{{#Wiki_filter:DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13CSeismic Walkdown Checklists (SWCs)Table C-1 Summary of Seismic Walkdown Checklists for DCCNP1 Online Walkdowns COMPONENT ID DESCRIPTION Anchorage PAGEVerification Confirmed UNIT 1 & UNIT 2 CONDENSATE STORAGE C-5TANKS CROSSTIE12-HE-16N Spent Fuel Pit Heat Exchanger (Note: This is y C-8the only SWEL2 Component included) 12-HV-ACCP-3 COMPONENT COOLING WATER PUMPS N C-10VENTILATION SOUTH12-HV-ESW-5 UNIT 1 WEST ESW PP ROOM SUPPLY y C-13VENTILATION FAN1-ABD-A 600VAC MOTOR CONTROL CENTER ABD- y C-19A1-ABD-B 600VAC MOTOR CONTROL CENTER ABD- N C-28B1-ACRA-2 CONTROL ROOM AIR HANDLING Y C-37SUBPANEL
{{#Wiki_filter:DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 C Seismic Walkdown Checklists (SWCs)Table C-1 Summary of Seismic Walkdown Checklists for DCCNP1 Online Walkdowns COMPONENT ID DESCRIPTION Anchorage PAGE Verification Confirmed UNIT 1 & UNIT 2 CONDENSATE STORAGE C-5 TANKS CROSSTIE 12-HE-16N Spent Fuel Pit Heat Exchanger (Note: This is y C-8 the only SWEL2 Component included)12-HV-ACCP-3 COMPONENT COOLING WATER PUMPS N C-10 VENTILATION SOUTH 12-HV-ESW-5 UNIT 1 WEST ESW PP ROOM SUPPLY y C-13 VENTILATION FAN 1-ABD-A 600VAC MOTOR CONTROL CENTER ABD- y C-19 A 1-ABD-B 600VAC MOTOR CONTROL CENTER ABD- N C-28 B 1-ACRA-2 CONTROL ROOM AIR HANDLING Y C-37 SUBPANEL #2 1-AM-A 600VAC MOTOR CONTROL CENTER AM-A Y C-44 1-BATT-AB PLANT BATTERY AB Y C-49 1-BC-AB PLANT BATTERY BATT-AB CONTROL Y C-54 PANEL 1-BC-AB1 PLANT BATTERY BATT-AB BATTERY Y C-59 CHARGER #1 1-BC-AB2 PLANT BATTERY BATT-AB CHARGER #2 N C-65 1-BCTC-AB(1)
#21-AM-A 600VAC MOTOR CONTROL CENTER AM-A Y C-441-BATT-AB PLANT BATTERY AB Y C-491-BC-AB PLANT BATTERY BATT-AB CONTROL Y C-54PANEL1-BC-AB1 PLANT BATTERY BATT-AB BATTERY Y C-59CHARGER #11-BC-AB2 PLANT BATTERY BATT-AB CHARGER #2 N C-651-BCTC-AB(1)
PLANT BATTERY CHARGERS BC-AB1 AND Y C-71 BC-AB2 TRANSFER 1-BLI-130 STEAM GENERATOR OME-3-3 WIDE y C-75 RANGE LEVEL INDICATOR TRANSMITTER 1-BLP-132 STEAM GENERATOR OME-3-1 CHANNEL N C-79 III REACTOR 1-CCV-AB 250VDC TRAIN 'B' CRITICAL SOLENOID N C-83 VALVES 1-CCW COMPONENT COOLING WATER CONTROL N C-87 PANEL 1-CFI-420 COMPONENT COOLING WATER TO WEST y C-91 COMPONENT COOLING 1-CFI-429 WEST RHR HEAT EXCHANGER HE-17W N C-95 COMPONENT COOLING 1-CLI-114 CONDENSATE STORAGE TANK TK-32 Y C-99 LEVEL INDICATOR 1-CMO-420 WEST CCW HEAT EXCHANGER CCW N C-103 OUTLET SHUTOFF VALVE I KA K C-1 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Table C-1 Summary of Seismic Walkdown Checklists for DCCNP1 Online Walkdowns COMPONENT ID DESCRIPTION Anchorage PAGE Verification Confirmed 1-CRID-3 120VAC CONTROL ROOM INSTRUMENT y C-107 DISTRIBUTION 1-CRID-4-INV 120VAC CONTROL ROOM INSTRUMENT y C-111 DISTRIBUTION SYSTEM 1-DGAB AB EMERGENCY DIESEL GENERATOR Y C-115 OME-150-AB CONTROL 1-DGAB-INV AB EMERGENCY DIESEL GENERATOR N C-126 OME-150-AB INVERTER 1-ESW ESSENTIAL SERVICE WATER CONTROL N C-132 PANEL 1-EZC-A 600VAC MOTOR CONTROL CENTER EZC- Y C-137 A 1-EZC-A1 600VAC MOTOR CONTROL CENTER EZC- N C-143 Al 1-EZC-B 600VAC MOTOR CONTROL CENTER EZC- Y C-147 B 1-EZC-B1 600VAC MOTOR CONTROL CENTER EZC- N C-153 B1 1-FFI-240 AUX FEEDWATER TO SG OME-3-4 FLOW y C-157 INDICATOR TRANSMITTER 1-HE-15W WEST COMPONENT COOLING WATER N C-161 HEAT EXCHANGER 1-HE-17W WEST RESIDUAL HEAT REMOVAL HEAT Y C-166 EXCHANGER 1-HE-18W WEST CONTAINMENT SPRAY HEAT Y C-170 EXCHANGER 1-HV-ACRA-2 CONTROL ROOM VENTILATION SOUTH N C-177 AIR CONDITIONING 1-HV-ACRF-2 CONTROL ROOM N C-180 PRESSURIZATION/CLEANUP FILTER UNIT 1-HV-AES-2 AUXILIARY BUILDING VENTILATION Y C-184 ENGINEERED SAFETY 1-HV-CEQ-1 CONTAINMENT HYDROGEN SKIMMER N C-190 VENTILATION FAN #1 1-HV-CEQ-2 CONTAINMENT HYDROGEN SKIMMER Y C-194 VENTILATION FAN #2 1-HV-DGX-1 AB EMERGENCY DIESEL GENERATOR Y C-199 ROOM VENTILATION 1-HV-SGRS-8 4KV ROOM 600V SWITCHGEAR Y C-203 TRANSFORMERS TR1 1A AND 1-IFI-53 BORON INJECTION TO REACTOR N C-207 COOLANT LOOP #3 FLOW 1-IMO-222 WEST CONTAINMENT SPRAY PUMP N C-210 DISCHARGE TO 1-IMO-225 REFUELING WATER STORAGE TANK TO N C-213 WEST CONTAINMENT C-2 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Table C-1 Summary of Seismic Walkdown Checklists for DCCNP1 Online Walkdowns COMPONENT ID DESCRIPTION Anchorage PAGE Verification Confirmed 1-IMO-320 WEST RESIDUAL HEAT REMOVAL PUMP N C-216 PP-35W SUCTION 1-IMO-331 WEST RHR TO UPPER CONTAINMENT N C-219 SPRAY SHUTOFF VALVE 1-IMO-350 WEST RHR HEAT EXCHANGER OUTLET N C-223 TO SAFETY INJECTION 1-IMO-52 BORON INJECTION TO REACTOR N C-227 COOLANT LOOP #2 SHUTOFF 1-IMO-911 REFUELING WATER STORAGE TANK TO N C-232 CVCS CHARGING 1-MCAB(1) 250VDC DISTRIBUTION PANEL MCAB Y C-236 I-MCM-221 MAIN STEAM LEAD #2 TO AUXILIARY N C-240 FEED PUMP TURBINE 1-MRV-230 STEAM GENERATOR OME-3-3 STOP N C-243 VALVE 1-MRV-243 STEAM GENERATOR OME-3-4 POWER N C-247 OPERATED RELIEF 1-NLP-153 PRESSURIZER OME-4 PROTECTION Y C-250 CHANNEL 3 LEVEL 1-NPS-111 REACTOR VESSEL TRAIN 'B' WIDE RANGE Y C-253 PRESSURE 1-OME-150-AB AB EMERGENCY DIESEL GENERATOR Y C-258 1-PP-10W WEST COMPONENT COOLING WATER N C-264 PUMP 1-PP-26S SOUTH SAFETY INJECTION PUMP N C-267 1-PP-35W WEST RESIDUAL HEAT REMOVAL PUMP N C-272 1-PP-3W WEST MOTOR DRIVEN AUXILIARY Y C-276 FEEDWATER PUMP 1-PP-4 TURBINE DRIVEN AUXILIARY FEED PUMP N C-281 1-PP-50W WEST CENTRIFUGAL CHARGING PUMP Y C-286 1-PP-7W WEST ESSENTIAL SERVICE WATER PUMP Y C-290 1-PP-9W WEST CONTAINMENT SPRAY PUMP Y C-297 1-PS-A 600VAC MOTOR CONTROL CENTER PS-A N C-301 1-QT-106-AB1 AB EMERGENCY DIESEL FUEL OIL Y C-307 TRANSFER PUMP #1 l-QT-107-AB AB EMERGENCY DIESEL FUEL OIL DAY Y C-312 TANK 1-QT-130-AB2 AB EMERGENCY DIESEL JACKET WATER Y C-317 PUMP #2 1-QT-141-AB1 AB EMERGENCY DIESEL STARTING AIR N C-320 RECEIVER #1 1-QT-142-AB1 AB EMERGENCY DIESEL STARTING AIR Y C-325 COMPRESSOR
PLANT BATTERY CHARGERS BC-AB1 AND Y C-71BC-AB2 TRANSFER1-BLI-130 STEAM GENERATOR OME-3-3 WIDE y C-75RANGE LEVEL INDICATOR TRANSMITTER 1-BLP-132 STEAM GENERATOR OME-3-1 CHANNEL N C-79III REACTOR1-CCV-AB 250VDC TRAIN 'B' CRITICAL SOLENOID N C-83VALVES1-CCW COMPONENT COOLING WATER CONTROL N C-87PANEL1-CFI-420 COMPONENT COOLING WATER TO WEST y C-91COMPONENT COOLING1-CFI-429 WEST RHR HEAT EXCHANGER HE-17W N C-95COMPONENT COOLING1-CLI-114 CONDENSATE STORAGE TANK TK-32 Y C-99LEVEL INDICATOR 1-CMO-420 WEST CCW HEAT EXCHANGER CCW N C-103OUTLET SHUTOFF VALVE IKAKC-1 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Table C-1 Summary of Seismic Walkdown Checklists for DCCNP1 Online Walkdowns COMPONENT ID DESCRIPTION Anchorage PAGEVerification Confirmed 1-CRID-3 120VAC CONTROL ROOM INSTRUMENT y C-107DISTRIBUTION 1-CRID-4-INV 120VAC CONTROL ROOM INSTRUMENT y C-111DISTRIBUTION SYSTEM1-DGAB AB EMERGENCY DIESEL GENERATOR Y C-115OME-150-AB CONTROL1-DGAB-INV AB EMERGENCY DIESEL GENERATOR N C-126OME-150-AB INVERTER1-ESW ESSENTIAL SERVICE WATER CONTROL N C-132PANEL1-EZC-A 600VAC MOTOR CONTROL CENTER EZC- Y C-137A1-EZC-A1 600VAC MOTOR CONTROL CENTER EZC- N C-143Al1-EZC-B 600VAC MOTOR CONTROL CENTER EZC- Y C-147B1-EZC-B1 600VAC MOTOR CONTROL CENTER EZC- N C-153B11-FFI-240 AUX FEEDWATER TO SG OME-3-4 FLOW y C-157INDICATOR TRANSMITTER 1-HE-15W WEST COMPONENT COOLING WATER N C-161HEAT EXCHANGER 1-HE-17W WEST RESIDUAL HEAT REMOVAL HEAT Y C-166EXCHANGER 1-HE-18W WEST CONTAINMENT SPRAY HEAT Y C-170EXCHANGER 1-HV-ACRA-2 CONTROL ROOM VENTILATION SOUTH N C-177AIR CONDITIONING 1-HV-ACRF-2 CONTROL ROOM N C-180PRESSURIZATION/CLEANUP FILTER UNIT1-HV-AES-2 AUXILIARY BUILDING VENTILATION Y C-184ENGINEERED SAFETY1-HV-CEQ-1 CONTAINMENT HYDROGEN SKIMMER N C-190VENTILATION FAN #11-HV-CEQ-2 CONTAINMENT HYDROGEN SKIMMER Y C-194VENTILATION FAN #21-HV-DGX-1 AB EMERGENCY DIESEL GENERATOR Y C-199ROOM VENTILATION 1-HV-SGRS-8 4KV ROOM 600V SWITCHGEAR Y C-203TRANSFORMERS TR1 1A AND1-IFI-53 BORON INJECTION TO REACTOR N C-207COOLANT LOOP #3 FLOW1-IMO-222 WEST CONTAINMENT SPRAY PUMP N C-210DISCHARGE TO1-IMO-225 REFUELING WATER STORAGE TANK TO N C-213WEST CONTAINMENT C-2 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Table C-1 Summary of Seismic Walkdown Checklists for DCCNP1 Online Walkdowns COMPONENT ID DESCRIPTION Anchorage PAGEVerification Confirmed 1-IMO-320 WEST RESIDUAL HEAT REMOVAL PUMP N C-216PP-35W SUCTION1-IMO-331 WEST RHR TO UPPER CONTAINMENT N C-219SPRAY SHUTOFF VALVE1-IMO-350 WEST RHR HEAT EXCHANGER OUTLET N C-223TO SAFETY INJECTION 1-IMO-52 BORON INJECTION TO REACTOR N C-227COOLANT LOOP #2 SHUTOFF1-IMO-911 REFUELING WATER STORAGE TANK TO N C-232CVCS CHARGING1-MCAB(1) 250VDC DISTRIBUTION PANEL MCAB Y C-236I-MCM-221 MAIN STEAM LEAD #2 TO AUXILIARY N C-240FEED PUMP TURBINE1-MRV-230 STEAM GENERATOR OME-3-3 STOP N C-243VALVE1-MRV-243 STEAM GENERATOR OME-3-4 POWER N C-247OPERATED RELIEF1-NLP-153 PRESSURIZER OME-4 PROTECTION Y C-250CHANNEL 3 LEVEL1-NPS-111 REACTOR VESSEL TRAIN 'B' WIDE RANGE Y C-253PRESSURE1-OME-150-AB AB EMERGENCY DIESEL GENERATOR Y C-2581-PP-10W WEST COMPONENT COOLING WATER N C-264PUMP1-PP-26S SOUTH SAFETY INJECTION PUMP N C-2671-PP-35W WEST RESIDUAL HEAT REMOVAL PUMP N C-2721-PP-3W WEST MOTOR DRIVEN AUXILIARY Y C-276FEEDWATER PUMP1-PP-4 TURBINE DRIVEN AUXILIARY FEED PUMP N C-2811-PP-50W WEST CENTRIFUGAL CHARGING PUMP Y C-2861-PP-7W WEST ESSENTIAL SERVICE WATER PUMP Y C-2901-PP-9W WEST CONTAINMENT SPRAY PUMP Y C-2971-PS-A 600VAC MOTOR CONTROL CENTER PS-A N C-3011-QT-106-AB1 AB EMERGENCY DIESEL FUEL OIL Y C-307TRANSFER PUMP #1l-QT-107-AB AB EMERGENCY DIESEL FUEL OIL DAY Y C-312TANK1-QT-130-AB2 AB EMERGENCY DIESEL JACKET WATER Y C-317PUMP #21-QT-141-AB1 AB EMERGENCY DIESEL STARTING AIR N C-320RECEIVER
#1 1-QT-506 TURBINE DRIVEN AUX FEED PUMP PP-4 N C-330 TRIP AND THROTTLE VALVE IA C-3 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Table C-1 Summary of Seismic Walkdown Checklists for DCCNP1 Online Walkdowns COMPONENT ID DESCRIPTION Anchorage PAGE Verification Confirmed 1-RC REACTOR CONTROL RODS CONTROL N C-333 PANEL 1-RPS-B REACTOR PROTECTION AND Y C-336 SAFEGUARD ACTUATION 1-RPST-B REACTOR PROTECTION AND N C-341 SAFEGUARD ACTUATION 1-RPSX-B REACTOR PROTECTION AND N C-346 SAFEGUARD ACTUATION 1-SG STEAM GENERATOR AND AUXILIARY Y C-350 FEED PUMP CONTROL 1-SIS SAFETY INJECTION CONTROL PANEL Y C-354 1-SPY CONTAINMENT SPRAY CONTROL PANEL N C-360 1-TDAB(1) 250VDC TRAIN 'B' TRANSFER CABINET N C-364 1-TR11A 600VAC BUS 11A SUPPLY TRANSFORMER N C-368 1-TR-AFWX 120/208VAC AUXILIARY FEEDWATER Y C-372 DISTRIBUTION PANEL 1-WMO-702 WEST ESSENTIAL SERVICE WTR PUMP N C-378 PP-7W DISCH S/O VA 1-WMO-715 WEST CONTAINMENT SPRAY HEAT N C-381 EXCHANGER 1-HE-18W 1-WMO-717 WEST CONTAINMENT SPRAY HEAT N C-384 EXCHANGER ESSENTIAL 1-WMO-744 ESSENTIAL SERVICE WATER TO WEST N C-387 MOTOR DRIVEN 1-WMO-753 ESSENTIAL SERVICE WATER TO TURBINE N C-390 DRIVEN 1-WPA-702 WEST ESW PUMP PP-7W DISCH LOW N C-393 PRES ALARM XMTR 1-XPC-21 AB EMER DIESEL STARTING AIR C-397 RECEIVER QT-141-ABI PRESSURE XMTR Notes: 1) Partial walkdowns performed on these Components because they could not be opened. These components were walked down again during the outage walkdowns and new checklists were developed and completed under Table C-3.IA C-4 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-CRV-51 Equipment Class: (7) Fluid-Operated Valves Equipment
#11-QT-142-AB1 AB EMERGENCY DIESEL STARTING AIR Y C-325COMPRESSOR
#11-QT-506 TURBINE DRIVEN AUX FEED PUMP PP-4 N C-330TRIP AND THROTTLE VALVEIAC-3 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Table C-1 Summary of Seismic Walkdown Checklists for DCCNP1 Online Walkdowns COMPONENT ID DESCRIPTION Anchorage PAGEVerification Confirmed 1-RC REACTOR CONTROL RODS CONTROL N C-333PANEL1-RPS-B REACTOR PROTECTION AND Y C-336SAFEGUARD ACTUATION 1-RPST-B REACTOR PROTECTION AND N C-341SAFEGUARD ACTUATION 1-RPSX-B REACTOR PROTECTION AND N C-346SAFEGUARD ACTUATION 1-SG STEAM GENERATOR AND AUXILIARY Y C-350FEED PUMP CONTROL1-SIS SAFETY INJECTION CONTROL PANEL Y C-3541-SPY CONTAINMENT SPRAY CONTROL PANEL N C-3601-TDAB(1) 250VDC TRAIN 'B' TRANSFER CABINET N C-3641-TR11A 600VAC BUS 11A SUPPLY TRANSFORMER N C-3681-TR-AFWX 120/208VAC AUXILIARY FEEDWATER Y C-372DISTRIBUTION PANEL1-WMO-702 WEST ESSENTIAL SERVICE WTR PUMP N C-378PP-7W DISCH S/O VA1-WMO-715 WEST CONTAINMENT SPRAY HEAT N C-381EXCHANGER 1-HE-18W1-WMO-717 WEST CONTAINMENT SPRAY HEAT N C-384EXCHANGER ESSENTIAL 1-WMO-744 ESSENTIAL SERVICE WATER TO WEST N C-387MOTOR DRIVEN1-WMO-753 ESSENTIAL SERVICE WATER TO TURBINE N C-390DRIVEN1-WPA-702 WEST ESW PUMP PP-7W DISCH LOW N C-393PRES ALARM XMTR1-XPC-21 AB EMER DIESEL STARTING AIR C-397RECEIVER QT-141-ABI PRESSURE XMTRNotes: 1) Partial walkdowns performed on these Components because they could not be opened. Thesecomponents were walked down again during the outage walkdowns and new checklists weredeveloped and completed under Table C-3.IAC-4 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:12-CRV-51 Equipment Class: (7) Fluid-Operated ValvesEquipment


