Injection Photographs Note: Broken Placard Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page C51 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 1 of 4 Status: Y[ NE UE Seismic Walkdown Checklist (SWC) SWELl- 016 Equipment ID No. MO1001-29A Equip. Class' Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Injection Location:

Bldg. RB Floor El. 23 R Manufacturer, Model, Etc. (optional but recommended) oom, Area A VL V Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

In-line component, no anchorage 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-] NEI YE-] NEi uE-] N/AN YE[- NE] U[-] N/A[YE- NEI UEi N/A]1 Enter the equipment class name from Appendix 13: Classes of Equipment.

EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-O0O01, Rev. 1 Attachment C Page 052 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: Y[ NF U-Seismic Walkdown Checklist (SWC) SWELl- 016 Equipment ID No. MO100I-29A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Injection 5. Is the anchorage configuration consistent with plant documentation?

Y[I Ni] UrI N/AM (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YZ N[i] Ur-potentially adverse seismic conditions?

See response #1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Masonry walls 63.4, 63.5, and 63.6 (C941Shl, El) are safety related, therefore seismically qualified and acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ Nr-1 U[-D N/A[-]YZ NDI Ur N/AD-I Y[ NDJ U[] N/AD-YZ ND- U--EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C53 of C413 AI'rACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YE NEI UI-Seismic Walkdown Checklist (SWC) SWELl- 016 Equipment ID No. MO1001-29A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Injection Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YZ NEI UE Comments (Additional pages may be added as necessary)

MO 1001-29A has both thermal and radiation shielding Area Walk-By is on A WC-0 11 Evaluated by: Gary Sweder ,~C'i~iU J~N(kJ-Qr{LA

'3 52~J Li?Date: ZO / 7-1z-(C /17 /112, navid rmnII EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C54 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ NrI UrL-Seismic Walkdown Checklist (SWC) SWELl- 016 Equipment ID No. MOIOOI-29A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR A Loop LPCI Injection Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page 055 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NE] UEI]Seismic Walkdown Checklist (SWC) SWELl- 017 Equipment ID No. MO1001-34A Equip. Class' Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR Loop A Torus Return Location:

Bldg. RB Floor El. 9 R Manufacturer, Model, Etc. (optional but recommended) oom, Area SE QD Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Inline component, no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-- NO YE] NE] UE] N/AO YE] NE-] uE] N/AO Y[E] N[-] U[] N/A[I Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C56 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: Y[ NFR- Ur]Seismic Walkdown Checklist (SWC) SWELl- 017 Equipment ID No. MO1001-34A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR Loop A Torus Return 5. Is the anchorage configuration consistent with plant documentation?

Y[-- NFi UiL N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI U-I potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NFil UD N/A-]YZ NEI ULI N/A--YZ Nil u[-] N/A[-]YZ NEL ULI EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C57 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YN Ný UE-Seismic Walkdown Checklist (SWC) SWELl- 017 Equipment ID No. MO1001-34A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR Loop A Torus Return Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y0 N[l U[-]adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

The paint is stripped around the weld between the valve body and the piping. There is mild surface corrosion in the area, but this is not considered an adverse seismic condition.

SWEL 1-017 is on AWC-007.2w~t4 Evaluated by: David Small Date: 10/09/2012 Halie Aroz 10/09/2012

-%--," 0 L)EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C58 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YE N[-] U[-Seismic Walkdown Checklist (SWC) SWELl- 017 Equipment ID No. MOIOOI-34A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR Loop A Torus Retum Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page C59 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YN Nr-F Ur Seismic Walkdown Checklist (SWC) SWELl- 018 Equipment ID No. MOIOOI-36A Equip. Class' Motor-Operated

& Solenoid-Ogerated Valves (08)Equipment Description RHR Loop A Torus Return Location:

Bldg. RB Floor El. -1.5 Rc Manufacturer, Model, Etc. (optional but recommended) om, Area SE QD Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Inline component, no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-] NO YE] NE- U[-] N/AO YE]- NE] Ur] N/A2 Y[E] NEI U[- N/AZ I Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C60 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NE] U--Seismic Walkdown Checklist (SWC) SWELl- 018 Equipment ID No. MO1001-36A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR Loon A Torus Return 5. Is the anchorage configuration consistent with plant documentation?