==
==
Description:==
Description:==


UNIT 1 & UNIT 2 CONDENSATE STORAGE TANKS CROSSTIEProject:
UNIT 1 & UNIT 2 CONDENSATE STORAGE TANKS CROSSTIE Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
TB1, 591.00 ft, 83 Manufacturer/Model:
TB1, 591.00 ft, 83Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
Not Applicable Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-5 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:12-CRV-51 Equipment Class: (7) Fluid-Operated ValvesEcuiroment
Yes C-5 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-CRV-51 Equipment Class: (7) Fluid-Operated Valves Ecuiroment


==
==
Description:==
Description:==


UNIT 1 & UNIT 2 CONDENSATE STORAGE TANKS CROSSTIEInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
UNIT 1 & UNIT 2 CONDENSATE STORAGE TANKS CROSSTIE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Fire extinguishers on short hooks cannot impact valve and therefore this was acceptable for this component.  
Fire extinguishers on short hooks cannot impact valve and therefore this was acceptable for this component.  
-AR 2012-11669 was issued.8. Are overhead equipment, distribution  
-AR 2012-11669 was issued.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes A Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
YesAYes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: " George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 Photos C-6 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Dment Descrintion:
CommentsEvaluated by: " George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 PhotosC-6 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:Dment Descrintion:
12-CRV-51 (7) Fluid-Operated Valves A H~FýI UVU4 C-7 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-HE-16N Equipment Class: (21) Tanks and Heat Exchangers Equipment  
12-CRV-51 (7) Fluid-Operated ValvesAH~FýI UVU4C-7 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F N USeismic Walkdown Checklist (SWC)Equipment ID No.: 12-HE-16N Equipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


Spent Fuel Pit Heat Exchanger Project:
Spent Fuel Pit Heat Exchanger Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB2, 609.00 ft, 96 Manufacturer/Model:
AB2, 609.00 ft, 96Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
SQUG 12-HE-16N REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
PAINTED 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
SQUG 12-HE-16N REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
PAINTED4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
C-8 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-HE-1 6N Equipment Class: (21) Tanks and Heat Exchangers Equipment  
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-8 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY N USeismic Walkdown Checklist (SWC)Equipment ID No.:12-HE-1 6NEquipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


Spent Fuel Pit Heat Exchanger Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
Spent Fuel Pit Heat Exchanger Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
12-SF-119N chain can swing into 12-HE-16N but is not damaging8. Are overhead equipment, distribution  
12-SF-119N chain can swing into 12-HE-16N but is not damaging 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: -George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-9 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ACCP-3 Equipment Class: (9) Fans Equipment
CommentsEvaluated by: -George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-9 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-Y NUSeismic Walkdown Checklist (SWC)Equipment ID No.:12-HV-ACCP-3 Equipment Class: (9) FansEquipment


==
==
Description:==
Description:==


COMPONENT COOLING WATER PUMPS VENTILATION SOUTHProject:
COMPONENT COOLING WATER PUMPS VENTILATION SOUTH Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB2, 633.00 ft, 633 Manufacturer/Model:
AB2, 633.00 ft, 633Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Insulated component attached inline with HVAC vents 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Insulated component attached inline with HVAC vents3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
Not Applicable Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-10 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: r-7 N USeismic Walkdown Checklist (SWC)Equipment ID No.:12-HV-ACCP-3 Equipment Class: (9) FansEquipment
Yes C-10 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: r-7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ACCP-3 Equipment Class: (9) Fans Equipment


==
==
Description:==
Description:==


COMPONENT COOLING WATER PUMPS VENTILATION SOUTHInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
COMPONENT COOLING WATER PUMPS VENTILATION SOUTH Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Nothing above fan -inline with vent and at ceiling level 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Not Applicable Yes Yes Other Adverse Conditions
Nothing above fan -inline with vent and at ceiling level9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?Not Applicable YesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: __ George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-11 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ACCP-3 Equipment Class: (9) Fans Equipment
CommentsEvaluated by: __ George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-11 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ACCP-3 Equipment Class: (9) FansEquipment


==
==
Description:==
Description:==


COMPONENT COOLING WATER PUMPS VENTILATION SOUTHC-12 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ESW-5 Equipment Class: (9) FansEquipment
COMPONENT COOLING WATER PUMPS VENTILATION SOUTH C-12 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ESW-5 Equipment Class: (9) Fans Equipment


==
==
Description:==
Description:==


UNIT 1 WEST ESW PP ROOM SUPPLY VENTILATION FANProject:
UNIT 1 WEST ESW PP ROOM SUPPLY VENTILATION FAN Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
SH1, 591.00 ft, 136 Manufacturer/Model:
SH1, 591.00 ft, 136Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
DWG 12-5682 REVIO 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
DWG 12-5682 REVIO2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
C-13 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1. 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ESW-5 Equipment Class: (9) Fans EauiDment
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-13 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1. 09/12/13Status: [] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:12-HV-ESW-5 Equipment Class: (9) FansEauiDment


==
==
Description:==
Description:==


UNIT 1 WEST ESW PP ROOM SUPPLY VENTILATION FANInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
UNIT 1 WEST ESW PP ROOM SUPPLY VENTILATION FAN Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: -- George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-14 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: L-1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ESW-5 Equipment Class: (9) Fans r--_ -~~~~ ... .-L ý .. .I l' .4 1 I---'l r-r" .Ir --.r- ---, Ir"f'l& I ý r- 1-klrl A"rl kl Ir'A .I WV-P9090026 P9090027 P9090028 P9090029 C-15 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: EauiDment  
CommentsEvaluated by: -- George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-14 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: L-1 N USeismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ESW-5 Equipment Class: (9) Fansr--_ -~~~~ ... .-L ý .. .I l' .4 1 I---'l r-r" .Ir --.r- ---, Ir"f'l& I ý r- 1-klrl A"rl kl Ir'A .IWV-P9090026 P9090027P9090028P9090029C-15 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:EauiDment  


==
==
Description:==
Description:==


12-HV-ESW-5 (9) FansUNIT 1 WEST ESW PP RCC-16 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ESW-5 Equipment Class: (9) FansVPPP9090036 P9090037C-17 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ESW-5 Equipment Class: (9) FansPP R(C-18 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y WIN USeismic Walkdown Checklist (SWC)Equipment ID No.:I -ABD-AEquipment Class: (1) Motor Control CentersEquipment
12-HV-ESW-5 (9) Fans UNIT 1 WEST ESW PP RC C-16 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ESW-5 Equipment Class: (9) Fans VPP P9090036 P9090037 C-17 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ESW-5 Equipment Class: (9) Fans PP R(C-18 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y WIN U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -ABD-A Equipment Class: (1) Motor Control Centers Equipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER ABD-AProject:
600VAC MOTOR CONTROL CENTER ABD-A Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 587.00 ft, 121 Manufacturer/Model:
AB1, 587.00 ft, 121Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
SQUG 1-ABD-A REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Concrete only in front of MCC 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
Yes Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
SQUG 1-ABD-A REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes C-19 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y j-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -ABD-A Equipment Class: (1) Motor Control Centers Equipment
YesYes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Concrete only in front of MCC5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
YesYes6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
YesC-19 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y j-] USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -ABD-AEquipment Class: (1) Motor Control CentersEquipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER ABD-AInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
600VAC MOTOR CONTROL CENTER ABD-A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Fire extinguishers on short hooks -AR 2012-11669 was issued.8. Are overhead equipment, distribution  
Fire extinguishers on short hooks -AR 2012-11669 was issued.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
C02 fire protection
C02 fire protection
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?NoYesYesNoOther Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?No Yes Yes No Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
CommentsEvaluated by: --George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-20 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y ¶N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-AEquipment Class: (1) Motor Control CentersE ui ment
Comments Evaluated by: --George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-20 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y ¶N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-A Equipment Class: (1) Motor Control Centers E ui ment


== Description:==
== Description:==


600VAC MOTOR CONTROL CENTER ABD-AP9130194 P9130195P9130196C-21 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N-] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-AEquipment Class: (1) Motor Control CentersEncinment Descrintion:
600VAC MOTOR CONTROL CENTER ABD-A P9130194 P9130195 P9130196 C-21 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-A Equipment Class: (1) Motor Control Centers Encinment Descrintion:
600VAC MOTOR CONTROL CENTER ABD-AC-22 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y F-] USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:nmant rlnaQrrintinn*
600VAC MOTOR CONTROL CENTER ABD-A C-22 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y F-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: nmant rlnaQrrintinn*
1-ABD-A(1) Motor Control Centers600VAC MOTOR CONTROL CEN1P9130203C-23 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N-] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-AEquipment Class: (1) Motor Control CentersEquipment
1-ABD-A (1) Motor Control Centers 600VAC MOTOR CONTROL CEN1 P9130203 C-23 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-A Equipment Class: (1) Motor Control Centers Equipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER ABD-AC-24 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y FJ] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-AEquipment Class: (1) Motor Control Centers600VAC MOTOR CONIC-25 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y EN USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-AEquipment Class: (1) Motor Control CentersE ui ment Descri tion: 600VAC MOTOR CONTROL CENTER ABD-AP9130208 P9130209P9130210 P9130211C-26 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y r-NE USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-AEquipment Class: (1) Motor Control CentersEculment DescriDtion:
600VAC MOTOR CONTROL CENTER ABD-A C-24 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y FJ] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-A Equipment Class: (1) Motor Control Centers 600VAC MOTOR CONI C-25 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y EN U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-A Equipment Class: (1) Motor Control Centers E ui ment Descri tion: 600VAC MOTOR CONTROL CENTER ABD-A P9130208 P9130209 P9130210 P9130211 C-26 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y r-NE U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-A Equipment Class: (1) Motor Control Centers Eculment DescriDtion:
600VAC MOTOR CONTROL CENTER ABD-AC-27 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y jN USeismic Walkdown Checklist (SWC)Equipment ID No.: I -ABD-BEquipment Class: (1) Motor Control CentersEquipment
600VAC MOTOR CONTROL CENTER ABD-A C-27 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y jN U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -ABD-B Equipment Class: (1) Motor Control Centers Equipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER ABD-BProject:
600VAC MOTOR CONTROL CENTER ABD-B Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 587.00 ft, 121 Manufacturer/Model:
AB1, 587.00 ft, 121Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
SQUG 1-ABD-A REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?Concrete only in front of MCC 5. Is the anchorage configuration consistent with plant documentation?
SQUG 1-ABD-A REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?Concrete only in front of MCC5. Is the anchorage configuration consistent with plant documentation?
C-28 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y F-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -ABD-B Equipment Class: (1) Motor Control Centers EauiDment
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-28 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y F-] USeismic Walkdown Checklist (SWC)Equipment ID No.:I -ABD-BEquipment Class: (1) Motor Control CentersEauiDment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER ABD-BInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
600VAC MOTOR CONTROL CENTER ABD-B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Fire extinguishers on short hooks -AR 2012-11669 was issued.8. Are overhead equipment, distribution  
Fire extinguishers on short hooks -AR 2012-11669 was issued.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
C02 fire protection
C02 fire protection
: 9. Do attached lines have adequate flexibility to avoid damage?NoYesYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?NoOther Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?No Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?No Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-29 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:I-ABD-B(1) Motor Control CentersCONTC-30 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y -N--] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-BEquipment Class: (1) Motor Control Centers-OR CONTROLC-31 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y EN] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-BEquipment Class: (1) Motor Control CentersC-32 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y FN-] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-BEquipment Class: (1) Motor Control CentersOTOR CON-_C-33 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y L] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-BEquipment Class: (1) Motor Control CentersCONTFC-34 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N-] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-BEquipment Class: (1) Motor Control Centers)ment
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-29 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: I-ABD-B (1) Motor Control Centers CONT C-30 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y -N--] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-B Equipment Class: (1) Motor Control Centers-OR CONTROL C-31 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y EN] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-B Equipment Class: (1) Motor Control Centers C-32 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y FN-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-B Equipment Class: (1) Motor Control Centers OTOR CON-_C-33 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y L] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-B Equipment Class: (1) Motor Control Centers CONTF C-34 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-B Equipment Class: (1) Motor Control Centers)ment


== Description:==
== Description:==


600VAC MOTOR CONTRC-35 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N-] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-BEquipment Class: (1) Motor Control CentersEclui"ment Descrigtion:
600VAC MOTOR CONTR C-35 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-B Equipment Class: (1) Motor Control Centers Eclui"ment Descrigtion:
600VAC MOTOR CONTROL CENTER ABD-BC-36 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ACRA-2Equipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
600VAC MOTOR CONTROL CENTER ABD-B C-36 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ACRA-2 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