YIO NI] U[i N/A[(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YE NEI U[I potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

The 1-1/2" rigid steel power conduit to Core Spray Valve MO 1400-3A is in contact with the motor operator of MO 100 1-36A. The conduit appears slightly bent due to this contact. Due to the potential for adverse interaction during a seismic event, CR-PNP-2012-04442 was written to address the concem. WR 286594 has been initiated to reroute the conduit to provide clearance with the motor. See attached photo.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YEI NZ Ur- N/A[YZ N[-] U-- N/A--YZ N[-] Ur-] N/AF-]YF- NZ Ur-1 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C61 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ Nn Ur-Seismic Walkdown Checklist (SWC) SWELl- 018 Equipment ID No. MO1001-36A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR Loop A Torus Return Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YED NEI U-j adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

The paint is stripped around the welds between the valve body and the piping. There is mild surface corrosion in the area, but this is not considered an adverse seismic condition.

Under the valve, two pins were found duct taped to a stanchion above a spring can. This was discussed with operations and engineering management, and was determined to be an acceptable practice for holding the pins in place; therefore, it is not a seismic interaction or a housekeeping concern.SWEL1-018 is on AWC-007.Evaluated by: David Small 0 J/ I 'A Halie Aroz Date: 10/09/2012 10/09/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C62 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y[ Nr I U--I Seismic Walkdown Checklist (SWC) SWELl- 018 Equipment ID No. MOIOOI-36A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR Loop A Torus Return Photographs Note: Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C63 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YN NR U-Seismic Walkdown Checklist (SWC) SWELl- 018 Equipment ID No. MOIOOI-36A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR Loop A Torus Return Note: MO1400-3A conduit in contact with the motor.Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 064 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NF- Ur-Seismic Walkdown Checklist (SWC) SWELl- 020 Equipment ID No. MO1001-7A Equip. Class' Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203A Suction Location:

Bldg. RB Floor El. -17.5 Rc Manufacturer, Model, Etc. (optional but recommended),om, Area SE QD Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Inline component, no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?YE-] NO YE-- NEI ULI N/AO YEl NEl U[E N/AO YF] NE] U[-E N/AZ I Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 065 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: Y[ NE UEl Seismic Walkdown Checklist (SWC) SWELl- 020 Equipment ID No. MO1001-7A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203A Suction 5. Is the anchorage configuration consistent with plant documentation?

Y[E NE] UE-] N/A (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Y[K NEI UEF potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Scaffold at base of valve is safety related per scaffold log 12-0 1, ECR 13360 and does not pose a seismic hazard.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NEi UE- N/AE[YZ NEl UE- NIAE YZ NE-] U[E- N/AE-YZ NE-] uE EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C66 of 0413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: Y[ N["] Ul-Seismic Walkdown Checklist (SWC) SWELl- 020 Equipment ID No. MO1001-7A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203A Suction Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YZ NEI uL Comments (Additional pages may be added as necessary)

Area walk-by is on AWC-032.Evaluated by: Gary Sweder Date: 10-9-12-- (,j -Laura Macla v )AWCLOct-6YLCQ 10-9-12 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C67 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ NE] Ur Seismic Walkdown Checklist (SWC) SWELl- 020 Equipment ID No. MO1001-7A Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203A Suction Photographs EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C68 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ Nr-] Ur-Seismic Walkdown Checklist (SWC) SWELl- 021 Equipment ID No. M01001-7C Equip. Classi Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203C Suction Location:

Bldg. RB Floor El. -17.5 R Manufacturer, Model, Etc. (optional but recommended) oom, Area SE QD Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Inline component, no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?YE-- N[Y--] NE] UEi N/AZ YEI NEI UEr N/A[YE] NEI uEr N/AZ I Enter the equipment class name from Appendix B: Classes of Equipment, EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C69 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YM NEI UI-Seismic Walkdown Checklist (SWC) SWELl- 021 Equipment ID No. M01001-7C Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203C Suction 5. Is the anchorage configuration consistent with plant documentation?