CONTROL ROOM AIR HANDLING SUBPANEL  
CONTROL ROOM AIR HANDLING SUBPANEL #2 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
#2Project:
AB1, 650.00 ft, 129 Manufacturer/Model:
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
AB1, 650.00 ft, 129Manufacturer/Model:
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
DWG 12-3366 REV5 2. Is the anchorage free of bent, broken, missing or loose hardware?
Additional space is provided at the end of this checklist for documenting other comments.
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
Anchorage
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
DWG 12-3366 REV52. Is the anchorage free of bent, broken, missing or loose hardware?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
Welds at all 4 comers. I bolt has lack of thread engagement  
Welds at all 4 comers. I bolt has lack of thread engagement  
-evaluated in SQUG -OKC-37 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1. 09/12/13Status: [] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:I -ACRA-2Equipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
-evaluated in SQUG -OK C-37 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1. 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -ACRA-2 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


CONTROL ROOM AIR HANDLING SUBPANEL  
CONTROL ROOM AIR HANDLING SUBPANEL #2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
#2Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes8. Are overhead equipment, distribution  
Block Wall -retrofitted (adjacent to panel) -OK per DWG 12-403 1, Wall W-1 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Block Wall -retrofitted (adjacent to panel) -OK per DWG 12-403 1,Wall W-19. Do attached lines have adequate flexibility to avoid damage?YesYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-38 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: E-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 1 -ACRA-2 (20) Instrumentation and Control Panels and Cabinets E Cment Descri t CONTROL ROOO P9100111 A AIR HANDLING SUBPANEL #2 C-39 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ACRA-2 Eauinment Class: (20) Instrumentation and Control Panels and Cabinets EauiDment DescriDtion:
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
AIR HANDL C-40 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ACRA-2 Equipment Class: (20) Instrumentation and Control Panels and Cabinets E ui ment
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-38 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: E-] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:1 -ACRA-2(20) Instrumentation and Control Panels and CabinetsE Cment Descri t CONTROL ROOOP9100111A AIR HANDLING SUBPANEL  
#2C-39 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-- N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ACRA-2Eauinment Class: (20) Instrumentation and Control Panels and CabinetsEauiDment DescriDtion:
AIR HANDLC-40 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ACRA-2Equipment Class: (20) Instrumentation and Control Panels and CabinetsE ui ment


== Description:==
== Description:==


CONTROL ROOM AIR HANDLING SUBPANEL  
CONTROL ROOM AIR HANDLING SUBPANEL #2 P9100115 P9100116 C-41 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-ACRA-2 Equipment Class: (20) Instrumentation and Control Panels and Cabinets CONTROL ROOM AIR HAl'I MI fI-C-42 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ACRA-2 Equipment Class: (20) Instrumentation and Control Panels and Cabinets AIR 1 17 1 %Jj I I ýU I,-rI uuIlzI C-43 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y `-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-AM-A Equipment Class: (1) Motor Control Centers Equipment
#2P9100115 P9100116C-41 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: I-ACRA-2Equipment Class: (20) Instrumentation and Control Panels and CabinetsCONTROL ROOM AIR HAl'I MI fI-C-42 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ACRA-2Equipment Class: (20) Instrumentation and Control Panels and CabinetsAIR1 17 1 %Jj I I ýUI,-rI uuIlzIC-43 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y `-] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-AM-AEquipment Class: (1) Motor Control CentersEquipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER AM-AProject:
600VAC MOTOR CONTROL CENTER AM-A Project: DC Cook 1 SWEL Location (BIdg, Elev, Room/Area):
DC Cook 1 SWELLocation (BIdg, Elev,Room/Area):
AB1, 633.00 ft, 633 Manufacturer/Model:
AB1, 633.00 ft, 633Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
SQUG 1-AM-A REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 2 J Bolts in comers on both sides (front and back) 4 Red Heads in front & 4 Red Heads in back 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
SQUG 1-AM-A REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes2 J Bolts in comers on both sides (front and back) 4 Red Heads infront & 4 Red Heads in back3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
C-44 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y F] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -AM-A Equipment Class: (1) Motor Control Centers Equipment
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-44 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y F] USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -AM-AEquipment Class: (1) Motor Control CentersEquipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER AM-AInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
600VAC MOTOR CONTROL CENTER AM-A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Fire extinguishers on short hooks -AR 2012-11669 was issued.8. Are overhead equipment, distribution  
Fire extinguishers on short hooks -AR 2012-11669 was issued.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
No Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?No Other Adverse Conditions
NoYes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?NoOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: CA George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-45 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y F--] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-AM-A Equipment Class: (1) Motor Control Centers Equipment
CommentsEvaluated by: CA George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-45 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y F--] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-AM-AEquipment Class: (1) Motor Control CentersEquipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER AM-AC-46 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y ¶1 USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-AM-AEquipment Class: (1) Motor Control CentersEquipment
600VAC MOTOR CONTROL CENTER AM-A C-46 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y ¶1 U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-AM-A Equipment Class: (1) Motor Control Centers Equipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER AM-AP9181081C-47 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y EN USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-AM-AEquipment Class: (1) Motor Control CentersEquipment
600VAC MOTOR CONTROL CENTER AM-A P9181081 C-47 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y EN U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-AM-A Equipment Class: (1) Motor Control Centers Equipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER AM-AC-48 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: 7Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BATT-AB Equipment Class: (15) Batteries on RacksEquipment
600VAC MOTOR CONTROL CENTER AM-A C-48 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BATT-AB Equipment Class: (15) Batteries on Racks Equipment


==
==
Description:==
Description:==


PLANT BATTERY ABProject:
PLANT BATTERY AB Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 609.00 ft, 200 Manufacturer/Model:
AB1, 609.00 ft, 200Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
SQUG 1-BA TT-AB REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
Very minor oxidation on base plate of front plate on right side batteries 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
SQUG 1-BA TT-AB REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Very minor oxidation on base plate of front plate on right side batteries
C-49 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -BATT-AB Equipment Class: (15) Batteries on Racks Equipment
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-49 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY N USeismic Walkdown Checklist (SWC)Equipment ID No.:I -BATT-ABEquipment Class: (15) Batteries on RacksEquipment


==
==
Description:==
Description:==


PLANT BATTERY ABInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
PLANT BATTERY AB Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: c George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-50 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BATT-AB Equipment Class: (15) Batteries on Racks Y AB C-51 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y--] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BAT Equipment Class: (15) Batteries on Racks Equipment
CommentsEvaluated by: c George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-50 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BATT-AB Equipment Class: (15) Batteries on RacksY ABC-51 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y--] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BATEquipment Class: (15) Batteries on RacksEquipment


==
==
Description:==
Description:==


PLANT BATTERY ABT-ABC-52 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BATT-AB Equipment Class: (15) Batteries on Racks,TTERY ABC-53 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-ABEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
PLANT BATTERY AB T-AB C-52 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BATT-AB Equipment Class: (15) Batteries on Racks ,TTERY AB C-53 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


PLANT BATTERY BATT-AB CONTROL PANELProject:
PLANT BATTERY BATT-AB CONTROL PANEL Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 613.00 ft, 205 Manufacturer/Model:
AB1, 613.00 ft, 205Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
DWG-PSI-91031-0
DWG-PSI-91031-0
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-54 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY NUSeismic Walkdown Checklist (SWC)Equipment ID No.:I -BC-ABEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
C-54 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -BC-AB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


PLANT BATTERY BATT-AB CONTROL PANELInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
PLANT BATTERY BATT-AB CONTROL PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YesYes8. Are overhead equipment, distribution  
Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: -George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-55 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 1 -BC-AB (20) Instrumentation and Control Panels and Cabinets*TERY BATT-C-56 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB Equipment Class: (20) Instrumentation and Control Panels and Cabinets TTERY BATT C-57 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: IDment Descriotion:
CommentsEvaluated by: -George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-55 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:1 -BC-AB(20) Instrumentation and Control Panels and Cabinets*TERY BATT-C-56 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-ABEquipment Class: (20) Instrumentation and Control Panels and CabinetsTTERY BATTC-57 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:IDment Descriotion:
I -BC-AB (20) Instrumentation and Control Panels and Cabinets PLANT BATTERY BATT-AB CONTROL PANEL I-": I C-58 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-ABI Equipment Class: (16) Inverters Equipment  
I -BC-AB(20) Instrumentation and Control Panels and CabinetsPLANT BATTERY BATT-AB CONTROL PANELI-": IC-58 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-ABIEquipment Class: (16) Inverters Equipment  


==
==
Description:==
Description:==


PLANT BATTERY BATT-AB BATTERY CHARGER #1Project:
PLANT BATTERY BATT-AB BATTERY CHARGER #1 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 613.00 ft, 205 Manufacturer/Model:
AB1, 613.00 ft, 205Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
SQUG 1-BC-ABI REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
Painted 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
SQUG 1-BC-ABI REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Painted4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
C-59 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -BC-AB1 Equipment Class: (16) Inverters Equipment  
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-59 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY NUSeismic Walkdown Checklist (SWC)Equipment ID No.:I -BC-AB1Equipment Class: (16) Inverters Equipment  


==
==
Description:==
Description:==


PLANT BATTERY BATT-AB BATTERY CHARGER #1Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
PLANT BATTERY BATT-AB BATTERY CHARGER #1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Yes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-60 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-ABI Equipment Class: (16) Inverters Y BATT P9190384 C-61 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-BC-ABI Equipment Class: (16) Inverters Equipment  
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-60 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-ABIEquipment Class: (16) Inverters Y BATTP9190384C-61 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY] N USeismic Walkdown Checklist (SWC)Equipment ID No.: I-BC-ABIEquipment Class: (16) Inverters Equipment  


==
==
Description:==
Description:==


PLANT BATTERY BATT-AB BATTERY CHARGER #1P9170630C-62 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: EF] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (16) In\I -BC-ABIverters,TTERY BATTP9170636 P9170637C-63 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB1Equipment Class: (16) Inverters EauiDment Descriotion:
PLANT BATTERY BATT-AB BATTERY CHARGER #1 P9170630 C-62 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: EF] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (16) In\I -BC-ABI verters ,TTERY BATT P9170636 P9170637 C-63 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB1 Equipment Class: (16) Inverters EauiDment Descriotion:
PLANT BATTERY BATT-AB BATTERY CHARGER #1C-64 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y F7J USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -BC-AB2Equipment Class: (16) Inverters Equipment  
PLANT BATTERY BATT-AB BATTERY CHARGER #1 C-64 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y F7J U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -BC-AB2 Equipment Class: (16) Inverters Equipment  


==
==
Description:==
Description:==


PLANT BATTERY BATT-AB CHARGER #2Project:
PLANT BATTERY BATT-AB CHARGER #2 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
ABI, 613.00 ft, 205 Manufacturer/Model:
ABI, 613.00 ft, 205Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?No Yes Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
NoYesYes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-65 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y jN USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -BC-AB2Equipment Class: (16) Inverters Equipment  
Yes C-65 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y jN U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -BC-AB2 Equipment Class: (16) Inverters Equipment  


==
==
Description:==
Description:==


PLANT BATTERY BATT-AB CHARGER #2Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
PLANT BATTERY BATT-AB CHARGER #2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Fire extinguishers on short hooks -AR 2012- 11669 was issued.9. Do attached lines have adequate flexibility to avoid damage?Yes No Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?No Other Adverse Conditions
Fire extinguishers on short hooks -AR 2012- 11669 was issued.9. Do attached lines have adequate flexibility to avoid damage?YesNoYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?NoOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: -- George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-66 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y Nj U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB2 Equipment Class: (16) Inverters Equipment  
CommentsEvaluated by: -- George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-66 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y Nj USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB2Equipment Class: (16) Inverters Equipment  


==
==
Description:==
Description:==


PLANT BATTERY BATT-AB CHARGER #2C-67 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y F-N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB2Equipment Class: (16) Inverters Equipment  
PLANT BATTERY BATT-AB CHARGER #2 C-67 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y F-N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB2 Equipment Class: (16) Inverters Equipment  


==
==
Description:==
Description:==


PLANT BATTERY BATT-AB CHARGER #2C-68 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y EPI USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB2Equipment Class: (16) Inverters Equipment  
PLANT BATTERY BATT-AB CHARGER #2 C-68 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y EPI U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB2 Equipment Class: (16) Inverters Equipment  


==
==
Description:==
Description:==


PLANT BATTERY BATT-AB CHARGER #2P9170648C-69 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB2Equipment Class: (16) Inverters Equipment  
PLANT BATTERY BATT-AB CHARGER #2 P9170648 C-69 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB2 Equipment Class: (16) Inverters Equipment  


==
==
Description:==
Description:==


PLANT BATTERY BATT-AB CHARGER #2C-70 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N j-uSeismic Walkdown Checklist (SWC)Equipment ID No.: I-BCTC-AB Equipment Class: (14) Distribution PanelsEquipment
PLANT BATTERY BATT-AB CHARGER #2 C-70 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N j-u Seismic Walkdown Checklist (SWC)Equipment ID No.: I-BCTC-AB Equipment Class: (14) Distribution Panels Equipment


==
==
Description:==
Description:==


PLANT BATTERY CHARGERS BC-AB1 AND BC-AB2 TRANSFERProject:
PLANT BATTERY CHARGERS BC-AB1 AND BC-AB2 TRANSFER Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
ABI, 613.00 ft, 205 Manufacturer/Model:
ABI, 613.00 ft, 205Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
COULD NOT OPEN -SQUG 1-BCTC-AB REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Unknown Cannot open -cannot see anchorage 3. Is the anchorage free of corrosion that is more than mild surface Unknown oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
Cannot open -cannot see anchorage 4. Is the anchorage free of visible cracks in the concrete near the Unknown anchors?Cannot open -cannot see anchorage 5. Is the anchorage configuration consistent with plant documentation?
COULD NOT OPEN -SQUG 1-BCTC-AB REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
Unknown (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
UnknownCannot open -cannot see anchorage
Cannot open -cannot see anchorage 6. Based on the above anchorage evaluations, is the anchorage free of Unknown potentially adverse seismic conditions?
: 3. Is the anchorage free of corrosion that is more than mild surface Unknownoxidation?
C-71 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N i-U-1 Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -BCTC-AB Equipment Class: (14) Distribution Panels Equipment
Cannot open -cannot see anchorage
: 4. Is the anchorage free of visible cracks in the concrete near the Unknownanchors?Cannot open -cannot see anchorage
: 5. Is the anchorage configuration consistent with plant documentation?
Unknown(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Cannot open -cannot see anchorage
: 6. Based on the above anchorage evaluations, is the anchorage free of Unknownpotentially adverse seismic conditions?
C-71 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N i-U-1Seismic Walkdown Checklist (SWC)Equipment ID No.:1 -BCTC-ABEquipment Class: (14) Distribution PanelsEquipment


==
==
Description:==
Description:==


PLANT BATTERY CHARGERS BC-AB1 AND BC-AB2 TRANSFERInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
PLANT BATTERY CHARGERS BC-AB1 AND BC-AB2 TRANSFER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YesNo8. Are overhead equipment, distribution  
Yes No 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Fire extinguishers on short hooks -AR 2012- 11669 was issued.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes No Other Adverse Conditions
Fire extinguishers on short hooks -AR 2012- 11669 was issued.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesNoOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions thatcould adversely affect the safety functions of the equipment?
Could not open due to safety concerns during online walkdown.Completed inspection during DCCNPI Unit I Outage Walkdown.Checklist included in report following Table C-3.Unknown A Comments Evaluated by: '--- George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 Photos C-72 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N -Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BCTC-AB Equipment Class: (14) Distribution Panels TTERY (C-73 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N E Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC'Equipment Class: (14) Distribution Panels Equipment
Could not open due to safety concerns during online walkdown.
Completed inspection during DCCNPI Unit I Outage Walkdown.
Checklist included in report following Table C-3.UnknownACommentsEvaluated by: '--- George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 PhotosC-72 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N -Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BCTC-AB Equipment Class: (14) Distribution PanelsTTERY (C-73 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N ESeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC'Equipment Class: (14) Distribution PanelsEquipment


==
==
Description:==
Description:==


PLANT BATTERY CHAIrC-ABC-74 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BL1-130 Equipment Class: (18) Instruments on RacksSTEAM GENERATOR OME-3-3 WIDE RANGE LEVEL INDICATOR Equipment  
PLANT BATTERY CHAI rC-AB C-74 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BL1-130 Equipment Class: (18) Instruments on Racks STEAM GENERATOR OME-3-3 WIDE RANGE LEVEL INDICATOR Equipment  


==
==
Description:==
Description:==


TRANSMITTER Project:
TRANSMITTER Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
CON1, 612.00 ft, 73 Manufacturer/Model:
CON1, 612.00 ft, 73Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
Dwg. 1-5570P. A 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
Dwg. 1-5570P.
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
A2. Is the anchorage free of bent, broken, missing or loose hardware?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
C-75 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -BLI-1 30 Equipment Class: (18) Instruments on Racks STEAM GENERATOR OME-3-3 WIDE RANGE LEVEL INDICATOR Equipment  
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-75 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY NUSeismic Walkdown Checklist (SWC)Equipment ID No.:1 -BLI-1 30Equipment Class: (18) Instruments on RacksSTEAM GENERATOR OME-3-3 WIDE RANGE LEVEL INDICATOR Equipment  


==
==
Description:==
Description:==


TRANSMITTER Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
TRANSMITTER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YesYes8. Are overhead equipment, distribution  
Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: -George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 Photos C-76 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BLI-130 Equipment Class: (18) Instruments on Racks STEAM GENERATOR OME-3-3 WIDE RANGE LEVEL INDICATOR C-77 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BLI-130 Equipment Class: (18) Instruments on Racks STEAM GENERATOR OME-3-3 WIDE RANGE LEVEL INDICATOR T7 A II RA I TTII C-78 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -BLP-1 32 Equipment Class: (18) Instruments on Racks Eauinment
CommentsEvaluated by: -George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 PhotosC-76 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BLI-130 Equipment Class: (18) Instruments on RacksSTEAM GENERATOR OME-3-3 WIDE RANGE LEVEL INDICATOR C-77 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BLI-130 Equipment Class: (18) Instruments on RacksSTEAM GENERATOR OME-3-3 WIDE RANGE LEVEL INDICATOR T7 A II RA I TTIIC-78 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -BLP-1 32Equipment Class: (18) Instruments on RacksEauinment


==
==
Description:==
Description:==


STEAM GENERATOR OME-3-1 CHANNEL III REACTORProject:
STEAM GENERATOR OME-3-1 CHANNEL III REACTOR Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
CON1, 612.00 ft, 72 Manufacturer/Model:
CON1, 612.00 ft, 72Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-79 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [-ý N USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -BLP-1 32Equipment Class: (18) Instruments on RacksEquipment Descri)tion:
Yes C-79 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -BLP-1 32 Equipment Class: (18) Instruments on Racks Equipment Descri)tion:
STEAM GENERATOR OME-3-1 CHANNEL III REACTORInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
STEAM GENERATOR OME-3-1 CHANNEL III REACTOR Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: -George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-80 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BLP-132 Equipment Class: (18) Instruments on Racks Oipment
CommentsEvaluated by: -George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-80 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BLP-132 Equipment Class: (18) Instruments on RacksOipment


== Description:==
== Description:==


STEAM GENERATOR OME-3-1 CHANNEL III REACTORC-81 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: EY] N USeismic Walkdown Checklist (SWC)Equipment ID No.: I-BLP-132 Equipment Class: (18) Instruments on RacksEquipment
STEAM GENERATOR OME-3-1 CHANNEL III REACTOR C-81 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: EY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-BLP-132 Equipment Class: (18) Instruments on Racks Equipment


==
==
Description:==
Description:==


STEAM GENERATOR OME-3-1 CHANNEL III REACTORI,& -I -I ulilinC-82 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -CCV-ABEquipment Class: (14) Distribution PanelsEauiDment
STEAM GENERATOR OME-3-1 CHANNEL III REACTOR I,& -I -I ulilin C-82 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -CCV-AB Equipment Class: (14) Distribution Panels EauiDment


==
==
Description:==
Description:==


250VDC TRAIN 'B' CRITICAL SOLENOID VALVESProject:
250VDC TRAIN 'B' CRITICAL SOLENOID VALVES Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 633.00 ft, 123 Manufacturer/Model:
AB1, 633.00 ft, 123Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Unistrut mounted 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable Not Applicable Yes C-83 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-CCV-AB Equipment Class: (14) Distribution Panels Equipment
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Unistrut mounted5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
Not Applicable Not Applicable YesC-83 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1-CCV-ABEquipment Class: (14) Distribution PanelsEquipment


==
==
Description:==
Description:==


250VDC TRAIN 'B' CRITICAL SOLENOID VALVESInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
250VDC TRAIN 'B' CRITICAL SOLENOID VALVES Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Check celing tiles -OK -clipped per DWG 12-4070 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Check celing tiles -OK -clipped per DWG 12-40709. Do attached lines have adequate flexibility to avoid damage?YesYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: c" George G Thomas Date: 10/18/12 tl -Neda Stoeva 10/18/12 Photos C-84 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-CCV-AB Equipment Class: (14) Distribution Panels Equipment
CommentsEvaluated by: c" George G Thomas Date: 10/18/12tl -Neda Stoeva 10/18/12PhotosC-84 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-CCV-ABEquipment Class: (14) Distribution PanelsEquipment


==
==
Description:==
Description:==


250VDC TRAIN 'B' CRITICAL SOLENOID VALVES11141Wis.J1 11 111 Iý III I IP9191257forit! fill 1:1-4 111 T IIL16.It it 6,ft, ofP9191258C-85 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: 7Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-CCV-ABEquipment Class: (14) Distribution PanelsEquipment
250VDC TRAIN 'B' CRITICAL SOLENOID VALVES 11141 Wis.J1 11 111 Iý III I I P9191257 for it! fill 1: 1-4 111 T I IL 16.It it 6,ft, of P9191258 C-85 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-CCV-AB Equipment Class: (14) Distribution Panels Equipment


==
==
Description:==
Description:==


250VDC TRAIN 'B' CRITICAL SOLENOID VALVESC-86 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1-CCWEquipment Class: (20) Instrumentation and Control Panels and CabinetsEauipment
250VDC TRAIN 'B' CRITICAL SOLENOID VALVES C-86 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-CCW Equipment Class: (20) Instrumentation and Control Panels and Cabinets Eauipment