YI] NFI UF- N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YE NFI U-]potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Scaffold at base of valve is safety related per scaffold log 12-01, ECR 13360 and does not pose a seismic hazard.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NEI U[-] N/Ar]Y[ NiE UI- N/A[-]YN NEII U[] N/A-]YZ NiE UE[EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C70 of 0413 A'RACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: Y0 NEI U[-Seismic Walkdown Checklist (SWC) SWELl- 021 Equipment ID No. M01001-7C Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203C Suction Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YN NEI UL Comments (Additional pages may be added as necessary)

Area walk-by is on AWC-032.Evaluated by: Garv Sweder Date: 10-9-12 Q Laura Maclay WT' V.U01.. U Y Ii C1L(tA 10-9-12 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C71 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ NE] ULI Seismic Walkdown Checklist (SWC) SWELl- 021 Equipment ID No. M01001-7C Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RHR Pump P203C Suction Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C72 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NF- UIZI Seismic Walkdown Checklist (SWC) SWELl- 022 Equipment ID No. E207A Equip. Class, Tanks and Heat Exchangers (21)Equipment Description RHR A Loop Heat Exchanger Location:

Bldg. RB Floor El. -17.5 Room, Area SE QD Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Although the component is anchored, due to the location in the overhead and lack of accessibility to that area, this item is not considered for the 50% anchorage verification.

2. Is the anchorage free of bent, broken, missing or loose hardware?Anchorage is visible from a distance below and to the side of the Heat Exchanger.
3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Anchorage from the component to the steel frame is in good condition.

4. Is the anchorage free of visible cracks in the concrete near the anchors?Equipment is anchored to a steel frame which sits on embedded plates in the wall. Due to high location on the wall, this is not visible.'Enter the equipment class name from Appendix B: Classes of Equipment.

YO NO YZ NEI UE! N/AEJ YZ NE- ULI N/AZ!YEI' NI- U-- N/AZ EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C73 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NM] U-Seismic Walkdown Checklist (SWC) SWELl- 022 Equipment ID No. E207A Equip. Class Tanks and Heat Exchangers (21)Equipment Description RHR A Loop Heat Exchanger 5. Is the anchorage configuration consistent with plant documentation?

YE] NE] UEI N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Refer to response to question 1 above.6. Based on the above anchorage evaluations, is the anchorage free of YN NE] UI-potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Component is covered in lead shielding.

Scaffold at top of Heat Exchanger is safety related per scaffold log 12-0 1, ECR 13360 and does not pose a seismic hazard.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y[ NEI UE] N/A--YZ NE] uE] N/AE]YZ NE] U[-] N/A[E]YN NE] uE-EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C74 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YZ NM UM-I Seismic Walkdown Checklist (SWC) SWELl- 022 Equipment ID No. E207A Equip. Class Tanks and Heat Exchangers (21)Equipment Description RHR A Loop Heat Exchanger Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YED NE] U[-E adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Area walk-by is on AWC-032.Evaluated by: Gary Sweder Date: 10-9-12 p Laura Maclay 40LAYYLcC 2 A 10-9-12 EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C75 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ N[-] UD Seismic Walkdown Checklist (SWC) SWELl- 022 Equipment ID No. E207A Equip. Class Tanks and Heat Exchangers (21)Equipment Description RHR A Loop Heat Exchanger Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C76 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NF UI-]Seismic Walkdown Checklist (SWC) SWELl- 024 Equipment ID No. M01201-5 Equip. Class, Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RWCU Suction Line Isolation Location:

Bldg. RB Floor El. 51 R Manufacturer, Model, Etc. (optional but recommended) oom, Area RWCU HX Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

In-line component, no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?YF- N YI-- N[I U["] N/AO YE" NEI UEI N/AZ YEI NEl uLE- N/A[IEnter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C77 of 0413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NF U-Seismic Walkdown Checklist (SWC) SWELl- 024 Equipment ID No. M01201-5 Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RWCU Suction Line Isolation 5. Is the anchorage configuration consistent with plant documentation?

Yr] NEi Ur] N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YN NE] U[-]potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Long term scaffolding, log 11-99, tag 12169 is erected in the room and is evaluated to show it does not pose an adverse seismic interaction.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NEI UE] N/AE]YN NEI] uE] N/AE]YZ NE] UE] N/AE]YZ N[-] U-]EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C78 of C413 ATrACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YO N-Il UE-Seismic Walkdown Checklist (SWC) SWELl- 024 Equipment ID No. M01201-5 Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RWCU Suction Line Isolation Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YZ N[:]UE1 Comments (Additional pages may be added as necessary)

Valve body is obstructed by shielding.

The Area Walk-By Checklist is AWC-028.Evaluated by: Gary Sweder A A-, Date: I-)- -I1E David Small lof /2.EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C79 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: Y[ NIjI Ur--Seismic Walkdown Checklist (SWC) SWELl- 024 Equipment ID No. M01201-5 Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RWCU Suction Line Isolation Photographs Note: Valve Identification EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 080 of C413 ATTACHMENT

9.6 Sheet

1 of 5 SEISMIC WALKDOWN CHECKLIST FORM Status: YZ NF-] U[Seismic Walkdown Checklist (SWC) SWELl- 025 Equipment ID No. M01201-80 Equip. Class, Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RWCU Return Line Isolation Location:

Bldg. RB Floor El. 51 Rc Manufacturer, Model, Etc. (optional but recommended) oom, Area RWCU HX Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

In-line component, no anchorage 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?YE- NZ YLI NEI Uil N/A]YEI- NE]l UEr N/AZ YEI- NEI urE- N/A;I Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C81 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: Y[ NOIl U[I Seismic Walkdown Checklist (SWC) SWELl- 025 Equipment ID No. M01201-80 Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RWCU Return Line Isolation 5. Is the anchorage configuration consistent with plant documentation?

YI- NFI ULI N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Y[ NEi UI-potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

A ladder at the north end of the room could not be verified to be secure.However, this is not deemed to pose an adverse seismic interaction due to the light weight of an aluminum ladder in comparison to the valve body.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Long term scaffolding, logs 11-99, 11-56, and 11-99 are erected and approved for use in the room and do not present a potentially adverse seismic interaction.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y[ N[il Ur] N/Ar]Y[E N[-] Ur] N/AE]YO N[] UI-- N/ALE YO NEL UF-EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C82 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YN NEIl UI-Seismic Walkdown Checklist (SWC) SWELl- 025 Equipment ID No. M01201-80 Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RWCU Return Line Isolation Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YU NEIUE1 Comments (Additional pages may be added as necessary)

The Area Walk-By Checklist is A WC-028.Evaluated by: Gary Sweder ,A a...L4 L "-,4 "U, Date: /o-/?-(Z'3 David Small-ja 6-7 1112-David Smal EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C83 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ N[-] U--Seismic Walkdown Checklist (SWC) SWELl- 025 Equipment ID No. M01201-80 Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RWCU Return Line Isolation Photographs Note: Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C84 of C413 ATTACHMENT

9.6 SEISMIC

WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NE U[D Seismic Walkdown Checklist (SWC) SWELl- 025 Equipment ID No. M01201-80 Equip. Class Motor-Operated

& Solenoid-Operated Valves (08)Equipment Description RWCU Return Line Isolation Note: Ladder Note: EN-DC-168 REV 0