==
==
Description:==
Description:==


COMPONENT COOLING WATER CONTROL PANELProject:
COMPONENT COOLING WATER CONTROL PANEL Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 633.00 ft, 123 Manufacturer/Model:
AB1, 633.00 ft, 123Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable Panel CCW does not have its own anchorage plate 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Mounted through the rest of the panels around it 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable Not Applicable Not Applicable Yes C-87 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: jYj N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-CCW Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Not Applicable Panel CCW does not have its own anchorage plate3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Mounted through the rest of the panels around it4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable YesC-87 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: jYj NUSeismic Walkdown Checklist (SWC)Equipment ID No.:1-CCWEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment


==
==
Description:==
Description:==


COMPONENT COOLING WATER CONTROL PANELInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
COMPONENT COOLING WATER CONTROL PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YesYes8. Are overhead equipment, distribution  
Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Check ceiling tiles -OK -clipped per DWG 12-4070 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Check ceiling tiles -OK -clipped per DWG 12-40709. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: -- George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-88 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: rinmnt I-merrinfinn-1-CCw (20) Instrumentation and Control Panels and Cabinets COMPONENT COOLING WATER CONTROL PANEL P9191227 C-89 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 1-CCw (20) Instrumentation and Control Panels and Cabinets T COOLING WAT I1V1IZU C-90 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: EiY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-CFI-420 Equipment Class: (18) Instruments on Racks Equipment
CommentsEvaluated by: -- George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-88 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F NUSeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:rinmnt I-merrinfinn-1-CCw(20) Instrumentation and Control Panels and CabinetsCOMPONENT COOLING WATER CONTROL PANELP9191227C-89 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:1-CCw(20) Instrumentation and Control Panels and CabinetsT COOLING WATI1V1IZUC-90 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: EiY N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-CFI-420 Equipment Class: (18) Instruments on RacksEquipment


==
==
Description:==
Description:==


COMPONENT COOLING WATER TO WEST COMPONENT COOLINGProject:
COMPONENT COOLING WATER TO WEST COMPONENT COOLING Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB2, 609.00 ft, 609 Manufacturer/Model:
AB2, 609.00 ft, 609Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
VTD-ITBA-0131, Figure 6-1. Outline Dimensional Drawing 0224.0901.3 Model 224 DPU, Yoke or Wall Mounting A 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?Mounted on rack with 4 bolts on the corners 5. Is the anchorage configuration consistent with plant documentation?
VTD-ITBA-0131, Figure 6-1. Outline Dimensional Drawing 0224.0901.3 Model224 DPU, Yoke or Wall Mounting A2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?Mounted on rack with 4 bolts on the corners5. Is the anchorage configuration consistent with plant documentation?
C-91 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -CFI-420 Equipment Class: (18) Instruments on Racks Eauipment
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-91 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [-Y NUSeismic Walkdown Checklist (SWC)Equipment ID No.:I -CFI-420Equipment Class: (18) Instruments on RacksEauipment


==
==
Description:==
Description:==


COMPONENT COOLING WATER TO WEST COMPONENT COOLINGInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
COMPONENT COOLING WATER TO WEST COMPONENT COOLING Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YesYes8. Are overhead equipment, distribution  
Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Fire piping well supported, joints welded.Evaluated by:" George G Thomas Date: 08/15/2013
CommentsFire piping well supported, joints welded.Evaluated by:" George G Thomas Date: 08/15/2013
-" Neda Stoeva 08/15/2013 Photos C-92 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: I -CFI-420 (18) Instruments on Racks 4iT COOLING C-93 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-CFI-420 Equipment Class: (18) Instruments on Racks Equipment
-" Neda Stoeva 08/15/2013 PhotosC-92 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:I -CFI-420(18) Instruments on Racks4iT COOLINGC-93 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-CFI-420 Equipment Class: (18) Instruments on RacksEquipment


==
==
Description:==
Description:==


COMPONENT COOLING WATER TO WEST COMPONENT COOLINGC-94 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y NUSeismic Walkdown Checklist (SWC)Equipment ID No.:1 -CFI-429Equipment Class: (18) Instruments on RacksEquipment
COMPONENT COOLING WATER TO WEST COMPONENT COOLING C-94 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -CFI-429 Equipment Class: (18) Instruments on Racks Equipment


==
==
Description:==
Description:==


WEST RHR HEAT EXCHANGER HE-17W COMPONENT COOLINGProject:
WEST RHR HEAT EXCHANGER HE-17W COMPONENT COOLING Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 633.00 ft, 633 Manufacturer/Model:
AB1, 633.00 ft, 633Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-95 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -CFI-429Equipment Class: (18) Instruments on RacksEauilpment DescriDtion:
Yes C-95 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -CFI-429 Equipment Class: (18) Instruments on Racks Eauilpment DescriDtion:
WEST RHR HEAT EXCHANGER HE-17W COMPONENT COOLINGInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
WEST RHR HEAT EXCHANGER HE-17W COMPONENT COOLING Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YesYes8. Are overhead equipment, distribution  
Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: -- George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-96 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-CFI-429 Equipment Class: (18) Instruments on Racks AT EX(r-ZI IUU IL I C-97 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FT- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-CFI-429 Equipment Class: (18) Instruments on Racks in: WEST RHR HEAT EXCHANGER HE-17W COMPONENT COOLING P9100122 FW1uu1Izj C-98}}
CommentsEvaluated by: -- George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-96 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [7 N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-CFI-429 Equipment Class: (18) Instruments on RacksAT EX(r-ZI IUU IL IC-97 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FT- N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-CFI-429 Equipment Class: (18) Instruments on Racksin: WEST RHR HEAT EXCHANGER HE-17W COMPONENT COOLINGP9100122FW1uu1Izj C-98}}

Latest revision as of 23:05, 13 July 2018

SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-1 Through Page C-98
ML13267A317
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/12/2013
From: Stoeva N
Stevenson & Associates
To:
American Electric Power, Indiana Michigan Power Co, Office of Nuclear Reactor Regulation
References
AEP-NRC-2013-74 SD-121023-001, Rev 1
Download: ML13267A317 (98)


Text

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 C Seismic Walkdown Checklists (SWCs)Table C-1 Summary of Seismic Walkdown Checklists for DCCNP1 Online Walkdowns COMPONENT ID DESCRIPTION Anchorage PAGE Verification Confirmed UNIT 1 & UNIT 2 CONDENSATE STORAGE C-5 TANKS CROSSTIE 12-HE-16N Spent Fuel Pit Heat Exchanger (Note: This is y C-8 the only SWEL2 Component included)12-HV-ACCP-3 COMPONENT COOLING WATER PUMPS N C-10 VENTILATION SOUTH 12-HV-ESW-5 UNIT 1 WEST ESW PP ROOM SUPPLY y C-13 VENTILATION FAN 1-ABD-A 600VAC MOTOR CONTROL CENTER ABD- y C-19 A 1-ABD-B 600VAC MOTOR CONTROL CENTER ABD- N C-28 B 1-ACRA-2 CONTROL ROOM AIR HANDLING Y C-37 SUBPANEL #2 1-AM-A 600VAC MOTOR CONTROL CENTER AM-A Y C-44 1-BATT-AB PLANT BATTERY AB Y C-49 1-BC-AB PLANT BATTERY BATT-AB CONTROL Y C-54 PANEL 1-BC-AB1 PLANT BATTERY BATT-AB BATTERY Y C-59 CHARGER #1 1-BC-AB2 PLANT BATTERY BATT-AB CHARGER #2 N C-65 1-BCTC-AB(1)

PLANT BATTERY CHARGERS BC-AB1 AND Y C-71 BC-AB2 TRANSFER 1-BLI-130 STEAM GENERATOR OME-3-3 WIDE y C-75 RANGE LEVEL INDICATOR TRANSMITTER 1-BLP-132 STEAM GENERATOR OME-3-1 CHANNEL N C-79 III REACTOR 1-CCV-AB 250VDC TRAIN 'B' CRITICAL SOLENOID N C-83 VALVES 1-CCW COMPONENT COOLING WATER CONTROL N C-87 PANEL 1-CFI-420 COMPONENT COOLING WATER TO WEST y C-91 COMPONENT COOLING 1-CFI-429 WEST RHR HEAT EXCHANGER HE-17W N C-95 COMPONENT COOLING 1-CLI-114 CONDENSATE STORAGE TANK TK-32 Y C-99 LEVEL INDICATOR 1-CMO-420 WEST CCW HEAT EXCHANGER CCW N C-103 OUTLET SHUTOFF VALVE I KA K C-1 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Table C-1 Summary of Seismic Walkdown Checklists for DCCNP1 Online Walkdowns COMPONENT ID DESCRIPTION Anchorage PAGE Verification Confirmed 1-CRID-3 120VAC CONTROL ROOM INSTRUMENT y C-107 DISTRIBUTION 1-CRID-4-INV 120VAC CONTROL ROOM INSTRUMENT y C-111 DISTRIBUTION SYSTEM 1-DGAB AB EMERGENCY DIESEL GENERATOR Y C-115 OME-150-AB CONTROL 1-DGAB-INV AB EMERGENCY DIESEL GENERATOR N C-126 OME-150-AB INVERTER 1-ESW ESSENTIAL SERVICE WATER CONTROL N C-132 PANEL 1-EZC-A 600VAC MOTOR CONTROL CENTER EZC- Y C-137 A 1-EZC-A1 600VAC MOTOR CONTROL CENTER EZC- N C-143 Al 1-EZC-B 600VAC MOTOR CONTROL CENTER EZC- Y C-147 B 1-EZC-B1 600VAC MOTOR CONTROL CENTER EZC- N C-153 B1 1-FFI-240 AUX FEEDWATER TO SG OME-3-4 FLOW y C-157 INDICATOR TRANSMITTER 1-HE-15W WEST COMPONENT COOLING WATER N C-161 HEAT EXCHANGER 1-HE-17W WEST RESIDUAL HEAT REMOVAL HEAT Y C-166 EXCHANGER 1-HE-18W WEST CONTAINMENT SPRAY HEAT Y C-170 EXCHANGER 1-HV-ACRA-2 CONTROL ROOM VENTILATION SOUTH N C-177 AIR CONDITIONING 1-HV-ACRF-2 CONTROL ROOM N C-180 PRESSURIZATION/CLEANUP FILTER UNIT 1-HV-AES-2 AUXILIARY BUILDING VENTILATION Y C-184 ENGINEERED SAFETY 1-HV-CEQ-1 CONTAINMENT HYDROGEN SKIMMER N C-190 VENTILATION FAN #1 1-HV-CEQ-2 CONTAINMENT HYDROGEN SKIMMER Y C-194 VENTILATION FAN #2 1-HV-DGX-1 AB EMERGENCY DIESEL GENERATOR Y C-199 ROOM VENTILATION 1-HV-SGRS-8 4KV ROOM 600V SWITCHGEAR Y C-203 TRANSFORMERS TR1 1A AND 1-IFI-53 BORON INJECTION TO REACTOR N C-207 COOLANT LOOP #3 FLOW 1-IMO-222 WEST CONTAINMENT SPRAY PUMP N C-210 DISCHARGE TO 1-IMO-225 REFUELING WATER STORAGE TANK TO N C-213 WEST CONTAINMENT C-2 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Table C-1 Summary of Seismic Walkdown Checklists for DCCNP1 Online Walkdowns COMPONENT ID DESCRIPTION Anchorage PAGE Verification Confirmed 1-IMO-320 WEST RESIDUAL HEAT REMOVAL PUMP N C-216 PP-35W SUCTION 1-IMO-331 WEST RHR TO UPPER CONTAINMENT N C-219 SPRAY SHUTOFF VALVE 1-IMO-350 WEST RHR HEAT EXCHANGER OUTLET N C-223 TO SAFETY INJECTION 1-IMO-52 BORON INJECTION TO REACTOR N C-227 COOLANT LOOP #2 SHUTOFF 1-IMO-911 REFUELING WATER STORAGE TANK TO N C-232 CVCS CHARGING 1-MCAB(1) 250VDC DISTRIBUTION PANEL MCAB Y C-236 I-MCM-221 MAIN STEAM LEAD #2 TO AUXILIARY N C-240 FEED PUMP TURBINE 1-MRV-230 STEAM GENERATOR OME-3-3 STOP N C-243 VALVE 1-MRV-243 STEAM GENERATOR OME-3-4 POWER N C-247 OPERATED RELIEF 1-NLP-153 PRESSURIZER OME-4 PROTECTION Y C-250 CHANNEL 3 LEVEL 1-NPS-111 REACTOR VESSEL TRAIN 'B' WIDE RANGE Y C-253 PRESSURE 1-OME-150-AB AB EMERGENCY DIESEL GENERATOR Y C-258 1-PP-10W WEST COMPONENT COOLING WATER N C-264 PUMP 1-PP-26S SOUTH SAFETY INJECTION PUMP N C-267 1-PP-35W WEST RESIDUAL HEAT REMOVAL PUMP N C-272 1-PP-3W WEST MOTOR DRIVEN AUXILIARY Y C-276 FEEDWATER PUMP 1-PP-4 TURBINE DRIVEN AUXILIARY FEED PUMP N C-281 1-PP-50W WEST CENTRIFUGAL CHARGING PUMP Y C-286 1-PP-7W WEST ESSENTIAL SERVICE WATER PUMP Y C-290 1-PP-9W WEST CONTAINMENT SPRAY PUMP Y C-297 1-PS-A 600VAC MOTOR CONTROL CENTER PS-A N C-301 1-QT-106-AB1 AB EMERGENCY DIESEL FUEL OIL Y C-307 TRANSFER PUMP #1 l-QT-107-AB AB EMERGENCY DIESEL FUEL OIL DAY Y C-312 TANK 1-QT-130-AB2 AB EMERGENCY DIESEL JACKET WATER Y C-317 PUMP #2 1-QT-141-AB1 AB EMERGENCY DIESEL STARTING AIR N C-320 RECEIVER #1 1-QT-142-AB1 AB EMERGENCY DIESEL STARTING AIR Y C-325 COMPRESSOR

  1. 1 1-QT-506 TURBINE DRIVEN AUX FEED PUMP PP-4 N C-330 TRIP AND THROTTLE VALVE IA C-3 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Table C-1 Summary of Seismic Walkdown Checklists for DCCNP1 Online Walkdowns COMPONENT ID DESCRIPTION Anchorage PAGE Verification Confirmed 1-RC REACTOR CONTROL RODS CONTROL N C-333 PANEL 1-RPS-B REACTOR PROTECTION AND Y C-336 SAFEGUARD ACTUATION 1-RPST-B REACTOR PROTECTION AND N C-341 SAFEGUARD ACTUATION 1-RPSX-B REACTOR PROTECTION AND N C-346 SAFEGUARD ACTUATION 1-SG STEAM GENERATOR AND AUXILIARY Y C-350 FEED PUMP CONTROL 1-SIS SAFETY INJECTION CONTROL PANEL Y C-354 1-SPY CONTAINMENT SPRAY CONTROL PANEL N C-360 1-TDAB(1) 250VDC TRAIN 'B' TRANSFER CABINET N C-364 1-TR11A 600VAC BUS 11A SUPPLY TRANSFORMER N C-368 1-TR-AFWX 120/208VAC AUXILIARY FEEDWATER Y C-372 DISTRIBUTION PANEL 1-WMO-702 WEST ESSENTIAL SERVICE WTR PUMP N C-378 PP-7W DISCH S/O VA 1-WMO-715 WEST CONTAINMENT SPRAY HEAT N C-381 EXCHANGER 1-HE-18W 1-WMO-717 WEST CONTAINMENT SPRAY HEAT N C-384 EXCHANGER ESSENTIAL 1-WMO-744 ESSENTIAL SERVICE WATER TO WEST N C-387 MOTOR DRIVEN 1-WMO-753 ESSENTIAL SERVICE WATER TO TURBINE N C-390 DRIVEN 1-WPA-702 WEST ESW PUMP PP-7W DISCH LOW N C-393 PRES ALARM XMTR 1-XPC-21 AB EMER DIESEL STARTING AIR C-397 RECEIVER QT-141-ABI PRESSURE XMTR Notes: 1) Partial walkdowns performed on these Components because they could not be opened. These components were walked down again during the outage walkdowns and new checklists were developed and completed under Table C-3.IA C-4 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-CRV-51 Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

UNIT 1 & UNIT 2 CONDENSATE STORAGE TANKS CROSSTIE Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

TB1, 591.00 ft, 83 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-5 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-CRV-51 Equipment Class: (7) Fluid-Operated Valves Ecuiroment

==

Description:==

UNIT 1 & UNIT 2 CONDENSATE STORAGE TANKS CROSSTIE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Fire extinguishers on short hooks cannot impact valve and therefore this was acceptable for this component.

-AR 2012-11669 was issued.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes A Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: " George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 Photos C-6 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Dment Descrintion:

12-CRV-51 (7) Fluid-Operated Valves A H~FýI UVU4 C-7 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-HE-16N Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

Spent Fuel Pit Heat Exchanger Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB2, 609.00 ft, 96 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 12-HE-16N REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

PAINTED 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-8 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-HE-1 6N Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

Spent Fuel Pit Heat Exchanger Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

12-SF-119N chain can swing into 12-HE-16N but is not damaging 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: -George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-9 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ACCP-3 Equipment Class: (9) Fans Equipment

==

Description:==

COMPONENT COOLING WATER PUMPS VENTILATION SOUTH Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB2, 633.00 ft, 633 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Insulated component attached inline with HVAC vents 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-10 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: r-7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ACCP-3 Equipment Class: (9) Fans Equipment

==

Description:==

COMPONENT COOLING WATER PUMPS VENTILATION SOUTH Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Nothing above fan -inline with vent and at ceiling level 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Not Applicable Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: __ George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-11 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ACCP-3 Equipment Class: (9) Fans Equipment

==

Description:==

COMPONENT COOLING WATER PUMPS VENTILATION SOUTH C-12 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ESW-5 Equipment Class: (9) Fans Equipment

==

Description:==

UNIT 1 WEST ESW PP ROOM SUPPLY VENTILATION FAN Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

SH1, 591.00 ft, 136 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DWG 12-5682 REVIO 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-13 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1. 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ESW-5 Equipment Class: (9) Fans EauiDment

==

Description:==

UNIT 1 WEST ESW PP ROOM SUPPLY VENTILATION FAN Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: -- George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-14 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: L-1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ESW-5 Equipment Class: (9) Fans r--_ -~~~~ ... .-L ý .. .I l' .4 1 I---'l r-r" .Ir --.r- ---, Ir"f'l& I ý r- 1-klrl A"rl kl Ir'A .I WV-P9090026 P9090027 P9090028 P9090029 C-15 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: EauiDment

==

Description:==

12-HV-ESW-5 (9) Fans UNIT 1 WEST ESW PP RC C-16 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ESW-5 Equipment Class: (9) Fans VPP P9090036 P9090037 C-17 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ESW-5 Equipment Class: (9) Fans PP R(C-18 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y WIN U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -ABD-A Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER ABD-A Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

SQUG 1-ABD-A REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Concrete only in front of MCC 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-19 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y j-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -ABD-A Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER ABD-A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Fire extinguishers on short hooks -AR 2012-11669 was issued.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

C02 fire protection

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?No Yes Yes No Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: --George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-20 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y ¶N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-A Equipment Class: (1) Motor Control Centers E ui ment

Description:

600VAC MOTOR CONTROL CENTER ABD-A P9130194 P9130195 P9130196 C-21 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-A Equipment Class: (1) Motor Control Centers Encinment Descrintion:

600VAC MOTOR CONTROL CENTER ABD-A C-22 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y F-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: nmant rlnaQrrintinn*

1-ABD-A (1) Motor Control Centers 600VAC MOTOR CONTROL CEN1 P9130203 C-23 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-A Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER ABD-A C-24 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y FJ] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-A Equipment Class: (1) Motor Control Centers 600VAC MOTOR CONI C-25 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y EN U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-A Equipment Class: (1) Motor Control Centers E ui ment Descri tion: 600VAC MOTOR CONTROL CENTER ABD-A P9130208 P9130209 P9130210 P9130211 C-26 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y r-NE U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-A Equipment Class: (1) Motor Control Centers Eculment DescriDtion:

600VAC MOTOR CONTROL CENTER ABD-A C-27 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y jN U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -ABD-B Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER ABD-B Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 1-ABD-A REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?Concrete only in front of MCC 5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-28 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y F-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -ABD-B Equipment Class: (1) Motor Control Centers EauiDment

==

Description:==

600VAC MOTOR CONTROL CENTER ABD-B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Fire extinguishers on short hooks -AR 2012-11669 was issued.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

C02 fire protection

9. Do attached lines have adequate flexibility to avoid damage?No Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?No Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-29 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: I-ABD-B (1) Motor Control Centers CONT C-30 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y -N--] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-B Equipment Class: (1) Motor Control Centers-OR CONTROL C-31 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y EN] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-B Equipment Class: (1) Motor Control Centers C-32 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y FN-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-B Equipment Class: (1) Motor Control Centers OTOR CON-_C-33 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y L] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-B Equipment Class: (1) Motor Control Centers CONTF C-34 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-B Equipment Class: (1) Motor Control Centers)ment

Description:

600VAC MOTOR CONTR C-35 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-B Equipment Class: (1) Motor Control Centers Eclui"ment Descrigtion:

600VAC MOTOR CONTROL CENTER ABD-B C-36 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ACRA-2 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL ROOM AIR HANDLING SUBPANEL #2 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 650.00 ft, 129 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DWG 12-3366 REV5 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

Welds at all 4 comers. I bolt has lack of thread engagement

-evaluated in SQUG -OK C-37 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1. 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -ACRA-2 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL ROOM AIR HANDLING SUBPANEL #2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block Wall -retrofitted (adjacent to panel) -OK per DWG 12-403 1, Wall W-1 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-38 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: E-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 1 -ACRA-2 (20) Instrumentation and Control Panels and Cabinets E Cment Descri t CONTROL ROOO P9100111 A AIR HANDLING SUBPANEL #2 C-39 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ACRA-2 Eauinment Class: (20) Instrumentation and Control Panels and Cabinets EauiDment DescriDtion:

AIR HANDL C-40 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ACRA-2 Equipment Class: (20) Instrumentation and Control Panels and Cabinets E ui ment

Description:

CONTROL ROOM AIR HANDLING SUBPANEL #2 P9100115 P9100116 C-41 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-ACRA-2 Equipment Class: (20) Instrumentation and Control Panels and Cabinets CONTROL ROOM AIR HAl'I MI fI-C-42 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ACRA-2 Equipment Class: (20) Instrumentation and Control Panels and Cabinets AIR 1 17 1 %Jj I I ýU I,-rI uuIlzI C-43 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y `-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-AM-A Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER AM-A Project: DC Cook 1 SWEL Location (BIdg, Elev, Room/Area):

AB1, 633.00 ft, 633 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 1-AM-A REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 2 J Bolts in comers on both sides (front and back) 4 Red Heads in front & 4 Red Heads in back 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-44 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y F] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -AM-A Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER AM-A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Fire extinguishers on short hooks -AR 2012-11669 was issued.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

No Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?No Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: CA George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-45 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y F--] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-AM-A Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER AM-A C-46 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y ¶1 U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-AM-A Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER AM-A P9181081 C-47 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y EN U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-AM-A Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER AM-A C-48 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BATT-AB Equipment Class: (15) Batteries on Racks Equipment

==

Description:==

PLANT BATTERY AB Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 609.00 ft, 200 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 1-BA TT-AB REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

Very minor oxidation on base plate of front plate on right side batteries 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-49 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -BATT-AB Equipment Class: (15) Batteries on Racks Equipment

==

Description:==

PLANT BATTERY AB Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: c George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-50 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BATT-AB Equipment Class: (15) Batteries on Racks Y AB C-51 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y--] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BAT Equipment Class: (15) Batteries on Racks Equipment

==

Description:==

PLANT BATTERY AB T-AB C-52 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BATT-AB Equipment Class: (15) Batteries on Racks ,TTERY AB C-53 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

PLANT BATTERY BATT-AB CONTROL PANEL Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 613.00 ft, 205 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DWG-PSI-91031-0

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-54 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -BC-AB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

PLANT BATTERY BATT-AB CONTROL PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: -George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-55 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 1 -BC-AB (20) Instrumentation and Control Panels and Cabinets*TERY BATT-C-56 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB Equipment Class: (20) Instrumentation and Control Panels and Cabinets TTERY BATT C-57 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: IDment Descriotion:

I -BC-AB (20) Instrumentation and Control Panels and Cabinets PLANT BATTERY BATT-AB CONTROL PANEL I-": I C-58 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-ABI Equipment Class: (16) Inverters Equipment

==

Description:==

PLANT BATTERY BATT-AB BATTERY CHARGER #1 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 613.00 ft, 205 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 1-BC-ABI REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

Painted 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-59 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -BC-AB1 Equipment Class: (16) Inverters Equipment

==

Description:==

PLANT BATTERY BATT-AB BATTERY CHARGER #1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-60 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-ABI Equipment Class: (16) Inverters Y BATT P9190384 C-61 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-BC-ABI Equipment Class: (16) Inverters Equipment

==

Description:==

PLANT BATTERY BATT-AB BATTERY CHARGER #1 P9170630 C-62 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: EF] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (16) In\I -BC-ABI verters ,TTERY BATT P9170636 P9170637 C-63 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB1 Equipment Class: (16) Inverters EauiDment Descriotion:

PLANT BATTERY BATT-AB BATTERY CHARGER #1 C-64 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y F7J U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -BC-AB2 Equipment Class: (16) Inverters Equipment

==

Description:==

PLANT BATTERY BATT-AB CHARGER #2 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

ABI, 613.00 ft, 205 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?No Yes Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-65 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y jN U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -BC-AB2 Equipment Class: (16) Inverters Equipment

==

Description:==

PLANT BATTERY BATT-AB CHARGER #2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Fire extinguishers on short hooks -AR 2012- 11669 was issued.9. Do attached lines have adequate flexibility to avoid damage?Yes No Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?No Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: -- George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-66 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y Nj U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB2 Equipment Class: (16) Inverters Equipment

==

Description:==

PLANT BATTERY BATT-AB CHARGER #2 C-67 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y F-N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB2 Equipment Class: (16) Inverters Equipment

==

Description:==

PLANT BATTERY BATT-AB CHARGER #2 C-68 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y EPI U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB2 Equipment Class: (16) Inverters Equipment

==

Description:==

PLANT BATTERY BATT-AB CHARGER #2 P9170648 C-69 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB2 Equipment Class: (16) Inverters Equipment

==

Description:==

PLANT BATTERY BATT-AB CHARGER #2 C-70 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N j-u Seismic Walkdown Checklist (SWC)Equipment ID No.: I-BCTC-AB Equipment Class: (14) Distribution Panels Equipment

==

Description:==

PLANT BATTERY CHARGERS BC-AB1 AND BC-AB2 TRANSFER Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

ABI, 613.00 ft, 205 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

COULD NOT OPEN -SQUG 1-BCTC-AB REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?

Unknown Cannot open -cannot see anchorage 3. Is the anchorage free of corrosion that is more than mild surface Unknown oxidation?

Cannot open -cannot see anchorage 4. Is the anchorage free of visible cracks in the concrete near the Unknown anchors?Cannot open -cannot see anchorage 5. Is the anchorage configuration consistent with plant documentation?

Unknown (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Cannot open -cannot see anchorage 6. Based on the above anchorage evaluations, is the anchorage free of Unknown potentially adverse seismic conditions?

C-71 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N i-U-1 Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -BCTC-AB Equipment Class: (14) Distribution Panels Equipment

==

Description:==

PLANT BATTERY CHARGERS BC-AB1 AND BC-AB2 TRANSFER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes No 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Fire extinguishers on short hooks -AR 2012- 11669 was issued.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes No Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?

Could not open due to safety concerns during online walkdown.Completed inspection during DCCNPI Unit I Outage Walkdown.Checklist included in report following Table C-3.Unknown A Comments Evaluated by: '--- George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 Photos C-72 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N -Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BCTC-AB Equipment Class: (14) Distribution Panels TTERY (C-73 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N E Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC'Equipment Class: (14) Distribution Panels Equipment

==

Description:==

PLANT BATTERY CHAI rC-AB C-74 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BL1-130 Equipment Class: (18) Instruments on Racks STEAM GENERATOR OME-3-3 WIDE RANGE LEVEL INDICATOR Equipment

==

Description:==

TRANSMITTER Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

CON1, 612.00 ft, 73 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

Dwg. 1-5570P. A 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-75 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -BLI-1 30 Equipment Class: (18) Instruments on Racks STEAM GENERATOR OME-3-3 WIDE RANGE LEVEL INDICATOR Equipment

==

Description:==

TRANSMITTER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: -George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 Photos C-76 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BLI-130 Equipment Class: (18) Instruments on Racks STEAM GENERATOR OME-3-3 WIDE RANGE LEVEL INDICATOR C-77 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BLI-130 Equipment Class: (18) Instruments on Racks STEAM GENERATOR OME-3-3 WIDE RANGE LEVEL INDICATOR T7 A II RA I TTII C-78 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -BLP-1 32 Equipment Class: (18) Instruments on Racks Eauinment

==

Description:==

STEAM GENERATOR OME-3-1 CHANNEL III REACTOR Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

CON1, 612.00 ft, 72 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-79 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -BLP-1 32 Equipment Class: (18) Instruments on Racks Equipment Descri)tion:

STEAM GENERATOR OME-3-1 CHANNEL III REACTOR Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: -George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-80 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BLP-132 Equipment Class: (18) Instruments on Racks Oipment

Description:

STEAM GENERATOR OME-3-1 CHANNEL III REACTOR C-81 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: EY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I-BLP-132 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

STEAM GENERATOR OME-3-1 CHANNEL III REACTOR I,& -I -I ulilin C-82 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -CCV-AB Equipment Class: (14) Distribution Panels EauiDment

==

Description:==

250VDC TRAIN 'B' CRITICAL SOLENOID VALVES Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 633.00 ft, 123 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Unistrut mounted 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Not Applicable Not Applicable Yes C-83 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-CCV-AB Equipment Class: (14) Distribution Panels Equipment

==

Description:==

250VDC TRAIN 'B' CRITICAL SOLENOID VALVES Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Check celing tiles -OK -clipped per DWG 12-4070 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: c" George G Thomas Date: 10/18/12 tl -Neda Stoeva 10/18/12 Photos C-84 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-CCV-AB Equipment Class: (14) Distribution Panels Equipment

==

Description:==

250VDC TRAIN 'B' CRITICAL SOLENOID VALVES 11141 Wis.J1 11 111 Iý III I I P9191257 for it! fill 1: 1-4 111 T I IL 16.It it 6,ft, of P9191258 C-85 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-CCV-AB Equipment Class: (14) Distribution Panels Equipment

==

Description:==

250VDC TRAIN 'B' CRITICAL SOLENOID VALVES C-86 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-CCW Equipment Class: (20) Instrumentation and Control Panels and Cabinets Eauipment

==

Description:==

COMPONENT COOLING WATER CONTROL PANEL Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 633.00 ft, 123 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable Panel CCW does not have its own anchorage plate 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Mounted through the rest of the panels around it 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Not Applicable Not Applicable Not Applicable Yes C-87 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: jYj N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-CCW Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

COMPONENT COOLING WATER CONTROL PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Check ceiling tiles -OK -clipped per DWG 12-4070 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: -- George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-88 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: rinmnt I-merrinfinn-1-CCw (20) Instrumentation and Control Panels and Cabinets COMPONENT COOLING WATER CONTROL PANEL P9191227 C-89 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 1-CCw (20) Instrumentation and Control Panels and Cabinets T COOLING WAT I1V1IZU C-90 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: EiY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-CFI-420 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

COMPONENT COOLING WATER TO WEST COMPONENT COOLING Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB2, 609.00 ft, 609 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

VTD-ITBA-0131, Figure 6-1. Outline Dimensional Drawing 0224.0901.3 Model 224 DPU, Yoke or Wall Mounting A 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?Mounted on rack with 4 bolts on the corners 5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-91 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: I -CFI-420 Equipment Class: (18) Instruments on Racks Eauipment

==

Description:==

COMPONENT COOLING WATER TO WEST COMPONENT COOLING Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Fire piping well supported, joints welded.Evaluated by:" George G Thomas Date: 08/15/2013

-" Neda Stoeva 08/15/2013 Photos C-92 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: I -CFI-420 (18) Instruments on Racks 4iT COOLING C-93 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-CFI-420 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

COMPONENT COOLING WATER TO WEST COMPONENT COOLING C-94 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -CFI-429 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

WEST RHR HEAT EXCHANGER HE-17W COMPONENT COOLING Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 633.00 ft, 633 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-95 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 -CFI-429 Equipment Class: (18) Instruments on Racks Eauilpment DescriDtion:

WEST RHR HEAT EXCHANGER HE-17W COMPONENT COOLING Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: -- George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-96 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-CFI-429 Equipment Class: (18) Instruments on Racks AT EX(r-ZI IUU IL I C-97 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FT- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-CFI-429 Equipment Class: (18) Instruments on Racks in: WEST RHR HEAT EXCHANGER HE-17W COMPONENT COOLING P9100122 FW1uu1Izj C-98